Letter Sequence Request |
---|
TAC:MC4545, Changes to Section 5.0, Administrative Controls, Removal of Monthly Operating Report and Occupational Radiation Exposure Report (Open) TAC:MC4547, Changes to Section 5.0, Administrative Controls, Removal of Monthly Operating Report and Occupational Radiation Exposure Report (Open) |
|
MONTHYEARML0427204482004-09-20020 September 2004 Cycle 12 (U2C12) 12-Month Steam Generator Inspection Report Project stage: Request ML0427904822004-09-28028 September 2004 Duke Energy Corporation, Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Project stage: Request ML0509101512005-03-31031 March 2005 Tech Spec Pages for Amendment Nos. 222 and 217, TS Revisions to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Project stage: Other ML0507004922005-03-31031 March 2005 License Amendment Nos. 222 and 217, TS Revisions to Eliminate Monthly Operating and Annual Occupational Radiation Exposure Reports Project stage: Other ML0507002032005-04-0606 April 2005 RAI, SG Tube IST Reports for End-of-Cycle 12 Refueling Outage (Tac No. MC4545) Project stage: RAI ML0511204592005-04-22022 April 2005 Unit 2 - Response to Request for Information Regarding Steam Generator (SG) Inspection Reports from Unit 2 Cycle 12 Project stage: Response to RAI ML0518107112005-07-0808 July 2005 Ltr., SG ISI Reports Summary for Cycle 12 (Tac No. MC4545) Project stage: Other ML0522300542005-08-11011 August 2005 Notice of Meeting with Firstenergy Nuclear Operating Company Beaver Valley Unit 1 and 2 Extended Power Uprate Small-Break Loss-Of-Coolant Accident Analyses (TAC No. MC4545 and MC4546) Project stage: Meeting ML0520803432005-08-11011 August 2005 Federal Register, Notice of Consideration of Issuance of Amendments to Facility Operating Licenses for Extended Power Uprate (EPU) and Opportunity for Hearing (TACs MC4545 and MC4546 Project stage: Other ML0531101892005-11-0707 November 2005 11/30/2005, Forthcoming Meeting with Firstenergy Nuclear Operating Company (Fenoc), ET Al., Regarding Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2), Extended Power Uprate Project stage: Meeting ML0531201042005-11-0808 November 2005 11/30/05 Revised Forthcoming Meeting with Firstenergy Nuclear Operating Company, Regarding Beaver Valley Units 1 and 2 Extended Power Uprate Project stage: Meeting ML0606002062006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) Project stage: Withholding Request Acceptance ML0605902302006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0605901912006-03-0202 March 2006 Westinghouse Electric Company, LLC, Request for Withholding Information from Public Disclosure for Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1 and 2) Project stage: Withholding Request Acceptance 2005-03-31
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000369/20240032024-11-0404 November 2024 Integrated Inspection Report 05000369/2024003 and 05000370/2024003 IR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 IR 05000269/20240032024-10-31031 October 2024 Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24303A4212024-10-30030 October 2024 Mcguire Nuclear Station, Units 1 & 2, Notification of an NRC Fire Protection Team Inspection FPTI NRC 05000369/2025010, 05000370/2025010 and Request for Information RFI ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure IR 05000369/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000369/2024402 05000370/2024402 IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) IR 05000369/20240052024-08-26026 August 2024 Updated Inspection Plan for McGuire Nuclear Station, Units 1 and 2, (Report 05000369-2024005 and 05000370-2024005) ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 IR 05000369/20244042024-08-0101 August 2024 Cover Letter Security Baseline Inspection Report 05000369/2024404 and 05000370/2024404 IR 05000369/20253012024-07-29029 July 2024 Notification of Licensed Operator Initial Examination 05000369/2025301 and 05000370/2025301 IR 05000369/20244032024-07-25025 July 2024 – Cyber Security Inspection Report 05000369/2024403 and 05000370/2024403 Rev IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 IR 05000369/20240022024-07-24024 July 2024 Integrated Inspection Report 05000369/2024002 and 05000370/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000369/20244012024-07-0303 July 2024 – Security Baseline Inspection Report 05000369/2024401 and 05000370/2024401 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station ML24176A2802024-06-26026 June 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000369-2024404 and 05000370-2024404) IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing IR 05000369/20240112024-06-0404 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000369/2024011 and 05000370/2024011 ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation IR 05000369/20240012024-05-0808 May 2024 Integrated Inspection Report 05000369-2024001 and 05000370-2024001 and 07200038-2024001 IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24100A8742024-04-10010 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000369/2024403; and 05000370/2024403 ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) ML24052A3062024-04-0808 April 2024 Issuance of Amendment Nos. 331 & 310, Regarding Adoption of Title 10 of Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24031A5402024-03-26026 March 2024 Issuance of Amendment Nos. 330 and 309 Regarding Implementation of TSTF 505,Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B 2024-09-05
