Category:Letter
MONTHYEARIR 05000413/20240032024-11-0404 November 2024 Integrated Inspection Report 05000413/2024003 and 05000414/2024003 ML24297A6222024-10-11011 October 2024 PCA Letter to NRC Catawba Hurricane Helene IR 05000413/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000413/2024011 and 05000414/2024011 ML24255A8312024-09-23023 September 2024 Project Manager Assignment ML24261B9782024-09-19019 September 2024 Notification of an NRC Fire Protection Team Inspection NRC Inspection Report 05000413-2024010, 05000414-2024010 and Request for Information IR 05000414/20240912024-09-0505 September 2024 Final Significance Determination of a White Finding and Nov and Assessment Followup Letter-NRC Inspection Report 05000414-2024091 IR 05000413/20240052024-08-26026 August 2024 Updated Inspection Plan for Catawba Nuclear Station (Report 05000413/2024005 & 05000414/2024005) ML24235A1542024-08-22022 August 2024 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000413-2024402 and 05000414-2024402) IR 05000413/20240022024-08-0808 August 2024 Integrated Inspection Report 05000413-2024002 and 05000414-2024002 and Apparent Violation IR 05000413/20244032024-08-0101 August 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000413/2024403; 05000414/2024403 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24178A0552024-06-26026 June 2024 Requalification Program Inspection – Catawba Nuclear Station IR 05000414/20240902024-06-24024 June 2024 NRC Inspection Report 05000414/2024090 and Preliminary White Finding and Apparent Violation ML24170A8632024-06-11011 June 2024 Flowserve June 11, 2024, Part 21 Notification - Redacted Version for Publishing ML24144A1162024-05-28028 May 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24149A1772024-05-28028 May 2024 NRC Response to Duke Energy 2025 FOF Schedule Change Request (Catawba and McGuire) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000413/20240012024-05-10010 May 2024 Integrated Inspection Report 05000413/2024001 and 05000414/2024001 and Apparent Violation ML24095A1072024-04-0808 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report (C1R27) IR 05000413/20243012024-03-12012 March 2024 – Notification of Licensed Operator Initial Examination 05000413/2024301 and 05000414/2024301 ML24017A0652024-03-0808 March 2024 Issuance of Amendment Nos. 319 and 315 to Technical Specification 3.7.11, Control Room Area Chill Water System (Cracws) 05000414/LER-2024-001, Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan2024-03-0404 March 2024 Condition Prohibited by Technical Specifications and Loss of Safety Function Due to Failed Damper Controller for the 2A1 Emergency Diesel Generator Room Ventilation Fan IR 05000413/20230062024-02-28028 February 2024 Annual Assessment Letter for Catawba Nuclear Station Units 1 and 2 - (NRC Inspection Report 05000413/2023006 and 05000414/2023006) IR 05000413/20230042024-02-0202 February 2024 – Integrated Inspection Report 05000413-2023004 and 05000414-2023004 ML24005A2512024-01-26026 January 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230102023-10-11011 October 2023 NRC Inspection Report 05000413/2023010 and 05000414/2023010 ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000413/20230052023-08-25025 August 2023 Updated Inspection Plan for Catawba Nuclear Station Units 1 and 2 (Report 05000413/2023005 and 05000414/2023005) ML23233A1692023-08-17017 August 2023 EN 56683 - Curtiss Wright, Interim Notification Report for PotentialPurt2l IR 05000413/20230022023-07-25025 July 2023 Integrated Inspection Report 05000413/2023002 and 05000414/2023002 ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23237A2672023-06-13013 June 2023 June 13, 2002 - Meeting Announcement - McGuire and Catawba Nuclear Stations 50-369, 50-370 and 50-413, 50-414 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined IR 05000413/20230012023-05-0505 May 2023 – Integrated Inspection Report 05000413/2023001 and 05000414/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000413/20230112023-04-25025 April 2023 Focused Engineering Inspection Report 05000413/2023011 and 05000414/2023011 ML23107A2542023-04-14014 April 2023 301 Examination Report Letter and Report (Merged) ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000413/20234012023-03-0101 March 2023 – Security Baseline Inspection Report 05000413 2023401 and 05000414 2023401 IR 05000413/20220062023-03-0101 March 2023 Annual Assessment Letter for Catawba Nuclear Station, Units 1 and 2 (NRC Inspection Report 05000413/2022006 and 05000414/2022006) IR 05000413/20233012023-02-17017 February 2023 Operator Licensing Examination