in the Matter of Dominion Nuclear Connecticut, Inc. (Millstone, Units 2 and 3)
ML062090051
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 12/08/2004
From:
Westlaw
To:
Office of Nuclear Reactor Regulation
References
50-336-LR, 50-423-LR
Download: ML062090051 (15)


Text

Page i or i3 Westlaw.

60 N.R.C. 631 Page 1 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

(Millstone Nuclear Power Station, Units 2 and 3)

Nuclear Regulatory Commission (N.R.C.)

Docket Nos. 50-336-LR, 50-423-LR December 8, 2004

  • 631 COMMISSIONERS: Nils J. Diaz, Chairman; Edward McGaffigan, Jr.; Jeffrey S.

Merrifield The Connecticut Coalition Against Millstone (CCAM) has sought intervenor status and a hearing in which to challenge Dominion Nuclear'Connecticut's (Dominion's) pending application to renew its operating licenses for Units 2 and 3 of the Millstone Nuclear Power Station. The Licensing Board issued LBP-04-15, denying CCAM's intervention petition on the ground that each of CCAM's six proffered contentions was inadmissible under 10 C.F.R. § 2.309(f)(1). CCAM sought reconsideration of the Board's order, and requested permission to provide additional support for its contentions. The Board issued LBP-04-22, denying these two requests. On appeal, the Commission affirms the Board's two orders, denies CCAM's appeals, and terminates the proceeding.

RULES OF PRACTICE: ADMISSIBILITY OF CONTENTIONS REGULATIONS: 10 C.F.R. § 2.309(f) (1)

The Commission will affirm a board's ruling on admissibility of contentions where the appellant fails on appeal to address adequately (if at all) the board's grounds for refusing to admit these contentions, and/or fails to provide specific support for its contentions, and/or presents contentions that fall beyond the scope of the proceeding.

  • 632 RULES OF PRACTICE: ADMISSIBILITY OF CONTENTIONS REGULATIONS: 10 C.F.R. § 2.309(f)(1)

Section 2.309(f) (1) of our new Rules of Practice provides that, for a contention to be admissible, it must provide (1) a specific statement of the legal or factual issue sought to be raised; (2) a brief explanation of its basis; (3) a concise statement of the alleged facts or expert opinions, including references to specific sources and documents, that support the petitioner's position and upon which the petitioner intends to rely at hearing; and (4) sufficient information demonstrating that a genuine dispute exists in regard to a material issue of law

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

I/n-i) l11t,.0 IntIr~nt/Mcttrpm -icnv9ci,--. nlt rptinntinn=tnkmnrirdAAoosRAOOOOO 167100 07/99/9006

F-age 2cot i 60 N.R.C. 631 Page 2 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

or fact, including references to specific portions of the application that the peiitioner disputes, or in the case where the application is alleged to be deficient, the identification of such deficiencies and supporting reasons for this belief. In addition, the petitioner must demonstrate that the issue raised in the contention is both within the scope of the proceeding and material to the findings the NRC must make to support the action that is involved in the proceeding.

Failure to comply with any of these requirements is grounds for the dismissal of a contention.

RULES OF PRACTICE: AMENDED OR NEW CONTENTIONS

    • 2 REGULATIONS: 10 C.F.R. § 2.309(f) (2)

This agency does not look with favor on amended or new contentions filed after the initial filing. Section 2.309(f) (2) of our new regulations provides that petitioners may file such late contentions "only upon a showing that -- (i) [t]he information upon which the amended or new contention is based was not previously available; (ii) [tihe information upon which the amended or new contention is based is materially different than information previously available; and (iii)

[t]he amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information."

RULES OF PRACTICE: RECONSIDERATION OF BOARD ORDERS REGULATIONS: 10 C.F.R. § 2.323(e)

The NRC sets a high bar for parties seeking reconsideration of board orders.

Section 2.323(e) of our regulations provides that "Motions for reconsideration may not be filed except upon leave of the presiding officer or the Commission, upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which could not have reasonably been anticipated, that renders the decision invalid."

  • 633 RULES OF PRACTICE: ADMISSIBILITY OF CONTENTIONS; APPELLATE REVIEW (ADMISSIBILITY OF CONTENTIONS)

The Commission affirms Board rulings on admissibility of contentions if the appellant "points to no error of law or abuse of discretion." Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-00-21, 52 NRC 261, 265 (2000).

SCOPE OF PROCEEDING: LICENSE RENEWAL RULES OF PRACTICE: SCOPE OF PROCEEDING (LICENSE RENEWAL)

The potential detrimental effects of aging is the issue that essentially defines the scope of license renewal proceedings. Our license renewal inquiry is narrow.

