Miscellaneous Correspondence for the D.C. Cook Retake Examination - August 10, 2004
ML042260401
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/10/2004
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
American Electric Power Co
References
50-315/04-302, 50-316/04-302 50-315/04-302, 50-316/04-302
Download: ML042260401 (8)


Text

MISCELLANEOUS CORRESPONDENCE FOR THE D. C. COOK RETAKE EXAMINATION - AUG I O , 2004

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 491 07 1395 lNDlANA MlCnl G A N POWER July 19,2004 AEP:NRC:2574-62 10 CFR 55.31(a)(3)

Docket Nos.: 50-3 15 50-3 16 U. S. Nuclear Regulatory Commission ATTN: Licensing Branch Chief, Region I11 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 REQUEST FOR INITIAL LICENSE EXAMINATION SUPPORT Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant, is requesting Initial License Examination support by Nuclear Regulatory Commission (NRC) Region I11 personnel in August 2004. This support is needed to write and administer one senior reactor operator upgrade re-take examination.

During conversations held between Mr. Dell McNeil and Mr. Michael Bielby (NRC Region 111), and Mr. Ronald Sieber and Mr. Ivan Fleetwood (I&M), it was determined that the development of the re-take examination would require writing the NUREG-1021, Revision 8, Supplement 1, Category A, Administrative Topics, portion of the examination. It is our understanding that Region I11 staff has agreed to write the applicable section of the examination.

The examination is to be validated and administered the week of August 9,2004.

There are no new commitments identified in this submittal.

Should you have any questions, please contact Mr. Ronald J. Sieber, Operations Training Manager, at (269) 466-3407.

Sincerely, PI ant Managed JEN/jn

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION Ill 2443 WARRENVILLE ROAD, SUITE 2 10 LISLE, ILLINOIS 60532-4352 July 21, 2004 Mr. M. Nazar Senior Vice President and Chief Nuclear Officer Nuclear Generation Group American Electric Power Company 500 Circle Drive Buchanan, MI 49107

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 SCHEDULING OF AN INITIAL LICENSE RE-TAKE EXAMINATION

Dear Mr. Nazar:

In a letter dated July 19, 2004, (AEP:NRC:2574-62) your staff requested the NRC develop and administer a senior reactor operator upgrade re-take examination for an applicant that failed the initial operator license examination administered in March 2004, at the Donald C. Cook Nuclear Power Plant Units Iand 2. In a telephone conversation on July 20, 2004, between Mr. I. Fleetwood, Initial License Training Lead, and Mr. D. McNeil, Reactor Engineer, arrangements were finalized for the development and administration of the requested re-take examination. On August 10, 2004, the applicant will be re-examined at the Donald C. Cook Nuclear Power Plant training building. The re-take examination will cover Category A, "Administrative Topics," of the operating test.

Per your request, the NRC will prepare the re-take examination based on the guidelines in Revision 8, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will be given the opportunity to review the proposed examination immediately prior to administration of the examination. In the unlikely event that significant changes are required for the examination to be valid due to plant administrative procedure revisions, the examination will be updated and administered on August 11, 2004.

To meet the above schedule, it was necessary for your staff to furnish the plant's operations administrative procedures during the week of July 19, 2004. Arrangements were made to send the procedures by e-mail to the NRC examiner that will develop the examination.

Appendix E of NUREG 1021 contains a number of NRC policies and guidelines that will be in effect while the re-take examination is being administered.

A signed application certifying that all training has been completed should be submitted at least 14 days before the examination date. The application should include a request for waivers for all parts of the examination the applicant passed on the first license examination. Those waivers will be granted upon receipt of the application. If you are unable to provide the final

M. Nazar application with waiver requests on July 27, 2004, Mr. Fleetwood has been advised concerning possible alternatives to this date.

This letter contains information collections that are subject to the Papenvork Reducfion Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006.

The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by internet electronic mail at BJSI@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9631.

In accordance with I O CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, 7,

Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 See Attached Distribution

M. Nazar application with waiver requests on July 27, 2004, Mr. Fleetwood has been advised concerning possible alternatives to this date.

This letter contains information collections that are subject to the Papenwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30,2006.

The public reporting burden for this collection is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001 , or by internet electronic mail at BJSI@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-I 0202, (3150-0018), Office of Management and Budget, Washington, D.C. 20503-0001.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Fleetwood has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. D. McNeil at 630-829-9737, or me at 630-829-9631.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readinq-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Roger D. Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 See Attached Distribution DOCUMENT NAME: DCC 07 04 DRS.wDd OFFICE Rlll I$I Rlll Id Rlll I Rlll I NAME DMcNeil:tr bv. RLanksbury Rn&

DATE 07/ Zl/04 0761 /04 OFFlCIAL RECORD COPY

M. Nazar cc: J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists L. Meyer, Training Manager ADAMS Distribution:

WDR DFT JGLI RidsNrrDipmI ipb GEG HBC BJKl DRPlll DRSlll PLBI JRKI DCT MA6 1

M. Nazar cc: J. Jensen, Site Vice President M. Finissi, Plant Manager G. White, Michigan Public Service Commission Michigan Department of Environmental Quality Emergency Management Division MI Department of State Police D. Lochbaum, Union of Concerned Scientists L. Meyer, Training Manager

MEMORANDUM TO: FILE FROM: Dell R. McNeil, Reactor Engineer

SUBJECT:

OPERATING TEST COMMENTS FOR DC COOK RETAKE TEST (8/10/04)

There were no facility comments on the proposed retake test which consisted of five administrative job performance measures. The proposed and administered job performance measures were the same. Only one set was submitted to ADAMS.