Approval 05000413/2023301 and 05000414/2023301 IR 05000413/20220042023-01-31031 January 2023 Integrated Inspection Report 05000413/2022004 and 05000414/2022004 05000414/LER-2022-003, Manual Reactor Trip and Auxiliary Feedwater System Actuation2022-12-23023 December 2022 Manual Reactor Trip and Auxiliary Feedwater System Actuation IR 05000413/20220112022-12-15015 December 2022 Biennial Problem Identification and Resolution Inspection Report 05000413/2022011 and 05000414/2022011 ML22356A0512022-12-14014 December 2022 Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl 05000414/LER-2022-002, Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination2022-12-0606 December 2022 Indications Identified During Reactor Vessel Head Penetration Embedded Flaw Repair Surface Examination ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations IR 05000413/20224032022-11-17017 November 2022 Cyber Security Inspection Report 05000413/2022403 and 05000414/2022403 (Public) 2024-09-05
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARRA-23-0245, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2024-06-18018 June 2024 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-23-0028, Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable2024-05-23023 May 2024 Application to Revise Technical Specifications to Adopt TSTF-234-A, Revision 1, Add Action for More than One (D)Rpi Inoperable ML23188A0732023-07-0707 July 2023 Acceptance of Requested Licensing Action License Amendment Application to Revise Control Room Cooling Technical Specifications RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-22-0091, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2023-02-16016 February 2023 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RA-22-0118, License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies2023-02-0101 February 2023 License Amendment Request to Revise Restrictive Technical Specification Surveillance Requirement Frequencies RA-21-0302, Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition2022-02-24024 February 2022 Application to Revise Technical Specifications to Adopt TSTF-569, Rev. 2, Revise Response Time Testing Definition RA-20-0107, Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-01-18018 January 2022 Duke Energy Progress, LLC, and Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position RA-21-0197, William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility2021-12-14014 December 2021 William, Units 1 and 2, License Amendment Request to Relocate the Duke Energy Emergency Operations Facility RA-19-0043, Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO2021-06-0909 June 2021 Duke Energy - Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO RA-18-0156, Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability2019-09-0404 September 2019 Administrative License Amendment Request Proposing to Revise Technical Specification 3.0, Surveillance Requirement (SR) Applicability RA-19-0006, License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description2019-07-0808 July 2019 License Amendment Application to Relocate Technical Specification Unit/Facility Staff Qualification ANSI N18.1-1971, ANSI/ANS-3.1-1978 and ANSI/ANS-3.1-1981 Requirements to the Duke Energy Corporation Quality Assurance Program Description RA-18-0036, License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits2019-07-0101 July 2019 License Amendment Request Proposing to Revise Technical Specification 3.4.3, RCS Pressure and Temperature (P/T) Limits RA-18-0198, (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System2018-10-29029 October 2018 (Cns), Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System RA-18-0094, Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating2018-10-0808 October 2018 Supplement to License Amendment Request Proposing Changes to Catawba and McGuire Technical Specification 3.8.1, AC Sources - Operating CNS-18-008, License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing2018-07-19019 July 2018 License Amendment Request to Remove the Containment Valve Injection Water System Supply from Specified Containment Isolation Valves and to Exempt These CIVs from Type-C Local Leak Rate Testing RA-18-000, Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications2018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications ML18130A8072018-05-10010 May 2018 Duke Energy Progress, LLC and Duke Energy Carolinas, LLC - Submittal of License Amendment Application to Remove Heaters from Ventilation System Technical Specifications RA-17-0005, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2017-11-0707 November 2017 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing CNS-17-014, License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time2017-09-14014 September 2017 License Amendment Request to Revise Technical Specification Section 3.7.8, Nuclear Service Water System, to Add a New Condition to Allow Single Pond Return Header Operation of the Nsws with a 30-Day Completion Time ML17165A4412017-07-21021 July 2017 Issuance of Amendments Adopting Technical Specification Task Force Traveler TSTF-269-A, Revision 2 (CAC Nos. MF8983 and MF8984). 