ML042890349
ML042890349 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 10/13/2004 |
From: | NRC/NRR/DLPM |
To: | |
References | |
TAC MC1155 | |
Download: ML042890349 (12) | |
Text
3/4.2 POWER DISTRIBUTION LIMITS 3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE LIMITING CONDITION FOR OPERATION 3.2.1 All AVERAGE PLANAR LINEAR HEAT GENERATION RATES (APLHGRs) for each type of fuel as a function of AVERAGE PLANAR EXPOSURE shall not exceed the limits specified in the CORE OPERATING LIMITS REPORT.
APPLICABILITY: OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or equal to 25W of RATED THERMAL POWER.
ACTION:
With an APLHGR exceeding the limits specified in the CORE OPERATING LIMITS REPORT, initiate corrective action within 15 minutes and restore APLHGR to within the required limits within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.1 All APLHGRs shall be verified to be equal to or less than the limits specified in the CORE OPERATING LIMITS REPORT:
a.- Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.
- b. Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL ROD PATTERN for APLHGR.
HOPE CREEK 3/4 2 -1 Amendment No. 153
POWER DISTRIBUTION LIMITS 3/4.2.3 MINIMUM CRITICAL POWER RATIO LIMITING CONDITION FOR OPERATION 3.2.3 The MINIMUM CRITICAL POWER RATIO (MCPR) shall be equal to or greater than the MCPR limit specified in the CORE OPERATING LIMITS REPORT.
APPLICABILITY: OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER.
ACTION:
- a. With the end-of-cycle recirculation pump trip system inoperable per Specification 3.3.4.2, operation may continue and the provisions of Specification 3.0.4 are not applicable provided that, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, MCPR is determined to be greater than or equal to the EOC-RPT inoperable limit specified in the CORE OPERATING LIMITS REPORT.
- b. With MCPR less than the applicable MCPR limit specified in the CORE OPERATING LIMITS REPORT, initiate corrective action within 15 minutes and restore MCPR to within the required limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.3 MCPR, shall be determined to be equal to or greater than the applicable MCPR limit specified in the CORE OPERATING LIMITS REPORT:
- a. Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.
- b. Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating with a LIMITING CONTROL ROD PATTERN for MCPR.
HOPE CREEK 3/4 2 -3 Amendment No. 153
POWER DISTRIBUTION LIMITS 3/4.2.4 LINEAR HEAT GENERATION RATE LIMITING CONDITION FOR OPERATION 3.2.4 The LINEAR HEAT GENERATION RATE (LHGR) shall not exceed the limit specified in the CORE OPERATING LIMITS REPORT.
APPLICABILITY: OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER.
ACTION:
With the LHGR of any fuel rod exceeding the limit specified in the CORE OPERATING LIMITS REPORT, initiate corrective action within 15 minutes and restore the LHGR to within the limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 25% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.2.4 LHGR's shall be determined to be equal to or less than the limit specified in the CORE OPERATING LIMITS REPORT:
- a. Once within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after THERMAL POWER is greater than or equal to 25% of RATED THERMAL POWER and at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> thereafter.
- b. Initially and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the reactor is operating on a LIMITING CONTROL ROD PATTERN for LHGR.