It focuses on the potential impacts of an additional 20 years of nuclear power

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

I-.tr~II~,~1)i,~i't1m, c/n/rint/nr~rntctrrnm -%env 9c%,-Vnlitgrd ptinntin =tnkrnrird-AnnflszoOOnflfl67100 0712 nri9

rage -ior i.

60 N.R.C. 631 Page 3 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

plant operation, not on everyday operational issues. Those issues are effectively addressed and maintained by ongoing agency oversight, review, and enforcement.

SCOPE OF PROCEEDING: LICENSE RENEWAL RULES OF PRACTICE: SCOPE OF PROCEEDING (LICENSE RENEWAL)

REGULATIONS: 10 C.F.R. § 2.206 A license renewal proceeding is not the proper forum for the NRC to consider operational issues. If an intervenor has information supporting its claim that a licensee's operation has caused "human suffering on a vast scale," its remedy would not be a narrowly focused license renewal hearing, but instead a citizen's petition under 10 C.F.R. § 2.206.

SCOPE OF PROCEEDING: LICENSE RENEWAL

"Contentions related to terrorism are beyond the scope of [a license renewal]

proceeding." Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI-02-26, 56 NRC 358, 363 (2002).

Security issues at nuclear power reactors, while vital, are simply not among the aging-related questions at stake in a license renewal proceeding.

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT

. The NRC does not require a licensee to possess a National Pollutant Discharge Elimination System permit. Philadelphia Electric Co. (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216, 8 AEC 13, 58, rev'd in part on other grounds, CLI-74-32, 8 AEC 217 (1974).

NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT SCOPE OF PROCEEDING: LICENSE RENEWAL RULES OF PRACTICE: SCOPE OF PROCEEDING (LICENSE RENEWAL)

LICENSING BOARD JURISDICTION A licensee's possession of a National Pollutant Discharge Elimination System permit is outside both the scope of the license renewal proceeding and the jurisdiction of the licensing board.

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

http://web2.westIaw.com/print/printstream.asix?sv=SDI it&destination=att&Drid=AO0558000000 67100... 07/25/2006

t-'age 4 or ID 60 N.R.C. 631 Page 4 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

RULES OF PRACTICE: APPELLATE REVIEW The Commission does not consider arguments raised for the first time on appeal.

EMERGENCY PLANNING RULES OF PRACTICE: SCOPE OF REVIEW (LICENSE RENEWAL PROCEEDINGS)

SCOPE OF REVIEW: LICENSE RENEWAL PROCEEDINGS Emergency planning issues fall outside the scope of license renewal proceedings.

Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3), LBP-04-15, 60 NRC 81, 97 (2004), citing Florida Power & Light *635 Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 9 (2001).

RULES OF PRACTICE: SANCTIONS REGULATIONS: 10 C.F.R. § 2.314(c) (1)

The Commission expresses its displeasure at the CCAM attorney's consistent disregard for our procedural rules. This is her fifth NRC adjudication since 1999, so she cannot credibly claim ignorance of our practices and procedures. CCAM's attorney has, in this proceeding, repeatedly failed to provide support at the hearing for her client's contentions, as required under 10 C.F.R. § 2.309(f), and has likewise ignored numerous other Commission adjudicatory procedures. She has a similar record in four previous Millstone proceedings, where she has repeatedly failed to follow basic NRC adjudicatory procedures.

    • 4 The Commission informs CCAM's Counsel that any further disregard of our practices and procedures in future adjudications will result in reprimand, censure, or suspension pursuant to 10 C.F.R. § 2.314(c)(1) (providing for sanctions against any "representative of a party who refuses to comply with [the Commission's or the Licensing Board's] directions"). This ruling applies regardless of whether her representation before the NRC is as an attorney at law or otherwise. If such breaches occur during the threshold or hearing stage of an adjudication, we instruct the Board in that proceeding to exercise its authority under 10 C.F.R. § 2.319(g) and impose what it considers appropriate sanctions. We will do the same for any breach during the appellate stage. This warning does not mean that CCAM or its counsel is unwelcome at future NRC proceedings, but only that they must participate according to our rules.

