HARRIS EXAM
50-40012004-301
FEBRUARY 23 - 27,2004
& MARCH 4,2004 (WR1TTEN)
Annendix L)
Simulator Scenario Outline
FOKM ES-D-I
Facility:
~
HARRIS
Scenario Kumber:
1
Op-Test Number:
K
Exuminers
Operators
Initial Conditions: Reset to saved IC-164 (based on IC-32): 26% power MOL;
Run CAEP ile2004scenariuI; CAEP includes the following intial setup items:
AFW Pump A-SA 0 0 s (CFWO26 RACK-OUT; CFWL 13 CP_OFF)
E.VI?. 7 -Reactor Trip failure (RPSOIB 3 3)
EVENT H - AI:% Pump 6 hip (CFWIB)
EVENT 9 - ICs-292 (LCV-I 158) RWSTto CSIR failed shut ABD ICs-291
(LCV-I i 5D) RWSl to CSiPe fail to auto open on SI or lo40 VCT level (CW2 I A
0; ZRPK70lB FAII,..ASIS; ZRPK602B FAIL-ASISI
Ensure the foilowing:
0
DEI1 HOLD button is illuminated
DEFI Demand window @ 195
Both Demand Connters on Bank L) @ IO8 steps
ICE-2791 ICE-284 in OFF
Hoth Condensate Pumps in setvice
One Condensate Booster Pump in service
Reactivity Plan is provided
Marked up copy of GP-005 to Step I18 with Step 93 noted to indicate maintenance
in progress un Condensate Booster Pump B and nll other steps marked off, inchding
Step 14metal temps of 350F7, Step 15 load rate 3 DEH Ihits, and Step 60 time of 1
how ago
Red Bar placed on ALB-01-6-5, ESF SIS TRN A BYPASSED OR INOPERABLE
e
rumover:
The unit is at 2h0/npower at hlOl., R hours following a reactor staitup. The plant tripped
approximately 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> ago (I 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> before startup).
Boron concenhation is 1166ppm. Bank D rods iire at IOllstrps
AFW Pump Awns @&en out of service 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago for oil replacement due to
contaminants and is expected to he rehlmed to aenricr within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Technical
Specification 3.7.1.2 has been entered. Risk level is YliLLOW.
The Hot Start pushbutton on the MSRs Wac depressed I hour ago.
PMs were performed on Condensate Booster Pump R and have been completed. The pun
isready to be placed in service. An Auxiliary Operator is standing by to stat the
Condensate Booster Pump. All prestarl checks to s t a ~ I the pump are complete.
Shift orders are to plax Condrnsatc Rooster Rimp B in serrice and cantinue the power
ramp to 9Phpower and restore AFW Pump Ato service when it becomes awiilnbk
GP-005 is heing pformed per Step 5.0. I IR.
OSI-PI is not a\\,ailable.
SCENARIOftl
NUREG-1021. Rcririon 9 , h
doXiinction
Number
N A
-j-
!OR LT4T
(none 0 0)
IWO
COK LT48h
none 0 0) 0 0
M F KCS06A
b5O 0 Ask
____
IMf'CND03
18 0 Ash
_-
MF MSSOlC
Asls
xeos znm
mnm 3 3
--
I
-
s
CiWlB
CVC21.40
ZRPK701B
FAII.,-ASIS
%WK6OZB
FAIL ASIS
Evcnt
'hype'
N (BOP)
N (SRO)
1 (W
___.I
___ -.
I (SRV)
I (BOP)
I (SRO)
I (KO)
I (SRO)
c (BOP)
c (SRO)
.~
R (RO)
_-
M (ALL)
__
M (ALL)
_I_
C (BOP)
c (§KO)
_I
C (RO)
C (SRO)
-
Pressurizer Level high failure
SG Level Lou, Failure
Partial Iass of Condenser Vacuum -----
NOTE: INITIATE THISEVENTDLIRIMG PERFORMANCE
OF EVENT 4 A S NOTED IN BODY OFSCENARIO DUE TO
TIME UNTIL THISEVENTIS NOTED BYAVAILABLE CUES.
T H E E VENT WILL ALSOREQUIRESl&iUU TOR
OPEM TOR TO ADJL'STSEVERIn.
Steam Break loaide Containment
Reactor Trip failure
NOTE: INSERT MALIWVCTrON DMUNG INITIAL SETWP
OFSIMULATOR.
AFW Pump 'B trip
4
VOTE; .MI 'I. TIPLE E 1'E.YT.S REQl 'IRt'D. IXSERT
MA1.FLiYCJIO.Y.S DL'RJNG IClTjAL SET1 'P Ot .Yl.Ul'L~j~~lR.
I
Page 2 "f 25
SCENARIOtlI
NUREG-1021, Revision 9,Dnil
Appendix 3
Required Operator Actions
FORM E§-D-2
SCEKAKIONUMBER: 1
EVENTNUMBER: I
FAC:Il.l'lY:
Harris
EVKNT DESCRIPTION:
Place Second Condensate Baoerter Pump in servtDe
I . Om Condcnsatc Booster Pump is in service per Section 5.5 ofOP-134
2. Condensate Booster Pump 3 Iak-Out Relay reset
Reviews CALITION: 'To prevent damagilig the CBP t'ecirc valves. do not operate
the second Condcnsate Booster Piimp for more than 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> with MPP suction
flow lass than 4500 kpph.
3. Total Fcedwater flow is greater than 4500 kpph
4, CPV Operator andChemishg have been notified ofpotential flow and pressiue
anges in the Condensate S
~..~.
TEBOOSI1<X P[MP 13 RECIR6>cE-261
in MOlXj
wsCAUTIQN: There
s UOTE: (:omputer points listed in Section 6.0cf this
monitored for infonnation,
' E: When die Condensate fiourter Pump control switch is placed to
sition, the A m Lube Oil Pump will start and supply the VSF
ater than or equal to 20 psi& at which
Page 5 of15
SI'ENARIOi'l
NUREG-IMI. Reviaion 9,Drafi
Appendix LI
Ryulred Operator Aclions
FORM ES-D-2
SCENARIOXUMRER: 1
PVENTNUMBEK:
1
FACILITY:
Harris
E m N r DESCRIPlTf~N:
Place Seoood Loodensate Traln in
vice (CONTmUED)
Pump running
k-+ BOP
1 Place the control switch CONDFNSATE BOOS%
PllMP R
SCEYARIC P I
h U R K - 1021, Revrsion 9, Drae
Page 4 of 25
Aptundia L1
Required Orrerator Actions
FORM ES-D-2
S(?ENi\\IAX?O NlJl\\.IREX: 1
EVENT NIJMBEk
2
FACILITY:
plsrais
EVENT DESCRIPTION:
PressurizeaLevel high failure
(IKG E:) ICOR L1459 (none0 0) IO0 0
APPLICANT'S AFI'IOZIS OR BEEIAVIOR
SXO
KO
....
-.
Diagnose high failure of controlling PRZ level control channel, 1.T.459
1.1-459 indicating IO(!%
D
Pi(z barkup heaters alJ energize3
e
C h q i n g flowdomcasingon F1-122A.l
PK% CONT HKiB 1,BYEL DEVIATION AEiD HEATERS OX (ALB-009-2-
._I__
increases flow to maintain YRZ lcVci
Enters and directs the performance of OWF-RP
Seizcts chnnneln 460146 1 011 PRZ.
Level Control Selcctar (may select per ALB-
309-4-I 01 -.1-2)
Directs tripping appiopriatc. histables
Kestores chweine iCS-231.1:K-l22.1
CSIAXGIKG FLOW) and aSaces in
.
.- .
-
~~~~
..
~~~~
~
~
---..___~I
~
I,
.
automatic> if desired
ReferstnTS 3.3.1(6lu),3.1.3.S.ahday)and3.3.3.h( 7day)forPRZlevel
channel failure
Initiates repairs
_..-_I
..
I__I__.
COMMENIS:
Page i
Of2?