HOPE CREEK 3/4 2 -5 Amendment No. 153
TABLE 4.3.1.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL OPERATIONAL CHANNEL FUNCTIONAL CHANNEL CONDITIONS FOR WHICH FUNCTIONAL UNIT CHECK TEST CALIBRATION(a) SURVEILLANCE REQUIRED
- a. Neutron Flux - High S(b) W R 2 I NS W R 3 , 4, 5
- b. Inoperative NA W NA 2 , 3, 4, 5
- 2. Average Power Range Monitor(f):
- b. Flow Biased Simulated Thermal Power-Upscale Q W(d)(e),SA,R(h) 1 I
- c. Fixed Neutron Flux -
Upscale S Q w(d),SA 1 I
- d. Inoperative NA Q NA 1, 2, 3, 4, 5
- 3. Reactor Vessel Steam Dome Pressure - High S Q (k) R 1, 2
Low, Level 3 S Q (k) R 1, 2
- 5. Main Steam Line Isolation Valve - Closure NA Q R 1
- 6. This item intentionally blank
- 7. Drywell Pressure - High S Q (k) R 1, 2 HOPE CREEK 3/4 3 -7 Amendment No. 153
TABLE 4.3.1.1-1 (Continued)
REACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL OPERATIONAL CHANNEL FUNCTIONAL CHANNEL CONDITIONS FOR WHICH FUNCTIONAL UNIT CHECK TEST CALIBRATION SURVEILLANCE REQUIRED
- 8. Scram Discharge Volume Water Level - High
- a. Float Switch NA Q R 1, 2, 5(i)
- b. Level Transmitter/Trip Unit S Q(k) R I, 2, 5(i)
- 9. Turbine Stop Valve - Closure NA Q R 1
- 10. Turbine Control Valve Fast Closure Valve Trip System Oil Pressure - Low NA Q R 1
- 11. Reactor Mode Switch Shutdown Position NA R NA 1, 2, 3, 4, 5
- 12. Manual Scram NA W NA 1, 2, 3, 4, 5 (a) Neutron detectors may be excluded from CHANNEL CALIBRATION.
(b) The IRM and SRM channels shall be determined to overlap for at least 1/2 decades during each startup after entering OPERATIONAL CONDITION 2 and the IRM and APRM channels shall be determined to overlap for at least 1/2 decades during each controlled shutdown, if not performed within the previous 7 days.
(c) DELETED (d) This calibration shall consist of the adjustment of the APRM channel to conform to the power values calculated by a heat balance during OPERATIONAL CONDITION 1 when THERMAL POWER 2 25% of RATED THERMAL POWER. Adjust the APRM channel if the absolute difference is greater than 2% of RATED THERMAL POWER.
Any APRM channel gain adjustment made in compliance with Specification 3.2.2 shall not be included in determining the absolute difference.
(e) This calibration shall consist of the adjustment of the APRM flow biased channel to conform to a calibrated flow signal.
(f) The LPRMs shall be calibrated at least once per 1000 effective full power hours (EFPH) using the TIP system.
(g) Verify measured core flow (total core flow) to be greater than or equal to established core flow at the existing recirculation loop flow (APRM % flow).
(h) This calibration shall consist of verifying the 6 +/- 0.6 second simulated thermal power time constant.
(i) This item intentionally blank (j) With any control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
(k) Verify the tripset point of the trip unit at least once per 92 days.
(1) Not required to be performed when entering OPERATIONAL CONDITION 2 from OPERATIONAL CONDITION 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2.
HOPE CREEK 3/4 3 -8 Amendment No. 153
TABLE 4.3.6-1 CONTROL ROD BLOCK INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL OPERATIONAL CHANNEL FUNCTIONAL CHANNEL CONDITIONS FOR WHICH TRIP FUNCTION CHECK TEST CALIBRATION(a) SURVEILLANCE REQUIRED
- 1. ROD BLOCK MONITOR
- a. Upscale NA Q(c) SA 1*
- b. Inoperative NA Q(c) NA 1*
- c. Downscale NA Q(c) SA 1*
- 2. APRM
- a. Flow Biased Neutron Flux -
Upscale NA Q SA 1
- b. Inoperative NA Q NA 1, 2, 5
- c. Downscale NA Q SA 1
- d. Neutron Flux - Upscale, Startup NA Q SA 2, 5
- 3. SOURCE RANGE MONITORS
- a. Detector not full in NA W NA 2, 5
- b. Upscale NA W R 2 ,5
- c. Inoperative NA W NA 2, 5
- d. Downscale NA W R 2, 5
- a. Detector not full in NA W NA 2, 5
- b. Upscale NA W R 2, 5
- c. Inoperative NA W NA 2, 5
- d. Downscale NA W R 2, 5
- a. Water Level-High (Float Switch) NA Q R 1, 2, 5**
- 6. REACTOR COOLANT SYSTEM RECIRCULATION FLOW
- a. Upscale NA Q SA 1
- b. Inoperative NA Q NA 1
- c. Comparator NA Q SA 1
- 7. REACTOR MODE SWITCH SHUTDOWN POSITION NA R(e) NA 3, 4 HOPE CREEK 3/4 3 -60 Amendment No. 153
TABLE 4.3.6-1 (Continued)
CONTROL ROD BLOCK INSTRUMENTATION SURVEILLANCE REQUIREMENTS NOTES:
- a. Neutron detectors may be excluded from CHANNEL CALIBRATION.
