Category:Code Relief or Alternative
MONTHYEARML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML22201A5082022-07-28028 July 2022 Authorization and Safety Evaluation for Alternative Request No. IR-04-09 ML21284A0062021-10-29029 October 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-04 and IR-4-02 ML21174A0202021-08-0202 August 2021 Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML21167A3552021-07-16016 July 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-06 ML20312A0012020-12-10010 December 2020 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML20312A0022020-12-10010 December 2020 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) ML20287A4712020-10-20020 October 2020 Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20189A2062020-07-16016 July 2020 Relief Request IR-4-03 Concerning Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping ML20080K5082020-03-24024 March 2020 Alternative Request RR-05-03 for the Fifth 10-Year Inservice Inspection Interval ML19340A0012019-12-18018 December 2019 Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19338G3722019-12-18018 December 2019 Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval ML19340A0002019-12-13013 December 2019 Relief Request IR-3-39, Proposed Alternative to ASME Code Weld Preheat Requirements ML19275D2522019-09-24024 September 2019 Alternative Request RR-05-03, Extension of ASME Code Case N-770-2 Volumetric Inspection Frequency for Reactor Coolant Pump Inlet and Outlet Nozzle Dissimilar Metal Butt Welds ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML18290A6022018-11-13013 November 2018 Alternative Requests Related to the Fifth and Fourth 10-Year Interval Pump, Valve, and Snubber Inservice Testing Programs, Respectively (EPID L-2018-LLR- 0012 Through EPID L-2018-LLR-0022) ML18252A0032018-09-17017 September 2018 Alternative Requests RR-04-27 and IR-3-38 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML18066A5222018-02-28028 February 2018 Proposed Alternative Requests RR-04-27 and IR-3-38 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55(z)(1) ML17132A1872017-05-25025 May 2017 Alternative Relief Requests RR-04-24 and IR-3-30: Reactor Pressure Vessel Threads in Flange ML17135A2962017-05-25025 May 2017 Alternative Relief Request RR-04-25 Boric Acid Pump P-19B Stuffing Box Cover ML17122A3742017-05-0303 May 2017 Alternative Relief Request RR-04-26 Boric Acid Pump P-19B Stuffing Box Cover ML17125A2522017-04-28028 April 2017 ASME Section XI Relief Request RR-04-26 ML17090A1102017-03-29029 March 2017 ASME Section XI Relief Request RR-04-25 ML16363A0892017-01-23023 January 2017 Alternative Relief RR-04-23 and IR-3-28 from the Requirements of ASME Code Section XI Regarding Radiographic Examinations ML16277A6782016-10-18018 October 2016 Alternative Request RR-04-22 to Implement Extended Reactor Vessel Inservice Inspection Interval ML16172A1352016-07-13013 July 2016 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML16038A0012016-02-16016 February 2016 Alternative Request IR-3-27 for Implementation of Extended Reactor Vessel Inservice Inspection Interval ML15257A0052015-09-21021 September 2015 Relief from the Requirements of ASME Code Section XI Regarding Radiographic Examinations ML15216A3632015-07-30030 July 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval ML15216A3592015-07-30030 July 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval ML15082A4092015-04-24024 April 2015 Alternative Use of Weld Overlay as Repair and Mitigation Technique ML14217A2032014-09-0404 September 2014 Relief from the Requirements of the ASME Code Section XI, Requirements for Repair/Replacement of Class 3 Service Water Valves (Tac No. MF1314) ML14163A5862014-07-10010 July 2014 Relief from the Inservice Testing Requirements of American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML14091A9732014-04-0404 April 2014 Issuance of Relief Request RR-04-16 Regarding Use of Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML1130001002011-11-0909 November 2011 Issuance of Relief Request RR-04-12 Regarding the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange ML11234A0772011-08-19019 August 2011 Relief Request RR-04-12 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange ML1118810292011-07-27027 July 2011 Issuance of Relief Request RR-04-04 Regarding Use of Alternative Pressure Testing Requirements ML1118706002011-07-22022 July 2011 Issuance of Relief Request RR-04-05 Regarding Use of Alternative Pressure Testing Requirements