Category:Letter type:L
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes 2024-09-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles ML24150A2192024-05-29029 May 2024 (E-Mail) St. Lucie, Unit 2 - License Amendment Request, Updated Spent Fuel Pool Criticality Analysis - Acceptance Review L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis ML24005A2772024-02-20020 February 2024 Issuance of Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 ML23275A1232023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.8, Electrical Systems, Revision 2 - Volume 13 ML23275A1242023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 - Volume 14 ML23275A1252023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 4.0, Design Features, Revision 2 - Volume 15 ML23275A1262023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 5.0, Administrative Controls, Revision 2 - Volume 16 L-2023-126, Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal2023-10-0202 October 2023 Enclosure 1: Contents of Improved Technical Specifications (ITS) Submittal ML23275A1222023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 - Volume 12 ML23275A1212023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 2 - Volume 11 ML23275A1192023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 2 - Volume 9 ML23275A1202023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 - Volume 10 ML23275A1182023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 2 - Volume 8 ML23275A1122023-10-0202 October 2023 Improved Technical Specifications Conversion License Amendment Request Self-Identified Administrative Changes - Volume 2 ML23275A1152023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.0, LCO and SR Applicability, Revision 2 - Volume 5 ML23275A1162023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 - Volume 6 ML23275A1172023-10-0202 October 2023 Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 - Volume 7 ML23275A1142023-10-0202 October 2023 Improved Technical Specifications Conversion, Chapter 2.0, Safety Limits, Revision 1 - Volume 4 ML23275A1112023-10-0202 October 2023 Improved Technical Specifications (ITS) Revision 2 Submittal Volumes 1 Through 16 ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-154, Subsequent License Renewal Application Revision 1, Supplement 42022-09-22022 September 2022 Subsequent License Renewal Application Revision 1, Supplement 4 L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 ML21285A1082021-10-12012 October 2021 Enclosure 1: St. Lucie Nuclear Plant, Units 1 and 2, Subsequent Licensee Renewal Application, Revision 1 ML21285A1112021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses ML21215A3192021-08-0303 August 2021 Appendix E - Applicant'S Environmental Report for St. Lucie ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary L-2021-192, Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-05-26026 May 2021 Westinghouse, Report LTR-REA-21-1-NP, Revision 1, St. Lucie Units 1 & 2 Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2020-164, License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements2020-12-21021 December 2020 License Amendment to Allow Risk Informed Completion Times (RICT) for the 120-Volt AC Instrument Bus Requirements L-2020-020, License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years2020-02-18018 February 2020 License Amendment Request for RCS Pressure/ Temperature Limits and LTOP Applicable for 55 Effective Full Power Years L-2019-091, License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements2019-10-0909 October 2019 License Amendment Request to Modify the Reactor Coolant Pump (RCP) Flywheel Inspection Program Requirements L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2018-161, License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation2018-12-20020 December 2018 License Amendment Request to Allow Performance of Selected Emergency Diesel Generator (EDG) Surveillance Requirements (Srs) During Power Operation L-2018-201, Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-0909 November 2018 Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-182, License Amendment Request Iodine Removal System Elimination2018-11-0909 November 2018 License Amendment Request Iodine Removal System Elimination L-2018-147, Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications2018-08-0202 August 2018 Submittal of License Amendment Request to Remove the Site Area Map from Technical Specifications L-2018-121, License Amendment Request to Reduce the Number of Control Element Assemblies2018-06-29029 June 2018 License Amendment Request to Reduce the Number of Control Element Assemblies L-2018-120, License Amendment Request to Remove the Site Area Map from the Technical Specifications2018-06-25025 June 2018 License Amendment Request to Remove the Site Area Map from the Technical Specifications L-2018-111, Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-06-0707 June 2018 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b 2024-09-25
[Table view] Category:Technical Specification
MONTHYEARML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2022-017, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42022-03-0707 March 2022 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-076, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42019-03-28028 March 2019 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-30030 November 2018 Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-2018-178, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42018-10-0202 October 2018 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML18096B4482018-04-0606 April 2018 Proposed Technical Specifications L-2017-166, Submittal of Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42017-09-20020 September 2017 Submittal of Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2017-077, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42017-05-0404 May 2017 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2017-041, Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process2017-03-30030 March 2017 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month,' Using the Consolidated Line Item Improvement Process L-2016-227, License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability2016-12-22022 December 2016 License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability L-2016-087, Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base2016-04-15015 April 2016 Florida Power & Light Company, on Periodic Report of Changes to the St. Lucie Unit 2 Technical Specification Base L-2016-008, Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle2016-01-19019 January 2016 Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle ML15280A3922015-10-19019 October 2015 Correction to Amendment Nos. 226 and 176 Change to Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program. L-2015-222, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42015-10-15015 October 2015 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2015-180, Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR2015-06-30030 June 2015 Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15198A0302015-06-30030 June 2015 St. Lucie, Units 1 and 2 - Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15084A0112015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel2015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents2015-03-10010 March 2015 Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2014-230, License Amendment Request