Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML0529904112005-10-28028 October 2005 RAI - Request for Additional Information Related to Request for Relief from ASME Section XI Code Requirements for Repair of Pressurizer Nozzle Penetrations - Use of Code Case N-638 with Three Exceptions Project stage: RAI ML0605800602006-03-21021 March 2006 Request for Authorization of Relief Request Number 1 for Certain Requirements in ASME Code, Section XI, Code Case N-638-1 Project stage: Acceptance Review 2005-10-28
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML20365A0012021-01-19019 January 2021 Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20282A7642020-10-16016 October 2020 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant - Relief Request 5-8 for Alternate Repair of Reactor Closure Head Penetration Nozzles ML20275A3432020-10-0101 October 2020 Verbal Authorization for Proposed Alternative (RR 5-8) Reactor Vessel Closure Head Penetration Repairs ML20272A1662020-09-30030 September 2020 Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, ML20267A3872020-09-23023 September 2020 Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML20267A3882020-09-23023 September 2020 Attachment 1 - Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML21067A4982017-09-0707 September 2017 Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System ML17194A8072017-08-14014 August 2017 Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval ML17137A0282017-06-29029 June 2017 Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage Examination ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16022A1072016-02-0101 February 2016 Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing Requirement ML15320A2442015-11-25025 November 2015 Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related Activities PNP 2015-073, Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination2015-09-17017 September 2015 Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination PNP 2015-075, Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement2015-09-16016 September 2015 Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division PNP 2015-024, Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval2015-05-19019 May 2015 Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval PNP 2015-022, Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities2015-04-29029 April 2015 Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities ML14199A5572014-08-13013 August 2014 Relief Request Number RR-4-19, Proposed Alternative to the Requirements of ASME Code Case N-638-4 ML12258A3522012-09-26026 September 2012 Relief from Certain Requirements of the ASME Code Case N-77-1 for the Fourth 10-Year Inservice Inspection Interval CNRO-2008-00035, Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 8052008-11-20020 November 2008 Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 805 ML0824801002008-09-19019 September 2008 Acceptance of Requested Licensing Action Relief Request and Supporting Amendment to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examination ML0726304272007-09-21021 September 2007 Relief, Request Relief No. 1 - from Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Repair of Pressurizer Nozzle Penetrations ML0719002512007-09-12012 September 2007 Relief Request 1 for the Repair of Reactor Vessel Closure Head Penetrations ML0716201362007-09-12012 September 2007 Relief Request 2 for ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0716302482007-05-31031 May 2007 Request for Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Vent Line Penetration ML0709200292007-04-30030 April 2007 Request for Relief from ASME Code Regarding Weld Reference System, Relief Request No. RR 4-11 ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 ML0607902512006-04-0303 April 2006 Request for Relief from ASME Code, Section XI, Requirements for Repair of Pressurizer Nozzle Penetrations ML0607900612006-04-0303 April 2006 Request for Authorization to Use Alternatives to ASME Code, Section XI, IWA-3300, IWBb-3142.4, IWB-3420, and IWB-3613 for Reactor Pressure Vessel Head Penetration Repair ML0608003192006-04-0303 April 2006 Request for Authorization to Use Alternatives to ASME Code, Section XI, IWA-4120 for Reactor Pressure Vessel Head Penetration Repair ML0605800602006-03-21021 March 2006 Request for Authorization of Relief Request Number 1 for Certain Requirements in ASME Code, Section XI, Code Case N-638-1 ML0601201042006-01-27027 January 2006 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Visual Examination, MC6546 ML0532002962005-11-29029 November 2005 Request for Authorization to Extend the Third Inservice Inspection Interval for Reactor Vessel Weld Examination ML0520706392005-08-17017 August 2005 Revised Relief