MEMORANDUM AND ORDER The Connecticut Coalition Against Millstone (CCAM) has sought intervenor status and a hearing in which to challenge Dominion Nuclear Connecticut's (Dominion's) pending application to renew its operating licenses for Units 2 and 3 of the Millstone Nuclear Power Station. On July 28, 2004, the Licensing Board issued LBP-04-15, 60 NRC 81, denying CCAM's intervention petition on the ground that each

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

hittrv-//xiph) ii,*actIn, oaminrint/nt ntctrPnm ncny 9u,=qnltkrrl tinntinn=:ltnknrid=AAO5,iRflOOOOi167100 " 7/29/00(6

rage D)o0 n) 60 N.R.C. 631 Page 5 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

of CCAM's six proffered contentions was inadmissible under 10 C.F.R. § 2.309(f) (1). CCAM sought reconsideration of the Board's order, and requested permission to provide additional support for its contentions. On September 20th, the Board issued LBP-04-22, 60 NRC 379, denying CCAM's motion for reconsideration and request to provide additional support. CCAM has appealed the Board's July 28th and September 20th orders. For the reasons set *636 forth below and in the Board's two orders, we affirm those orders, deny CCAM's appeals, and terminate the proceeding.

LEGAL STANDARDS Section 2.309(f)(1) of our new Rules of Practice provides that, for a contention to be admissible, it must provide (1) a specific statement of the legal or factual issue sought to be raised; (2) a brief explanation of its basis; (3) a concise statement of the alleged facts or expert opinions, including references to specific sources and documents, that support the petitioner's position and upon which the petitioner intends to rely at hearing; and (4) sufficient information demonstrating that a genuine dispute exists in regard to a material issue of law or fact, including references to specific portions of the application that the petitioner disputes, or in the case where the application is alleged to be deficient, the identification of such deficiencies and supporting reasons for this belief. [FNI] In addition, the petitioner must demonstrate that the issue raised in the contention is both "within the scope of the proceeding" and "material to the findings the NRC must make to support the action that is involved in the proceeding." [FN2] Failure to comply with any of these requirements is grounds for the dismissal of a contention. [FN3]

    • 5 This agency does not look with favor on "amended or new contentions filed after the initial filing." [FN4] Section 2.309(f) (2) of our new regulations provides that petitioners may file such late contentions only upon a showing that --

(i) (t]he information upon which the amended or new contention is based was not previously available; (ii) [tihe information upon which the amended or new contention is based is materially different than information previously available; and (iii) [t~he amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information." [FN5]

The NRC likewise sets a high bar for parties seeking reconsideration of Board orders. Section 2.323(e) of our regulations provides that

  • 637 Motions for reconsideration may not be filed except upon leave of the presiding officer or the Commission, upon a showing of compelling circumstances, such as the existence of a clear and material error in a decision, which could not

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

httn://weh2.we.qtlaw.cnm/nrint/nrint.,trenrm .,.nx ?.cv=Snlit&des.-tination=n rn&nrid= A 0055snonnon167100 n7/121/210O6

t'age t ot i, 60 N.R.C. 631 Page 6 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

have reasonably been anticipated, that renders the decision invalid.

Finally, the Commission affirms Board rulings on admissibility of contentions if the appellant "points to no error of law or abuse of discretion." [FN6J DISCUSSION I. APPEAL OF LBP-04-15 CCAM asserts in its appeal of LBP-04-15 that the Board should have admitted all six of CCAM's contentions. We examine each one briefly below and conclude that CCAM has failed on appeal to address adequately (if at all) the Board's grounds for refusing to admit these contentions. We also concur with the Board's conclusions that CCAM has repeatedly failed to provide specific support for its contentions and that many of its contentions are beyond the limited scope of this license renewal proceeding. Consequently, we affirm LBP-04-15.

In Contention I, CCAM argued that "[t~he operations of Millstone Units 2 and 3 have caused death, disease, biological and genetic harm and human suffering on a vast scale." [FN7] The Licensing Board rejected this contention for failure to set forth the specific factual or legal basis, as required by 10 C.F.R. § 2.309 (f) (1) (v). [FN8] The Board further found that CCAM had not shown how its allegations may be related to the potential detrimental effects of aging [FN9] --

which is, after all, the issue that essentially defines the scope of this (and all other) license renewal proceedings. [FNl0] Our license renewal inquiry is narrow.

It focuses on "the potential impacts of an additional 20 years of nuclear power plant operation," [FNII] not on everyday *638 operational issues. Those issues are "effectively addressed and maintained by ongoing agency oversight, review, and enforcement." [FNl2]

    • 6 We have reviewed the record here and conclude that it fully supports the Board's determinations on Contention I. We therefore reject CCAM's appeal of the Board's ruling that Contention I is inadmissible. We also reject this portion of CCAM's appeal on an additional procedural ground -- the appeal does not even challenge the Board's ruling that Contention I falls outside the scope of this proceeding. [FNI3] CCAM's failure to challenge this last ruling is, in and of itself, sufficient justification to reject CCAM's appeal as to Contention I. This is not to say, however, that we take lightly assertions such as those set forth in Contention I. We don't. We are saying merely that a license renewal proceeding is not the proper forum for the NRC to consider operational issues. If CCAM has information supporting its claim that Millstone's operation has caused "human suffering on a vast scale," its remedy would not be a narrowly focused license renewal hearing,.but a citizen's petition under 10 C.F.R. § 2.206.