Application for Technical Specifications Change to Permanently Extend the Integrated Leak Rate Test (ILRT) Frequency to 15 Years2014-08-26026 August 2014 License Amendment Request Application for Technical Specifications Change to Permanently Extend the Integrated Leak Rate Test (ILRT) Frequency to 15 Years L-2014-205, Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents2014-08-0808 August 2014 Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents L-2014-160, Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C, Using the Consolidated Line Item Improvement Process2014-08-0707 August 2014 Application to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C, Using the Consolidated Line Item Improvement Process L-2014-124, Technical Specification Bases Control Program Periodic Report of Bases Change TS 6.8.4.j.42014-05-0707 May 2014 Technical Specification Bases Control Program Periodic Report of Bases Change TS 6.8.4.j.4 L-2013-233, Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2014-02-26026 February 2014 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process L-2014-015, Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2014-02-20020 February 2014 Application for Technical Specification Change Regarding Risk-Informed Justifications for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2012-362, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42012-10-0101 October 2012 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2012-048, License Amendment Request, Station Battery Surveillance Requirement Changes2012-08-10010 August 2012 License Amendment Request, Station Battery Surveillance Requirement Changes L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1107302982011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1107302842011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages ML1035604282010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 4; Technical Specifications Bases Markups ML1035604272010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-078, Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only)2010-04-16016 April 2010 Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only) ML1011601922010-04-16016 April 2010 Attachment 4, St. Lucie License Amendment Request Extended Power Uprate, Technical Specifications Bases Markups (for Information Only) L-2009-099, Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.42009-04-21021 April 2009 Technical Specification Bases Control Program, Periodic Report of Bases Changes TS 6.8.4.j.4 L-2008-120, Proposed License Amendments Diesel Fuel Oil Test Program TSTF-3742008-07-10010 July 2008 Proposed License Amendments Diesel Fuel Oil Test Program TSTF-374 L-2008-149, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42008-06-26026 June 2008 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2007-198, Proposed License Amendment Update PT Curve and LTOP for 55 EFPY2008-01-23023 January 2008 Proposed License Amendment Update PT Curve and LTOP for 55 EFPY L-2007-168, Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42007-10-29029 October 2007 Technical Specifications Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML0729808602007-10-22022 October 2007 Tech Spec Pages for Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications L-2007-087, Proposed License Amendment, Alternative Source Term and Conforming Amendment2007-07-16016 July 2007 Proposed License Amendment, Alternative Source Term and Conforming Amendment L-2007-028, Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications2007-06-0404 June 2007 Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications 2024-05-17
[Table view] Category:Amendment
MONTHYEARML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2019-147, Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG2019-07-19019 July 2019 Exigent Technical Specification Amendment Request One-Time Allowed Outage Time Extension for Inoperable EDG L-2019-055, Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications2019-03-26026 March 2019 Stations - Supplement to Application to Add Limiting Condition for Operation (LCO) 3.0.6 to the Technical Specifications L-2018-215, Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2018-11-30030 November 2018 Resubmittal of Fourth Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML18096B4482018-04-0606 April 2018 Proposed Technical Specifications L-2016-227, License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability2016-12-22022 December 2016 License Amendment Request Change to P /T Limit Curve and LTOP Period of Applicability ML15280A3922015-10-19019 October 2015 Correction to Amendment Nos. 226 and 176 Change to Technical Specification 6.8.4.h, Containment Leakage Rate Testing Program. L-2015-180, Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR2015-06-30030 June 2015 Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR ML15198A0302015-06-30030 June 2015 St. Lucie, Units 1 and 2 - Proposed TS Changes for TSTF-523 LAR Incorporating Approved TSTF-425 LAR L-2015-091, St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel2015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel ML15084A0112015-03-23023 March 2015 St. Lucie, Unit 2 - Supplemental Information for Technical Specification Change and Exemption Request Regarding the Transitioning to Areva Fuel L-2015-030, Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents2015-03-10010 March 2015 Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents L-2014-205, Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents2014-08-0808 August 2014 Application for Technical Specification Change to Remove RCS Chemistry Requirements and Relocate to Licensee-Controlled Documents L-2014-027, Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements2014-01-30030 January 2014 Fourth Ten-Year Inservice Inspection Interval License Amendment Request, Changes to Snubber Surveillance Requirements L-2012-048, License Amendment Request, Station Battery Surveillance Requirement Changes2012-08-10010 August 2012 License Amendment Request, Station Battery Surveillance Requirement Changes ML1107302842011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages ML1035604272010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2010-259, St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages2010-12-15015 December 2010 St. Lucie, Unit 1 - License Amendment Request for Extended Power Uprate, Attachment 3; Renewed Facility Operating License and Technical Specifications Markups and Clean Pages L-2008-120, Proposed License Amendments Diesel Fuel Oil Test Program TSTF-3742008-07-10010 July 2008 Proposed License Amendments Diesel Fuel Oil Test Program TSTF-374 L-2007-198, Proposed License Amendment Update PT Curve and LTOP for 55 EFPY2008-01-23023 January 2008 Proposed License Amendment Update PT Curve and LTOP for 55 EFPY ML0729808602007-10-22022 October 2007 Tech Spec Pages for Amendments 202 and 149 Regarding Minor Changes and Corrections to the Technical Specifications L-2007-028, Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications2007-06-0404 June 2007 Proposed License Amendments, Removal of Hydrogen Recombiners and Analyzers from Technical Specifications L-2006-094, Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.902006-05-25025 May 2006 Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.90 ML0535703302005-12-23023 December 2005 Tech Spec Pages for Amendment 140 One-Time Type a Test Interval Extension L-2005-029, Proposed License Amendment Containment