Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

~

Title:

Downshift Reactor Recirculation Pumps Revision: NRC 2005 Task Number: 2029150101 Approvals:

/

NA EXAMINATION SECURITY Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer : (ROlSRO)

TrainedEvaluator:

Evaluation Method: X P e r f o r m Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 1 1 04/20/05

Recommended Start Location:

Simulator Simulator Set-up:

Reset to IC-44 Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, nd Auxiliary Operators. Prio to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a "*".
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-29 G . l .O
2. NUREG WA 202001 A4.01 3.7/3.7 Tools and Equipment:
1. None Task Standard:

Recirculation pumps 1A and 1B running in slow speed with their flow control valves full open.

NRC JPM 1 2 04/20/05

Initial Conditions:

1. The plant is at 41OO/ power.
2. The Rod line is at 60%.
3. Hydrogen injection has been secured.
4. Evaluator to ask the operator for any questions.

Initiating cue:

RO - (Operators name), Transfer Recirc Pumps from high speed to low speed per N2-OP-29 section G. 1.O.

SRO - (Operators name), Transfer Recirc Pumps from high speed to low speed.

I Performance Steps I Standard 1 Grade 1

1. Provide repeat back of initiating cue. Proper communications used for repeat Satfunsat Evaluator Acknowledge repeat back back (GAP-OPS-0 1) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference o N2-OP-29 obtained. Precautions & Satf Unsat procedure and reviewlutilize the correct Limitations reviewed and section G . l .O section. referenced
3. Verify the following:

3 BRKR 1 N B control switches in o Observes BRKR 1A and 1B control Satfunsat NORMAL. switches in NORMAL o Observes BRKR 2A and 2B control Satfunsat o BRKR 2 N B are open AND control switches in NORMAL switches in NORMAL.

Observes BRKR 2N2B green lights - ON Satfunsat o Observes BRKR 2N2B red lights - OFF Satfunsat o LFMG generator AND pump motor Cue: When asked, report that LFMG lockout AND relays are reset at generator & pump motor lockout and RECIRCULATION SYSTEM LFMG SET relays are reset AUXILIARY RELAY PANEL B35-PO01A( B).

4. At 2NPS-SWG004 (SWGOOS), confirm Cue: Acknowledge request and report that breaker 1, REACTOR breaker 1 on both NPS-SWG004 and RECIRCULATION PUMP MOTOR 005 are charged.

BRKR - 2A(B) 2RCS-M1A(B) is charged as indicated by yellow indicator on lower left of breaker.

5. Position AND hold BRKR 5A(B) control Rotates BRKR 5A control switch - Pass/Fail switch to TRANSFER MG, THEN TRANSFER MG position the remaining BRKR 5B(A) o Rotates BRKR 5B control switch - Pass/Fail control switch to TRANSFER MG TRANSFER MG The following annunciators alarm not requiring action:

603139 Reactor Water Level High (idclear)

NRC JPM 1 3 04/20/05

I Performance Steps I Standard I Grade I o 603218 OPRM Trip Enabled (clears) o 842310 HWC Trouble (reflashes) 851456 Cnst System Trouble No Backup Pmp Available (inklear)

6. Observe the following:

o BRKR 5A trips. o Observes BRKR 5A red light - OFF Sat/Unsat o Observes BRKR 5A green light - ON Sat/Unsat LI BRKR 5B trips. o Observes BRKR 5B red light - OFF Sat/Unsat o Observes BRKR 5B green light - ON Sat/Unsat o BRKR 1A AND BRKR 1B close. o Observes BRKR 1A red light - ON Sat/ Unsat o Observes BRKR 1A green light - OFF Sat/ Unsat o Observes BRKR 1B red light - ON Sat/Unsat o Observes BRKR 1B green light - OFF Sat/Unsat o Pump speed lowers to between 460 o Observes speed on B35-651A and B drop Sat/Unsat AND 350 rpm. <460 but >350 rpm 3 BRKR 2A AND BRKR 2B close. o Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat Observes BRKR 2A red light - ON Sat/Unsat o Observes BRKR 2A green light - OFF Sat/Unsat Pump speed stabilizes at about 445 o Observes speed on B35-651A and B at Sat/Unsat rpm. about 445 rpm

7. Using RECIRC LOOP A B FLOW o Positions RECIRC LOOP A and B FLOW Pass/Fail CONTROL stations, raise output signal CONTROL to raise.

to 100% (about 85 on A loop o/o VALVE o Observe loop A VALVE POSITION at Sat/Unsat POSIT10N indicated ) . about 85%

o Observe loop B VALVE POSTION at Sat/Unsat about 95%

The following annunciators alarm not requiring action:

o 603218 OPRM Trip Enabled alarms

8. Monitors recirculation pump and LFMG Observe about 73 amps on AM- Sat/Unsat parameters. 2RCSA(B)60 Observe 445 rpm on B35-R651A(B). Sat/Unsat n Dispatches an Auxiliary Operator to Sat/Unsat report LFMG generator voltage and amperage.

Cue: As the Auxiliary Operator, report that LFMG A generator indicates 1250 volts and 95 amps. Also, LFMG 6 generator indicates 1250 volts and 94 amps.

NRC JPM 1 4 04/20/05

I Performance Steps I Standard I Grade 1

9. Reports that Recirc pumps have been Cue: Acknowledges the report.

transferred to slow speed.

-- TERMINATING CUE: Recirc pumps 1A and 1B running in slow speed.

RECORD STOP TIME NRC JPM 1 5 04/20/05

Initial Conditions:

1. The plant is at 41% power.

-_ 2. The Rod line is at 60%.

3. Hydrogen injection has been secured.
4. Evaluator to ask the operator for any questions.

Initiating cue:

RO - (Operators name), Transfer Recirc Pumps from high speed to low speed per N2-0P-29 section G . l .O.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 1 6 04/20/05

Initial Conditions:

1. The plant is at 41% power.
2. The Rod line is at 60%.
3. Hydrogen injection has been secured.
4. Evaluator to ask the operator for any questions.

Initiating cue:

SRO (Operators name), Transfer Recirc Pumps from high speed to low speed.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 1 7 04120105

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

RCIC Injection With Oscillations (Faulted) Revision: NRC 2005 Task Number: 2179150101 Approvals:

NA EXAMINATION SECURITY General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATON SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: -Plant X Simulator Expected Completion Time: 15 min. Time Critical Task: No Alternate Path Task: Yes Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator's Signature: Date:

02-OPS-SJE-217-2-05 NRC JPM 2 1 211412005

Recommended Start Location:

Simulator Simulator Set-u p:

1. Reset to any hot IC
2. RPV pressure >300 psig
3. Malfunction RC04, TRUE, Event Trigger 049 [Relatives]

FALSE, Event Trigger 050

4. Reactor in MODE 3 with Main Turbine off-line, or RCIC-Turbine trip bypassed CAUTION: Do not use setup disk or snapshot. Load the Malfunction and relative each time, to ensure proper JPM event trigger operation.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SSS, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.

With the exception of accessing panels, NO plant equipment will be physically manipulated.

Repositioning of devices will be simulated by discussion and acknowledged by my cues.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independenupeer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a "*".
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

Additional verification shall be demonstrated.

References:

1. N2-OP-35, Section F.2.0
2. NUREG K/A 217000 A4.01 3.7/3.7 Tools and Equipment:

None Task Standard:

RClC Flow Controller in manual and with RClC injecting to RPV at approximately 600 gpm.

02-OPS-SJE-2 17-2-05 NRCJPM2 2 2/14/2005

Initial Conditions:

1. Reactor pressure is (report digital pressure reading on P603)
2. RPV level is lowering.

-..- Initiating Cues:

(Operators name), initiate RCIC, inject into the RPV and establish rated flow, per N2-0P-35, Section F.2.0.

Performance Steps Sta ndard Grade

1. Provide repeat back of initiating cue. Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back back (GAP-OPS-01) providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference o N2-OP-35 obtained. Precautions & Sat/ Unsat procedure and reviewhtilize the correct limitations reviewed and Section F.2.0 section of the procedure. referenced.

At P601, rotate RClC manual initiation Pass/Fail

3. Initiate RCIC. pushbutton collar to armed position.

Depress RClC manual initiation Pass/FaiI pushbutton.

4. Verify RClC System response. a Verifies RClC has started properly by verifying the following:

o Gland Seal System Air Sat/Unsat Compressor STARTS.

o ICS*MOV116, Lube Oil Cooling Sat/Unsat Water Supply, OPENS.

ICS*MOV120, Turbine Steam Sat/Unsat Supply Valve, OPENS.

ICS*MOV126, RClC Pump Sat/Unsat discharge to the Reactor, OPENS.

o ICS*MOV143, RClC Pump Sat/Unsat minimum flow to the Suppression Pool. OPENS and then CLOSES once discharge flow is greater than 220 gpm.

a ICS*AOV 156 and 157, RClC Sat/Unsat Injection Outboard and Inboard Isolation Valves, OPEN once System Pressure is greater than Reactor Pressure.

02-OPS-SJE-217-2-05 NRCJPM2 3 2114/2005

Performance Steps Standard Grade

5. Observe and respond to failure of the Recognizes as RClC Flow is Pass/Fail RClC System flow controller in AUTO. increasing that the flow to the Reactor Vessel is OSCILLATING.

o Places ICS*FClOI, RClC Flow PasdFail Controller in MANUAL and ESTABLISHES approximately 600 gpm flow rate.