SCENARIOUI
NVKEO-IQ21, Kevisim 9.D&
~~
~~~~~
~
Appendix 1)
Required Operdtor .Actions
FORM ESD-2
SCENARIONUMBER
1
EVENTNUMBER:
3
FACIIJTY:
Harris
EVENT DESCRIPTION:
SC: Level Low Failure
'El (AI.B-14-5-IA) alanning
SG 'B' feed ree wlvc meninx
~~~
~
(IMMEDIATE ACTION) Cheek any Main FeMtwater Pump hipped
(IMMEDIATE ACTION) Chcck initial Reactor power Less than 90'h.
power less than 80%.
.
-
-**6ntrolti"g
__l-l____
Turbine Valves properly
~-1
-
Mdntain all oftke following:
. . ALL Steam Ge~ne~~~~reaterthan 3Ooh-_.
Check Feedwater Regulator Vnlvrs NOT operating properly in A U l 0 and perfom
.At least one Main Feedwater Pomp running
Main Feedwater flow to all Stem Generators
ter Regulator Valve (PK-488) m MANUAL
s between 52 and 62%(EDUCEFW
.
Paer 6 of25
SCENARlOQl
NUREG-1021. Rension 9, DnR
..
Appendix I)
Required Operator Actions
FORM ES-D-2
)NlJMBEl
.SCRIPTIC
WSITIOK
SKO
IIOP
CUMMENIS:
1
EVEKI'NCMEIER:
3
FACILITY:
Harris
SG Level b w Failure (CONTIWJFB)
APPLICANTS ACTIONS OR BEHAVIOR
Check the following Pump status:
0
If any Fzcdwafcr Train hmps tripped, go to §tap I 1
.........
.......
...
..
..
...
.-
.-
.VOTE: ON* Y 4 FW PI .tip .E OPRR.J TING A T riiis rwF.
Gc IC [!I<
sedluablc \\C'I:r)":
..
o
All i'nndenat+ieiPeedwatcr flow malfunctrona (other than pump trips) Scctlon
3.1 .-
.
Check the following Kesirc and Dump Valves operating properly in MODU:
Main Fcedaater Punips
0
Condenrate Booser Primps
e
Condensate Pumps
e
ICE-293, Condensate Kecirc
<;heck the Condensate and Feedwater System mtact
Reviews NOTE: Pump8 sliould br stopped in the order ofhigher to lower
oressure. (To s t m a Condensate Pumo. stou a Main Feedwater PYMD fidlowed hv e
e
ICl..-142, Condensate Dumq'Ib __
CST Isolation Valve
-
_I
Check Reactor thermal power changed hy less than 15% in any onc hour pcriud
Exit AOP-010
Xefm toi)WP-RP for SG 'B'level fnili:re ( X i 'B' Level)
ReferstoTSi.?.l (Items 13and 14). ~io,rrrerluirementfotri?,hislablw
lnitiatc repairs
...................
~~.
. ~ ~ .
-
.-I__
.-
Pafie 7 of 25
SCENABUONUMBER 4
EVENTNUMBER:
4
FACILITY
Harris
EVEKT UCSCRII'TION:
Median Tsvg high Cnllure
(TRG E3) IMF R W 6 A 6% 0 ASIS
alarming
Charging flow FI-122A.1 increasing
YK-122 output increasing
Enter and direct the actions of BOP-00 1. Malfunction d Rod Control and
-
lndicatioti System
(IMMEDIATE ACTION1 Chcck that < 2 control rods are dropped
-
(IMMEDIATE ACTION) Position Rod Bank Selector Switch to MAN --
-
-
-
--
ACTl0K;Chcck Control Rank motion stopped
Goto the appropriate section:
Section 3.2, Continuous SpuiiousControl Bank Motion
.~
.~ -
-4 no I Manuallu merate affected control hank to restore the fnllowinz:
. .
-
. Equilibrium power and temperature conditions
! e
Rods above the insertion limits of Tech Saec 3.1 3.6 and PLP-I 06. Technical
COMMENTS:
Page8of25
SCENARIO#i
NUREG-IU21. Revision 9, Drdlt
Agpcndm I1
Kqarred Opemtoi Actions
FORM ES-D-2
D
KCSTavg
e
RCS Tref
a
Power RangeNl channels
~
Reactor Makeup Control System
~.
Check that this section was not entered t l x
_.I_
cnntrol banks moving out and go tn
c following occurred:
.~
- ed RCS dilution
n automatic Rod Control malfunction occiirred
COMMENTS:
I'age 9 of 25
SCENARIO%I
NUREO.1021, Rcvisiotl9, Dnfl
FORM ES-D-2
Ameridix r)
Required Ooerator Actions
SCENARIO NUMBER: 1
EVENTNUMBER:
5
FACILITY:
Harris
EVEXI I)ESCRIP1'60N:
PirIX Loss of Condenser Vacuum
(TRO M)IMFCNW3 18 Oasis
in both %ones ess t
5.5 inches Hg-absolute and Turbine first stage pressure is @eater thnn Wh
g absolute and Turbine fint stage pressure is less than 60%
Y~CCUUIII loss identifiedwd corrected
stable or incredsing
1-
'H OPERATOR
COMMEhTS:
Appendix D
Rcqwcd Operator ~4ctionr
FORM ES-13-2
SCENARIONIIMDER: 1
EVEN1 NLIMBER:
5
FACILITY:
Harris
EVEN? DESCRIPTION
Partial LOSS of Condenser Vacuum (CONTINUED)
Ilowing valves shut
e
ICE-449. Condenser Vac Breaker
expansion joint is indicated and 80 to Step 14
i
i%k
NO lsolahle IC&
between Con&crWaterbox
isolation valves exists and I
go to Step20
Check Circulating Water tcmpcraturce using the following EWIS
~~~~~~~.~~~~
~ ~ ~ ~ . ~ ~ . . .
Points stable or decreasing:
e
TCW 1939, Cooling Tower Basin Temp
TCW1940A. Con&nser A Circ Water-Inlet Temp
TCWI94OB, Condenser U Circ Waterlnlet Temp
plant shutdown initiated
Load Disvatcher of reduced load capability
__
..
. -
--
itor lurhiae vibsatinn levelfi normal
COMMENTS:
FJW 11 of 25
SCENARlOill
Appendix D
Required O m t o r Actions
10RM ES-D-2
SCENAKIO NIIMHER: 1
EVENTNUMBER:
S
FACILITY:
Harris
EVEhV DESCRIPlION:
Partial Loss of CondenserVaculurm (CONTWUEII)
Page 12of25
SCENARlOill
NUREG-1021, Revision% Drafl
.Appendix D
Required Operator Actions
FORM ES-D-2
SCPNARilONIiMBER: ?
EVENTNIJMBER:
6 / 7
FACILITY:
Harris
EVEN'?' IIIISCKIPTIOK:
Steam Urea& Inside Containment with FaikW of Rea&or to Trip
IIRG ESI IMF MSSOIC 8eMX ZO%JAssIs
L
neartar power increasing
-
Steam ilow increasing
Feed flow increasing
s
SG Ieve1s decreasing after iiiitial swell
Steam pressure decreasing
KCS temperature decreasing
0
Containment pressure increasig
Containment sadiation levels unciiange
Orders a reactor trip and safety injection and enten PATH-I
__
Reactor trip bieakcrr closed
Kod bottom lights off
a
Neii:ron flux NOT dccrcasing
Altcmpts manual trip ofreactor
Dstenninesmanml trip NOT successful
a
Raactnr trip breakers dosed
a
Rod bottom lights off
e
Neutron flux NOT decreasing
Infsm~ SRO of failure of reactor to trip autumntically or nmually
Transitions to and directs the actions ofFW-S.:, RcsponsttoNuclear Power
(jmcration / A'rw
(MMEDBATK ACTION) Verifies rods inserting a~~tornatically
or manually inserts
contrul rods
..-..._____I
-~
.~
~~
~
.