Leakage Rate Program One-Time Type a Test Interval Extension2005-03-31031 March 2005 Proposed License Amendment Containment Leakage Rate Program One-Time Type a Test Interval Extension L-2004-244, Proposed License Amendment Extension of the Reactor Coolant System Pressure/Temperature Curve Limits and LTOP to 35 EFPY2004-12-20020 December 2004 Proposed License Amendment Extension of the Reactor Coolant System Pressure/Temperature Curve Limits and LTOP to 35 EFPY L-2004-091, Proposed License Amendments Supplement 1 - Request for Additional Information Response Elimination of RPS, Afas and ESFAS Pressure Sensor Response Time Testing Requirements2004-05-18018 May 2004 Proposed License Amendments Supplement 1 - Request for Additional Information Response Elimination of RPS, Afas and ESFAS Pressure Sensor Response Time Testing Requirements ML0407603452004-03-11011 March 2004 Technical Specification Amendment 133 ML0407603392004-03-11011 March 2004 Technical Specification Amendment 189 L-2003-276, Proposed License Amendment, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit2003-12-0202 December 2003 Proposed License Amendment, WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit L-2003-265, Proposed License Amendments Regarding Elimination of RPS, Afas, and ESFAS Pressure Sensor Response Time Testing Requirements2003-11-21021 November 2003 Proposed License Amendments Regarding Elimination of RPS, Afas, and ESFAS Pressure Sensor Response Time Testing Requirements L-2003-217, Proposed License Amendments Relocation of Pump Technical Specification Surveillance Requirements2003-10-29029 October 2003 Proposed License Amendments Relocation of Pump Technical Specification Surveillance Requirements L-2003-224, Proposed License Amendments Regarding Alternate Source Term and Conforming Amendments2003-09-18018 September 2003 Proposed License Amendments Regarding Alternate Source Term and Conforming Amendments L-2003-136, Application for Amendment to License NPF-16, by Incorporating Technical Specification Revision2003-05-22022 May 2003 Application for Amendment to License NPF-16, by Incorporating Technical Specification Revision L-2002-113, Proposed License Amendments, Engineered Safety Features Actuation Signal (ESFAS) Trip/Bypass Single Failure Vulnerabilities2002-07-18018 July 2002 Proposed License Amendments, Engineered Safety Features Actuation Signal (ESFAS) Trip/Bypass Single Failure Vulnerabilities ML0215505292002-05-30030 May 2002 Tech Spec Pages for Amd Nos. 182 and 125 Relief Value Allowed Outage Time L-2002-003, Proposed Amendments Regarding Relocation of Specific Working Hour Limits and Controls2002-01-18018 January 2002 Proposed Amendments Regarding Relocation of Specific Working Hour Limits and Controls L-76-191, Proposed Amendment to Facility Operating License DPR-67. Proposed Deletion of Applicability of Specification 3.2.3 to Mode 21978-05-11011 May 1978 Proposed Amendment to Facility Operating License DPR-67. Proposed Deletion of Applicability of Specification 3.2.3 to Mode 2 L-78-129, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Operability and Surveillance of Subject Facility Overpressure Mitigating System1978-04-13013 April 1978 Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Operability and Surveillance of Subject Facility Overpressure Mitigating System ML18088B2741978-04-12012 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Deleting Requirements for Part Length Control Element Assemblies from Unit 1 Technical Specifications L-78-121, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Supporting Operation of the Containment Spray Additive System Scheduled to Be Installed at Facility1978-04-0505 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Supporting Operation of the Containment Spray Additive System Scheduled to Be Installed at Facility L-78-119, Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.6.6.1.A to Include Testing of Sbvs Auxiliary Heaters1978-04-0404 April 1978 Application for Proposed Amendment to License No. DPR-067. Proposed Change Concerns Revision to Surveillance Requirement 4.6.6.1.A to Include Testing of Sbvs Auxiliary Heaters L-78-110, License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Revision to Specification on Decay Time for Fuel Assemblies Stored in Modules Nearest the Fuel Cask Compartment1978-04-0404 April 1978 License No. DPR-67 Application for Amendment: Appendix a Technical Specification Proposed Change Concerning Revision to Specification on Decay Time for Fuel Assemblies Stored in Modules Nearest the Fuel Cask Compartment ML18088B2641978-03-20020 March 1978 Proposed Amendment for Operating License DPR-67 to Support the Replacement of Selected Safety-Related Hydraulic During Upcoming Refueling Outage ML18088B2851978-01-0404 January 1978 Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Repositioning Cea'S About Three Inches Different from Their Present Position to Minimize Potential Guide Tube Wear at Single Location L-77-386, Proposed Amendment to Facility Operating License No. DPR-67. Technical Specifications Proposed Change Concerning Modification of Incore Monitoring Alarm Setpoints & Excore Monitoring Power Scaling Factor to Be More Conservative1977-12-19019 December 1977 Proposed Amendment to Facility Operating License No. DPR-67. Technical Specifications Proposed Change Concerning Modification of Incore Monitoring Alarm Setpoints & Excore Monitoring Power Scaling Factor to Be More Conservative L-77-339, Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Deletion of the Requirement for Annual Operating Report1977-11-0101 November 1977 Proposed Amendment to Facility Operating License No. DPR-67. Proposed Change Concerns Deletion of the Requirement for Annual Operating Report ML18088B3051977-09-16016 September 1977 Attachment C to L-77-291 Proposed Technical Specification Changes 2024-05-17
[Table view] |
Text
Florida Power & Light Company, 6501 S.Ocean Drive, Jensen Beach, FL 34957 March 31, 2005 F=PL L-2005-029 10 CFR 50.90 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Unit 2 Docket No. 50-389 Proposed License Amendment Containment Leakage Rate Program One-Time Type A Test Interval Extension Pursuant to 10 CFR 50.90, Florida Power & Light Company (FPL) requests to amend Facility Operating License NPF-16 for St. Lucie Unit 2. The proposed amendment revises Administrative Technical Specification (TS) Section 6.8.4.h, Containment Leakage Rate Testing Program, to revise an exception to the commitment to follow the guidelines of Regulatory Guide (RG) 1.163, Performance-Based Containment Leak-Test Program. This exception is based on information in the proposal for the 15-year Type A integrated leak rate test (ILRT) surveillance interval and NEI 94-01, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. The effect will be a one-time extension from the currently approved 15-year interval since the last Type A test to approximately a 15.5-year interval since the last Type A test. The last St. Lucie Unit 2 Type A test was performed in June 1992. The next ILRT will be required to be performed prior to start-up from the fall 2007 refueling outage (SL2-17). Refueling outage SL2-17 is the scheduled reactor pressure vessel head (RPVH) and steam generator replacement (SGR) outage for St. Lucie Unit 2. SL2-17 is currently scheduled to end in late December 2007. The current TS requires the ILRT to be performed no later than June 2007, which is four months before the start of the RPVH and SGR outage.
