Technical Specification, Increasing Flexibility in Mode Restraints
ML041250216
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 04/29/2004
From:
NRC/NRR/DLPM
To:
Duke Energy Corp
References
TAC MC1348, TAC MC1349
Download: ML041250216 (16)


Text

LCO Applicability 3.0 3.0 LCO APPLICABILITY 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2 and 3.0.7.

LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.

If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:

a.

MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />;

b.

MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and

c.

MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.

Exceptions to this Specification are stated in the individual Specifications.

Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.

LCO 3.0.3 is only applicable in MODES 1, 2, 3, and 4.

McGuire Units I and 2 3.0-1 Amendment Nos. 221, 203

LCO Applicability 3.0 3.0 LCO APPLICABILITY (continued)

LCO 3.0.4 When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:

a.

When the associated ACTIONS to be entered permit continued operation in the MODE or other specified condition in the Applicability for an unlimited period of time; or

b.

After performance of a risk assessment addressing inoperable systems and components, consideration of the results, determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate; exceptions to this Specification are stated in the individual Specifications; or

c.

When an allowance is stated in the individual value, parameter, or other Specification.

This Specification shall not prevent changes in MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be returned to service under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system returned to service under administrative control to perform the required testing to demonstrate OPERABILITY.

LCO 3.0.6 When a supported system LCO is not met solely due to a support system LCO not being met, the Conditions and Required Actions associated with this supported system are not required to be entered. Only the support system LCO ACTIONS are required to be entered. This is an exception to LCO 3.0.2 for the supported system. In this event, additional evaluations and limitations may be required in accordance with Specification 5.5.15, "Safety Function Determination Program (SFDP).' If a loss of safety function is determined to exist by this program, the appropriate Conditions and Required Actions of the LCO in which the loss of safety function exists are required to be entered.

When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.

(continued)

McGuire Units 1 and 2 3.0-2 Amendment Nos.. 2 21, 2 0 3

LCO Applicability 3.0 3.0 LCO APPLICABILITY (continued)

LCO 3.0.7 Test Exception LCOs 3.1.8 and 3.4.17 allow specified Technical Specification (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Test Exception LCOs is optional. When a Test Exception LCO is desired to be met but is not met, the ACTIONS of the Test Exception LCO shall be met. When a Test Exception LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall be made in accordance with the other applicable Specifications.

LCO 3.0.8 LCOs including the associated ACTIONS shall apply to each unit individually unless otherwise indicated as follows:

a.

Whenever the LCO refers to systems or components which are shared by both units, the ACTIONS will apply to both units simultaneously;

b.

Whenever the LCO applies to only one unit, this will be identified in the Applicability section of the Specification; and

c.

Whenever certain portions of a Specification contain operating parameters, setpoints etc., which are different for each unit, this will be identified in parentheses or footnotes. (For example, '...flow rate of 54,000 cfm (Unit 1) or 43,000 cfm (Unit 2)...').

McGuire Units 1 and 2 3.0-3 Amendment Nos.

221,' 2 03

SR Applicability 3.0 3.0 SR APPLICABILITY (continued)

SR 3.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the LCO's Surveillances have been met within their specified Frequency, except as provided by SR 3.0.3. When an LCO is not met due to Surveillances not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with LCO 3.0.4.

This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

SR 3.0.5 Surveillance Requirements shall apply to each unit individually unless otherwise indicated as stated in LCO 3.0.8 for individual Specifications or whenever certain portions of a Specification contain surveillance parameters different for each unit, which will be identified in parentheses or footnotes.

McGuire Units 1 and 2 3.0-5 Amendment Nos.

2 21, 20 3

PAM Instrumentation 3.3.3 3.3 INSTRUMENTATION 3.3.3 Post Accident Monitoring (PAM) Instrumentation LCO 3.3.3 APPLICABILITY:

The PAM instrumentation for each Function in Table 3.3.3-1 shall be OPERABLE.

MODES 1, 2, and 3.

ACTIONS Imt I

Separate Condition entry is allowed for each Function.

I CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more Functions A.1 Enter the Condition Immediately with one or more referenced in Table 3.3.3-1 required channels for the channel.

inoperable.

B.

One or more Functions B.1 Restore required channel 30 days with one required to OPERABLE status.

channel inoperable.

C.

Required Action and C.1 Initiate action in Immediately associated Completion accordance with Time of Condition B not Specification 5.6.7 met.

D.

One or more Functions D.1 Restore required channel 7 days with one required to OPERABLE status.

channel inoperable.

(continued)

McGuire Units I and 2 3.3.3-1 Amendment Nos.

