Letter Sequence Other |
---|
TAC:MC4546, Changes to Section 5.0, Administrative Controls, Removal of Monthly Operating Report and Occupational Radiation Exposure Report (Open) TAC:MC4547, Changes to Section 5.0, Administrative Controls, Removal of Monthly Operating Report and Occupational Radiation Exposure Report (Open) |
|
MONTHYEARML0427204482004-09-20020 September 2004 Cycle 12 (U2C12) 12-Month Steam Generator Inspection Report Project stage: Request ML0427904822004-09-28028 September 2004 Duke Energy Corporation, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Project stage: Request ML0509101512005-03-31031 March 2005 Tech Spec Pages for Amendment Nos. 222 and 217, TS Revisions to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Project stage: Other ML0507004922005-03-31031 March 2005 License Amendment Nos. 222 and 217, TS Revisions to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Project stage: Other ML0507002032005-04-0606 April 2005 RAI, SG Tube IST Reports for End-of-Cycle 12 Refueling Outage (Tac No. MC4545) Project stage: RAI ML0511204592005-04-22022 April 2005 Unit 2 - Response to Request for Information Regarding Steam Generator (SG) Inspection Reports from Unit 2 Cycle 12 Project stage: Response to RAI ML0518107112005-07-0808 July 2005 Ltr., SG ISI Reports Summary for Cycle 12 (Tac No. MC4545) Project stage: Other ML0522300542005-08-11011 August 2005 Notice of Meeting with Firstenergy Nuclear Operating Company Beaver Valley Unit 1 and 2 Extended Power Uprate Small-Break Loss-Of-Coolant Accident Analyses (TAC No. MC4545 and MC4546) Project stage: Meeting ML0520803432005-08-11011 August 2005 Federal Register, Notice of Consideration of Issuance of Amendments to Facility Operating Licenses for Extended Power Uprate (EPU) and Opportunity for Hearing (TACs MC4545 and MC4546 Project stage: Other ML0531101892005-11-0707 November 2005 11/30/2005, Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), ET Al., Regarding Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2), Extended Power Uprate Project stage: Meeting ML0531201042005-11-0808 November 2005 11/30/05 Revised Forthcoming Meeting with Firstenergy Nuclear Operating Company, Regarding Beaver Valley Units 1 and 2 Extended Power Uprate Project stage: Meeting ML0606002062006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) Project stage: Withholding Request Acceptance ML0605902302006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0605901912006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) Project stage: Withholding Request Acceptance 2005-03-31
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000413/20230042024-02-0202 February 2024 Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20234012023-03-0101 March 2023 Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22319A0942022-11-10010 November 2022 EN 56219 - Flowserve. 10 CFR Part 21 Report 38878-8 Solenoid Valve at Duke, Catawba Flowserve Evaluation 105 IR 05000414/20220032022-10-31031 October 2022 Integrated Inspection Report 05000414/2022003 and 05000414/2022003 IR 05000413/20224022022-10-28028 October 2022 Security Baseline Inspection Report 05000413 2022402 and 05000414 2022402 ML22297A2642022-10-25025 October 2022 Project Manager Assignment ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22303A0052022-10-24024 October 2022 EN 56178 - Tioga Final. LTR-TP-22-29 2021 10CFR Part 21 Improper Notification of NRC ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22231B1362022-09-0101 September 2022 Review of the Draft Environmental Assessment and Findings of No Significant Impact for Catawba Nuclear Station, H.B. Robinson Steam Electric Plant, and Oconee Nuclear Station Independent Spent Fuel Storage Installation Decommissioning Fundi ML22303A0042022-08-31031 August 2022 Final Report Notification Pursuant to 10 CFR Part 21.21, Regarding Supply of 6 NPS Sch. 40 Seamless Stainless-Steel Pipe; Manufacturer: Maxim Tubes Company Pvt. Ltd.; Heat No: N200309AW01, SR No: 7; 9 Pcs; 180 Feet Total Procured as Unquali IR 05000413/20220052022-08-26026 August 2022 Updated Inspection Plan for Catawba Nuclear Station, Units 1 and 2 - NRC Inspection Report 05000413/2022005 and 05000414/2022005 ML22217A0792022-08-0303 August 2022 301, Corporate Notification Letter (210-day Ltr) IR 05000413/20220022022-07-29029 July 2022 Integrated Inspection Report 