Category:Safety Evaluation
MONTHYEARML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML22039A1982022-05-13013 May 2022 Issuance of Amendment No. 272 Permanently Defueled Technical Specifications ML21292A1482021-12-13013 December 2021 Safety Evaluation Related to Request for Direct and Indirect Transfers of Control of Facility Operating License DPR-6 for Big Rock Point and Renewed Facility Operating License DPR-20 for Palisades Nuclear Plant and ISFSI (EPID L-2020-LLM-00 ML21292A1472021-12-13013 December 2021 Draft Conforming License Amendments - Palisades Nuclear Plant Renewed Facility Operating License DPR-20 and ISFSI and Big Rock Point Facility Operating License DPR-6 and ISFSI (EPID L-2020-LLM-0003) (Enclosure 2) ML20365A0012021-01-19019 January 2021 Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20226A2722020-08-18018 August 2020 Request to Use a Provision of a Later Edition of the ASME BPV Code, Section XI ML19317D8552019-12-30030 December 2019 Issuance of Amendment No. 271 Regarding Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B ML19318E3942019-12-0202 December 2019 Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19198A0802019-08-20020 August 2019 Issuance of Amendments No. 269 Regarding Changes to NFPA 805 Modifications and Change to Full Compliance Implementation Date for the Fire Protection Program (Epids L-2018-LLA-0296 and L-2019-LLA-0049) ML19135A0502019-05-21021 May 2019 Correction to Safety Evaluation for Amendment No.268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement ML19107A0532019-05-13013 May 2019 Issuance of Amendment No. 268 Regarding Revision to Diesel Generator Undervoltage Start Surveillance Requirement ML19112A3172019-04-26026 April 2019 Approval of Alternative for Repair of Reactor Pressure Vessel Head Penetrations ML18170A2192018-09-24024 September 2018 Issuance of Amendment Changes to the Emergency Plan for Permanently Defueled Condition (CAC No. MG0198; EPID L-2017-LLA-0305) ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 ML18114A4102018-06-0404 June 2018 Issuance of Amendment Regarding Administrative Controls for Permanently Defueled Condition (CAC No. MG0021; EPID L-2017-LLA-0266) ML18135A2632018-05-21021 May 2018 Relief Request No. RR 5-6 Alternate to the Reexamination Frequency for a Relevant Condition ML18039A2442018-02-27027 February 2018 Issuance of Amendment License Amendment Request to Change the Full Compliance Implementation Date for the Fire Protection Program Transition License Condition for Required Modifications ML17328B0332017-12-15015 December 2017 Issuance of Amendment Cyber Security Plan Implementation Schedule (CAC No. MF9523; EPID L-2017-LLA-0199) ML21067A4982017-09-0707 September 2017 Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System ML17151A3502017-08-21021 August 2017 Approval of Certified Fuel Handler Training and Retraining Program ML17194A8072017-08-14014 August 2017 Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval ML17137A0282017-06-29029 June 2017 Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage Examination ML17121A5102017-06-0808 June 2017 Issuance of Amendment License Amendment Request for Editorial and Administrative Changes to Technical Specifications ML17082A4652017-05-30030 May 2017 Issuance of Amendment Application to Revise Technical Specifications to Adopt TSTF 545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ML16300A0302016-12-19019 December 2016 Issuance of Amendment Revision to the Requirements for Steam Generator Tube Inspections and Repair Criteria in the Cold Leg Tube Sheet Region ML16281A4982016-10-28028 October 2016 Issuance of Amendment No. 260, Revise License Condition 2.C.(4) and Technical Specifications Related to Control Rod Drive Exercise Surveillance ML16251A6202016-09-13013 September 2016 Entergy Fleet Request for Approval of Change to the Entergy Quality Assurance Program Manual (CAC Nos. MF7086 - MF7097) ML16014A3182016-08-22022 August 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16093A0282016-05-31031 May 2016 Entergy Services, Inc., Proposed Alternative to Utilize ASME Code Case N-789-1, Relief Request RR-EN-15-1, Revision 1 ML16078A0682016-05-0202 May 2016 Issuance of Amendment Cyber Security Plan Implementation Schedule ML16043A4852016-03-14014 March 2016 Relief Request Number RR 4-24 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination ML16022A1072016-02-0101 February 2016 Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing Requirement ML15334A3072015-12-22022 December 2015 Relief Request Numbers RR 5-2 and 5-3, Proposed Alternative to the Requirements of the ASME OM Code for the Fifth 10-Year Inservice Test Interval