ML051050200
| ML051050200 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/08/2004 |
| From: | Paul Krohn NRC/RGN-III |
| To: | Chernoff H Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0282 | |
| Download: ML051050200 (2) | |
Text
Harold Chernoff - Sorted log entries on 1 MS-228 Page 1 1 From:
To:
Date:
Subject:
CC:
'PGK1@NRC.GOV"<pgklnrc.gov>
p \\p/
t P I
'HKC@NRC.GOV
<hkcnrc.gov>
4-Cer fAA. M-L Tue, Jun 8, 2004 9:53 AM Sorted log entries on 1 MS-228 "PLL@NRC.GOV" <pll~nrc.gov>
/
, D-
Al -z
Warodr4 Crhenrnoff - flA; n
I'.~UI
-I
-I L.I.JU
- d-W -VI I IWUII - LU['JCUi I L.DlJU M-n-1 a r
-A~~~~~~~~~~~~~~~~~~~~~~~.
dWL' I Log Entries Report it;entry Mtem.~
l-'EntrTypelL_
06104/2004 01 SD Identified a body to bonnet steam leak on 1MS-228. HX-1A SG HEADER DRAIN AND TRAP ISOLATION.
'This valve is a first off Isolation Upstream of the 1A MSNV. Control Roam and OCC notified. [Hastings,'
Randy - MISC - StatIon Log - Mid Shilft lEtyate~meclr_~p:
ll~~
-r
,;{-..
i Entry Text-0610412004 01:56 ANNOTATION Maintenance and Engineering personnel will be evaluating the steam leak on IMS-228. (Hastings. Randy.
MISC - StatIon Loo-Mid Shift) nliyDate/TimeJll Enry yp r
=
nr~xt_---~i'~'"'-~)
06t0412004 02:09 ANNOTATION AOP-2A Secondary Coolant Leak was referenced for the body to bonnet leakage from IMS-228. Based on the magnitude of leakage and location In the plant, no actions for the AOP are required. [Stalzer, Charles -
STA - Station Log - Mid Shift) 0610412004 03:15 Contacted the Duty and Call Regulatory Affatrs individual. He concurred with the conclusion that IMS-228 Is a containment Isolation valve and that TSAC 3.6.3.C Is the appropriate entry. [Holzmann. Mike - MISC.
Station Log - Mid Shift)
Entry DtetMme ll'7Ent.yp l l.-
> !EntryText!
06i10412004 03:39 ANNOTATION Unit 1; Attempt to shut 1MS-228 was unsuccessful. Leakage Increased as valve was being shut. so 1MS-228 was returned to full open position. (Wiicox, Mark - DOS (Fire Brigade). Stalion Log - Mid
.Shitl]
LEntr DatelTime1 i
xIEntryfi 06/04/2004 04:14 l-EntrDatelTlme'
>Entry'r eh" 0610412004 04:27
[JEntr Date/Timeii ;t -. Ent-.
'r' 06104)2004 12:35 DSS Midnight Entr)
L' EjryDateqTlie,
'yype"%l 0604/200416:00 C.Entry DatelTime EntXy 061052004 00:00
'Entzv Date/t~imi
-.;En Type l
06/0512004 17:10 Tz er j [_Eritrw2Ty 06/06)2004 00:00 I _ __ _
r
.j!
^- --_ +, w ;X., t
, a ' - l f l Unit 1, Holding RCS temperaturelpressure Increase at 500 degrees Fl2235 psig per OP-1A'Cold Shutdcwn to FHot Standby'. and secured plotting per Ol-105 'RCS Heatup/Cooldown Plottin' pending resolution of the steam leak on 1MS-228. (Wilson, Jim - OS (Fire Brigade) -Staton Log - Mid Shift]
NRC Resident and Plant Manager notified or IMS-228 steam leak concern. [Harrsch. Rob - DSS - Station Log - Mid Shilt]
t; --:--
.*Xr. ^Z.r>^,I<,) 'EntryTixt=*i^;'-!s~^..'>'
-i (Reference 6/4104 0150 log entry) IMS-228 Is shut and leakage from this UIC penetration has stopped. <-
This meets the requirements of TSAC 3.6.3.C.1 to Isolate the affected penetration flow path using a closed manual valve. Exit TSAC 3.6.3.C.1.
TSAC 3.6.3.C.2 to verify the affected flow path Is isolated once per 31 days remains In effect. pHarper. Ron
- DSS - Station Log - Day ShiGI U-1 checked shut IMS-228. HX-1A SG HEADER DRAIN AND TRAP ISOLATION. did not get any tnovement on handwheel. Valve continues to ddp slight14,re~auche. Steve - OS Fr~e Brigade) -
I sStatlon iLog - Swhg Shift]J Unit 1 Is In Refueling Outage U1JR28. MODE 3. OP-1A. Cold Shutdown to Hot Shutdown Is In progress.
The RCS Is maintaining 547 F and 2260 to 2280 psig per IT-230 RCS Leak Test.
IMS-228 'A' SG Header Drain and Trap Isol is OOS. Unit I TSAC 3.6.3.C2 to verity the affected flow path is Isolated once per 31 days Unit 2 Is In MODE I at 100% power.2RC-508. Reactor Makeup Water Containment isolation Valve Is OS, Unit 2 TSAC 3.6.3A.2 to verify Isolation once per 31 days.
Equipment OOS and Fire Rounds are per the OOS.doc.
rrsch. Rob - DSS - Station Log - Mid Shift]
4 =...
_.Entry.Text Unit 1-during RESP 3.1 Primary Systems Tests. Control Bank B rod F-8 dropped unexpectedly. The rod was fully withdrawn wfhen the rod unexpectedly dropped. Rod botton tight and IRPI Indicates rod on bottom. (Bank B had been fully withdrawn at 228 steps with banks C and D moving wvhen the drop occurred - approximately 116 additional steps taken after bank B reached 228 steps). (Jessessky. Tom -
STA - Station Log - Swing Shifl]
Unit 1 Is In Refueling Outage UiR28. MODE 3. OP-1A, Cold Shutdown to Hot Shutdown Is In progress.
The RCS Is at NOP & NOT I MS-228 'A-S Header Drain and Trap Isol Is OOS. Unit I TSAC 3.6.3.C.2 to verify the affected flow path Is Isolated once per 31 days Unit 2 is In MODE 1 at 100% power. 2RC-48. Reactor Makeup Water Containment Isolation Valve Is OOS. Unit 2 TSAC 3.6.3A.2 to verify Isolation once per 31 days.
Equipment 005 and Fire Rounds are per the OOS.dor.
[Harrsch. Rob - DSS - Station Log. Mid ShIft]
Page 1 of 2