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0245, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2024-06-18018 June 2024 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-24-0136, Subsequent License Renewal Application Third Annual Update to the License Renewal Application and Subsequent License Renewal Application Supplement 52024-05-24024 May 2024 Subsequent License Renewal Application Third Annual Update to the License Renewal Application and Subsequent License Renewal Application Supplement 5 RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable ML24110A0382024-04-30030 April 2024 – Correction to Issuance of Amendment Nos. 330 and 309, Regarding Implementation of Technical Specifications Task Force (TSTF) Traveler TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-22-0292, License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-04-0404 April 2023 License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies RA-18-0090, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-02-17017 February 2023 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-18-0190, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-02-16016 February 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-22-0285, Subsequent License Renewal - Appendix E Environmental Report Supplement 22022-11-0707 November 2022 Subsequent License Renewal - Appendix E Environmental Report Supplement 2 RA-22-0157, Subsequent License Renewal Application First Annual Amendment to the License Renewal Application and Subsequent License Renewal Application Supplement 42022-06-0707 June 2022 Subsequent License Renewal Application First Annual Amendment to the License Renewal Application and Subsequent License Renewal Application Supplement 4 RA-22-0057, License Amendment Request to Address Technical Specifications Mode Change Limitations2022-03-31031 March 2022 License Amendment Request to Address Technical Specifications Mode Change Limitations RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0320, License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2021-12-20020 December 2021 License Amendment Request (LAR) to Revise the Applicability Term for Pressure and Temperature Limit Curves of Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-21-0316, Subsequent License Renewal Application Supplement 32021-12-15015 December 2021 Subsequent License Renewal Application Supplement 3 RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-21-0297, Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 12021-11-11011 November 2021 Subsequent License Renewal Application, Appendix E, Environmental Report Supplement 1 RA-21-0288, Subsequent License Renewal Application Supplement 22021-11-11011 November 2021 Subsequent License Renewal Application Supplement 2 RA-21-0249, Subsequent License Renewal Application Supplement 12021-10-28028 October 2021 Subsequent License Renewal Application Supplement 1 RA-21-0005, Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis2021-09-0202 September 2021 Application to Revise Technical Specification 3.7.7, Low Pressure Service Water (LPSW) System, to Extend the Completion Time for One Required Inoperable LPSW Pump on a Temporary Basis RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RA-19-0039, License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes2020-04-13013 April 2020 License Amendment Request to Revise Technical Specifications to Adopt Two NRC-Approved Generic Technical Specification Changes RA-19-0144, License Amendment Request for Measurement Uncertainty Recapture Power Uprate2020-02-19019 February 2020 License Amendment Request for Measurement Uncertainty Recapture Power Uprate RA-20-0011, Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process2020-02-0606 February 2020 Application for Technical Specifications Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process RA-18-0156, Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability2019-09-0404 September 2019 Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability RA-19-0253, Proposed License Amendment Request to Revise the Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of the Containment Building2019-08-28028 August 2019 Proposed License Amendment Request to Revise the Oconee Nuclear Station Current Licensing Basis for High Energy Line Breaks Outside of the Containment Building RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0036, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2019-07-0101 July 2019 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-18-0136, License Amendment Request Proposing a Revised Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, ...2018-11-0101 November 2018 License Amendment Request Proposing a Revised Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, ... RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System2018-10-29029 October 2018 (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2018-10-0808 October 2018 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating RA-18-0026, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Sections Associated with the Oconee Tornado Licensing Basis2018-09-14014 September 2018 Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Sections Associated with the Oconee Tornado Licensing Basis CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing RA-18-0015, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.2018-07-10010 July 2018 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating. RA-18-001, McGuire Nuclear Station, Units 1 and 2 - Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating.2018-07-10010 July 2018 McGuire Nuclear Station, Units 1 and 2 - Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating. MNS-18-001, Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable2018-05-31031 May 2018 Application to Revise Technical Specifications to Adopt TSTF-234-A Revision 1, Add Action for More than One Dpri Inoperable RA-18-0023, License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources2018-05-17017 May 2018 License Amendment Request (2017-05) to Add a Surveillance Requirement to Technical Specification 3.8.1, AC Sources RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications MNS-18-017, Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs2018-02-26026 February 2018 Non-Voluntary License Amendment Request (LAR) to Correct Non-Conservative Technical Specification 3.4.11 - PORVs MNS-17-026, Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles2017-12-0808 December 2017 Submittal of License Amendment Request Proposing to Revise the Bases for Protection from Tornado-Generated Missiles RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing ONS-2017-074, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-032017-10-20020 October 2017 Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-03 MNS-17-031, License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition2017-09-14014 September 2017 License Amendment Request for Temporary Changes to Technical Specifications to Address an 'A' Train Nuclear Service Water System (Nsws) Non-Conforming Condition CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time2017-09-14014 September 2017 License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time 2024-06-18
[Table view] |
Text
I Duke WILLIAM RMCCOLLUM, JR.