Requests 28, 30, and 31 for 3rd 10-year Pump and Valve Inservice Testing ML0436504802005-01-18018 January 2005 Relief Request to Use Code Case N-661, and Safety Evaluation ML0430901912004-11-0808 November 2004 Relief, ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0430605712004-11-0303 November 2004 Verbal Authorization of Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0419103642004-09-14014 September 2004 Relief, Third 10-Year Interval Inservice Inspection Program Plan ML0422402492004-08-0909 August 2004 Request for Relief from ASME Section XI Code Requirements for Repair of Pressurizer Nozzle Penetrations ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0311505002003-05-19019 May 2003 Risk-Informed Inservice Inspection Program TAC No. MB4420 ML0306906292003-03-20020 March 2003 3/20/2003, Palisades, Relief, Re Third Inservice Inspection Interval Program ML0207202292002-03-0101 March 2002 Relief Code, Relief Request for Alternate ASME Code, Section XI, Risk-Informed Inservice Inspection Program ML0207201452002-02-27027 February 2002 Code Relief, Request for Relief from ASME Code Requirements for Inservice Inspection Pressure Test Program (Relief Request PR-07) 2021-10-28
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] Category:Safety Evaluation
MONTHYEARML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22039A1982022-05-13013 May 2022 Issuance of Amendment No. 272 Permanently Defueled Technical Specifications ML21292A1482021-12-13013 December 2021 Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI (EPID L-2020-LLM-00 ML21292A1472021-12-13013 December 2021 Draft Conforming License Amendments - Palisades Nuclear Plant Renewed Facility Operating License DPR-20 and ISFSI and Big Rock Point Facility Operating License DPR-6 and ISFSI (EPID L-2020-LLM-0003) (Enclosure 2) ML20365A0012021-01-19019 January 2021 Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML19317D8552019-12-30030 December 2019 Issuance of Amendment No. 271 Regarding Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19318E3942019-12-0202 December 2019 Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19198A0802019-08-20020 August 2019 Issuance of Amendments No. 269 Regarding Changes to NFPA 805 Modifications and Change to Full Compliance Implementation Date for the Fire Protection Program (Epids L-2018-LLA-0296 and L-2019-LLA-0049) ML19135A0502019-05-21021 May 2019 Correction to Safety Evaluation for Amendment No.268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement ML19107A0532019-05-13013 May 2019 Issuance of Amendment No. 268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement ML19112A3172019-04-26026 April 2019 Approval of Alternative for Repair of Reactor Pressure Vessel Head Penetrations ML18170A2192018-09-24024 September 2018 Issuance of Amendment Changes to the Emergency Plan for Permanently Defueled Condition (CAC No. MG0198; EPID L-2017-LLA-0305) ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18114A4102018-06-0404 June 2018 Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition (CAC No. MG0021; EPID L-2017-LLA-0266) ML18135A2632018-05-21021 May 2018 Relief Request No. RR 5-6 Alternate to the Reexamination Frequency for a Relevant Condition ML18039A2442018-02-27027 February 2018 Issuance of Amendment License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications ML17328B0332017-12-15015 December 2017 Issuance of Amendment Cyber Security Plan Implementation Schedule (CAC No. MF9523; EPID L-2017-LLA-0199) ML21067A4982017-09-0707 September 2017 Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System ML17151A3502017-08-21021 August 2017 Approval of Certified Fuel Handler Training and Retraining Program ML17194A8072017-08-14014 August 2017 Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval ML17137A0282017-06-29029 June 2017 Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage Examination ML17121A5102017-06-0808 June 2017 Issuance of Amendment License Amendment Request for Editorial and Administrative Changes to Technical Specifications ML17082A4652017-05-30030 May 2017 Issuance of Amendment Application to Revise Technical Specifications to Adopt TSTF 545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16300A0302016-12-19019 December 2016 Issuance of Amendment Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region ML16281A4982016-10-28028 October 2016 Issuance of Amendment No. 260, Revise License Condition 2.C.