ML050870491

From kanterella
Jump to navigation Jump to search
Technical Specification Pages Re Elimination of Periodic Pressure Sensor & Protection Channel Response Time Testing
ML050870491
Person / Time
Site: Beaver Valley
Issue date: 03/24/2005
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML050870491 (15)


Text

DEFINITIONS 1.15 THROUGH 1.17 (DELETED)

QUADRANT POWER TILT RATIO (OPTR) 1.18 QPTR shall be the ratio of the maximum upper excore detector calibrated output to the average of the upper excore detector calibrated outputs, or the ratio of the maximum lower excore detector calibrated output to the average of the lower excore detector calibrated outputs, whichever is greater.

DOSE EQUIVALENT I-131 1.19 DOSE EQUIVALENT I-131 shall be that concentration of I-131 (microcuries/gram) that alone would produce the same thyroid dose as the quantity-and isotopic mixture of I-131, I-132, I-133, I-134, and I-135 actually present. The DOSE EQUIVALENT I-131 is calculated with the following equation:

Cl 131 = C ~ cl- 1 3 2 + cl-133 + cl-134 + cl-1 31 + 35 D.E. 170 6 1000 34 Where "C" is the concentration, in microcuries/gram of the iodine isotopes. This equation is based on dose conversion factors derived from ICRP-30.

STAGGERED TEST BASIS 1.20 A STAGGERED TEST BASIS shall consist of:

a. A test schedule for n systems, subsystems, trains or other designated components obtained by dividing the specified test interval into n equal subintervals;
b. The testing of one (1) system, subsystem, train or other designated component at the beginning of each subinterval.

FREQUENCY NOTATION 1.21 The FREQUENCY NOTATION specified for the performance of Surveillance Requirements shall correspond to the intervals defined in Table 1.2.

REACTOR TRIP SYSTEM RESPONSE TIME 1.22 The REACTOR TRIP SYSTEM RESPONSE TIME shall be the time interval from when the monitored parameter exceeds its trip setpoint at the channel sensor until loss of stationary gripper coil voltage.

The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC.

BEAVER VALLEY - UNIT 2 1-4 Amendment No. 147

DEFINITIONS ENGINEERED SAFETY FEATURE RESPONSE TIME 1.23 The ENGINEERED SAFETY FEATURE RESPONSE TIME shall be that time interval from when the monitored parameter exceeds its ESF actuation setpoint at the channel sensor until the ESF equipment is capable of performing its safety function (i.e., the valves travel to their required positions, pump discharge pressures reach their required values, etc.). Times shall include diesel generator starting and sequence loading delays where applicable. The response time may be measured by means of any series of sequential, overlapping, or total steps so that the entire response time is measured. In lieu of measurement, response time may be verified for selected components provided that the components and methodology for verification have been previously reviewed and approved by the NRC.

AXIAL FLUX DIFFERENCE 1.24 AXIAL FLUX DIFFERENCE shall be the difference in normalized flux signals between the top and bottom halves of a two-section excore neutron detector.

PHYSICS TESTS 1.25 PHYSICS TESTS shall be those tests performed to measure the fundamental nuclear characteristics of the reactor core and related instrumentation and 1) described in Chapter 14.0 of the FSAR,

2) authorized under the provisions of 10 CFR 50.59, or 3) otherwise approved by the Commission.

E - AVERAGE DISINTEGRATION ENERGY 1.26 E shall be the average sum (weighted in proportion to the concentration of each radionuclide in the reactor coolant at the time of sampling) of the average beta and gamma energies per disintegration (in MeV) for isotopes, other than iodines, with half lives greater than 15 minutes, making up at least 95% of the total non-iodine activity in the coolant.

SOURCE CHECK 1.27 A SOURCE CHECK shall be the qualitative assessment of channel response when the channel sensor is exposed to a radioactive source.

PROCESS CONTROL PROGRAM 1.28 The PROCESS CONTROL PROGRAM (PCP) shall contain the current formulas, sampling, analyses, test, and determinations to be made to ensure that processing and packaging of solid radioactive wastes based on demonstrated processing of actual or simulated wet solid wastes will be accomplished in such a way as to assure compliance with 10 CFR Parts 20, 61, and 71, State regulations, burial ground requirements, and other requirements governing the disposal of solid radioactive waste.

