_____________ ____ Exd n Ex&~ Gene atior Thmpa y LtC N uc]
Bra~dwoodStation May 1,2006 BW060041 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Braidwood Station, Unit 1 Facility Operating License No. NPF-72 NRC Docket No. STN 50-456
Subject:
Core Operating Limits Report, Braidwood Unit 1 Cycle 13 The purpose of this letter is to transmit the Core Operating Limits Report (COLR) for Braidwood Unit 1 Cycle 13, in accordance with Technical Specification 5.6.5, Core Operating Limits Report (COLR). This revision of the COLR was recently implemented in support of a reload cycle.
If you have any questions regarding this matter, please contact Mr. Dale Ambler, Regulatory Assurance Manager, at (815) 417-2800.
Sincerely, Keith J. PoIson Site Vice President Braidwood Station
Attachment:
Core Operating Limits Report, Braidwood Unit 1 Cycle 13 cc: Regional Administrator NRC Region Ill NRC Senior Resident Inspector Braidwood Station
ATTACHMENT 1 Core Operating Limits Report Braidwood Unit 1 Cycle 13
CORE OPERATING LIMITS REPORT (COLR)
FOR BRAIDWOOD UNIT I CYCLE 13 EXELON TRACKING ID:
COLR BRAIDWOOD 1 REVISION 4
COLR BRAIDWOOD 1 Revision 4 Page 1 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Braidwood Station Unit 1 Cycle 13 has been prepared in accordance with the requirements of Technical Specification 5.6.5 (ITS).
The Technical Specifications affected by this report are listed below:
SL 2.1.1 Reactor Core Safety Limits (SL5)
LCO 3.1.1 SHUTDOWN MARGIN (SDM)
LCO 3.1.3 Moderator Temperature Coefficient (MTC)
LCO 3.1.4 Rod Group Alignment Limits LCO 3.1.5 Shutdown Bank Insertion Limits LCO 3.1.6 Control Bank Insertion Limits LCO 3.1.8 PHYSICS TESTS Exceptions MODE 2 LCO 3.2.1 Heat Flux Hot Channel Factor (F0(Z))
LCO 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor (F~H)
LCO 3.2.3 AXIAL FLUX DIFFERENCE (AFD)
LCO 3.2.5 Departure from Nucleate Boiling Ratio (DNBR)
LCO 3.3.1 Reactor Trip System (RTS) Instrumentation LCO 3.3.9 Boron Dilution Protection System (BDPS)
LCO 3.4.1 Reactor Coolant System (RCS) Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits LCO 3.9.1 Boron Concentration The portions of the Technical Requirements Manual affected by this report are listed below:
TRM ILCO 3.1 .b Boration Flow Paths Operating TRM ILCO 3.1 .d Charging Pumps Operating TRM TLCO 3.1 .f Borated Water Sources Operating TRM TLCO 3.1 .g Position Indication System Shutdown TRM TLCO 3.1 .h Shutdown Margin (SDM) MODE 1 and MODE 2 with keff 1.0 TRM TLCO 3.1.i Shutdown Margin (SDM) MODE 5 TRM ILCO 3.1.j Shutdown and Control Rods TRM ILCO 3.1 .k Position Indication System Shutdown (Special Test Exception)
COLR BRAIDWOOD 1 Revision 4 Page 2 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 2.0 OPERATING LIMITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits are applicable for the entire cycle unless otherwise identified. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 5.6.5.
2.1 Reactor Core Safety Limits (SLs) (SL 2.1.1) 2.1.1 In MODES 1 and 2, the combination of Thermal Power, Reactor Coolant System (RCS) highest loop average temperature, and pressurizer pressure shall not exceed the limits specified in Figure 2.1.1.
680 660 2250 psia -------.-..--
~
._~__
2000 ala
.~
~I640 ~___
620
.~
~
, ~
600
~
580 I I I I C, .2 .4 .5 .8 .2 Fraction of Nominal Power Figure 2.1.1: Reactor Core Limits
COLR BRAIDWOOD I Revision 4 Page 3 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 2.2 SHUTDOWN MARGIN (SDM)
The SDM limit for MODES 1, 2, 3, and 4 is:
2.2.1 The 8DM shall be greater than or equal to 1.3% Ak/k (LCO5 3.1.1, 3.1.4, 3.1.5, 3.1.6, 3.1.8, 3.3.9; TRM TLCOs 3.1.b, 3.1.d, 3.1.f, 3.1.h, and 3.1.j).
