Revised License DPR-080, Page 9 and DPR-082, Pages 6 and 7 (TAC Nos. MD2219 and 2220)
ML062980511
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/11/2006
From: Harold Denton
Office of Nuclear Reactor Regulation, NRC/NRR/ADRO/DORL/LPLIV
To:
Pacific Gas & Electric Co
Wang A, NRR/DORL/LP4, 415-1445
References
TAC MD2219, TAC MD2220
Download: ML062980511 (3)


Text

E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans Including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, by Training and Qualification Plan, and Safeguards Contingency Plan," submitted by letter dated May 16, 2006. l F. Deleted by Amendment No. 189 l G. Reporting PG&E shall report any violations of the requirements contained In Sections 2.C(3) and 2.C(4), 2.C(6) through 2.C(1 0), 2.E and 2.F, of this License within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Initial notification shall be made In accordance with the provisions of 10 CFR 50.72, with written follow-up in accordance with the procedures described In 10 CFR 50.73(b), (c),

(d) and (e).

H. Financial Protection PG&E shall have and maintain financial protection of such type and in such amonts as the Commission shall require In accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

I. Term of License This License is effective as of the date of Issuance and shall expire at midnight on November 2, 2024.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by:

Edson G. Case for Harold R. Denton, Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A - Technical Specifications
2. Appendix B - Environmental Protection Plan
3. Appendix C - Deleted l
4. Appendix D - Additional Conditions Date of Issuance: November 2, 1984 Amendment No. 82,:75,97,129,188 189 Revised by letter dated October 28, 2004' Revised by letter dated

(10) Pipeway Structure DE and DDE Analysis (SSER 32. Section 4)

Prior to start-up following the first refueling outage PG&E shall complete a confirmatory analysis for the pipeway structure to further demonstrate the adequacy of the pipeway structure for load combinations that include the design earthquake (DE) and double design earthquake (DDE).

(11) Spent Fuel Pool Modification The licensee is authorized to modify the spent fuel pool as described in the application dated October 30, 1985 (LAR 85-13) as supplemented. Amendment No. 6 issued on May 30, 1986 and stayed by the U.S. Court of Appeals for the Ninth Circuit pending completion of NRC hearings is reinstated.

Prior to final conversion to the modified rack design, fuel may be stored, as needed, in either the modified storage racks described in Technical Specification 5.6.1.1 or in the unmodified storage racks (or both) which are designed and shall be maintained with a nominal 21-inch center-to-center distance between fuel assemblies placed in the storage racks.

(12) Additional Conditions The Additional Conditions contained in Appendix D, as revised through Amendment No. 118, are hereby incorporated into this license. Pacific Gas and Electric Company shall operate the facility in accordance with the Additional Conditions.

D. Exemption (SSER 31, Section 6.2.6)

An exemption from certain requirements of Appendix J to 10 CFR Part 50 is described in the Office of Nuclear Reactor Regulation's Safety Evaluation Report, Supplement No.

9. This exemption is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest. Therefore, this exemption previously granted in Facility Operating License No. DPR-81 pursuant to 10 CFR 50.12 is hereby reaffirmed. The facility will operate, with the exemption authorized, in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission.

E. Physical Protection The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).

The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Diablo Canyon Power Plant, Units 1 and 2 Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan," submitted by letter dated May 16, 2006. l Amendment No. 21, 31, 118 Revised by letter dated October 28, 2004 Revised by letter dated

F. Deleted by Amendment No. 191 l G. Reporting Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, the licensee shall report any violations of the requirements contained in Sections 2.C(3), 2.C(5) through 2.C(10), 2.E and 2.F of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within thirty days in accordance with the procedures described in 10 CFR 50.73(b), (c), and (e).

H. Financial Protection PG&E shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.

I. Term of License This License is effective as of the date of issuance and shall expire at midnight on August 26, 2025.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by:

Harold R. Denton Harold R. Denton, Director Office of Nuclear Reactor Regulation Attachments:

1. Appendix A Technical Specifications (NUREG-1151)
2. Appendix B - Environmental Protection Plan
3. Appendix C - Deleted l
4. Appendix D - Additional Conditions Date of Issuance: August 26, 1985 Amendment No. 96,118, 190 Correction letter of 12-3-2001 Revised by letter dated