rEPowere VP, Nuclear Support Duke Energy Corporation A Duke Energy Company Duke Power EC07H / 526 South Church Street Charlotte, NC 28202-1802 Mailing Address:
P. 0. Box 1006 - EC07H Charlotte, NC 28201-1006 September 28, 2004 704 382 8983 704 382 6056 fax U. S. Nuclear Regulatory Commission wrmccoll@duke-energy.com Washington, D. C. 20555 ATTENTION: Document Control Desk
SUBJECT:
Duke Energy Corporation Oconee Nuclear Station Docket Nos. 50-269, 50-270, and 50-287 McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Catawba Nuclear Station Docket Nos. 50-413 and 50-414 Application for Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports In accordance with the provisions of Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), Duke Energy Corporation (Duke) is submitting a request for an amendment to the Technical Specifications (TS) for Oconee Nuclear Station, Units 1, 2, and 3; McGuire Nuclear Station, Units 1 and 2; and Catawba Nuclear Station, Units 1 and 2.
The proposed amendment would delete the TS requirements to submit monthly operating reports and occupational radiation exposure reports. The change is consistent with NRC-approved Revision 1 to Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-369, "Removal of Monthly Operating Report and Occupational Radiation Exposure Report." The availability of this TS improvement was announced in the Federal Register on June 23, 2004 (69 FR 35067), as part of the Consolidated Line Item Improvement Process (CLIIP).
Attachment 1 provides a description of the proposed change and confirmation of applicability. Attachment 2 provides the existing TS pages marked-up to show the proposed change.
www. dukepower. corn
U. S. Nuclear Regulatory Commission September 28, 2004 Page 2 Duke requests approval of the proposed license amendment by February 1, 2005, with the amendment being implemented within the NRC's standard 30-day grace period.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated officials of the State of North Carolina and the State of South Carolina.
This submittal document contains regulatory commitments regarding implementation of this LAR and confirmation of the reactor types as required by the CLIIP. These commitments are discussed in detail in Section 6.1 of Attachment 1.
Inquiries on this matter should be directed to J. S. Warren at 704-875-5171.
Very truly yours, William R. McCollum, Jr.
Attachments: - Description and Assessment Attachments 2a, 2b, and 2c - Proposed Technical Specifications Changes (Mark-up) for Oconee, McGuire, and Catawba, Respectively
U. S. Nuclear Regulatory Commission September 28, 2004 Page 3 xc w/Attachments:
W. D. Travers U. S. Nuclear Regulatory Commission Regional Administrator, Region II San Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 L. N. Olshan (Addressee Only)
NRC Senior Project Manager (Oconee)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 J. J. Shea (Addressee Only)
NRC Project Manager (McGuire)
U. S. Nuclear Regulatory Commission Mail Stop 0-7 D11 Washington, DC 20555-0001 S. E. Peters (Addressee Only)
NRC Project Manager (Catawba)
U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 M. C. Shannon Senior Resident Inspector U. S. Nuclear Regulatory Commission Oconee Nuclear Site J. B. Brady Senior Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Site E. F. Guthrie Senior Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Site
U. S. Nuclear Regulatory Commission September 28, 2004 Page 4 Beverly 0. Hall, Section Chief Radiation Protection Section 1645 Mail Service Center Raleigh, NC 27699-1645 H. J. Porter, Director Division of Radioactive Waste Management South Carolina Bureau of Land and Waste Management 2600 Bull Street Columbia, SC 29201
U. S. Nuclear Regulatory Commission September 28, 2004 Page 5 William R. McCollum, Jr., affirms that he is the person who subscribed his name to the foregoing statement, and that all the matters and facts set forth herein are true and correct to the best of his knowledge.
William R. McCollum, Jr., Vice Pr ent, Nuclear Support Subscribed and sworn to me: Y>c Date
, Notary Public My commission expires: 3/f/ -c2 Date SEAL- .-
I ., _
ATTACHMENT 1 Description and Assessment
1.0 INTRODUCTION
The proposed license amendment deletes the requirements in Technical Specification (TS) 5.6.1 for an annual report on occupational radiation exposures and TS 5.6.4 for a monthly report of operating statistics and shutdown experience.
The changes are consistent with NRC approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-369, "Removal of Monthly Operating Report and Occupational Radiation Exposure Report," Revision 1. The availability of this Technical Specification improvement was announced in the Federal Register on June 23, 2004 (69 FR 35067), as part of the Consolidated Line Item Improvement Process (CLIIP).
