ML042450557
| ML042450557 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 08/30/2004 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Security and Incident Response |
| References | |
| 3088, TAC MC2912 | |
| Download: ML042450557 (2) | |
Text
. -
FENOC FirstEnergy Nuclear Operating Company SAFEGUARDS INFORMATION 5501 North State Route 2 Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President-Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3088 August 30, 2004 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Response to Request for Additional Information on the Davis-Besse Nuclear Power Station Unit 1 Physical Security Plan (TAC No. MC2912)
Ladies and Gentlemen:
On August 16, 2004, FirstEnergy Nuclear Operating Company (FENOC) provided a response to issues contained in a Request for Additional Information (RAI) from the Nuclear Regulatory Commission (NRC) staff. The subject of the RAI was the Davis-Besse Nuclear Power Station Unit 1 Physical Security Plan submitted to the NRC in a letter dated April 29, 2004 (Serial Number 3051).
Several issues were identified in that response as still being industry open items. Those issues have now been resolved; therefore the responses for those remaining items, as well as several clarifications for previously addressed items are provided in Attachment 1 to this letter.
Attachment I contains Safeguards Information.
If you have questions or require additional information, please contact Mr. David R. Kline, Manager - Security, at 419-249-2322.
SAFEGUARDS INFORMATION 1)
NOTE: ATTACHMENT I TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1,
\\
THIS PAGE IS DECONTROLLED.
p
SAFEGUARDS INFORMATION Docket Number 50-346 License Number NPF-3 Serial Number 3088 Page 2 of 2 The statements contained in this submittal, including its associated attachments, are true and correct to the best of my knowledge and belief. I am authorized by the FirstEnergy Nuclear Operating Company to make this submittal. I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 30, 2004.
Sincerely, Mark B. Bezilla GMW/s Attachments:
- 1) Revised Response to Previous Requests for Additional Information (contains Safeguards Information)
- 2) Commitment List cc: J. L. Caldwell, Regional Administrator, NRC Region III (w/ Attachments)
J. B. Hopkins, DB-I NRCINRR Senior Project (w/o Attachment 1)
C. S. Thomas, DB-1 Senior Resident Inspector (w/o Attachment 1)
D. W. Spaulding, Project Manager, Security Plan Review Team (w/ Attachments)
Utility Radiological Safety Board (w/o Attachment 1)
SAFEGUARDS INFORMATION NOTE: ATTACHMENT 1 TO THIS LETTER CONTAINS SAFEGUARDS INFORMATION AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, THIS PAGE IS DECONTROLLED.