(4) and Technical Specifications Related to Control Rod Drive Exercise Surveillance ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16014A3182016-08-22022 August 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16078A0682016-05-0202 May 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML16043A4852016-03-14014 March 2016 Relief Request Number RR 4-24 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination ML16022A1072016-02-0101 February 2016 Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing Requirement ML15334A3072015-12-22022 December 2015 Relief Request Numbers RR 5-2 and 5-3, Proposed Alternative to the Requirements of the ASME OM Code for the Fifth 10-Year Inservice Test Interval ML15320A2442015-11-25025 November 2015 Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related Activities ML15103A0592015-05-18018 May 2015 Issuance of Amendment Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiatives 6B and 6C. ML15055A1062015-04-22022 April 2015 Issuance of Amendment License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML15007A1912015-02-27027 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14237A1442014-12-0808 December 2014 Issuance of Amendment Cyber Security Plan Implementation Schedule ML14283A2872014-10-22022 October 2014 Issuance of Amendment Application for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML14223B2262014-09-0404 September 2014 Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination ML14199A5572014-08-13013 August 2014 Relief Request Number RR-4-19, Proposed Alternative to the Requirements of ASME Code Case N-638-4 ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13129A2192013-05-29029 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML13056A5142013-02-28028 February 2013 Non-Proprietary Issuance of Amendment Regarding Replacement of Spent Fuel Pool Region 1 Storage Racks 2023-05-01
[Table view] |
Text
March 21, 2006 Mr. Paul A. Harden Site Vice President Nuclear Management Company, LLC Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT REQUEST FOR AUTHORIZATION OF RELIEF REQUEST NO. 1 FOR CERTAIN REQUIREMENTS IN ASME CODE, SECTION XI, CODE CASE N-638-1 AT PALISADES NUCLEAR POWER PLANT (TAC NO. MC7993)
Dear Mr. Harden:
Nuclear Management Company, LLCs (NMCs) letter of July 22, as supplemented November 22, 2005, and January 6, 2006, submitted a request for authorization to use an alternative to certain requirements of American Society of Mechanical Engineers (ASMEs)
Boiler and Pressure Vessel (B&PV) Code Case N-638-1, "Similar and Dissimilar Metal Welding Using Ambient Temperature Machine Temper Bead Technique." NMC intends to use the alternative for weld repair of pressurizer vessel nozzle heater sleeves at Palisades Nuclear Power Plant.
The staff has completed its review of NMCs request, and concludes that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the use of the proposed alternative for the repair of pressurizer vessel nozzle heater sleeves during the spring 2006 outage. Enclosed is our safety evaluation.
Sincerely,
/RA/
L. Raghavan, Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
Safety Evaluation cc w/encl: See next page
March 21, 2006 Mr. Paul A. Harden Site Vice President Nuclear Management Company, LLC Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT REQUEST FOR AUTHORIZATION OF RELIEF REQUEST NO. 1 FOR CERTAIN REQUIREMENTS IN ASME CODE, SECTION XI, CODE CASE N-638-1 AT PALISADES NUCLEAR POWER PLANT (TAC NO. MC7993)
Dear Mr. Harden:
Nuclear Management Company, LLCs (NMCs) letter of July 22, as supplemented November 22, 2005, and January 6, 2006, submitted a request for authorization to use an alternative to certain requirements of American Society of Mechanical Engineers (ASMEs)
Boiler and Pressure Vessel (B&PV) Code Case N-638-1, "Similar and Dissimilar Metal Welding Using Ambient Temperature Machine Temper Bead Technique." NMC intends to use the alternative for weld repair of pressurizer vessel nozzle heater sleeves at Palisades Nuclear Power Plant.
The staff has completed its review of NMCs request, and concludes that the proposed alternative provides an acceptable level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), the staff authorizes the use of the proposed alternative for the repair of pressurizer vessel nozzle heater sleeves during the spring 2006 outage. Enclosed is our safety evaluation.
Sincerely,
/RA/
L. Raghavan, Chief Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
Safety Evaluation cc w/encl: See next page DISTRIBUTION:
PUBLIC LPLIII-1 R/F RidsNrrPMMPadovan RidsNrrLATHarris RidsNrrDorlLple RidsOgcRp RidsAcrsAcnwMailCenter RidsNrrDorlDpr DWeaver MRubin RidsRgn3MailCenter EAndruszkiewicz ADAMS Accession Number: ML060580060 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA DCI/CFEB OGC NRR/LPL3-1/BC NAME LPadovan THarris KGruss SUttal LRaghavan DATE 3/16/06 3/14/06 2/22/06 3/17/06 3/21/06 OFFICIAL RECORD COPY
Palisades Plant cc:
Robert A. Fenech, Senior Vice President Michigan Department of Attorney General Nuclear, Fossil, and Hydro Operations Special Litigation Division Consumers Energy Company 525 West Ottawa St.