05000413/2022002 and 05000414/2022002 IR 07200045/20220012022-07-26026 July 2022 Operation of an Independent Spent Fuel Storage Installation Report 07200045/2022001 ML22215A2502022-07-25025 July 2022 EN 55960 - Update - Curtiss Wright IR 05000413/20220102022-07-21021 July 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010 ML22195A2432022-07-19019 July 2022 Request for Withholding Information from Public Disclosure Regarding Reactor Vessel Closure Head Repair Alternative ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22199A2552022-07-0606 July 2022 Ds Catawba 2022 RQ Inspection Notification Letter ML22222A0092022-07-0101 July 2022 EN 55974 - Flowserve, Part 21 Report Re Solenoid Coil Failure of Model 38878-8 Solenoid Valve at Catawba Nuclear Station for Use on FWIV Actuator ML22175A0342022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403 ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22111A3572022-05-16016 May 2022 Letter Issuing Exemption to Catawba IR 05000414/20220012022-04-28028 April 2022 Integrated Inspection Report 05000413/ 2022001 and 05000414/2022001 2024-02-02
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22276A2492022-10-25025 October 2022 Completion of License Renewal Commitment No. 10, Aging Management of Environmentally Assisted Fatigue ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 ML21224A1012021-10-0707 October 2021 Issuance of Amendments to Revise the Technical Specification for Engineered Safety Feature Actuation System Instrumentation ML21155A2132021-08-26026 August 2021 Plant ML21131A0262021-06-23023 June 2021 Issuance of Amendments to Change Technical Specification 3.8.1, to Reduce Emergency Diesel Generator Maximum Voltage ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20174A0452020-08-0404 August 2020 Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits ML19296D1192020-01-31031 January 2020 Issuance of Amendment Nos. 305 and 301 to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability ML19212A6552019-08-27027 August 2019 Issuance of Amendment Nos. 304 and 300 to Technical Specification 3.8.1, AC Sources - Operating ML19121A5512019-06-17017 June 2019 Issuance of Amendments Related to the Removal of Containment Valve Injection Water System Supply from Specified Containment Isolation Valves ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18275A2782018-11-28028 November 2018 Issuance of Amendments Related to the Nuclear Service Water System New Condition for Single Pond Return Header Configuration ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML17296A2082018-01-0404 January 2018 Issuance of Amendments Adopting Technical Specifications Task Force Traveler TSTF-197-A, Revision 2 (CAC Nos. MF8971 & MF8972, EPID L-2016-LLA-0026) ML17254A1442017-10-23023 October 2017 Issuance of Amendments Adopting Technical Specifications Task Force Traveler TSTF-352-A, Revision 1 (CAC Nos. MF8969 and MF8970; EPID L-2017-LLA-0031) ML17257A2972017-10-23023 October 2017 Issuance of Amendment Nos. 295 and 291, Adoption of TSTF-340-A, Revision 3, Allow 7-Day Completion Time for a Turbine-Driven AFW Pump Inoperable (CAC Nos. MF8979 and MF8980; EPID L-2017-LLA-0043) ML17261B2902017-10-23023 October 2017 Issuance of Amendment Nos. 296 and 292, Adopt TSTF-142-A, Revision 0, Increase the Completion Time When the Core Reactivity Balance Is Not within Limit (CAC Nos. MF8962 and MF8963); EPID L-2017-LLA-0024 ML17249A1352017-09-29029 September 2017 Issuance of Amendments Adopting Technical Specifications Task Force Travelers TSTF-349-A, Revision 1, TSTF-361-A, Revision 2, and TSTF-438-A, Revision 0 ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17172A4282017-07-26026 July 2017 Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-315-A, Revision 0 ML17144A0342017-06-19019 June 2017 Correction Letter to Amendment Nos. 287 and 283 National Fire Protection Association Standard NFPA 805 ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16137A3082017-02-0808 February 2017 Issuance of Amendments Regarding National Fire Protection Association Standard NFPA 805 ML16229A1132016-09-12012 September 2016 Issuance of Amendments Regarding Extension of the Containment Integrated Leak Rate Test Intervals ML16159A3362016-07-19019 July 2016 Issuance of Amendments Regarding Request to Use an Alternate Fission Gas Gap Release Fraction (CAC Nos. MF6480 Through