In Contention II, CCAM argued that Millstone Units 2 and 3 are "terrorist targets of choice." [FNI4] The Licensing Board concluded that this contention was inadmissible for failure to satisfy the requirements of 10 C.F.R. § 2.309(f) (1)(iii) (requiring that a contention be within the scope of the

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

httn'llu1h9 ixtlnu, rnmlnrint/nrintctr~qm qny9n v=.qnlitkcli-ztin~qtinn=qtnPrnrirl= A A(155RAOOOO 1167 1O0 07/') S/')006

t'age / o iD 60 N.R.C. 631 Page 7 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

proceeding), and also for failure to provide supporting documentation. [FN15] We again concur in the Board's view. We draw particular attention to our ruling just 2 years ago that "contentions related to terrorism are beyond the scope of [a license renewal] proceeding." [FN16] On appeal, CCAM cites no authority to the contrary, offering instead only general references to the "911 Commission" Report and unidentified statements in the media. [FN17] This does not come close to satisfying our requirement to demonstrate clear error or abuse of discretion. As with the health-related concerns expressed in Contention I, we want to emphasize that security issues at nuclear power reactors, while vital, are simply not among the aging-related questions at stake in a license renewal proceeding. The Commission, as we have often reiterated, takes its security responsibilities seriously and has taken numerous regulatory steps to enhance security at nuclear power reactors. [FNI8]

In Contention III, CCAM argued that Dominion currently lacks a valid National Pollutant Discharge Elimination System permit. The Board rejected this *639 contention as outside both the scope of the license renewal proceeding and the jurisdiction of the Licensing Board. [FN19] We agree with the Board. On appeal, CCAM does not challenge the correctness of the Board's "scope" ruling. [FN20] This contention has nothing whatever to do with aging-related issues, is beyond the scope of this proceeding, and is therefore inadmissible. Moreover, the NRC simply does not require a licensee to possess this particular permit. [FN21] Contention III is therefore also immaterial to this proceeding

    • 7 In Contention IV, CCAM contended that the operations of Millstone Units 2 and 3 "have caused devastating losses to the indigenous Niantic winter flounder population" and that "continued operations [of the facility] will increase the severity of the environmental damage." [FN22] The Licensing Board declined to admit this contention for three reasons: CCAM's failure to take issue with the environmental provisions of Dominion's license renewal application by pointing out what portion is deficient; CCAM's failure to assert that Dominion failed to comply with the applicable NEPA regulation (10 C.F.R. § 51.53(c) (3)(ii) (B)); and CCAM's failure to provide any expert opinion or reference to substantiate its "general allegation" that Units 1 and 2 "somehow played a material role in the flounder population decline." [FN23]

On appeal, CCAM challenges none of these three rulings, and instead merely makes general arguments about the flounder population's decline and CCAM's willingness to produce supporting documentation at a future hearing in this proceeding. [FN24]

CCAM's general arguments do not come to grips with the Board's reasons for rejecting Contention IV and are not nearly enough to revive a contention that lacks support in the law or facts. [FN25] We see no basis to overturn the Board's well-taken rulings.

In Contention V, CCAM asserted that Units 2 and 3 "suffer technical and operational defects which preclude safe operation." [FN26] The Licensing Board, noting that CCAM had failed to cite even a "single specific deficiency" in *640 the application, [FN27] rejected this contention as failing to satisfy the Q 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

httn'//w-wh2.wt.'*tlw.c.nm/nrint/nri nt.qt,'anm.q.qnx ?.v=Snlit&.de.qtinntinn=,atnk.nrid=AO05598000000167100 071251006

r'age zs or 13_-

60 N.R.C. 631 Page 8 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

requirements of section 2.309(f)(1)(v) and (vi) to provide specificity and to set forth each deficiency and the reasons supporting petitioner's conclusion regarding that deficiency. [FN28] On appeal, CCAM again fails to dispute the Board's rationale (FN29] -- a fatal flaw in its appellate challenge to the Board's rejection of Contention V.

