Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, ... further results|Request]]
- Acceptance, Acceptance, Acceptance
Results
Other: BVY 06-065, License Renewal Application, Amendment 6, BVY 06-077, License Renewal Application, Amendment 9, BVY 06-095, E-mail: (PA-LR) Copy of SAMA Response, BVY-06-100, License Renewal Application, Amendment 22, Clarification of Aging Management Program and Environmental Report Items, ML061040142, ML061730180, ML061740035, ML061740572, ML061770071, ML061920474, ML062680034, ML063120067, ML070230041, ML070710215, ML071430101, ML071840778, ML071840890
|
MONTHYEARBVY 05-110, Vermont - Supplement to the Annual Radiological Environmental Operating Report for Year 20042005-12-29029 December 2005 Vermont - Supplement to the Annual Radiological Environmental Operating Report for Year 2004 Project stage: Request ML0617302372005-12-31031 December 2005 Average Connecticut River Discharge (Cfs) at Vernon Station for the Year 2005 Project stage: Request ML0617302362005-12-31031 December 2005 VYNPS, Table 3. Vermont Yankee Effluent and Waste Disposal Annual Report Project stage: Request ML0617701552005-12-31031 December 2005 VYNPS 2005 Waste Inventory Project stage: Request ML0617302872006-01-26026 January 2006 2005 Air Pollutant Emissions Inventory Report for Entergy Nuclear Vermont Yankee, LLC Project stage: Request ML0617302192006-02-0707 February 2006 Annual Groundwater Monitoring Report, Vermont Yankee Power Plant, Sms Site 99-2617 Vernon, Vermont Project stage: Request ML0617301802006-02-17017 February 2006 License Renewal SEIS Information Needs Project stage: Other ML0617303142006-02-27027 February 2006 VYNPS Operating Procedure OP 2180, Revision 39, Circulating Water/Cooling Tower Operation Project stage: Request ML0617701492006-03-14014 March 2006 2005 Annual Report of the Town of Hinsdale and the Hinsdale School District Project stage: Request ML0617302162006-03-28028 March 2006 Vernon VT FY2006 Municipality Reconciliation, Final Data Based on Final Education Grand Lists Project stage: Request ML0617302802006-03-30030 March 2006 NPDES Final Amended Permit 3-1199 Project stage: Request ML0617700702006-04-0404 April 2006 VYNPS Environmental Review Procedure, Nuclear Management Manual Fleet Procedure EN-EV-115, Rev. 4 Project stage: Request ML0617705932006-04-10010 April 2006 State of Vermont, Environmental Radiation Surveillance Report, 2005 Summary. Vermont Department of Health Office of Radiological Health Project stage: Request ML0610401422006-04-12012 April 2006 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process for License Renewal for the Vermont Yankee Nuclear Power Station Project stage: Other ML0625400452006-04-27027 April 2006 Email: (PA) Request for Additional Information to Support the Staffs Severe Accident Mitigation Alternative Review for Vermont Yankee Nuclear Power Project stage: RAI ML0617701692006-04-27027 April 2006 VYNPS Emergency Diesel DG-1-1A Preventative Maintenance Logs Project stage: Request ML0617701622006-04-27027 April 2006 VYNPS Emergency Diesel Driven Fire Pump P-40-1A Preventative Maintenance Logs Project stage: Request ML0617701652006-04-27027 April 2006 VYNPS John Deere Diesel DG-3-1A Preventative Maintenance Logs Project stage: Request ML0617701592006-04-27027 April 2006 VYNPS Emergency Diesel DG-1-1B Preventative Maintenance Logs Project stage: Request ML0617700692006-05-0404 May 2006 VYNPS Email to L.Dewald Re Dry Fuel Storage Pad, Apron, and Ramps EN Ev 115 Envrionmental Review. March 20, 2006 Project stage: Request ML0617301882006-05-10010 May 2006 VYNPS, MSLRM Actual Maximum DR-53 Dose Calculations Utilizing ODCM Methodology Project stage: Request BVY 06-046, Annual 2005 Radioactive Effluent Release Report2006-05-15015 May 2006 Annual 2005 Radioactive Effluent Release Report Project stage: Request BVY 06-047, 2005 Annual Radiological Environmental Operating Report2006-05-15015 May 2006 2005 Annual Radiological Environmental Operating Report Project stage: Request ML0618803852006-05-22022 May 2006 Windham Regional Plan Draft, May 22, 2006 Project stage: Request ML0618804492006-05-23023 May 2006 VYNPS Public Service Board Testimony for Hydrogen Storage, Parking Area, and Security Barrier System Project stage: Request ML0617405532006-05-24024 May 2006 VYNPS Aerial Photos During Construction 1968-1971 Project stage: Request ML0618802112006-05-24024 May 2006 VYNPS Archeological Sensitivity of Assessment, Proposed Gas Storage Area and Access Road January 17, 2001 Project stage: Request ML0617301862006-05-24024 May 2006 VYNPS, DR-53 Location Exposure Rate Status-Pre Power Up, Pre and Post Shield Project stage: Request ML0617302402006-05-24024 May 2006 Vernon, VT School District, Actual FY05 School Revenue Project stage: Request ML0617302142006-05-24024 May 2006 Wsesu Annual Report 2005-2006 Project stage: Request ML0617701802006-05-25025 May 2006 VYNPS Diesel Fuel Oil Analyses Project stage: Request ML0617704052006-05-25025 May 2006 VYNPS Used Oil Management and Furnace Operation Summary, 2006 Project stage: Request ML0617404352006-05-25025 May 2006 Federal Facilities and Lands within 50 Miles of VYNPS Project stage: Request ML0617700672006-05-25025 May 2006 VYNPS Land Use Map, Vegetation and Cover Type, Delineated Site Wetlands, and Riparian Zone Project stage: Request ML0617701722006-05-25025 May 2006 VYNPS Air Emissions Record-Keeping Logs Project stage: Request ML0617704962006-05-25025 May 2006 VYNPS House Heating Boiler Nameplate Ratings, Fuel Consumption and Air Emissions Recordkeeping. 