Meeting Handouts from Exelon Generation Company, LLC to Discuss Regulatory Resolution Pathways for a Proposed Submittal, for the Ultimate Heat Sink for LaSalle, Units 1 and 2
ML071090218
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/02/2007
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Sands S,NRR/DORL, 415-3154
Shared Package
ML071090184 List:
References
TAC MD7434, TAC MD7435
Download: ML071090218 (6)


Text

Exe Iv n,,.

INu cea.v

Exel no Nuclear UHS Meeting Participants- Exe Darin Benyak - Licensing Director (Acting)

Terry Simpkin - LaSalle Regulatory Assurance Manager Vikram Shah - LaSalle Electrical/l&C Design Manager Alison Mackellar - Licensing Engineer Wes Bowers - Senior Engineer Jerry Voss - Director, Engineering & Technical Support, Excel Services Corporation

Exelin Nuclear

  • UHS Timeline 3/13/06 License Amendment Request submitted to the NRC 6/15/06 Received RAI on UHS 7/13/06 RAI response submitted 8/4/06 Supplemental response submitted 11/3/06 NRC denies LaSalle UHS LAR

'1 Th

L ii sq 4

k^* u(Iea I e ea UHS Timelin4 1/24/07 Exelon response to denial submitted 1/26/07 NRC - Exelon meeting to discuss denial of LAR 3/22/07 NRC uncertainty calculation for UHS 4/5/07 NRC - Exelon meeting to discuss possible regulatory resolution

Exelln.

Nuclear Action Items from 1/26/07 M-ee'. Nft Exelon Action Items

1. Assess the acceptability of inserting a table in the LSCS TS to address the loss of 3 of 4 RTDs.
2. Correct the discrepancy in the UFSAR that describes the post accident temperature limit of 102 0 F versus the stated License Amendment value of 1040F.
3. Verify the level of accuracy of the original thermocouple measurement uncertainty and the basis for it.
4. Determine if the NRC approved a graded approach to setpoint methodology for other licensees.

Exel no Action Items from 1/26/07 Me *

  • Nuclear Exelon Action Items (continued)
5. Describe the industry standard for a graded approach to setpoint methodology.
6. Describe the TS limit if the uncertainty calculation were done to 2 G.

Exelkn, Nuclear Action Items from 1/26/07 Mee NRC Action Items

1. Review the response to the denial letter in detail including existing regulatory structure with respect to a graded approach to setpoint methodology.
2. Clarify the graded approach review for non-LSSS setpoints
3. Re-engage the TS branch to evaluate if the TS Bases is the appropriate place to address the situation where 3 of 4 RTDs are out of service.
4. Determine if the NRC approved a graded approach to setpoint methodology for other licensees.

Exekn.

Nuclear Open Discussion v/ Review of NRC Uncertainty Calculation v' Regulatory Resolution Pathways

  • Identify Additional Issues with Exelon's Approach
  • Resolve Issues
  • Resubmittal