|
---|
Category:- No Document Type Applies
MONTHYEARML24227A5212024-08-12012 August 2024 Inservice Inspection Request for Information ML22034A3952022-02-16016 February 2022 Enclosure 3 - IP 96001 CY2021 - IR 8 Baseline Inspection Completion ML22034A3972022-02-16016 February 2022 Enclosure 2 - IP 92707 CY2021 - IR 8 Baseline Inspection Completion ML22034A3992022-02-16016 February 2022 Enclosure 1 - IP 71130.03 Cy 2021 - IR 8 Baseline Inspection Completion ML21354A7632021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 18 of 18 ML21354A7592021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 14 of 18 ML21354A7602021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 15 of 18 ML21354A7612021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 16 of 18 ML21354A7462021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 1 of 18 ML21354A7572021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 12 of 18 ML21354A7492021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 4 of 18 ML21354A7562021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 11 of 18 ML21026A2602021-02-0808 February 2021 Authorization and Safety Evaluation for Alternative Request No. ANO1-ISI-034 ML20329A1452020-11-20020 November 2020 Terrapower'S QAPD Preliminary Questions ML20135G7202020-05-14014 May 2020 Final ASP Analysis - ANO 1 (LER 313-93-003) ML19009A3222019-01-0808 January 2019 NRC-2017-000688 - Resp 4 - Interim, Agency Records Subject to the Request Are Enclosed (Arkansas Nuclear One, Units 1 and 2, FHRR - Released Set) ML18228A5012018-08-15015 August 2018 NEI 99-02 FAQ 18-04 ANO Uswc Rev 1 W/Proposed NRC Response ML18232A2332018-06-20020 June 2018 FAQ 18-04 ANO-1 Uswc Rev 1 Wapproved Final NRC Response, August 20, 2018 ML18002A2362018-01-0303 January 2018 Public Notice of Application for Exigent Amendment, Request for Allowance to Exclude Exercise of Control Element Assembly 4 Related to Surveillance Requirement 4.1.3.1.2 for Remainder of Cycle 26 ML18008A2972018-01-0303 January 2018 ANO Timeline for Remaining Key Milestones CNRO-2016-00024, Entergy - Form 10-K for Fiscal Year Ended December 31, 20152016-12-20020 December 2016 Entergy - Form 10-K for Fiscal Year Ended December 31, 2015 ML16327A5302016-12-0202 December 2016 Enclosure 1 - Mitigating Strategies Flood Hazard Information Tables for Interim Staff Response (Redacted Version) ML16285A3312016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-09 ML16285A3262016-10-12012 October 2016 ROP PI Frequently Asked Questions (Faqs): 14-03 ML16225A5402016-08-12012 August 2016 U.S. Nuclear Regulatory Commission Staff Review of Resolutions of Arkansas Nuclear One Internal Events and Fire PRA Facts and Observations (F&Os) ML14314A5122014-11-13013 November 2014 Enclosure 2 - Frequently Asked Questions (Faqs) Discussed During the October 22 2014 Reactor Oversight Process Public Meeting ML14329A4112014-08-15015 August 2014 U.S. Nuclear Regulatory Commission, Record of Review, Arkansas Nuclear One Unit 2 (ANO-2), LAR Attachment V- Table V-1 Internal Events PRA Facts and Observations (F&Os) ML14219A4302014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 11 of 27 ML14220A1662014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 27 of 27 ML14220A1642014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 26 of 27 ML14220A1632014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 23 of 27 ML14220A1622014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 25 of 27 ML14220A1612014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 24 of 27 ML14220A0952014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 22 of 27 ML14220A0942014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 21 of 27 ML14220A0932014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 20 of 27 ML14220A0922014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 19 of 27 ML14219A4352014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 18 of 27 ML14219A4342014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 17 of 27 ML14219A4332014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 13 of 27 ML14219A4312014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 12 of 27 ML14219A4232014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 14 of 27 ML14219A4282014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 10 of 27 ML14219A4272014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B, (Records Being Released in Their Entirety), Part 9 of 27 ML14219A4262014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 8 of 27 ML14219A4252014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 16 of 27 ML14219A4242014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial, Group B (Records Being Released in Their Entirety). Part 15 of 27 ML14218A4882014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety) ML14218A4972014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group C (Records Being Released in Part) ML14218A6052014-07-30030 July 2014 FOIA/PA-2014-0024 - Resp 3 - Partial. Group B (Records Being Released in Their Entirety). Part 4 of 27 2024-08-12
[Table view] |
Text
REACTIVITY CONTROL SYSTEMS MODERATOR TEMPERATURE COEFFICIENT LIMITING CONDITION FOR OPERATION 3.1.1.4 The moderator temperature coefficient (MTC) shall be within the limits specified in the CORE OPERATING LIMITS REPORT. The maximum upper design limit shall be:
- a. Less positive than +0.5x10 4 Ak/k/OF whenever THERMAL POWER is _*70% of RATED THERMAL POWER, and
- b. Less positive than 0.0 Ak/k/°F whenever THERMAL POWER is > 70% of RATED THERMAL POWER.
APPLICABILITY: MODES 1 and 2*#
ACTION:
With the moderator temperature coefficient outside any one of the above limits, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.1.1.4.1 The MTC shall be determined to be within its limits by confirmatory measurements.
MTC measured values shall be extrapolated and/or compensated to permit direct comparison with the above limits. (Note 1)'
4.1.1.4.2 The MTC shall be determined at the following frequencies and THERMAL POWER conditions during each fuel cycle:
- a. Prior to initial operation above 5% of RATED THERMAL POWER, after each fuel loading. (Note 1)*
- b. At any THERMAL POWER, prior to reaching a RATED THERMAL POWER equilibrium boron concentration of 800 ppm.
- c. At any THERMAL POWER, within 14 EFPD after reaching a RATED THERMAL POWER equilibrium boron concentration of 300 ppm. (Note 2) O
- See Special Test Exception 3.10.2.
Note 1: For fuel cycles that meet the applicability requirements given in WCAP-1 6011-P-A, the verification prior to entering MODE 1 may be made using the predicted MTC as adjusted for the measured boron concentration.,
Note 2: The MTC determination of surveillance 4.1.1.4.2.c is not required if the results of the tests required in surveillances 4.1.1.4.2.a and 4.1.1.4.2.b are within a tolerance of
_ 0.16'x 10"4 Ak/k/ 0 F from the Corresponding design values. For cycles that meet the applicability requirements given in WCAP-1 6011-P-A, the MTC determination of surveillance 4.1.1.4.2.c is not required if the result of the test required in surveillance 4.1.1.4.2.b is within a tolerance of +/- 0.16 x 10Q4 Ak/k/OF from the corresponding design value.Y ARKANSAS - UNIT 2 3/4 1"-5 Amendment No. 84,8e,&+,94,+-57,2,