6. Reports to the SM; u RClC is injecting to the Reactor CUE: As the SM, respond to the Sat/ Unsat Vessel at 600 gpm in the MANUAL Candidates report on the RClC mode. System.

Sat/Unsat u The Flow Controller, 21CS*FC10l1IS CUE: As the SM, respond to the NOT in the AUTOMATIC mode due Candidates report on the RClC to flow oscillations during startup of System.

the RClC System.

J Current Reactor Vessel Level.

CUE: If asked, tell the Candidate that Sat/ Unsat/

RClC flow is still required, and NA to monitor the RClC System for any further signs of malfunctions.

Terminating Cue: The RClC System is injecting in the manual mode at rated flow conditions.

RECORD STOP TIME 02-OPS-SJE-217-2-05 NRC JPM 2 4 2/14/2005

Initial Conditions:

L

1. Reactor pressure is (report digital pressure reading on P603)
2. RPV level is lowering.

Initiating Cues:

(Operators name), initiate RClC per N2-OP-35, Section F.2.0, inject into the RPV and establish rated flow.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-SJE-217-2-05 NRCJPM2 5 2/14/2005

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Restore RHS in Shutdown Cooling Mode (Alternate) Revision: NRC 2005 Task Number: 2050030101 Approvals:

NA EXAMINATION SECURITY General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

TrainerIEvaluator:

Evaluation Method: X Perform Simulate EvaIuat io n Location: Plant X Simulator Expected Completion Time: 10 Mins. Time Critical Task: NO Alternate Path Task: YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

EvaIuator's Signature: Date:

NRC JPM 3 211412005

Recommended Start Location:

Unit 2 Simulator

-~ -

Simulator Set-up:

1. Place Simulator in IC-43
2. Shutdown the B RHS Loop per N2-OP-31, Section H.3.0
3. Set up the following I/O and Event Trigger: - (P14/35), ET#51.
a. I/O 2RHS*MOV40B control switch (Page 14/36) in Neutral and trigger (ET-51) with the red open indication for 2RHS*MOV40B.

(P601-B22H-S44-A, RHR Shutdown Cooling Injection lsol Vlv MOV 406, NEUTRAL ETO1)

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cuesasnecessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore, it should not be requested.

Read Before Each Training JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the independent/peer verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified in grading areas as Pass/Fail. All steps are sequenced critical unless denoted by a I..
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

0 Additional verification shall be demonstrated.

References:

1. N2-OP-31, Section H.3.0 and H.4.0
2. N2-ARP-01, Attachment 6, ARP for window 601648
3. NUREG 1123, 205000 A4.01 3.7/3.7 Shutdown Cooling System (RHR Shutdown Cooling Mode)

Tools and Equipment:

None required Task Standard: RHS*Pl B tripped within 40 seconds of start NRC JPM 3 2114/2005

Initial Conditions:

1. Plant is in mode 4.
2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
3. SDC Loop B has been shut down for 15 minutes.
4. RDS Back fill is in service.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), Restore RHS Loop B in Shutdown Cooling per N2-OP-31 .I SRO- (Operators name), Restore RHS Loop B in Shutdown Cooling.

I Performance Steps I Standad I Grade I

1. Provide repeat back of initiating cue. Proper communications used for repeat Sat/ Unsat Evaluator Acknowledge repeat back back (GAP-OPS-01/0perations providing correction if necessary. Manual).

RECORD START TIME

2. Obtain a copy of the reference o N2-OP-31 obtained. Precautions & Sat/U nsat procedure and reviewhtilize the limitations reviewed & section H.4.0 correct section of the procedure. referenced.
3. IF RDS Backfill Injection is out of a Determines that RDS backfill is in Sat/ Unsat service to one OR more RPV Level service and no action is required, reference Legs in Mode 3, THEN perform the following:
a. Enter N2-OP-lOlC, Attachment 1.
b. Perform concurrently with this Subsection to monitor for possible RPV level instrumentation notching.
c. IF observed, take the proper actions.
4. CAUTION: The RHR pump is without o Obtains stopwatch. Sat/ Unsat minimum flow protection, Minimum flow of > 1000 gpm must be established within 40 seconds of pump start. Use of a stopwatch is recommended to ensure the pump is tripped within the required time if minimum flow is not achieved. Do not allow pump to run for > 15 seconds dead headed, NRC JPM 3 2/14/2005

I Performance Steps I Standard I Grade 1

5. Start 2RHS*P1B at Panel 601. 0 Rotates RHS*PI B control switch to start PasslFail and releases to Normal-After-Start.

0 Starts the stopwatch SaUUnsat 0 Observes control switch red flagged. SaUUnsat 0 Observes RHS*Pl B red light - ON Sat/Unsat 0 Observes RHS*PI B green light - OFF SaUUnsat

6. Throttle open RHS*MOV40B, SDC B 0 Places RHS*MOV40B control switch to PasslFail RETURN THROTTLE to > 1000 OPEN (requires key).

gpm. 0 Observes RHS*MOV40B red light - ON SaUUnsat 0 Observes RHS*MOV40B green light - SaUUnsat ON

7. IF RHS*MOV40B does not begin to 0 Observes no rising flow indication on SaUUnsat open in 15 seconds OR system flow meter E l 2-R603B is NOT > 1000 gpm 40 seconds after a Prior to 40 seconds after RHS*PI B is PasslFail pump start. Place RHS*PI B control started, places RHS*PI B control switch switch to STOP, THEN release to to STOP and releases to Normal-After-Normal-After-Stop. Stop.
8. Report to CRS inability to obtain 0 Report made to CRS of inability to Sat/ Unsat required minimum flow on RHS*PI B obtain satisfactory min-flow and that and that the pump has been tripped. RHS*PI B has been tripped.

Cue: As the CRS, Acknowledge the report.

Terminating Cue: RHS*Pl B tripped within 40 seconds of start.

RECORD STOP TIME NRC JPM 3 211412005

Initial Conditions:

1. Plant is in mode 4.
2. SDC Loop B; has been shut down per N2-OP-31, section H.3.0.
3. SDC Loop B has been shut down for 15 minutes.
4. RDS Back fill is in service.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), Restart RHS Loop B in Shut Down Cooling per N2-OP-31.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 3 211412005

initial Conditions:

1. Plant is in mode 4.

.-. 2. SDC Loop B; has been shut down per N2-0P-31, section H.3.0.

3. SDC Loop B has been shut down for 15 minutes.
4. RDS Back fill is in service.
5. Instructor to ask operator for any questions.

Initiating Cues:

SRO- (Operators name), Restart RHS Loop B in Shut Down Cooling.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 3 211412005

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Initiate Containment Venting Through Revision: NRC 2005 Standby Gas Treatment (GTS)

Task Number: 2000070501 Approvals:

NA EXAMINATION SECURITY Date ' General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (ROISRO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate

.. Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

EvaIuator Signature: Date:

02-OPS-SJE-261-2-02 NRC JPM 4 1 04/20/05

Recommended Start Location:

Simulator Simulator Set-up:

This JPM can be run from any IC. No setup is required.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor I Evaluator:

1. Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted by a
2. During Evaluated JPM:

0 Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-0P-61A, Primary Containment Ventilation Purge & Nitrogen System, Section H . l .O
2. NUREG WA: 295024, EA1.20 3.5 / 3.6 Tools and Equipment:

None required Task Standard:

SBGTS Train A running, aligned to the Drywell in accordance with applicable procedures.

02-OPS-SJE-261-2-02 NRC JPM 4 2 04120105

Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), place Standby Gas Train A on the Drywell per N2-0P-61A, Section H . l .O.

SRO- (Operators name), place Standby Gas Train A on the Drywell.

I Performance Steps I Standard 1 Grade I

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-01) providing correction if necessary.

RECORD START TIME

2. Obtain a copy of the reference N2-0P-61A obtained. Precautions & Sat/Unsat procedure and reviewhtilize the correct Limitations reviewed & section H.l .O section of the procedure. referenced.
3. IF required, as determined by o Determines that Chemistry samples Chemistry Supervision, notify Chemistry have been obtained and analysis is

.- to sample the containment for the pre- completed vent acceptance criteria of ODCM Table D3.2.1-1 per Precaution and Limitation D.13.0 guidance:

4. IF time permits, concurrently with the Cue: Time does not permit the filling following steps, fill out Attachment 3 for out of attachment 3.

the valves operated (ODCM DSR 3.2.6.1). The listed position shall be the position of the valve following completion of the step.

5. IF desired to reduce Drywell or Suppression Chamber pressure, open the following:

o IAS*SOV168 at 2CEC*PNL851. o Places IAS*SOV168 control switch PasslFail clockwise to OPEN.

o Observes IAS*SOV168 red light - ON Sat/Unsat o Observes IAS*SOV168 green light - Sat/Unsat OFF 3 IAS*SOV180 at 2CEC*PNL851 o Places IAS*SOV180 control switch PasslFail clockwise to OPEN o Observes IAS*SOV180 red light - ON Sat/Unsat

- o Observes IAS*SOV180 green light - Sat/Unsat OFF 02-OPS-SJE-261-2-02 NRC JPM 4 3 04/20/05

1 Performance Steps I Standard I Grade I

6. Start at least one of the GTS trains by o rotates the Train A Initiation switch PasslFail placing TRAIN A (B) INITIATION clockwise to the start position Control Switch to START position at o Observes Train A Initiation red light - SaUUnsat 2CEC*PNL870 (871) AND verify the ON following: o Observes Train A Initiation green light Sat/Unsat

- OFF u GTS*MOVIA (B), INLET FROM RX Observes GTS*MOVIA red light - ON Sat/Unsat BLDG VENTILATION - Opens. o Observes GTS*MOVIA green light - Sat/Unsat OFF u GTS*AOVZA (B), TRAIN A (B) INLET o Observes GTS*MOV2A red light - ON Sat/Unsat VLV - Opens. o Observes GTS*MOV2A green light - Sat/Unsat OFF u GTS*AOV3A (B), FAN 1A (B) DISCH Observes GTS*MOV3A red light - ON Sat/Unsat ISOL VLV - Opens. Observes GTS*MOV3A green light - Sat/Unsat OFF u GTS*FNIA (B), SBGTS FAN - Starts. Observes GTS*FNIA red light - ON Sat/Unsat o Observes GTS*FNIA green light - Sat/Unsat OFF

7. Verify that Chemistry is standing by to o Requests Chemistry Technician Sat/Unsat the sampling required durinq the commence sampling vent (ODCM Table D3.2.1-1).

