Request for Additional Information - Amendment Application Pressure-Temperature Limit Curves
ML031260301
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 05/06/2003
From: Tam P
NRC/NRR/DLPM/LPD1
To: Conway J
Nine Mile Point
Tam P, NRR/DLPM, 415-1451
References
TAC MB6687
Download: ML031260301 (5)


Text

May 6, 2003 Mr. John T. Conway Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION - AMENDMENT APPLICATION RE: PRESSURE-TEMPERATURE LIMIT CURVES (TAC NO. MB6687)

Dear Mr. Conway:

The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing the subject proposed amendment, requested by your application dated November 15, 2002, as supplemented by letter on January 15, 2003. On April 30, 2003, we held a telephone conference with Messrs. D. Wolniak, C. Mackaman, G. Inch, T. Salvagan, et al. of your staff, and your contractor, on comments we previously e-mailed to your staff (available in the Agencywide Documents Access and Management System under Accession No. ML031140208).

Participants agreed that a formal request for additional information (RAI) be issued. Enclosed please find the RAI. Your staff agreed that it can respond before June 30, 2003.

If you have any questions, please call me at 301-415-1451.

Sincerely,

\RA\

Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-220

Enclosure:

As stated cc w/encl: See next page

May 6, 2003 Mr. John T. Conway Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION - AMENDMENT APPLICATION RE: PRESSURE-TEMPERATURE LIMIT CURVES (TAC NO. MB6687)

Dear Mr. Conway:

The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing the subject proposed amendment, requested by your application dated November 15, 2002, as supplemented by letter on January 15, 2003. On April 30, 2003, we held a telephone conference with Messrs. D. Wolniak, C. Mackaman, G. Inch, T. Salvagan, et al. of your staff, and your contractor, on comments we previously e-mailed to your staff (available in the Agencywide Documents Access and Management System under Accession No. ML031140208).

Participants agreed that a formal request for additional information (RAI) be issued. Enclosed please find the RAI. Your staff agreed that it can respond before June 30, 2003.

If you have any questions, please call me at 301-415-1451.

Sincerely,

\RA\

Peter S. Tam, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-220

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC PDI-1 R/F RLaufer PTam OGC LLois ACRS BPlatchek, RGI SLittle CSydnor Accession Number: ML031260301 OFFICE PDI-1/PM PDI-1/LA SRXB SRXB/SC PDI-1/SC NAME PTam SLittle* LLois JUhle RLaufer DATE 5/2/03 5/6/03 5/5/03 5/5/03 5/6/03 OFFICIAL RECORD COPY

  • Concurred by e-mail

REQUEST FOR ADDITIONAL INFORMATION NINE MILE POINT NUCLEAR STATION, UNIT NO. 1 (NMP1)

AMENDMENT APPLICATION REGARDING PRESSURE-TEMPERATURE LIMIT CURVES

References:

(1) Letter, J. T. Conway to U.S. Nuclear Regulatory Commission (NRC),

November 15, 2002.

(2) Letter, J. T. Conway to U.S. Nuclear Regulatory Commission, January 15, 2002 The NRC staff has completed its review of the referenced documents. Based on this review, the NRC staff plans to approve your proposed use of the pressure-temperature (P-T) limit curves for 23.38, in lieu of 28, effective-full-power-years (EFPYs) of operation. If you agree, the NRC staff would request that you revise all the curves with a label to limit their usefulness to 23.38 EFPYs. In a telephone conference on April 30, 2003, the NRC staff learned that you would pursue approval of the P-T limit curves for 28 EFPYs. To make the curves acceptable for 28 EFPYs, the following issues need to be addressed in a supplement to your application:

Benchmarking - The licensee derived the neutron sources using the power distribution and the ORIGEN 2.1 code. It is not clear to the NRC staff why this code was used since fuel composition as a function of burnup should be available from reload reports. Please justify the derivation of the source. For example, calculate a cycle for which you know the source would compare with results using ORIGEN 2.1.

Poolside Critical Assembly (PCA) Benchmark - The arrangement analyzed has a 12-cm gap between the core and the thermal shield and a 13-cm gap between the thermal shield and the vessel. However, the core-to-shroud distances in Unit 1 range from 10 to about 40 cm and the shroud-to-vessel distance is about 40 cm. The arrangement chosen is not representative of a boiling-water reactor geometry. In addition, the test excluded the Rh-103 and U-238 detectors.

The licensees justification was that the Rh-103 detector is not commonly used due to its short half-life; therefore, the cross sections are not well known. Based on NUREG/CR-6115 (ORNL/TM-13205), the NRC staff disagrees with that justification. The basis for rejecting the U-238 dosimeter was due to cross section difficulties. The purpose of benchmarking is to demonstrate the ability of the methodology as an integrated tool to calculate the dosimeter activation. Based on this review, the benchmarking appears not successful because it analyzed the wrong geometry and rejected dosimeters without a reasonable justification.

NMP1 Surveillance Capsule at 210-Degree Azimuthal - The NRC staff reviewed the NMP1 210-degree surveillance capsule report (the capsule was removed at the end of cycle 12 at 16.81 EFPYs). This report does not include any information on the methodology of neutronic calculations, and in addition, indicates substantial discrepancies between the copper, iron, and nickel dosimeters. The report recommends the fluence value based on the copper results, yet copper activation represents a small part of the spectrum compared to iron and nickel. Iron and nickel results are also available. Because the neutronic methodology was not presented and Enclosure

because of very large discrepancies in the dosimeter response, the NRC staff finds that the NMP1 210-degree surveillance capsule results do not support the benchmarking of the fluence calculational methodology.

Surveillance Capsules Used in the Proposed Benchmarking - The licensee removed, tested, and analyzed a total of five surveillance capsules from both Nine Mile Point units. However, only two capsules were used in the submitted benchmarking analysis. As stated in RG 1.190, one of the objectives of benchmarking is to determine potential bias in the calculation of the best-estimate which requires that all of the existing data be used. The licensee ignored the existence of three Nine Mile Point capsules and made no effort to determine the existence of a bias. The benchmarking effort appears incomplete.

Because you requested approval of a plant-specific methodology, the NRC staff recommends that you concentrate your efforts on the Nine Mile Point surveillance capsules and re-think your effort to calculate the PCA in view of the successful outcome of your NUREG-6115 calculation.

Nine Mile Point Nuclear Station Unit No. 1 Regional Administrator, Region I Mr. James M. Petro, Jr., Esquire U.S. Nuclear Regulatory Commission Counsel 475 Allendale Road Constellation Power Source, Inc.

King of Prussia, PA 19406 111 Market Place Suite 500 Resident Inspector Baltimore, MD 21202 U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 Mr. William M. Flynn, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group 750 East Pratt Street Baltimore, MD 21201-2437