ML041530593
| ML041530593 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 05/25/2004 |
| From: | NRC/NRR/DLPM |
| To: | |
| Peters S, NRR/DLPM, 415-1842 | |
| Shared Package | |
| ML041460509 | List: |
| References | |
| TAC MC1348, TAC MC1349 | |
| Download: ML041530593 (1) | |
Text
LTOP System 3.4.12 ACTIONS
NOTE----
I LCO 3.0.4.b is not applicable when entering MODE 4.
CONDITION REQUIRED ACTION COMPLETION TIME A.
Two centrifugal charging pumps capable of injecting into the RCS.
OR One centrifugal charging pump and one safety injection pump capable of injecting into the RCS.
OR Two safety injection pumps capable of injecting into the RCS.
A.1
NOTE-------------
Two centrifugal charging pumps may be capable of injecting into the RCS during pump swap operation for < 15 minutes.
Initiate action to verify a maximum of one centrifugal charging pump or one safety injection pump is capable of injecting into the RCS.
OR A.2.1 Verify RHR suction relief valve is OPERABLE and the suction isolation valves are open.
AND A.2.2.1 Verify RCS cold leg temperature > 1740F (Unit
- 1) or > 890F (Unit 2).
OR A.2.2.2Verify RCS cold leg temperature > 740F and cooldown rate < 200F/ hr (Unit 1), or > 740F and cooldown rate < 600F/hr (Unit 2).
OR Immediately Immediately Immediately Immediately (continued)
McGuire Units 1 and 2 3.4. 12-2 Amendment Nos. 21 4 & 1 9 5