_
_
_
Appendix D
Required Operator Actions
FORM ES-D-2
SCEIL'ARIONI!MRER 1
EVEN1' NUMBER: 6 / 7 !
8
FAC.IL1I'Y: Harris
EVENT DESCRIPTION:
Steam Break inside Contninmentwith Failure of Reactor to Trip
fCONTINUED)-FallureofMAPW Pumn to Start
I
I
I
Ai! turbine throttle valves shut
I
tripped and directs operato
I
I NEGATIVE REACTIVITY TO CQRE.
I
I
Directs operatorto locallytrip the reactor hy (order of preference):
-
Loally opening the reactor trip kreakers
i.ocal!v @in both rud drive M(i set eenerator oulput breakers.
Page 140f25
SCENARIO PI
~
Appendix D
Required Operator Actions
FORM ES-D-2
(CONTINUED)
-FailureofR'rVST toCSW Suctions to Qpen
CSlP Suction Valve Failm initiated in CAEP
0
0
Start a boric scid pump
Open !C:S-Z7R, Emergency Boric Acid Addition valve
Verify :.- 30 gptn emergeiicy boration flow
Verify > 30 gppn: CSlP llowtn KCS
Verify RCS pressure -: 2335 p i
Krcect.; RO to initiate manual §I
due:"
oiily one train actuating
Attempts to nrsnually actuate Train B SI
NOTE: 5 I A C m F E D m 1
_l_l
..~
I
kernpis to open IC§-491 and ~ ~ p o r t s
failureto SRU
1 CS-291 red light off. green w o n
COMMEKTS:
Page 15 uf25
SCENAK1OBI
NI!KE(i-I021,
Revision !), DraR
Appendix I)
Required Operator Actions
FORM ES-t-2
SCENARIONUMBER: 1
EVENT NUIMBER:
6 / 7
FACILI1'Y:
Harris
EVENT DESCRIPTION:
Steam Break Inside CQUtUinEEICUt with Failure of Reactor to Trip
(CONTINUED)
R T I C C ~ R L Y I F M S I S O L A T l ~ ~ n A S
OCXURRED, AND
TQISOLATEAFWTOSG 'C!
, II Dilution Paths Isolated
Reactor Makeup Water pumps OFF
I'C.V-I 14B. Reactor Makeup Water valve SHUT
ICSOR, BTRS Bypass valvc OPEN
Direct A 0 to locally verifv ICs-S IO. Boric Acid Ratch Tank Outlet valve
@
Checks for positive reac.tivity addition due to cooldown
Keactar timed
COMMEWS:
Page 16 of 25
SCENARIOUI
hVREF;-IOZL, ReririonY, Drafl
Appendix 1)
Kequirrd Opsmtor Actions
FORM ES-D-2
SCENARIOMJMIIEK: I
EVENTNIMBER:
6 / 7
FACILITY:
Harris
EVENT DFXR1PTION:
S t e m Break Inside Containment wlth Failum of Reactor to Trio
(CONTINCED)
APPI.ICAUI"S ACIIONS OR BEHAVIOR
I>etermines S t i 'W'and SO '8' NOT faulted
.
. -
ISOlatZS sc 'C'
e
Verifics PORV closed
Verifies FW Isolation closed
Verifies AFW iuohted to Si3
e
Closeu Steam supply to TDAFW Pwnp
0
Verifies beforz Beat draiii isoiation ctwcd
Verifies SCi blowdoown isolation closed
Verifies stcam analyzer isolation closed
0
Vcrify reactor subcritical
e
Power ranges< 24
Intermediate startup ratc negative
Implcmcnts I W 3 . as required and transitions IO PATH- I due fn NO Red or
Orange Path conditions ~-
Page iIof'2S
SCBNAKlOXl
NIREG-IO21, Reriiion 9. Draft
FORM ES-D-2
Appendix I)
Required Operator Actions
I
~~~~
Verifics p r o p operation of emergcnc.). safeguards equipment
CSIP and RllR pumps running
Main steam line isolation
SI flnw > 200 gpm
c
Containment pressure above 10 psig, with action3 takcn
AFW flow at least 210 KPPL; available
I
I
-
COMMEhTS
SCENARIO ff 1
NUREG-1021, RevisioaQ. h a R
i w m d i x 1)
Required Operator Actions
FORM ES-D-2
SCENARIO NLMBER: 1
EVENI"UR1HER:
6 i 7
FACIIII'Y
Harris
EVENT DESCRIPT1C)h:
Steam 5rmk Inside Containment with Pailore oPReador to Trio
(CONTINUED)
APPLICANT'S ACTIONS OK REIIAVIOR
ESFAS proper aligninem using Attachment 6
0
2 CSIPs iunning
e
2 KHR Primps running
2 CCW Pumps running
All ESW and t S W Booseer Pumps mnning
s
SI Valves properly aligned
NOTE: RWSTWC'TlON TOCSIP ICS-fYi FAil
ACTliA TIOX MAYII.4 VE REENRECOG~VIZEL
ALREADYATTEMPTED TQ OPEA!
e
Phase A proper alignment
e
e
Main steam lines isolatd
Rlowdowi: and SCi sample YBIY~S
shut
Containment Spray opcmtion
RCPs stopped
Both PW Pumps tripped
1:W Isolation valves closed
NEITHER MDAFW Pump operating
'I'DAFW Pilmp operating
AFW alignment (FLOW ISOIATED TO SG 'C')
Containment Fan Cuolcrs - I per unit operating in slow speed
Contrul Room Ventilation in Emergency Xecirc
AC Buses 1.41 and ID! encrgizd
Air compressors 1A and lil in Local Control Mode
a
80th EL)Gs iunning
8
s
a
e
SCENARIWI
Reauired Oaerntor Actions
FORlrl IS-D-2
Anncndix I)
SCENARIONIJMBER: 1
EVENTNUMBER:
6 ! 7
FACILII'Y:
Harris
EVENT UESCRiPllON:
Steam Break Inside Containment with Failure of Reactor to Trip
CONTINUED)
SG 'C' was previously isolated
SI NUL'terminated by SI flow being > 200 gpni
RCS Pnsrurc (stable/ incnasine)
-.
~~~~
~~
RCS OVERFILL AND PRESSURIZATION RESULTiNG IN
COMMENTS
SCENARIOPI
Appendix I1
Required Opermr Actions
FORM ES-11-2
SCENARIONIIMBER 1
EVENTNUMBER:
61 7
FACILITY: Harris
EVENT DOSCRIPTIOW.
Steam Break 1nsideContdinmentwith Failure aftleastor to Trip
ow isolation valves
. ICs-196
I . ICs-210
I
VALVES(ICS-I82. ICs-196, AND ICs-210) STROKE
0PEA'A.W TMENIMMEDIA TELY CLOSE. TRAINA VALVE (ICs-214)
COMMENTS,
NVREG.1021, Rcvrsron 9, Draft
Page 21 of 2s
SCEhARIO1 I
Appendix D
Required Operator Actions
FORM ES-a2
SCENARIONUMBER: I
E\\'E.NI"UMBER:
6/ 4
FACLITY
Hnrris
EVENT UESCRIPTIOK:
Steam 5reak Imide Contsinmenfwith Failnreaf Readorto Trip
DIRECT BREAKER
BOOTH OPERATOR
t east 60 gpm through CSlP
Ne 23 of25
SCENARIO#l
NUXEG-IUZI, Revision9, kfl
Appendix 1)
Required Opmtor Actions
FOKM ES-D-2
SCENARIO NIJMWER
I
CRITICAL TASKS
FACILITY:
Harris
CRITICAL TASKS INSCENARIO 1
the following:
CRITKALSTEP TOPREVENTPLANT TRIPASA RESULT OFKIGH-
HIGH SG LE VEL.
contact orreport to Control Room
Place applicable Fcedwatcr Rcgulmor Valve (I'K-4R8) hi MANIlAl.