2.0 DESCRIPTION
OF PROPOSED AMENDMENT Consistent with the NRC-approved Revision 1 of TSTF-369, the proposed TS changes include:
Deleted - TS 5.6.1, Occupational Radiation Exposure Report Deleted - TS 5.6.4, Monthly Operating Reports As addressed in the safety evaluation (SE) published in the Notice of Availability for TSTF-369, Duke is proposing to adopt a part of NRC-approved Revision 4 to TSTF-258, "Changes to Section 5.0, Administrative Controls," for McGuire Nuclear Station, Units 1 and 2; and Catawba Nuclear Station, Units 1 and 2. Specifically, McGuire and Catawba TS 5.6.4 include a requirement to include in the monthly operating reports any challenges to the pressurizer power operated relief valves or pressurizer safety valves. The NRC model SE addressed the removal of requirements to submit monthly operating reports in those cases where the TS include a requirement to address challenges to relief and safety valves (i.e., if a licensee had not yet adopted the associated part of TSTF-258). The proposed change is consistent with the option described in the Notice of
Attachment 1 Availability published on June 23, 2004 (69 FR 35067), and the related documentation for both TSTF-369 and the limited portion of TSTF-258 included in this application.
3.0 BACKGROUND
The background for this application is adequately addressed by the NRC Notice of Availability published on June 23, 2004 (69 FR 35067), and TSTF-369.
4.0 REGULATORY REQUIREMENTS AND GUIDANCE The applicable regulatory requirements and guidance associated with this application are adequately addressed by the NRC Notice of Availability published on June 23, 2004 (69 FR 35067), and TSTF-369.
5.0 TECHNICAL ANALYSIS
Duke has reviewed the SE published on June 23, 2004 (69 FR 35067), as part of the CLIIP Notice of Availability. This verification included a review of the NRC Staff's SE and the supporting information provided to support TSTF-369.
Duke has concluded that the justifications presented in the TSTF proposal and the SE prepared by the NRC staff are applicable to Oconee Units 1, 2, and 3; McGuire Units 1 and 2; and Catawba Units 1 and 2, and justify this amendment for the incorporation of the changes to the Oconee, McGuire, and Catawba TS.
6.0 REGULATORY ANALYSIS
A description of this proposed change and its relationship to applicable regulatory requirements and guidance was provided in the NRC Notice of Availability published on June 23, 2004 (69 FR 35067), and TSTF-369.
2
Attachment 1 6.1 Verification and Commitments As discussed in the model SE published in the Federal Register on June 23, 2004 (69 FR 35067), for this TS improvement, Duke is making the following regulatory commitments:
- 1. Duke is making a regulatory commitment to provide to the NRC using an industry database the operating data (for each calendar month) that is described in Generic Letter 97-02, "Revised Contents of the Monthly Operating Report," by the last day of the month following the end of each calendar quarter. The regulatory commitment will be based on use of an industry database (e.g., the industry's Consolidated Data Entry (CDE) Program, currently being developed and maintained by the Institute of Nuclear Power Operations). This regulatory commitment will be implemented to prevent any gaps in the monthly operating statistics and shutdown experience provided to the NRC (i.e., data for all months will be provided using one or both systems (monthly operating reports and CDE)).
- 2. The Oconee Site, the McGuire Site, nor the Catawba Site does not have different reactor types or both operating and shutdown reactors.
7.0 NO SIGNIFICANT HAZARDS CONSIDERATION Duke has reviewed the proposed no significant hazards consideration determination published on June 23, 2004 (69 FR 35067), as part of the CLIIP. Duke has concluded that the proposed determination presented in the notice is applicable to Oconee, McGuire, and Catawba and the determination is hereby incorporated by reference to satisfy the requirements of 10 CFR 50.91(a).
8.0 ENVIRONMENTAL EVALUATION Duke has reviewed the environmental evaluation included in the model SE published on June 23, 2004 (69 FR 35067), as part of the CLIIP. Duke has concluded that the Staff's 3
Attachment 1 findings presented in that evaluation are applicable to Oconee, McGuire, and Catawba and the evaluation is hereby incorporated by reference for this application.
9.0 PRECEDENT This application is being made in accordance with the CLIIP. Duke is not proposing variations or deviations from the TS changes described in TSTF-369 and the limited portion of TSTF-258 or the NRC Staff's model SE published on June 23, 2004 (69 FR 35067).
10.0 REFERENCES
Federal Register Notice: Notice of Availability of Model Application Concerning Technical Specifications Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports Using the Consolidated Line Item Improvement Process, published June 23, 2004 (69 FR 35067).
4
,; I Attachment 2a Oconee Units 1, 2, and 3 Proposed Technical Specifications Changes (Mark-up)