1.29 DELETED BEAVER VALLEY - UNIT 2 1-5 Amendment No. 147

3/4.3 INSTRUMENTATION 3/4.3.1 REACTOR TRIP SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.1.1 As a minimum, the reactor trip system instrumentation channels and interlocks of Table 3.3-1 shall be OPERABLE.

APPLICABILITY: As shown in Table 3.3-1.

ACTION: As shown in Table 3.3-1.(2)

SURVEILLANCE REQUIREMENTS 4.3.1.1.1 Each reactor trip system instrumentation channel and interlock and automatic trip logic shall be demonstrated OPERABLE by the performance of th Reactor Trip System Instrumentation Surveillance Requirements during the MODES and at the frequencies shown in Table 4.3-1.

4.3.1.1.2 The logic for the interlocks shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by interlock operation. The total interlock function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by interlock operation.

4.3.1.1.3 The REACTOR TRIP SYSTEM RESPONSE TIME of each reactor trip function shall be verified to be within its limit at least once per 18 months. Neutron detectors are exempt from response time testing. Each verification shall include at least one logic train such that both logic trains are verified at least once per 36 months and one channel per function such that all channels are verified at least once every N times 18 months where N is the total number of redundant channels in a specific reactor trip function as shown in the "Total No. of Channels" column of Table 3.3-1.

(1) For the automatic trip logic, the surveillance requirements shall be the application of various simulated input combinations in conjunction with each possible interlock logic state and verification of the required logic output including, as a minimum, a continuity check of output devices.

(2) Separate ACTION statement entry is allowed for each Function.

BEAVER VALLEY - UNIT 2 3/4 3-1 Amendment No. 147

INSTRUMENTATION 3/4.3.2 ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS 4.3.2.1.1 Each engineered safety feature actuation system instrumentation channel and interlock and the automatic actuation logic with master and slave relays shall be demonstrated OPERABLE by the perforr nce of the ESFAS Instrumentation Surveillance Requirements during the MODES and at the frequencies shown in Table 4.3-2.

4.3.2.1.2 The logic for the interlocks shall be demonstrated OPERABLE during the at power CHANNEL FUNCTIONAL TEST of channels affected by interlock operation. The total interlock function shall be demonstrated OPERABLE at least once per 18 months during CHANNEL CALIBRATION testing of each channel affected by interlock operation.

4.3.2.1.3 The ENGINEERED SAFETY FEATURES RESPONSE TIME of each ESF function shall be verified to be within the limit at least once per 18 months. Each verification shall include at least one logic train such that both logic trains are verified at least once per 36 months and one channel per function such that all channels are verified at least once per N times 18 months where N is the total number of redundant channels in a specific ESF function as shown in the "Total No. Of Channels" Column of Table 3.3-3.

(1) For the automatic actuation logic, the surveillance requirements shall be the application of various simulated input conditions in conjunction with each possible interlock logic state and verification of the required logic output including, as a minimum, a continuity check of output devices. For the actuation relays, the surveillance requirements shall be the energization of each master and slave relay and verification of OPERABILITY of each relay. The test of master relays shall include a continuity check of each associated slave relay. The test of slave relays (to be performed at least once per 92 days in lieu of at least once per 31 days) shall include, as a minimum, a continuity check of associated actuation devices that are not testable. The slave relay test frequency can be extended to once per 12 months provided a satisfactory contact loading analysis has been completed, and a satisfactory slave relay service life has been established, for the slave relay being tested.