Cue: If requested, inform Operator that Chemistry has starfed sampling during the vent.

8. IF GTS operation is affecting Reactor u Verify Reactor Building pressure 5.6 Sat/ Unsat Building differential pressure, adjust WG on GTS*PDIK5A.

controller 2GTS*PDIK5A (B),

REACTOR BLDG INLET/OUTLET DlFF If necessary, throttle pressure valve PasslFail PRESS, to throttle 2GTS*PV5A (B), RX 2GTS*PDIK5A as necessary to BLDG PRESSURE CONTROL as maintain 2 -.6WG Reactor Building necessary. pressure.

02-OPS-SJE-261-2-02 NRC JPM 4 4 04/20/05

1 Performance Steps I Standard I Grade I

9. At CEC*PNL873, verify the following valves closed:

aCPS*AOVI04 Observe CPS*AOV104 green light - SaffUnsat ON o Observe CPS*AOV104 red light - OFF Sat/Unsat o CPS*AOV105 o Observe CPS*AOVlOS green light - Sat/Unsat ON Observe CPS*AOVlOS red light - OFF SaffUnsat Observe CPS*AOV110 green light - Sat/Unsat ON Observe CPS*AOVI 10 red light - OFF Sat/Unsat LI CPS*AOVI 11 Observe CPS*AOV111 green light - SaffUnsat ON R Observe CPS*AOV111 red light - OFF SaffUnsat GTS*SOV102 o Observe CPS*AOV102 green light - SaVUnsat ON o Observe CPS*AOV102 red light - OFF SaffUnsat u GTS*AOVlOl o Observe CPS*AOV101 green light - SaffUnsat ON Observe CPS*AOV101 red light - OFF SaffUnsat

10. At CEC*PNL875, verify the following

-_ valves closed:

o CPS*AOV106 Observe CPS*AOV106 green light - Sat/Unsat ON o Observe CPS*AOV106 red light - OFF SaffUnsat 3 CPS*SOV132/AOVI 07 Observe CPS*SOV132/AOVI 07 green Sat/ Unsat light - ON o Observe CPS*SOV132/AOVI 07 red Sat/ Unsat light - OFF LICPS*AOVI 08 o Observe CPS*AOV108 green light - SaffUnsat ON Observe CPS*AOV108 red light - OFF SaffUnsat LICPS*SOVI 331AOV109 R Observe CPS*SOV133/AOVI 09 green Sat/Unsat light - ON Observe CPS*SOV133/AOVI 09 red Sat/Unsat light - OFF

11. Notify Chemistry to start ODCM Cue: If requested, inform Operator that required sampling. Chemistry has started sampling during the vent.

02-OPS-SJE-261-2-02 NRC JPM 4 5 04/20/05

I Performance Steps I Standard I Grade 1

12. At CEC*PNL873. ot3en 2GTS*SOVl 02. u Rotates 2GTS*SOV102 control switch Pass/Fail clockwise to - OPEN Observe 2GTS*SOV102 red light - ON SaffUnsat u Observe 2GTS*SOV102 green light - SaffUnsat OFF
13. At CEC*PNL873/875, open the following:

3 CPS*AOVI 08 u Rotate CPS*AOVI 08 control switch PasslFail clockwise to OPEN u Observe CPS*AOV108 red light - ON Sat/Unsat o Observe CPS*AOV108 green light - Sat/Unsat OFF o CPS*AOVI 10 o Rotate CPS*AOVI 10 control switch PasslFail clockwise to OPEN Observe CPS*AOVI 10 red light - ON Sat/Unsat u Observe CPS*AOVI 10 green light - Sat/Unsat OFF

14. Reports that GTS Train A is running on Cue: Acknowledge the report the Drywell.

TERMINATING CUE: SBGTS Train "A" running on the Drywell.

RECORD STOP TIME 02-OPS-SJE-261-2-02 NRC JPM 4 6 04/20/05

Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.
5. Instructor to ask operator for any questions.

Initiating Cues:

RO- (Operators name), place Standby Gas Train A on the Drywell per N2-OP-61A, Section H . l .O.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-SJE-261-2-02 NRC JPM 4 7 04/20/05

Initial Conditions:

1. EOPs have been entered due to high suppression pool temperature.
2. Conditions require standby gas be placed on the drywell to reduce pressure.
3. Drywell and Suppression Chamber vent samples have been obtained and are satisfactory.
4. There is no Nitrogen makeup to the Primary Containment in progress.
5. Instructor to ask operator for any questions.

Initiating Cues:

SRO- (Operators name), place Standby Gas Train A on the Drywell.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-SJE-261-2-02 NRC JPM 4 8 04/20/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Energize Reserve Station Transformer 1B and NPS-SWG003. Revision: NRC 2005 Task Number: 2000350501 Ap provaIs:

NA EXAMINATION SECURITY Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Pedorme r : (RO/SRO)

Trai ner/Evaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 5 1 04/20/05

Recommended Start Location:

Simulator Simulator Set-up:

Reset to IC 46 Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used. Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor I Evaluator:

1.

by a 2.

Critical steps are identified as Pass/Fail. All steps are sequenced critical unless denoted During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

0 Self-verification shall be demonstrated.

0 No other verification shall be demonstrated.

References:

1. N2-SOP-03 Tools and Equipment:
1. None Task Standard:

Reserve Transformer 1B energized from Line 6 and NPS-SWG003 and NNS-SWGOI 3 energized from Reserve Transformer 1B.

NRC JPM 5 2 04/20/05

Initial Conditions:

1. The plant experienced a Loss of Line 6.
2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

RO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.5 Power Restoration.

SRO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3.

1. Provide repeat back of initiating cue. o Proper communications used for SaVUnsat Evaluator Acknowledge repeat back repeat back (GAP-OPS-01) providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference procedure o N2-SOP-3 obtained. Precautions & SaVUnsat and review/utilize the correct section. Limitations are reviewed and Attachment 1 Section 1.5 referenced.
3. Review Attachment 1 Section 1.5 Power a Per step 1.5.2, determines SaUUnsat Restoration to determine applicable performance of Attachment 6 is Attachment to Energize Reserve required.

Transformer 1B

4. At Panel 808 (CB 288), verify reset 86- o Verifies 86 device is reset Sat/Unsat 2SPRYO1 (RES STA SER XFMR 1B PRIM PROT LO RELAY). Cue: If asked, inform the candidate that 86-SPRY01 is reset.
5. At Panel 809 (CB 288), verify reset 86- Verifies 86 device is reset SaVUnsat 2SPRZ08 (RES STA SER XFMR 1B BU PROT LOCKOUT RELAY). Cue: If asked, inform the candidate that 86-SPRZO8 is reset.
6. Determine step 6.2 is N/A Marks N/A block for step 6.2 SaVUnsat
7. Determine section 6.3 is applicable CI Carries out the actions of section SaVUnsat 6.3 NRC JPM 5 3 04/20/05

I Performance Steps I Standard I Grade 1

8. Close MDS2 - (1 15 KV MOD SWITCH 63) Places MDS2 control switch to PasslFail LINE 6. CLOSE o Observes MDS2 red light - ON Sat/Unsat o Observes MDS2 green light - OFF Sat/Unsat
9. Close MDS4 - (115 KV CIRCUIT o Places MDS4 control switch from PasslFail SWITCHER CKT SWITCH 38). PULL-TO-LOCK to NORMAL-AFTER-OPEN o Places MDS4 control switch to PasslFail CLOSE o Observes MDS4 red light - ON Sat/Unsat Observes MDS4 green light - OFF Sat/Unsat The following annunciators clear with no required action:

o 852421 MOT Operator CKT 2YUC-MDS4 852435 RES STA SER XFMER 1B Loss of Voltage

10. IF required, place in Normal-After-Trip o Places 3-1 control switch from PasslFail 2NPS-SWG003-1. PULL-TO-LOCK to NORMAL-AFTER-TRIP.

o Observes 3-1 green light - ON SaVUnsat

11. Return to Attachment 1 Section 1.5. Per step 1.5.8, determines SaVUnsat performance of Attachment 7 is required .
12. Step 7.1 Prerequisites Cue: If asked, 7.1.4 lockouts have been verified reset. Step 7.1, Prerequisites, are completed
12. Determines section 7.2 is applicable o Carries out the actions of section SaVUnsat 7.2
13. Place 3-14 in Pull-to-Lock. o Places 3-14 control switch in PasslFail PULL-TO-LOCK Observes 3-14 greedred lights - Sat/Unsat OFF The following annunciator clears with no required action:

852560 13.8KV Bus NPS003 ACB 3-1/14/16 Auto Trip/FTC

14. Place the SYNC switch to ON o Rotates the SYNC switch to ON PasslFail (SYNCHRONIZE RES STA SVCE XFMR 1B).

NRC JPM 5 4 04/20/05

Performance Steps I Standard Grade CLOSE o Observes 3-1 red light - ON SaVUnsat Observes 3-1 green light - OFF Sat/Unsat Numerous annuciators clear.