MF6486) ML16174A0722016-06-27027 June 2016 Correction to License Pages Issuance of Amendments Regarding Adoption of TSTF-523 (Cac Nos. MF6413 Through MF6422) ML16105A3262016-06-21021 June 2016 Issuance of Amendments Regarding Use of Optimized Zirlo ML16124A6942016-06-0202 June 2016 Issuance of Amendments Regarding Changes to Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML16085A1132016-04-29029 April 2016 1 & 2; Shearon Harris Nuclear Power Plant 1; Catawba Nuclear Station 1 & 2; Mcguire Nuclear Station 1 & 2; and Oconee Nuclear Station 1, 2, & 3: Issuance of Amendments Regarding Adoption of TSTF-523 (CAC Nos. MF6413-MF6422) ML16081A3332016-04-29029 April 2016 Issuance of Amendments Regarding Measurement Uncertainty Recapture Power Uprate ML16075A3012016-04-26026 April 2016 Issuance of Amendments Regarding the Revision of the Steam Generator Technical Specifications to Reflect the Adoption of TSTF-510(CAC Nos. MF6139,MF6140,MF6141,MF6142,MF6143,MF6144. ML16082A0382016-04-18018 April 2016 Issuance of License Amendment Regarding Emergency Action Level Scheme Change ML16067A2292016-04-0808 April 2016 Issuance of Amendments Regarding Removal of Obsolete Technical Specification Requirements ML15320A3332015-12-18018 December 2015 Issuance of Amendments Regarding Non-Conservative Technical Specifications Allowable Value ML15133A4532015-06-11011 June 2015 McGuire Nuclear Station, Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Cyber Security Plan Implementation Schedule Milestone 8 ML15063A2712015-04-14014 April 2015 Issuance of Amendments Technical Specification 3.1.3, Moderator Temperature Coefficient and TS 5.6.5, Core Operating Limits Report. ML15027A3662015-03-25025 March 2015 Issuance of Amendments DPC-NE-3001-P, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology ML15002A3242015-02-12012 February 2015 McGuire Nuclear Station, and Oconee Nuclear Station - Issuance of Amendments Regarding Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Areas ML14056A2172014-02-27027 February 2014 Issuance of Amendments Regarding Exigent License Amendment Request to Revise Technical Specification 3.3.4, Remote Shutdown System (TAC MF3473&74) ML13169A1392013-08-0909 August 2013 Issuance of Amendments Regarding Technical Specifications Changes for Nuclear Service Water System ML13168A0762013-07-16016 July 2013 Issuance of Amendments Regarding Changes to Technical Specification (TS) 3.6.14, Divider Barrier Integrity (TAC Nos. MF0620, MF0621, Mf 0626 and MF0627) ML12166A0222012-07-25025 July 2012 Issuance of Amendments Regarding Deletion of Superseded Technical Specification Requirements Following Implementation of the Emergency Core Cooling System Water Management Initiative 2023-08-29
[Table view] Category:Safety Evaluation
MONTHYEARML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22213A2532022-08-31031 August 2022 Authorization and Safety Evaluation for Alternative Request RA-21-0144 to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method ML22164A0362022-07-19019 July 2022 Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 ML22007A3452022-01-11011 January 2022 Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21266A0112021-10-0505 October 2021 Staff Evaluation Related to Aging Management Program and Inspection Plan of Reactor Vessel Internals Per MRP-227, Revision 1-A ML21253A0822021-09-20020 September 2021 Proposed Alternative Request RA-21-0145 to Use Reactor Vessel Head Penetration Embedded Flaw Repair Method ML21155A2132021-08-26026 August 2021 Plant ML21131A0262021-06-23023 June 2021 Issuance of Amendments to Change Technical Specification 3.8.1, to Reduce Emergency Diesel Generator Maximum Voltage ML21113A0132021-05-0606 May 2021 Request for Use of a Later Edition of ASME Boiler and Pressure Vessel Code, Section XI for Repair and Replacement Activities ML21029A3352021-02-16016 February 2021 Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20300A2062020-11-0909 November 2020 Duke Fleet - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20258A2712020-09-21021 September 2020 Correction Letter to Amendment Nos. 301, 329, 307, 303, 178, 317, 296, 416, 418, 417, and 268 ML20083F9272020-08-12012 August 2020 Issuance of Amendments to Relocate the Unit/Facility/Plant Staff Qualification Requirements to the Duke Energy Quality Assurance Program Description ML20174A0452020-08-0404 