MONTHYEARML0710902182007-05-0202 May 2007 Meeting Handouts from Exelon Generation Company, LLC to Discuss Regulatory Resolution Pathways for a Proposed Submittal, for the Ultimate Heat Sink for LaSalle, Units 1 and 2 Project stage: Meeting ML0710901802007-05-0202 May 2007 Meeting Summary with Exelon Generation Company, LLC to Discuss Regulatory Resolution Pathways for a Proposed Submittal, for the Ultimate Heat Sink for LaSalle, Units 1 and 2 Project stage: Meeting 2007-05-02
[Table View] |
|
---|
Category:Meeting Briefing Package/Handouts
MONTHYEARML24100A7672024-04-11011 April 2024 Meeting Slides - Preapplication with Constellation on Planned Fleet Alternative Request to Adopt OMN-2 ML24089A2612024-04-0909 April 2024 Slides - Constellation - Pre-Application Regarding Hooded Masks 4/9/2024 Meeting Slides (L-2024-LLM-0041) ML24029A1742024-01-30030 January 2024 Constellation Pre-Application January 30, 2024, Meeting Slides - Proposed Alternative to Utilize Code Case N-932, Alternative Requirements for Acceptance of Containment Base Metal Corrosion or Erosion ML23317A0712023-11-14014 November 2023 NRC Pre-Submittal Meeting on November 14th, 2023 - TSTF-591 and Selected 50.69 License Condition Updates (EPID L-2023-LLM-0098) (Slides) ML23255A1042023-08-11011 August 2023 Slides - Constellation - Pre-Application EP 9/18/2023 Draft CEG Presubmittal SG Performance Monitoring Plan Meeting Handout ML22311A5112022-11-0707 November 2022 Pool Swell License - Amendment Request ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval ML21194A1582021-07-13013 July 2021 and Lasalle Nuclear Generating Stations 2020 Annual Assessment Meeting Slides ML21141A0102021-05-21021 May 2021 La Salle County Station, Units 1 and 2, May 27, 2021 Pre Submission Public Meeting Slides (EPID-L-2021-LRM-0052) ML20261G7322020-09-16016 September 2020 Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a ML20238B8662020-08-25025 August 2020 Hq Online EOC Slides ML20178A4202020-06-30030 June 2020 NEI Slides for June 30, 2020, Public Meeting on COVID-19 Response ML20170B0212020-06-23023 June 2020 NRC Pre-Submittal Meeting Byron Unit 2 One-Time Deferral of Reactor Pressure Vessel Head Penetration Nozzle (Rpvhpn) Inspections ML20163A6552020-06-16016 June 2020 6-16-20 Byron Unit 2 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections ML20169A5592020-06-16016 June 2020 Steam Generator License Amendment Request Pre-Submittal Meeting (NRC) - Byron Unit 2 LAR for One-Time Deferral of Steam Generator Inspections (Rev 1) ML19318F9512019-11-20020 November 2019 Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19022A2002019-01-23023 January 2019 Request for Use of ASME Code Case N-879 for Exelon Nuclear Power Plants ML18347B3142018-12-19019 December 2018 Bwrvip/Asme Relief Request Discussion December 19, 2018 ML18334A2162018-11-30030 November 2018 Presentation Slides: Exelon BWR MSIV (Boiling-Water Reactor - Main Steam Isolation Valve) Leakage Optimization for NRC Pre-Submittal Meeting of December 6, 2018 ML18319A1272018-11-19019 November 2018 Slides for 11/19/18 Public Meeting - Exelon Fleet LAR for Common Language for TS 5.7 High Radiation Areas ML18054B3592018-02-27027 February 2018 Slide: NRC Pre-Submittal Meeting for Exelon Fleet LAR to Relocate TS Unit Staff Qualification ANSI Requirements to the QATR, February 27, 2018, Profile Info: Submitted by Frank Mascitelli ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16194A0062016-07-12012 July 2016 Pre-Application Meeting Presentation Regarding LaSalle County Station License Amendment Request for Revision of Suppression Pool Swell Design Analysis ML16077A1562016-03-22022 March 2016 Fleet: Pre-application Teleconference with Exelon to Discuss a Potential License Amendment Request Regarding Operating Training Standards ML16077A3492016-03-17017 March 2016 NRC Briefing Slides for LaSalle Dseis Public Meeting March 22, 2016 ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML15062A3642015-03-0303 March 2015 Environmental Scoping Briefing for March 10th Meetings ML15058A6322015-02-27027 February 2015 LSCS Scoping Briefing Prepared 2-27-15 for March 10th Meeting ML13212A3372013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting NEI 01-01, NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting2013-07-31031 July 2013 NRC NEI-01-01 Meeting Presentation on 7/31/13 Digital I&C Meeting ML13211A3782013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 NEI 01-01, 7/31/2013 NRC Public Meeting Presentation on NEI 01-012013-07-30030 July 2013 7/31/2013 NRC Public Meeting Presentation on NEI 01-01 ML13164A3792013-06-24024 June 2013 Summary of Public Meeting with Exelon Generation Company, LLC, Regarding the Proposed Extended Power Uprate License Amendment