Numerous annunciators alarm.

Numerous annunciators reflash. None of these requires action.

16. Place the SYNC switch to OFF. Rotates the SYNC switch to OFF PasslFail
17. Close 13-6. o Rotates 13-6 control switch from PasslFail PULL-TO-LOCK to NORMAL-AFTER-TRIP.

Observes 13-6 green light - ON SaVUnsat Rotates 13-6 control switch to PasslFail CLOSE Observes 13-6 red light - ON SaVUnsat Observes 13-6 green light - OFF SaVUnsat The following annunciator clears with no required action:

852527 4KV Bus NNS 013 Undervoltage

18. Return to Attachment 1 Section 1.5.
19. Reports that Reserve Station Transformer Cue: Acknowledge report.

1B is energized from Line 6, and ZNPS-SWG003 & NNS-SWG013 are energized from Reserve Station Transformer 1B TERMINATING CUE: Reserve Station Transformer 1B Powered from Line 6, and NPS-SWG003 &

NPS-SWG013 are energized from Reserve Station Transformer 1B.

RECORD STOP TIME NRC JPM 5 5 04/20/05

Initial Conditions:

1. The plant experienced a Loss of Line 6.
2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

RO- I (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWG013 per N2-SOP-3 Attachment 1 Section 1.5 Power Restoration.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 5 6 04/20/05

Initial Conditions:

_. 1. The plant experienced a Loss of Line 6.

2. The plant was manually scrammed.
3. Immediate and Subsequent Actions of N2-SOP-3 are complete.
4. Fault Identification and Isolation per Attachment 1 Section 1.4 are complete.
5. Power has been restored to Line 6 and Power Control has verified its reliability.
6. Ask the operator for any questions.

Initiating cue:

SRO- (Operators name), Energize Reserve Station Transformer 1B from Line 6, then restore power to 2NPS-SWG003 and NNS-SWGOI 3 per N2-SOP-3.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 5 7 04120105

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

PERFORM TURBINE CONTROL VALVE (CV2 and 3) Revision: NRC 2005 CYCLING SURVEILLANCE Task Number: 21 29050201 Approvals:

t Y/z (0< NA EXAMINATION SECURITY Genefa1 Supervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Pe rformer : (ROERO)

Trainer/Evaluator:

Evaluation Method: X Perform Simulate

.-. Evaluation Location: Plant X Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: YES Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 6 1 04/20/05

Recommended Start Location:

Simulator Simulator Set-up:

1. Reset to a full power IC (such as IC-20).
2. Malfunction RP02,TRUE F3 Directions to Evaluator:
1. Reduce recirc flow to reduce power to 85 % by APRM's
2. Set the MAX COMBINED FLOW LIMITER to 7.50.
3. This JPM will require an instructor to role-play as a second RO. The second RO will hold the test pushbutton, allowing the candidate to verify indications.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional

/ concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a ".".
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OSP-RPS-Q001
2. NUREG K/A 212000 A2.03 3 3 3 . 5 Tools and Equipment:
1. None Task Standard:

Cycle CV3 results in a RPS failure, then insert a manual trip of RPS B2 logic.

NRC JPM 6 2 04120105

Initial Conditions:

1. The plant is at 85% power.

. No equipment is out of service.

3 . N2-OSP-RPS-Q001 Control Valve Cycling surveillance is in progress.

4. Testing for Control Valve CV1 is complete.
5. A second RO is available to assist with surveillance performance.
6. Ask the operator for any questions.

Initiating cue:

(Operators name), Continue performing Turbine Control Valve Cycling per N2-OSP-RPS-Q001 for CV2 and CV3. The surveillance is in progress and step 8.1.5.1, in preparation for cycling CV2, is the next step to be performed.

1. Provide repeat back of initiating cue. Evaluator Proper communications used for Sat/ Unsat Acknowledge repeat back providing correction if repeat back (GAP-OPS-01 )

necessary RECORD START TIME

2. Provide candidate with a marked-up working N2-OSP-RPS-Q001 section 8.0 is Sat/Unsat copy of Surveillance Test N2-OSP-RPS-Q001. referenced
3. Commences test at step 8.1 $5.1 Commences test at step 8.1 5 . 1 Sat/Unsat Verifies no trips on RPS B trip Sat/Unsat system.

NOTES:

4. Closing 2MSS-CV2 may cause bypass valve(s) Informs CRS and/or CSO of Sat/Unsat/

to open to maintain pressure. expected ann unciators NA Closing 2MSS-CV2 will cause the following Cue: As the CRS/CSO acknowledge annunciators to alarm: the annunciator report.

o 603104 RPS A TURB CONT VLV FAST CLOSE TRIP J 6031 10 RPS A AUTO TRIP

5. Depress and HOLD, CV-2 TEST pushbutton, o Depresses the CV-2 TEST PasslFail (hold depressed until directed to release), when pushbutton on panel 2CEC*PNL842 position indicator indicates valve is fully closed (0% indicated), verify following alarms and Cue: Instructor role play to hold the indications : TEST pushbutton allowing the candidate to verify indications.

o Annunciator 603104 RPS A TURB CONT o Observes 603104 annunciator Sat/ Unsat VLV FAST CLOSE TRIP alarmed. window is lit.

NRC JPM 6 3 04/20/05

Annunciator 6031 10 RPS A AUTO TRIP o Observes 6031 10 annunciator Satfunsat alarmed. window is lit.

PILOT SCRAM VALVE SOLENOIDS o Observes Pilot SCRAM valve Satfunsat A,C,E,G indicating lights on 2CEC*PNL603 solenoids white lights A, C, E & G -

are OFF. OFF REACTOR SCRAM TRIP LOGIC AI Cue: I f asked, state that the Reactor Sat/ U nsat indicating light on 2CEC*PNL609 is OFF. SCRAM Trip Logic A1 white light Located on P609 is OFF.

RECIRC PUMP TRIP SYSTEM A indicating Cue: If asked, state that the Recirc Satfunsat light C72A-DS7 on 2CEC*PNL609 is OFF, Pump Trip System B light C72A-DS7 C72A-DS8 on 2CEC*PNL611 becomes on P609 is OFF and C72A-DS8 on brighter. P611 is BRIGHTER.

Process points MSSUCO9 and RPSUC03 Observes computer alarms Satfunsat are generated. MSSUCOS and RPSUC03 on the process computer NOTES:

Opening 2MSS-CV2 will cause the following Informs CRS and/or CSO of Satfunsat annunciators to clear: expected annunciators u 603104 RPS A TURB CONT VLV FAST Cue: As the CRWCSO acknowledge CLOSE TRIP the annunciator report.

a 6031 10 RPS A AUTO TRIP

6. Release CV-2 Test pushbutton and observe u Release CV-2 Test pushbutton Satfunsat position indicator until valve returns to pre-test position.

7 . At panel 2CEC*PNL603 reset REACTOR o At P603 resets RPS A trip using PasslFail SCRAM RESET LOGIC A. channel A and C reset switches

8. Verify following alarms and indications are in Observes the following:

indicated status :

Annunciator 603104 RPS A TURB CONT Annunciator 603104 RPS A Sat/Unsat VLV FAST CLOSE TRIP is clear. TURB CONT VLV FAST CLOSE TRIP is clear.

Annunciator 6031 10 RPS A AUTO TRIP is 0 Annunciator 6031 10 RPS A Sat/ Unsat cleared. AUTO TRIP is cleared.

PILOT SCRAM VALVE SOLENOIDS 0 PILOT SCRAM VALVE Satfunsat A,C,E,G indicating lights on 2CEC*PNL603 SOLEN0IDS A, C ,E,G indicating are ON. lights on 2CEC*PNL603 are ON.

NRC JPM 6 4 04/20/05

RECIRC PUMP TRIP SYSTEM A o RECIRC PUMP TRIP SYSTEM A Sat/Unsat

_- indicating light C72A-DS7 on indicating light C72A-DS7 on 2CEC*PNL609 is ON, C72A-DS8 on 2CEC*PNL609 is ON, C72A-DS8 2CEC*PNL611 return to normal on 2CEC*PNL611 return to brightness. normal brightness.

Cue: If asked, state that the Recirc Pump Trip System B light C72A-DS7 on P609 and C72A-DS8 on P677 have returned to normal brightness.

3 Process points MSSUCO9 and RPSUC03 Process points MSSUCO9 and Sat/Unsa t are reset. RPSUC03 are reset.

CONSOLE OPERATOR WHEN RPS A is reset enter malfunction RPO2 by depressing F3 Key, to prevent RPS B from tripping when CV3 is tested.

The following section cycles CV3 NOTES:

1. Closing 2MSS-CV3 may cause bypass valve(to open to maintain pressure.
2. Closing 2MSS-CV3 will cause following annunciators to alarm:

603404 RPS B TURB CONT VLV FAST CLOSE TRIP 603410 RPS B AUTO TRIP

9. Verify no trip signals exist in RPS A Trip Observes no red annunciators lit on Sat/Unsat System. panel 603.
10. Notify CSO of trip to be received in RPS B Trip Notifies the CSO of expected half Sat/Unsat System. scram initiation in RPS A Trip System.