Maintain Steam Generator levels between 52 and 62% (REDUCE FW
FLOW)
- f l M M E D l ~ 4
TE ACTION) Deteimines ,actor
is not tripped and directs operator to
. ~ ~ _ ~ ~ ~ .
TO DIRE'CTA I.OC.4L REACTQR TRIP TOADD
NEGATIVE REACTIVITY TO CORE.
___
Isolates SG ' C
a
Verifies PORV closed
e
Verifies FW Isolation closed
e
e
Closes r h m supplgto TDAFW Pump
-
Verifies before scat drain isolation closed
-
Verifies SG blowdown isolation closed
-
Vcrifies steam analvzer isolation dosed
, - ~
~
~~~
~
Verifies chemical addition isolations closed
I'OISOLATESG 'C'PRIOR TOEXITING FRP-SI Til
I MI!VlMlZE PRE.SSLIRE RISE INSIDE CONTAIh'MENT,
...~
....
~
-_
R O
Determines SI'I'ern:inathn Criteria arc met
s
Subcooling (Z 40°F)
Hent Sink(SG level > 40%)
-
KCS Pressure (stable I increasing)
Page t5 of25
SCENARIO Jil
WREG-1021, Revision9,Dnft
Ths unit is zt 16% power at MUI,, 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> following a reactor startup. 'h
plant nipped
approximately 20 liotirs ago (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> before startup).
Boron concentration is 1 866 ppm. Rank D rods are at j OS steps.
Ai:W Punip 'A' was takdii ntif of senice 2 hwrs ago for oii replacement duc to contaminant8 and
is cxpccted IO be rerliined tQ sewice within the x x t 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Technical Specification 3.9.1.2 has
been entered. Ri& level is YlII.I.C)W
The Hot Slanpushhutton on the MSRs was depressed I hour ago
PMs WCIO perforniod on Condensate Booxter Pump B and have been completed, The pump is
ready to bc placcd in service. An Auxiliary Operator is standing by to start the Condensate
Rooster Pump. All prestart checks to daltthe pump arc complete.
Shift orders are to place Condensate Booster Pump LI in service and continue the power ramp I o
909; powrr and restore AFW Pump 'A' to service when it bcconiss available.
W - O O S is king performed per Step 5.0.1 IS.
0%-PI is not available
4 010102
5 010102
6 0lO102
7 010102
R 0101@2
xi 010102
I1 010102
I3 010102
I4 OlOi02
15 010i02
16 010:02
17 010102
18 0lOI02
I.?
0lDiC2
20 nioxcli
21 010i@2
22 nieinz
13 nicnc;1
Y nioim
12 nioinz
M 010102
25 010102
26 OXliOZ
27 u1011'2
P 1111)102
30 OL0102
31 010102
2 om102
1s.n
21.0
18.0
24.0
27.0
30.0
33.0
- s.0
39.0
45.0
51.0
54.0
57.0
64.0
63.0
66. fl
R . O
78.0
81.0
84.0
R4.0
90.0
93.0
96. a
100.0
Xa.2
100.0
42.0
48.0
69.0
35.11
0
0
n
0
ZB
33
31
3L
2s
27
P
42
27
2u
m
Iti
P
19
6
I I
6
3
0
0
25
I ?
1
n
171
II
Q1
60
19
G
0
0
0
0
0
0
(I
0
0
0
0
U
0
a
n
0
0
0
0
52
49
n
0
0
285
952
n
1:5
m
121
124
I27
122
137
141
145
I48
5.2
5.8
6.3
6.6
6.9
7.2
7.5
S.8
8.1
8.4
8.1
9.0
9.4
9.7
io.0
10.1
10.1
10.3
10.5
10.4
10.5
10.5
10.5
10.2
lU.0
ln.7
11.5
eZ.0
11.6
9.3
6.8
-3.1
-3.2
-3.3
-3.3
-3.4
-2.5
-3.6
-3.6
-3.6
-3.9
-3.7'
-3.7
-3.6
-3.6
-3.5
-3.5
-3.4
-3.2
-2.1
-2.9
-2.7
-2.4
-2.2
8 9
-1.5
-1.2
-0.9
-0.5
2.1
5.3
-0.2
0.99491
0.99491
0.93498
0.9949i
0.YY49i
O.Og4Y 1
n.wz
0.99491
0.941%
n.wm
n.mgi
0,994'11
0.934%
0.99491
0. W491
0.Y9401
0. 59491
1;. 9749 I
0.9949'1
0.594991
n.93ps
0.99490
U.'IY49O
0.99491
0.88491
0.99491
0.99491
Q.99492
0.99490
0.99490
n.wm
~4ppendix 9
Simulator Scenario Outline
FORM BS-i-I
Facility:
HANRBS
Scenario Number:
2
Qp-Tcst Number:
1
-.
Examiners
Operators
Psge I Of 19
SCENARIO U?
NURF.(i-IO?I. ReVisiun 9, Draft
A'CTKON DGRIVG INITIAL
- (N)nrmnl, (R)eactiviIy, (I)nshurnent, (C)nmponent, (Wnjor
SCENARIO#I
Appendix D
Keqlured Operator Actions
FORM ES-D3
SCENARIONUMHER 2
EVENT NUMBER:
2
FACILITY:
l a d s
EVIWr DESCRIPTlOK:
LT-IlZ,VCT Level, High Failure
(TRG EZ)lCORI.T:11? ( m w O Q ) 1000
- ailable
.tennines LK-I I2 output lm failed
r VCT leyel using either:
.
. ~.
~I
TINI!OUS ACTION) Maintain VCT level above 5% autos
COMMENTS:
Page 4 of 10
SCENAKIONIIMBER 2
EVENTNLIMBER:
2
FRCIIJTY:
Harris
EVENT DESCRIPTION:
LT-II2,VCT !&vel, High Failure (CONTINUED)
-
Appendix I)
Required Operator Artiona
FORh4 FS-D-2
.....
FACILITY
llorrir
--..-_.
SCFN\\RIO Ut. ! d l k K .
i
EVtN'I NI:MBEK:
?
_..-
I h p p e d Control Rod F2
alarming
AI Fl-013-4-5. POWER RANGE CHANNU. DEVIATION, alarmink?
a
ALB-013-5-3; POWER RANGE IJPPEK DETECTOR HIGH FLUX-UEV OR
AI,B-013-5-4. POWER RANGE LOWER DETECTORHIGH FLIJX DEV
OR AtJTO DEFEAT, ahming
A1.B-013-1.4, ONE ROD AT BOlTOM. alarming
ALB-013-8.1. RANK D F7lLL ROD WITHDRAWAL, alsrming
AL.13-0(3-8-5, COMPUTER ALARM ROD DEViSEy t 4 S PWR RANGE
'TILTS, alarming
Contml rods semina out until C-l 1 interlock
e
D
w . RCS temperature decreasing
.. -
9
Enters and directs the actions of AOP-00 I, Malfunction of Rod Cuntrd and
DRPl indicates Rod F2 drop&
___
Go To Section 3.1. Dronncd Cuntrol Rod
Record the time at whic.h the rod dropped
Adjust m e of the fullowing to equalize Tavy with Tret
-
Turbine load mine OP-131.0I.A0!'-038.
orGI'-'-006
nommal operation, as fi)llows
NO Blowtl fuses
Power and Loeic Cabinets
COMMEY I'S
SCENARIO b2
NIIRW-lO?l, Revwon 9, Lhfl
Page 6 of 19
Amrndix D
Remind Operator Actions
FORM ES-D-2
0
e
e
3 2 ! , Axial Flux Difference
0
Notify thc following:
Manager -0pcrations
3.1.1.1, Hriraiiun Control -Shutdown Margin -Modes :C 2
3.1.3.1. Movable Control Assemblies -Group Height
3.1.3.5, Shutdown Kod Insmion Limit
1. I .3.6, Control Rod lnreltion : h i t s
3.2.4, Quadrant Power Tilt Ratio
I
i Dop I Reset any negative rate trip alarm attht NIS cabiosts
COMMENI'S:
P U * ~ ? 7 f I Y
SCENARIO c2
NIJREG-1021,
Kevisiun 9.1haR
--
Awcndix I1
Required Operator Actions
FORM ES-D-2
Direct the actions of AOP-038, "Rqid Downpower" after
IO onnwfor dropped rad recovev
_I
Criteria using A t l a c m , !
