ML050260706
ML050260706 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 10/25/2004 |
From: | Johnson G NRC/RGN-I/DRS/OSB |
To: | Caruso J NRC/RGN-I/DRS/OSB |
Conte R | |
Shared Package | |
ML041450453 | List: |
References | |
Download: ML050260706 (5) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:E-Mail
MONTHYEARML24312A1662024-11-0707 November 2024
[Table view]Request for Additional Information (11/7/2024 E-mail) - LAR to Revise TSs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3 ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24240A1902024-08-12012 August 2024 E-mail (8/12/2024) from R. Reynolds (CEG) to R. Guzman (NRC) - Corrected TS Pages for LAR TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24213A2202024-07-31031 July 2024 Updated Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24197A0092024-07-15015 July 2024 Acceptance Review Determination for LAR to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24008A0592024-01-0808 January 2024 E-mail Dated 1-8-2024 from R. Guzman to R. Reynolds Correct TS Page 204 for License Amendment No. 250 Adoption of TSTF-505 ML24008A2622024-01-0808 January 2024 Acceptance Review Determination for Relief Request I5R-12, Concerning Installation of a FSWOL on RPV Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld ML23268A0022023-09-22022 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-264-A, Revision 0 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23205A2432023-07-19019 July 2023 NRC Staff Follow-up Question on Audit Question 18 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/19/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23207A0762023-07-14014 July 2023 EN 56557 - Update to Part 21 Report Re Potential Defect with Trane External Auto/Stop Emergency Stop Relay Card Pn: XI2650728-06 ML23205A2412023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 6a, 6b, and 6c TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23205A2422023-07-11011 July 2023 NRC Staff Follow-up Comments on Audit Questions 17 and 19 TSTF-505 and 50.69 Regulatory Audit (E-mail Dated 7/11/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7692023-06-14014 June 2023 Draft Audit Results File TSTF-505 and 50.69 (E-mail Dated 6/14/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23209A7672023-06-13013 June 2023 Share File Observations on Response to Question 06 and 22 TSTF-505 and 50.69 (E-mail Dated 6/13/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML23159A0052023-06-0505 June 2023 56557-EN 56557 - Paragon - Redlined ML23149A0012023-05-29029 May 2023 Audit Agenda TSTF-505 and 50.69 (E-mail Dated 5/29/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23142A0222023-05-22022 May 2023 Regulatory Audit Questions (PRA) TSTF-505 and 50.69 (E-mail Dated 5/22/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23118A3882023-04-28028 April 2023 Regulatory Audit Questions TSTF-505 and 50.69 (E-mail Dated 4/28/2023) (EPIDs L-2022-LLA-0185 and L-2022-LLA-0186) ML23104A3472023-04-14014 April 2023 Verbal Authorization for Relief Request I5R-14, Proposed Alternative Associated with N2E Dissimilar Metal Weld Overlay Repair with Laminar Indication ML23093A1782023-04-0303 April 2023 E-mail from T. Loomis to R. Guzman Proposed Alternative to Utilize Specific Provisions of Code Case N-716-3 ML23090A1302023-03-31031 March 2023 Verbal Authorization for Relief Request I5R-11, Proposed Alternative Repair of Recirculation Inlet Nozzle N2E Dissimilar Metal Weld ML23087A2912023-03-28028 March 2023 Request for Additional Information (3/28/2023 E-mail) - Proposed Emergent I5R-11 Alternative Associated with a Weld Overlay on RPV Recirculation Nozzle N2E DM Weld ML23061A0522023-03-0202 March 2023 Request for Additional Information (3/2/2023 E-mail) - Proposed Alternative Associated with a Weld Overlay Repair to the Torus ML23047A3832023-02-15015 February 2023 (2-15-2023 Email from J. Nelson to R. Guzman) Long Island Power Authority and Long Island Lighting Company Request for Threshold Determination ML23033A0142023-02-0202 February 2023 E-mail Dated 2-2-2023 from R.Guzman to R.Reynolds Correction to Error in NMP1 TSTF-505 and 50.69 Audit Plan ML23019A3092023-01-19019 January 2023 Acceptance Review Determination License Amendment Request to