Cue:Acknowledge that a half scram will be received.

11 Depress and HOLD, CV-3 TEST pushbutton, Depresses the CV-3 TEST PasslFail (hold depressed until directed to release), when pushbutton on panel 2CEC*PNL842.

position indicator indicates valve is fully closed (0% indicated), verify following alarms and Cue: Instructor role play to hold the NRC JPM 6 5 04/20/05

I Performance Steps } Standard I Grade 1 indications : TEST pushbutton allowing the candidate t o verify indications.

u Annunciator 603404 RPS B TURB CONT o Observes 603404 annunciator SaVUnsat VLV FAST CLOSE TRIP alarmed. window is lit.

c1 Annunciator 603410 RPS B AUTO TRIP Observes 603410 annunciator Sat/Unsat alarmed. window is extinguished.

ZI PILOT SCRAM VALVE SOLENOIDS B, D, Observes Pilot SCRAM valve Sat/ Unsat F, H indicating lights on 2CEC*PNL603 are solenoids white lights B, D, F, H -

OFF. -

ON.

3 REACTOR SCRAM TRIP LOGIC I32 Cue: If asked, state that the Reactor Sat/Unsat indicating light on 2CEC*PNL611 is OFF. SCRAM Trip Logic B2 white light Located on P611 is ON The next two items may not be physically checked, since the failure is now identified and transition to N2-SOP-97 is appropriate.

o RECIRC PUMP TRIP SYSTEM B indicating Cue: I f asked, state that the Recirc Sat/Unsat/

light C72A-DS15 on 2CEC*PNL609 is OFF, Pump Trip System B light C72A-DS15 NA C72A-DS13 on 2CEC*PNL611 becomes on P609 is OFF and C72A-DS13 on brighter. P611 is BRIGHTER.

o Process points MSSUC12 and RPSUC04 o Observes computer alarms Sat/ Unsat/

are generated MSSUC12 and RPSUC04 on the NA process computer.

12. Reports to the SM that RPS B did not trip and/or Cue: As the SM, acknowledge the Sat/ Unsat RPS B, D, F, H white lights are still ON. report of the failure of RPS B to trip.

Cue: If asked, inform the candidate to take the appropriate action.

13. Obtains a copy of N2-SOP-97 flow chart. o References N2-SOP-97 flow chart Sat/Unsat
14. Stop any half scram isolation testing Notifies the SM to stop half scram or SaffUnsat isolation testing.

NOTE: The candidate may also notify the CRS, or just make the decision that the surveillance test has already been stopped and not inform anyone.

Cue: As the SM, acknowledge the request.

NRC JPM 6 6 04/20/05

Determines the cause of the RPS Sat/Unsat failure is a FAILURE TO TRIP

16. Arm and Depress manual scram switches for Rotate REACTOR SCRAM B2 collar Pass/Fail the affected channel clockwise to the ARMED position.

Depress REACTOR SCRAM 8 2 Pass/Fail pushbutton.

17. Verify the following indications:

2 PILOT SCRAM SOLENOIDS B, D, F & H Observes Pilot SCRAM valve Sat/Unsat indicating lights on 2CEC*PNL603 are OFF solenoids white lights B, D, F & H -

OFF.

Sat/Unsat REACTOR SCRAM TRIP LOGIC B2 Cue: When asked, state that the indicating light on 2CEC*PNL611 is OFF Reactor SCRAM Trip Logic B2 white light located on P617 is OFF

18. Reports that RPS B is tripped CUE: Acknowledge the report TERMINATING CUE: Cycle CV3 results in a RPS failure, then insert a manual trip of RPS B2 logic RECORD STOP TIME NRC JPM 6 7 04/20/05

Initial Conditions:

I . The plant is at 85% power.

L. No equipment is out of service.

3. A second RO is available to assist with surveillance performance.
4. Ask the operator for any questions.

Initiating cue:

(Operators name), Continue performing Turbine Control Valve Cycling per N2-OSP-RPS-Q001 for CV2 and CV3. The surveillance is in progress and step 8.1 5 1 , in preparation for cycling CV2, is the next step to be performed.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 6 8 04/20/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Shift Running Instrument Air Compressors (Faulted) Revision: NRC 2005 Task Number: 2780040101 Approvals:

y 21 0.: NA EXAMINATION SECURITY Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trai ner/Eval uator:

Evaluation Method: X Perform Simulate EvaIuat ion Location: Plant X Simulator

- Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: Yes Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 7 1 04/20/05

Recommended Start Location:

Simulator Simulator Set-up:

1 . Reset to IC20 or equivalent

2. Verify A-B-C air compressor line-up
3. Enter the following Malfunctions:

IA02A, 21AS-C3A Thermal Overload Trip, TUA = 5 sec ET77 o IAOZB, 21AS-C3B Thermal Overload Trip, TUA = 1 min ET77

4. Enter the following Instructor Overrides:

P851-1B-21ASAOI-A, Instrument Air Compressor Selector SW, POS-4, TUA = 15 sec ET77 (PI 1/21)

P851-1B-21ASAOl-A, Instrument Air Compressor Selector SW, POS-3, ET91 (PI 1/21)

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional

/ concurrent verification will not be provided; therefore it should not be requested.

. Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1.

2.

by a ".".

Critical steps are identified as PasdFail. All steps are sequenced critical unless denoted During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-19, Section F.2.0
2. N2-SOP-19
3. NUREG K/A 295019 AA2.01 3.5/3.6 Tools and Equipment:
1. None Task Standard: IAS-C3C is running and IAS header pressure has recovered above alarm set point.

NRC JPM 7 2 04/20/05

Initial Conditions:

1. The plant is operating at 41 YO power.
2. 21AS-C3A is operating but degraded.
3. IAS 120VAC remains energized.
4. Ask the operator for any questions.

Initiating cue:

RO - (Operators name), Shift Instrument Air Compressors from A running to B running per N2-OP-19 Section F.2.0.

SRO- (Operators name), Shift Instrument Air Compressors from A running to B.

Performance Steps I Standard I Grade I

1. Provide repeat back of initiating cue. Proper communications used for repeat Sat/Unsat Evaluator Acknowledge repeat back back (GAP-OPS-01) providing correction if necessary RECORD START TIME
2. .Obtain a copy of the reference procedure N2-0P-19 obtained. Precautions & Sat/ Unsat and reviewhtilize the correct section. Limitations reviewed and section F.2.0 referenced.
3. For the oncoming 21AS -C3B: Requests an in-plant operator to Sat/ Unsat Verify OFF/OPERATE switch in verify that IAS-C3B is ready to start.

OPERATE Verify UNLOAD/NORMAL switch in Cue: As an operator at the Air NORMAL Compressor, report that the Confirm fault indicator lamps OFF/OPERATE switch is in OPERATE, extinguished the UNLOAD/NORMAL switch is in NORMAL, and all fault indicator lights are OFF

4. Slowly open 2CCP-V523 Request that the in-plant operator Sat/Unsat slowly open 2CCP-V523 Cue: As an in-plant operator report that 2CCP-V523 is open
5. Select 21AS-C3B as LEAD on Instrument o Rotates Instrument Air Compressor Pass/Fail Air Compressor Selector at P851 Selector Switch to BCA position
6. Place 21AS-C3B control switch in Normal- Rotates IAS-C3B control switch to PasslFail After Start at P851 START Observes IAS-C3B red light - ON Sat/Unsat o Observes IAS-C3B green light - OFF Sat/Unsat o Observes AM-21ASB03 amps - rise Sat/Unsat to 280 amps and drop back to 175 amps.

PasslFail u Releases IAS-C3B to the NORMAL-AFTER-START NRC JPM 7 3 04/20/05

[ Performance Steps I Standard I Grade 1

7. IAS-C3A trips on thermal overload o Observes Annunciator 851228, Sat/ Unsat INSTR AIR CPSR 3A/3B/3C AUTO START/ FAIL TO TRIP - LIT o Observes IAS-C3A green light - ON Sat/ Unsat o Observes IAS-C3A red light - OFF Sat/ Unsat o Observes AM-21ASA03 amps - 0 Sat/Unsat NOTE: Annunciators 851259, INST AIR COMPRESSOR CLG WTR FLOW LOW, and 851260, INST AIR COMPRESSOR COOLING SYS TROUBLE may alarm. These annunciators are of no consequence to the JPM, and the candidates may not responds to them.
8. .Reports to the CRS that IAS-3CA has Cue: Acknowledge the report of IAS- Sat/Unsat tripped on thermal overload/motor C3A trip electrical fault
9. .Obtains and references ARP 851228 u Enter N2-SOP-19 Sat/Unsat May dispatch an operator to check the running and tripped air compressor u Rotates and pulls IAS-C3A control Sat/Unsat switch to PULL-TO-LOCK u Verify the Instrument Air Compressor Sat/ Unsat Selector in the BCA position NOTE: If IAS-C3A control switch is placed in PULL-TO-LOCK prior to the trip of IAS-C3B, annunciator 851228 will alarm.

I O . .IAS-C3B Trips Observes IAS-C3B green light - ON Sat/ Unsat Observes IAS-C3B red light - OFF Sat/ Unsat 1 1. .Reports to the CRS that IAS-3CB has Cue: Acknowledge the report of IAS- Sat/ Unsat tripped on thermal overload/motor C3B trip electrical fault

12. .Obtains and references N2-SOP-19 Determines the air compressors are Sat/ Unsat tripped or degraded
13. .LOSS of all air compressors due to slow u Determines that electrical power and Sat/ Unsat transfer or loss of control power? control power remain available
14. .Annunciator 851229, INSTR AIR 0 Recognizes that IAS pressure is less Sat/ Unsat SYSTEM TROUBLE sounds. that 90 psig.