1945 Parnall Rd. Sixth Floor, G. Mennen Williams Building Jackson, MI 49201 Lansing, MI 48913 Arunas T. Udrys, Esquire Michael B. Sellman Consumers Energy Company President and Chief Executive Officer 1 Energy Plaza Nuclear Management Company, LLC Jackson, MI 49201 700 First Street Hudson, MI 54016 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Jonathan Rogoff, Esquire Suite 210 Vice President, Counsel & Secretary 2443 Warrenville Road Nuclear Management Company, LLC Lisle, IL 60532-4351 700 First Street Hudson, WI 54016 Supervisor Covert Township Douglas E. Cooper P. O. Box 35 Senior Vice President - Group Operations Covert, MI 49043 Palisades Nuclear Plant Nuclear Management Company, LLC Office of the Governor 27780 Blue Star Memorial Highway P. O. Box 30013 Covert, MI 49043 Lansing, MI 48909 Stephen T. Wawro, Director U.S. Nuclear Regulatory Commission of Nuclear Assets Resident Inspector's Office Consumers Energy Company Palisades Plant Palisades Nuclear Plant 27782 Blue Star Memorial Highway 27780 Blue Star Memorial Highway Covert, MI 49043 Covert, MI 49043 Michigan Department of Environmental Quality Laurie A. Lahti, Manager Waste and Hazardous Materials Division Regulatory Affairs Hazardous Waste and Radiological Nuclear Management Company, LLC Protection Section Palisades Nuclear Plant Nuclear Facilities Unit 27780 Blue Star Memorial Highway Constitution Hall, Lower-Level North Covert, MI 49043 525 West Allegan Street P.O. Box 30241 Lansing, MI 48909-7741
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR AUTHORIZATION OF RELIEF REQUEST NO. 1 FOR CERTAIN REQUIREMENTS IN ASME CODE, SECTION XI, CODE CASE N-638-1 NUCLEAR MANAGEMENT COMPANY, LLC PALISADES NUCLEAR PLANT DOCKET NO. 50-255
1.0 INTRODUCTION
Nuclear Management Company, LLCs (NMCs) letter of July 22, as supplemented November 22, 2005, and January 6, 2006, submitted a request for authorization to use an alternative to certain requirements of American Society of Mechanical Engineers (ASMEs)
Boiler and Pressure Vessel (B&PV) Code Case N-638-1, "Similar and Dissimilar Metal Welding Using Ambient Temperature Machine Temper Bead Technique." NMC intends to use the alternative for weld repair of pressurizer vessel nozzle heater sleeves at Palisades Nuclear Power Plant (Palisades). Specifically, NMC proposed performing the weld overlay repair with Alloy 52 filler material using the machine Gas Tungsten Arc Welding (GTAW) process and an ambient temperature temper bead method with 50 degrees F minimum preheat temperature and no post weld heat treatment (PWHT).
2.0 REGULATORY REQUIREMENTS Title 10 of the Code of Federal Regulations (CFR) 50.55a(g)(4), specifies that ASME Code Class 1, 2, and 3 components (including supports) must meet the requirements set forth in the ASME Code,Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, to the extent practical within the limitations of design, geometry, and materials of construction of the components. Paragraph IWA-4120(a) of ASME Section XI requires that, Repairs shall be performed in accordance with the owners design specification and the original construction code of the component or system. Later editions and addenda of the Construction Code or of Section III, either in their entirety or portions thereof, and Code Cases may be used.
The applicable Code edition and addenda of the ASME B&PV,Section XI, is the 1989 Edition, no Addenda, which requires a PWHT at elevated temperature. ASME Code Case N-638-1 provides for machine GTAW temper bead weld repairs at ambient temperature using dissimilar materials and without need for PWHT. Therefore, NMC is requesting authorization to use ASME Code Case N-638-1. This Code Case was conditionally approved in Regulatory Guide (RG) 1.147, "Inservice Inspection Code Case Acceptability - ASME Section XI Division 1," Revision 14, dated August 2005. NMC will meet the condition required by the Code
Case, but due to component interferences, it is unable to meet the requirement for final weld examination area specified in paragraph 4.0(b) of the Code Case.
Pursuant to 10 CFR 50.55a(a)(3), the Nuclear Regulatory Commission (NRC) may authorize alternatives to ASME Code requirements if the licensee demonstrates that: (i) the proposed alternatives provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. NMC submitted the subject relief request pursuant to 10 CFR 50.55a(a)(3)(i), as a proposed alternative to the requirements of ASME Code Case N-638-1.