BEAVER VALLEY - UNIT 2 3 /4 3-15 Amendment No. 147

TECHNICAL SPECIFICATION BASES INDEX BASES SECTION PAGE 2.1 SAFETY LIMITS 2.1.1 REACTOR CORE ................................. B 2-1 2.1.2 REACTOR COOLANT SYSTEM PRESSURE .............. B 2-2 3/4.0 APPLICABILITY...................................... B 3/4 0-1 3/4.1 REACTIVITY CONTROL SYSTEMS 3/4.1.1 BORATION CONTROL............................. B 3/4 1-1 3/4.1.2 BORATION SYSTEMS............................. B 3/4 1-2 3/4.1.3 MOVABLE CONTROL ASSEMBLIES. B 3/4 1-4 3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 AXIAL FLUX DIFFERENCE (AFD) .................. B 3/4 2-1 3/4.2.2 AND 3/4.2.3 HEAT FLUX AND NUCLEAR ENTHALPY HOT CHANNEL FACTORS FQ(Z) AND FRH. B 3/4 2-2 3/4.2.4 QUADRANT POWER TILT RATIO .................... B 3/4 2-5 3/4.2.5 DNB PARAMETERS ............................... B 3/4 2-11 3/4.3 INSTRUMENTATION 3/4.3.1 AND 3/4.3.2 REACTOR TRIP SYSTEM INSTRUMENTATION AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION ...................... B 3/4 3-1 3/4.3.3 MONITORING INSTRUMENTATION ................... B 3/4 3-11 I 3/4.3.3.1 Radiation Monitoring Instrumentation ......... B 3/4 3-11 I 3/4.3.3.5 Remote Shutdown Instrumentation .............. B 3/4 3-11 3/4.3.3.8 Accident Monitoring Instrumentation .......... B 3/4 3-11 BEAVER VALLEY - UNIT 2 B-I Amendment No.147 I

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

OPERABILITY of the following trips in Table 3.3-1 provides additional diverse or anticipatory protection features and is not credited in the accident analyses:

Undervoltage - Reactor Coolant Pumps (Above P-7); Underfrequency Reactor Coolant Pumps (Above Pr7); Turbine Trip (Above P-9); Reactor Coolant Pump Breaker Position Trip (Above P-7); Turbine First Stage Pressure, P-13.

Specified surveillance intervals and surveillance and maintenance outage times have been determined in accordance with WCAP-10271, "Evaluation of Surveillance Frequencies and Out of Service Times for the Reactor Protection Instrumentation System," and supplements to that report as approved by the NRC and documented in the SER (letter to J. J. Sheppard from Cecil 0. Thomas dated February 21, 1985).

Jumpers and lifted leads are not an acceptable method for placing equipment in bypass as documented in the NRC safety evaluation report for this WCAP.

The surveillance requirements for the Manual Trip Function, Reactor Trip Breakers, and Reactor Trip Bypass Breakers are provided to reduce the possibility of an Anticipated Transient Without Scram (ATWS) event by ensuring OPERABILITY of the diverse trip features

(

Reference:

Generic Letter 85-09).

The verification of response time at the specified frequencies provides assurance that the protective and ESF action function associated with each channel is completed within the time limit assumed in the accident analyses. No credit was taken in the analyses for those channels with response times indicated as not applicable.

ESF response times which include sequential operation of the RWST and VCT valves are based on values assumed in the non-LOCA safety analyses and are provided in Section 3 of the Licensing Requirements Manual. These analyses take credit for injection of borated water from the RWST. Injection of borated water is assumed not to. occur until the VCT charging pump suction valves are closed following opening of the RWST charging pump suction valves. When sequential operation of the RWST and VCT valves is not included in the response times, the values specified are based on the LOCA analyses. The LOCA analyses take credit for injection flow regardless of the source. Verification of the response times will assure that the assumptions used for the LOCA and Non-LOCA analyses with respect to operation of the VCT and RWST valves are valid.

BEAVER VALLEY - UNIT 2 B 3/4 3-2 Amendment No. 147

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

The maximum response time for control room isolation on high radiation is based on ensuring that the control room remains habitable following a small line break outside the containment.

From a control room habitability aspect, the worst case accident that does not initiate a Containment Isolation - Phase B signal is the small line break outside the containment. This response time includes radiation monitor processing delays associated with the monitor averaging techniques. Diesel Generator starting and sequence loading delays are not included since these delays occur prior to the control room environment exceeding the high radiation setpoint.

Response time may be verified by actual response time tests in any series of sequential, overlapping or total channel measurements, or by the summation of allocated sensor, signal processing and actuation logic response times with actual response time tests on the remainder of the channel. Allocations for sensor response times may be obtained from: (1) historical records based on acceptable response time 'tests (hydraulic, noise, or power interrupt tests), (2) in place, onsite, or offsite (e.g., vendor) test measurements, or (3) utilizing vendor engineering specifications. WCAP-13632-P-A Revision 2, "Elimination of Pressure Sensor Response Time Testing Requirements" provides the basis and methodology for using allocated sensor response times in the overall verification of the channel response time for specific sensors identified in the WCAP. Response time verification for other sensor types must be demonstrated by test.