0 Recognizes that IAS-C3C did not Sat/ Unsat automatically start.

NRC JPM 7 4 04/20/05

I Performance Steps I Standard ] Grade 1

-- 15. .If required stawverify auto started air compressors

16. Select IAS-C3C as the LEAD on the o Rotates Instrument Air Compressor PasslFail Instrument Air Compressor Selector Selector Switch to the CAB position.

Switch.

0 17 Place 21AS-C3C control switch in Normal- o Rotates IAS-C3C control switch to PasslFail After Start. START o Observes IAS-C3C red light - ON SatlUnsat Observes IAS-C3C green light - Sat/ Unsat OFF Observes AM-21ASC03 amps - rise Sat/Unsat to 280 amps and drop back to 175 amps.

o Releases IAS-C3C to the NORMAL- PasslFail AFTER-START

18. Pressure Restored? o Observes 21AS-PI101 pressure SaVUnsat indication rising.
19. Notifies the CRS Instrument Air Cue: As the CRS, Acknowledge the SaVUnsat Compressor C did not start automatically. report Instrument Air Compressor C was manually started and Instrument Air pressure is recovering End of JPM TERMINATING CUE: IAS-C3C is running and IAS header pressure has recovered above alarm setpoint.

RECORD STOP TIME NRC JPM 7 5 04/20/05

Initial Conditions:

1. The plant is operating at 41% power.
2. 21AS-C3A is operating but degraded.
3. IAS 12OVAC remains energized.
4. Ask the operator for any questions.

Initiating cue:

RO - (Operators name), Shift Instrument Air Compressors from A running to B running per N2-OP-19 Section F.2.0.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 7 6 04/20/05

Initial Conditions:

1. The plant is operating at 41 % power.
2. 21AS-C3A is operating but degraded.
3. IAS 120VAC remains energized.
4. Ask the operator for any questions.

Initiating cue:

SRO- (Operators name), Shift Instrument Air Compressors from A running to B.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 7 7 04/20/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Manual Initiation of the Control Building Special Filter Train Revision: NRC 2005 Task Number: 28800201012 Approvals:

NA EXAMINATION SECURITY General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Perfo rmer : (ROISRO)

TrainerlEvaluator:

Evaluation Method: X Perform Simulate Evaluation Location: Plant X Simulator Expected Completion Time: 15 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Eva1uator Signature: Date:

NRC JPM 8 1 04/20/05

Recommended Start Location: (Completion time based on the start location)

Simulator

-. Simulator Set-up (if required):

Any IC as long as no LOCA or LOOP exists that will automatically start Control Building Special Filter Train.

Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a m.
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-OP-53A, Rev 08, Control Building Ventilation System
2. NUREG K/A 290003 A4.01 (3.2/3.2), 295038 EA1.07 (3.6/3.8)

Tools and Equipment:

1. None Task Standard:

Control Building Special Filter Train A operating in the filtration mode NRC JPM 8 2 04/20/05

Initial Conditions:

1. EOP-MSL has been entered.
2. Control Building radiation levels are 6E-6 mci/cc and rising
3. Ask the candidate if they have any questions.

Initiating Cues:

RO- (Operators name), manually initiate Control Building Special Filter Train A per N2-0P-53A, section H.6.0.

SRO- (Operators name), manually initiate Control Building Special Filter Train A Performance Steps I Standard I Grade

1. Provide repeat back of initiating cue. Proper communications used for Sat/Unsat Evaluator Acknowledge repeat back providing repeat back (GAP-OPS-01 )

correction if necessary RECORD START TIME

2. Obtain a copy of the reference procedure and o N2-OP-53A obtained. Precautions & Sat/ Unsat review/utilize the correct section of the limitations reviewed & section H.6.0 procedure. referenced.
3. Close HVC*MOVlA, CONTROL ROOM AC o Places HVC*MOVIA control switch in PasslFail FLT TRAIN BYP VLV at 2CEC*PNL870. CLOSE.

o Observe HCV*MOVIA green light - Sat/ Unsat ON Observe HCV*MOVIA red light - OFF Sat/ Unsat

4. Close HVC*MOVI B, CONTROL ROOM AC Places HVC*MOVI B control switch in Pass/Fail FLT TRAIN BYP VLV at 2CEC*PNL871 CLOSED o Observe HVC*MOVI B green light - Sat/Unsat ON Observe HVC*MOVI B red light - OFF Sat/Unsat
5. Start HVC*FN2A, CONTROL ROOM AC u Places and holds HVC*FN2A control Pass/Fail BOOSTER FAN at 2CEC*PNL870. switch in START a Observes HVC*FN2A red light - ON Sat/Unsat o Observes HVC*FN2A green light - Sat/Unsat OFF o Returns the HVC*FN2A control switch Sat/Unsat to NORMAL-AFTER START (release).
6. Observe 2HVC*FR1 OA FILTER TRAIN o Observes 2HVC*FR1OA FILTER Sat/U nsat HVC*FLT2A INLET AIR FLOW (red pen) TRAIN HVC*FLT2A INLET AIR FLOW should indicate approximately 63% of full (red pen) indicates approximately 63%

scale (corresponds to approximately 2250 of full scale.

scfm).

7. Confirm that Control Room/Atmosphere, d/p is Cue: When operator walks behind Fire Sat/U nsat

> +0.125 in WG as read on 2HVC-PD1147, Panel 2CEC-PNL849 provide cue that

- located in the Control Room behind 2CEC- PO1147 indicates +0.2 inches WG.

PNL849.

NRC JPM 8 3 04/20/05

I Performance Steps I Standard Grade

8. Observes the following at 2HVC*PNLCH7A: Dispatches Auxiliary Operator to verify Sat/Unsat ON INDICATOR red light ON indications locally on 2HVC*PNLCH7A:

LOW AIRFLOW INDICATOR green light OFF NOTE: May simulate going to the panel OVERTEMPERATURE I NDICATOR instead of sending an Auxiliary Operator green light OFF Cue: When asked, as the Auxiliary Operator Report:

o ON INDlCATOR red light ON LOW AIRFLOW INDICATOR green light OFF o OVERTEMPERA TURE INDICATOR green light OFF

9. Notify Radiation Protection to periodically Cue: Acknowledge the request.

sample the Control Room Atmosphere to ensure proper operation of the Special Filter Train in service.

(Simulate)

10. Reports that Control Building Special Filter Cue: Acknowledge the report.

Train A has been initiated.

TERMINATING CUE: Control Room Special Filter Train A initiated.

RECORD STOP TIME NRC JPM 8 4 04/20/05

Initial Conditions:

1. EOP-MSL has been entered.
2. Control Building radiation levels are 6E-6 mcikc and rising
3. Ask the candidate if they have any questions.

Initiating Cues:

RO- (Operators name), manually initiate Control Building Special Filter Train A per N2-OP-53A. section H.6.0.

Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 8 5 04/20/05

I --

Initial Conditions:

1. EOP-MSL has been entered.
2. Control Building radiation levels are 6E-6 mcikc and rising
3. Ask the candidate if they have any questions.

Initiating Cues:

SRO- (Operators name), manually initiate Control Building Special Filter Train A Candidate: Direct ALL communications and announcements through the JPM Evaluator, first.

NRC JPM 8 6 04/20/05

Constellation Energy Group OPERATORJOBPERFORMANCEMEASURE

Title:

Vent Control Rod Overpiston Volume Revision: NRC 2005 Task Number: 2009620501,2009620504 Approvals:

NA EXAMINATION SECURITY jate General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

Trainer/Evaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 20 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

02-OPS-PJE-200-2-69 NRC JPM 9 1 04/20/05

Recommended Start Location: (Completion time based on the start location)

RP Access Area Simulator Set-up (if required):

None Directions to the Instructor/Evaluator:

Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators.

Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional /

concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a 0 .
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

No other verification shall be demonstrated.

References:

1. N2-EOP-6, Att. 14, Rev. 5, Alternate Rod Insertions, Sections 3.6
2. NUREG 1123, WA 295015, AA.1.01 (3.8/3.9)

Tools and Equipment:

EOP box has a breakaway tie-wrap.

Task Standard: Control Rod 26-59 at notch 00 and 2RDS*V1 shut.

02-OPS-PJE-200-2-69 NRC JPM 9 2 04/20/05

Initial Conditions:

1. A scram has occurred.
2. Several rods have not fully inserted.
3. Communications are established with Control Room.
4. An OD-7, Print out of Rod Positions is NOT available.
5. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name) using EOP-6, Attachment 14, insert control rod 26-59 to notch 00 by locally venting its overpiston area.

1. Provide repeat back of initiating Proper communications used for repeat Sat/Unsat cue. Evaluator Acknowledge back (GAP-OPS-01/Operations Manual) repeat back providing correction if necessary RECORD START TIME
2. Obtain a copy of the reference Open EOP box by removing breakaway Sat/Unsat

-. procedure and reviewhtilize the tie-wrap and review procedure and correct section of the procedure enclosures. Reference EOP-6, Att. 14, Section 3.6 Cue: When candidate identifies the equipment required to Describe and identify the tools necessary vent the overpiston area, to perform the task, but do NOT remove proceed to the HCU. It is the tools from the EOP Box NOT required to open the EOP box.