3.0 TECHNICAL EVALUATION
3.1 Components for which Relief is Requested The affected components are the Palisades pressurizer vessel heater sleeves. Palisades has 120 pressurizer heater sleeves penetrating the bottom head. The pressurizer assembly was fabricated in accordance with the ASME Code,Section III, Class A components.
3.1.1 Applicable Code Edition and Addenda The applicable code edition and addenda for the pressurizer vessel heater sleeve repair is the ASME B&PV Code, Section Xl, 1989 Edition with no addenda. Palisades is currently in the third 10-year inservice inspection interval. The original construction code of record for the Palisades pressurizer vessel is ASME Section III, Class A, 1965 Edition, including addenda through winter 1965.
3.2 NMCs Proposed Alternative and Basis for Use NMC plans to implement an outer-diameter pad plug design if a repair is necessary for Palisades. Therefore, in support of the proposed repair design, NMC is requesting relief from the applicable ASME Code requirements.
As previously mentioned, Code Case N-638-1 was conditionally approved in RG 1.147. NMC will meet the condition required by the Code Case. However, it will be unable to meet the requirement for final weld examination area specified in paragraph 4.0(b) of the Code Case due to component interferences.
Code Case N-638-1, paragraph 4.0(b), requires that the final weld, and the band around the area defined in paragraph 1.0(d), shall be examined using surface and ultrasonic methods when the completed weld has been at ambient temperature for at least 48 hours2 days <br />0.286 weeks <br />0.0658 months <br />. The area to be examined, as defined in paragraph 1.0(d), is the area to be welded and a band around the area of at least 1-1/2 times the component thickness, or 5-inches, whichever is less. The vessel thickness at the lower head is nominally 4-1/8 inches. Applying paragraph 1.0(d) would require that the examination area include the weld pad area and the area extending 5-inches on each side of the weld pad. The weld pad has square dimensions of approximately 3-1/4 inches on a side. Adding the examination area of 5 additional inches around provides a total area defined by a square with dimensions of approximately 13-1/4 inches x 13-1/4 inches. Other pressurizer penetrations are positioned at distances less than 13-1/4 inches and would interfere
with the Code Case defined area. Code Case N-638-1, paragraph 4.0(e), allows for additional acceptance criteria to be specified by the owner to account for differences in weld configuration.
Due to the configuration of the weld pad repair, NMC proposed to use the examination area defined by ASME Code Section III, 1992 Edition, subsection NB-5244, Weld Buildup Deposits at Openings for Nozzles, Branch, and Piping Connections. This area consists of the weld metal buildup, the fusion zone and the parent metal beneath the weld metal buildup. NMC would examine the entire fusion zone and the parent metal beneath the weld metal buildup using liquid penetrant and ultrasonic examinations. NMC proposed the following inspection plan:
- Perform surface examination of the base material prior to weld buildup. The surface examination would be evaluated to the 1992 Edition of ASME Code Section III, subsection NB-5350.
- Perform ultrasonic examination of the base material prior to weld buildup. The ultrasonic examination would be evaluated in accordance with the 1992 Edition of ASME Section III, subsection NB-2532.1(b)(1).
- Perform nondestructive examination of welded pad. Pre-service inspection would be performed using liquid penetrant and ultrasonic examination techniques after the completed weld has been at ambient temperature for at least 48 hours2 days <br />0.286 weeks <br />0.0658 months <br />. The examination area is defined in ASME Code Section III, 1992 Edition, subsection NB-5244, which consists of the weld buildup surface for liquid penetrant and the weld buildup fusion zone to parent metal to ensure freedom from lack of fusion and laminar defects for ultrasonic examination. The acceptance standards for the welded pad are ASME Code Section III, 1992 Edition, subsection NB-5350, for the liquid penetrant examination, and ASME Code Section III, 1992 Edition, subsection NB-5330, for the ultrasonic examination.
- In accordance with the condition required by RG 1.147, NMC will also perform ultrasonic examination demonstrations using samples which represent the repaired volume as a performance demonstration to ensure a quality repair. These samples will contain construction type flaws.
The proposed alternative provides an acceptable level of quality and safety, pursuant to 10 CFR 50.55a(a)(3)(i). NMC will implement the proposed alternative during the spring 2006 outage at Palisades for the proposed repair of the pressurizer heater sleeve penetrations.