WCAP-14036-P-A Revision 1, "Elimination of Periodic Protection Channel Response Time Tests" and WCAP-15413, "Westinghouse 7300A ASIC-Based Replacement Module Licensing Summary Report" provide the basis and methodology for using allocated signal processing and actuation logic response times in the overall verification of the protection system channel response time. The allocations for sensor, signal conditioning and actuation logic response times must be verified prior to placing the component in operational service and re-verified following maintenance that may adversely affect response time. In general, electrical repair work does not impact response time provided the parts used for repair are of the same type and value. Specific components identified in the WCAP may be replaced without verification testing. One example where response time could be affected is replacing the sensing assembly of a transmitter.

WCAP-15413 provides bounding response times where 7300 cards have been replaced with ASICs cards.

BEAVER VALLEY - UNIT 2 B 3/4 3-3 Amendment No.147

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

The Engineered Safety Feature Actuation System interlocks perform the following functions:

P-4 Reactor tripped - Actuates turbine trip, closes main feedwater valves on Tavg below setpoint, prevents the opening of the main feedwater valves which were closed by a safety injection or high steam generator water level signal, allows safety injection block so that components can be reset or tripped.

Reactor not tripped - prevents manual block of safety injection.

P-11 Above the setpoint, P-11 automatically reinstates safety injection actuation on low pressurizer pressure, automatically blocks steamline isolation on high steam pressure rate, and enables safety injection and steamline isolation (with Loop Stop Valve Open) on low steamline pressure. Below the setpoint, P-11 allows the manual block of safety injection actuation on low pressurizer pressure, allows manual block of safety injection and steamline isolation (with Loop Stop Valve Open) on low steamline pressure and enables steamline isolation on high steam pressure rate.

P-12 Above the setpoint, P-12 automatically reinstates an arming signal to the steam dump system. Below the setpoint P-12 blocks steam dump and allows manual bypass of the steam dump block to cooldown condenser dump valves.

Table 3.3-1 Action 2 has been modified by two notes. Note (4) allows placing the inoperable channel in the bypass condition for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> while performing: a) routine surveillance testing of other channels, and b) setpoint adjustments of other channels when required to reduce the setpoint in accordance with other techniical specifications. The 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> time limit is justified in accordance with WCAP-10271-P-A, Supplement 2, Revision 1, June 1990. Note (5) only requires SR 4.2.4 to be performed if a Power Range High Neutron Flux channel input to QPTR becomes inoperable. Failure of a component in the Power Range High Neutron Flux channel which renders the High Neutron Flux trip function inoperable may not affect the capability to monitor QPTR. As such, determining QPTR using the movable incore detectors once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> may not be necessary.

BEAVER VALLEY - UNIT 2 B 3/4 3-4 Amendment No. 147

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

The following discussion pertains to Table 3.3-3, Functional Units 6.b and 6.c and the associated ACTION 34. The degraded voltage protection instrumentation system will automatically initiate the separation of the offsite power sources from the emergency buses.

This action results in an automatic diesel generator start signal being generated as a direct result of the supply breakers opening between the normal and emergency buses. The failure of the degraded voltage protection system results in a loss of one of the automatic start signals for the diesel generator. Therefore, the ACTION statement requires the affected diesel generator to be declared inoperable if the required actions cannot be met within the specified time period.

The instrumentation functions that receive input from neutron detectors are modified by a note stating that neutron detectors are excluded from the CHANNEL CALIBRATION. The CHANNEL CALIBRATION for the power range neutron detectors consists of a normalization of the detectors based on a power calorimetric and flux map performed above 15% RATED THERMAL POWER. The power range neutron detector CHANNEL CALIBRATION is performed every 18 months but is not required for entry into MODE 2 or 1 on unit startup because the unit must be in at least MODE 1 to perform the test. The neutron detector CHANNEL CALIBRATION for the source range and intermediate range detectors consists of obtaining detector characteristics and performing an engineering evaluation of those characteristics. The intermediate range neutron detector CHANNEL CALIBRATION is performed every 18 months but is not required for entry into MODE 2 on unit startup because the unit must be in at least MODE 2 to perform the test. The source range neutron detector CHANNEL CALIBRATION is performed every 18 months but is not required for entry into MODE 2 or 3 on unit shutdown because the unit must be in at least MODE 3 to perform the test. The P-6 permissive neutron detector CHANNEL CALIBRATION is performed in conjunction with the intermediate range neutron detectors. The overtemperature AT, P-8, P-9 and P-10 permissive neutron detector CHANNEL CALIBRATIONS are performed in conjunction with the power range neutron detectors.