August 2020 Issuance of Amendment No. 306 to Revise Technical Specification 3.4.3, RCS (Reactor Coolant System) Pressure and Temperature (P/T) Limits ML19296D1192020-01-31031 January 2020 Issuance of Amendment Nos. 305 and 301 to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability ML19254A6202019-09-17017 September 2019 Duke Energy Fleet (Brunswick, Catawba, Robinson, McGuire, Oconee, and Shearon Harris) - Alternative to Use Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML19212A6552019-08-27027 August 2019 Issuance of Amendment Nos. 304 and 300 to Technical Specification 3.8.1, AC Sources - Operating ML19191A0612019-07-15015 July 2019 Review of the Steam Generator Tube Inservice Inspection Report for the Fall 2018 Refueling Outage 24 ML19058A6322019-07-0101 July 2019 Issuance of Amendments to Revise Emergency Action Level Schemes to Incorporate Clarifications Provided by Emergency Preparedness FAQs ML19128A3262019-06-20020 June 2019 Alternative to Depth Sizing Qualification Examination of Welds ML19121A5512019-06-17017 June 2019 Issuance of Amendments Related to the Removal of Containment Valve Injection Water System Supply from Specified Containment Isolation Valves ML19050A2972019-04-18018 April 2019 McGuire Nuclear Station, Units 1 and 2, Shearon Harris Nuclear Power Plant, Unit 1, H B. Robinson Steam Electric Plant, Unit 2 - Issuance of Amendments Regarding Removal ML18275A2782018-11-28028 November 2018 Issuance of Amendments Related to the Nuclear Service Water System New Condition for Single Pond Return Header Configuration ML18172A1722018-08-15015 August 2018 Issuance of Amendments to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application ML18016A1782018-01-24024 January 2018 Request for Relief No. 17-CN-001, Regarding Category B-J Pressure Retaining Welds for the Third 10-Year Inservice Testing Interval (CAC Nos. MF9807 and MF9808; EPID L-2017-LLA-0032) ML17296A2082018-01-0404 January 2018 Issuance of Amendments Adopting Technical Specifications Task Force Traveler TSTF-197-A, Revision 2 (CAC Nos. MF8971 & MF8972, EPID L-2016-LLA-0026) ML17331A0862017-12-26026 December 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads ML17261B2902017-10-23023 October 2017 Issuance of Amendment Nos. 296 and 292, Adopt TSTF-142-A, Revision 0, Increase the Completion Time When the Core Reactivity Balance Is Not within Limit (CAC Nos. MF8962 and MF8963); EPID L-2017-LLA-0024 ML17257A2972017-10-23023 October 2017 Issuance of Amendment Nos. 295 and 291, Adoption of TSTF-340-A, Revision 3, Allow 7-Day Completion Time for a Turbine-Driven AFW Pump Inoperable (CAC Nos. MF8979 and MF8980; EPID L-2017-LLA-0043) ML17254A1442017-10-23023 October 2017 Issuance of Amendments Adopting Technical Specifications Task Force Traveler TSTF-352-A, Revision 1 (CAC Nos. MF8969 and MF8970; EPID L-2017-LLA-0031) ML17249A1352017-09-29029 September 2017 Issuance of Amendments Adopting Technical Specifications Task Force Travelers TSTF-349-A, Revision 1, TSTF-361-A, Revision 2, and TSTF-438-A, Revision 0 ML17188A3872017-08-21021 August 2017 Issuance of Amendments Regarding Application to Consolidate Emergency Operations Facilities and Associated Emergency Plan Changes (CAC Nos. MF7650 Through MF7660) ML17172A4282017-07-26026 July 2017 Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-315-A, Revision 0 ML17165A4412017-07-21021 July 2017 Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-269-A, Revision 2 (CAC Nos. MF8983 and MF8984). 08/10/2017 ML17055A6472017-05-0808 May 2017 Brunswick, Catawba, McGuire, Shearon Harris, and H. B. Robinson - Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-522, Revision 0 (CAC Nos. MF8422, MF8423, MF8424, MF8425, MF8426, MF8427, MF8428, and MF8429) ML17066A3742017-04-26026 April 2017 Issuance of Amendments Re. Application to Revise TSs to Adopt TSTF-427, Rev. 2, Using the Consolidated Line Item Improvement Process (CAC Nos. MF8039 Through MF8049) ML16137A3082017-02-0808 February 2017 Issuance of Amendments Regarding National Fire Protection Association Standard NFPA 805 ML16277A4042016-10-20020 October 2016 Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML16208A2832016-08-0808 August 2016 Correction to Issuance of Amendments Regarding Use of Optimized Zirlo ML16159A3362016-07-19019 July 2016 Issuance of Amendments Regarding Request to Use an Alternate Fission Gas Gap Release Fraction (CAC Nos. MF6480 Through MF6486) ML16105A3262016-06-21021 June 2016 Issuance of Amendments Regarding Use of Optimized Zirlo ML16124A6942016-06-0202 June 2016 Issuance of Amendments Regarding Changes to Technical Specification 3.4.1, RCS Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits 2023-09-25