Attachment 1 is a description of the proposed changes and the supporting justification.
Attachment 2 is the Determination of No Significant Hazards and Environmental Considerations. Attachment 3 includes the marked up copy of the proposed Technical Specification change. Attachment 4 is a copy of the retyped TS page.
The St. Lucie Facility Review Group and the Florida Power & Light Company Nuclear Review Board have reviewed the proposed amendment.
In accordance with 10 CFR 50.91 (b)(1), a copy of the proposed amendment is being forwarded to the State Designee for the State of Florida.
Approval of this proposed license amendment is requested by April 2006 to support planning for the spring 2006 refueling outage. If the proposed amendment is not approved an FPL Group company gYA
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Page 2 as requested, the ILRT will need to be performed in the spring 2006 refueling outage (SL2-16). This is 14 months prior to the current surveillance due date. Please issue the amendment to be effective on the date of issuance and to be implemented within 60 days of receipt by FPL. Please contact George Madden at 772-467-7155 if there are any questions about this submittal.
Vtruly s William rs Jr.
Vice President St. Lucie Plant WJ/GRM Attachments cc: Mr. William A. Passetti, Florida Department of Health
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Page 3 STATE OF FLORIDA )
) ss.
COUNTY OF ST. LUCIE )
William Jefferson, Jr. being first duly sworn, deposes and says:
That he is Vice President, St. Lucie Plant, for the Nuclear Division of Florida Power & Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.
STATE OF FLORIDA Wri e n, Jr.
COUNTY OF ST LUCIE Sworn to and subscribed before me this 3 day of A-L4 __, 2005 by William Jefferson, Jr., who is personally known to me.
Name of Notary P - State of Florida
,4.;'t, Leslie 1 WhhwIll MY COMMISSION# DD020212 EXPIRES BON,:, May 12, 2005 THRU BONDED ROY FAIN tNSURANCf INC (Print, type or stamp Commissioned Name of Notary Public)
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 1 Page 1 ATTACHMENT 1 DESCRIPTION OF THE PROPOSED CHANGES AND JUSTIFICATION INTRODUCTION The proposed amendment modifies the Administrative Technical Specification (TS) Section 6.8.4.h, Containment Leakage Rate Testing Program, to change exception (b) to the guidelines of Regulatory Guide (RG) 1.1631. This exception is based on information in the proposal for the 15-year Type A integrated leak rate test (ILRT) surveillance interval and NEI 94-012 . The effect will be a one-time extension from the currently approved 15-year interval since the last Type A test to approximately a 16 year interval since the last Type A Test. The last St. Lucie Unit 2 Type A Test was performed in June 1992. The proposed ILRT due date will be required prior to start-up from the fall 2007 refueling outage (SL2-17).
Refueling outage SL2-17 is the scheduled reactor pressure vessel head (RPVH) and steam generator replacement (SGR) outage for St. Lucie Unit 2. The current TS requires the ILRT to be performed no later than June 2007, which is four months before the RPVH and SGR outage.
BACKGROUND The testing requirements of 10 CFR 50, Appendix J, provide assurance that leakage through the containment, including systems and components that penetrate containment, does not exceed design values anticipated up to and including the design basis accident.
The integrated leakage rate test (ILRT), or Type A test as referred to in 10 CFR 50, Appendix J, is primarily an overall test of the containment structure.
10 CFR 50 Appendix J was revised effective October 26, 1995 to allow use of Option B, Performance-Based Requirements. Regulatory Guide 1.163 provides an acceptable method to the NRC for compliance with the performance based option by the use of NEI 94-01 Revision 0, Industry Guideline for Implementing Performance Based-Option of 10 CFR 50 Appendix J, including the performance criteria for test interval selection.
NEI 94-01, Revision 0, allows an extended test interval of 10 years, based on two consecutive successful tests. There have been four ILRTs performed on Unit 2, all of which have been successful. Therefore, in 1997, St. Lucie Unit 2 was placed on the extended surveillance interval of 10 years.
In 2003, St. Lucie Units 1 and 2 received approval of Technical Specification amendments 187 and 130, respectively, which allowed a one-time increase in the ILRT surveillance interval from 10 years to 15 years. This change was evaluated utilizing a risk-based approach that demonstrated that there was only a minimal increase in risk. This agreed 1 Regulatory Guide 1.163, Performance-Based Containment Leak-Test Program, September 1995.
2 NEI 94-01, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J, Rev. 0, July 1995.
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 1 Page 2 with the generic analysis of NUREG-1493 3 , Performance-Based Containment Leak-Test Program. NUREG-1493 concluded that reducing the frequency to only once in 20 years would lead to an imperceptible increase in risk. A specific due date of June 2007 was included in the Technical Specifications for the Unit 2 amendment. Since there is no grace period for the surveillance, the ILRT must currently be performed in SL2-16 outage tentatively scheduled to start in April 2006.