Adopt 10 CFR 50.69 Categorization Process ML23019A3032023-01-19019 January 2023 Acceptance Review Determination License Amendment Requets to Adopt TSTF-505 ML23013A3332023-01-13013 January 2023 Acceptance Review Determination Proposed Alternative for Weld Overlay Repair to the Torus ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22314A2262022-11-10010 November 2022 E-mail Dated 11/10/2022 Relief Request Associated with Pump Periodic Verification Tests of Core Spray System Pumps ML22301A0902022-10-28028 October 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-301, Revision 2 ML22252A1522022-09-0909 September 2022 Acceptance Review Determination Partial Adoption of TSTF-568 to Revise TS 3.3.1 for Primary Containment Oxygen Concentration ML22207A0192022-07-26026 July 2022 (E-mail Dated 7/26/2022) Setup of Online Reference Portal for Revision to Alternative Source Term Calculation for MSIV and Non-MSIV Leakage ML22207A0122022-07-26026 July 2022 Acceptance Review Determination Revision to Alternative Source Term Analysis for Containment Leakage ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22194A9412022-07-13013 July 2022 Request for Additional Information Relief Request CS-PR-02 (7/13/2022 e-mail) ML22173A0802022-06-22022 June 2022 E-mail Dated 6/22/2022, Acceptance of Requested License Amendment Request to Revise Surveillance Requirements to Reduce Number of Fast Starts of EDGs ML22075A0362022-03-16016 March 2022 Acceptance Review Determination - Relief Request CS-PR-02 Associated with Pump Periodic Verification Test of Core Spray System Pumps, E-mail Dated 3/16/2022 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 2024-09-06 Category:License-Operator MONTHYEARML24213A1412024-07-31031 July 2024
[Table view]Requalification Program Inspection ML24263A1162024-01-0808 January 2024 Final Qa/Related Forms ML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23257A1732023-09-14014 September 2023 Requalification Program Inspection ML23220A0262023-08-0808 August 2023 Licensed Operator Positive Fitness-for-Duty Test ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21258A3552021-09-16016 September 2021 Requalification Program Inspection ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML19289D0132019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) NMP1L3288, Fitness-for-Duty Response to Request for Information2019-07-0101 July 2019 Fitness-for-Duty Response to Request for Information ML19154A5672019-06-0303 June 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations 2024-07-31 Category:Part 55 Examination Related Material MONTHYEARML24263A1162024-01-0808 January 2024
[Table view]Final Qa/Related Forms ML24002B0852024-01-0202 January 2024 FY24 NMP2 Final QA Forms ML23347A0632023-12-13013 December 2023 NMP1 Retake FY23 Examination Files ML23186A1642023-07-0606 July 2023 Operator Licensing Retake Examination Approval RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23135A1562023-05-15015 May 2023 Final Qa/Related Forms IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 ML23123A0582023-05-0303 May 2023 Final Qa/Related Forms ML23109A0332023-04-19019 April 2023 Senior Reactor and Reactor Operator Initial License Examinations RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21137A1692021-05-17017 May 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21137A2402021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21137A1602021-05-17017 May 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21133A2422021-05-13013 May 2021 Handouts to Applicants (Folder 3) ML21133A1472021-05-13013 May 2021 Final Qa/Related Forms (Folder 1) ML21131A1892021-05-11011 May 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21123A1892021-05-0303 May 2021 Draft Written Examination (Folder 2) ML21123A1982021-05-0303 May 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21123A2412021-04-19019 April 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML21123A2242021-04-19019 April 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21034A4762021-02-0303 February 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21034A4742021-02-0303 February 2021 Handouts to Applicants (Folder 3) ML21033A7962021-02-0202 February 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML21033A5382021-02-0202 