ML042100207
| ML042100207 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse (NPF-003) |
| Issue date: | 07/26/2004 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| 3079, TAC MC2912 | |
| Download: ML042100207 (2) | |
Text
I i FENOC FirstEnergy Nuclear Operating Company SAFEGUARDS INFORMATION 5501 North State Route 2 Oak Harbor. Ohio 43449 Mark B. Bezila Vice President - Nuclear 419-321-7676 Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3079 July 26, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Response to Request for Additional Information on the Davis-Besse Nuclear Power Station Unit 1 Training and Qualification Plan (TAC No. MC2912)
Ladies and Gentlemen:
By letter dated July 9, 2004 and received July 12, 2004, the NRC staff issued a Request for Additional Information (RAI) concerning the Training and Qualification Plan of the Davis-Besse Nuclear Power Station (DBNPS) Physical Security Plan. This RAI was based upon the revision to the DBNPS Physical Security Plan submitted to the NRC inma letter dated April 29, 2004 (Serial Number 3051).
The response to the issues contained in the RAI are provided in Attachment 1 to this letter, which contains Safeguards Information. If you have questions or require additional information, please contact Mr. David R. Kline, Manager - Security, at 419-249-2322.
SAFEGUARDS INFORMATION NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, THIS PAGE IS DECONTROLLED.
SAFEGUARDS INFORMATION Docket Number 50-346 License Number NPF-3 Serial Number 3079 Page 2 of 2 The statements contained in this submittal, including its associated attachments, are true and correct to the best of my knowledge and belief. I am authorized by the FirstEnergy Nuclear Operating Company to make this submittal. I declare under penalty of perjury that the foregoing is true and correct.
Executed on July 26, 2004.
Sincerely, Mark B. Bezilla Vice President, Nucleu GMW/s Attachments:
- 1) Response to Request for Additional Information (contains Safeguards Information)
- 2) Commitment List cc: J. L. Caldwell, Regional Administrator, NRC Region HI (w/ Attachments)
J. B. Hopkins, DB-1 NRC/NRR Senior Project (w/o Attachment 1)
C. S. Thomas, DB-1 Senior Resident Inspector (w/o Attachment 1)
D. W. Spaulding, Project Manager, Security Plan Review Team (w/ Attachments)
Utility Radiological Safety Board (w/o Attachment 1)
SAFEGUARDS INFORMATION NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, THIS PAGE IS DECONTROLLED.