b Appendix D Operator Action Form ES-D-2 SCENARIO #I
- 1. SIMULATOR OPERATOR INSTRUCTIONS A.
INITIAL SIMULATOR SETUP J -
ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION H Prepare simulator per TQ-AA-106-0301, Simulator Training Practices Job Aid Reset simulator to IC-40
- 100% Power
- RClC out of service Apply Information Tags on the following RClC components:
- HV49-1F007, INBD PClV
- HV49-1 F008, OUTBD PClV
- HV49-I F076, Warmup Bypass
- HV49-1 FOIO, CST Suction
- HV49-1 F012, Discharge Valve
- HV49-I FO19, Min Flow Valve
- HV49-1 F029, Suppression Pool Suction
- HV50-1 F045, Steam Supply MOV
- HMO-I F060, Turbine Exhaust H Take out of FREEZE and ensure the following:
Reactor Power is 100%
- With the exception of RCIC, all other equipment is OPERABLE
/
Page I of 15
b Amendix D OPerator Action Form ES-D-2 H If not embedded in IC-40, load Scenario ILT NRC Scenario #I from floppy disk labeled 2006 NRC EXAM using A: drive. Ensure the following malfunctions are loaded:
MV1238B, active 1 minute after Trigger 1 is activated.
MED263D, active 10 minutes after narrow range B fails low (Trigger I).
MADl47E, active 15 minutes after fault on bus D14 (Trigger I).
MRR441, Trigger 2 active when mode switch placed in Shutdown MFW252B, Trigger 3 active when drywell pressure at 2psig.
MHP449, Trigger 4 active when HPCl flow is at 5000 gpm.
MSL559, Active immediately.
MCR412A, Trigger 5 active when drywell pressure at 2psig.
Reset any annunciators that should not be present Page 2 of 15
Appendix D Operator Action Form ES-D-2 B.
INSTRUCTIONS FOR SIMULATOR OPERATOR EVENT 1 : I By Narrow Range Level Transmitter Fails Downscale ll J I MALFUNCTION / REMOTE FUNCTION / REPORT II W Activate Trigger # I after crew takes the shift and when prompted by floor If I&C / WWM contacted, report that failure will be investigated promptly.
EVENT 2: D14 Bus Overcurrent / Loss of D14 Bus
~~~~~
I
~ Ensure D14 bus trip trigger timer activates appropriately.
4 If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report to the crew that several overcurrent relays are tripped on D14.
W If Equipment Operator / Floor Supervisor contacted to perform pre-start checks on the 1A Drywell Chiller, wait 5 minutes and report to the crew that the chiller is ready to start.
Respond appropriately to a request for running checks on the D14 diesel and the IA Drywell Chiller.
W Respond to request for other assistance as appropriate.
EVENT 3:
SRV L Fails Open Mechanically 1 4 1 MALFUNCTION / REMOTE FUNCTION / REPORT II 11 I
Ensure SRV open trigger timer activates appropriately.
H If Equipment Operator / Floor Supervisor is contacted to pull fuses for SRV L IAW OT-I 14, wait 8 minutes, remove the fuses (RAD214 Toggle Out),
and report that the fuses are removed.
W If requested to open HV51-1 F068B (due to the power loss), wait 15 minutes and report the valve cannot be opened manually.
Page 3 of 15
Appendix D Operator Action Form ES-D-2 EVENT 4: Coolant Leakage In Drywell II J I MALFUNCTION / REMOTE FUNCTION / REPORT II II 11 I
Respond to request for assistance as appropriate.
EVENT 5: By Feedwater Line Rupture Inside Primary Containment J
MALFUNCTION / REMOTE FUNCTION / REPORT Respond to request for assistance as appropriate.
W If requested, perform the field actions of SE-10. If requested, perform the field actions of SE-10.
-Reset RHRSW Rad Monitor
-Reset RE ARMS
-Reset shunt trips
-Perform running checks on the diesel generators EVENT 6: HPCl Turbine Trip ll J I MALFUNCTION / REMOTE FUNCTION / REPORT ll If requested, wait I O minutes and report that the cause of the HPCI trip is unknown.
EVENT 7: IA CRD Pump Trip I1 J I MALFUNCTION / REMOTE FUNCTION / REPORT II I
Respond to request for assistance as appropriate.