3.3 NRC Staff Evaluation NMC plans to implement an outer-diameter pad plug design repair during the spring 2006 outage, if a repair is necessary for Palisades. Therefore, in support of the proposed repair design, NMC is requesting relief from the applicable ASME Code requirements.
The applicable Code edition and addenda of the ASME B&PV Code,Section XI, requires a PWHT at elevated temperature. ASME Code Case N-638-1 provides for machine GTAW temper bead weld repairs at ambient temperature using dissimilar materials and without the need for PWHT. Therefore, NMC is requesting authorization to use ASME Code Case N-638-1. This Code Case was conditionally approved in RG 1.147. NMC will meet the condition required by the Code Case, but due to component interferences they will be unable to
meet the requirement for final weld examination area as specified in paragraph 4.0(b) of the Code Case. This paragraph requires that the final weld, and the band around the area defined in paragraph 1.0(d) of the Code Case, shall be examined using surface and ultrasonic methods when the completed weld has been at ambient temperature for at least 48 hours2 days <br />0.286 weeks <br />0.0658 months <br />. The area to be examined as defined in paragraph 1.0(d), is the area to be welded, and a band around the area of at least 1-1/2 times the component thickness or 5-inches, whichever is less. Application of this Code Case requirement would require an examination area of approximately 13-1/4 inches x 13-1/4 inches. The location of other pressurizer penetrations would interfere with the Code Case defined area. Code Case N-638-1, paragraph 4.0(e), allows for additional acceptance criteria to be specified by the owner to account for differences in weld configuration.
Due to the configuration of the weld pad repair, NMC proposed to use the examination area defined by ASME Code Section III, 1992 Edition, subsection NB-5244. This area consists of the weld metal buildup, the fusion zone and the parent metal beneath the weld metal buildup.
NMC would examine the entire weld buildup pad area using liquid penetrant and ultrasonic examinations.
Code Case N-638 was originally written to be applied to the repair of partial and full penetration groove welds. However, nothing in the Code Case precludes its use in other applications, such as the current NMC application of an alloy 52 weld pad deposited over an outer diameter plug of alloy 690. The welding principles involved and application of the weld filler metal are the same as for a groove weld design. When performing a full penetration groove weld between two pieces of thick low alloy steel (over 1-inch thick) using a low alloy steel filler metal, there can be significant residual stresses built up in the base metal from contraction of the weldment.
These stresses can cause distortion and cracking of the base metal a significant distance from the weld groove. To make certain that these types of defects do not remain in the weld area away from the weld groove, the Code has extended the area of the non-destructive examination well into the base metal. The filler metal used in the subject repair is alloy 52, which is more ductile than the low alloy steel. The thickness of filler metal applied to the pressurizer shell is 0.25 inches, which is much less than the 4-1/8 inch pressurizer shell thickness. Therefore, due to the more ductile weld filler metal, and the much thinner weld being applied to the pressurizer shell, the residual stresses built up in the base metal from contraction of the weldment will be much less than for a full penetration groove weld. Examination of large areas of base metal outside the weld area, as required by the Code Case, provide no additional information in this type of weld since the examination would be in base metal which is unaffected by the repair. In addition, in accordance with the condition required by RG 1.147, NMC will also perform ultrasonic examination demonstrations using samples which represent the repaired volume.
These samples will contain construction type flaws which are more pertinent to the type of weld being performed. This additional performance demonstration will provide the required level of quality and safety.
Based on the above evaluation, the staff has determined that NMCs proposed alternative to the requirements of ASME Code Case N-638-1 for the outer diameter pad plug design repair is acceptable, because it provides an acceptable level of quality and safety.
4.0 CONCLUSION
Based on the information provided in NMCs submittals, the NRC staff has determined that NMC has provided an acceptable alternative to certain requirements of ASME Code Case N-638-1. Therefore, pursuant to 10 CFR 50.55a(a)(3)(i), NMCs proposed alternative is
authorized for the outer-diameter pad plug design repair for pressurizer vessel nozzle heater sleeves during the spring 2006 outage at Palisades.
All other ASME Code,Section XI, requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: E. Andruszkiewicz Date: March 21, 2006