ML1106800802011-03-24024 March 2011 Issuance of Relief Request lR-3-14 -- Use of Risk-Informed Inservice Inspection Program Plan ML1014700992010-06-11011 June 2010 Issuance of Relief Request IR-3-05 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix Viii ML1012412192010-05-13013 May 2010 Relief Request IR-3-02 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition ML1010400422010-04-29029 April 2010 Issuance of Relief Request lR-3-11 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition ML0935702372010-04-26026 April 2010 Issuance of Relief Request RR-89-67 Regarding the Repair of Reactor Coolant Pump Seal Cooler Return Tubing and Weld ML1011301872010-04-19019 April 2010 ASME Section XI Inservice Inspection Program Relief Request for Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval ML1008407382010-04-15015 April 2010 Issuance of Relief Requests IR-3-13 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition ML1006801182010-04-0606 April 2010 Issuance of Relief Request IR-3-01 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix Viii ML1009002002010-03-30030 March 2010 Relief Requests RR-04-02, Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel, and RR-04-03, Alternative Evaluation Criteria for Code Case N-513-2, Temporary Acceptance of Flaws In.. ML1006404462010-03-12012 March 2010 Issuance Relief ML1005402202010-02-19019 February 2010 Relief Request IR-3-01 Supplemental Information Re Snubber Inspection and Testing for Third 10-Year Interval ML0923901412009-08-24024 August 2009 Relief Request for Millstone Power Station, Unit 3, Relief Request IR-3-04, Response to Request for Additional Information for Alternative Brazed Joint Assessment Methodology 2023-07-31
[Table view] Category:Letter
MONTHYEARML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages IR 05000336/20234022024-01-30030 January 2024 Security Baseline Inspection Report 05000336/2023402 and 05000423/2023402 (Cover Letter Only) ML23341A0172024-01-12012 January 2024 Issuance of Amendment No. 288 Revision to Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures IR 05000336/20234402024-01-11011 January 2024 Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only) ML24004A1052024-01-0404 January 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000336/2024010 & 05000423/2024010 ML23361A0942023-12-21021 December 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies and Core Operating Limits Report . ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23361A0312023-12-20020 December 2023 Intent to Pursue Subsequent License Renewal ML23352A0202023-12-18018 December 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23334A2242023-11-30030 November 2023 Request for Exemption from Enhanced Weapons Firearms Background Checks, and Security Event Notifications Implementation ML23324A4222023-11-20020 November 2023 Reactor Vessel Internals Inspections Aging Management Program Submittal Related to License Renewal Commitment 13 ML23324A4302023-11-20020 November 2023 Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment 15 ML23317A2702023-11-13013 November 2023 Core Operating Limits Report, Cycle 23 IR 05000336/20230032023-11-0606 November 2023 Integrated Inspection Report 05000336/2023003 and 05000423/2023003 ML23298A1652023-10-26026 October 2023 Requalification Program Inspection IR 05000336/20234202023-10-0404 October 2023 Security Inspection Report 05000336/2023420 and 05000423/2023420 ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis IR 05000245/20230012023-09-19019 September 2023 Safstor Inspection Report 05000245/2023001 IR 05000336/20230102023-09-0808 September 2023 Commercial Grade Dedication Report 05000336/2023010 and 05000423/2023010 IR 05000336/20230052023-08-31031 August 2023 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Report 05000336/2023005 and 05000423/2023005) ML23248A2132023-08-30030 August 2023 Response to Request for Additional Information Regarding Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure-Temperature. ML23242A0142023-08-30030 August 2023 Operator Licensing Examination Approval ML23223A0552023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specifications for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23223A0482023-08-18018 August 2023 Request for Withholding Information from Public Disclosure for License Amendment Request to Use Framatome Small Break and Realistic Large Break LOCA Evaluation Methodologies for Establishing COLR Limits IR 05000336/20230022023-08-0909 August 2023 Integrated