Page 4 of 15
Appendix D Operator Action Form ES-D-2 EVENT 8: SLC Pipe Rupture J
I MALFUNCTION / REMOTE FUNCTION / REPORT Respond to request for assistance as appropriate.
Page 5 of 15
Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-I Scenario No. 1 Event No.: 1 Event
Description:
1 B Narrow Ranqe Level Transmitter fails downscale Time Position Applicants Actions or Behavior Reference ARC for annunciator 107 Reactor D-5, FWLCS I
Ro I TROUBLE.
RO RO CRS CRS Determine signal identity and alarm condition at the FWLC operator station IAW S06.1.H U/1.
Recognize that the 1 B Narrow Range Level Transmitter has failed low and report the failure to the CRS.
Direct contacting I&C / WWM to investigate the instrument failure.
Reference Tech Spec 3.3.9 for the turbine high level trip logic.
Page 6 of 15
Appendix D Operator Action Form ES-D-2
-~
PRO CRS Enter E-Dl4 and E-Dl44.
Recognize loss of the D14 Bus and report the failure to the CRS.
Op-Test No. ILT05-1 Scenario No. 1 Event No.: 2 Event
Description:
D14 Bus Overcurrent / Loss of D14 Bus RO / PRO PRO CRS 11 Time I Position I Applicants Actions or Behavior Dispatch EO / Floor Supervisor to investigate loss of D14.
Recognize that IB Drywell Chiller is not running.
Direct PRO to start the IA Drywell Chiller and restore drywell cooling.
CRS PRO II I
CRS I Direct dispatching EO / Floor Supervisor to investigate loss of D14.
Reference Tech Spec 3.8.3.1 for loss of D14 bus.
Recognize the I D Core Spray and RHR pumps are inoperable.
I RO / PRO Dispatch EO / Floor Supervisor to perform start / running checks on lthe 1A Drywell Chiller.
ll I
PRO I Start the 1A D w e l l Chiller.
I RO / PRO Dispatch EO / Floor Supv. to perform running checks on the D14 I diesel.
Page 7 of 15
Appendix D Operator Action Form ES-D-2 RO PRO CRS RO Op-Test No. ILT05-I Scenario No. 1 Event No.: 3 Recognize "I L" SRV has failed open and report failure to CRS.
Attempt to place both loops of Suppression Pool Cooling in service.
Enter OT-I 14, Inadvertent Opening of a Relief Valve Provide confirmation of the open SRV.
Event
Description:
SRV "1 L" Fails Open Mechanically
~~
~
PRO CRS Time I Position I Recognize the "B" RHRSW heat exchanger outlet valve has lost power, therefore only one loop of Suppression Pool Cooling is available.
Direct RO to reduce turbine inlet pressure to 900 psig.
Applicant's Actions or Behavior RO CRS Recognize SRV did not close and report to CRS.
Enter G P-4.
PRO CRS I
RO I Reduce turbine inlet pressure to 900 psig Transfer house loads.
Direct the PRO / RO to runback recirc to minimum.
PRO/RO CRS I
CRS I Direct PRO to transfer house loads.
Runback recirc to minimum.
Direct RO to scram the Reactor at 50% core flow.
CRS Enter T-101 on low Reactor level.
CT I
RO I Manually scram the Reactor.
Page 8 of 15
Appendix D Operator Action Form ES-D-2 Op-Test No. lLTO5-I Scenario No. 1 Event No.: 3 Event
Description:
Coolant Leakage in Drywell 11 Time I Position I Applicant's Actions or Behavior Reference ARC for annunciator 107 REACTOR F-2, DRYWELL HI /
I Ro I LOW PRESS.
CRS CRS PRO CRS Enter OT-101, High Drywell Pressure.
Direct PRO to maximize Drywell cooling and terminate Primary Containment inerting Verify Drywell cooling maximized and Primary Containment inerting is not in progress Direct PRO to isolate RWCU IAW OT-101.
Enter T-I 02 when Suppression Pool temperature reaches 95 I
CRS I degrees F. (stuck open SRV)
Page 9 of 15
Appendix D Operator Action Form ES-D-2 CT Op-Test No. lLTO5-1 Scenario No. 1 Event No.: 3 PRO CRS CRS CRS PRO Event
Description:
By Feedwater tine Rupture Inside Primary Containment Time I Position Applicants Actions or Behavior I
CRS Re-enter T-I 01 and enter T-I 02 on high drywell pressure.