[Table view] |
Text
March 31, 2005 Mr. D. M. Jamil Vice President Catawba Nuclear Station Duke Energy Corporation 4800 Concord Road York, SC 29745
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: ELIMINATION OF REQUIREMENTS TO PROVIDE MONTHLY OPERATING REPORTS AND ANNUAL OCCUPATIONAL RADIATION EXPOSURE REPORTS (TAC NOS. MC4546 AND MC4547)
Dear Mr. Jamil:
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 222 to Renewed Facility Operating License NPF-35 and Amendment No. 217 to Renewed Facility Operating License NPF-52 for the Catawba Nuclear Station, Units 1 and 2. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated September 28, 2004.
The amendments revise TSs by eliminating the requirements to submit monthly operating reports and annual occupational radiation exposure reports.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Sean E. Peters, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414
Enclosures:
- 1. Amendment No. 222 to NPF-35
- 2. Amendment No. 217 to NPF-52
- 3. Safety Evaluation cc w/encls: See next page
March 31, 2005 Mr. D. M. Jamil Vice President Catawba Nuclear Station Duke Energy Corporation 4800 Concord Road York, SC 29745
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS RE: ELIMINATION OF REQUIREMENTS TO PROVIDE MONTHLY OPERATING REPORTS AND ANNUAL OCCUPATIONAL RADIATION EXPOSURE REPORTS (TAC NOS. MC4546 AND MC4547)
Dear Mr. Jamil:
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 222 to Renewed Facility Operating License NPF-35 and Amendment No. 217 to Renewed Facility Operating License NPF-52 for the Catawba Nuclear Station, Units 1 and 2. The amendments consist of changes to the Technical Specifications (TSs) in response to your application dated September 28, 2004.
The amendments revise TSs by eliminating the requirements to submit monthly operating reports and annual occupational radiation exposure reports.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Sean E. Peters, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-413 and 50-414
Enclosures:
- 1. Amendment No. 222 to NPF-35
- 2. Amendment No. 217 to NPF-52
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION: See next page Package Number: ML050900464 Amendment Number: ML050700492 Tech Spec Number: ML050910151 NRR-058 OFFICE CLIIP LPM PDII-1/PM PDII-1/LA PDII-1/SC NAME WReckley SPeters CHawes JNakoski DATE 2/14/05 03 / 17 /05 03 / 14 /05 03 / 29 /05 OFFICIAL RECORD COPY
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 RE: ISSUANCE OF AMENDMENTS (TAC NOS. MC4546 AND MC4547)
Date: March 31, 2005 Distribution:
PUBLIC PDII-1 R/F SPeters LOlshan WReckley EHackett JNakoski CHawes OGC ACRS/ACNW GHill (4)
TBoyce RidsRgn2MailCenter DLPM DPR
DUKE ENERGY CORPORATION NORTH CAROLINA ELECTRIC MEMBERSHIP CORPORATION SALUDA RIVER ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-413 CATAWBA NUCLEAR STATION, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 222 Renewed License No. NPF-35
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Catawba Nuclear Station, Unit 1 (the facility) Renewed Facility Operating License No. NPF-35 filed by the Duke Energy Corporation, acting for itself, North Carolina Electric Membership Corporation and Saluda River Electric Cooperative, Inc. (licensees), dated September 28, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-35 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 222, which are attached hereto, are hereby incorporated into this license. Duke Energy Corporation shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: March 31, 2005
DUKE ENERGY CORPORATION NORTH CAROLINA MUNICIPAL POWER AGENCY NO. 1 PIEDMONT MUNICIPAL POWER AGENCY DOCKET NO. 50-414 CATAWBA NUCLEAR STATION, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 217 Renewed License No. NPF-52
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Catawba Nuclear Station, Unit 2 (the facility) Renewed Facility Operating License No. NPF-52 filed by the Duke Energy Corporation, acting for itself, North Carolina Municipal Power Agency No.
