April 26, 2004
Carolina Power & Light Company
ATTN: Mr. J. W. Moyer
Vice President
H. B. Robinson Steam Electric Plant Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
H. B. ROBINSON STEAM ELECTRIC PLANT - 05000261/2004-301
Dear Mr. Moyer
In a telephone conversation on April 19, 2004, between Mr. Mike Milbee, Lead Operations
Instructor, and Mr. Edwin Lea, Senior Operations Engineer, arrangements were made for the
administration of licensing examinations at the H. B. Robinson Steam Electric Plant. The
written examinations are scheduled to be given on August 27, 2004, and the operating tests are
scheduled to be given August 30 through September 10, 2004. The on-site preparatory week
is scheduled for the week of August 16, 2004.
As agreed during the telephone conversation, your staff will prepare the examination based on
the guidelines in Draft Revision 9 of NUREG-1021, "Operator Licensing Examination Standards
for Power Reactors." The NRC regional office will discuss with your staff any changes that
might be necessary before the examination is administered. Your staff will also provide copying
services for administering the exam.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by June 14, 2004. The written examinations, operating tests, and the supporting
reference materials identified in Attachment 2 of ES-201 will be due by July 12, 2004. Pursuant
to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the
outlines, examinations, and tests before they are submitted to the NRC for review and approval.
All materials shall be complete and ready-to-use. Any delay in receiving the required
examination and reference materials, or the submittal of inadequate or incomplete materials,
may cause the examination to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
2
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The
public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, writing the examinations, and completing and reviewing the collection of information.
Send comments on any aspect of this collection of information, including suggestions for
reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Milbee has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Edwin Lea at (404) 562-4567, (Internet E-mail:
exl2@nrc.gov ), or myself at (404) 562-4638, (Internet E-mail: mee@nrc.gov).
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket No. 50-261
License No. DPR-23
cc: (See page 3)
3
cc contd:
Chris L. Burton
Director, Site Operations
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
T. P. Cleary
Plant General Manager
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
James W. Holt, Manager
Performance Evaluation and
Regulatory Affairs CPB 9
Electronic Mail Distribution
C. T. Baucom, Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
J. F. Lucas, Manager
Support Services - Nuclear
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Henry J. Porter, Director
Div. of Radioactive Waste Mgmt.
Dept. of Health and Environmental
Control
Electronic Mail Distribution
R. Mike Gandy
Division of Radioactive Waste Mgmt.
S. C. Department of Health and
Environmental Control
Electronic Mail Distribution
Beverly Hall, Acting Director
Division of Radiation Protection
N. C. Department of Environment,
Health and Natural Resources
Electronic Mail Distribution
Steven R. Carr
Associate General Counsel - Legal Dept.
Progress Energy Service Company, LLC
Electronic Mail Distribution
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC 20037-1128
Peggy Force
Assistant Attorney General
State of North Carolina
Electronic Mail Distribution
Chairman of the North Carolina
Utilities Commission
c/o Sam Watson, Staff Attorney
Electronic Mail Distribution
Robert P. Gruber
Executive Director
Public Staff - NCUC
4326 Mail Service Center
Raleigh, NC 27699-4326
Public Service Commission
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
Bo Clark, Training Manager
Progress Energy Carolinas, Inc.
H. B. Robinson Steam Electric Plant Unit 2
3581 West Entrance Road
Hartsville, SC 29550
4
Distribution:
C. Patel, NRR
C. Evans (Part 72 Only)
L. Slack, RII EICS
RIDSNRRDIPMLIPB
PUBLIC
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA/
/RA/
NAME
ELea:pmd
MErnstes
PFredrickson
DATE
4/25/04
4/26/04
4/26/04
E-MAIL COPY?
YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO YES
NO
PUBLIC DOCUMENT
YES
NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML041170411.wpd