ML15320A2442015-11-25025 November 2015 Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related Activities ML15103A0592015-05-18018 May 2015 Issuance of Amendment Adoption of TSTF-426, Revision 5, Revise or Add Actions to Preclude Entry Into Limiting Condition for Operation 3.0.3 - RITSTF Initiatives 6B and 6C. ML15055A1062015-04-22022 April 2015 Issuance of Amendment License Amendment Request to Revise Emergency Response Organization Staff Augmentation Response Times ML15007A1912015-02-27027 February 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) ML14237A1442014-12-0808 December 2014 Issuance of Amendment Cyber Security Plan Implementation Schedule ML14283A2872014-10-22022 October 2014 Issuance of Amendment Application for Technical Specification Change (TSTF-427) to Add Limiting Condition for Operation 3.0.9 Regarding the Unavailability of Barriers Using the Consolidated Line Item Improvement Process ML14223B2262014-09-0404 September 2014 Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination ML14199A5572014-08-13013 August 2014 Relief Request Number RR-4-19, Proposed Alternative to the Requirements of ASME Code Case N-638-4 ML14210A2662014-08-0808 August 2014 Arkansas, Units 1 & 2, Big Rock Point, James A. Fitzpatrick, Grand Gulf, Unit 1, Indian Point, Units 1, 2 & 3, Palisades, Pilgrim, River Bend, Unit 1, Vermont Yankee, Waterford, Safety Evaluation Quality Assurance Program Manual, Rev. 24 & ML13312A4232013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13129A2192013-05-29029 May 2013 Staff Assessment in Response to Recommendation 9.3 of the Near-Term Task Force Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident ML13025A3062013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction to Amendments Issued on 12/28/12, Revise QA Program Manual and Staff Qualification Technical Specifications ML13056A5142013-02-28028 February 2013 Non-Proprietary Issuance of Amendment Regarding Replacement of Spent Fuel Pool Region 1 Storage Racks 2023-05-01
[Table view] Category:Code Relief or Alternative
MONTHYEARML21299A0032021-10-28028 October 2021 and Waterford Steam Electric Station, Unit 3 - Approval of Request for Alternative EN-20-RR-003 from Certain Requirements of the ASME Code ML20365A0012021-01-19019 January 2021 Relief Request 5-8 Related to ASME Code Case N-729-4 Supplemental Examination Requirements of Reactor Vessel Closure Head Penetration Nozzles ML20282A7642020-10-16016 October 2020 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant - Relief Request 5-8 for Alternate Repair of Reactor Closure Head Penetration Nozzles ML20275A3432020-10-0101 October 2020 Verbal Authorization for Proposed Alternative (RR 5-8) Reactor Vessel Closure Head Penetration Repairs ML20272A1662020-09-30030 September 2020 Attachment 3 - Framatome Document No. ANP-3876, Revision 1Q1NP, Response to NRC Request for Additional Information of Palisades Relief Request Number RR 5-8, Repair of Reactor Pressure Vessel Head Penetration, Inservice Inspection Program, ML20267A3872020-09-23023 September 2020 Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML20267A3882020-09-23023 September 2020 Attachment 1 - Relief Request Number RR 5-8, Proposed Alternative to ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) ML19254A6032019-09-19019 September 2019 Units 2 and 3; Palisades Nuclear Plant; River Bend; and Waterford Steam Electric Station, Unit 3 - Relief Request No. EN-19-RR-1, Use of ASME Code Case N-831-1 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML18128A0672018-06-0808 June 2018 Arkansas, Units 1 and 2; Grand Gulf, Unit 1; Indian Point Unit Nos. 2 and 3; Palisades; Pilgrim; River Bend Station, Unit 1; and Waterford, Unit-3 Relief Request No. EN-17-RR-1, Alternative to Use ASME Code Case N-513-4 CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 ML21067A4982017-09-0707 September 2017 Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System ML17194A8072017-08-14014 August 2017 Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval ML17137A0282017-06-29029 June 2017 Relief Request Number RR 5; 5 Proposed Alternative, Under-Vessel Leakage Examination ML16096A2692016-06-0606 June 2016 Arkansas; Grand Gulf; James A. Fitzpatrick; Indian Point; Palisades; Pilgrim; River Bend; and Waterford - Relief Request RR-EN-15-2, Proposed Alternative to Use ASME Boiler and Pressure Vessel Code Case N-786-1 ML16022A1072016-02-0101 February 2016 Relief Request Number RR 4-23- Proposed Alternative Concerning ASME Code Depth Sizing Requirement ML15320A2442015-11-25025 November 2015 Relief Request Number 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-Year ISI Interval for ISI Related Activities