Source Range Neutron Flux The limiting condition for operation (LCO) requirement for the source range neutron flux trip function ensures that protection is provided against an uncontrolled rod cluster control assembly (RCCA) bank rod withdrawal accident from a subcritical condition during startup with the reactor trip breakers (RTBs) closed. This trip function provides redundant protection to the Power Range Neutron Flux-Low Setpoint and Intermediate Range Neutron Flux trip functions (see UFSAR Section BEAVER VALLEY - UNIT 2 B 3/4 3-5 Amendment No.147

3/4.3 INSTRUMENTATION BASES.

3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued) 15.4.1). In MODES 3, 4, and 5, with the RTBs closed, administrative controls also prevent the uncontrolled withdrawal of rods. The nuclear instrumentation system (NIS) source range detectors are located external to the reactor vessel and measure neutrons leaking from the core. The NIS source range detectors do not provide any inputs to control systems. In Modes 3, 4, and 5, with the reactor trip breakers closed, the source range detectors provide an automatic trip function with a setpoint in the shutdown range and the intermediate range detectors provide an automatic trip function with a setpoint in the power range. Therefore, the functional capability at the specified trip setpoint is assumed to be available.

The LCO requires two channels of source range neutron flux to be OPERABLE when the RTBs are closed. Two OPERABLE channels are sufficient to ensure no single random failure will disable this trip function. The LCO also requires one channel of the source range neutron flux to be OPERABLE in MODE 3, 4, or 5 with RTBs open. In this case, the source range function is to provide control room indication and the high flux at shutdown alarm. The outputs of the function to RTS logic are not required OPERABLE when the RTBs are open.

The source range neutron flux function provides protection for control rod withdrawal from subcritical, boron dilution and control rod ejection events. The function also provides visual neutron flux indication in the control room.

In MODE 2 when below the P-6 setpoint during a reactor startup, the source range neutron flux trip must be OPERABLE. Above the P-6 setpoint, the Intermediate Range Neutron Flux trip and Power Range Neutron Flux-Low Setpoint trip will provide core protection for reactivity accidents. Above the P-6 setpoint, the NIS source range detectors are de-energized and not functional.

In MODE 3, 4, or 5 with the reactor shut down and with the control rod drive (CRD) system capable of rod withdrawal, the source range neutron flux trip function must also be OPERABLE. If the CRD system is not capable of rod withdrawal, the source range detectors are not required to trip the reactor. However, their monitoring function must be OPERABLE to monitor core neutron levels and provide indication of reactivity changes that may occur as a result of events like a boron dilution.

BEAVER VALLEY - UNIT 2 B 3/4 3-6 Amendment No. 147

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

Suitable detectors used in place of primary source range neutron flux monitors are recognized as alternate detectors. Alternate detectors may be used in place of primary source range neutron flux monitors as long as the required neutron flux indication, high flux at shutdown alarm, and source range high neutron flux trip functions are provided.

Note' (8) limits the use of alternate detectors to a monitoring function until a plant design change can provide the capability for directly connecting these detectors into the source range circuits so they can provide the required alarm and trip functions.

ACTION 4 Item (a) applies to one inoperable source range neutron flux trip channel when in MODE 2, below the P-6 setpoint, and performing a reactor startup. With the unit in this condition, below P-6, the NIS source range performs the, monitoring and protection functions. With one of the two channels inoperable, operations involving positive reactivity additions shall be suspended immediately.

This will preclude any power escalation. With only one source range channel OPERABLE, core protection is severely reduced and any actions that add positive reactivity to the core must be suspended immediately.

Item (b) applies to one inoperable source range neutron flux trip channel when in MODE 3, 4, or 5, with the RTBs closed and the CRD system capable of rod withdrawal. With the unit in this condition, the NIS source range performs the monitoring and protection functions. With one of the source range channels inoperable, 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is allowed to restore it to OPERABLE status. If the channel cannot be returned to an OPERABLE status, 1 additional hour is allowed to open the RTBs. Once the RTBs are open, rod withdrawal is not possible and the unit enters ACTION 5. The allowance of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to restore the channel to OPERABLE status, and the additional hour to open the RTBs, are justified in WCAP-10271-P-A, Supplement 2, Rev. 1, June 1990.