The Board also concluded that even CCAM's general arguments reflect a failure to read or analyze the license renewal application, [FN30] constitute an improper challenge to Commission regulations, [FN31] and exceed the aging-management scope of this license renewal proceeding. [FN32] Based on our own review of the record, we fully concur in the Board's conclusions. We do not reach CCAM's belated argument that "the discussion of metal fatigue and its implications for the two reactors is closely mirrored, with no discussion of Unit 2's history of excessive unplanned shutdowns and, hence, their effect on aging." [FN33] This last argument was improperly raised for the first time on appeal. CCAM made no attempt to file this concern as a late-filed contention. [FN34] If CCAM can substantiate its new-arising argument, a petition under 10 C.F.R. § 2.206 would be the appropriate recourse.

    • 8 Finally, CCAM argued in Contention VI that parts or all of Connecticut and Long Island "cannot be evacuated." [FN35] The Licensing Board declined to admit the contention because it did not relate to aging and therefore, as with many of CCAM's other claims, it lay beyond the scope of the license renewal proceeding.

[FN36] In support, the Board cited our decision in Turkey Point, where we specifically held that emergency planning issues fall outside the scope of license renewal proceedings. [FN37] On appeal, CCAM does not attempt to distinguish Turkey Point; indeed, CCAM does not even cite the decision. Rather, CCAM challenges the adequacy of the evacuation plan itself, based on vague references to "[c]urrent circumstances," "faithfulness to reality" and "common sensed" [sic]. [FN38] We consider Turkey Point dispositive of this issue. The Licensing Board *641 also explained that, in any event, the contention would have been inadmissible due to CCAM's failure to provide specific supporting facts or expert opinion -- a conclusion CCAM does not challenge on appeal. [FN39]

In sum, we believe that the Board in LBP-04-15 applied the correct standards for evaluating the proposed contentions and reached the correct result in refusing to admit each of them. We further believe that CCAM failed to show on appeal that the Board has either committed errors of law or abused its discretion.

II. APPEAL OF LBP-04-22 In its September 30th Appeal, CCAM first incorporates by reference its entire reconsideration request, [FN40] which we reject for the reasons given by the Board in LBP-04-22. CCAM also makes four specific arguments, which we address and reject below. Before examining each assertion, however, we rule generally that CCAM has failed to make the showing, required of all motions for reconsideration filed under 10 C.F.R. § 2.323(e), "of compelling circumstances, such as the existence of a clear and material error .... which could not have reasonably been anticipated,

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

http://web2.westlaw.com/print/Drintstream.asDx?sv=SDlit&destination=atn&nrid=A00559OO*Oq 167100 07/9?/")nn

Page 9 or 1n 60 N.R.C. 631 Page 9 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

that renders the decision invalid." CCAM likewise failed to address the regulatory criteria for amending already-filed contentions, [FN41] which is essentially what CCAM seeks to do in its second appeal and motion for reconsideration. Notably, CCAM does not challenge on appeal the Board's ruling that CCAM did not attempt either to address those criteria or to demonstrate the prior unavailability of the material it submitted with its Motion for Reconsideration and Request for Leave To Amend Petition. We turn now to CCAM's four specific arguments.

First, CCAM argues that the Licensing Board "exalted form over substance" in rejecting the information supporting CCAM's petition. In particular, CCAM complains that the Licensing Board rejected "without proper basis" the proffered expert testimony of Dr. Ernest Sternglass and Joseph Mangano, as well as the proffered testimony of Cynthia Besade. [FN42] These three affidavits accompanied CCAM's August 9th Request for Reconsideration and Motion To Amend Petition. The Licensing Board denied CCAM's motion to amend, citing the relevant *642 standards for amending contentions. [FN43] Specifically, the Board noted that CCAM did not attempt to demonstrate that the new information was "not previously available,"

"materially different from information previously available," or that, as a result of earlier unavailability, CCAM's request to amend was timely submitted. [FN44]

    • 9 CCAM never explains on appeal why it believes these Licensing Board determinations were erroneous. We do not believe that the Board erred. The Board applied the proper regulatory criteria and reached what we consider the correct result. We also agree with the Licensing Board statement in LBP-04-22 that CCAM's filings in this proceeding "failed to demonstrate even a modicum of the necessary discipline and preparedness" required by the contention admissibility rules. [FN45]

Next, CCAM claims that the Board improperly accepted the truth and accuracy of Dominion's positions regarding environmental and marine effects and validity of necessary permits. CCAM claims to have offered proof to the contrary. [FN46] CCAM is presumably referring here to the Board's rulings on Contentions III and IV --

relating to pollution discharge permits and to the local flounder population --

and appears to believe that the Board rejected these two contentions on their merits. We disagree. The Licensing Board's rejection of Contentions III and IV had nothing to do with their merits but rested instead on the conclusions that they fell outside the scope of a license renewal proceeding and lacked sufficient documentary, expert or factual backing to meet our threshold requirements for admitting contentions for hearing. [FN47] The Board made these holdings without any reference to the material supporting the license renewal application, but rather on the basis that the proposed contentions were deficient on their face.