PNP 2015-073, Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination2015-09-17017 September 2015 Forwards Response to Request for Additional Information Regarding Relief Request Number RR 4-22 - Proposed Alternative, Use of Alternate ASME Code Case N-770-1 Baseline Examination PNP 2015-075, Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement2015-09-16016 September 2015 Submittal of Relief Request Number RR 4-23, Proposed Alternative Concerning ASME Code Depth Sizing Requirement CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division PNP 2015-024, Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval2015-05-19019 May 2015 Requests Relief of Proposed Alternatives for the Fifth 10-Year Inservice Test Interval PNP 2015-022, Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities2015-04-29029 April 2015 Relief Request Number RR 5-1, Proposed Alternative, Extend the Current ASME Code of Record Into the Fifth 10-year ISI Interval for ISI Related Activities ML14199A5572014-08-13013 August 2014 Relief Request Number RR-4-19, Proposed Alternative to the Requirements of ASME Code Case N-638-4 ML12258A3522012-09-26026 September 2012 Relief from Certain Requirements of the ASME Code Case N-77-1 for the Fourth 10-Year Inservice Inspection Interval CNRO-2008-00035, Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 8052008-11-20020 November 2008 Follow-up to Request for Extension of Discretion for the Interim Enforcement Policy for Fire Protection Issues on 10CFR50.48(c), National Fire Protection Association Standard NFPA 805 ML0824801002008-09-19019 September 2008 Acceptance of Requested Licensing Action Relief Request and Supporting Amendment to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examination ML0726304272007-09-21021 September 2007 Relief, Request Relief No. 1 - from Requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Requirements for Repair of Pressurizer Nozzle Penetrations ML0719002512007-09-12012 September 2007 Relief Request 1 for the Repair of Reactor Vessel Closure Head Penetrations ML0716201362007-09-12012 September 2007 Relief Request 2 for ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0716302482007-05-31031 May 2007 Request for Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Vent Line Penetration ML0709200292007-04-30030 April 2007 Request for Relief from ASME Code Regarding Weld Reference System, Relief Request No. RR 4-11 ML0617103642006-07-0303 July 2006 Monticello Nuclear Generating Plant, Palisades Nuclear Plant, Point Beach Nuclear Plant Units 1 and 2, Prairie Island Nuclear Generating Plant, Units 1 and 2 - Use of ASME Code Case N-513-2 ML0607902512006-04-0303 April 2006 Request for Relief from ASME Code, Section XI, Requirements for Repair of Pressurizer Nozzle Penetrations ML0607900612006-04-0303 April 2006 Request for Authorization to Use Alternatives to ASME Code, Section XI, IWA-3300, IWBb-3142.4, IWB-3420, and IWB-3613 for Reactor Pressure Vessel Head Penetration Repair ML0608003192006-04-0303 April 2006 Request for Authorization to Use Alternatives to ASME Code, Section XI, IWA-4120 for Reactor Pressure Vessel Head Penetration Repair ML0605800602006-03-21021 March 2006 Request for Authorization of Relief Request Number 1 for Certain Requirements in ASME Code, Section XI, Code Case N-638-1 ML0601201042006-01-27027 January 2006 Request for Authorization to Extend the Third 10-Year ISI Interval for Reactor Vessel Visual Examination, MC6546 ML0532002962005-11-29029 November 2005 Request for Authorization to Extend the Third Inservice Inspection Interval for Reactor Vessel Weld Examination ML0520706392005-08-17017 August 2005 Revised Relief Requests 28, 30, and 31 for 3rd 10-year Pump and Valve Inservice Testing ML0436504802005-01-18018 January 2005 Relief Request to Use Code Case N-661, and Safety Evaluation ML0430901912004-11-0808 November 2004 Relief, ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0430605712004-11-0303 November 2004 Verbal Authorization of Relief from ASME Section XI Code Requirements for Repair of Reactor Pressure Vessel Head Penetrations ML0419103642004-09-14014 September 2004 Relief, Third 10-Year Interval Inservice Inspection Program Plan ML0422402492004-08-0909 August 2004 Request for Relief from ASME Section XI Code Requirements for Repair of Pressurizer Nozzle Penetrations ML0401607382004-02-26026 February 2004 Prairie, Units 1 and 2, Kewaunee, Point Beach, Units 1 and 2, Palisades, Re Request for Alternatives to ASME Section XI, Appendix Viii, Supplement 10 ML0311505002003-05-19019 May 2003 Risk-Informed Inservice Inspection Program TAC No. MB4420 ML0306906292003-03-20020 March 2003 3/20/2003, Palisades, Relief, Re Third Inservice Inspection Interval Program ML0207202292002-03-0101 March 2002 Relief Code, Relief Request for Alternate ASME Code, Section XI, Risk-Informed Inservice Inspection Program ML0207201452002-02-27027 February 2002 Code Relief, Request for Relief from ASME Code Requirements for Inservice Inspection Pressure Test Program (Relief Request PR-07) 2021-10-28