- b. DELETED
- c. Includes reactor manual control multiplexing system input.
- d. DELETED
- e. Not required to be performed until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after reactor mode switch is in the shutdown position.
- With THERMAL POWER a 30% of RATED THERMAL POWER.
- With more than one control rod withdrawn. Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.
HOPE CREEK 3/4 3 -61 Amendment No. 153
INSTRUMENTATION SOURCE RANGE MONITORS LIMITING CONDITION FOR OPERATION 3.3.7.6 At least the following source range monitor channels shall be OPERABLE:
- a. In OPERATIONAL CONDITION 2*, three.
- b. In OPERATIONAL CONDITION 3 and 4, two.
APPLICABILITY: OPERATIONAL CONDITIONS 2*, 3 and 4.
ACTION:
- a. In OPERATIONAL CONDITION 2* with one of the above required source range monitor channels inoperable, restore at least 3 source range monitor channels to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. In OPERATIONAL CONDITION 3 or 4 with one or more of the above required source range monitor channels inoperable, verify all insertable control rods to be inserted in the core and lock the reactor mode switch in the Shutdown position within one hour.
SURVEILLANCE REQUIREMENTS 4.3.7.6 Each of the above required source range monitor channels shall be demonstrated OPERABLE by:
- a. Performance of a:
- 1. CHANNEL CHECK at least once per:
a) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in CONDITION 2*, and b) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in CONDITION 3 or 4.
.2. CHANNEL CALIBRATION** at least once per 18 months.
- b. Performance of a CHANNEL FUNCTIONAL TEST at least once per 31 days.
- c. Verifying, prior to withdrawal of control rods, that the SRM count rate is at least 3 cps with the detector fully inserted.
- d. The provisions of Specification 4.0.4 are not applicable for entry into OPERATIONAL CONDITION 2* or 3 from OPERATIONAL CONDITION 1.
- With IRM's on range 2 or below.
- Neutron detectors may be excluded from CHANNEL CALIBRATION.
HOPE CREEK 3/4 3 -88 Amendment No.153
REFUELING OPERATIONS SURVEILLANCE REQUIREMENTS (Continued)
- 2. Verifying the detectors are inserted to the normal operating level, and
- 3. During CORE ALTERATIONS, verifying that the detector of an OPERABLE SRM channel is located in the core quadrant where CORE ALTERATIONS are being performed and another is located in an adjacent quadrant.
- b. Performance of a CHANNEL FUNCTIONAL TEST at least once per 7 days.
- c. Verifying that the channel count rate is at least 3 cps.
- 1. Prior to control rod withdrawal,
- 2. Prior to and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS***, and
- 3. At least once per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s***.
- d. Unless adequate shutdown margin has been demonstrated per Specification 3.1.1, verifying that the RPS circuitry "shorting links" have been removed, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during the time any control rod is withdrawn.**
- Not required for control rods removed per Specification 3.9.10.1 or 3.9.10.2.
- Except as noted in Specifications 3.9.2.d and 3.9.2.e.