The SDM limit for MODE 5 is:
2.2.2 SDM shall be greater than or equal to 1.3% Ak/k (LCO 3.1.1, LCO 3.3.9; TRM TLCOs 3.1.i and 3.1.j).
2.3 Moderator Temperature Coefficient (MTC) (LCO 3.1.3)
The Moderator Temperature Coefficient (MTC) limits are:
2.3.1 The BOL/ARO/HZP-MTC upper limit shall be +1.695 x i0~Ak/k/°F.
2.3.2 The EOL/ARO/HFP-MTC lower limit shall be -4.6 x 10~~ Ak/k/°F.
2.3.3 The EOL/ARO/HFP-MTC Surveiflance limit at 300 ppm shall be -3.7 x 10~Ak/ki°F.
2.3.4 The EOL/ARO/HFP-MTC Surveillance limit at 60 ppm shall be -4.3 x i0~Ak/k/°F.
where: BOL stands for Beginning of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero Thermal Power EOL stands for End of Cycle Life HFP stands for Hot Full Thermal Power 2.4 Shutdown Bank Insertion Limits (LCO 3.1.5) 2.4.1 All shutdown banks shall be fully withdrawn to at least 224 steps.
2.5 Control Bank Insertion Limits (LCO 3.1.6) 2.5.1 The control banks, with Bank A greater than or equal to 224 steps, shall be limited in physical insertion as shown in Figure 2.5.1.
2.5.2 Each control bank shall be considered fully withdrawn from the core at greater than or equal to 224 steps.
2.5.3 The control banks shall be operated in sequence by withdrawal of Bank A, Bank B, Bank C and Bank D. The control banks shall be sequenced in reverse order upon insertion.
2.5.4 Each control bank not fully withdrawn from the core shall be operated with the following overlap limits as a function of park position:
Park Position (step) Overlap Limit (step) 225 110 226 111 227 112 228 113 229 114
COLR BRAIDWOOD 1 Revision 4 Page 4 of 13 CORE OPERATING LII\ ITS REPORT (COLR) for BRAIDWOOD UNIT I CYCLE 13 Figure 2.5.1:
Control Bank Insertion Limits Versus Percent Rated Thermal Power 224 (27%, 224) (77%, 224) 220 200 180 IIC1C1OI 4~4\
160 I, IJJfQ, I.JI/
~ 120 C
0
~10O U) 0 0~
C
~260 40 20 0
0 10 20 30 40 50 60 70 80 90 100 RelatIve Power (Percent)
COLR BRAIDWOOD 1 Revision 4 Page 5 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 2.6 Heat Flux Hot Channel Factor (FQ~fl(LCO 3.2.1) 2.6.1 Total Peaking Factor:
F FQ (Z) ~----xK(Z) for P 0.5 FRTP FQ(Z) 2-xK(Z) forP>0.5 where: P = the ratio ofTHERMAL POWER to RATED THERMAL POWER F~T~= 2.60 K(Z) is provided in Figure 2.6.1.
2.6.2 W(Z) Values:
a) When PDMS is OPERABLE, W(Z) = 1.00000 for all axial points.
b) When PDMS is inoperable, W(Z) is provided in Table 2.6.2.a.
The normal operation W(Z) values have been determined at burnups of 150, 6000, 14000, and 20000 MWD/MTU.
Table 2.6.2.b shows the F1°0(z)penalty factors that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase the FWa(z) as per Surveillance Requirement 3.2.1.2. A 2% penalty factor shall be used at all cycle burnups that are outside the range of Table 2.6.2.b.
2.6.3 Uncertainty
The uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor F0(Z) shall be calculated by the following formula Li~Q=
- where:
Uqu = Base F0 measurement uncertainty = 1.05 when PDMS is inoperable (Uqu is defined by PDMS when OPERABLE.)