[Table view] Category:Letter
MONTHYEARPNP 2024-014, Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances2024-10-0909 October 2024 Request for USNRC to Rescind Approved Exemption Requests for 140.11(a)(4) and 50.54(w)(1), Reduction of Insurances PNP 2024-037, Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-0202024-10-0404 October 2024 Response to Requests for Additional Information Regarding the Proposed Reauthorization of Power Operations Under Renewed Facility Operating License Number DPR-020 ML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24263A1712024-09-20020 September 2024 Environmental Request for Additional Information ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24219A4202024-09-12012 September 2024 Change in Estimated Hours and Review Schedule for Licensing Actions Submitted to Support Resumption of Power Operations (Epids L-2023-LLE-0025, L-2023-LLM-0005, L-2023-LLA-0174, L-2024-LLA-0013, L-2024-LLA-0060, L-2024-LLA-0071) IR 05000255/20244022024-09-0606 September 2024 Public: Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2024402 PNP 2024-029, Notice of Payroll Transition at Palisades Nuclear Plant2024-08-15015 August 2024 Notice of Payroll Transition at Palisades Nuclear Plant IR 05000255/20240022024-08-0909 August 2024 NRC Inspection Report No. 05000255/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-032, Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations2024-07-31031 July 2024 Supplement to License Amendment Request to Revise Selected Permanently Defueled Technical Specifications Administrative Controls to Support Resumption of Power Operations ML24206A0572024-07-25025 July 2024 PRM-50-125 - Letter to Alan Blind; Docketing of Petition for Rulemaking and Sufficiency Review Status (10 CFR Part 50) PNP 2024-033, Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations2024-07-24024 July 2024 Response to Request for Additional Information - License Amendment Request to Revise the Palisades Nuclear Plant Site Emergency Plan to Support Resumption of Power Operations PNP 2024-031, Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-07-18018 July 2024 Response to RIS 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000255/20240112024-07-15015 July 2024 Nuclear Plant - Restart Inspection Report 05000255/2024011 PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2024-07-0909 July 2024 Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24183A1382024-07-0202 July 2024 Tribal Letter - Lac Du Flambeau Band of Lake Superior Chippewa Indians ML24137A0142024-07-0202 July 2024 OEDO-24-00011 - 2.206 Petition for Misuse of Palisades Decommissioning Trust Fund (EPID L-2023-CRS-0008) - Letter ML24183A1492024-07-0101 July 2024 Tribal Letter - Pokagon Band of Potawatomi Indians ML24156A0222024-07-0101 July 2024 Initiation of Scoping Process to Prepare an Environmental Assessment for the Environmental Review of Holtec Decommissioning International, Llc’S Licensing and Regulatory Requests for Reauthorization of Power Operations at Palisades EPID L-2 ML24183A1552024-07-0101 July 2024 Tribal Letter - Red Lake Band of Chippewa Indians ML24183A1542024-07-0101 July 2024 Tribal Letter Red Cliff Band of Lake Superior Chippewa Indians ML24172A0032024-07-0101 July 2024 Letter to L. Powers, Mackinac Bands of Chippewa and Ottawa Indians Re Initiation of Scoping Process for Environ Review Holtec Decommissioning Intl, LLC Request for Reauthorization of Power Ops-Palisades ML24183A1332024-07-0101 July 2024 Tribal Letter-Forest County Potawatomi Community ML24183A1582024-07-0101 July 2024 Tribal Letter Sault Ste. Marie Tribe of Chippewa Indians ML24183A1302024-07-0101 July 2024 Tribal Letter-Chippewa Cree Indians of the Rocky Boys Reservation ML24183A1282024-07-0101 July 2024 Tribal letter-Bay Mills Indian Community ML24183A1532024-07-0101 July 2024 Tribal Letter Quechan Tribe of the Fort Yuma Indian Reservation ML24183A1572024-07-0101 July 2024 Tribal Letter - Saint Croix Chippewa Indians of Wisconsin ML24183A1462024-07-0101 July 2024 Tribal letter-Mille Lacs Band of Ojibwe ML24183A1422024-07-0101 July 2024 Tribal Letter-Little Traverse Bay Bands of Odawa Indians ML24183A1312024-07-0101 July 2024 Tribal Letter-Citizen Potawatomi Nation ML24163A0552024-07-0101 July 2024 Rebecca Held Knoche NOAA-Palisades-NOI to Conduct