Subsequent to the approval of the one-time 15-year ILRT surveillance interval, it was determined that Unit 2 would be required to replace both the reactor vessel head and the steam generators. These projects have been slated for the SL2-17 refueling outage that is scheduled to begin in late October 2007 and finish in December 2007. This was the earliest opportunity that this project could reasonably be scheduled, given the fabrication lead times and project planning requirements.
Replacement of the reactor pressure vessel head and steam generators requires that the containment be cut open for removal and installation of these components. This will necessitate that an ILRT be performed as part of the post-modification testing for the containment structure and appurtenances. In order to eliminate performing ILRTs in back to back outages, it is proposed that the current Technical Specification wording be amended to extend the due date to startup following the SL2-17 outage. The result would be that the currently approved ILRT surveillance interval would only have to be extended approximately six months in order to eliminate performing a redundant and costly test in SL2-16.
DESCRIPTION OF PROPOSED CHANGE The proposed amendment to the Unit 2 Administrative Technical Specification 6.8.4.h would revise an exception (b)to the commitment to follow the guidelines of RG 1.163. This exception is based on information in the proposal for the 15-year ILRT surveillance interval and NEI 94-01 in which the effect will be an extension from the currently approved 15-year interval (from the last ILRT) to the startup of Unit 2 following the SL2-17 outage. A marked up copy of the Technical Specification page for this proposed change is included in this submittal.
FPL proposes to revise the St. Lucie Unit 2 Technical Specification 6.8.4.h as follows:
Current Unit 2
...This program is in accordance with the guidelines contained in Regulatory Guide 1.163,
'Performance-Based Containment Leak-Test Program," as modified by the following exception(s):
- a. Bechtel Topical Report, BN-TOP-1 or ANS 56.8-1994 (as recommended by R.G. 1.163) will be used for Type A testing.
3 NUREG-1493, Performance-Based Containment Leak-Test Program, September 1995.
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 1 Page 3
- b. The first Type A test performed after the June 1992 Type A test shall be no later than June 2007.
Unit 2 Revised
...This program is in accordance with the guidelines contained in Regulatory Guide 1.163, NPerformance-Based Containment Leak-Test Program," as modified by the following exception(s):
- a. Bechtel Topical Report, BN-TOP-1 or ANS 56.8-1994 (as recommended by R.G.
1.163) will be used for Type A testing.
- b. The first Type A test performed after the June 1992 Type A test shall be prior to startup following the SL2-17 refueling outage.
JUSTIFICATION FOR THE PROPOSED CHANGE The proposed change to extend the ILRT surveillance interval is justified based on assessment of the containment structural condition utilizing ILRT historical results and containment inspection programs and is supported by risk-informed analysis.
ILRT Historical Results The results of the previous Type A tests (ILRTs) for St. Lucie Unit 2 are reported below.
Data is reported using the 95% confidence level estimate. The maximum allowable containment leakage rate (L.) is 0.5% of containment air weight per day (Wt%/day) for Unit 2 as described in the Technical Specifications.
Unit 2 ILRT Data Date Leak Rate Original 10CFR50 NEI 94-01 As-Found (Wt%/day) App J Acceptance Acceptance Criteria Criteria (Wt%/day) (Wt%/day) 12/2/1982* 0.026 0.375 0.5 5/17/1 98 6 ST 0.092 0.263 NA 4_3_1989__T 0.117 0.375 0.5 6/17/1 9 9 2LT 0.053 0.375 0.5
§ Reduced pressure test
£ Test results obtained using BN-TOP-1 I Includes difference of as-found/as-left LLRT results (IN 85-71)
All four Type A tests performed on St. Lucie Unit 2 passed the as-found acceptance criteria with considerable margin. It should be noted that the later results reflect the addition of
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 1 Page 4 calculation conservatism due to the use of the BN-TOP-1 methodology and the addition of the negative difference in leakage resulting from LLRTs performed due to maintenance prior to the respective ILRT. These results demonstrate a history of satisfactory performance of both the leak tight capability and structural integrity of the containment vessel.
Containment Visual Inspection The St. Lucie containment vessel is examined in accordance with the requirements of ASME Code Section Xl, Subsection IWE4, the plant protective coatings program, and the Containment Leakage Rate Test Program. These inspection processes are described as follows.
Historically, the ILRT was preceded by a visual inspection of containment thus ensuring that the inspection was performed three times in 10 years. Following the adoption of Option B to 10 CFR 50, when the ILRT surveillance interval was extended to 10 years, the general visual inspections of both sides of the accessible containment vessel surface and the shield building were maintained on the previous frequency of three times in 10 years.
At that time, the requirement for these inspections was relocated from Technical Specifications to the containment leakage rate testing program. This original inspection frequency was also maintained subsequent to approval of the one-time 15-year ILRT surveillance interval. The results of these inspections indicate that there have been no significant deficiencies in the structural integrity or material condition of the containment vessel and only minor coatings issues.
There have been two conditions identified by other inspection processes, which relate to the material condition of the containment boundary. The first condition documented in St.
Lucie Plant Condition Report 97-0890, concerned deterioration of the moisture barrier at the interface of the concrete floor and containment vessel. Areas were selected at various points where the moisture barrier exhibited cracking and/or partial disbanding from the vessel or slab, and the sealant material was removed to allow inspection of the containment vessel. Generally, only staining or light surface corrosion was noted with a few instances of pitting observed. Evaluations have determined that the localized areas of concern do not represent an issue with respect to the integrity of the containment vessel.
