RCS P/T Limits 3.4.3 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4.3 RCS Pressure and Temperature (P/T) Limits LCO 3.4.3 RCS pressure and RCS temperature shall be limited during RCS heatup and cooldown, criticality, and inservice leak and hydrostatic testing in accordance with:
- a. A maximum heatup rate as specified in Figure 3.4.3-1, Figure 3.4.3-2, Figure 3.4.3-3, or Figure 3.4.3-4; l
- b. A maximum cooldown rate as specified in Figure 3.4.3-5 or Figure 3.4.3-6; and I
- c. A maximum temperature change of < 10 0F in any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period during inservice leak end hydrostatic testing operations above the heatup and cooldown limit curves.
APPLICABILITY: At all times.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. - ---- NOTE------ A.1 Restore parameter(s) to 30 minutes Required Action A.2 within limits.
shall be completed whenever this Condition AND is entered.
A.2 Determine RCS is 72 hours3 days <br />0.429 weeks <br />0.0986 months <br /> acceptable for continued Requirements of LCO operation.
not met in MODE 1, 2, 3, or 4..
B. Required Action and B.1 Be in MODE 3. 6 hours0.25 days <br />0.0357 weeks <br />0.00822 months <br /> associated Completion Time of Condition A not AND met.
B.2 Be in MODE 5 with RCS 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br /> pressure < 500 psig.
(continued)
McGuire Units I and 2 3.4.3-1 Amendment NOS. 214 & 195
RCS P/T Umits 3.4.3 MATERIAL PROPERTY BASIS LIMITING MATERIAL: LOWER SHELL LONGITUDINAL WELD LIMPTING ART VALUES AT 34 EFPY: 114T, 2020 F 3/4T, 1460F 2500 2250 2000 1750 6
1500 V. 1250 a
PC 1000 U
wV 750 500 250 0
0 50 100 150 200 250 300 350 400 450 500 550 Reactor Beitline Reeion Fluid Temperature (Dea. F)
Figure 3.4.3-1 McGuire Unit 1 Reactor Coolant System Heatup Limitations (Heatup Rate of 6O 0F/hr) Applicable for the First 34 EFPY (Without Margins for Instrumentation Errors) Using 1996 App.G Methodology & ASME Code Case N-641 McGuire Units 1 and 2 3.4.3-3 Amendment Nos. 214 & 195
RCS P/T Umits 3.4.3 MATERIAL PROPERTY BASIS LIMITING MATERIAL: LOWER SHELL LONGrTUDINAL WELD LIMITING ART VALUES AT 34 EPPY: 114T, 2020F 3/4T, 146 0F 2500 2250 2000 1750 8,1500
.64.
L 1250 g 1000 3I# ?50 500 250 0
0 50 100 150 200 250 300 350 400 450 500 550 Reactor Beltline Region Fluid Temperature (Deg. F)
Figure 3A.3-2 McGuire Unit 1 Reactor Coolant System Heatup Limitations (Heatup Rates of 80 &
1000 F/hr) Applicable for the First 34 EFPY (Without Margins for Instrumentation Errors) Using 1996 App.G Methodology & ASME Code Case N-641 McGuire Units 1 and 2 3.4.3-4 Amendment Nos. 214 & 195
RCS PTr Limits 3.4.3 MATERIAL PROPERTY BASIS LIMITING MATERIAL: LOWER SHELL FORGING 04 LIMrTING ART VALUES AT 34 EFPY: 114T, 1230 F 3/4T, 910 F 2500 2250 2000 1750 1500 V-
- a. 1250 C
E V
1000 750 500 250 0
0 50 100 150 200 250 300 350 400 450 500 550 Reactor Beltline Region Fluid Temperature (Deg. F)