Scoping Process and Prepare an EA - EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24163A2392024-07-0101 July 2024 Sara Thompson, Michigan DNR-Palisades-NOI to Conduct Scoping Process and Prepare an EPID No. L-2024-LNE-0003-Docket No. 50-0255 ML24155A0102024-07-0101 July 2024 Quentin L. Messer Jr., Michigan Econ-Palisades-NOI to Conduct Scoping Process and Prep an EA-EPID No. L-2024-LNE-0003 Docket No.50-0255P ML24155A0032024-07-0101 July 2024 Kathy Kowal, Us EPA Region 5-Palisades-NOI to Cibdyct Scoping Process and Prepare an EA EPID L-2024-LNE-0003 ML24163A0832024-07-0101 July 2024 Ltr to R Schumaker SHPO Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1342024-07-0101 July 2024 Tribal Letter-Grand Portage Band of Lake Superior Chippewa ML24183A1392024-07-0101 July 2024 Tribal Letter-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24183A1272024-07-0101 July 2024 Tribal Letter-Bad River Band of the Lake Superior Tribe of Chippewa ML24183A1412024-07-0101 July 2024 Tribal Letter-Little River Band of Ottawa Indians ML24163A1922024-07-0101 July 2024 Jeremy Rubio, Dept of Env, Great Lakes and Energy, Kalamazoo District-Palisades-NOI to Conduct Scoping Process and Prepare an EA EPID No. L-2024-LNE-0003 Docket No.50-0255 ML24183A1322024-07-0101 July 2024 Tribal Letter-Fond Du Lac Band of Lake Superior Chippewa ML24183A1592024-07-0101 July 2024 Tribal letter-Sokaogon Chippewa Community ML24163A0822024-07-0101 July 2024 Ltr to J Loichinger Achp Re Initiation of Scoping Process, Section 106 Consult for Env Rev of HDI, LLC Request for Reauth of Power Operations at Palisades Nuclear Plant ML24183A1252024-07-0101 July 2024 Letter to G. Gould, Swan Creek Black River Confederated Ojibwa-Init of Scoping Process for the Env Rev of Holtec Decommissioning Intl, LLC Request for Reauth of Power Ops at Palisades ML24183A1352024-07-0101 July 2024 Tribal Letter-Hannahville Indian Community ML24183A1442024-07-0101 July 2024 Tribal Letter - Menominee Indian Tribe of Wisconsin ML24183A1502024-07-0101 July 2024 Tribal Letter - Prarie Band Potawatomi Nation ML24183A1452024-07-0101 July 2024 Tribal Letter - Miami Tribe of Oklahoma 2024-09-06
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 26, 2012 Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9S30
SUBJECT:
PALISADES - ONE-TIME RELIEF FROM CERTAIN REQUIREMENTS OF THE ASME CODE CASE N-770-1 FOR THE FOURTH 10-YEAR INSERVICE INSPECTION INTERVAL (TAC NO. ME8492)
Dear Sir:
By letter dated April 26, 2012, as supplemented by letters dated April 30, 2012, and May 1, 2012, Entergy Nuclear Operations, Inc. requested relief from certain requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-770-1, as conditioned by Title 10 of the Code of Federal Regulations (10 CFR), Section SO.SSa(g)(6)(ii)(F)(3) for the fourth ten-year inspection interval at Palisades Nuclear Plant (PNP).
On May 3,2012, the staff verbally authorized the licensee's proposed alternative on one-time basis only. This safety evaluation provides the basis for the staff's prior finding that the licensee's proposed alternative meets the requirements of 10 CFR SO.SSa(a)(3)(ii) and the staff's authorization of the licensee's proposed alternative until the next refueling outage to perform the repair/replacement activity.
As set forth in the enclosed safety evaluation, the NRC staff determines that the proposed alternative provides reasonable assurance of structural integrity of the subject components and that complying with the requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR SO.SSa(a)(3)(ii). Therefore, the NRC staff authorizes the use of the proposed alternative to Code Case N-770-1 examination requirements until the next refueling outage. At which time, the licensee is expected to be able to meet the examination coverage requirements for these welds.
The letter dated April 26, 2012, attachment 2, provided a commitment made by the licensee with three options for satisfying the commitment. The NRC staff does not agree with the third option regarding the submittal of a relief request, in accordance with the applicable provisions of 10 CFR 50.55a, prior to startup from the planned fall 2013 refueling outage. The NRC staff does not consider this to be an appropriate means to meet the examination coverage requirements of ASME Code Case N-770-1 for these welds during future outages. This was made clear during the verbal authorization on May 3, 2012. The commitment should be changed by the licensee, as the NRC staff does not accept this option.
-2 If you have any questions, please contact the Project Manager, Mahesh Chawla at 301-415-8371 or via e-mail at Mahesh.chawla@nrc.gov.
Sincerely, J
I
/
/ !'