.
. .
Notify Load Dispatrltrr that the Unit is Educing load
Dcteminc reouired boric acid addition for desired ooww rrductbn usim
.
requirenients due to bratian-
Check that a planned load duction will NOT take thc Unit to Turbine shutdown
__I-
~~
netennine react(n power change will NOT exc&
15% in il one hour p i a l
Dirccts Tavg-lkf maintilined within f 2-F
Check Kod Ccnbol in NOT in AITIY) and maintains Tavg-Trefwithin t 2'F
~~
_.__I..__.
-__
~ Ene.min dl svailahle PRZ Backup hentors
. .~
Direct A 0 to go to letmination Cabinet Room to check VIDAM
Depress the Load Kate M W M N pushbutton
Enter desired rate in DEMAND display
Depress EXIER pushbutton
e
Deprcss KEF pushbutton
e
Ikprcss EKTOR pushhutton
Enter desired load in DEMAND display
Check 1101.D pushbutton 1.1 P
COMMENTS :
Page 8 of 15'
SCENARlOf2
NCREG-1024, Revision 9, DruIi
Appendix D
Kequized Operator Actions
FORM ES-D-2
SCENARIO NUMBEK: 2
WENT NUMBEK:
4 / 5
FACILITY
Harrir
EVENT DESCRIPTION:
Puwer Reduction (Continued) I Bode Acid Pump Tdp
TRG E4 IMT CVC23A
Harrir
on (Continued) I Bode Acid Pumo T ~ D
. .
TRG E4 IMT CVC%A-
Insertion Litnil_,
AI,i3-006-8-4, BONC ACID FLOW I>EVIATION, alarming
Boric Acid Pump A-SA tripped
RCS tcmpemturo NOT responding
~ - -
A'OTE: ALB-1106-84 WILL QNLYEE INANAL4RMSODDITION~F THE
BQRATION IS PERFORMED USlh'G NORMAL BQRATlOn: RAPID
EQRAT~~NWPLLNOTRESULTIN
THISALARM WHENTHE PUMP
I I
I
I
I Drrcts RO to start standby boric acid pump to allow continuing boration
--
s W
R
~
guidelines
ch ail operator tn open 3A and
,el at the target value
COMMbNTS
rage 9 of 19
SCENARIO #2
NURFfi-IMI, RevislonY,htl
I_
___
-
Amendix O
Required Operator Actions
FORM ES-D-2
SCEN.4RIO NUMRER 2
EVENTNUMBER:
6
FACILITY:
Harris
EVENT DESCRIPTION:
Losa of Power to an ESP Bus with Failureof ED(: to toad
(TRti E5) IMF EPSOSA
IMF nuitri .I
.....
__.
.
APPIJCANTS ACTIONS OR WHAVIOK
, I m s of One Emergency AC Bus
3.6.5 V
m
Relief System
.
3.8.1.1 AC SourcesOpcrating
3.8.3.1 Onsite Power Distribution -Operating
Page IO of 19
SCENARIO U2
NUREG-1021, Xcvision 9, DraR
Appclldlx D
Requircd Operator Actions
FORM ES-D-2
XENARIONUMBEX: 2
EVENS NI!MREK:
6
FACILITY:
Harris
EVENT DF.SC.RlPTIOK:
LQW ofPowerto an ESF 5s with Fsilurc ofEDG to Loa&
(CONTIWED)
I
y Charging and Lctdown flow per OP-107
Directs sccuring or azknowledgenreourine TDAFW Pump hy
lI>hF\\V Pump by closing IMS-40
COMMENTS:
Page I I of 19
SCENARIO nz
Appendix D
Required Operator Actions
FORM ES-DZ
SCENARIO 3UMRE.K: 2
EVENT NUMBER:
7
FACILITY: Nards
EVENI DESCRIPlION:
Second Dropped Contml Rod K14/ Reactor Tnp
TUG E6 IMF CRFOjB 2 23
ALB-0 13-7-3. TWO OR MORE RODS AT BOTTOM, alanniny
OR WHEN SECOND DROPPED
~~~
. Trip breaken KTA and BYA - Ope11
Trip breakers RTB and BYR .- open
I
I
I, Rod hottorn lights - no( available due to loss of power
D
Check bus voltages
Check 6.9 KV bus IA-SA breakers -wen
COMMWTS:
Page 12 of I 9
SCENARiO #2
NIIREG-IC21, Revision 9, DmA
FORM ES-D-2
Appendix 5
Required Operator Actions
SC:ENARIO NIJMUEK: 2
EVENTILIJMBEK:
4
FACILITY:
Harris
EVENT DESCKIPTION:
Second Dropped Control Rod K14 /Reactor Trip (CONlINUED)
. A m - I 1-2-2
ALR-11-5-1
. ALN-I 1-5-3
SI Actuated bpass permissive iighl
Page 13 or I9
SCENARIO P2
NUREGI021, Revision 9, Draft
Appendix D
Required Opcratur Adianr
FORM ES-0-2
--
Page 14 of19
SCENARIO #Z
NUREG-IO21. Revirion 9. Drafl
Required Operator Actions
FORM PS-D-2
Appeiidix D
EVENr NGMBER:
R
FACILITY.
liarpis
SCENARIONUMBER 2
EVEN1 DESCRIPTION:
Pressurizer Steam SpeceBreakl Single Train SI (CONT!NUF:D)
COMMENTS:
Pase IS of 19
SCEAARlCdZ
NIIREG- 1021, Revision 9, Drafl
Awendrx L)
Rwoired Overator Actions
FORM ESD-2
SCENARIO NIJMBEK: 2
EVENT NUMBER
8 / 9
FACYLITY:
Harris
EVEN! DESCRIPTION:
Pressurizer Steam Space Break I Single Train SI (CONTINUEIEP))
MS IntermediateRange Compensating Voltage Low, Failore
KlS COMP VOLT FAILURF. blitiated in CAEP
COMMENTS:
Paga 16 of 19
SCENARIO#
NUREGI02:. KennonY, Dnfl
Appcndix D
Required Operator Actions
FORM PS-D3
SCENAKIONUMBER: 2
EVENTNYMRER
S
FACILITY:
Harris
EVENY UESCKIPYION:
Presssriz@r Steam Space Breek/ Singlelrain $1 (CONTlNWO)
rifv Auriliarv and Radwastc hoocessinc Liuildinr Radiution iinrmal
COMMENTS:
Page 1:
of 19
SCENARIO n2
NlJREG- 1021, Re~ision9, haft
Appendix D
Required Operator Actions
FORM FS-D-2
SCEiXAKIO NUMBER: 2
EVENT NJMRER
I O
FACILITY:
Harris
EVENT DESCRIPTION:
Ckwsifies the Event
'ITME I POSITION 1
APPLICANT'S ACI'IONS OR BEHAVIOR
SCENARIO#2
NIJREG-102I.
Revision 9, I h R
Appendix D
Required Operator Actions
FOXM E§-D-2
SCENARIONCMUER: 2
CKITICAI. 'TASKS
FACILITY:
Harris
CRITICAL TASKS IN SCENARIO2
..
,STEP TO TMP REACTOR WHEN SECOND DROPPED ROD
Trips RCPs when RCS-pirssure decreases below 1400 psig afrer verifying SI tlow
C) TRIP RCPs WMFA 'TRIP CRBlERIA MET.