Flgure 3.4.3-3 McGuire Unit 2 Reactor Coolant System Heatup limitations (HIeatup Rate of 600 F/hr) Applicable for the First 34 EFPY (Without Margins for Instrumentation Errors) Using 1996 App.G Methodology & ASME Code Case N-641 McGuire Units 1 and 2 3.4.3-5 Amendment Nos. 214 & 195-
RCS PIT Limits 3.4.3 MATERIAL PROPERTY BASIS LIMirING MATERIAL: LOWER SHELL FORGING 04 LIMITING ART VALUES AT 34 EFPY: 1/4T, 1230F 3/4T, 910F 2500 2250 2000 a 1750 E 1500 C
1250 I.S 1000 c
M V
lam 4 750 v:
500 I
250 0
0 50 100 150 200 250 300 350 400 450 5O0 550 Reactor Beltline Region Fluid Temperature (Deg. F)
Figure 3.4.3--4 McGuire Unit 2 Reactor Coolant System Heatup Limitations (Heatup Rates of 80 &
100°F/hr) Applicable for the First 34 EFPY (Without Margins for Instrumentation Errors) Using 1996 App.G Methodology & ASME Code Case N-641 McGuire Units 1 and 2 3.4.3-6 Amendment Nos. 214 & 195
RCS P/T Limits 3.4.3 MATERIAL PROPERTY BASIS LIMITING MATERIAL: LOWER SHELL LONGITUDINAL WELD LIMITING ART VALUES AT 34 EFPY: 1/4T, 2020 F 3/4T, 146 0F 2500 2250 2000 I-- 1750 1500 P4) 4)
1250 PC U5 1000 1Z 750 500 250 0
0 50 100 150 200 250 300 350 400 450 500 550 Reactor Beltline Region Fluid Temperature (Deg. F) \
Figure 3A.3-5 McGuire Unit 1 Reactor Coolant System Cooldown Limitations (Cooldown Rates up to 100°F/hr) Applicable for the First 34 EFPY (Without Margins for Instrumentation Errors) Using 1996 App.G Methodology & ASME Code Case N-641 McGuire Units 1 and 2 3.4.3-7 Amendment Nos. 2 1 4 & 195
RCS PIT Limits 3.4.3 MATERIAL PROPERTY BASIS LIMITING MATERIAL: LOWER SHELL FORGING 04 LIMITING ART VALUES AT 34 EFPY: 1/4T, 123 0F 3/4T, 910 F 2500 2250 2000 1750 a-P. 1500 1250 C
e3la 1000 M
I 750 500 250 0
0 50 100 150 200 250 300 350 400 450 500 550 Reactor Beitline Region Fluid Temperature (Deg. F)
Figure 3.43-6 McGuire Unit 2 Reactor Coolant System Cooldown Limitations (Cooldown Rates up to 100F/hr) Applicable for the First 34 EFFY (Without Margins for Instrumentation Errors) Using 1996 App.G Methodology & ASME Code Case N-641 McGuire Units 1 and 2 3.4.3-8 Amendment Nos. 214 & 195
LTOP System 3.4.12 ACTIONS
-NOTE-LCO 3.0.4 is not applicable.
CONDITION _REQUIRED ACIO____ CMEI TIM CONDITION REQUIRED ACTION COMPLETION TIME A. Two centrifugal charging A.1 ---- NOTE -------
pumps capable of Two centrifugal charging injecting into the RCS. pumps may be capable of Injecting into the RCS OR during pump swap operation for < 15 minutes.
One centrifugal charging pump and one safety Initiate action to verify a Immediately injection pump capable maximum of one centrifugal of injecting into the RCS. charging pump or one safety injection pump is OR capable of injecting Into the RCS.
Two safety injection pumps capable of OR injecting into the RCS.
A.2.1 Verify RHR suction relief Immediately valve is OPERABLE and the suction isolation valves are open.
AND A.2.2.1 Verify RCS cold leg Immediately temperature > 174 0F (Unit
- 1) or > 89 0F (Unit 2). I OR A.2.2.2 Verify RCS cold leg Immediately temperature > 74 0F and cooldown rate < 200F/ hr (Unit 1), or > 74 0F and cooldown rate < 6 0°F/hr (Unit 2).