HOPE CREEK 3/4 9-4 Amendment No. 153
3/4.3 INSTRUMENTATION BASES 3/4.3.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION The reactor protection system automatically initiates a reactor scram to:
- a. Preserve the integrity of the fuel cladding.
- b. Preserve the integrity of the reactor coolant system.
- c. Minimize the energy which must be adsorbed following a loss-of-coolant accident, and
- d. Prevent inadvertent criticality.
This specification provides the limiting conditions for operation necessary to preserve the ability of the system to perform its intended function even during periods when instrument channels may be out of service because of maintenance. When necessary, one channel may be made inoperable for brief intervals to conduct required surveillance.
The reactor protection system is made up of two independent trip systems. There are usually four channels to monitor each parameter with two channels in each trip system. The outputs of the channels in a trip system are combined in a logic so that either channel will trip that trip system.
The tripping of both trip systems will produce a reactor scram. The system meets the intent of IEEE-279 for nuclear power plant protection systems.
Specified surveillance intervals and surveillance and maintenance outage times have been determined in accordance with NEDC-30851P, "Technical Specification Improvement Analyses for BWR Reactor Protection System," as approved by-the NRC and documented in the SER (letter to T. A. Pickens from A. Thadani dated July 15, 1987). The bases for the trip settings of the RPS are discussed in the bases for Specification 2.2.1.
The measurement of response time at the specified frequencies provides assurance that the protective functions associated with each channel are com-pleted within the time limit assumed in the safety analyses. No credit was taken for those channels with response times indicated as not applicable.
Response time may be demonstrated by any series of sequential, overlapping or total channel test measurement, provided such tests demonstrate the total channel response time as defined. Sensor response time verification may be demonstrated by either (1) inplace, onsite or offsite test measurements, or (2) utilizing replacement sensors with certified response times. Selected sensor response time testing requirements were eliminated based upon NEDO-32291, "System Analyses for Elimination of Selected Response Time Testing Requirements," as approved by the NRC and documented in the SER (letter to R.A. Pinelli from Bruce A. Boger, dated December 28, 1994). The Reactor Protection System Response Times are located in UFSAR Table 7.2-3.
As noted, the SR for the APRM Neutron Flux - Upscale, Setdown channel functional test is not required to be performed when entering OPERATIONAL CONDITION 2 from OPERATIONAL CONDITION 1, since testing of the OPERATIONAL CONDITION 2 required APRM Function cannot be performed in OPERATIONAL CONDITION 1 without utilizing jumpers, lifted leads, or movable links. This allows entry into OPERATIONAL CONDITION 2 if the 7 day frequency is not met per SR 4.0.2. In this event, the SR must be performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2 from OPERATIONAL CONDITION 1. Twelve hours is based on operating experience and in consideration of providing a reasonable time in which to complete the SR.
HOPE CREEK B 3/4 3-1 Amendment No.153
INSTRUMENTATION BASES 3/4.3.5 REACTOR CORE ISOLATION COOLING SYSTEM ACTUATION INSTRUMENTATION The reactor core isolation cooling system actuation instrumentation is provided to initiate actions to assure adequate core cooling in the event of reactor isolation from its primary heat sink and the loss of feedwater flow to the reactor vessel. Specified surveillance intervals and surveillance and maintenance outage times have been determined in accordance with NEDC-30936P-A, "BWR Owners' Group Technical Specification Improvement Methodology (With Demonstration for BWR ECCS Actuation Instrumentation)," Parts 1 and 2 and GENE-770-06-2-A. "Addendum to Bases for Changes to Surveillance Test Intervals and Allowed Out-of-Service Times for Selected Instrumentation Technical Specifications." The safety evaluation reports documenting NRC approval of NEDC-30936P-A and GENE-770-06-2-A are contained in letters to D.
N. Grace from A. C. Thadani dated December 9, 1988 (Part 1), D. N. Grace to C. E. Rossi dated December 9, 1988 (Part 2), and G. J. Beck from C. E. Rossi dated September 13, 1991.