Pagt I 9 of 19
SCENARIO 112
The unit is at 100%powcr at ROL, with equilibriumxenon conditions
Buron concentration is 1238 ppm. Bank D rods are at 2 I5 steps
APW Pump 'A'war taken out ofsc-cc
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago for oil rcplscenient due lo contaminants and
is expcctedtn be returned to sewiccwithin the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Technical Specification 1.7.1.2 has
been entered. Risk level isYEiLOW,
IIDP 'A' was tagged out of service 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> ago for bearing replacenlent and is not expected back
forthe next several days.
Shift orders are to maintain power at 100% and restore AFW Pump 'A' to selvice when it
becomes available. GP-005 was completed prim to removing HDP 'A' h i n service. The plmt
has been stuble for 3 weeks.
C)SI-PI is oot available
SCPNARIO #2
Appmdix D
Simulator Scenario Outline
FORM ES-D-I
Facility:
HARRIS
Scenario Number:
3
Op-lest Nllrnbrr:
1
Examiners
OQ'
rrdtnrs
'
Initial Conditions: Reset to saved IC-Io0 (bnsed on IC-] X): 1000iooower BOL:
Power lowered hy 25 MWe and increased boron eoacentmtion by 2 ppm: Allowed
plant to stabilize.
EVENT 7 - Failure ofMSlV on Ruptured Si; to close - can he clnsed locally
(MSS-5C 2)
E V X W 8 - Partial failurr of Automatic Phase A isolation signal (Train II Phase A
Slave Relay for select CNMT Phase A valves fails to energize when required). ISH-
287, ICs-l I 8 !SW-242
(ZWXc62213 Deenergire)
e
The unit is at appmxiinatcly 99". power at Il3L. with equilibrium xenon conditions.
Boron cuncajtration is 12iBppin. Bank 1) rods are at 215 steps
AFW Pump 'A'was taken nut of service 2 honrs ago for oil replacement due to
contaminants and is exprcted to be returned In service within the ncxt 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Technica
Sprc,ification 3.7.1.2 has been entered. Risk level is YEI.LOW.
IlDP 'A' was tagged out of sesviee 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> ago for bearing replaccrnent and is not
expectedbnck for the mxt seueral days.
Shift orders are tn maintain current powcr level and restore AFW Pump
wwice
when it hecomes available. GP-005 was compietedpriur to removing HDP 'A'from
servicc. The plant llad been ntahlr for 3 reeks prior tu removing the Heater Drain Pump
from service
0 3 - P I is not available
Page 1 of22
NiJREG-1021, Revision 0
0
I l e O 6 . 4 *
[COR FT477
(TRG E4)
---+--
IMFCRF 148
(TRG E4)
C (BOP
C (SRO
C: (RO)
c m a
-
I (BOP)
I (SRO)
C (BOP
c (SRO
R (KO)
--
Main Generator Oscillations
___-
Heater Drain Pump Tripwitb Fail
Automatically Runhack
Auto Rod Failure - Rods Fail To Mow
NOTE: MULTIPLEE VENTS Oh' TRIGGER 4.
iVOTE: INSER TMALFUNCTIO.h'DL?RLVGlNlT~.4L
- @)mal, (Rpactivity, Ojnstrument, (C)omponent, (u)ajor
Page 2 of 22
SCENARIC#3
NUREG-1021, Revision9
Appendix 1)
Kequircd Operator Actions
FORM ES-D-2
SCENhMIONUMBER: 3
EVEiWNCMBER:
I
FACILITY:
Harris
EVEN i DESCRIPTION.
Mdn Generator Oscillations
clears, then a l m s again and clears as Generator Voltage exceeds high aid 1
alarm fietpoiat s-hile oa4lntii:g
I._..._..__
_.
~-ALB-lIZ2-9-4
__.___
is JlidI56XA in Group 2 :sing one of the following:
..-__lll
ator voltage mid Mvar indications
SH ERFIS Group Display GENRION. GENMON!. or
~~.__.....-._~I__._
568A GEN GKDSS REACTWE POWER,
may indicate an impending or achlal gcneralor voltage regulator failure
.-
__
-
mprvogage ~-
Places piirrator voltage replalor in nliiniial and adjusts for pmwr voltage
Place the regulator in TEST
Operate CiENBKATOR UASE ADIliSTEX switch to r e s t ~ c Genoraator voltage
-P-T
tu 22KV
Appendix D
Required Overator Actions
FORM ES-D-2
SCENARIO NUMBER: 3
EVEKT N 6 k 3 k R :
2
FACILITY:
Harris
EVENT DESCRIPTION:
Operating CCW Pump Trip with failure or standby pump kti
asltornstifsIly start
( ~ ~ t i m i ~ ~ t ' ~ c w o 4 i o n
IMI: CCWMl A
automatic start
0
Ntimrmr alarms on ALB-005 due to no CCW flor
Breaker indication on CCW Pumo IA-SA
I
R O
1 Check CCW header oressure male1 than 52 D R I ~
I
COMMENTS,
Page 4 of22
SCEN.ARIOU2
KIJREO IOZI. Revision 9
Appendix D
Requircd Operator Actions
FORM ES-I)-?
SCENARIO NUMBER: 3
EVENT N1 IMBER
3
FACILITY:
Harris
HOI'
APPl II'ANT'S ACTIOVS OR BEHAVIOR
Diagnosr low failurc of controlling SG 'A'fcod flow channcl
o
D
FI-477 indicating 5
e
e
Xi 'A' Icwl decreasing
Enter and alircct the actions of AOP-01 0, ?c.edwxer Malfunctions
(IMMELXATE ACTION) Check NO Main Feedwater Yliinp tripped
rake8 MANUAL control of FK-478 prior to direction in AOP-010 tu f e d per
K-Ol)linsUuctions
Chcck DEH controlling Turbinc Valvcs properly
Maintain all of the following:
B
At lcast one Main Feedwater Pump sunning
a
Main Feedwater flow to all Steam Generattors
B
ALL Stem Cicnemt:Llovclr
rreaterthan 319b
Check Feedwater Kcgulatoi Valves NO1 operating properly in AUTO and perl'vrm
the following:
D
1
CRITICAL STEP TO PWEVEYF PLAXT TWY AS A RESULT OF
lheck W i n Control Room annunciators avnilablc
Check the following Punip mbs:
SG A STM > FW FLOW MISMATCH (A1.B-0144-1 B) alarming
SG 'A'feed rcg ~ d v e
cinaing
a
SG ' K a e feed flow=
!ow... -
..
.......................
. .-
___II_.
__
___.
~.
._.._.^_____._I___-
......
..
~'IIICE appljuuhls Feedwater Kepulator Valve ( F K - U X ) in MANIIAI.
Maintain Stearnncnerator levekbetween 52 and 625 Wl>LXX FW FLOW)
LQWSG I.EVEI..
......... -
............
N C Feedwater Train Pumps tripped
a
only m e l.ll>P operating
COMMENTS:
Page 5 of 22
SCtUARIOA3
NUREti-lli21. Revision9
FOKM ES-D-2
Aooeudh n
ResnimJ Ooerator Actions
3
EVENT NI!MBER
3
FACILITY:
Harris
i:
Feed Water Flow Low FaiIure(CQNT1NUED)
NOTE: E VEX THOUGH DNLY ONE HDP IS OPEMTrNG, THE CREW
,siiOuw GO TO SECTION 3.1 IroR THE FAILURE OF THE FEED FLOW
TRANSMITTER.
Go to the applicahlc soction
e
Ckck the following Kscirc and Dump Valves operating proprly in MODU:
Main Feedwater Pumps
Candensate Pumps
ICE-293. Condensate Kecirc
-.
a
ICli-142. Condensate Dump ToCST b&tion Valve
Check the Condensate nnd Feedwater System intact
All Con&nsate/Fe.edwater flow ri?alftrnclions (other lhan pump trips! Section
3. I
..
I
--
Condensate BmSter PUInpS
__I_._
~.___
_.
-.
.I_
Check pumps for noms1 operation
Notify Load Dispatcher of any Ihad limitiilions
Check Reactor thermal power changed hy less than 1.5% in any one I~our period
--
-.
Exit AOP-0 10
Refer to ORP-RFWX for SG Afced flow failure SF/W 1.
