Letter Sequence Other |
|---|
TAC:MC7505, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO (Approved, Closed) |
Results
Other: ML053050028, ML053200289, ML061070587, ML061230032, ML061240255, ML061240259, ML061240264, ML061240266, ML061240269, ML061510164, ML061950598, ML062850028, ML062920044
|
MONTHYEARML0530500282005-11-16016 November 2005 Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0532002892005-11-17017 November 2005 Note to File - Closure of TAC No. MC7607 for Monticello Improved Technical Specification (ITS) Conversion, Beyond Scope Issue (Bsi) 3.3.3.1, Doc L.2, Post-Accident Monitoring (PAM) Instrumentation Project stage: Other ML0609505482006-04-0707 April 2006 Draft Safety Evaluation for the Conversion to Improved Technical Specifications (TAC Nos. MC7505, MC7597 Through MC7611, and MC8887) Project stage: Draft Approval L-MT-06-033, Supplement to License Amendment Request: Conversion of Current Technical Specifications to Improved Technical Specifications2006-04-25025 April 2006 Supplement to License Amendment Request: Conversion of Current Technical Specifications to Improved Technical Specifications Project stage: Supplement ML0612300322006-04-28028 April 2006 Two Incomplete Issues in ITS Conversion Project stage: Other L-MT-06-036, Copy of Improved Technical Specifications and Improved Technical Specifications Bases Pages2006-05-0404 May 2006 Copy of Improved Technical Specifications and Improved Technical Specifications Bases Pages Project stage: Request ML0612405562006-05-0909 May 2006 Operated by Nuclear Management Company (Nmc), LLC Safety Evaluation for the Conversion to the Improved Technical Specifications (TAC No. MC7505). Transmittal Memo Project stage: Approval ML0612405422006-05-0909 May 2006 Safety Evaluation by the Office of Nuclear Reactor Regulations Technical Specifications Branch Related to Amendment No. 146 to Facility Operating License No. DPR-22 Nuclear Management Company, LLC Monticello Nuclear Generating Plant Project stage: Request L-MT-06-039, Replacement Page for Improved TS 3.5.12006-05-12012 May 2006 Replacement Page for Improved TS 3.5.1 Project stage: Request ML0610705872006-05-25025 May 2006 Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications Project stage: Other ML0612402692006-06-0505 June 2006 Attachment 6 - Table R - Relocated Specifications for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Other ML0612402552006-06-0505 June 2006 Attachment 2 - Table a - Administrative Changes for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Other ML0612402592006-06-0505 June 2006 Attachment 3 - Table M - More Restrictive Changes for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Other ML0612402642006-06-0505 June 2006 Attachment 4 - Table L - Less Restrictive Changes for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Other ML0612402662006-06-0505 June 2006 Attachment 5 - Table La - Removed Details for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Other ML0610705772006-06-0505 June 2006 Issuance of Licensing Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues Project stage: Approval ML0615101642006-06-0505 June 2006 Improved Technical Specifications Project stage: Other ML0619505982006-07-21021 July 2006 Transmittal of Correction to Page 3 of Amendment Improved Technical Specifications Project stage: Other ML0628500282006-10-12012 October 2006 Correction of Amendment 146 Regarding Improved Technical Specifications Project stage: Other ML0629200442006-10-12012 October 2006 Tech Spec Page, Correction of Amendment 146 Regarding Improved Technical Specifications Project stage: Other 2006-04-07
[Table View] |
Text
ECCS Instrumentation 3.3.5.1 Table 3.3.5.1-1 (page 3 of 6)
Emergency Core Cooling System Instrumentation APPLICABLE CONDITIONS MODES REQUIRED REFERENCED OR OTHER CHANNELS FROM SPECIFIED PER REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS FUNCTION ACTION A.1 REQUIREMENTS VALUE
- 2.
LPCI System
- e.
Reactor Steam Dome Pressure Permissive - Bypass Timer (Pump Permissive) 1,2,3 4 (a) 5 (a) 2 2
C SR 3.3.5.1.7 SR 3.3.5.1.8 B
SR 3.3.5.1.7 SR 3.3.5.1.8
> 18 minutes and
_ 22 minutes
> 18 minutes and
< 22 minutes
- f.
Low Pressure Coolant Injection Pump Start - Time Delay Relay 1,2,3, 4 (a) 5 (a) 4 per pump B
SR 3.3.5.1.7 SR 3.3.5.1.8 Pumps A, B Pumps C, D
- g.
Low Pressure Coolant Injection Pump Discharge Flow - Low (Bypass)
- h.
Reactor Steam Dome Pressure -
Low (Break Detection)
Recirculation Pump Differential Pressure
- High (Break Detection)
- j.
Recirculation Riser Differential Pressure
- High (Break Detection)
- k.
Reactor Steam Dome Pressure -
Time Delay Relay (Break Detection) 1,2,3, 4(a), 5 (a) 1,2,3, 1 per pump 4
1,2,3 4 per pump E
SR SR SR B
SR SR SR C
SR SR SR C
SR SR SR B
SR SR SR 3.3.5.1.2 3.3.5.1.7 3.3.5.1.8 3.3.5.1.2 3.3.5.1.7 3.3.5.1.8 3.3.5.1.2 3.3.5.1.7 3.3.5.1.8 3.3.5.1.2 3.3.5.1.6 3.3.5.1.8 3.3.5.1.2 3.3.5.1.4 3.3.5.1.8
< 5.33 seconds
_< 10.59 seconds
>_ 360 gpm and 5 745 gpm
>_ 873.6 psig and
- 9 923.4 psig
_ 63.5 inches wc
< 24.0 inches wc
1,2,3 2
(a)
When associated ECCS subsystem(s) are required to be OPERABLE per LCO 3.5.2.
Monticello 3.3.5.1-8
-A^erncm-nt Ne. 44 G Correction letter of 10/12/06