U~= Engineering uncertainty factor = 1.03 2.6.4 PDMS Alarms:
F0(Z) Warning Setpoint 2% of F0(Z) Margin F0(Z) Alarm Setpoint 0% of F0(Z) Margin
COLR BRAIDWOOD 1 Revision 4 Page 6 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 Figure 2.6.1 K(Z) Normalized FQ(Z) as a Function of Core Height 1.1 (0.0 1.0) (6.0 1.0) 1 - ~~t*W4 S~
SI,,
.tit,~tt_ 0.924)
~it*it,~
0.9 0.8 i~i~
0.7 a
U-0.6
~+~LOCA LImItIng
~ 0.4 Envelope 0.3 0.2 0.1 0
fl .1 1 fl A C 1 ~7 C) C) . C) .4 .4 .4 C)
U I L ,~ U U 1 0 ~ IV II IL BOTTOM Core Height (ft) TOP
COLR BRAIDWOOD 1 Revision 4 Page 7 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT I CYCLE 13 Table 2.6.2.a W(Z) versus Core Height (Top and Bottom 8% Excluded per WCAP-1 0216>
Height 135 6000 14000 20000 (feet> MWD/MTU MWD/MTU MWD/MTU MWD/MTU 0.00 (core bottom> 1.3280 1.3937 1.4526 1.3298 0.20 1.3118 1.3643 1.4255 1.3221 0.40 1.3049 1.3541 1.4138 1.3197 0.60 1.2960 1.3445 1.4051 1.3200 0.80 1.2665 1.3035 1.3818 1.3153 1.00 1.2545 1.2878 1.3604 1.3093 1.20 1.2387 1.3043 1.3519 1.3008 1.40 1.2583 1.2830 1.3402 1.2920 1.60 1.2548 1,2542 1.3170 1.2787 1.80 1.2398 1.2314 1.3015 1.2679 2.00 1.2236 1.2086 1.2859 1.2545 2.20 1.2044 1.1817 1.2656 1.2375 2.40 1,1868 1.1614 1.2472 1.2221 2.60 1.1689 1.1569 1.2276 1.2023 2.80 1.1556 1.1536 1.2160 1.1850 3.00 1.1487 1.1501 1.2065 1.1718 3.20 1.1427 1,1443 1.1944 1.1657 3.40 1.1367 1.1405 1.1854 1.1710 3.60 1.1297 1.1336 1.1743 1.1760 3.80 1.1252 1.1286 1.1647 1.1810 4.00 1.1259 1.1233 1.1562 1.1859 4.20 1,1264 1.1159 1.1505 1.1948 4.40 1.1268 1.1129 1.1444 1.2039 4.60 1.1254 1.1081 1.1414 1.2114 4.80 1.1238 1.1038 1.1409 1.2163 5.00 1.1212 1.0998 1.1384 1.2191 5.20 1.1176 1.0951 1.1365 1.2206 5.40 1.1141 1.1014 1.1366 1.2253 5.60 1.1085 1.1071 1.1425 1.2427 5.80 1.1083 1.1129 1.1580 1.2592 6.00 1.1250 1.1176 1.1716 1.2718 620 1.1418 1.1214 1.1832 1.2804 6.40 1.1575 1.1345 1,1928 1.2870 6.60 1.1723 1.1508 1.1995 1.2877 6.80 1.1851 1.1665 1.2042 1.2874 7.00 1.1970 1.1794 1.2069 1.2842 7.20 1.2078 1.1903 1.2058 1.2761 7.40 1.2167 1.1983 1.2028 1.2660 7.60 1.2236 1.2044 1.1969 1.2501 7.80 1.2296 1.2143 1.1899 1.2373 8.00 1.2346 1.2243 1.1839 1.2261 8.20 1.2373 1.2323 1.1760 1.2132 8.40 1.2425 1.2403 1.1671 1.2016 8.60 1.2445 1.2473 1.1667 1.1865 8.80 1.2490 1.2554 1.1686 1.1795 9.00 1.2516 1.2595 1.1703 1.1747 9.20 1.2600 1.2613 1.1715 1.1683 9.40 1.2728 1.2646 1.1728 1.2079 9.60 1.2844 1.2728 1.1767 1.2534 9.80 1.2954 1.2820 1.2020 1.2949 10.00 1.3010 1.2892 1.2320 1.3335 10.20 1.2988 1.2963 1.2590 1.3692 10.40 1.2954 1.3048 1.2790 1.3988 10.60 1.2902 1.3235 1.2940 1.4226 10.80 1.2865 1.3410 1.3040 1.4424 11.00 1.2942 1.3567 1.3070 1.4552 11.20 1.3022 1.3180 1.2873 1.4690 11.40 1.3109 1.3283 1.2932 1.468-8 11.60 1.3274 1.3842 1.2871 1.4518 11.80 1.3327 1.3799 1.2750 1.4~