The site corrective action program has been utilized to track additional inspections and provides a long term plan for any required material improvements or repairs to the moisture barrier and the containment vessel. One third of the moisture barrier at the concrete floor to vessel interface on both sides of containment is inspected during each inspection period of the St. Lucie ASME Section Xl, ISI-IWE Plan. Two thirds of the Unit 2 moisture barrier have been inspected, as of the spring 2003 refueling outage, with results similar to or less significant than the originally inspected areas. The second condition involved external corrosion, due to moisture accumulation from condensation, on the component cooling water penetrations to containment as initially documented in Condition Report 97-1799.
4 ASME Section Xl, Subsection IWE, Requirements for Class MC and Metallic Liners of Class CC Components of Light-Water Cooled Plants, 1992 Edition.
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 1 Page 5 Corrective actions included removal of corrosion products, inspection of components and respective thickness measurements, application of protective coatings, and installation of anti-sweat insulation. Corrective actions, inspections, and evaluation of inspection results implemented on the most affected penetrations have provided objective evidence that the piping degradation is minor and a large thickness margin is available before encroaching upon design requirements. Based on these results, the remaining penetrations are in satisfactory condition. Completion of corrective actions for the remaining penetrations is being tracked by the site corrective action program. Both of these conditions were identified prior to implementation of the IWE inspection program at St. Lucie. Based on the inspections, repairs, and evaluation of these issues it has been determined that augmented inspection was not required in accordance with IWE-1240.
The ASME Section Xl, Subsection IWE inspection plan was implemented for St. Lucie Unit 2 on August 9, 2000. All inspections have been completed for the second period of the initial 10-year surveillance interval. The IWE program performs inspection of the entire accessible interior surface of the containment in each of three periods within a 10 year surveillance interval. The 100% general surface area inspection was completed for the first period in April 2000 and second period in November 2001 on Unit 2. The results were satisfactory with no indications of significant degradation. There are currently no areas identified that require augmented inspection in accordance with IWE-1240.
The containment inservice inspection program at St. Lucie Unit 2 is described in detail in ISI/IWE-PSL-1/2-PROGRAM, Metal Containment Inservice Inspection Program, which provides the rules and requirements. The specific areas and components scheduled for inspection in accordance with the program are provided in ISI/IWE-PSL-2-PLAN, ASME Section Xl, Subsection IWE Containment Building Metal Containment Inservice Inspection Plan for St Lucie Unit 2. The program requirements include inspection of containment surfaces, pressure retaining welds, bolting, seals, gaskets, and moisture barriers using visual, surface, and volumetric techniques as required. Examinations that detect flaws or evidence of degradation shall be documented through the site corrective action process and dispositioned in accordance with the requirements of IWE-3000. Personnel performing NDE shall be qualified and certified in accordance with IWA-2300 of the 1992 Edition with 1992 Addenda of ASME Section Xl and implemented by CSI-QI-9.1, Qualification and Certification of Nondestructive Examination Personnel.
During activities that require repair of the containment vessel coatings, ASME Section Xl, Subsection IWE requires visual exams to assess the condition of the vessel metal surface for evidence of flaking, blistering, peeling, discoloration, and other signs of distress. Prior to any repair, an inspection is performed by NDE personnel to assess the condition of the base material. Following completion of coating repairs, a final inspection is performed by NDE personnel to determine acceptability of the final condition and to act as a reference for future inspections. There has been no indication of containment vessel metal degradation on either unit resulting from these types of inspections.
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 1 Page 6 The protective coatings program at St. Lucie requires that a walkdown of the containment interior be performed each refueling outage by the FPL coatings specialist and Engineering to inspect any existing areas of non-qualified coatings and to determine any other areas in need of repair. The accessible exterior containment surface is inspected by personnel familiar with the ASTM coatings standards in accordance with plant procedures. Portions of the upper exterior containment vessel surface are not normally accessible for inspection due to the unavailability of sufficient installed ladders or platforms and so the containment external surface above the floor is not inspected each outage. Inspections of the upper exterior surface of the containment have been performed during previous outages.
Inspection of the upper section of the exterior side of the containment vessel identified no degraded areas and no potential means by which corrosion would be promoted such as moisture sources or equipment interface. Those areas identified by inspection which do not meet acceptance criteria are evaluated and scheduled for repair as necessary.
Following repairs, containment vessel coatings are re-examined upon completion by certified NDE examiners and the as-left condition documented. This allows identification of any potential for containment vessel degradation. As previously stated, there have been no indications of significant degradation of the containment vessel base metal.
Summary of Plant Specific Risk Evaluation The risk-informed basis for extending the ILRT surveillance interval is generically addressed by NUREG-1493, which provided the technical basis for NEI 94-01 allowing the original extension of up to 10 years for the ILRT surveillance interval. The NUREG stated that reducing the frequency to once in 20 years between tests would lead to an imperceptible increase in risk.
FPL has performed a site specific risk assessment for extending the ILRT surveillance interval until the end of the SL2-17 refueling outage (approximately an additional six months). Regulatory Guide 1.1745 defines very small changes in risk as resulting in CDF of less than 1E-06/yr and increases in LERF of less than 1E-07/yr. Since the ILRT does not impact CDF, the relevant metric is LERF. The calculation shows that the reduction in Type A test (ILRT) frequency to once in 16 years from the current once in 15 years results in a change in LERF of 5.94E-09 per year for Unit 2. The cumulative increase in LERF resulting from a change in the ILRT frequency from the original three times in 10 years to once in 16 years is estimated to be 9.5E-08 per year. This is considered a "very small change" in LERF, below the criteria presented in RG 1.174 and RG 1.177 6 , and therefore is concluded to be non-risk significant. In addition, the calculation shows a minimal increase in population dose of 0.0019 person-rem/yr and a minimal percent change in conditional containment failure probability (CCFP) of 0.03% due to the change in ILRT surveillance interval from 15 years to 16 years for Unit 2. The cumulative increase in population dose and percent change in CCFP resulting from a change in the ILRT 5 Regulatory Guide 1.174, An Approach for Using Probabilistic Risk Assessment In Risk-informed Decisions On Plant-Specific Changes to the Licensing Basis, July 1998.