3. Locate the correct HCU (26-59). Physically locate the correct HCU (26- PasslFail 59). Use Figure 14-1, RDS HCU LOCATIONS, as a guide, if required.

04.Remove the drain plug from AT HCU, use wrench to remove the Pass/Fail 2RDS*V1, Withdraw Line Vent Withdraw Line Vent Valve drain plug.

Valve.

Cue: Simulate cap removal.

05. Install quick disconnect adapter. At HCU, connect adapter to the correct Pass/Fail RDS*Vl by threading in the quick Cue: Simulate drain adapter disconnect adapter.

connected.

02-OPS-PJE-200-2-69 NRC JPM 9 3 04/20/05

I Performance Steps I Standard Grade

06. Connect hose. At HCU, connect hose to the quick PasslFail disconnect adapter and route to a drain.

Cue: Simulate hose connected Secure the hose at the drain against and routed. If the whip.

candidate starts to go down the ladder to secure the hose at the drain, tell them another operator has secured the bottom of the hose.

07. Uncap 2RDS*V1 Valve Operator. At HCU, remove cap from RDS*VI Valve Pass/Fail Operator.

Cue: Simulate cap removed.

8. Insert rod. At HCU, slowly open RDS*Vl by inserting PasslFail the T-handled HCU Vent Tool and Cue: Simulate RDS*Vl opened rotating counter clockwise, venting the and sound of flow noise. above piston area.
9. Report to Control Room. Report that RDS*Vl is opened. Request Sat/Unsat rod position.

Cue: Acknowledge report and inform the operator that control rod 26-59 has fully inserted

10. Shut RDS*Vl . At HCU, using the T-handled HCU Vent Pass/Fail Tool shut RDS*Vl by rotating the Cue: Simulate RDS*Vl shut. operator clockwise.
11. Replace the cap on 2RDS*Vl At HCU, replace the cap on RDS*Vl Sat/Unsat Valve Operator. Valve Operator.

Cue: Simulate cap replaced.

02-OPS-PJE-200-2-69 NRC JPM 9 4 04/20/05

1 Performance Steps I Standard Grade

12. Remove high pressure hose from At HCU, disconnect and remove hose. Sat/U nsat RDS*VI.

NOTE: At this time the JPM may be stopped.

End of JPM TERMINATING CUE: Control Rod 26-59 at notch 00 and 2RDS*V1 shut.

RECORD STOP TIME 02-OPS-PJE-200-2-69 NRC JPM 9 5 04/20/05

Initial Conditions:

- 1. A scram has occurred.

2. Several rods have not fully inserted.
3. Communications are established with Control Room.
4. An OD-7, Print out of Rod Positions is NOT available.
5. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name) using EOP-6, Attachment 14, insert control rod 26-59 to notch 00 by locally venting its overpiston area.

Candidate:

Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-PJE-200-2-69 NRC JPM 9 6 04120105

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Align Fire Water System to Inject to RHR A Revision: NRC 2005 Task Number: 2009020504 Approvals:

P1 - w NA EXAMINATION SECURITY M n e r a l Fupervisor Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer : (RO/SRO)

T rainer/Evaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: NO Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

02-OPS-PJE-205-2-02 NRC JPM 10 1 04/20/05

Recommended Start Location: (Completion time based on the start location)

RP Access Area Simulator Set-up (if required):

N/A Directions to the Instructor/Evaluator:

Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a e.
2. During Evaluated JPM:

0 Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

0 No other verification shall be demonstrated.

References:

1. EOP-6, Rev. 7, Attachment 6, RHR Fire Water System Cross-Tie
2. NUREG 1123, 295031, EA1.08 3.8 / 3.9 02-OPS-PJE-205-2-02 NRC JPM 10 2 04/20/05

Tools and Equipment:

1. PL-3 Key
2. EOP tool boxes are secured with a breakaway tie-wrap Task Standard:

Fire Water System is aligned to inject to RHR loop A per N2-EOP-6, Attachment 6.

02-OPS-PJE-205-2-02 NRC JPM 10 3 04/20/05

Initial Conditions:

1. All high pressure feed to the RPV is lost.
2. Alternate injection systems are being lined up.
3. Instructor to ask operator for any questions.

Initiating Cues:

(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.

1. Provide repeat back of Proper communications used for repeat Sat/Unsat initiating cue. Evaluator back (GAP-OPS-OIlOperations Manual)

Acknowledge repeat back providing correction if necessary.

RECORD START TIME

02. Obtain a copy of the N2-EOP-6, Attachment 6 obtained. Sat/Unsat reference procedure and Section 3.1 referenced.

reviewhtilize the correct section of the procedure.

CUE: Steps 3.1.1, 3.1.2, 3.1.3, 3.1.4 and 3.1.5 are complete.

NOTE: For simulation purposes, actual layout of hosedflanges and connection to pump or plant equipment is not required.

Identification of hose/flange and use along with connection points is all that is required.

3. Verify closed 2RHS*V70, 2RHS*V70, CONDENSATE FLUSH TO Sat/Unsat CONDENSATE FLUSH TO A CONTMT SPRAY HDR is rotated in A CONTMT SPRAY HDR. the clockwise direction to verify it is closed. (Rx Sldg EL 289).

Cue: 2RHS*V70 is closed 02-OPS-PJE-205-2-02 NRC JPM 10 4 04/20/05

- 4. Close 2CNS-V621, CNS TO 2CNS-V621, CNS TO RHR SUPPLY Pass/Fail RHR SUPPLY ISOL. ISOL is rotated in the clockwise direction to verify it is closed. (Rx Bldg, Northside Cue: 2CNS-V621 is closed E1289 above 2RHS*MOV24A, LPCl lnjection Valve).

5. Remove test connection blind Blind Flange is properly removed using PasslFail flange from between valves the tools from the EOP gang box. (Rx 2CNS-V621 AND 2RHS*V70. Bldg EL 289)

Cue: Blind flange is removed

6. Install 2 '/2 inch fire hose Adapter installed to test connection Pass/Fail adapter to test connection. flange correctly using tools from the EOP gang box.

Cue: Adapter is installed.

7. Connect male end of 2 '/2 inch Male end of 2 % inch fire hose from EOP PasslFail fire hose from EOP box to box is properly connected to test test connection flange connection flange adapter adapter.

Cue: Male end of 2 % inch fire hose is connected to test connection flange adapter.

8. Disconnect firehose at FHR Firehose from FHR 93 is properly PasslFail 93 disconnected using tools from the EOP gang box. (Rx Bldg, EL 289, near North Cue: Firehose is disconnected stairwell entrance) from FHR 93
9. Connect 2 1/2" firehose from Firehose is properly connected to FHR PasslFail test connection f Ia nge 93 using tools from the EOP gang box.

adapter to FHR 93.

Cue: Firehose is connected to FHR 93

10. Open 2FPW-V391, FHR 93 2FPW-V391, FHR 93 ANGLE VALVE PasslFaiI ANGLE VALVE is opened by rotating the handwheel in the counterclockwise direction.

Cue: 2FPW-V391 is open 02-OPS-PJE-205-2-02 NRC JPM 10 5 04/20/05

II . Unlock AND open 2RHS*V70 Using the PL-3 Key, unlock AND open PasslFail 2RHS*V70 by rotating the handwheel in the counterclockwise direction.

Cue: 2RHS*V70 is unlocked and open.

10. Notify control room that fire Sat/Unsat water is lined-up to inject via RHR A End of JPM TERMINATING CUE: Fire Water System is aligned to inject to RHR loop A per N2-EOP-6, Attachment 6.

RECORD STOP TIME 02-OPS-PJE-205-2-02 NRC JPM 10 6 04/20/05

Initial Conditions:

1. All high pressure feed to the RPV is lost.
2. Alternate injection systems are being lined up.
3. Instructor to ask operator for any questions.

initiating Cues:

(Operators name), Line-up the Fire Water System to RHR loop A, per EOP-6, Attachment 6.

Candidate:

Direct ALL communications and announcements through the JPM Evaluator, first.

02-OPS-PJE-205-2-02 NRC JPM 10 7 04/20/05

Constellation Energy Group OPERATOR JOB PERFORMANCE MEASURE

Title:

Local Start of Division I Diesel Generator with Emergency Stop Revision: NRC 2005 Task Number:

Approvals:

4$xdd NA EXAMINATION SECURITY Date General Supervisor Date Operations Training (Designee) Operations (Designee)

NA EXAMINATION SECURITY Configuration Control Date Performer: (RO/SRO)

TrainedEvaluator:

Evaluation Method: Perform X Simulate Evaluation Location: X Plant Simulator Expected Completion Time: 25 minutes Time Critical Task: NO Alternate Path Task: Yes Start Time: Stop Time: Completion Time:

JPM Overall Rating: Pass Fail NOTE: A JPM overall rating of fail shall be given if any critical step is graded as fail. Any grade of unsat or individual competency area unsat requires a comment.

Comments:

Evaluator Signature: Date:

NRC JPM 11 Revised 1 04/20/05

Recommended Start Location:

Control Building Elev. 261 Diesel Generator Rooms L-Simulator Set-up:

N/A Directions to the Instructor/Evaluator:

Prior to the performance of this JPM, obtain SM / CSO general permission to open equipment cabinets and inspection covers. If opening the equipment cabinet or inspection cover will affect Tech. Spec. Operability, operational status, or the effects are unknown, obtain specific SM / CSO permission Directions to Operators:

Read Before Every JPM Performance:

For the performance of this JPM, I will function as the SM, CSO, and Auxiliary Operators. Prior to providing direction to perform this task, I will provide you with the initial conditions and answer any questions. During task performance, I will identify the steps to be simulated, or discuss and provide cues as necessary.