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21032A3232021-02-0101 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21032A2812021-02-0101 February 2021 Final Qa/Related Forms (Folder 1) ML21027A2592021-01-27027 January 2021 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML21008A3322021-01-0808 January 2021 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML21008A3542021-01-0808 January 2021 Final Operating Test (Sections a, B, and C) (Folder 3) ML20350B7852020-12-11011 December 2020 Modified Question Source Information (Post 2020 Audit) (Folder 3) ML20120A5582020-04-30030 April 2020 Senior Reactor and Reactor Operator Initial License Examinations ML20105A1762020-04-15015 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Nine Mile Point Nuclear Station, Unit 1 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20055E0092020-01-15015 January 2020 Final Q/A Related Form - Form ES-401-6 (Folder 1) ML20055D8832020-01-15015 January 2020 Final Qa/Related Forms (Folder 1) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19337A5342019-11-29029 November 2019 Operator Licensing Examination Approval ML20055E0122019-10-28028 October 2019 NRC Comments on Draft Licensee-Developed Operating Test ML20055E0152019-10-28028 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20055E0172019-10-28028 October 2019 Nile Mile Point Unit 2 - Draft Written Examination (Folder 2) ML20055E0132019-10-15015 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19151A8132019-05-31031 May 2019 Licensed Operator Positive Fitness-For-Duty Test RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML20055E0202019-04-22022 April 2019 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18333A0182018-11-25025 November 2018 Initial Operator Licensing Operating Test Approval ML18088A7262018-05-21021 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18117A2102018-04-26026 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18088A7172018-03-29029 March 2018 Final Outlines (Folder 3) ML18088A7282018-03-29029 March 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) 2024-01-08 |
Text
From: Gilbert Johnson To: Jgc Date: 10/25/04 1:OOPM
Subject:
Fwd: Checking for duplication of questions between the 2004 NMP-1 and 2 previous exams This is what I did on the NMP exam
From: Gilbert Johnson To: Jgc Date: 10/21/04 3:07PM
Subject:
Checking for duplication of questions between the 2004 NMP-1 and 2 previous exams As you requested, I developed a table (attached) reflecting WA numbers on the 2004,2002 and 2000 NMP-1 written exams. I then compared the WA numbers on the 2004 exam with the other two, looking for duplicate WA numbers.
I found NO duplication of WA numbers between the 2004 and 2002 exams. I found 12 duplicate WA numbers between the 2004 and 2000 exams. I then picked 5 duplicate WA numbers and compared the actual questions from each exam related to the duplicate WA numbers.
I found NO exact duplicate questions between the 2004 and 2000 exams. I found two questions that were similar but were different enough to be considered "modified". The remaining three questions were completely different.
I trust this complies with your request to check for duplication between the current written exam and the previous two written exams
I NMP-1 Exam 11/04 I NMP-1 Exam SeDt 2002 I NMP Exam Julv 2000 I Overlap with 2004 295001 AK3.05 295006 AA2.02 295005 AK2.07 295003 AA2.04 295007 AK2.05 295006 2.4.1 1 295003 2.1.32 295009 AKl.05 295007 AK3.05 295004 AK3.01 295010 AAl.03 295009 AK2.01
.07 295010 AK2.05 295006 AA1.02 295015 AK2.04 295024 EK3.04 295016 AA1.07 295015 AK1.04 295025 EA1.03 295018 AKl.01 295025 EA2.01 295031 EA2.04 295019 AA2.01 295037 EK2.13 295037 EKl.07 295021 2.1.2 295037 EA1.01 295037 EK3.02 295023 AKl.01 500000 EKl.01 500000 2.4.6 295024 EK3.04 295001 AAl.05 295001 AA2.06 295025 EK2.08 295001 AA2.02 295002 AK2.02 295026 EK3.05 295002 AK3.02 295003 AA2.04 295028 2.4.6 295003 AA1.01 295004 AKl.02 295030 2.1.23 295004 AK2.01 295008 AA1.02
.02 295012 AA1.02 I 295022 AA1.02 I 295026 EK2.03 295022 AK1.01
, ~ .01 295026 EK1.01 295036 EA2.02 295029 2.1.30 295028 EA1.01 205000 K5.02 295033 EKl.02 295029 EK3.02 206000 K2.01 295038 2.3.9 295030 EK2.07
11'E'Z OP'P'Z P'E'Z 11'Z.Z L 1'Z.Z 2' C'Z L' C'Z ZE'L'Z