Inspection Report 05000336/2023002 and 05000423/2023002 ML23188A0432023-07-31031 July 2023 Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML23208A0922023-07-26026 July 2023 Request for Approval of Appendix F of Fleet Report DOM-NAF-2-P Qualification of Framatome ORFEO-GAIA and OORFE-NMGRID CHF Correlations in the Dominion Energy Vipre-D Computer Code Response ML23188A0202023-07-26026 July 2023 Closeout of Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML23207A1102023-07-26026 July 2023 NRC Regulatory Issues Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations IR 05000336/20234012023-07-17017 July 2023 Material Control and Accounting Program Inspection Report 05000336/2023401 and 05000423/2023401 - (Cover Letter Only) ML23175A0052023-07-12012 July 2023 Alternative Request P-07 for Pump Periodic Verification Testing Program for Containment Recirculation Spray System Pumps ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23178A1682023-06-26026 June 2023 2022 Annual Report of Emergency Core Cooling System (ECCS) Model Changes Pursuant to the Requirements of 10 CFR 50.46 ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23151A0742023-06-12012 June 2023 Review of the Spring 2022 Steam Generator Tube Inspection Report ML23159A2202023-06-0808 June 2023 Associated Independent Spent Fuel Storage Installation Revision to Emergence Plan - Report of Changes IR 07200047/20234012023-06-0808 June 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200047/2023401 2024-01-04
[Table view] |
Text
I'll Dominion Nuclear Connecticut, Inc.
Millstone Power Station Dominion Rope Ferry Road Waterford, CT 06385 Docket No. 50-336 B18946 RE: 10 CFR 50.55a(a)(3)(ii)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit No. 2 Inservice Inspection Program Alternative Request RR-89-42 for the Inspection of Pressure-Retaininq Surfaces of the Reactor Vessel Bottom Head Area Pursuant to the provisions of 10 CFR 50.55a(a)(3)(ii), Dominion Nuclear Connecticut, Inc. (DNC) requests U.S. Nuclear Regulatory Commission (NRC) approval for the attached Inservice Inspection (ISI) Program Alternative Request RR-89-42. The American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) requires examinations of the reactor vessel bottom head areas during the system leakage and hydrostatic test at normal operating pressure and temperature (NOP/NOT).
Due to the harsh conditions in these areas at NOP/NOT and the ability to achieve the objectives of the required examination at different conditions during refueling outages when temperatures are less harsh, the ASME Code requirement represents a hardship for Millstone Unit No. 2 without a compensating increase in the level of quality and safety.
The Millstone Unit No.2 ISI Program is based on the ASME Code, Section Xl, 1989 Edition, no Addenda. This request is for the Third Ten-Year Interval of the ISI Program at Millstone Unit No. 2, which began on April 1, 1999.
This request is submitted in support of inspection activities required to be completed during upcoming refueling outages. The next refueling outage is scheduled for the Fall of 2003. Accordingly, DNC requests review and approval of this alternative by October 2003.
There are no regulatory commitments contained within this letter.
4XW7
U.S. Nuclear Regulatory Commission B18946/Page 2 If you should have any questions regarding this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.
Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.
J. Alanjpnie Site ViipPresident - Millstone Attachment (1) cc: H. J. Miller, Region I Administrator R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 Millstone Senior Resident Inspector
Docket No. 50-336 B18946 Attachment 1 Millstone Power Station, Unit No. 2 10 CFR 50.55a Request Number: RR-89-42
U.S. Nuclear Regulatory Commission B18946/Attachment 1/Page 1 Millstone Power Station, Unit No. 2 10 CFR 50.55a Request Number: RR-89-42 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(ii)
-- Hardship or Unusual Difficulty without Compensating Increase in Level of Quality or Safety--
1.0 ASME CODE COMPONENT(S) AFFECTED Code Class 1 Pressure-Retaining Surfaces of the Reactor Vessel Bottom Head Area 2.0 APPLICABLE CODE EDITION AND ADDENDA American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code), Section Xl, 1989 Edition, no Addenda 3.0 APPLICABLE CODE REQUIREMENT The following Code requirements are applicable to the examination of the reactor vessel bottom head area during the system leakage and hydrostatic tests.