I___
OWP-KP-OR
Selects Channel 47.5 on FS-47XL for steam flow control in accordance with
OP-RPa*
. __
Referr to TS 3.3. I (Item 14)- 6 huur requirement lo trip histnhlur
Kestores Fced Reg Valve controller to AUTO when lcrel stable at program wit
nd steam flow mkhed
COMMENTS:
~
P ~ g e
6 cf 22
SCENARIO f 3
NL;RE<;-III21. Revision 9
Appendix D
Required Operator Actions
FORM ES-D-2
SC:ENARIONIJMBER: 3
EVENTNUMRER:
41 S
FACILI'I'Y:
Hsrsis
EVENT DESCRIPTION:
lkdter Drain Pump Trip with Failure of 'Turbine to Audumatknlly
Runbaek and Failweof Auto Rod Contrul
CUE
Diagnoses trip of Heater Drain Pump '3'
a
ALB-019-3-2A, HTR DXPi PlJRlP B O K TRIP-GND, alarming
ALB-U1944A, CND BSlK PVMP .4 SUCT LOW I'RESS. alarming
AI.B-019-5-4A. CND BS'TR PUMP B SIJCT i.OW PKESS, alarming
SG levels decnasinx
I
I
8QP
I fIMMkDIATE ACTII"
Check NO Main Feedwater Puim trinxd
.
, I
....
.-I
.__._I
1
T
F
-
F
Maintain all Q f the following:
Turbine Valves properly
At Iemt one Main FeedGater Pump running
Main Feedwater tlow to nil Steam Generators
- ... ALL Stcam ( i c n e r a t o r ! 4 8 f e ? ! e r t ~ a ~ O ~
Clreck Main Control Rwin annunciators available
Check the following Pump status:
NO Feedwater ?rain Pumps tripped
_f-E5?!!LEK!
hipped
....
Go tu the applicablc section:
0
Maintain 811 of the following:
0
9
0
I.oss ....
oi Rnnniw'urnps (incldi&fiO.IH Heater Drain Pumps~Se+jon 7
2
2
At least one Main Feedrater Pump running
Main kzdwater flow to :ill Stcam fitnerators
tLLSteamGenemtor levels grcatrr than 308
Appendix D
Required Operator Actions
1:ORM ES-D-2
SCtN.4RIO NL'MI3I.9 3
F.\\'FNl NUMBER
4 / 5
FAC'ILll'Y.
Harris
~~~~~~~~
~~
~~
~~~
EVENT DESCRIPTION
Heater Drain &nip Trip with Failure- of Turbine to Ant~matis5lly
.....
Pump Kecirc Valves 'Tiippe,pe? Ump .
..
..
Check both Heater Drain I'umm trioord
~
~
I
I Commence load reduction to meet "bine one ofthe follouine
I
COMMENTS:
Page @of 22
NURL:Ci-1021 Revision !I
Appendix D
Krqiiircd Oporator Action,
FORM ES-D-2
..
SCENARIONlJ.MBER: 3
EVENT NIJMBER:
4 I 5
FACILITY:
Harris
EVEKT DESCRIPTION:
Heater Drain Pump Trip with Paililre of Turbbjne to Automabically
Runbark and Failure of AMfQ Rod Control (C0NTENIJF.D)
Notify Load Dispatcher thaf the Cnit is reducing load
Determine, required horic acid addition for desired power reduction using
~-
waste Control Room to he prepared for thz increased water processing
a piannsd load reduction wil! NOT take the ::nil
to Turbine shutdown
tsdwc.to.boration
~
__
..... ~-
-
y Chcmishy that Reactor power chxigc will e x c d 15%m a cine hour period
-
....
--
all available PW,
Backup heaters
_I___
~
h c k the DEH System in AUTO.
-
~
____
Perfonn the following at the DEE panel:
D
0
- lkpreas EWER puahbunm
Depress REF pushhlrnon
Enter desired load in I)HMANl> display
e
Depress E:NTE:R pushhvttnn
Check HOLD pushbvnon lit
Direct A 0 w go IO
'Termination Cabinct Room IO check VIUAR
Deprcss thc Load Rate MWIMIN pushbutton
M e r desired rate (NOT to exceed 4.3 MWf!vllN) in DEMAND display
COMMENTS:
Page 9 of 22
SCENARIO #3
Appendix D
Required OpsrdtOr Actions
FORM ES-D-2
SCENARIONUMBER: 3
EVENTNCMBER:
4 I5
FACILITY:
Ilarsis
EVENT DESCRIPTIOIZ:
Heater Drain h m p Trip 6th Faillired Tlsrbine to Autnmaticdiy
Runback and Fsifure d
Auto Rod Controt (CONTINUKD)
mctive load (VAKs) within guiddincr
COMMENTS:
Page IO of 22
SCBNARIOX?
NUHRC-IIIZL.
Reviiicin 9
4ppendix I>
Required Operator Actions
FORMES-D-2
SCENARIONUMBER: 3
EVEhT NUMBER:
4 / 5
FACILITY.
Harris
EVENT DESCRIPTIOK.
Heater Drain Ponip Trip with Failureof Turbineto Automatkdly
Boratc or dilute as necessary to rnamwin AFD iCuwe F-X-21 as close to the m'sl -
value as possilrle while maintaining r d s above the Rod Insertion Limit (Corvel;
Notify the Lmd Dispatcher that power reduction iscomplete
Retuns to ADP-OIU
D
MSR Relief Valves
~..._...._._~-__.._I
~ _.__
__I
~-
I tu check the following seated, observing tailpips:
. ..
&endint: to bemeen 71% slld 96%.
"
Reset Loss of Load interlwks C7A and C7B
Xotify Load Dispatcher of any load limitations
Check Ractorlhermal ~ o w e ~
chanerd by less thm 15% in a n ~
one how oerind
_____
.
~
_
_
.
.
~ - ~..
.. -
~
.~
~~~ ........
~
tion, check control rods above inseltion limits
____
___
COMMENTS:
rage I I or22
SCENhRlOY3
NIIREG-IIEI. Rcrision 9
Apwndin I)
Required Operator Actions
L'OKM ES-D-?
. . . . . . . .
FACILITY:
Harris
_
. . . . . . . . . .
CC'CNT N'IJMIWR
4
. . . . . . .. . . . . . . . . . . . . . . . . . ._
SCENA.RIONll\\IFJEK. 3
~
~~~~
EVENT DESCRIPTION:
Pressurizer Pressure High Failure
(TKGES I C O R ~ I Y ~ ~
m n e n n)2500 iron
APPLICANT'S ACTIONS O R BEHAVIOR
Diagnoses high failure of Pressurizer Pressurc channel P
4
e PKESSURIZER HIGH PRESS DEVIATION CONTROL (ALB-0%-3-1).
- --
I?-
alarming
PRESSURIZER RELIEF DISCHARGE HIGH TEMP(ALB-M)9-8-2).
alarming
PRESSURIZER HIGH-LOU' PRESS (.4LB-00%.5-lj. alarming
PRF.SS:'RIJER
RELIEF TANK HIGH-LOU' LEVEL., PRESS OR TAMP
(ALB-009-8-I), akrniing
o
o
D
s PRZ heaters o t i
-
PWI sprnys open
B
PR' PORV 4448 rnomeiitarily open
D
PKL pressure lowerine. m o ~ ~ h ~ M . e l s
h t e m and directs the actions of BOP-01 7, Malfunction of KCS Ikssun Connoi
(IMMEDIATEACTION) Check that a kuhhie exists in the PRL
[IMMEDIATE ACTION) Venfics proper operation of PKZ PORVs AND
ysiated block valves by closing POKvJg&.--
'IMMEDIATE ACTION) 'lakes manual cmml CC pressurizer pressure by either:
b
iecs Rx Trip limits for high and low pressure
io TO Section 3.1, Pressure Control Malfunctions While Operating With a
donitor PKZ pressure by observing othcr reliable indication
_'heck plsnt in MODE I OR 2
- heck PKZ prcsrure controlled
CONTINIJOUS ACTION) Check PK'
pressure 7335l'SIG OK I.ESS
.