Direct PRO to bypass and restore drywell cooling when drywell air temperature reaches 145 degrees F.
Bypass and restore drywell cooling.
1 CRS PRO RO Recognize feedwater is not iniecting into RPV.
Direct PRO I RO to verify isolations.
Re-enter T-101 on low Reactor level.
I CRS Direct PRO to spray the Suppression Pool per T-225 using RHR before Suppression Pool pressure reaches 7.5 psig.
I PRO Spray the Suppression Pool per T-225.
I CRS Enter T-I 11, Level Restoration, when it is determined RPV level cannot be maintained above -161.
+
PRO / RO Direct PRO / RO to inhibit auto ADS.
Inhibit auto ADS.
Direct PRO / RO to start alternate iniection sub-systems.
Attempt to start SLC and recognize problem (Event 8).
I CRS Direct PRO / RO to start iniection sub-systems.
Start injection sub-systems.
Enter T-I 12 when Reactor level reaches -1 61 by the PSP curve in T-102.
when required Direct the RO / PRO to prevent uncontrolled injection with low pressure systems.
Direct PRO to open 5 ADS valves.
Open 5 ADS valves.
I CRS Enter SE-I 0 for the LOCA signal.
Dispatch EO / Floor Supervisor to perform SE-IO actions in the field.
Page 10 of 15
Appendix D Operator Action Form ES-D-2 PRO I Contact EO / FSV to investigate loss of HPCI.
Scenario No. 1 Event No.: 6 Event
Description:
HPCl Turbine Trip I
II I
I iI Time I Position I Applicant's Actions or Behavior II I1 I
PRO I Recoanize HPCl is not iniectina.
II Page 11 of 15
Appendix D Operator Action Form ES-D-2 RO PRO Op-Test No. lLTO5-I Scenario No. 1 Event No.: z Event
Description:
I A CRD Pump Trip Recognize CRD is not running.
Contact EO / FSV to investigate loss of CRD pump.
11 Time I Position I Applicants Actions or Behavior Page 12 of 15
v Appendix D 0 perato r Act ion Form ES-D-2 CRS RO Op-Test No. ILT05-I Direct the RO to secure the SLC pumps.
Secure the SLC pumps.
ScenarioNo. 3 Event No.: 8 Event
Description:
SLC Pipe Rupture 11 Time I Position I Applicant's Actions or Behavior H
I Recognize SLC discharge pressure is low and is not injecting to w
I R 0 l RPV. Give report to CRS.
Page 13 of 15
I ADDendix D ODerator Action Form ES-D-2 TERMINATION POINT The scenario will be terminated when the following criteria are met:
- 1. An Emergency Blowdown has been performed per T-I12 and RPV level has been stabilized.
Page 14 of 15
w Aeeendix D OPerator Action Form ES-D-2 SCENARIO #I INITIAL CONDITIONS 0
Unit 1 is at 100% power INOP / OUT OF SERVICE EQUIPMENT 0
RClC is out of service for bearing replacement. Estimated out of service time is approximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. A regulatory log entry has been completed.
PLANNED EVOLUTIONS 0
Maintain 100% power.
Page 15 of 15
I I
Appendix D Operator Action Form ES-D-2 SCENARIO #2
- 1. SIMULATOR OPERATOR INSTRUCTIONS A.
INITIAL SIMULATOR SETUP
~
ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION Prepare simulator per TQ-AA-106-0301, Simulator Training Practices Job Aid Reset Simulator to IC-41 Take out of FREEZE and ensure the following:
- 95%power If not embedded in IC-41, load Scenario ILT NRC Scenario #2 from floppy disk labeled 2006 NRC EXAM using A: drive. Ensure the following malfunctions are loaded:
MV1234A, active 1 minute after Trigger # I is activated.
MCN078C, active 10 minutes after the A pressure instrument fails high (Trigger I).
MRR435B, active 5 minutes after IC condensate pump trips (Trigger I).
MRR435A, Trigger #2 activated after Tech Specs are referenced for the trip of the 1 B recirc pump AND when prompted by floor instructor.
Reset any annunciators that should not be present Page I of 12
I I
~
~
~
~~~
~
~~
~
~ _ _ _
4 Ensure condensate pump trip trigger timer activates appropriately.
H If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report to the crew that an overcurrent relay is tripped on the 11 bus for the 1 C condensate pump.