08/10/2017 RA-17-0035, Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating.2017-07-20020 July 2017 Supplement to License Amendment Request Proposing Changes to Technical Specification 3.5.1, AC Sources - Operating. RA-17-0001, Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules2017-07-18018 July 2017 Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules ML17122A1162017-05-0202 May 2017 Catawba and McGuire - License Amendment Request Proposing Changes to Technical Specification 3.8.1, AC Sources - Operating. RA-16-0028, Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers2016-12-15015 December 2016 Application to Revise Technical Specifications to Adopt Multiple Technical Specification Task Force Travelers RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces2016-09-27027 September 2016 Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process CNS-16-030, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants - LAR Supplement to Address ...2016-06-15015 June 2016 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants - LAR Supplement to Address ... RA-16-0021, License Amendment Request Proposing an Updated Final Safety Analysis Report Revision to Reflect Electrical Power Systems Alignments for Shared Systems2016-05-26026 May 2016 License Amendment Request Proposing an Updated Final Safety Analysis Report Revision to Reflect Electrical Power Systems Alignments for Shared Systems CNS-16-014, License Amendment Request (LAR) to Adopt National Fire Protection (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, LAR Submittal to Correct a Legacy Submittal Discrepancy And.2016-03-23023 March 2016 License Amendment Request (LAR) to Adopt National Fire Protection (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants, LAR Submittal to Correct a Legacy Submittal Discrepancy And. CNS-16-015, Technical Specification Bases Changes2016-02-18018 February 2016 Technical Specification Bases Changes CNS-16-001, License Amendment Request (LAR) to Revise Technical Specifications (TS) Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2016-01-18018 January 2016 License Amendment Request (LAR) to Revise Technical Specifications (TS) Section 5.5.2, Containment Leakage Rate Testing Program for Permanent Extension of Type a and Type C Leak Rate Test Frequencies CNS-15-101, License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants2015-12-11011 December 2015 License Amendment Request (LAR) to Adopt National Fire Protection Association (NFPA) 805 Performance-Based Standard for Fire Protection for Light-Water Reactor Generating Plants RA-15-0020, License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding2015-08-20020 August 2015 License Amendment Request and 10 CFR 50.12 Exemption Request for Use of Optimized Zirlo Fuel Rod Cladding RA-15-001, Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Foot2015-07-15015 July 2015 Catawba, McGuire, and Oconee - License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footn RA-15-0013, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 112015-07-15015 July 2015 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3, Footnote 11 ML15175A4472015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 5 of 6 ML15175A4482015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 6 of 6 ML15175A4392015-06-24024 June 2015 Duke Energy Carolinas, LLC, Application to Revise Technical Specifications to Adopt TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 1 of 6 ML15175A4422015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 3 of 6 ML15175A4452015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 4 of 6 RA-15-0006, Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 62015-06-24024 June 2015 Application to Revise Technical Specifications to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process. Part 2 of 6 CNS-15-058, Proposed Technical Specifications (TS) Amendments, TS 3.4.1, Reactor Coolant System (RCS) Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits2015-06-12012 June 2015 Proposed Technical Specifications (TS) Amendments, TS 