I
._
.._I_
Piacing martercontmllcr P K U A in manual, or
b ._ Placing heasztad-pmy valves in.&-
'ressunzcr
___
Bubble
.-
__
I_-.._.
~
__I..
._l_li__
. .~____...._.....I_.
__
COMMENTS:
NIlKlG.lOZI. Revmion4
Page I ? "f 22
SCENARIO X 3
Amendm B
Required Operator Act~oni
SCENARIO NIJMBER 3
EVENT NUMBER:
6
FACILITY:
Aarrjs
.......
EVENT DESCRPPTION
Pressurizer Pressore Isg Failure (COKTlNUEW)
fiutction of I T 4 4 4 has occurrcd
~
_
I
_
.
.....
pressure as follows:
0
D
Adjorr PK444A oulpol as necessary, to attempt to restore arid maintain PW.
Check both PRZ spray Y R ~ V C ~ ~ n t r ~ l l c n
in AIITC) and both spray valves
operating as desired
Check dl PKZ heaters operatingapdesid
.heck both of the following conditions prment:
e
PRZ nressum is controlled
..
...
. .
..
_
I
.
.-
.
....
..........
COMMENTS:
Required Operator Actions
FORM ES-D-2
Appendix D
SCEKARIO NUMHEK: 3
EVENT NUMBEK:
7
FACLITY:
Earris
~~
EVENT DESCRIPTION:
SG Tube Rupture
NOTE: MAYMAKEAl7XMPTS TO
EXCESSIVE PRIMARY PIANT LEA
THAT LEAKAGE IS lh EXCESS OF
Neutron flux decma:i&
[IMMEDIATE AC1ION)Verify Turbine Trip
0
(IMMHUIATE ACTIOY) Verify Ponser To AC Emergency Buses
Trip breakers RTA arid RYA -open
Trip breakem RTB and BYH -opeii
Rod b o r n Iights - lil
~
~~
~
~~ .~
All turbine throttle valves -,shut
All turbine governor valves T shut
..__
Check AC emergency buses IA-SA and 15-SB -energired by offsitr pvwer ur
COMMENTS:
Inpe 14 of22
SCENARlOWl
NIJRF.C-IO2I. Keviriun Y
Appendix D
Required Opsnror Actioiir
FORM ES-D-2
SCENAKIONUMHEII: 1
EVENT NIJHREK:
7 / 9
FACILITY:
Harris
EVENT U1;SCKIPTih)N:
SG 'Tube Rupture (CONTINUED)
PurUnI Failure nf Automatic Phase A Isolation Signal
__
....
___..,'..-~_._I__.
CS pressure > 230 psig
Steam Isolation NOT actuated, iiOR r
._ .. .
COMMENTS:
Auvendix Y
Required Owrator Actions
K)KRI E;S-D-2
SCEKARIO NIIMBER: 3
EVENT NUMBER:
7 I 8
FACI1,ITY:
llarpis
E V E N DESCRIPTION:
SG Tube Rupture (CONTINUED)
F~Nuw
or MSIV on Roptured SG to Close
I ISOLATE POTENTIAL RELEASE PATH.
COMMENTS:
eaEc i o 0 m
SCb.NAKIO#?
NLIKEG- I02 I, Kovlsion 9
Appendix D
Required Opemtur Actions
FORM m-n-2
SCENARIO NUMBER: 3
EVENT NUMBER.
7 I 9
FACILITY:
Harris
I 0
Shut all remaininr Main Steam Isoistim valves and hyn~sses
I
. .
SIVs AND PLACE
IN OFF/ RESET TO
~.
.
_ -
_I .-
...
.
condenserNOT available
.itnun rase using SG POI1Vs .
-n Cole Exit Temperatures are less than target temperature
Maintain CETs less than target temperature
h o e recovery actions during cooldawn
<
Slop thc RCS cooldmrn
--
......
~
ainmin KCPseal injection hetween 8 m'd 13 gpn
I_
~-
Control feed I~CW to maintain SG '.4'and
'R' levels hetween 25% and SO%
COMMENTS:
SCEXARIOH3
NlJRF~~~-Ili21,
Kerision 9
ripe 1 7 o f 2 2
w---t--
-1
Page 18 or 22
SCENARIO #3
NlIRliG-II121. Revision4
Appendix I)
Required Operator .4ctiions
FORM PS-n-2
SCENARIONUMBER: 3
EVENT NUMBER.
7
FACILITY:
Harris
EVEN1 DESCRIPTION:
SG Tube Ruptwre (CONTINUED)
. PKZ. level > 759%
e ANDPRZ level > In%
HAS BEEK COMPLETED.
COMMENTS.
Pape 19 "fa2
Appendix D
Required Operator Actions
FORM ES-D.2
SCENARIO NUMBER: 3
EVENT NUMBER:
9
FACIL.ITY: Hsrris
SCENARIO n3
Apwndix D
Required Owrator Actions
FURM BS-D-2
~~
~~~
SCENARIO NUMBER: 3
CRITICAL TASKS
FACIIJTY:
Harris
CRITICAL TASKS 1% SCEKARIQ 3
the following:
0
Place Gppk!ahk Feedwater Rogulator Valvc (FK-498) in MANUAL
Maintain StearnCencrator levels be!ween 52 and 62% (REDUCE FU' FLOW,
CRITICALSTEP TOPRI3WiNTPIANT TRIPAS A REW1.T OF HIGiI-
.?fIGJf SG @E.E.-p..~
__
Yctonnines the idlowins Phase A valves failed to close and wanudlv closes then
.
0
151-287, ACCLIMU'LATORS & PRZPOKV Ei2 SlJPPLY
ICs-I 1 , LTDN ISOL V1.V
0
e
Adjust ruptured SG 'c' I'OKV controller tn HXB and verify proper operation
Shut faulted SG 'c' steam supply valve, INS-72, to TDAFW puinp ( m y haw
been pzrformed earlier fur RCS trmpcrature control)
Verify SG hlowdown isnlation valves sliat
Verify SG 'c'
Main Steam Drain isolation valves shut
Verify s%TICAL
7QlSOLATESTEAM SUPPLY TO TDAFW' PUMP Til ISOLATE
eaTEN-Ei.EASEPdTY_.
-
Deterniines X i 'C' Main Stcam Isolation vabe failcd tn shut
3
9
Shut ail remaining Main Steam IsolatWn valves and bypasses
Place hoth Steam Dump interlock switches to OFF i RESET
Else intact SO W)RSa for all fimher steam dumping
Direct operator to locally isolate SG 'C' wing PAIH-? Guide, Attachment I
Page 2 1 of 22
NlJRl (ti. I O? 1 , Kcvision U
Required Oper3tar Actions
FORM ES-D-2
Appendix D
SCENARl0NUMBE.R 3
CRITICAL ACI'IONS
FACILITY:
Harris
CRITlC4L 'TASKS IN SCENARIO 3 (Continwd)
I
I
1 SECONUARY LEAKAGE.
PItgc 22 of 22
The unit is at appmiirnately 89% power at SOL. with equilibrium xenm conditions.
Boron concentration is 1238 ppm. Bank D sods nre at 215 steps.
AFW h m p Awns taken out of service 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago for oil replacement due to contaminants and i8
exlxctcd to k returned lo service within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Technical Specification 3.7.1.2has been
altered. Risk level is YELLOW.
HD? .4ras tagged out of service3 hours ago for kanng rcpiwenxnl and is not expcctcd back for the
next several days.
Shift orders are to maintain current pawcr level and mtorc AIW Pump Atn Fewice when it becomes
availzhle, GP-005 was completed prior to removing HD? A from Service. lhc plant had k e n stable
for 3 wceks prior to removing the Ileater Drain Pump from service.
OSI-PI is not auailablc.