FENOC First Energy Nuclear Operating Company SAFEGUARDS INFORMATION 5501 North State Route 2 Oak Harbor, Ohio 43449 Mark B. Bezilta Vice President - Nuclear 419-321-7676 Fax: 419-321-7582 Docket Number 50-346 10 CFR 50.4(b)(4) 10 CFR 73.4 License Number NPF-3 Serial Number 3091 September 10, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Revision to Proposed Physical Security Plan for the Davis-Besse Nuclear Power Station, Unit 1 (TAC No. MC2912)
Ladies and Gentlemen:
The Nuclear Regulatory Commission (NRC) issued an Order dated April 29, 2003, requiring compliance with the revised design basis threat ("Order EA-03-086" or "Order") and other security related Orders (collectively "Orders") for the Davis-Besse Nuclear Power Station (DBNPS), Unit 1. By letter dated April 29, 2004, the FirstEnergy Nuclear Operating Company (FENOC) provided a supplement (letter Serial Number 3051) to the previously submitted responses to Order EA-03-086 for the DBNPS. Included in that submittal was a proposed revision to the DBNPS Physical Security Plan (PSP) as required by the Order.
The review of the draft DBNPS PSP by the NRC staff resulted in several Requests for Additional Information (RAls). The proposed revision to the DBNPS PSP has now been modified to incorporate changes based on the resolution of the RAI issues and is included with this letter as.
In accordance with 1 OCFR 73.21, Attachment I to this document has been determined to contain Safeguards Information, and is thereby exempt from public disclosure. If there are any questions concerning this matter, please contact Mr. David R. Kline, Manager-Security, at 419-249-2322.
SAFEGUARDS INFORMATION NOTE: ATTACHMENT 1 TO TIlS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, TIlIS PAGE IS DECONTROLLED.
SAFEGUARDS INFORMATION Docket Number 50-346 License Number NPF-3 Serial Number 3091 Page 2 of 2 The statements contained in this submittal, including its associated attachments, are true and correct to the best of my knowledge and belief. I am authorized by the FirstEnergy Nuclear Operating Company to make this submittal. I declare under penalty of perjury that the foregoing is true and correct.
Executed on September 10, 2004.
Very truly yours, Mark B. Bezilla Vice President, Nuclear GMW/s Attachments:
- 1) Revision to the DBNPS Physical Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan (contains Safeguards Information)
- 2) Commitment List cc: J. L. Caldwell, Regional Administrator, NRC Region III (w/ Attachments)
J. B. Hopkins, DB-1 NRC/NRR Senior Project (w/o Attachment 1)
C. S. Thomas, DB-1 Senior Resident Inspector (w/o Attachment 1)
D. W. Spaulding, Project Manager, Security Plan Review Team (w/ Attachments)
Utility Radiological Safety Board (w/o Attachment 1)
SAFEGUARDS INFORMATION NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, THIS PAGE IS DECONTROLLED.