OR (continued)
McGuire Units 1 and 2 3.4.12-2 Amendment Nos. 214 & 195
LTOP System 3.4.12 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.3 Verify two PORVs secured Immediately open and associated block valves open and power removed.
OR A.4 Depressurize RCS and Immediately establish RCS vent of > 4.5 square inches.
OR A.5.1 Depressurize RCS and Immediately establish RCS vent of
> 2.75 square inches.
AND A.5.2 Verify two PORVs are Immediately OPERABLE.
B. An accumulator not B.1 Isolate affected 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> isolated when the accumulator.
accumulator pressure is greater than or equal to the maximum RCS pressure for existing cold leg temperature allowed in Specification 3.4.3.
C. Required Action and C.1 Increase RCS cold leg 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> associated Completion temperature to > 3000 F.
lime of Condition B not met. OR C.2 Depressurize affected 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> accumulator to less than the maximum RCS pressure for existing cold leg temperature allowed by 3.4.3.
.Specification D. One PORV inoperable In D.1 Restore PORV to 7 days MODE 4. OPERABLE status.
(continued)
McGuire Units 1 and 2 3.4.12-3 Amendment Nos. 214 & 195
LTOP System 3.4.12 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME E. One PORV inoperable in E.1 Suspend all operations Immediately MODE 5 or 6. which could lead to a water solid pressurizer.
AND E.2 Restore PORV to 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> OPERABLE status.
F. Required Action and F.1. Verify RCS cold leg 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> associated Completion temperature > 1740F (Unit Time of Condition E not 1) or > 890F (Unit 2).
met.
AND F.2 Verify RHR suction relief valve Is OPERABLE and 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> the suction isolation valves are open.
G. Two PORVs inoperable. G.1 Depressurize RCS and 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> establish RCS vent of OR > 2.75 square Inches.
Required Action and associated Completion Time of Condition C, D, E, or F not met.
OR LTOP System inoperable for any reason other than Condition A, B, C, D, E, or F.
McGuire Units 1 and 2 3.4.12-4 Amendment Nos. 214 & 195
RCS PIT Limits B 3.4.3 BASES BACKGROUND (continued)
Appendix H of 10 CFR 50 (Ref. 4). The operating P/T limit curves will be adjusted, as necessary, based on the evaluation findings and the recommendations of Regulatory Guide 1.99 (Ref. 5).
A second program that employs excore cavity dosimetry to monitor the reactor vessel neutron fluence has been installed in both units. This program meets the requirements of 10 CFR 50 Appendix H (Ref. 4).
The P/T limit curves are composite curves established by superimposing limits derived from stress analyses of those portions of the reactor vessel and head that are the most restrictive. At any specific pressure, temperature, and temperature rate of change, one location within the reactor vessel will dictate the most restrictive limit. Across the span of the P/T limit curves, different locations are more restrictive, and, thus, the curves are composites of the most restrictive regions.
The heatup curve represents a different set of restrictions than the cooldown curve because the directions of the thermal gradients through the vessel wall are reversed. The thermal gradient reversal alters the location of the tensile stress between the outer and inner walls.
The criticality limit curve includes the Reference 1 requirement that it be 2: 400 F above the heatup curve or the cooldown curve, and not less than the minimum permissible temperature for ISLH testing. However, the criticality curve is not operationally limiting; a more restrictive limit exists in LCO 3.4.2, ORCS Minimum Temperature for Criticality.'
The consequence of violating the LCO limits is that the RCS has been operated under conditions that can result in brittle failure of the RCPB, possibly leading to a nonisolable leak or loss of coolant accident. In the event these limits are exceeded, an evaluation must be performed to determine the effect on the structural integrity of the RCPB components.
The ASME Code, Section Xl, Appendix E (Ref. 6), provides a recommended methodology for evaluating an operating event that causes an excursion outside the limits.
APPLICABLE The PIT limits are not derived from Design Basis Accident (DBA)
SAFETY ANALYSES analyses. They are prescribed during normal operation to avoid encountering pressure, temperature, and temperature rate of change conditions that might cause undetected flaws to propagate and cause nonductile failure of the RCPB, an unanalyzed condition. Although the P/T limits are not derived from any DBA, the PIT limits are acceptance limits since they preclude operation in an unanalyzed condition.