3.4.1, Reactor Coolant System (RCS) Pressure, Temperature, and Flow Departure from Nucleate Boiling (DNB) Limits ML15125A1352015-04-30030 April 2015 License Amendment Request to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors, Dated November 2012 CNS-14-128, License Amendment Request for Changes to Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation and TS 3.3.5, Loss of Power Diesel Generator Start Instrumentation Resolution of Operable.2014-11-24024 November 2014 License Amendment Request for Changes to Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation and TS 3.3.5, Loss of Power Diesel Generator Start Instrumentation Resolution of Operable. RA-14-0001, License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area2014-07-21021 July 2014 License Amendment Request to Reflect Changes to Organization, Unit Staff Responsibility, Unit Staff Qualifications, Programs and Manuals, and High Radiation Area CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate2014-06-23023 June 2014 License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate CNS-14-026, Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System.2014-02-17017 February 2014 Exigent License Amendment Request (LAR) to Revise Technical Specification (TS) 3.3.4, Remote Shutdown System. CNS-13-005, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology2013-11-14014 November 2013 License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology ML13032A0332013-01-21021 January 2013 License Amendment Request for Technical Specification (TS) 3.6.14, Divider Barrier Integrity. ML1207600792012-06-25025 June 2012 Issuance of Amendment Deletion of E Bar Definition and Revision to Reactor Coolant System Specific Activity Technical Specifications 2024-06-18
[Table view] |
Text
Duke D.M. JAMIL UW Power. Vice President A Duke Energy Company Duke Power Catawba Nuclear Station 4800 Concord Rd. / CNO1VP York, SC 29745-9635 803 831 4251 803 831 3221 fax February 14, 2005 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION: Document Control Desk
Subject:
Duke Energy Corporation Catawba Nuclear Station Units 1 and 2 Docket Nos. 50-413 and 50-414 License Amendment Request to Eliminate the Requirements for the Hydrogen Recombiners (Technical Specification 3.6.7) and the Requirements for Hydrogen Monitors (Technical Specification 3.3.3), Using the Consolidated Line Item Improvement Process
Reference:
Letter from Duke Energy Corporation to the NRC, same subject, dated May 27, 2004 The reference letter transmitted Duke Energy Corporation (Duke) proposed license amendment request (LAR) for the Facility Operating Licenses and Technical Specifications (TS) for Catawba Nuclear Station Units 1 and 2. The proposed amendment eliminated the TS 3.6.7 requirements for the Hydrogen Recombiners and the TS 3.3.3 requirements for Hydrogen Monitors. Conforming changes were also made to all associated Bases affected by this LAR and these Bases changes were included in the submittal package. The change was consistent with NRC approved Industry/Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler, TSTF-447, Rev. 1 (Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors).
A00(
www. dukepower. corn
U.S. NRC Page 2 February 14, 2005 On April 29, 2004, the NRC issued License Amendments 213 and 207 for Catawba Units 1 and 2, respectively.
Subsequently, on January 13, 2005, the NRC issued License amendment 218 and 212 for Catawba Units 1 and 2, respectively. These amendments modified the TS Table of Contents, TS and Bases for 3.3.3 and the Bases only for 3.6.8. Consequently, these amendments revised the pages contained in the reference letter. The affected pages are being remarked and resubmitted to reflect the currently issued pages.
The resubmittal of the affected TS and Bases pages does not result in changes to the technical discussion associated with the reference letter. Additionally, there are no changes needed to the originally transmitted No Significant Hazards Consideration Analysis or Environmental Analysis.
There are no NRC commitments contained in this letter or its attachment.
Pursuant to 10 CFR 50.91, a copy of this amendment request is being sent to the appropriate State of South Carolina official.
Inquiries on this matter should be directed to A. Jones-Young at (803) 831-3051.
Very truly yours, D. M. Jamil Site Vice President ATTACHMENT
U.S. NRC February 14, 2005 Page 3 D. M. Jamil, being duly sworn, affirms that he is the person who subscribed his name to the foregoing statement, and that all matter~s' and facts set forth herein are true and correct to the best of his knowledge.
