Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection
ML051040409
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 04/13/2005
From: Burgess B
NRC/RGN-III/DRP/RPB2
To: Peifer M
Nuclear Management Co
References
Download: ML051040409 (5)


Text

April 13, 2005 Mr. Mark Peifer Site Vice-President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION

Dear Mr. Peifer:

This letter is to request information to support our biennial PI&R inspection beginning May 23, 2005, at Duane Arnold Energy Center. This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of performance indicator reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by May 2, 2005. Mr. Ronald Langstaff, the Lead Inspector, will contact you to determine the best method of providing the requested information.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Ronald Langstaff at 630-829-9747 or Mr. Charles Zoia at 630-829-9863.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Roger D. Lanksbury for/

Bruce L. Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49

Enclosure:

Requested Information to Support PI&R Inspection See Attached Distribution

DOCUMENT NAME: E:\Filenet\ML051040409.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME CZoia:dtp BBurgess*RDL for DATE 04/14/05 04/14/05 OFFICIAL RECORD COPY

M. Peifer cc w/encl: E. Protsch, Executive Vice President -

Energy Delivery, Alliant; President, IES Utilities, Inc.

C. Anderson, Senior Vice President, Group Operations J. Cowan, Executive Vice President and Chief Nuclear Officer J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel, & Secretary B. Lacy, Nuclear Asset Manager Chairman, Linn County Board of Supervisors Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.

Iowa State Senator D. McGhee - Department of Public Health

M. Peifer ADAMS Distribution:

WDR DPB RidsNrrDipmIipb GEG KGO GAW1 DRPIII DRSIII PLB1 JRK1

Requested Information to Support Problem Identification and Resolution (PI&R)

Inspection

1. A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
2. A copy of Quality Assurance (QA) audits and/or self-assessments of the corrective action program completed since January 2003.
3. A copy of the QA manual.
4. A copy of the Employee Concerns Program/Ombudsman administrative procedure.
5. A list of QA audits completed since January 2003 with brief description of areas where findings were identified.
6. A list of self-assessments completed since January 2003.
7. A list of root cause evaluations completed since January 2003.
8. A list of test failures (In-service Test [IST] or Technical Specification surveillances) since January 2003, with a brief description of component/system which failed.
9. A list of all open condition reports sorted by significance level. Include a description of the issue and the significance category.
10. A list of condition reports closed since January 2003 including a description, significance category, date initiated, date closed, and whether there is an associated operability evaluation.
11. A list of condition reports initiated since January 2003 that involve inadequate or ineffective corrective actions. Include a brief description, status, and significance category of the issue.
12. A list of condition reports initiated since January 2003 that identify trends of conditions adverse to quality. Include a brief description, status, and significance category for each item.
13. A copy of any performance indicator reports used to track the corrective action program effectiveness.
14. A list of condition reports issued during the past 3 refueling outages sorted by system and component, including a brief description, status, and significant category for each item.