I IV'!".-.--c____ .-_...__
Istvan Frankl, Abting Chief Plant Licensing Branch 3-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555'()001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR RELIEF FROM AMERICAN SOCIETY OF MECHANICAL ENGINEERS CODE CASE N-770-1!
ENTERGY NUCLEAR OPERATIONS. INC PALISADES NUCLEAR PLANT DOCKET NO. 50-255
1.0 INTRODUCTION
By letter dated April 26, 2012 (Agencywide Documents Access and Management System Accession No. ML12118A144), and supplemented by letters dated April 30, 2012 (ML121230295), and May 1, 2012 (ML12123A079), Entergy Nuclear Operations, Inc. (the licensee) requested relief from certain requirements of American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (Code) Case N-770-1, as conditioned by Title 10 of the Code of Federal Regulations (10 CFR), Section 50.55a(g)(6)(ii)(F)(3) for the fourth ten-year inspection interval at Palisades Nuclear Plant (PNP).
On May 3,2012, the staff verbally authorized the licensee's proposed alternative (ML12130A357). This safety evaluation provides the basis for the staff's prior finding that the licensee's proposed alternative meets the requirements of 10 CFR 50.55a(a)(3)(ii) and the staff's authorization of the licensee's proposed alternative until the next refueling outage to perform the repair/replacement activity.
2.0 REGULATORY EVALUATION
In this relief request, the licensee proposes to use alternatives to the requirements of ASME Code Case N-770-1.
10 CFR 50.55a(g){6){ii)(F)(1) requires "licensees of existing, operating pressurized water reactors as of July 21,2011, shall implement the requirements of ASME Code Case N-770-1, subject to the conditions specified in paragraphs (g)(6)(ii)(F)(2) through (g)(6)(ii)(F)(10) of this section, by the first refueling outage after August 22, 2011."
Enclosure
-2 10 CFR 50.55a(g)(6)(ii)(F)(3) states that baseline examinations for welds in Code Case N-770-1, Table 1, Inspection Items A-1, A-2, and B, shall be completed by the end of the next refueling outage after January 20, 2012. Previous examination of these welds can be credited for baseline examinations if they were performed within the re-inspection period for the weld item in ASME Code Case N-770-1, Table 1 using Section XI, Appendix VI" requirements and met the Code required examination volume of essentially 100 percent. Other previous examinations that do not meet these requirements can be used to meet the baseline examination requirement, provided NRC approval of alternative inspection requirements in accordance with paragraphs (a)(3)(i) or (a)(3)(ii) of this section is granted prior to the end of the next refueling outage after January 20, 2012.
10 CFR 50.55(a)(g)(6)(ii)(F)(4) states that the axial examination coverage requirements of Code Case N-770-1 -2500(c) may not be considered to be satisfied unless essentially 100 percent J
coverage is achieved.
10 CFR 50.55a(a)(3), states, in part, that alternatives to the requirements of 10 CFR 50.55a(g) may be used when authorized by the Nuclear Regulatory Commission (NRC) if the licensee demonstrates: (i) the proposed alternatives would provide an acceptable level of quality and safety, or (ii) compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety.
Based on the above analysis, the staff finds that regulatory authority to authorize an alternative to the ASME Code, as requested by the licensee, exists.
3.0 TECHNICAL EVALUATION
3.1 Applicable Code edition and addenda The current code of record for Palisades Nuclear Power Plant fourth ten-year inservice inspection interval is ASME Code Section XI, 2001 Edition, through 2003 addenda, as conditioned by 10 CFR 50.55a.
3.2 Code Requirements for Which Relief is Requested Relief is being requested from the examination volume coverage requirements in Code Case N-770-1, "Alternate Examination Requirements and Acceptance Standards for Class 1 PWR
[pressurized-water reactor] Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities,Section XI, Division 1" as conditioned by 10 CFR 50.55a(g)(6)(ii)(F)(1), 10 CFR 50.55a(g)(6)(ii)(F)(3), and 10 CFR 50.55a(g)(6)(ii)(F)(4).
3.3 Affected Systems and Components The licensee is requesting relief for Class 1 PWR pressure retaining Dissimilar Metal (OM) piping and vessel nozzle butt welds containing alloy 82/182 for which 100 percent volumetric examination was not obtained, as shown in Table 1 below.