Subscribed and sworn to me:
_, Notary Public My commission expires: 7-/lo- P-o 2-
. . ^SEAL
U.S. NRC February 14,2005 Page 4 xc (with attachments):
W. D. Travers U. S. Nuclear Regulatory Commission Regional Administrator, Region II Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, GA 30303 S. E. Peters NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop 0-8 H12 Washington, DC 20555-0001 E. F. Guthrie Senior Resident Inspector U. S. Nuclear Regulatory Commission Catawba Nuclear Site H. J. Porter Division of Radioactive Waste Management South Carolina Bureau of Land and Waste Management 2600 Bull Street Columbia, SC 29201
ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION and BASES CHANGES (MARK-UP)
7"! ."
TABLE OF CONTENTS (continued) 3.4 REACTOR COOLANT SYSTEM (RCS).... 3.4.1-1 3.4.1 RCS Pressure, Temperature, and Flow Departure from
'Nucleate Boiling (DNB) Limits. .3.4.1-1 3.4.2 ' RCS Minimum Temperature for Criticality ............. ............. 3.4.2-1 3.4.3 RCS Pressure and Temperature (Pt)Limits . . .... 3.4.3-1 3.4.4'. RCS Loops-MODES I and 2 . .3.4.4-1 3.4.5 RCS Loops -MODE 3 ....... '3.4.51 ..
3.4.6 RCS Loops- MODE44 ............... 3.4.6-1 3.4.7 RCS Loops-MODE 5, Loops Filled 3.4.7-1 3.4.8 RCS Loops-MODE 5,'Loops Not Filed. . . 3.4.8-1 3.4.9 , Pressurizer; ;.' .. 3.4.9-1 3.4.10 Pressurizer Safety Valves ..... ;.3.4.10-1 3A.11 Pressurizer Power Operated Relief Valves (PORVs) .. 3.4.11-1 3.4.12 Low Temperature Overpressure Protection (LTOP) System ..... .3.4.12-1 3.4.13 ' RCS Operational LEAKiA.GEE.... 3.4.13-1 3.4.14 RCS Pressure Isolation Valve (PIV) Leakage . ..............................
3.4.14-1 3.4.15 RCS Leakage Detection Instrumentation . ..........................3.4.15-1 3.4.16 RCS Specific Activity ................ ;. 3.4.16-1 3.4.17 RCS Loops-Test Exceptions .... 3.4.17-1 3.4.18 Steam Generator (SG) Tube Integrity . ... 3.4.18-1 I 3.5 'EMERGENCY CORE COOLING SYSTEMS (ECCS) .... 3.5.1-1 3.5.1 Accumulators ............. ... ; ..;.;.;.-.;.3.5.1-1 3.5.2 ECCS-Operating ...... .;.3.5.2-1 3.5.3 ECCS-Shutdown;; .. ;.:
- 3.5.3-1 3.5.4 Refueling Water Storage Tank (RWST) .......................... 3.5.4-1 3.5.5 Seal Injection FIow ;...;. 3.5.5-1 3.6 CONTAINMENT SYSTEMS ................ 3.6.1-1 3.. 1 C.ontainmen
.......... 3.6.1-1 3.6.2 Containment Air Locks ;......., -:3.6.2-1 3.6.3 Containment Isolation Valves . . ................ ..... 3.6.3-1 3.6.4 Containment Pressure ................ . ; 3.6.4-1 3.6.5 Containment Air Temperature ........................ 3.6.5-1 3.6.6 Containment Spray System ........................ 3.6.6-1 3.6.7 do-I- ~sce bn3681 3.6.8 Hydrogen Skimmer System (HSS) 3.3..6. 81 3.6.9 Hydrogen Ignition System (HIS) . .3.6.9-1 3.6.10 Annulus Ventilation System (AVS) . . ..................... 3.6.10-1 3.6.11 Air Return System (ARS) .. 3.6.11-1 3.6.12 Ice Bed ..... -.;; 3.6.12-1 3.6.13 Ice Condenser Doors . ............... .. 3.6.13-1 3.6.14 Divider Barrier Integrity': ...... 3.6.14.1 3.6.15 Containment Recirculatlon Drains . .. ....................;3.6.15-1 3.6.16 Reactor Building ;' . . .................. 3.6.16-1 3.6.17 . Containment Valve Injection Water System (CVIWS) .3.6.17-1 Catawba Units I and 2 -.tli a Amendment Nos; 241aiJ 2l2