CCAM next raises what appears to be a brand new contention -- namely, that it "established" that Units 2 and 3 cannot be shut down safely "because [their]

shutdowns release unsafe levels of radioisotopes into the environment." [FN48]

CCAM did not, however, attempt to satisfy the requirements for submitting late-filed contentions. Even if, as the NRC Staff suggests, [FN49] CCAM intended this argument to support the admissibility of Contention I (regarding Millstone's general health effects), CCAM still failed to address the Licensing Board's

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

http://web2.westlaw.com/print/dipntstream.asx.x?sv=Solit&destination=att&nrid=A00558000000 167100.. 07/9.5/2006

r'age mUor i:

60 N.R.C. 631 Page 10 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

reasons for declining *643 to admit that contention or for denying CCAM's motion to amend its petition. This failure is fatal to CCAM's argument on appeal. [FN50]

Finally, CCAM asserts, presumably regarding Contention V (regarding past operational difficulties at Millstone), that the record in this proceeding demonstrates "that the licensee did not establish that it had evaluated the Millstone Unit 2 operational history of unplanned shutdowns as a discrete element in its application and therefore its analysis of metal fatigue and related issues is incomplete." [FN51] As noted by the Licensing Board, however, the license renewal application incorporated historical data regarding emergency shutdowns (and other transient events) when developing the fatigue analysis of the components required to be examined in the aging analysis, and CCAM never challenged this analysis. [FN52] CCAM has offered no basis on appeal for us to conclude that the Licensing Board was incorrect, either in this assessment or in its determination that CCAM Contention V was inadmissible for its failure, among other things, to challenge the application. (The language quoted at the beginning of this paragraph constitutes the entirety of CCAM's argument.)

III. CCAM'S LEGAL REPRESENTATION

    • 10 Finally, we join the Licensing Board in expressing displeasure at the CCAM attorney's consistent disregard for our procedural rules. [FN53] As we noted just
  • 644 last year when criticizing CCAM's same counsel for similar dereliction, she is "no stranger[] to the NRC adjudicatory process." This is her fifth NRC adjudication since 1999, EFN54] so she cannot credibly claim ignorance of our practices and procedures. As the Board's two orders in this proceeding and our own order today make clear, CCAM's attorney has repeatedly failed to provide support at the hearing for her client's contentions, as required under section 2.309(f) of our rules of practice and procedure. [FN55] Further, the record in this proceeding indicates that CCAM's attorney has likewise ignored numerous other Commission adjudicatory procedures. Nor has her disregard for our procedures been limited to this proceeding. She has a similar record in four previous Millstone proceedings, where she has repeatedly failed to follow basic NRC adjudicatory procedures. [FN56]

CCAM's Counsel is informed that any further disregard of our practices and procedures in future adjudications will result in reprimand, censure, or suspension pursuant to 10 C.F.R. § 2.314(c)(1) (providing for sanctions against any "representative of a-party who refuses to comply with [the Commission's or the Licensing Board's] directions"). [FN57] This ruling applies regardless of whether her representation before the NRC is as an attorney at law or otherwise. If such breaches occur during the threshold or hearing stage of an adjudication, we instruct the Board in that proceeding to exercise its authority under 10 C.F.R. § 2.319(g) and impose what it considers appropriate sanctions. We will do the same for any breach during the appellate stage. This warning does not mean that CCAM or its counsel is unwelcome at future NRC proceedings, but only that they must participate according to our rules.

  • 645 CONCLUSION

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

http://web2.westlaw.comlplrint/printstream.asnx?sv=Snhit&destination=atD&Drid=AO0558000000 67100... 07/25/.006

Paige I I ot 1-')

60 N.R.C. 631 Page 11 60 N.R.C. 631, Nuclear Reg. Rep. P.31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

For the reasons set forth above, we affirm LBP-04-15 and LBP-04-22 in all respects, deny CCAM's two appeals, and terminate this proceeding.

IT IS SO ORDERED.

For the Commission ANNETTE L. VIETTI-COOK Secretary of the Commission FNl. See 10 C.F.R. § 2.309(f) (1) (i), (ii), (v), and (vi). These requirements are the same as those in our prior contention pleading rule, 10 C.F.R. § 2.714(c).