0 (corefnn 1.3403 1.3861 1.2648 1,4:
Note: W(Z) values at 20000 MWD/MTU may be applied to cycle bumups greater than 20000 MWD/MTU to prevent W(Z) function extrapolation
COLR BRAIDWOOD 1 Revision 4 Page 8 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 Table 2.6.2.b Penalty Factors in Excess of 2% per 31 EFPD Cycle Burnup Penalty Factor (MWD/MTU) F00(z) 840 1.0200 1702 1.0374 1874 1.0385 2219 1.0342 3253 1.0200 11184 1.0200 11529 1.0250 11701 1.0270 11874 1.0283 12046 1.0294 12563 1.0322 12736 1.0314 13080 - 1.0278 13770 1.0200 16873 1.0200 17218 1.0239 17390 1.0248 17563 1.0252 18597 1.0245 19287 1.0200 Notes:
Linear interpolation is adequate for intermediate cycle burnups.
All cycle burnups outside the range of the table shall use a 2% penalty factor for compliance with the 3.2.1.2 Surveillance Requirements.
COLR BRA1DWOOD 1 Revision 4 Page 9 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 2.7 Nuclear Enthalpy Rise Hot Channel Factor (Ft~~~ (LCO 3.2.2) 2.7.1 F~H F~[1.0+ PFAH(1.0 P)} -
where: P = the ratio of THERMAL POWER to RATED THERMAL POWER FRW AK PF~H= 0.3 2.7.2 Uncertainty when PDMS is inoperable The uncertainty, UFAH, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNAH shall be calculated by the following formula:
UF~~,H= UFAHm where:
UFJHm = Base F~Hmeasurement uncertainty = 1.04 2.7.3 PDMS Alarms:
FNAH Warning Setpoint 2% of FNAH Margin FNAH Alarm Setpoint 0% of FNAH Margin 2.8 AXIAL FLUX DIFFERENCE (AFD) (LCO 3.2.3) 2.8.1 When PDMS is inoperable, the AXIAL FLUX DIFFERENCE (AFD) Acceptable Operation Limits are provided in Figure 2.8.1 or the latest valid PDMS Surveillance Report, whichever is more conservative.
2.8.2 When PDMS is OPERABLE, no AFD Acceptable Operation Limits are applicable.
2.9 Departure from Nucleate Boilin~Ratio (DNBR) (LCO 3.2.5) 2.9.1 DNBRAPSL 1.536 The Axial Power Shape Limiting DNBR (DNBRAPSL) is applicable with THERMAL POWER 50% RTP when PDMS is OPERABLE.
2.9.2 PDMS Alarms:
DNBR Warning Setpoint 2% of DNBR Margin DNBR Alarm Setpoint 0% of DNBR Margin
COLR BRAIDWOOD I Revision 4 Page 10 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 Figure 2.8.1 Axial Flux Difference Limits as a Function of Rated Thermal Power Axial Flux Difference Limits with PDMS Inoperable 120 100 w
0 0~ 80
-j uJ I 60 I
Ui I-40 0
1~~
LU 0
40 20 -10 0 10 20 30 40 50 AXIAL FLUX DIFFERENCE (%)
COLR BRAIDWOOD I Revision 4 Page 11 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 2.10 Reactor Trip System (RTS) Instrumentation (LCO 3.3.1)- Overtemperature AT Setpoint Parameter Values 2.10.1 The Overtemperature AT reactor trip setpointK1 shall be equal to 1.325.