221, 203

Remote Shutdown System 3.3.4 3.3 INSTRUMENTATION 3.3.4 Remote Shutdown System LCO 3.3.4 APPLICABILITY:

The Remote Shutdown System Functions in Table 3.3.4-1 shall be OPERABLE.

MODES 1, 2, and 3.

ACTIONS

,-----I t-- -_--

I Separate Condition entry is allowed for each Function.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more required A.1 Restore required Function 30 days Functions inoperable.

to OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND B.2 Be in MODE 4.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> McGuire Units 1 and 2 3.3.4.1 Amendment Nos.

. ? 21, 2 0 3

Pressurizer PORVs 3.4.11 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.11 Pressurizer Power Operated Relief Valves (PORVs)

LCO 3.4.11 APPLICABILITY:

Each PORV and associated block valve shall be OPERABLE.

MODES 1, 2, and 3.

ACTIONS NOT Separate Condition entry is allowed for each PI- - - ---- --- --- -_-- --- ----

CONDITION REQUIRED ACTION COMPLETION TIME A.

One or more PORVs A.1 Close and maintain power 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable and capable to associated block valve.

of being manually cycled.

B.

One or two PORVs


NOTE------------------

inoperable and not Required Actions B.1 and B.2 are capable of being not applicable to a PORV made manually cycled.

inoperable by Required Action C.2.

B.1 Close associated block 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> valves.

AND B.2 Remove power from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated block valves.

AND (continued)

McGuire Units I and 2 3.4.1 1-1 Amendment Nos. 2 21, 2 0 3

LTOP System 3.4.12 ACTIONS NOTE-----

LCO 3.0.4.b is not applicable when entering MODE 4.

I CONDITION REQUIRED ACTION COMPLETION TIME A.

Two centrifugal charging pumps capable of injecting into the RCS.

OR One centrifugal charging pump and one safety injection pump capable of injecting into the RCS.

OR Two safety injection pumps capable of injecting into the RCS.

A.1


NOTE-------------

Two centrifugal charging pumps may be capable of injecting into the RCS during pump swap operation for < 15 minutes.

Initiate action to verify a maximum of one centrifugal charging pump or one safety injection pump is capable of injecting into the RCS.

OR A.2.1 Verify RHR suction relief valve is OPERABLE and the suction isolation valves are open.

AND A.2.2.1 Verify RCS cold leg temperature > 1 670F.

OR A.2.2.2 Verify RCS cold leg temperature > 1070F and cooldown rate < 20'F/hr.

OR Immediately Immediately Immediately Immediately (continued)

McGuire Units 1 and 2 3.4.1 2-2 Amendment Nos. 221, 203

RCS Leakage Detection Instrumentation 3.4.15 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.15 RCS Leakage Detection Instrumentation LCO 3.4.15 APPLICABILITY:

The following RCS leakage detection instrumentation shall be OPERABLE:

a.

The containment floor and equipment sump level monitoring system;

b.

One containment atmosphere gaseous radioactivity monitor; and

c.

Either the containment ventilation condensate drain tank level monitor or the containment atmosphere particulate radioactivity monitor.

MODES 1, 2,3, and 4.

ACTIONS I

CONDITION REQUIRED ACTION COMPLETION TIME A.

Containment floor and A.1 Perform SR 3.4.13.1.

Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> equipment sump level monitoring system AND inoperable.

A.2 Restore containment floor 30 days and equipment sump level monitoring system to OPERABLE status.

(continued)

McGuire Units 1 and 2 3.4.1 5-1 Amendment Nos. 2 21, 2 0 3

RCS Specific Activity 3.4.16 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.16 RCS Specific Activity LCO 3.4.16 APPLICABILITY:

The specific activity of the reactor coolant shall be within limits.

MODES 1 and 2, MODE 3 with RCS average temperature (Tavg) > 500'F.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

DOSE EQUIVALENT


Note----------------

1-131 > 1.0,pCi/gm.

LCO 3.0.4.c is applicable.

A.1 Verify DOSE Once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> EQUIVALENT 1-131 within the acceptable region of Figure 3.4.16-1.

AND A.2 Restore DOSE 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> EQUIVALENT 1-131 to within limit.

B.

Gross specific activity of-B.1 Be in MODE 3 with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> the reactor coolant not Tavg < 500'F.

within limit.

(continued)

I McGuire Units 1 and 2 3.4.1 6-1 Amendment Nos.

2 21, 2 0 3

ECCS - Shutdown 3.5.3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5.3 ECCS-Shutdown LCO 3.5.3 APPLICABILITY:

One ECCS train shall be OPERABLE.