Item (c) applies to two inoperable source range neutron flux trip channels when in MODE 2, below the P-6 setpoint, and performing a reactor startup, or in MODE 3, 4, or 5 with the RTBs closed and the CRD system capable of rod withdrawal. With the unit in this condition, below P-6, the NIS source range performs the monitoring and protection functions. With both source range channels inoperable, the RTBs must be opened immediately. With the RTBs open, rod withdrawal is not possible and the unit enters ACTION 5.

BEAVER VALLEY - UNIT 2 B 3/4 3-7 Amendment No. 147

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

ACTION 5 This ACTION applies when the required number of OPERABLE source range neutron flux channels is not met in MODE 3, 4, or 5 with the RTBs open. With the unit in this condition, the NIS source range performs the monitoring function. With less than the required number of source range channels OPERABLE, operations involving positive reactivity additions shall be suspended immediately. This will preclude any power escalation. However, a note applicable to this ACTION allows plant cooldown as long as the shutdown margin is adequate to account for the positive reactivity addition resulting from the temperature change. This ensures the core is controlled and the shutdown margin requirements are satisfied for all applicable events. In addition to suspension of positive reactivity additions, the valves that control the addition of unborated water to the RCS must be closed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The isolation of unborated water sources will preclude a boron dilution accident.

Also, the shutdown margin (SDM) must be verified within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter as per SR 4.1.1.1.1 or 4.1.1.2, SDM verification. With no source range channels OPERABLE, core protection is severely reduced. Verifying the SDM within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allows sufficient time to perform the calculations and determine that the SDM requirements are met. The SDM must also be verified once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter to ensure that the core reactivity has not changed. Item (a) precludes any positive reactivity additions; therefore, core reactivity should not be increasing, and a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> frequency is adequate. This does not include xenon decay which is accounted for in the shutdown margin surveillance. The completion times of within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> are based on operating experience in performing the ACTIONS and the knowledge that unit conditions will change slowly.

SOURCE RANGE NEUTRON FLUX SURVEILLANCE REQUIREMENTS (SR)

CHANNEL CHECK The alternate source range detectors are modified by a note to indicate they are not subject to the source range detector surveillance requirements until they have been connected to the applicable circuits and are required to be OPERABLE. This complies with the testing requirements for components that are required to be OPERABLE.

BEAVER VALLEY - UNIT 2 B 3/4 3-8 Amendment No.147

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

Performance of the CHANNEL CHECK once every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> ensures that gross failure of instrumentation has not occurred. A CHANNEL CHECK is a comparison of the parameter indicated on one channel to a similar parameter on other channels. It is based on the assumption that instrument channels monitoring the same parameter should read approximately the same value. Significant deviations between the two instrument channels could be an indication of excessive instrument drift in one of the channels or of something even more serious. A CHANNEL CHECK for a single channel involves a qualitative assessment of the channel indication to verify the channel is operating in the approximate range for the expected plant conditions. A CHANNEL CHECK will detect gross channel failure; thus, it is key to verifying that the instrumentation continues to operate properly between each CHANNEL CALIBRATION.

Agreement criteria are determined by the unit staff based on a combination of the channel instrument uncertainties, including indication and readability. If a channel is outside the match criteria, it may be an indication that the sensor or the signal processing equipment has drifted outside its limit.

The frequency is based on operating experience that demonstrates channel failure is rare. Thus, performance of the CHANNEL CHECK ensures that undetected overt channel failure is limited to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

The CHANNEL CHECK supplements less formal, but more frequent, checks of channels during normal operational use of the displays associated with the LCO required channels.

When the control rods are fully inserted and are not capable of withdrawal, inadvertent control rod withdrawal is not a concern and one source range detector can adequately monitor the core.

CHANNEL FUNCTIONAL TEST The alternate source range detectors are modified by a note to indicate they are not subject to the source range detector surveillance requirements until they have been connected to the applicable circuits and are required to be OPERABLE. This complies with the testing requirements for components that are required to be OPERABLE.