Request for LaSalle County Station, Units 1 and 2 ML12159A2662012-06-11011 June 2012 County Generating Station Pre-Application Meeting Extended Power Uprate: Replacement Steam Dryers. June 11, 2012 ML12130A0442012-06-0707 June 2012 Summary of Public Meeting with Exelon Generation Company, LLC, Regarding Proposed Extended Power Uprate License Amendment Request for LaSalle County Station, Units 1 and 2 ML1209306162012-04-0202 April 2012 Enclosure - 04/04/2012 Exelon Nuclear Meeting Presentation LaSalle Count Station Pre-Application Meeting Extended Power Uprate. ML1209006542012-03-30030 March 2012 Slides for April 4 Public Meeting on LaSalle Extended Power Uprate ML1208701402012-03-27027 March 2012 Licensee Slides for Exelon Fleet Pre-Submittal Public Meeting 4-10-12 Licensed Operator Eligibility Requirements LAR ML1208806542012-03-27027 March 2012 Non-Proprietary Slides for LaSalle Prnm Meeting ML1200303212012-01-19019 January 2012 12/7/2011 - Summary of Public Meeting with Exelon Regarding the Proposed Extended Power Uprate License Amendment Request for LaSalle, Units 1 and 2 ML13014A1002011-09-12012 September 2011 Sprinkler Clogging LaSalle Exelon - Presentation During September 2011 NEI Fire Protection Information Forum RS-11-096, Intent to Submit License Amendment Request to Install Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I & C-ISG-062011-06-0707 June 2011 Intent to Submit License Amendment Request to Install Power Range Neutron Monitor (Prnm) in Accordance with Interim Staff Guidance, Digital I & C-ISG-06 ML1100502552011-01-17017 January 2011 December 29, 2010, Summary of Public Conference Call with Exelon Generation Company, LLC, Regarding LaSalle Netco Insert Request ML1100503592010-12-29029 December 2010 NRC Meeting Slides for December 29, 2010, Public Conference Call with Exelon Generation Company Regarding LaSalle Netco Insert Request ML1030903782010-11-19019 November 2010 Licensee Handouts for LaSalle Meeting with Exelon to Discuss Netco Inserts ML1030704842010-11-19019 November 2010 Summary of Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Netco Insert Request ML1032601422010-11-10010 November 2010 Handouts for November 10, 2010 Public Conference Call with Exelon Regarding LaSalle Insert Request ML0919803632009-08-20020 August 2009 Summary of Licensing Counterparts Meeting with Exelon Generation Company, to Discuss Licensing Practices and Processes 2024-04-09
[Table view] |
Text
Exe Iv n,,.
INu cea.v
Exel no Nuclear UHS Meeting Participants- Exe Darin Benyak - Licensing Director (Acting)
Terry Simpkin - LaSalle Regulatory Assurance Manager Vikram Shah - LaSalle Electrical/l&C Design Manager Alison Mackellar - Licensing Engineer Wes Bowers - Senior Engineer Jerry Voss - Director, Engineering & Technical Support, Excel Services Corporation
Exelin Nuclear
- UHS Timeline 3/13/06 License Amendment Request submitted to the NRC 6/15/06 Received RAI on UHS 7/13/06 RAI response submitted 8/4/06 Supplemental response submitted 11/3/06 NRC denies LaSalle UHS LAR
'1 Th
L ii sq 4
k^* u(Iea I e ea UHS Timelin4 1/24/07 Exelon response to denial submitted 1/26/07 NRC - Exelon meeting to discuss denial of LAR 3/22/07 NRC uncertainty calculation for UHS 4/5/07 NRC - Exelon meeting to discuss possible regulatory resolution
Exelln.
Nuclear Action Items from 1/26/07 M-ee'. Nft Exelon Action Items
- 1. Assess the acceptability of inserting a table in the LSCS TS to address the loss of 3 of 4 RTDs.
- 2. Correct the discrepancy in the UFSAR that describes the post accident temperature limit of 102 0 F versus the stated License Amendment value of 1040F.
- 3. Verify the level of accuracy of the original thermocouple measurement uncertainty and the basis for it.
- 4. Determine if the NRC approved a graded approach to setpoint methodology for other licensees.
Exel no Action Items from 1/26/07 Me *
- Nuclear Exelon Action Items (continued)
- 5. Describe the industry standard for a graded approach to setpoint methodology.
- 6. Describe the TS limit if the uncertainty calculation were done to 2 G.
Exelkn, Nuclear Action Items from 1/26/07 Mee NRC Action Items
- 1. Review the response to the denial letter in detail including existing regulatory structure with respect to a graded approach to setpoint methodology.
- 2. Clarify the graded approach review for non-LSSS setpoints
- 3. Re-engage the TS branch to evaluate if the TS Bases is the appropriate place to address the situation where 3 of 4 RTDs are out of service.
- 4. Determine if the NRC approved a graded approach to setpoint methodology for other licensees.
Exekn.
Nuclear Open Discussion v/ Review of NRC Uncertainty Calculation v' Regulatory Resolution Pathways
- Identify Additional Issues with Exelon's Approach