-3 3.4 Proposed Alternative As an alternative to the volumetric examination coverage requirements of ASME Code Case N-770-1, the licensee proposes to perform the following:
- Conduct ultrasonic examinations to the maximum extant practical
- Perform plant personnel walk downs of Class 1 systems inside containment during refueling outages
- Perform dye penetrant surface examinations of the inspection Item B welds The licensee is considering several options to address the inability to obtain full coverage in the 2012 refueling outage, which include weld overlay, nozzle removal and weld pad with half nozzle installation, machine removal of existing heat affected zone material and installation of new primary water stress-corrosion cracking (PWSCC) resistant weld, or alternative inspection approaches.
f Table 1 Inspeclon Coverages I Component Oeseription/NPS Cire Sean for Axial Sean for Total Coverage I 10 Axial Flaws Cire Flaws (percent) (percent) (percent)
PCS-2 2" Nozzle to Pipe 0 0 0 DRL-1A1-1 Weld PCS-2 2" Nozzle to Pipe 0 ! 0 0 i
I DRL-1 B1-1 I Weld I PCS-2 2" Nozzle to Pipe 40.6 66.6 53.6 i CHL-1A1-17 Weld i PCS-2 2" Nozzle to Pipe 75 . 100 88 DRL-2A1-1 Weld PCS-3 3" Nozzle to 72.8 63.6 68.2 PSS-1 B1-1 Elbow Weld PCS-3 3" Nozzle to 72.8 63.6 68.2 I PSS-2A1-1 Elbow Weld !
PCS-4 4" Nozzle to 12.5 82.1 47.3
- PRS-1P1-1 Safe-End 3.5 Licensee's Basis for Request The ultrasonic testing techniques proposed for each weld were reviewed to determine the amount of examination coverage that could be achieved. Surface conditioning was performed as appropriate to obtain the maximum amount of coverage. However, due to various weld configurations, only limited examination volume coverages were possible for applicable circumferential and axial scans.
The operating temperature of a component is a primary factor influencing the initiation of PWSCC. Research by the Electronic Power Research Institute indicates that the difference in the operating temperature between hot leg locations and cold leg locations is sufficient to
- 4 significantly influence the time to initiation of PWSCC, with the susceptibility increasing with temperature. The research reports PWSCC is least likely to occur in cold leg temperature penetrations.
Other than the pressurizer weld, the welds covered by this relief are found in lower temperature regions of the system, typically at temperatures near to Tcold, which is approximately 537 degrees Fahrenheit. The licensee states that there is a lower probability of crack initiation, and a slower crack growth rate under these colder conditions.
No flaws have been found in the welds for which relief is requested. If flaws were to be found, the leak detection methodology presently used by industry is very sensitive. After a number of recent operating events, the industry imposed a Nuclear Energy Institute 03-08 "needed" requirement, to improve leak detection capability. As a result, virtually all pressurized water reactors in the United States, including Palisades, have a leak detection capability of less than or equal to 0.1 gallons per minute. All plants also monitor seven day moving averages of reactor coolant system leak rates.
Action response times following a leak detection vary, based on the action level exceeded and range up to containment entry to identify the source of the leak. The licensee has incorporated the appropriate action levels into their operating procedures.
Therefore, the licensee proposes that, with the periodic system pressure tests, outage system walk downs, and leakage monitoring, and the surface examinations performed during the 2012 refueling outage, an acceptable level of quality and safety is provided for identifying degradation from PWSCC prior to a safety significant flaw developing.
3.6 NRC Staff's Evaluation The staff reviewed the licensee's proposed alternative under the requirements of 10 CFR 50.55a(a)(3)(ii), such that:
"Compliance with the specified requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety."
Without the proposed alternative, the licensee stated that they would need to mitigate or redesign each of the subject welds. This work has not been fully deSigned or planned, but the licensee estimated radiological doses that range between 23-90 roentgen equivalent man (rem) for each of the welds included in the request, with a total estimated dose of 347 rem. The licensee performed an assessment of implementing Eddy Current Testing of the pressurizer nozzle to piping transition piece weld. It would require special tooling, a mockup, procedure development and qualification of the process, all of which would take significant time to develop and implement. In addition, the dose rate at the pressurizer manway is approximately 800 millirem per hour and would result in significant worker exposure. The licensee also provided information on performing an inside diameter surface examination for each of the remaining welds covered in this relief request. In all cases, performing a surface examination would require hardship, ranging from a full core offload to developing special tooling and qualification for each of the welds. The NRC staff finds this radiological dose presents an unusual difficulty in performing a volumetric examination due to the geometry of these welds and implementing a mitigation technique or repair to achieve an inspectable volume during the
- 5 2012 refueling outage to be a significant hardship in order to meet ASME Code inspection requirements. Therefore, the staff finds the licensee has identified sufficient hardship under 10 CFR 50.55a(a)(3)(ii).
The licensee proposes to address the inspection limitations for each of the welds during the current spring 2012 refueling outage by conducting a system pressure test, ultrasonic examinations to the maximum extent practical, a boric acid corrosion control program walk down to look for indications of leakage and by performing dye penetrant surface examinations of each of the Inspection Item B welds.