Operation with a trip set less conservative than its Trip Setpoint but within its specified Allowable Value is acceptable on the basis that the difference between each Trip Setpoint and the Allowable Value is an allowance for instrument drift specifically allocated for each trip in the safety analyses.
3/4.3.6 CONTROL ROD BLOCK INSTRUMENTATION The control rod block functions are provided consistent with the requirements of the specifications in Section 3/4.1.4, Control Rod Program Controls and Section 3/4.2 Power Distribution Limits and Section 3/4.3 Instrumentation. The trip logic is arranged so that a trip in any one of the inputs will result in a control rod block.
Operation with a trip set less conservative than its Trip Setpoint but within its specified Allowable Value is acceptable on the basis that the difference between each Trip Setpoint and the Allowable Value is an allowance for instrument drift specifically allocated for each trip in the safety analyses.
As noted, the SR for the Reactor Mode Switch Shutdown Position functional test is not required to be performed until 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after the reactor mode switch is in the shutdown position, since testing of this interlock with the reactor mode switch in any other position cannot be performed without using jumpers, lifted leads, or movable links. This allows entry into OPERATIONAL CONDITIONS 3 and 4 if the 18 month frequency is not met per SR 4.0.2. The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance is based on operating experience and in consideration of providing a reasonable time in which to complete the SR.
3/4.3.7 MONITORING INSTRUMENTATION 3/4.3.7.1 RADIATION MONITORING INSTRUMENTATION The OPERABILITY of the radiation monitoring instrumentation ensures that; (1) the radiation levels are continually measured in the areas served by the individual channels, and (2) the alarm or automatic action is initiated when the radiation level trip setpoint is exceeded; and (3) sufficient information is available on selected plant parameters to monitor and assess these variables following an accident. This capability is consistent with 10 CFR Part 50, Appendix A, General Design Criteria 19, 41, 60, 61, 63 and 64.
HOPE CREEK B 3/4 3-4 Amendment No. 153
INSTRUMENTATION BASES MONITORING INSTRUMENTATION (Continued) 3/4.3.7.2 DELETED 3/4.3.7.3 DELETED 3/4.3.7.4 REMOTE SHUTDOWN MONITORING INSTRUMENTATION AND CONTROLS The OPERABILITY of the remote shutdown monitoring instrumentation and controls ensures that sufficient capability is available to permit shutdown and maintenance of HOT SHUTDOWN of the unit from locations outside of the control room. This capability is required in the event control room habitability is lost and is consistent with General Design Criteria 19 of 10 CFR 50.
3/4.3.7.5 ACCIDENT MONITORING INSTRUMENTATION The OPERABILITY of the accident monitoring instrumentation ensures that sufficient information is available on selected plant parameters to monitor and assess important variables following an accident. This capability is consistent with the recommendations of Regulatory Guide 1.97, "Instrumentation for Light Water Cooled Nuclear Power Plants to Assess Plant Conditions During and Following an Accident," December 1980 and NUREG-0737, "Clarification of TMI Action Plan Requirements," November 1980.
3/4.3.7.6 SOURCE RANGE MONITORS The source range monitors provide the operator with information of the status of the neutron level in the core at very low power levels during startup and shutdown. At these power levels, reactivity additions shall not be made without this flux level information available to the operator. For a discussion of SPIRAL RELOAD and SPIRAL UNLOAD and the associated flux monitoring requirements, see Technical Specification Bases Section 3/4.9.2.
When the intermediate range monitors are on scale, adequate information is available without the SRMs and they can be retracted.
3/4.3.7.7 TRAVERSING IN-CORE PROBE SYSTEM The OPERABILITY of the traversing in-core probe system with the specified minimum complement of equipment ensures that the measurements obtained from use of this equipment accurately represent the spatial neutron flux distribution of the reactor core.
HOPE CREEK B 3/4 3-5 Amendment No. 153