Category:E-Mail
MONTHYEARML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program ML21074A2552021-03-15015 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance of Requested Licensing Action LAR for One-Time Change to Support Upgrade of the ECP Supply Piping ML21071A2172021-03-10010 March 2021 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI Proposed Change to Quality Assurance Program Manual ML21022A1692021-01-22022 January 2021 NRR E-mail Capture - Entergy Fleet (ANO, Grand Gulf, River Bend, and Waterford) - Acceptance Review for RR EN-20-RR-003, Proposed Alternative to Use ASME Code Case N-711-2 ML21019A5142021-01-14014 January 2021 March 2021 Emergency Preparedness Exercise Inspection - Request for Information ML20356A1142020-12-17017 December 2020 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action LAR Concerning LCO 3.0.6 and Proposed Adoption of SFDP ML20350B7602020-12-14014 December 2020 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Request to Use Alternative Examination Requirements - ANO2-ISI-022 2023-09-22
[Table view] |
Text
Thomas Alexion - PRE-APPLICATION FOR USE OF MNSA-2 ON VESSEL BOTTOM NOZZLES Page 1 .1 From: Thomas Alexion To: DAVANT, GUY H Date: 3/26/04 8:50AM
Subject:
PRE-APPLICATION FOR USE OF MNSA-2 ON VESSEL BOTTOM NOZZLES Guy, Attached is NRC staff feedback on your 02/05/04 pre-application submittal (CNRO-2004-0001 0).
I can arrange for a phone call with the NRC staff reviewers if you want to discuss it.
Tom CC: SBENNE2@entergy.com o A 1S
I CiW1IN D0WS\TEMP\GW)00001 .TMP Pagie 1 Paae 1 I.1 I CAWINDOWS\TEMP\GW}00001 .TMP Mail Envelope Properties (40643522.CA3: 0: 20628)
Subject:
PRE-APPLICATION FOR USE OF MNSA-2 ON VESSEL BOTTOM NOZZLES Creation Date: 3/26/04 8:50AM From: Thomas Alexion Created By: TWA@nrc.gov Recipients Action Date & Time entergy.com Transferred 03/26/04 08:50AM GDAVANT (DAVANT, GUY H)
SBENNE2 CC (SBENNE2@enterzy.com)
Post Office Delivered Route entergy.com Files Size Date & Time MNSA2RAI.wpd 6435 03/26/04 08:44AM MESSAGE 880 03/26/04 08:50AM Options Auto Delete: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard To Be Delivered: Immediate Status Tracking: Delivered & Opened
STAFF FEEDBACK ON THE ANO-1 PRE-APPLICATION SUBMITTAL ON USE OF MNSA-2 CLAMPS ON THE BOTTOM MOUNTED INSTRUMENTATION NOZZLES
- 1. The application needs to have an expanded justification (the 2nd paragraph in Section III of the submittal is not sufficient) why MNSAs are the appropriate repair technique to be applied in this area, when there are other permanent repair techniques available.
- 2. By proposing a temporary MNSA repair, followed by a permanent half-nozzle repair, ANO-1 will incur higher worker radiation exposures than if the permanent repair were performed at the outset. This deviation from ALARA principles needs to be further justified.
- 3. If the MNSAs are the appropriate repair technique, then the application needs to discuss how this can be considered a temporary repair since drilling holes into the reactor vessel is not reversible. How would the reactor vessel be returned to its original condition when a permanent repair is completed in the future?
- 4. Since the use of MNSAs on the vessel bottom may not be considered a temporary repair, your application should discuss the concerns identified in the NRC's letter of December 8, 2003.
- 5. You will need to submit a separate relief request for leaving flaws in service and not reinspecting them in accordance with IWB-2420(b) of Section Xl of the ASME Code.
- 6. If nozzle leakage is identified, you will need to off load the core and perform extensive NDE to fully characterize the flaws. The staff would need for you to describe the NDE and flaw characterization results in detail.
- 7. NRC staff approval on the use of MNSAs on the vessel bottom will likely involve an extensive review. A general comment here would be that you provide as complete and thorough a design and test package as possible, and not wait for the staff to ask for it.
The design package should include a Section III fatigue evaluation of the region adjacent to the MNSA as well as a Section Xl fatigue crack propagation analysis, based on postulating a detectable crack within the wall adjacent to the MNSA. Note that the statement in the relief request that the staff previously reviewed and approved the methodology used to evaluate the installation of the MNSA-2s is not consistent with the referenced letters.
- 8. In addition, the request should be as accurate as possible. For example, the cover letter says relief is requested under 10 CFR 50.55a(a)(3)(ii); however, the Enclosure requests relief under 10 CFR 50.55a(a)(3)(i). You need to determine upon what basis you are requesting relief.
Page 1 of 2
- 9. The staff believes that before authorizing the use of MNSAs on the bottom of the vessel, it is prudent to await the finalization of the ASME Code deliberations on the use of this type of repair technique.
- 10. A first-of-a-kind staff approval to use the MNSAs to repair nozzle leakage on the bottom of the vessel is not envisioned to be a straightforward, nor short duration, review. The staff recommends pursuing a proven permanent repair technique (half-nozzle) for the upcoming outage and for the industry to seek approval to use MNSAs for this application on a longer term.
- 11. At a minimum, visual inspection requirements should be consistent with past applications; e.g., insulation removal and treating all leaks as pressure boundary leaks (since the design of the original installation did not permit any leakage).
Page 2 of 2