6 Regulatory Guide 1.177, An Approach for Plant-Specific, Risk-informed Decisionmaking: Technical Specifications, August 1998.
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 1 Page 7 frequency from the original three times in 10 years to once in 16 years is estimated to be
.03 person-rem/yr and 0.49%, respectively.
This proposal is similar to the previous license amendment re uest submitted by St. Lucie for a one-time extension of the ILRT surveillance to 15 years .
CONCLUSION The proposed Technical Specification changes regarding the exception to RG 1.163 and NEI-94-01 requirements that would extend the ILRT surveillance interval are considered to be acceptable. Analysis demonstrates that only a minimal increase in the relevant risk metrics would result from the proposed change. Historical ILRT data and a continuing containment inspection program coupled with LLRT of the individual containment penetrations provide assurance of the leak tight integrity of the containment vessel.
7 FPL letter L-2002-143, from D. E. Jemigan to USNRC dated August 15, 2002, Proposed License Amendments - Risk-informed One-Time Increase In Integrated Leak Rate Test Surveillance Interval
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 2 Page 1 ATTACHMENT 2 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Introduction The proposed amendment modifies the Administrative Technical Specification (TS) Section 6.8.4.h, Containment Leakage Rate Testing Program, to change exception (b) to the guidelines of Regulatory Guide (RG) 1.163, Performance-Based Containment Leak-Test Program. This exception is based on information in the proposal for the 15-year Type A integrated leak rate test (ILRT) surveillance interval and NEI 94-01, Industry Guideline for Implementing Performance-Based Option of 10 CFR Part 50, Appendix J. The effect will be a one-time extension from the currently approved 15-year interval since the last Type A test to approximately a 16-year interval since the last Type A test. The last St. Lucie Unit 2 Type A test was performed in June 1992. The proposed ILRT due date will be required prior to start-up from the fall 2007 refueling outage (SL2-17). Refueling outage SL2-17 is the scheduled reactor pressure vessel head (RPVH) and steam generator replacement (SGR) outage for St. Lucie Unit 2. The current TS requires the ILRT to be performed no later than June 2007, which is four months before the RPVH and SGR outage.
Determination of No Significant Hazards Consideration The standards used to arrive at a determination that a request for amendment involves a no significant hazards consideration are included in the Commission's regulation, 10 CFR 50.92, which states that no significant hazards considerations are involved if the operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. Each standard is discussed as follows:
(1) Operation of the facility In accordance with the proposed amendment would not Involve a significant Increase in the probability or consequences of an accident previously evaluated.
The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated. The proposed amendment of the Technical Specifications adds a one-time extension to the current surveillance interval for Type A testing (ILRT). The current test interval of 15 years from the last Type A test would be extended to end prior to startup from the SL2-17 refueling.
This is anticipated to be an approximately six-month addition to the 15 year interval.
The proposed extension to the Type A testing interval does not significantly increase the probability of an accident previously evaluated since the containment Type A test is not a modification, nor a change in the way that plant systems, structures or components (SSC) are operated, and is not an activity that could lead
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 2 Page 2 to equipment failure or accident initiation. The proposed extension of the test interval does not involve a significant increase in the consequences of an accident since research documented in NUREG-1493 has found that generically, very few potential leak paths are not identified with Type B and C tests (LLRT). The Type B and C testing are unaffected by this proposed change. The NUREG concluded that an increase in the Type A test interval to twenty years resulted in an imperceptible increase in risk. St. Lucie Unit 2 provides a high degree of assurance through testing and inspection that the containment will not degrade in a manner only detectable by Type A testing. Inspections required by the ASME Code, the containment leakage rate testing program, the plant protective coatings program, and Maintenance Rule are performed in order to identify indications of containment degradation that could affect leak tightness. Type B and C testing required by 10 CFR 50, Appendix J, are not affected by this proposed extension to the Type A test interval and will identify openings in containment penetrations that would otherwise require a Type A test.
(2) Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any previously evaluated.
The proposed change does not result in facility operation that would create the possibility of a new or different kind of accident from any accident previously evaluated. The proposed extension to Type A testing does not create a new or different type of accident for St. Lucie because no physical plant changes are made and no compensatory measures are being imposed that could potentially lead to a failure. There are no operational changes that could introduce a new failure mode or create a new or different kind of accident. The proposed change only adds an extension to the current interval for Type A testing and does not change implementation aspects of the test.
(3) Operation of the facility In accordance with the proposed amendment would not Involve a significant reduction In a margin of safety.
The proposed change would not result in operation of the facility involving a significant reduction in a margin of safety. The proposed license amendment adds a one-time extension to the current interval for Type A testing (ILRT). The current one-time test interval of 15 years from the last Type A test would be extended to end prior to startup from the SL2-17 refueling outage. This is anticipated to be an approximately six month addition to the 15 year interval. The NUREG-1493 generic study of the effects of extending the Type A test interval out to 20 years concluded that there is an imperceptible increase in plant risk. A plant specific risk calculation obtained results consistent with the generic conclusions regarding risk which show a slight but negligible increase in risk. Inspections required by the ASME code and maintenance rule are performed to ensure that the containment will not degrade in a manner that is only detectable by Type A testing (ILRT).