TABLE OF CONTENTS B 3.4 REACTOR COOLANT SYSTEM (RCS) (continued)
B 3.4.9 Pressurizer ... .............B 3.4.9-1 B 3.4.10 Pressurizer Safety Valves ............. . . .B 3.4.10-1 B 3.4.11 Pressurizer Power Operated Relief Valves (PORVs) ................ B 3.4.11-1 B 3.4.12 Low Temperature Overpressure Protection (LTOP) System ............ B 3.4.12-1 B 3.4.13 RCS Operational LEAKAGE .................................... . ... B 3.4.13-1 B 3.4.14 RCS Pressure Isolation Valve (PMV) Leakage . .............. B 3.4.14-1 B 3.4.15 RCS Leakage Detection Instrumentation ........................................ B 3.4.15-1 B 3.4.16 RCS Specific Activity . . .............................. B 3.4.16-1 B 3.4.17 RCS Loops-Test Exceptions ........................................ B 3.4.17-1 B 3A.18 Steam Generator (SG) Tube Integrity ............ B 3.4.18-1 B3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B3.5.1 Accumulators . . .B 3.5.1-1 B 3.5.2 . ECCS.Operating ..... B 3.5.2-1 B 3.5.3 ECCS-Shutdown . .... ... B 3.5.3-1 B 3.6.4 Refueling Water Storage Tank (RWST) .B 3.5.4-1 B 3.5.5 Seal Injection FlowB. 3.5.5-1 B3.6 CONTAINMENT SYSTEMS B 3.6.1 Containment ................... B 3.6.1-1 B 3.6.2 Containment Air Locks ................... B 3.6.2-1 B 3.6.3 Containment Isolation Valves ................... B 3.6.341 B 3.6.4 Containment Pressure .................... B 3.6.4-1 B3.6.5 Containment Air Temperature ................... B 3.6.5-1 B 3.6.6 Containment Spray System ................... B 3.6.6-1 B 3.67tr elmb............................ B7-1 ..
B 3.6.8 Hydrogen Skimimer System (HSS) ...................... B 3.6.8-1 B 3.6.9 Hydrogen Ignition System (HIS) ....................... B 3.6.9-1 B 3.6.10 Annulus Ventilation System (AVS) ....................... B 3.6.10-1 B 3.6.11 Air Return System (ARS) ...................... B 3.6.1 1-1 B 3.6.12 Ice Bed ...................... B 3.6.12-1 B 3.6.13 Ice Condenser Doors .:..... B 3.6.13-1 B 3.6.14 Divider Barrier Integrity ..................... B 3.6.14-1 B 3.6.15 Containment Recirculation Drains ..................... B 3.6.1 5-B 3.6.16 Reactor Building ..................... B 3.6.16-1 B 3.6.17 Containment Valve Injection Water System (CViWS) ...................... B 3.6.17-1 B 3.7 PLANT SYSTEMS B 3.7.1 Main Steam Safety Valves (MSSVs) ........................ B 3.7.1-1 B 3.7.2 Main Steam Isolation Valves (MSIVs) ........................ B 3.7.2-1 B 3.7.3 Main Feedwater Isolation Valves (MFIVs), Main Feedwater Control Valves (MFCVs), their Associated Bypass Valves, and the Tempering Valves .......................................... B 3.7.3-1 B 3.7.4 Steam Generator Power Operated Relief Valves (SG PORVs) ....... B 3.7.4-1 B 3.7.5 Auxiliary Feedwater (AFW) System .......................................... B 3.7.5-1 B 3.7.6 Condensate Storage System (CSS) .......................................... B 3.7.6-1 Catawba Units i and 2 li Revision No./
Il PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 The PAM instrumenrtation for each Function in Table 3.3.3-1 shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3.