1 and Piedmont Municipal Power Agency (licensees), dated September 28, 2004, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Renewed Facility Operating License No. NPF-52 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 217, which are attached hereto, are hereby incorporated into this license. Duke Energy Corporation shall operate the facility in accordance with the Technical Specifications.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: March 31, 2005
ATTACHMENT TO LICENSE AMENDMENT NO. 222 FACILITY OPERATING LICENSE NO. NPF-35 DOCKET NO. 50-413 AND LICENSE AMENDMENT NO. 217 RENEWED FACILITY OPERATING LICENSE NO. NPF-52 DOCKET NO. 50-414 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
Remove Insert 5.6-1 5.6-1 5.6-2 5.6-2 5.6-3 5.6-3 5.6-4 5.6-4 5.6-5 5.6-5
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 222 TO RENEWED FACILITY OPERATING LICENSE NPF-35 AND AMENDMENT NO. 217 TO RENEWED FACILITY OPERATING LICENSE NPF-52 DUKE ENERGY CORPORATION, ET AL.
CATAWBA NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-413 AND 50-414
1.0 INTRODUCTION
By letter dated September 28, 2004, Duke Energy Corporation, et al. (DEC, the licensee),
submitted a request for changes to the Catawba Nuclear Station, Units 1 and 2, Technical Specifications (TS). The application is available in the Agencywide Documents Access and Management System (ADAMS) under Accession No. ML042790482. The requested change would delete TS 5.6.1, "Occupational Radiation Exposure Report," and TS 5.6.4, "Monthly Operating Reports," as described in the Notice of Availability published in the Federal Register on June 23, 2004 (69 FR 35067).
2.0 REGULATORY EVALUATION
Section 182a. of the Atomic Energy Act of 1954, as amended (the "Act"), requires applicants for nuclear power plant operating licenses to state TS to be included as part of the license. The Commissions regulatory requirements related to the content of TSs are set forth in 10 CFR 50.36, "Technical specifications." The regulation requires that TSs include items in five specific categories, including: (1) safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation (LCOs); (3) surveillance requirements; (4) design features; and (5) administrative controls. However, the regulation does not specify the particular requirements to be included in a plants TSs.
The Commission has provided guidance for the content of TSs in its "Final Policy Statement on Technical Specification Improvements for Nuclear Power Reactors" (58 FR 39132, published July 22, 1993), in which the Commission indicated that compliance with the Final Policy Statement satisfies Section 182a. of the Act. The Final Policy Statement identified four criteria to be used in determining whether a particular item should be addressed in the TSs as an LCO.
The criteria were subsequently incorporated into 10 CFR 50.36 (60 FR 36593, published July 19, 1995). While the criteria specifically apply to LCOs, the Commission indicated that the intent of these criteria may be used to identify the optimum set of administrative controls in TSs.
Addressing administrative controls, 10 CFR 50.36 states that they are "the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner." The specific content of the
administrative controls section of the TS is, therefore, related to those programs and reports that the Commission deems essential for the safe operation of the facility, which are not adequately covered by regulations or other regulatory requirements. Accordingly, the Nuclear Regulatory Commission (NRC) staff may determine that specific requirements, such as those associated with this change, may be removed from the administrative controls in the TS if they are not explicitly required by 10 CFR 50.36(c)(5) and are not otherwise necessary to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.
The impetus for the monthly operating report (MOR) came from the 1973-1974 oil embargo.