H If I&C / WWM contacted, report that failure will be investigated promptly.
Appendix D Operator Action Form ES-D-2 I
B.
INSTRUCTIONS FOR SIMULATOR OPERATOR EVENT 1: A RPV Pressure Transmitter (RPS) Fails Upscale II J I MALFUNCTION / REMOTE FUNCTION / REPORT II 11 I H Activate Trigger # I after the crew takes the shift when prompted by the floor instructor.
H If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report back that the pressure transmitter trip unit (PIS-I N678A) is failed upscale.
II I H If I&C / WWM contacted, report that failure will be investigated promptly.
1 1
I EVENT 2: IC Condensate Pump Trips II MALFUNCTION / REMOTE FUNCTION / REPORT I1 I
EVENT 3: I By Recirc Pump Trips II MALFUNCTION / REMOTE FUNCTION / REPORT II I
~~
~~~~
~
H Ensure recirc pump I By trip trigger timer activates appropriately.
H If Equipment Operator I Floor Supervisor contacted, wait 5 minutes and report to the crew that the cause of the trip cannot be determined at this time.
H If I&C / WWM contacted, report that failure will be investigated promptly.
Page 2 of 12
Appendix D Operator Action Form ES-D-2 EVENT 5: IA Recirc Pump Trips II J 1 -
MALFUNCTION / REMOTE FUNCTION / REPORT II I
Activate trigger when prompted by floor instructor.
II If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report to the crew that the cause of the trip cannot be determined at this time.
If I&C / WWM contacted, report that failure will be investigated promptly.
EVENT 6: AlWS - By RPS Fails to Trip, Both RRCS Channels Fail to Initiate ARI.
MALFUNCTION I REMOTE FUNCTION / REPORT II J I w Respond to request for assistance as appropriate.
If requested to perform T-215, remove malfunction MRP029D after the first terminate and prevent with Reactor level stable AND prompt from floor instructor.
If requested to perform T-216, wait 6 minutes and report back to the crew
/I I
that the air valve is stuck closed.
w If requested to perform T-270, wait 7 minutes load appropriate training 11 I
scenario and report back that 7;-270 is complete.
If requested to perform T-221, wait I 1 minutes load appropriate training 11 I
scenario and report back that T-221 is complete.
If requested to perform T-251, wait 6 minutes respond as appropriate, load appropriate training scenario and report back that T-251 is complete I/
1 EVENT 7: SLC Squib Valve Failure to Fire IJI MALFUNCTION / REMOTE FUNCTION / REPORT Respond to request for assistance as appropriate.
Page 3 of 12
I Appendix D Operator Action Form ES-D-2 CRS Op-Test No. ILT05-1 Scenario No. 2 Event No.: 1 Event
Description:
A RPS Pressure Transmitter (RPS) Fails High Reference Tech Spec 3.3.1 for the failed pressure instrument.
11 Time 1 Position I Applicants Actions or Behavior Reference ARC for annunciator 107 REACTOR G-I, REACTOR HI PRESS TRIP Reference ARC for annunciator I08 REACTOR B-I, AUTO I
Ro I SCRAM CHANNEL A I Recognize that the Reactor high pressure trip signal has resulted in I
Ro I an A RPS half scram.
I RO I Attempt to reset the RPS half scram.
Direct dispatching EO / Floor Supervisor to investigate RPS high I
CRS I Reactor pressure trip units in AER.
I RO 1 PRO Dispatch EO 1 Floor Supv to AER to investigate RPS high reactor I pressure trip units.
Page 4 of 12
Appendix D Operator Action Form ES-D-2 Op-Test No. lLTO5-1 ScenarioNo. 2 Event No.: 2 Event
Description:
"1 C" Condensate Pump Trips 11 Time I Position PRO PRO PRO II I
CRS Applicant's Actions or Behavior Recognize that the I C condensate pump has tripped.
Reference ARC for annunciator 104 COND G-1, I C CONDENSATE PUMP MOTOR OVERCURRENT Reference ARC for annunciator 104 COND G-2, I C CONDENSATE PUMP BREAKER TRIP Reference ARC for annunciator 108 REACTOR A-4, OPRM TRIPS ENABLED Recognize that recirc is running back and report to the CRS.