ASME Section Xl, 1989 Edition, Table IWB-2500-1, Examination Category B-P, Item Nos. B15.10 and B15.11 require a visual (VT-2) examination of the reactor vessel pressure retaining boundary during the system leakage test of IWB-5221, following each refueling outage and during the system hydrostatic test of IWB-5222 at or near the end of the inspection interval. Code Case N-498-1 has been approved for use at Millstone Unit No. 2 that allows the normal operating pressure and temperature requirements of IWB-5221 to be used during the system hydrostatic test as an alternative to the elevated hydrostatic pressure requirements of IWB-5222.
4.0 REASON FOR THE REQUEST Pursuant to the provisions of 10 CFR 50.55a(a)(3)(ii), Dominion Nuclear Connecticut, Inc. (DNC) requests U.S. Nuclear Regulatory Commission (NRC) approval to perform the examination of the reactor vessel bottom head area at different plant conditions than those required by the ASME Code. Performance of the required examinations during the system leakage and hydrostatic test is performed at normal operating pressure and temperature (NOP/NOT), which represents undue hardship without a commensurate safety benefit.
Figure 1 provides an illustration of the arrangement of the under vessel area.
This area is classified as a confined space with limited air circulation and limited access. With the Reactor Coolant System (RCS) at NOP/NOT conditions,
U.S. Nuclear Regulatory Commission B18946/Attachment 1/Page 2 ambient temperatures in this area are very high due to the uninsulated condition of the vessel. The high temperature levels in this area create a significant safety hazard to personnel entering this space. Additionally, the position of the vessel in the cubicle is relatively low with about a 2-foot distance between the floor and bottom of the vessel. Consequently, the floor elevation poses an additional hazard for personnel in the area to inadvertently contact the uninsulated vessel surface with a potential for a severe burn.
Figure 1: General Arrangement of Reactor Vessel Area In Mode 3, Cold Shutdown or refueling Modes during a refueling outage, the radiation dose rate in the area is estimated to be at approximately 2 to 4 R/Hr and consideration to As-Low-As-Reasonably-Achievable (ALARA) Program goals will be applied for performance of this examination. However, radiation exposure is not included as a reason for the request because no significant reductions in exposures to radiation are expected from this proposal.
5.0 PROPOSED ALTERNATIVE AND BASIS FOR USE DNC proposes to conduct the VT-2 examination of the pressure retaining surfaces of the reactor vessel bottom head following plant cooldown during each refueling outage. With the substantially lower RCS temperatures, the under vessel area will also be at a lower temperature and therefore less hazardous to personnel.
U.S. Nuclear Regulatory Commission B18946/Attachment 1/Page 3 The objective of the required VT-2 visual examination at normal operating pressure and temperature is to detect evidence of leakage and thereby verify the integrity of the RCS pressure boundary. DNC believes that this objective can be achieved by the same VT-2 visual examination performed following the RCS cooldown to support the refueling outage. There is no insulation on the reactor vessel in this area and evidence of leakage and boric acid corrosion occurring during the fuel cycle would be detected by visual examination of this area at the end of the cycle during the outage. This ability to detect evidence of leakage and boric acid corrosion in this area during the refueling outage provides reasonable assurance of leak tight integrity of the reactor vessel bottom head area without exposing personnel to the environmental hazards associated with entry into this area during Mode 3 at normal operating pressure and temperature.
Note that there are no bottom mounted instrumentation nozzles on the reactor vessel at Millstone Unit No. 2. Consequently, degradation in the vessel wall with the potential to challenge the pressure boundary integrity is not expected in the absence of penetrations.
6.0 DURATION OF PROPOSED ALTERNATIVE This alternative is requested for the remainder of the Third Ten-Year Inspection Interval for Millstone Unit No. 2, which began on April 1, 1999.
7.0 PRECEDENTS
A similar ASME Code relief request was submitted by Virginia Electric and Power Company and aproved by the NRC for the Surry Power Station Units 1 and 2 on August 1, 2001. '
(1) NRC letter, Surry Power Station Units 1 and 2 re: Inservice Inspection (ISI) Program Relief Requests RR 14 (Unit 1) and RR 8 (Unit 2) (TAC NOS. MB1 083 and MB1084), August 1, 2001, Accession No. ML012060064.