RCS P/T limits satisfy Criterion 2 of 10 CFR 50.36 (Ref. 7).
McGuire Units 1 and 2 B 3.4.3-2 Revision No.
LTOP System B 3.4.12 BASES APPLICABLE SAFETY ANALYSES (continued)
PORV Performance The fracture mechanics analyses show that the vessel is protected when the PORVs are set to open at or below the specified limit. The setpoints are derived by analyses that model the performance of the LTOP System, assuming the limiting LTOP transient of one centrifugal charging pump or one safety injection pump injecting Into the RCS. These analyses consider pressure overshoot and undershoot beyond the PORV opening and closing, resulting from signal processing and valve stroke times. The PORV setpoints at or below the derived limit ensures the Reference 1 P/T limits will be met.
The PORV setpoints will be updated when the revised P/T limits conflict with the LTOP analysis limits. The P/T limits are periodically modified as the reactor vessel material toughness decreases due to neutron embrittlement caused by neutron irradiation. Revised limits are determined using neutron fluence projections and the results of examinations of the reactor vessel material irradiation surveillance specimens. The Bases for LCO 3.4.3, "RCS Pressure and Temperature (P/T) Limits," discuss these examinations.
The PORVs are considered active components. Thus, the failure of one PORV is assumed to represent the worst case, single active failure.
RCS Vent Performance With the RCS depressurized, analyses show a vent size of 2.75 square inches is capable of mitigating the allowed LTOP overpressure transient.
The capacity of a vent this size is greater than the flow of the limiting transient for the LTOP configuration, one centrifugal charging pump or one safety injection pump OPERABLE, maintaining RCS pressure less than the maximum pressure on the P/T limit curve.
The RCS vent size will be re-evaluated for compliance each time the P/T limit curves are revised based on the results of the vessel material surveillance.
The RCS vent is passive and is not subject to active failure.
The LTOP System satisfies Criterion 2 of 10 CFR 50.36 (Ref. 7).
McGuire Units 1 and 2 B 3.4.12-5 Revision No.
LTOP System B 3.4.12 BASES LCO This LCO requires that the LTOP System Is OPERABLE. The LTOP System is OPERABLE when the minimum coolant input and pressure relief capabilities are OPERABLE. Violation of this LCO could lead to the loss of low temperature overpressure mitigation and violation of the Reference 1 limits as a result of an operational transient.
To limit the coolant input capability, the LCO permits a maximum of one centrifugal charging pump or one safety injection pump capable of injecting into the RCS and requires all accumulator discharge Isolation valves closed and immobilized when accumulator pressure Is greater than or equal to the maximum RCS pressure for the existing RCS cold leg temperature allowed in LCO 3.4.3.
The elements of the LCO that provide low temperature overpressure mitigation through pressure relief are:
- a. Two OPERABLE PORVs (NC-32B and NC-34A); or A PORV is OPERABLE for LTOP when its block valve is open, Its lift setpoint is set to the specified limit and testing proves its automatic ability to open at this setpoint, and motive power Is available to the valve and its control circuit.
An RCS vent is OPERABLE when open with an area of
> 2.75 square inches.
Each of these methods of overpressure prevention is capable of mitigating the limiting LTOP transient.
The LCO is modified with a note that specifies that a PORV secured in the open position may be used to meet the RCS vent requirement provided that its associated block valve is open and power removed.
With the PORV physically secured or locked in the open position with its associated block valve open and power removed, this vent path is passive and is not subject to active failure.
APPLICABILITY This LCO is applicable In MODE 4 when any RCS cold leg temperature is'
< 3001F, In MODE 5, and in MODE 6 when the reactor vessel head is on.
The pressurizer safety valves provide overpressure protection that meets the Reference 1 P/T limits above 3000F. When the reactor vessel head is off, overpressurization cannot occur.
LCO 3.4.3 provides the operational P/T limits for all MODES.