In order to address the pressurizer nozzle to piping transition piece weld, the licensee also performed a postulated flaw analysis for crack growth due to PWSCC. The evaluation, provided in supplemental letter dated April 30, 2012, indicates that a postulated initial crack of a conservative size would take approximately 25 years to grow beyond the allowable flaw depth.
The flaw analysis shows that even if a flaw were to have initiated when the weld was first put in service, leakage should not occur during the duration of the proposed alternative. NRC staff reviewed the licensee's flaw analysis and found it to have reasonably conservative assumptions regarding initial flaw size, residual stress profile and crack growth rate. Therefore, given the licensee's lack of coverage for axial flaws, the NRC staff finds reasonable assurance of leaktightness for this weld during the period of the proposed alternative. Additionally, the staff performed a circumferential flaw analysis that provided reasonable assurance of the weld's structural integrity through the next cycle of operation.
For the Inspection Item B welds, the NRC staff notes that the current inspection requirements were recently imposed on the licensee. These inspections required the first volumetric examination of these welds during plant life. As these inspections are required to be performed by all licensees during the first refueling outage starting after January 20, 2012, the NRC expected licensees to complete these exams across the fleet by the spring 2014 refueling outage season. The licensee's best effort inspection coverage combined with surface examinations and system walk downs provides confidence in the structural integrity and leaktightness of these component welds during this outage. As these welds are located in the cold leg of the reactor coolant system loop, the average temperature significantly lowers the susceptibility of these welds to the initiation and crack growth rate of PWSCC. Further, the licensee has not identified any indications of PWSCC in any dissimilar metal weld in the reactor coolant system, including the more temperature susceptible welds in the hot leg and pressurizer locations. Therefore, given the licensee's hardship the NRC staff finds extension of the baseline examination of the Inspection Category B welds of the licensee's proposed alternative for one cycle of operation acceptable.
The licensee committed to perform appropriate action to meet ASME Section XI Code Case N-770-1 baseline examinations for those dissimilar metal welds not meeting the examination coverage requirements during the 2012 refuellng outage prior to startup from the planned fall 2013 refueling outage. These options include: 1) compliance with N-770-1 requirements, or
- 2) removal of the subject locations from the scope of ASME Section XI Code Case N-770-1, or
- 3) submittal of relief request in accordance with the applicable provisions of 10 CFR 50.55a.
The NRC staff does not agree that the third option, which is submittal of a relief request, is an appropriate means to meet the examination coverage requirements of ASME Code Case N-770-1 for these welds during future outages.
- 6 In conclusion, the NRC staff's review finds the licensee's proposed alternatives will provide reasonable assurance of structural integrity until the next scheduled refueling outage, when the licensee shall perform a permanent mitigation, repair or meet ASME Section XI Code Case N-770-1 baseline examinations for the dissimilar metal welds.
4.0 CONCLUSION
As set forth above, the NRC staff determines that the proposed alternative provides reasonable assurance of structural integrity of the subject components and that complying with the requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Accordingly, the NRC staff concludes that the licensee has adequately addressed all of the regulatory requirements set forth in 10 CFR 50.55a(a)(3)(ii).
Therefore, the NRC staff authorizes the use of the proposed alternative to Code Case N-770-1 examination requirements until the next refueling outage. At which time, the licensee is expected to be able to meet the examination coverage requirements for these welds.
All other ASME Code,Section XI, requirements for which relief was not specifically requested and approved in this relief request remain applicable, including third-party review by the Authorized Nuclear Inservice Inspector.
Principal Contributor: Margaret Audrain Date: September 26, 2012
-2 If you have any questions, please contact the Project Manager, Mahesh Chawla at 301-415-8371 or via e-mail at Mahesh.chawla@nrc.gov.
Sincerely, IRA!
Istvan Frankl, Acting Chief Plant Licensing Branch 3-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Enclosure:
Safety Evaluation cc w/encl: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 rlf RidsNrrDorlDpr Resource RidsNrrDorlLpl3-1 Resource RidsNrrEpnb Resource RidsNrrLABTullyResource RidsNrrPMPalisades Resource RidsOgcRp Resource SKennedy, EDO R3 RidsRgn3MailCenter Resource RidsAcrsAcnw_MaiICTR Resource ADAMS Accession Number' ML12258A352 OFFICE NRR/LPL3-1/PM NRR/LPL3-1/LA NRR/DE/EPNB/BC NRR/LPL3-1/ BC(A}
NAME MChawla BTu/ly TLupold IFrankl DATE 09/24/12 09/24112 09/24/12 09/26/12 OFFICIAL RECORD COpy