~~
Enter OT-104 for the power drop.
Page 5 of 12
Appendix D Operator Action FOUYI ES-D-2 Op-Test No. ILT05-1 Scenario No. 2 Event No.:
Event
Description:
I B Recirc Pump Trips Time
~
Pfn Applicants Actions or Behavior Reference ARC for annunciator I 12 CLEANUP E-I, 1 B RECIRC Recognize the 1 B recirc pump has tripped and report the trip to the CRS.
Enter OT-I 12, RECIRCULATION PUMP TRIP M-G DRIVE MOTOR LOCKOUT TRIP RO.
CRS PRO PRO CRS Recognize in the Restricted Region of the Power / Flow map.
Direct RO to insert control rods IAW RMSI to exit the Restricted Reaion of the Power / Flow map.
Insert control rods IAW RMSI.
Direct PRO to close the I B recirc pump discharge valve for 5 minutes.
Close the 1 B recirc pump discharge valve for 5 minutes and then reopen the valve.
Reopen the I B recirc pump discharge valve 5 minutes after it was closed.
Reference Tech Spec 3.4.1.I for Recirc Pump trip.
Page 6 of 12
t Awendix D ODerator Action Form ES-D-2 PRO Op-Test No. ILT05-1 Scenario No. 2 Event
Description:
"1A Recirc Pump Trips
~~~~
Reference ARC for annunciator 1 I I RECIRC E-I, 1 A RECIRC M-G DRIVE MOTOR LOCKOUT TRIP Event No.: 3 PRO CRS Time I Position I Recognize the "1A Recirc Pump has tripped and report the failure to the CRS.
Continue with actions of OT-I 12 for trip of BOTH recirc pumps.
Applicant's Actions or Behavior CRS RO Direct the RO to manually scram the Reactor.
Scram the Reactor and place mode switch in shutdown.
Page 7 of 12
Appendix D Operator Action Form ES-D-2 RO RO Op-Test No. ILTO5-1 Scenario No. 2 Event No.: 6 Event
Description:
ATWS - B RPS Fails to Trip, Both RRCS Channels Fail to Initiate ARI Recognize B RPS failed to de-energize.
Report to crew that the Reactor has failed to scram.
Time I Position I Applicants Actions or Behavior CRS RO Enter T-101 for scram condition with power greater than 4%.
Recognize that control rods did not insert.
I RO I Manuallv initiate RRCS / ARI.
CT CRS RO Direct RO to manually insert control rods and bypass the RWM as necessary.
Insert control rods with RWM bypassed.
RO/PRO CRS Contact EO / Floor Supv to perform T-216 Enter T-I 17, LEVEL / POWER CONTROL Direct performance of T-215, DE-ENERGIZATION OF SCRAM I
CRS I SOLENOIDS CRS PRO PRO I RO/PRO I Contact EO / Floor Supv to perform T-215
~~~
~~
~
~~
~
Direct performance of T-270 to terminate and prevent injection to reduce Reactor level to below -50.
Perform T-270 to terminate and prevent HPCl injection.
Contact EO / Floor Supv to perform T-270 in the AER to terminate and prevent low pressure ECCS injection.
Direct performance of T-216, MANUAL ISOLATION AND VENT OF I
CRS I Direct PRO to inhibit auto ADS.
CT I
PRO I Inhibit both divisions of auto ADS.
I CRS I Direct performance of T-221 to maintain MSIVs open.
I RO/PRO I Contact EO / Floor Supv to perform T-221 Page 8 of 12
Appendix D Operator Action Form ES-D-2 RO Op-Test No. ILT05-1 Scenario No. 2 Event No.: 6 Event
Description:
ATWS - "B" RPS Fails to Trip, Both RRCS Channels Fail to Initiate ARI Re-inject to the RPV to a level band of 12.5 to 54 inches.
Time 1 Position 1
Applicant's Actions or Behavior Perform T-270 to terminate and prevent condensate and feedwater CT I
Ro I injection.
Provide direction to the RO to re-inject as necessary to maintain I
CRS I RPV level in a band that is above -129 and at or below -50".
Re-inject with condensate / feedwater as necessary to maintain Ro I Reactor level in the band directed by the CRS.
Recognize that T-215 was successful and all control rods have fully Ro I inserted.
