Corrected Technical Specification Page 3.4.12-2 for Amendments Nos. 214 & 195. TS Page 3.4.12-2 Corrected to Include Updated Version of Required Actions A.2.2.1 & A.2.2.2
ML041530593
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/25/2004
From:
NRC/NRR/DLPM
To:
Peters S, NRR/DLPM, 415-1842
Shared Package
ML041460509 List:
References
TAC MC1348, TAC MC1349
Download: ML041530593 (1)


Text

LTOP System 3.4.12 ACTIONS

- --------------------------------------------------- NOTE----

I LCO 3.0.4.b is not applicable when entering MODE 4.

CONDITION REQUIRED ACTION COMPLETION TIME A. Two centrifugal charging A.1 --------------NOTE-------------

pumps capable of Two centrifugal charging injecting into the RCS. pumps may be capable of injecting into the RCS OR during pump swap operation for < 15 minutes.

One centrifugal charging pump and one safety Initiate action to verify a Immediately injection pump capable maximum of one centrifugal of injecting into the RCS. charging pump or one safety injection pump is OR capable of injecting into the RCS.

Two safety injection pumps capable of OR injecting into the RCS.

A.2.1 Verify RHR suction relief Immediately valve is OPERABLE and the suction isolation valves are open.

AND A.2.2.1 Verify RCS cold leg Immediately temperature > 174 0F (Unit

1) or > 890F (Unit 2).

OR A.2.2.2Verify RCS cold leg Immediately temperature > 740 F and cooldown rate < 200 F/ hr (Unit 1), or > 740F and cooldown rate < 600F/hr (Unit 2).

OR (continued)

McGuire Units 1 and 2 3.4. 12-2 Amendment Nos. 21 4 & 19 5