The Hyr-99 " iJ~s~trFG Wre Aot Fejlrid.n 44D
- --- - JU
ce..q ACTIONS
- -NOTE---
Separate Condition entry is allowed for each Function. I CONDITION REQUIRED ACTION COMPLETION TIME A. One or more Functions A.1 Enter the Condition Immediately with one or more referenced in Table 3.3.3-1 required channels for the channel.
inoperable.
B. One or more Functions B.1 Restore required channel 30 days with one required to OPERABLE status.
channel inoperable.
C. One or more Functions C.1 Restore'required channel 30 days with one required to OPERABLE status.
channel inoperable.
AND Diverse channel OPERABLE.
(continued)
CATAWBA UNITS I AND 2 3.3.3-1 CAAmendment Nos. 2
PAM Instrumentation B 3.3.3 BASES APPLICABILITY (continued)
-ydrog gen-iMterentrequired4e4be PER8LABfEin DCE3E.
i-ACTIONS A Note has been added Inthe ACTIONS to clarify the application of I Completion Time rules. The Conditions of this Specification may be entered Independently for each Function listed on Table 3.3.3-1. When the Required Channels InTable 3.3.3-1 are specified (e.g., on a per steam line, per loop, per SG, etc., basis), then the Condition may be entered separately for each steam line, loop, SG, etc., as appropriate.
The Completion Time(s) of the Inoperable channel(s) of a Function will be tracked separately for each Function starting from the time the Condition was entered for that Function.
A.1 Condition A applies to all PAM instrument Functions. Condition A addresses the situation when one or more required channels for one or more Functions are inoperable. The Required Action is to refer to Table 3.3.3-1 and take the appropriate Required Actions for the PAM instrumentation affected. The Completion Times are those from the referenced Conditions and.Required Actions.
B.1 Condition B applies when one or more Functions have one required channel that is Inoperable. Required Action A.1 requires restoring the inoperable channel to OPERABLE status within 30 days. The 30 day Completion Time is based on operating experience and takes into account the remaining OPERABLE channel, the passive nature of the Instrument (no critical automatic action is assumed to occur from these instruments), and the low probability of an event requiring PAM instrumentation during this interval.
Catawba Units 1 and 2 B 3.3.3-12 Revision No./1
HSS B 3.6.8 BASES.
APPLICABILITY (continued)
-In MODE 3 or 4, both the hydrogen production rate and the total hydrogen produced after a LOCA would be less than that calculated for the DBA LOCA. Also, because of the limited time in these MODES, the probability of an accident requiring the HSS is low. Therefore, the HSS is not required In MODE 3 or 4.
In MODES 5 and 6, the probability and consequences of a LOCA or steam line break (SLB) are reduced due to the pressure and temperature limitations Inthese MODES. Therefore, the HSS Is not required Inthese MODES.
ACTIONS A.1 With one HSS train inoperable, the inoperable train must be restored to OPERABLE status within 30 days. In this Condition, the remaining OPERABLE HSS train Is adequate to perform the hydrogen mixing function. However, the overall reliability Is reduced because a single failure In the OPERABLE train could result in reduced hydrogen mixing capability. The 30 day Completion Time Is based on the availability of the other HSS train, the small probability of a LOCA or SLB occurring (that would generate an amount of hydrogen that exceeds the flammability limit), the amount of time available after a LOCA or SLB (should one occur) for operator action to prevent hydrogen accumulation from exceeding the flammability limit, and the availability of the-hydrogen--
-reembinere and, hydrogen ignitors.
B.1 If an inoperable HSS train cannot be restored to OPERABLE status within the required Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to at least MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The allowed Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is reasonable, based on operating experience, to reach MODE 3 from full power conditions in an orderly manner and without challenging plant systems.
Catawba Units 1 and 2 B 3.6.8-3 Revision No.,