I CRS I Exit T-I 17 and enter T-I 01.
~~
I CRS I Direct RO to maintain a new RPV level band of 12.5 to 54 inches.
Page 9 of 12
Appendix D Operator Action Form ES-D-2 CRS RO Op-Test No. lLTO5-1 Scenario No. 2 Event No.: z Event
Description:
SLC Squib Valve Failure to Fire Direct the RO to secure the SLC pumps.
Secure the 3 SLC pumps.
1 Time I Position I RO/PRO Applicant's Actions or Behavior Contact EO / Floor Supv to perform T-212 Recognize the SLC pumps have started and the squib valves have I
Ro I failed to fire. Report the failure to the CRS.
Direct performance of T-212, BYPASSING SQUIB VALVES FOR I
CRS I SLC INJECTION Page 10 of 12
Appendix D Operator Action Form ES-D-2 TERM IN AT I 0 N PO I N T The scenario will be terminated when the following criteria are met:
1. T-215 is performed to de-energize RPS resulting in a full Reactor scram.
- 2. Reactor level is stabilized between 12.5 and 54.
Page 11 of 12
C I
Appendix D Operator Action Form ES-D-2 SCENARIO #2 INITIAL CONDITIONS Unit 1 is at 95% power.
Reactor Engineering is preparing a revised REMA to raise power to 100%. Estimated time of REMA completion is I 5 minutes.
INOP / OUT OF SERVICE EQUIPMENT No inoperable equipment.
PLANNED EVOLUTIONS 0 When REMA is completed, raise power to 100%.
Page 12 of 12
Appendix D Operator Action Form ES-D-2 SCENARIO #3
- 1. SIMULATOR OPERATOR INSTRUCTIONS A.
INITIAL SIMULATOR SETUP J
ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION
~~
~
H Prepare simulator per TQ-AA-106-0301, Simulator Training Practices Job Aid Reset Simulator to IC-42
- 5%Power H Place an information tag on the 1A SRM bypass joystick.
Take out of FREEZE and ensure the following:
- 5%Power
- ? A SRM is bypassed If not embedded in IC-42, load Scenario ILT NRC Scenario #3 from floppy disk labeled 2006 NRC EXAM using A: drive. Ensure the following malfunctions are loaded:
MSR214F, active 1 minute after Trigger 1 is activated.
- MED282A, active 10 minutes after IRM channel F fails upscale (Trigger 1).
- VICI 14A, active 15 minutes after fault on Div. I DC Bus (Trigger I).
- MRR441, Trigger 2 manually activated when I B CRD pump is placed in service AND when prompted by floor instructor.
- MMS067, Trigger 3 active when mode switch taken to shutdown.
Page 1 of 14
I I
Amendix D Operator Action Form ES-D-2 J
ITEM / MALFUNCTION / REMOTE FUNCTION / CONDITION 1
Page 2 of 14
f I
Awendix D ODe rator Action Form ES-D-2 J
B.
INSTRUCTIONS FOR SIMULATOR OPERATOR MALFUNCTION / REMOTE FUNCTION / REPORT EVENT 1: Continue to Withdraw Control Rods II I
MALFUNCTION / REMOTE FUNCTION / REPORT II Activate Trigger #I after crew continues with the startup and when prompted by floor instructor.
EVENT 2: IRM Channel F Fails Upscale II I
MALFUNCTION / REMOTE FUNCTION / REPORT II H
I Ensure IRM upscale trip trigger timer activates appropriately.
If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report back that IRM Channel F indicates failed upscale with no apparent reason.
If I&C / WWM contacted, report that failure will be investigated as soon as possi bie.
EVENT 3: Loss of Division I DC Ensure DC bus trip trigger timer activates appropriately.
H If Equipment Operator / Floor Supervisor contacted, wait 5 minutes and report back that the Div. I DC bus is de-energized, there is no fire, but there is a smell of burned insulation.
If I&C / WWM contacted, report that failure will be investigated as soon as possible.
If requested, investigate steam flooding damper panel trouble alarms.
Page 3 of 14
I I
Appendix D Operator Action Form ES-D-2 EVENT 4: IA CRD Pump High Vibration Ensure Trigger 3 activates when Drywell pressure goes above 1.2 psig.
Respond to request for assistance as appropriate.
If requested, perform the field actions of SE-10.