FN2. See id. § 2.309(f) (1)(iii), (iv).

FN3. See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-99-10, 49 NRC 318, 325 (1999); Arizona Public Service Co. (Palo Verde Nuclear Generating Station, Units 1, 2, and 3), CLI-91-12, 34 NRC 149, 155 (1991).

FN4. 10 C.F.R. § 2.309(f) (2).

FN5. 10 C.F.R. § 2.309(f) (2) (i)-(iii). See also 10 C.F.R. § 2.309(c) (1).

FN6. Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation),

CLI-00-21, 52 NRC 261, 265 (2000).

FN7. LBP-04-15, 60 NRC at 90.

FN8. Id. at 90-91.

FN9. Id. at 92.

FNI0. See "Notice of Acceptance for Docketing of the Applications and Notice of Opportunity for Hearing Regarding Renewal of Facility Operating License Nos.

DPR-65 and NPF-49," 69 Fed. Reg. 11,897 (Mar. 12, 2004), defining the scope of the instant proceeding. See generally Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 7 (2001); Final Rule:

"Nuclear Power Plant License Renewal; Revisions," 60 Fed. Reg. 22,461 (May 8, 1995).

FNII. Turkey Point, CLI-01-17, 54 NRC at 7.

FNI2. Id. at 9.

FNI3. See Notice of Appeal, undated but filed Aug. 9, 2000 ("First Appeal"), at 2-4.

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

httn-/IAuPh') %xiPetl v rr~mlnintlnt ntctrrn-nm nny 9c~1,.nlitRr pztnitn A rni]Ann5RnnnnnnlOOi £7 1A morionnA 7/ /9n

Fage 12 ot 1i3 60 N.R.C. 631 Page 12 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

FN14. LBP-04-15, 60 NRC at 92.

FN15. Id.

FNI6. Duke Energy Corp. (McGuire Nuclear Station, Units 1 and 2; Catawba Nuclear Station, Units 1 and 2), CLI-02-26, 56 NRC 358, 363 (2002).

FNI7. First Appeal at 4-6.

FNI8. Riverkeeper, Inc. v. Collins, 359 F.3d 156, 160-62 & nn.4-6 (2d Cir. 2004).

FNI9. LBP-04-15, 60 NRC at 93.

FN20. See First Appeal at 6-7.

FN21. Philadelphia Electric Co. (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216, 8 AEC 13, 58, rev'd in part on other grounds, CLI-74-32, 8 AEC 217 (1974).

FN22. LBP-04-15, 60 NRC at 94, citing CCAM's Petition To Intervene, dated March 22, 2004, at 7, and CCAM's Amended Petition To Intervene, dated June 15, 2004, at 7.

FN23. LBP-04-15, 60 NRC at 94, citing 10 C.F.R. § 2.309(f) (1)(v), (vi).

FN24. See First Appeal at 7-8.

FN25. See generally Advanced Medical Systems, Inc. (One Factory Row, Geneva, Ohio 44041), CLI-94-6, 39 NRC 285, 297 (1994) ("The appellant bears the responsibility of clearly identifying the errors in the decision below and ensuring that its brief contains sufficient information and cogent argument to alert the other parties and the Commission to the precise nature of and support for the appellant's claims").

FN26. LBP-04-15, 60 NRC at 95.

FN27. Id.

FN28. Id. at 96.

FN29. See First Appeal at 8-10.

FN30. LBP-04-15, 60 NRC at 95.

FN31. Id. at 96.

FN32. Id.

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

httn-//uuh') xv.-cfl~i~xi tnm/nrint/ndntezt1rPqr qny 'k?,ziInlit rrp.tinqticnn=-tnknric=AAosspn0flOOOO g7 100O 07/95/006

rage i-ior i:

60 N.R.C. 631 Page 13 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

FN33. CCAM's August 9th Appeal at 11.

FN34. See Private Fuel Storage, L.L.C. (Independent Spent Fuel Storage Installation), CLI-04-22, 60 NRC 125, 139-40 (2004); Sequoyah Fuels Corp. (Gore, Oklahoma Site), CLI-04-2, 59 NRC 5, 8 n. 18 (2004); Hydro Resources, Inc. (2929 Coors Road, Suite 101, Albuquerque, NM 87120), CLI-00-8, 51 NRC 227, 243 (2000).

FN35. LBP-04-15, 60 NRC at 96, citing CCAM Petition at 9.

FN36. 60 NRC at 96-97.

FN37. 60 NRC at 97, citing Turkey Point, CLI-01-17, 54 NRC at 9.

FN38. First Appeal at 10.