Regulatory Guide 1.16, Revision 4, "Reporting of Operating Information - Appendix A Technical Specifications," published for comment in August 1975, identifies operating statistics and shutdown experience information that was desired in the operating report at that time. In the mid-1990s, the NRC staff assessed the information that is submitted in the MOR and determined that while some of the information was no longer used by the NRC staff, the MOR was the only source of some data used in the NRC Performance Indicator (PI) Program of that time period (see NRC Generic Letter (GL) 97-02, "Revised Contents of the Monthly Operating Report"). Beginning in the late 1990s, the NRC developed and implemented a major revision to its assessment, inspection, and enforcement processes through its Reactor Oversight Process (ROP). The ROP uses both plant-level PIs and inspections performed by NRC personnel. In conjunction with the development of the ROP, the NRC developed the Industry Trends Program (ITP). The ITP provides the NRC a means to assess overall industry performance using industry level indicators and to report on industry trends to various stakeholders (e.g.,
Congress). Information from the ITP is used to assess the NRCs performance related to its goal of having "no statistically significant adverse industry trends in safety performance." The ITP uses some of the same PIs as the PI Program from the mid-1990s and, therefore, the NRC has a continuing use for the data provided in MORs. The NRC also uses some data from the MORs to support the evaluation of operating experience, licensee event reports, and other assessments performed by the NRC staff and its contractors.
The reporting requirements for the monthly operating report include challenges to the pressurizer power operated relief valves and pressurizer safety valves. The reporting of challenges to the pressurizer power operated relief valves and pressurizer safety valves was included in TSs based on the guidance in NUREG-0694, [Three Mile Island] TMI-Related Requirements for New Operating Licensees. The industry proposed and the NRC accepted the elimination of the reporting requirements in TS for challenges to pressurizer power operated relief valves and pressurizer safety valves in Revision 4 to Technical Specification Task Force (TSTF-258), Changes to Section 5.0, Administrative Controls. The NRC staffs acceptance of TSTF-258 and subsequent approval of plant-specific adoptions of TSTF-258 is based on the fact that the information on challenges to relief and safety valves is not used in the evaluation of the monthly operating report data, and that the information needed by the NRC is adequately addressed by the reporting requirements in 10 CFR 50.73, Licensee event reports.
Licensees are required by TSs to submit annual occupational radiation exposure reports (ORERs) to the NRC. The reports, developed in the mid-1970s, supplement the reporting requirements currently defined in 10 CFR 20.2206, "Reports of individual monitoring," by providing a tabulation of data by work areas and job functions. The NRC included data from the ORERs in its annual publication of NUREG-0713, "Occupational Radiation Exposure at
Commercial Nuclear Power Reactors and Other Facilities," through the year 1997, but no longer includes the data in that or other reports.
3.0 TECHNICAL EVALUATION
3.1 Monthly Operating Reports As previously mentioned, the administrative requirements in TSs are reserved for "the provisions relating to organization and management, procedures, recordkeeping, review and audit, and reporting necessary to assure operation of the facility in a safe manner." The current use of the information from the MORs is not related to reporting on or confirming the safe operation of specific nuclear power plants. Instead, the data is used by the NRC to assess and communicate with stakeholders regarding the overall performance of the nuclear industry. Data related to PIs for specific plants are reported to the NRC as part of the ROP. The NRC staff has determined that the MORs do not meet the criteria defined for requirements to be included in the administrative section of TSs and the reporting requirement may, therefore, be removed.
Although the MORs do not satisfy the criteria for inclusion in TSs, the NRC staff nevertheless has a continuing need to receive the data in order to compile its reports on industry trends and to support other evaluations of operating experience. In addition, information such as plant capacity factors that are reported in the MORs are useful to the NRC staff and are frequently asked for by agency stakeholders.
The NRC staff interacted with licensees, industry organizations, and other stakeholders during the development of the Consolidated Data Entry (CDE) program (currently being developed and maintained by the Institute of Nuclear Power Operation), regarding the use of an industry database like CDE to provide data currently obtained from MORs. These discussions also involved the related Revision 1 to TSTF-369, "Removal of Monthly Operating Report and Occupational Radiation Exposure Report." As described in Section 4.0 of this safety evaluation, the licensee is making a regulatory commitment to continue to provide the data identified in GL 97-02, following the removal of the TS requirement to submit MORs, and will, therefore, continue to meet the needs of the NRC staff for the ITP and other evaluations. The use of an industry database such as CDE is more efficient and cost-effective for both the NRC and licensees than would be having the NRC staff obtain the needed information from other means currently available. Should a licensee fail to satisfy the regulatory commitment to voluntarily provide the information, the NRC could obtain the information through its inspection program (similar to the process described in NRC Inspection Procedure 71150, "Discrepant or Unreported Performance Indicator Data") with the licensee being charged for the time spent by the NRC staff.