LCO 3.4.10, 3Pressurizer Safety Valves," requires the OPERABILITY of McGuire Units 1 and 2 B 3.4.12-6 Revision No.
. I LTOP System B 3.4.12 BASES APPLICABILITY (continued) the pressurizer safety valves that provide overpressure protection during MODES 1,2, and 3, and MODE 4 above 3000F.
Low temperature overpressure prevention is most critical during shutdown when the RCS is water solid, and a mass or heat input transient can cause a very rapid increase In RCS pressure when little or no time allows operator action to mitigate the event.
The Applicability is modified by a Note stating that accumulator Isolation is only required when the accumulator pressure Is more than or at the maximum RCS pressure for the existing temperature, as allowed by the P/T limit curves. This Note permits the accumulator discharge isolation valve Surveillance to be performed only under these pressure and temperature conditions.
ACTIONS LCO 3.0.4 is not applicable for entry Into LTOP operation.
A.1. A.2.1. A.2.2.1. A.2.2.2. A.3. A.4. A.5.1. and A.5.2 With two centrifugal charging pumps, safety injection pumps, or a combination of each, capable of injecting into the RCS, RCS overpressurization is possible.
To immediately initiate action to restore restricted coolant input capability to the RCS reflects the urgency of removing the RCS from this condition.
Two pumps may be capable of injecting into the RCS provided the RHR suction relief valve is OPERABLE with:
- 1. RCS cold leg temperature > 1740 F (Unit 1), or
- 2. RCS cold leg temperature > 890 F (Unit 2), or
- 3. RCS cold leg temperature > 740 F and cooldown rate < 200 F/hr (Unit 1),
or
- 4. RCS cold leg temperature > 740 F and cooldown rate < 6 0°F/hr (Unit 2),
or
- 5. two PORVs secured open with associated block valves open and power removed, or
- 6. a RCS vent of > 4.5 square inches, or
- 7. a RCS vent of > 2.75 square inches and two OPERABLE PORVs (the RCS vent shall not be one of the two OPERABLE PORVs).
For cases where no reactor coolant pumps are Inoperation, RCS cold leg temperature limits are to be met by monitoring of BOTH the WR Cold Leg temperatures and Residual Heat Removal Heat Exchanger discharge temperature. With both PORVS and block valves secured open, or with McGuire Units I and 2 B 3.4.1 2-7 Revision No.
t I LTOP System B 3.4.12 BASES ACTIONS (continued) active failure of the remaining valve path during this time period is very low.
E.1 and E.2 The consequences of operational events that will overpressurize the RCS are more severe at lower temperature (Ref. 8). Thus, with one of the two PORVs inoperable in MODE 5 or In MODE 6 with the head on, all operations which could lead to a water solid pressurizer must be suspended immediately and the Completion Time to restore two valves to OPERABLE status is 24 hours1 days <br />0.143 weeks <br />0.0329 months <br />.
The Completion Time represents a reasonable time to investigate and repair several types of relief valve failures without exposure to a lengthy period with only one OPERABLE PORV to protect against overpressure events.
F.1 and F.2 If the Required Actions and associated Completion Times of Condition E are not met, then alternative actions are necessary to establish the required redundancy in relief capacity. This is accomplished by verifying that the RHR relief valve Is OPERABLE and the RHR suction isolation valves open and the RCS cold leg temperature > 1740F (Unit 1) or > B90 F (Unit 2). For cases where no reactor coolant pumps are in operation, RCS cold leg temperature limits are to be met by monitoring of BOTH the WR Cold Leg temperatures and Residual Heat Removal Heat Exchanger discharge temperature. The Completion Time of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reflects the Importance of restoring the required redundancy at lower RCS temperatures.
G.1 The RCS must be depressurized and a vent must be established within 8 hours0.333 days <br />0.0476 weeks <br />0.011 months <br /> when:
- a. Both required PORVs are inoperable; or
- b. A Required Action and associated Completion rime of Condition C, D, E, or F Is not met; or McGuire Units 1 and 2 B 3.4.12-9 Revision No.