ML042790033
| ML042790033 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/30/2004 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| 3094, EA-03-086, TAC MC2912 | |
| Download: ML042790033 (2) | |
Text
FE-NOC FirstEnergy Nuclear Operating Company SAFEGUARDS INFORMATION 5501 North State Route 2 Oak Harbor. Ohio 43449 Mark B. Bezilla Vice President - Nuclear 419-321-7676 Fax: 419-321-7582 Docket Number 50-346 10 CFR 50.4(b)(4) 10 CFR 73.4 License Number NPF-3 Serial Number 3094 September 30, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Revision to Proposed Physical Security Plan for the Davis-Besse Nuclear Power Station, Unit I (TAC No. MC2912)
Ladies and Gentlemen:
By letter dated April 29, 2004 (letter Serial Number 3051), the FirstEnergy Nuclear Operating Company (FENOC) provided a proposed revision to the Davis-Besse Nuclear Power Station (DBNPS) Physical Security Plan (PSP) as required by NRC Order EA-03-086 dated April 29, 2003. A subsequent FENOC submittal (letter Serial Number 3091) dated September 10, 2004 modified that proposed revision to incorporate the resolution of several Requests for Additional Information that had been issued by the NRC.
On September 21, 2004, the NRC issued correspondence regarding security plan provisions for enhanced Owner Controlled Area (OCA) surveillance and response. The proposed revision to the DBNPS PSP has now been modified to incorporate these enhanced OCA provisions.
Additional PSP changes were made based on requests made by the NRC staff in telephone conference calls on September 21, 22, and 24, 2004. The chapters of the PSP containing revised pages are included with this letter as Attachment 1 and supercede any versions of those chapters previously submitted.
In accordance with I OCFR 73.21, Attachment I to this document has been determined to contain Safeguards Information, and is thereby exempt from public disclosure. If there are any questions concerning this matter, please contact Mr. David R. Kline, Manager-Security, at 419-249-2322.
SAFEGUARDS INFORMATION NOTE: ATTACHMENT I TO TIlS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, THIS PAGE IS DECONTROLLED.
SAFEGUARDS INFORMATION Docket Number 50-346 License Number NPF-3 Serial Number 3094 Page 2 of 2 The statements contained in this submittal, including its associated attachments, are true and correct to the best of my knowledge and belief. I am authorized by the FirstEnergy Nuclear Operating Company to make this submittal. I declare under penalty of perJury that the foregoing is true and correct.
Executed on September 30, 2004.
Very truly yours, 1//s Mark B. Bezilla Vice President, Nuclear GMW/s Attachments:
- 1) Revised Chapters of the DBNPS Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (contains Safeguards Information)
- 2) Commitment List cc: J. L. Caldwell, Regional Administrator, NRC Region III (w/ Attachments)
J. B. Hopkins, DB-I NRC/NRR Senior Project Manager (%v/o Attachment 1)
C. S. Thomas, DB-1 Senior Resident Inspector (wh/o Attachment 1)
D. W. Spaulding, Project Manager, Security Plan Review Team (wv/ Attachments)
Utility Radiological Safety Board (w/o Attachment 1)
SAFEGUARDS INFORMATION NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, THIS PAGE IS DECONTROLLED.