FN39. 60 NRC at 97, citing 10 C.F.R. § 2.309(f)(1)(vi).

FN40. CCAM's Appeal, dated Sept 30, 2004 ("Second Appeal"), at 1. The Commission does not favor incorporating pleadings by reference. See Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-89-3, 29 NRC 234, 240-41 (1989).

CCAM had been advised of this in the instant and prior proceedings. See Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3), 2004 WL 1505510, at *1 (NRC June 8, 2004); id. 2003 WL 194528, at *1 (NRC Jan. 16, 2003).

FN41. 10 C.F.R. § 2.309(f) (2).

FN42. Second Appeal at 1-2.

FN43. See LBP-04-22, 60 NRC at 383.

FN44. Id. at 383-84.

FN45. Id. at 384.

FN46. Second Appeal at 2.

FN47. 10 C.F.R. § 2.309(f).

FN48. Second Appeal at 2-3.

FN49. NRC Staff's Brief in Opposition to Appeal by Connecticut Coalition Against Millstone of LBP-04-15 and LBP-04-22, dated Oct. 18, 2004, at 7.

FN50. See Advanced Medical Systems, CLI-94-6, 39 NRC at 297, quoted supra note 25.

FN51. Second Appeal at 3.

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

http://web2.westlaw.com/nrint/lrintstream.asDx ?sv=SDlit&destination=atD&Drid=A00558000000 671 00... 07/25/2006

F'age 14 01 1-60 N.R.C. 631 Page 14 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

FN52. LBP-04-15, 60 NRC at 95.

FN53. The Board's two orders are riddled with expressions of frustration at CCAM counsel's repeated failures to comply with this agency's procedural rules. In the interest of brevity, however, we cite only the following handful as examples:

"This is only one of several examples in which CCAM has ... provided little or no sources or specificity so as to warrant admission of a contention. Such lack of care is unjustifiable, notwithstanding counsel representing CCAM on a pro bono basis." LBP-04-15, 60 NRC at 91.

The Board referred to counsel's "poorly articulated and misapprehended reference" to a regulatory provision. Id. at 92.

The Board referred to counsel's "failure to read or perform any meaningful analysis of the applications." Id. at 95.

"CCAM has given no reason whatsoever ... why -- despite having numerous opportunities to do so -- it chose not to provide this information until now."

LBP-04-22, 60 NRC at 382.

"CCAM has failed to demonstrate even a modicum of the necessary discipline and preparedness." Id. at 384.

The Board referred to "the careless disregard of relevant standards and procedures by CCAM counsel, and the disorganized manner in which the CCAM information has been presented." Id."

FN54. In addition to the instant proceeding, CCAM's attorney has participated in the following license amendment proceedings: Docket No. 50-336-OLA-2; Docket No.

50-423-LA-3; Docket Nos. 50-336-LA & 50-423-LA; and Docket Nos. 50-245-LT, 50-336-LT, & 50-423-LT.

FN55. 10 C.F.R. § 2.309(f).

FN56. See, e.g., Connecticut Coalition Against Millstone v. NRC, 2004 WL 2309754, at *1-*2 (2d Cir. Oct. 14, 2004); Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 2), CLI-03-14, 58 NRC 207 (2003), reconsid'n denied, CLI-03-18, 58 NRC 433 (2003), aff'g LBP-03-12, 58 NRC 75, 93-94 (2003), petition for review denied sub nom. Connecticut Coalition Against Millstone v. NRC, supra; Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI-01-24, 54 NRC 349 (2001), reconsid'n denied, CLI-02-1, 55 NRC 1 (2002),

aff'g LBP-01-10, 53 NRC 273 (2001); Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 3), CLI-00-18, 52 NRC 129 (2000).

FN57. Federal courts have imposed sanctions on parties who repeatedly disregard court orders or procedural rules. See, e.g., Velazquez-Rivera v. Sea-Land Service, Inc., 920 F.2d 1072, 1076-77 (1st Cir. 1990); Yusov v. Yusuf, 892 F.2d 784, 787

© 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.

httD://web2.westlaw.com/orint/oDintstream.asDx ?sv=SrIlit&destination=atn&nricd=AO0 58000000167100 7 13719.V19.06

Page 15 or 1ot5 60 N.R.C. 631 Page 15 60 N.R.C. 631, Nuclear Reg. Rep. P 31,461, 2004 WL 3247606 (N.R.C.)

(Cite as: 60 N.R.C. 631, 2004 WL 3247606 (N.R.C.))

(9th Cir. 1989).

END OF DOCUMENT 0 2006 Thomson/West. No Claim to Orig. U.S. Govt. Works.