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 2 Page 3 Based on the above, we have determined that the proposed amendment does not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any previously evaluated, or (3) involve a significant reduction in a margin of safety; and therefore does not involve a significant hazards consideration.
Environmental Impact Consideration Determination The proposed license amendment changes requirements with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20.
The proposed amendment involves no significant increase in the amounts and no significant change in the types of any effluents that may be released off-site, and no significant increase in individual or cumulative occupational radiation exposure. FPL has concluded that the proposed amendment involves no significant hazards consideration, and therefore, meets the criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b), an environmental impact statement or environmental assessment need not be prepared in connection with issuance of the amendment.
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 3 Page 1 ATTACHMENT 3 ST. LUCIE UNIT 2 MARKED UP TECHNICAL SPECIFICATION PAGE TS Page 6-15b
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 3 Page 2 ADMINISTRTiVE CONTROLS than 8 days in gaseous effluents released from each unit to areas beyond the SITE BOUNDARY conforming to Appendix I to 10 CFR Part 50,
- 10) Limitations on the annual dose or dose commitment to any MEMBER OF THE PUBLIC due to releases of radioactivity and to radiation from uranium fuel cycle sources conforming to 40 CFR Part 190.
- g. Radiological Environmental Monitoring Proaram A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. The program shall provide (1) representative measurements of radioactivity in the highest potential exposure pathways, and (2) verification of the accuracy of the effluent monitoring program and modeling of the environmental exposure pathways. The program shall (1) be contained In the ODCM, (2) conform to the guidance of Appendix I to 10 CFR Part 50. and (3) include the following:
- 1) Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters in the ODCM.
- 2) A Land Use Census to ensure that changes Inthe use of areas at and beyond the SITE BOUNDARY are identified and that modifications to the monitoring program are made If required by the results of this census, and
- 3) Participation in a Interlaboratory Comparison Program to ensure that independent checks on the precision and accuracy of the measurements of radioactive materials in environmental sample matrices are performed as part of the quality assurance program for environmental monitoring.
- h. Containment Leakage Rate Testing Program A program to Implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50 Appendix J, Option B, as modified by approved exemptions. This program Is in accordance with the guidelines contained in Regulatory Guide 1.163, 'Performance-Based Containment Leak-Test Program, as modified by the following exception(s):
a) Bechtel Topical Report, BN-TOP-1 orANS 56.8-1994 (as recommended by R.G. 1.163) will be used for type A testing.
b) The first Type A test performed after the June 1992 Type A test shall bei'e-W itio _
=Sl.2-17following to refueling outage.
The peak calculated containmsis oss of coolant accident P., Is 41.8 psig. The containment design pressure is 44 psig.
The maximum allow containment leakage rate, L., at P., shall be 0.50%
of containment air weight per day.
ST. LUCIE - UNIT 2 6S1 b Amendm-,ent No. 64. 8,130
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 4 Page 1 ATTACHMENT 4 ST. LUCIE UNIT 2 RETYPED TECHNICAL SPECIFICATION PAGE The attached retype reflects the currently issued version of the Technical Specifications.
Pending Technical Specification changes or Technical Specification changes issued subsequent to this submittal are not reflected in the enclosed retype. The enclosed retype should be checked for continuity with Technical Specifications prior to issuance.
TS Page 6-15b
St. Lucie Unit 2 Docket No. 50-389 L-2005-029 Attachment 4 Page 2 ADMINISTRATIVE CONTROLS than 8 days in gaseous effluents released from each unit to areas beyond the SITE BOUNDARY conforming to Appendix I to 10 CFR Part 50,
- 10) Limitations on the annual dose or dose commitment to any MEMBER OF THE PUBLIC due to releases of radioactivity and to radiation from uranium fuel cycle sources conforming to 40 CFR Part 190.
- g. Radiological Environmental Monitorina Program A program shall be provided to monitor the radiation and radionuclides in the environs of the plant. The program shall provide (1) representative measurements of radioactivity in the highest potential exposure pathways, and (2) verification of the accuracy of the effluent monitoring program and modeling of the environmental exposure pathways. The program shall (1) be contained In the ODCM, (2) conform to the guidance of Appendix I to 10 CFR Part 50, and (3) include the following:
- 1) Monitoring, sampling, analysis, and reporting of radiation and radionuclides in the environment in accordance with the methodology and parameters in the ODCM.
- 2) A Land Use Census to ensure that changes in the use of areas at and beyond the SITE BOUNDARY are identified and that modifications to the monitoring program are made if required by the results of this census, and
- 3) Participation in a Interlaboratory Comparison Program to ensure that Independent checks on the precision and accuracy of the measurements of radioactive materials in environmental sample matrices are performed as part of the quality assurance program for environmental monitoring.
- h. Containment Leakage Rate Testing Program A program to implement the leakage rate testing of the containment as required by 10 CFR 50.54(o) and 10 CFR 50 Appendix J, Option B, as modified by approved exemptions. This program Is In accordance with the guidelines contained in Regulatory Guide 1.163, 'Performance-Based Containment Leak-Test Program, as modified by the following exception(s):
a) Bechtel Topical Report, BN-TOP-1 orANS 56.8-1994 (as recommended by R.G. 1.163) will be used for type A testing.
b) The first Type A test performed after the June 1992 Type A test shall be prior to startup following the SL2-17 refueling outage.
The peak calculated containment internal pressure for the design basis loss of coolant accident Pa, Is41.8 psig. The containment design pressure is 44 psig.
The maximum allow containment leakage rate, La., at Pa, shall be 0.50%
of containment air weight per day.
ST. LUCIE - UNIT 2 6-15b Amnendment No. 6ar 88,4 i