Read Before Each Evaluated JPM Performance:

This evaluated JPM is a measure of your ability to perform this task independently. The Control Room Supervisor has determined that a verifier is not available and that additional / concurrent verification will not be provided; therefore it should not be requested.

Read Before Each Traininq JPM Performance:

During this Training JPM, applicable methods of verification are expected to be used.

Therefore, either another individual or I will act as the additional / concurrent verifier.

Notes to Instructor / Evaluator:

1. Critical steps are identified as PasslFail. All steps are sequenced critical unless denoted by a 0 .
2. During Evaluated JPM:

Self-verification shall be demonstrated.

3. During Training JPM:

Self-verification shall be demonstrated.

0 No other verification shall be demonstrated.

References:

1. N2-OP-100A Tools and Equipment:
1. None Task Standard: Emergency Shutdown of EDG complete.

NRC JPM 11 Revised 2 04/20/05

Initial Conditions:

-_.- I. The plant is shutdown for an outage

2. Division I Diesel Generator 2EGS*EG1 is in standby
3. 2EGS*EGI is to be started to support NNS-SWG16 outage
4. N2-OP-1OOA steps F.5.1 and F.5.2 are complete
5. Ask the operator for any questions.

Initiating cue:

(Operators name), locally start the Division I Diesel Generator and return control to P852 for remote loading in accordance with N2-OP-IOOA, section F.5.0.

1. Provide repeat back of initiating Proper communications used for repeat Sat/ Unsat cue. Evaluator Acknowledge back (GAP-OPS-01) repeat back providing correction if necessary RECORD START TIME -
2. .Obtain a copy of the reference a Obtain copy of N2-OP-1OOA and Sat/ Unsat procedure and reviewhtilize the reference section F.5.0.

correct section.

3. At 2CES*IPNL407, u Confirms Voltage Regulator Switch in Sat/ Unsat GENERATOR CONTROL AUTO.

PANEL, verify Voltage Regulator Switch in AUTO.

4. At 2CES*IPNL406 (408), u SIMULATE: Place CONTROL MODE PasslFail ENGINE CONTROL PANEL, keylock switch in LOCAL.

place CONTROL MODE keylock switch in LOCAL AND verify the o Verify the white LOCAL indicating Sat/ Unsat white LOCAL indicating light is light is illuminated.

illuminated.

CUE: CONTROL MODE switch is in LOCAL AND the white LOCAL indicating light is illuminated.

NRC JPM 11 Revised 3 04/20/05

I Performance Steps

5. At 2CEC*PNL852, ELECTRIC I Standard 0 Contacts Control Room to direct I Grade Sat/Unsat CONTROL BOARD, perform the performance of steps at P852.

5_- following:

3 Verify DIVISION 1 2EGS*EG1 0 Directs DIVISION 1 2EGS*EG1 Sat/Unsat START switch in Normal-After- START switch verified in Normal-STOP. After- STOP.

CUE: Report DIVISION 1 2EGS*EG1 START switch in Normal-After-STOP u Verify 2EGS*SWGIOl -N1 0 Directs ZEGS*SWGlOI-Nl, NEUTRAL BREAKER 101-N1, NEUTRAL BREAKER 101-N1, verified SaUUnsat closed. closed.

CUE: Report 2EGS*SWGIOl - N l ,

NEUTRAL BREAKER 101-N1, closed o Verify EMERGENCY DSL GEN 0 Directs EMERGENCY DSL GEN 1 Sat/Unsat 1 VOLTAGE REGULATOR VOLTAGE REGULATOR MODE MODE SELECT switch in AUTO. SELECT switch verified in AUTO.

CUE: Report EMERGENCY DSL GEN IVOLTAGE REGULATOR MODE SELECT switch in AUTO

6. At 2CEC*PNL852, place 0 DirectsEMERGENCY DSL GEN 1 Sat/ Unsat EMERGENCY DSL GEN 1 PARALLEL switch to ON.

PARALLEL switch to ON.

CUE: Report EMERGENCY DSL GEN 1 PARALLEL switch in ON 7 At 2CES*IPNL406, depress a SIMULATE: Depresses ENGINE PasslFail ENGINE CONTROL START CONTROL START pushbutton pushbutton.

CUE: Report sound of engine acceleration heard from engine room.

8. At 2CES*IPNL407, verify the following Diesel Generator start indications:

NRC JPM 11 Revised 4 04/20/05

12ESI-2EGSA04 ENGINE on 12ESI-2EGSA04 ENGINE SPEED,

-L SPEED. rises to 600 RPM. rises to 600 RPM.

CUE: Diesel Speed is 600 RPM 3 Generator Voltage as indicated o Confirms Generator Voltage as Sat/Unsat on GVM-2EGPA22 VOLTS indicated on GVM-2EGPA22 VOLTS GENERATOR, rises to 41 60 A- GENERATOR, rises to 4160 A-C C VOLTS. VOLTS.

CUE: Generator Voltage is 41 60 Volts AC Generator Frequency as o Confirms Generator Frequency as Sat/U nsat indicated on FM-2EGPA22 indicated on FM-2EGPA22 FREQUENCY GENERATOR, FREQUENCY GENERATOR, rises to rises to 60 HERTZ. 60 HERTZ.

CUE: Generator Frequency is 60 Hz LI Generator Field Current as o Confirms Generator Field Current as Sat/ Unsat indicated on GFAM-2EGPA21 indicated on GFAM-2EGPA21 AMPS AMPS FIELD, indicates about 91 FIELD, indicates about 91 DC DC AMPERES. AMPERES.

CUE: Generator Field Current indicates about 91 DC AMPERES

9. At 2CEC*PNL852, observe the o Contacts Control Room to determine, following Diesel Generator start the following:

ind icat io ns:

SWP*MOV66A, SERVICE WTR o SWP*MOV66A position Sat/Unsat OUTLET, opens.

3 Diesel Service Water Flow as 0 SWP flow SaVUnsat indicated on 2SWP*F176A, SERVICE WTR FLOW, is 1 8 0 0 GPM.

LI Annunciator 8521 17, EDG 1 o Annunciator 8521 17 status Sat/ Unsat RUNNING, alarms.

CUE: Report SWP*MOV66A is open and flow is 1000 gpm.

Annunciator 852117 is in alarm.

NRC JPM 11 Revised 5 04/20/05

AFTER ENGINE IS STARTED,

_- ALTERNATEPATHSTEPSARE INITIATED BY EVALUATOR ALTERNATE PATH CUE: Inform candidate that there is audible alarm sound at 2C ES*IPNL406.

CUE: WHEN candidate asks for indications of the alarming condition, state that 406-1-1 and 406-3-3 are alarming.

CUE: WHEN candidate checks LUBE OIL PRESSURE indication report pressure at 15 psig I O . Alarm 406-1-1 Step 1 directs Refers to annunciator response 406- PasslFail verify automatic response 3-3 and 406-1-1 and determines occurs. Determines engine engine shutdown with lube oil shutdown should have occurred, pressure c 30 psig did not occur.

but did not. Initiates actions to shutdown the engine.

11. Reports conditions to the Control Room.

CUE: IF candidate requests direction, advise the candidate t o trip the diesel.

CUE: IF candidate attempts t o stop the engine using normal STOP pushbuttons or contacts the control room to stop the engine from P852, report the engine is still running after these methods are attempted.

12 Determines Emergency Stop Refers to N2-OP-1OOA, H . l .O Sat/Unsat per N2-OP-I00A, H.l.O is required

13. At 2CES*IPNL406 ENGINE Sat/ Unsat CONTROL PANEL, depress EMERGENCY STOP red STOP pushbutton.

NRC JPM 11 Revised 6 04/20/05

CUE: Diesel Generator is NOT

-.. stopped

14. IF Diesel does NOT stop, Shutdown engin by performing i y one perform one of the following: of the following:

Depress button AND pull 0 Depress button AND pull Manual Fuel Pass/Fail/NA Manual Fuel Control Quadrant Control Quadrant Handle down AND Handle down AND hold down hold down UNTIL Diesel Generator UNTIL Diesel Generator comes comes to a complete stop. OR to a complete stop.

Trip Turbocharger Air Inlet 0 Trip Turbocharger Air Inlet Butterfly Pass/Fail/NA Butterfly Valve closed by Valve closed by pushing Overspeed pushing Overspeed Governor Governor output arm towards output arm towards Turbocharger with foot. OR Turbocharger with foot.

Pull out latching rod of Pull out latching rod of Overspeed Overspeed Trip Valve at Trip Valve at Overspeed Governor.

Overspeed Governor.

CUE: WHEN candidate performs any one of the emergency stop methods, report that the engine is beginning to coast down.

The JPM is complete.

End of JPM TERMINATING CUE: Emergency Shutdown of EDG complete.

RECORD STOP TIME NRC JPM 11 Revised 7 04/20/05

Initial Conditions:

1. The plant is shutdown for an outage
2. Division I Diesel Generator ZEGS*EGl is in standby
3. 2EGS*EG1 is to be started to support NNS-SWG16 outage
4. N2-0P-lOOA steps F.5.1 and F.5.2 are complete
5. Ask the operator for any questions.

Initiating cue:

(Operators name), locally start the Division I Diesel Generator and return control to P852 for remote loading in accordance with N2-OP-lOOA, section F.5.0.

NRC JPM 11 Revised 8 04/20/05