MODE 4.

ACTIONS


----- a--- - ----------N t-LCO 3.0.4.b is not applicable to ECCS centrifugal charging subsystem.

CONDITION REQUIRED ACTION COMPLETION TIME A.

Required ECCS residual A.1 Initiate action to restore Immediately heat removal (RHR) required ECCS RHR subsystem inoperable.

subsystem to OPERABLE status.

B.

Required ECCS B.1 Restore required ECCS 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> centrifugal charging centrifugal charging subsystem inoperable.

subsystem to OPERABLE status.

C.

Required Action and C.1 Be in MODE 5.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> associated Completion Time of Condition B not met.

McGuire Units 1 and 2 3.5.3-1 Amendment Nos. 221, 203

Hydrogen Recombiners 3.6.7 3.6 CONTAINMENT SYSTEMS 3.6.7 Hydrogen Recombiners LCO 3.6.7 APPLICABILITY:

Two hydrogen recombiners shall be OPERABLE.

MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One hydrogen A.1 Restore hydrogen 30 days recombiner inoperable.

recombiner to OPERABLE stauts B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

McGuire Units 1 and 2 3.6.7-1 Amendment Nos. 2 21, 2 0 3

HSS 3.6.8 3.6 CONTAINMENT SYSTEMS 3.6.8 Hydrogen Skimmer System (HSS)

LCO 3.6.8 APPLICABILITY:

Two HSS trains shall be OPERABLE.

MODES 1 and 2.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One HSS train A.1 Restore HSS train to 30 days inoperable.

OPERABLE status.

B.

Required Action and B.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

I McGuire Units 1 and 2 3.6.8-1 Amendment Nos. 2 21, 2 0 3

SG PORVs 3.7.4 3.7 PLANT SYSTEMS 3.7.4 Steam Generator Power Operated Relief Valves (SG PORVs)

LCO 3.7.4 APPLICABILITY:

Three SG PORV lines shall be OPERABLE.

MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One required SG PORV A.1 Restore required SG 7 days line inoperable.

PORV line to OPERABLE status.

B.

Two or more required B.1 Restore all but 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SG PORV lines one required SG PORV line inoperable.

to OPERABLE status.

C.

Required Action and C.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met.

AND C.2 Be in MODE 4 without 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> reliance upon steam generator for heat removal.

McGuire Units 1 and 2 3.7.4-1 Amendment Nos.

221, 203

AFW System 3.7.5 3.7 PLANT SYSTEMS 3.7.5 Auxiliary Feedwater (AFW) System LCO 3.7.5 Three AFW trains shall be OPERABLE.

-'gL t- - - - -

Only one AFW train, which includes a motor driven pump, is required to be OPERABLE in MODE 4.

APPLICABILITY:

MODES 1, 2, and 3, MODE 4 when steam generator is relied upon for heat removal.

ACTIONS NOTE----------------

LCO 3.0.4.b is not applicable when entering MODE 1.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One steam supply to A.1 Restore steam supply to 7 days turbine driven AFW OPERABLE status.

pump inoperable.

AND 10 days from discovery of failure to meet the LCO B.

One AFW train B.1 Restore AFW train to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> inoperable in MODE 1, 2 OPERABLE status.

or 3 for reasons other AND than Condition A.

10 days from discovery of failure to meet the LCO (continued)

McGuire Units 1 and 2 3.7.5-1 Amendment Nos. 2 21, 2 0 3

AC Sources - Operating 3.8.1 3.8 ELECTRICAL POWER SYSTEMS 3.8.1 AC Sources-Operating LCO 3.8.1 The following AC electrical sources shall be OPERABLE:

a.

Two qualified circuits between the offsite transmission network and the Onsite Essential Auxiliary Power System; and

b.

Two diesel generators (DGs) capable of supplying the Onsite Essential Auxiliary Power Systems; AND The automatic load sequencers for Train A and Train B shall be OPERABLE.

APPLICABILITY:

MODES 1, 2, 3, and 4.

ACTIONS

-NOTIE-- ---- ------------------------ ------ --- -_-- ---

LCO 3.0.4.b is not applicable to DGs.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One offsite circuit A.1 Perform SR 3.8.1.1 for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable.

OPERABLE offsite circuit.

AND Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter AND A.2 Declare required feature(s) 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> from with no offsite power discovery of no available inoperable when offsite power to one its redundant required train concurrent with feature(s) is inoperable.

inoperability of redundant required feature(s)

AND (continued)

McGuire Units 1 and 2 3.8.1 -1 Amendment Nos. 2 21, 20 3