2.10.2 The Overtemperature AT reactor trip setpoint Taugcoefficient K2 shall be equal to 0.0297 I °F.
2.10.3 The Overtemperature AT reactor trip setpoint pressure coefficient K3 shall be equal to 0.00181 Ipsi.
2.10.4 The nominal Tavgat RTP (indicated)T shall be less than or equal to 588.0 °F.
2.10.5 The nominal RCS operating pressure (indicated) P shall be equal to 2235 psig.
2.10.6 The measured reactor vessel AT lead/lag time constant t~shall be equal to 8 sec.
2.10.7 The measured reactor vessel AT lead/lag time constant t2shall be equal to 3 sec.
2.10.8 The measured reactor vessel AT lag time constant r3shall be less than or equal to 2 sec. -
2,10.9 The measured reactor vessel average temperature lead/lag time constant 14 shall be equal to 33 sec.
2.10.10 The measured reactor vessel average temperature lead/lag time constant t~shall be equal to 4 sec.
2.10.11 The measured reactor vessel average temperature lag time constant t~ be less than or equal to 2 sec.
2.10.12 The f1 (Al) positive breakpoint shall be +10% Al.
2.10.13 The f (Al) negative breakpoint shall be -18% Al.
1 2.10.14 The f1 (Al) positive slope shall be +3.47% / % Al.
2.10.15 The f1 (Al) negative slope shall be -2.61% / % Al.
COLR BRAIDWOOD 1 Revision 4 Page 12 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT 1 CYCLE 13 2.11 Reactor Trip System (RTS) Instrumentation (LCO 3.3.1) Overpower AT Setpoint Parameter Values 2.11.1 The Overpower AT reactor trip setpoint K4 shall be equal to 1.072.
2.11.2 The Overpower AT reactor trip setpoint Taug rate/lag coefficient K5 shall be equal to 0.02 / tF for increasing Tavg, 2.11.3 The Overpower AT reactor trip setpoint Tavg rate/lag coefficient K5 shall be equal to 0 / °Ffor decreasing Tavg, 2.11.4 The Overpower AT reactor trip setpoint Tavg heatup coefficient K6 shall be equal to 0.00245 / °Fwhen T> T.
2.11.5 The Overpower AT reactor trip setpoint Tavg heatup coefficient K6 shall be equal to 0 / °Fwhen T T.
2.11.6 The nominal T5~9at RTP (indicated) T shall be less than or equal to 588.0 °F 2.11.7 The measured reactor vessel AT lead/lag time constant 11 shall be equal to 8 sec.
2.11.8 The measured reactor vessel AT lead/lag time constant 12 shall be equal to 3 sec.
2.11.9 The measured reactor vessel AT lag time constant 13 shall be less than or equal to 2 sec.
2.11.10 The measured reactor vessel average temperature lag time constant 16 shall be less than or equal to 2 sec.
2.11.11 The measured reactor vessel average temperature rate/lag time constant 17 shall be equal to 10 sec.
2.11.12 The f2 (Al) positive breakpoint shall be 0 for all Al.
2.11.13 The f2 (Al) negative breakpoint shall be 0 for all Al.
2.11.14 The f2 (Al) positive slope shall be 0 for all Al.
2.11.15 The f2(AI) negative slope shall be 0 for all Al.
COLR BRAIDWOOD 1 Revision 4 Page 13 of 13 CORE OPERATING LIMITS REPORT (COLR) for BRAIDWOOD UNIT I CYCLE 13 2.12 Reactor Coolant System (RCS) Pressure, Temperature, and Flow Departure from Nucleate Boilin~(DNB) Limits (LCO 3.4.1) 2.12.1 The pressurizer pressure shall be greater than or equal to 2209 psig.
2.12.2 The RCS average temperature (Tuvg) shall be less than or equal to 593.1 °F.
2.12.3 The RCS total flow rate shall be greater than or equal to 386,000 gpm.
2.13 Boron Concentration 2.13.1 The refueling boron concentration shall be greater than or equal to the value given in the Table below (LCO 3.9.1). The reported value also bounds the end-of-cycle requirements for the previous cycle.
2.13.2 To maintain keff 0.987 with all shutdown and control rods fully withdrawn in MODES 3, 4, or5 (TRM TLCO 3.1.g Required Action B.2 and TRM TLCO 3.1.k.2), the Reactor Coolant System boron concentration shall be greater than or equal to the values given in the Table below.
COLR Conditions Boron Concentration Section (ppm) 2.13.1 Refueling 1711 2.13.2 a) prior to initial criticality 1765 2.13.2 b) all other times in core life 1984