-Reset RHRSW Rad Monitor
-Reset RE ARMS
-Reset shunt trips
-Perform running checks on the diesel generators II J I MALFUNCTION / REMOTE FUNCTION / REPORT II Ensure CRD pump high vibration trigger timer activates appropriately.
If Equipment Operator / Floor Supervisor contacted to investigate the high vibration, wait 5 minutes and report back that the outboard pump bearing is red hot and the pump is visibly shaking.
If Equipment Operator / Floor Supervisor contacted to prepare to start the 1 By CRD pump, wait 5 minutes and report back that the 1 B CRD pump is readv to start.
w After the I B CRD pump is running, toggle B CRD pump discharge valve ir I
open.
EVENT 5: Coolant Leakage in Drywell II J I MALFUNCTION / REMOTE FUNCTION / REPORT II
~~
Trigger 2 is activated after the 1 By CRD pump is started AND prompt from floor instructor.
Respond to request for assistance as appropriate.
EVENT 6: Steam Leak in Drywell II J
I MALFUNCTION / REMOTE FUNCTION / REPORT II Page 4 of 14
I Appendix D Operator Action Form ES-D-2 J
EVENT 7: ID Core Spray Pump Fails to Auto Start MALFUNCTION / REMOTE FUNCTION / REPORT If I&C / WWM contacted, report that failure to auto start will be investigated as soon as possible.
Respond to other requests for assistance as appropriate.
Page 5 of 14
Appendix D Operator Action Form ES-D-2 Time Position CRS RO Applicant's Actions or Behavior Direct RO to continue the Reactor startup Resume control rod withdrawal IAW GP-2.
Page 6 of 14
Amendix D OPerator Action Form ES-D-2 Op-Test No. ILT05-1 Scenario No. 3 Event No.: 2 Event
Description:
IRM Channel F Fails Upscale
\\
Time I Position I
Ro I
CRS I
Ro I
CRS RO CRS Applicants Actions or Behavior Recognize that IRM channel F has failed upscale resulting in a half scram and report the failure to the CRS.
Direct RO to stop rod withdrawal.
Reference ARC for annunciator 107 Reactor H-3, IRM UPSCALE /
~~
~
Direct RO to bypass the F IRM and reset the half scram.
Bypass the F IRM.
Reset the half scram.
~~
~
~~~
~
~
Reference Tech Spec 3.3.1 and 3.3.6 for the failed instrument.
Page 7 of 14
Appendix D Operator Action Form ES-D-2 CRS CRS CRS Op-Test No. ILT05-1 Scenario No. 3 Event No.: 3 Event
Description:
Loss of Division 1 DC
~~
Enter E-I FA, LOSS OF DIVISION 1 SAFEGUARD 125 / 250 V DC BUS IFA Direct dispatching EO / Floor Supervisor to investigate the loss of bus IFA.
Direct PRO to initiate a chlorine isolation.
11 Time I Position I CRS Applicant's Actions or Behavior Reference Tech Spec 3.8.3.1 for loss of DC bus 1 FA and various LCO's for equipment lost off of DC bus 1 FA.
Recognize the loss of Division 1 DC and report the failure to the I
I CRS.
1 PRO-1 Reference ARC for annunciator 120 D11 G-2, 1 DA 250V DC MCC UNDERVOLTAGE ir RO
~~
Reference ARC for annunciator 108 REACTOR H-I, STANDBY LIQUID TANK LO-LO LEVEL.
RO Reference ARC for annunciator 1 I O STEAM A-I, DIV I ADS OUT OF SERVICE.
II I
PRO I Initiate a chlorine isolation.
Page 8 of 14
I Appendix D Operator Action Form ES-D-2 Op-Test No. ILT05-l Scenario No. 3 Event
Description:
I A CRD Pump High Vibration Event No.: 4 Time I Position I
Ro I
CRS I Ro/PRo I RO/PRO Applicants Actions or Behavior Reference ARC for annunciator 107 REACTOR 1-3, VIBRATION ALARM DANGER Investigate high vibration on VMS computer.
Recognize that the IA CRD pump is indicating high vibration.
Direct dispatching the EO / Floor Supervisor to check on the high vibration condition of the IA CRD pump.
Dispatch the EO / Floor Supervisor to investigate the high vibration on the 1A CRD pump.
