March 28, 2007 LICENSEE:
DUKE POWER COMPANY LLC (DUKE)
FACILITY:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)
SUBJECT:
SUMMARY
OF MARCH 5, 2007, MEETING TO DISCUSS THE NOVEMBER 30, 2006, LETTER REGARDING OCONEE HIGH-ENERGY LINE BREAK (HELB) AND TORNADO MITIGATION STRATEGIES (TAC NOS.
MD3721, MD3722, MD3723, MD3724, MD3725, AND MD3726)
On March 5, 2007, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (the licensee) to discuss the licensees letter dated November 30, 2006, (available in the Agencywide Documents Access and Management System under accession number ML070290328) regarding the Oconee HELB/tornado mitigation strategies and NRC concerns that resulted from NRC review of this letter (ML07050530070). At the beginning of the meeting, the licensee provided a handout (ML070670206) that included a list of the NRC concerns. This list was modified to reflect comments and agreements made during the meeting, and the modified list was made available at the end of the meeting (ML070670203). Enclosed is a list of the attendees.
During the meeting, the NRC staff and the licensee agreed that most of the items were either resolved with no further information needed or that additional information would be provided in the future license amendment requests. The following two issues remained unresolved:
(1) Volumetric inspections of non-seismic piping instead of evaluating the effects of pipe ruptures in the turbine and auxiliary buildings, and (2) Justification of 100-percent humidity, non-condensing environment in the penetration rooms as a result of a pipe break. The licensee and the NRC staff agreed to have a meeting in the near future to discuss these two unresolved issues.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page
March 28, 2007 LICENSEE:
DUKE POWER COMPANY LLC (DUKE)
FACILITY:
OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)
SUBJECT:
SUMMARY
OF MARCH 5, 2007, MEETING TO DISCUSS THE NOVEMBER 30, 2006, LETTER REGARDING OCONEE HIGH-ENERGY LINE BREAK (HELB) AND TORNADO MITIGATION STRATEGIES (TAC NOS.
MD3721, MD3722, MD3723, MD3724, MD3725, AND MD3726)
On March 5, 2007, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (the licensee) to discuss the licensees letter dated November 30, 2006, (available in the Agencywide Documents Access and Management System under accession number ML070290328) regarding the Oconee HELB/tornado mitigation strategies and NRC concerns that resulted from NRC review of this letter (ML07050530070). At the beginning of the meeting, the licensee provided a handout (ML070670206) that included a list of the NRC concerns. This list was modified to reflect comments and agreements made during the meeting, and the modified list was made available at the end of the meeting (ML070670203). Enclosed is a list of the attendees.
During the meeting, the NRC staff and the licensee agreed that most of the items were either resolved with no further information needed or that additional information would be provided in the future license amendment requests. The following two issues remained unresolved:
(1) Volumetric inspections of non-seismic piping instead of evaluating the effects of pipe ruptures in the turbine and auxiliary buildings, and (2) Justification of 100-percent humidity, non-condensing environment in the penetration rooms as a result of a pipe break. The licensee and the NRC staff agreed to have a meeting in the near future to discuss these two unresolved issues.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page Distribution:
Public RidsOgcRp J. Segala, NRC LPL2-1 R/F T. Liu, NRR J. Wermiel, NRC RidsNrrDorlLpl2-1 (EMarinos)
J. Tatum, NRC S. Campbell, NRC RidsNrrPMLOlshan (hard copy)
K. Manoly, NRC Y. Chung, NRC RidsNrrLAMOBrien (hard copy)
J. Fair, NRC J. Moorman, NRC RidsAcrsAcnwMailCenter K. OBrien, NRC R. Carroll, NRC W. Rogers, NRC S. Campbell, EDO Rgn II RidsRgn2MailCenter (MErnstes)
Accession Number: ML070750126 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME LOlshan:nc MOBrien EMarinos DATE 3/22/07 3/22/07 3/28/07 OFFICIAL RECORD COPY
Enclosure MEETING ATTENDEES FROM MARCH 5, 2007, MEETING WITH DUKE POWER COMPANY LLC TO DISCUSS THE NOVEMBER 30, 2006, LETTER REGARDING OCONEE HIGH-ENERGY LINE BREAK AND TORNADO MITIGATION STRATEGIES NRC DUKE J. Tatum J. Sumpter E. Marinos L. Kanipe K. Manoly J. Robertson J. Fair G. McAninch K. OBrien T. Brown L. Olshan A. Park J. Segala L. Nicholson J. Wermiel R. Freudenberger S. Campbell Y. Chung J. Moorman (by phone)
R. Carroll (by phone)
W. Rogers (by phone)
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.
Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.
Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.
Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202