June 17, 2003 LICENSEE:
STP Nuclear Operating Company FACILITY:
South Texas Project, Unit 1
SUBJECT:
SUMMARY
OF HEADQUARTERS, REGION IV, AND STP NUCLEAR OPERATING COMPANY (STPNOC) MAY 8, 2003, TELEPHONE CONFERENCE CALL REGARDING SOUTH TEXAS PROJECT, UNIT 1, BOTTOM MOUNTED INSTRUMENTATION LEAKAGE ISSUE; STATUS OF ACTIVITIES (TAC NO. MB8435)
On May 8, 2003, the NRC Headquarters and Region IV staff held a telephone conference call with STPNOC, the licensee for South Texas Project, Unit 1. The conference call was a continuation of the ongoing weekly discussions following the discovery of leakage at the interface of reactor vessel bottom head and bottom mounted instrumentation penetrations 1 and 46. Enclosure 1 is a list of participants. Enclosure 2 is the Conference Call Agenda.
On this telephone conference call, the licensee briefed the NRC on the status of nondestructive examination (NDE) and the status of planning for repair activities.
Overall Unit 1 Status The licensee stated offloading of the core was proceeding and that 101 of the 193 fuel assemblies had been offloaded. The licensee expected to complete offloading fuel by May 9 and that the core barrel was to be removed on Sunday.
Planned NDE Activities Lynchburg demonstration activities are complete and NDE Demonstration is ongoing at Waltz Mill today.
Full scale mock-up will be on site today. Plans are to have the mock-up flooded. On-site demonstration for Westinghouse is planned for Sunday and on Monday for Framatome.
NDE delivery equipment will be packaged and shipped to the site. NDE data acquisition will commence on May 15.
Status of Repair Activities The licensee has selected Framatome as contractor and has chosen the half nozzle repair option.
Root Cause Investigation The licensee is following the Materials Reliability Program failure modes and effects analysis to arrive at the cause of the failure and leakage.
The licensee confirmed that the J-groove welds are stick shielded metal arc weld laid by hand. Preparations for full scale hemispheric weld mock up are in progress.
The licensee is evaluating other NDE techniques to provide information that will be useful to the understanding of the root cause.
Schedule for the next week Special Inspection team will be on site. The licensee will keep the team informed. Licensee plans to have the next public meeting in the week of June 2, 2003.
/RA/
Mohan C. Thadani, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-498
Enclosures:
- 1. List of Participants
- 2. Conference Call Agenda cc w/encls: See next page The licensee confirmed that the J-groove welds are stick shielded metal arc weld laid by hand. Preparations for full scale hemispheric weld mock up are in progress.
The licensee is evaluating other NDE techniques to provide information that will be useful to the understanding of the root cause.
Schedule for the next week Special Inspection team will be on site. The licensee will keep the team informed. Licensee plans to have the next public meeting in the week of June 2, 2003.
/RA/
Mohan C. Thadani, Senior Project Manager, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-498
Enclosures:
- 1. List of Participants
- 2. Conference Call Agenda cc w/encls: See next page DISTRIBUTION:
PUBLIC PDIV-1 Reading RidsNrrDlpmLpdiv (HBerkow)
RidsNrrDlpmLpdiv1(RGramm)
RidsNrrPMMThadani RidsNrrLAMMcAllister RidsNrrAdpt (BSheron/TMensah)
RidsNrrDlpm (JZwolinski/TMarsh)
RidsNrrDe (RBarrett/CGrimes)
RidsRgn4MailCenter (AHowell, WJohnson)
BMcDermott BBateman SCoffin ESullivan MMitchell KManoly DTerao JFoster WCullen WReckley SBloom SLee CMoyer MHartzman AHiser TFarnholtz, RIV RidsOgcRp RidsAcrsAcnwMailCenter TMensah CGratton KGott MFields, EDO ACCESSION NO: ML031681113
- See previous concurrence NRR-001 OFFICE PDIV-1/PM PDIV-1/LA RIV (e-mail concurrence)
PDIV-1/SC NAME MThadani:sab MMcAllister*
WJohnson RGramm*
DATE 6/17/03 6/13/03 6/17/03 6/13/03 OFFICIAL RECORD COPY LIST OF PARTICIPANTS Licensees Participants Tom Jordan Vice President Engineering and Technical Services Mark McBurnet Manager, Quality & Licensing Steve Thomas Manager, Plant Design Engineering Tim Bowman Manager, Unit 1 Operations Paul Serra Manager, Plant Protection Kevin Richards Outage Manager Tom Strochein Supervising Engineer Harry Murray BMI Project Manager Wayne Harrison Sr. Staff Licensing Engineer NRC Participants Headquarters Region IV Bob Gramm Art Howell Herb Berkow Dwight Chamberlain Karen Gott Gail Good Carol Moyer Bill Johnson Mark Hartzman Charles Marschall Bill Cullen Lee Ellershaw Brian McDermott Tom Farnholtz Allen Hiser Victor Dricks Mohan Thadani Russ Bywater Chris Gratton Matt Mitchell CONFERENCE CALL AGENDA What How Who Time (minutes) 1.
Desired Outcomes & Agenda Review McBurnett 1400 CDT (2) 2.
Overall status of unit 1 Discuss Bowman (5) 3.
High level status of NDE demonstration activities and planned activities for following week*
Discuss McBurnett (5) 4.
Status of repair design activities Discuss Thomas (15) 5.
Response to some of the NRC questions from May 1st meeting Discuss Thomas (10) 6.
Schedule for next call and handle any coordination needed for inspections or other communications Discuss McBurnett (10)
- STPNOC NDE personnel are on travel this week in support of the NDE demonstration activities and will not be on the call. This agenda item will be primarily schedule status.
South Texas, Unit 1 cc:
Mr. Cornelius F. OKeefe Senior Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 A. Ramirez/C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 Mr. L. K. Blaylock Mr. W. C. Gunst City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Mr. C. A. Johnson/A. C. Bakken AEP Texas Central Company P. O. Box 289 Mail Code: N5022 Wadsworth, TX 77483 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-3064 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 D. G. Tees/R. L. Balcom Texas Genco, LP P. O. Box 1700 Houston, TX 77251 Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 A. H. Gutterman, Esq.
Morgan, Lewis & Bockius 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mr. T. J. Jordan, Vice President Engineering & Technical Services STP Nuclear Operating Company P. O. Box 289 Wadsworth, TX 77483 S. M. Head, Manager, Licensing Nuclear Quality & Licensing Department STP Nuclear Operating Company P. O. Box 289, Mail Code: N5014 Wadsworth, TX 77483 Environmental and Natural Resources Policy Director P. O. Box 12428 Austin, TX 78711-3189 Jon C. Wood Matthews & Branscomb 112 East Pecan, Suite 1100 San Antonio, TX 78205 Arthur C. Tate, Director Division of Compliance & Inspection Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326
South Texas, Unit 1 cc:
Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087 Mr. Terry Parks, Chief Inspector Texas Department of Licensing and Regulation Boiler Division P. O. Box 12157 Austin, TX 78711 Mr. Ted Enos 4200 South Hulen Suite 630 Ft. Worth, Texas 76109 Mr. James J. Sheppard President and Chief Executive Officer STP Nuclear Operating Company South Texas Project Electric Generating Station P. O. Box 289 Wadsworth, TX 77483