2001-2005 Project stage: Request ML0616400652006-05-26026 May 2006 Massachusetts Attorney Generals Request for a Hearing and Petition for Leave to Intervene with Respect to Entergy Nuclear Operations Inc.S Application for Renewal of the Vermont Yankee Nuclear Power Plant Operating License and Petition Project stage: Request ML0615205062006-06-0101 June 2006 Request for Additional Information Regarding Severe Accident Mitigation Alternatives for the Vermont Yankee Nuclear Power Station Project stage: RAI ML0618400362006-06-0606 June 2006 VYNPS Environmental Scoping Open House Transcript Re. LRA Environmental Review, Pages 1-7 Project stage: Request ML0617904762006-06-0707 June 2006 Slides Used During the Scoping Meeting for VYNPS License Renewal Project stage: Meeting ML0618400332006-06-0707 June 2006 VYNPS Scoping Mtg Afternoon Transcript Re. LRA Environmental Review, Pages 1-116 Project stage: Request ML0618400292006-06-0707 June 2006 VYNPS Scoping Mtg Evening Transcript Re. LRA Environmental Review, Pages 1-143 Project stage: Request ML0619204742006-06-0707 June 2006 Comment (17) of E. Stamas on Environmental Scoping Process for Vermont Yankee Nuclear Power Station, License Renewal Project stage: Other ML0617401172006-06-12012 June 2006 Vermont Dept of Health Report on Cancer in Vermont Project stage: Request ML0617401132006-06-21021 June 2006 Vermont Municipal and Regional Planning and Development Act, as Amended Through 2004, Title 24 Vsa Chapter 117 Project stage: Request ML0617400352006-06-22022 June 2006 Comment (2) of Thomas Matsuda on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application Project stage: Other ML0617405722006-06-23023 June 2006 Comment (9) of Jon Block, on Behalf of Citizens Awareness Network, on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application Project stage: Other ML0617700712006-06-23023 June 2006 Comment (12) of Sunny Miller on the Environmental Scoping Process for the Vermont Yankee Nuclear Power Station License Renewal Application Project stage: Other ML0618406152006-06-23023 June 2006 NRC Public Meeting to Discuss the Environmental Scoping Process of Vermont Yankee Nuclear Power Station, License Renewal Application, Feedback Project stage: Meeting ML0619204952006-07-11011 July 2006 Summary of Public Scoping Meeting Conducted Related to the Review of the Vermont Yankee Nuclear Power Station, License Renewal Application Project stage: Meeting 2006-05-15
[Table View] |
Text
Impacts of Channelization Along the Northern Connecticut River, Vermont and New Hampshire John Field Field Geology Services PO Box 985 Farmington ME 04294 Ph: (207) 491-9541 Fax: (207) 645-9773 jfield@field-geology.com Over 30 percent of the northern Connecticut River was straightened and channelized in the 19th Century for log drives. The practice of channelization continued until at least the 1960's for flood control purposes along some tributaries. Erosion and sedimentation problems persist on the Connecticut River to this day as the river continues to respond to these past management practices. Channel enlargement along the straightened reaches is largely complete accept for where rock revetments were constructed in an attempt to arrest this widening. In these areas, scour can be observed around the revetments as the river channel continues to approach an equilibrium condition within the straightened reaches. Sharp bends in the channel created where straightened reaches reconnect with more naturally meandering portions of the channel are currently the sites of active erosion. Erosion pressures will remain until a more natural smoother bend develops so attempts to armor the bends in their current configuration will not likely meet with longer term success. Recognition of where these erosion pressures exist will help identify high priority areas for riparian buffer restoration.
Channelization at the downstream ends of some tributaries has increased sediment delivery to the mainstem as access to the tributary alluvial fans has been cut off. The excess sediment entering the mainstem has led to the deposition of large unvegetated gravel bars downstream of the tributary confluences. The diversion of flow around the bars has, in turn, led to severe bank erosion that threatens farmland, buildings, and other infrastructure.
Recognizing the ultimate source of erosion and deposition problems will lead to more successful restoration of channel stability and aquatic habitat. By reestablishing tributary access to alluvial fans, flow will be able to spread out and decrease sediment delivery to the mainstem. Reoccupying abandoned channels on the alluvial fan surfaces will also restore and expand critical side channel habitat lost during channelization. Successful restoration of stream channels across the nation will depend on thorough watershed assessments that identify the root causes of channel instabilities. Since these instabilities may have been created by human activities that occurred decades or even centuries ago, a study of current land use practices in a watershed is often insufficient to identify appropriate restoration strategies.