The only significant changes resulting from the adoption of TSTF-369 are that the information will be provided quarterly instead of monthly (although the operating data will still be divided by month) and the form of the reporting will be from a consolidated database such as CDE instead of in correspondence from individual licensees. The change of reporting frequency to quarterly has some advantages for both the NRC staff and licensees, since it will coincide with the collection and submission of the ROP PI data. In terms of the specific method used to transmit the data to the NRC, the licensee has committed (see Section 4.0) to provide data identified in GL 97-02 on a quarterly basis. The NRC staff believes that the most efficient process for
licensees and the NRC will be for all licensees to use a system such as CDE. Such systems have advantages in terms of improved data entry, data checking, and data verification and validation. The NRC will recognize efficiency gains by having the data from all plants reported using the same computer software and format. Although the data may be transmitted to the NRC from an industry organization maintaining a database such as CDE, the licensee provides the data for the system and remains responsible for the accuracy of the data submitted to the NRC for its plant. The public will continue to have access to the data through official agency records accessible through ADAMS.
The content requirements for the MOR currently include information on challenges to the pressurizer power operated relief valves and pressurizer safety valves. As discussed in the previous section, the NRC staff has documented in its approval of TSTF-258 and related plant-specific amendments that the reporting of challenges to pressurizer power operated relief valves and pressurizer safety valves may be removed from TSs since the information needed by the NRC is adequately addressed by the reporting requirements in 10 CFR 50.73, Licensee event reports. The NRC staff finds it acceptable to remove the requirement to report challenges to pressurizer power operated relief valves and pressurizer safety valves along with the other reporting requirements associated with the MOR.
3.2 Occupational Radiation Exposure Reports The information that the NRC staff needs regarding occupational doses is provided by licensees in the reports required under 10 CFR Part 20. The data from 10 CFR Part 20 reports are sufficient to support the NRC trending programs, radiation related studies, and preparation of reports such as NUREG-0713. Accordingly, the NRCs limited use of the ORER submitted pursuant to the existing TS requirements no longer warrants the regulatory burden imposed on licensees. Therefore, the NRC staff finds it acceptable that TS 5.6.1 is being deleted and the ORER will no longer be submitted by the licensee.
4.0 VERIFICATIONS AND COMMITMENTS In order to efficiently process incoming license amendment applications, the NRC staff requested each licensee requesting the changes addressed by TSTF-369 using the CLIIP to address the following plant-specific regulatory commitment.
4.1 Each licensee should make a regulatory commitment to provide to the NRC using an industry database the operating data (for each calender month) that is described in Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," by the last day of the month following the end of each calendar quarter. The regulatory commitment will be based on use of an industry database (e.g., the industrys Consolidated Data Entry (CDE) program, currently being developed and maintained by the Institute of Nuclear Power Operations).
The licensee has made a regulatory commitment to provide the requested data via an industry database (e.g., the CDE) by the end of the month following each calendar quarter.
The NRC staff finds that reasonable controls for the implementation and for subsequent evaluation of proposed changes pertaining to the above regulatory commitment(s) can be provided by the licensees administrative processes, including its commitment management program. The NRC staff has agreed that NEI 99-04, Revision 0, "Guidelines for Managing NRC Commitment Changes," provides reasonable guidance for the control of regulatory commitments made to the NRC staff (see Regulatory Issue Summary 2000-17, "Managing Regulatory Commitments Made by Power Reactor Licensees to the NRC Staff," dated September 21, 2000). The NRC staff notes that this amendment establishes a voluntary reporting system for the operating data that is similar to the system established for the ROP PI program. Should the licensee choose to incorporate a regulatory commitment into the final safety analysis report or other document with established regulatory controls, the associated regulations would define the appropriate change-control and reporting requirements.
5.0 STATE CONSULTATION
In accordance with the Commission's regulations, the South Carolina State official was notified of the proposed issuance of the amendments. The State official had no comments.
6.0 ENVIRONMENTAL CONSIDERATION
The amendment relates to changes in recordkeeping, reporting, or administrative procedures or requirements. The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding (69 FR 68182; November 23, 2004). Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
7.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: W. Reckley Date: March 31, 2005