When report comes back from the EO stating that the 1A CRD pump has a hot bearing and is shaking, direct the RO trip the 1A CRD pump and start the IB CRD pump.
Enter ON-I 07, CONTROL ROD DRIVE SYSTEM PROBLEMS.
Direct the EO to perform startup checks on the 1 B CRD pump.
Start the I B CRD Pump.
Direct EO/ Floor Supervisor to open I B CRD discharge valve.
Page 9 of 14
Appendix D Operator Action Form ES-D-2 Time Op-Test No. ILT05-1 Scenario No. 3 Event
Description:
Coolant Leakage in Drywell Position Event No.: 3 1
CRS I
PRO Applicant's Actions or Behavior
~~~
Reference ARC for annunciator 1 15 COOL B B-5, DRYWELL COOLER DRAIN FLOW HIGH Reference ARC for annunciator 107 REACTOR F-2, DRYWELL HI I LOW PRESS Enter OT-I 01, High Drywell Pressure.
Direct PRO to maximize Drywell cooling and terminate Primary Containment inerting Verify Drywell cooling maximized and Primary Containment inerting is not in progress Direct PRO to isolate RWCU IAW OT-I 01.
isolate RWCU.
Page 10 of 14
c 1
Appendix D Operator Action Form ES-D-2 Event No.: 6 Op-Test No. ILT05-1 Scenario No. 3 Event
Description:
Steam Leak in Drywell / RPS Fails to Scram
~
~
~~~
Applicant's Actions or Behavior Enter T-101 and T-102 for high drywell pressure.
~
Recoanize failure of RPS to scram Reactor.
Direct RO to manually initiate RRCS / ARI Arm and depress both divisions of RRCS initiation pushbuttons Recognize that all rods inserted and inform the CRS Direct the crew to control RPV injection from ECCS and low pressure systems to prevent uncontrolled RPV flood up.
Control injection into the RPV from ECCS that started.
~~~~~~
~~~
Enter SE-10 for the LOCA signal.
I RO/PRO Dispatch EO / Floor Supervisor to perform SE-10 actions in the field.
Direct PRO to spray the Suppression Pool per T-225 using RHR before Suppression Pool pressure reaches 7.5 psig.
Sprav the Suppression Pool per T-225.
I CRS Direct PRO to bypass and restore drywell cooling when drywell air temperature reaches 145 degrees F.
I PRO Bypass and restore drywell cooling.
Enter T-I 12 when safe side of T-I 02 curve PC/P-3 cannot be maintained.
~
~~~
~
~~~~~
~
Direct RO / PRO to open 5 ADS valves.
CT I RO/PRO Open 5 ADS valves.
Direct PRO to spray the Drywell per T-225.
Spray the Drywell per T-225.
Page 11 of 14
I Appendix D Operator Action Form ES-D-2 PRO
~~
~
Op-Test No. ILT05-1 Scenario No. 3 Event
Description:
1 D Core Spray Pump Fails to Auto Start Start the 1 D Core Spray Pump.
Event No.: z Time I Position I Applicants Actions or Behavior Recognize that the ID Core Spray Pump did not auto start and I
I report failure to CRS.
Page 12 of 14
Appendix D Operator Action Form ES-D-2 TERMINATION POINT The scenario will be terminated when the following criteria are met:
- 1.
Drywell spray is in progress and Drywell pressure is lowering.
Page 13 of 14
I Appendix D Operator Action Form ES-D-2 SCENARIO #3 INITIAL CONDITIONS e
0 e
0 e
0 e
0 a
Unit I is at 5% power with a startup in progress after a refueling outage.
Reactor pressure is 390 psig with 2% BPVs open (pressure set in control) 1 A and I B RFP are in standby with the LIC-006-120 controller in AUTO I A and 1B condensate pumps are running I
B and 1 C circulating water pumps are running Main Turbine is in shell warming 1A and I B recirculation pumps are at 28% speed I A RWCU pump is in service 1A SJAE in service with vacuum at 29 Hg Drywell closure is complete INOP /OUT OF SERVICE EQUIPMENT 1A SRM is inoperable and bypassed, with repais PLANNED EVOLUTIONS in progress.
0 Continue with the startup / heatup at step 3.3.29 of GP-2.
Control rod withdrawal will continue with rod 18-59 (00 to 12).
Page 14 of 14