A CHANNEL FUNCTIONAL TEST is performed on each required channel to ensure the entire channel will perform the intended function.

Setpoints must be within the Allowable Values. The frequency of 92 days is justified for certain channels in WCAP-10271-P-A, Supplement 2, Rev. 1, June 1990.

BEAVER VALLEY - UNIT 2 B 3/4 3-9 Amendment No. 147

3/4.3 INSTRUMENTATION BASES 3/4.3.1 and 3/4.3.2 REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION (Continued)

This surveillance is modified by a Note that specifies testing when below P-6 and is clarified to address the transition from MODE 2 to MODE 3. A transition into MODE 3 with the reactor trip breakers closed is often made for a short period of time during plant shutdown. During a normal shutdown, the reactor trip breakers are opened shortly after entering MODE 3. The transition time in MODE 3 from when the reactor trip breakers are closed to when they are opened is less than the time required to perform the CHANNEL FUNCTIONAL TEST prior to entering MODE 3. Therefore, an allowance to enter MODE 3 without first performing the source range CHANNEL FUNCTIONAL TEST is warranted.

When performing the CHANNEL FUNCTIONAL TEST for manual initiation functions, the injection of a simulated signal into the channel as close to the primary sensor as practicable is accomplished by manually operating the function's manual switch(es).

CHANNEL CALIBRATION The alternate source range detectors are modified by a note to indicate they are not subject to the source range detector surveillance requirements until they have been connected to the applicable circuits and are required to be OPERABLE. This complies with the testing requirements for components that are required to be OPERABLE.

A CHANNEL CALIBRATION is performed every 18 months, or approximately at every refueling. The CHANNEL CALIBRATION for the source range neutron detectors consists of obtaining the detector plateau and preamp discriminator curves, evaluating those curves, and establishing detector operating conditions as directed by the detector manufacturer. The 18 month frequency is based on the need to perform this surveillance under the conditions that apply during a plant outage since performance at power is not possible. The protection and monitoring functions are also calibrated at an 18 month frequency as is normal for reactor protection instrument channels. Operating experience has shown these components usually pass the surveillance when performed on the 18 month frequency.

SLAVE RELAY TESTING The slave relay test frequency can be extended to once per 12 months provided a satisfactory contact loading analysis has been completed and a satisfactory slave relay service life has been established for the slave relay being tested. The frequency of 12 months is justified in WCAP-15887-NP, Revision 2, dated December 2002.

BEAVER VALLEY - UNIT 2 B 3/4 3-10 Amendment No. 147 l

3/4.3 INSTRUMENTATION BASES 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.1 RADIATION MONITORING INSTRUMENTATION The OPERABILITY of the radiation monitoring channels ensures that:

1) the radiation levels are continually measured in the areas served by the individual channels; 2) the alarm or automatic action is initiated when the radiation level trip setpoint is exceeded; and
3) sufficient information is available on selected plant parameters to monitor and assess these variables following an accident. This capability is consistent with the recommendations of NUREG-0737, "Clarification of TMI Action Plan Requirements," October, 1980.

A "recently" irradiated fuel assembly is fuel that has occupied part of a critical reactor core within the previous 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />.

3/4.3.3.2 (This Specification number is not used.)

3/4.3.3.3 (This Specification number is not used.)

3/4.3.3.4 (This Specification number is not used.)

3/4.3.3.5 REMOTE SHUTDOWN INSTRUMENTATION The OPERABILITY of the remote shutdown instrumentation ensures that sufficient capability is available to permit shutdown and maintenance of HOT STANDBY of the facility from locations outside of the control room. This capability is required in the event control room habitability is lost and is consistent with General Design Criteria 19 of 10 CFR 50.

3/4.3.3.6 (This Specification number is not used).

3/4.3.3.7 (This Specification number is not used).

3/4.3.3.8 ACCIDENT MONITORING INSTRUMENTATION The OPERABILITY of the accident monitoring instrumentation ensures that sufficient information is available on selected plant parameters to monitor and assess these variables during and following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97, "Instrumentation for Light-Water-Cooled Nuclear Plants to Assess Plant Conditions During and Following an Accident," December 1975 and NUREG-0578, "TMI-2 Lessons Learned Task Force Status Report and Short-Term Recommendations."

BEAVER VALLEY - UNIT 2 B 3/4 3-11 Amendment No. 147