MONTHYEAR3F0824-01, Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 52024-08-21021 August 2024 Independent Spent Fuel Storage Installation Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revision 5 3F0824-02, Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 2622024-08-12012 August 2024 Withdrawal of License Amendment Request to Add License Condition 2.C.21, License Termination Plan, Proposed Change Number 262 3F0624-02, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-06-13013 June 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0624-01, Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 20242024-06-11011 June 2024 Response to Questions from the NRC Environmental Assessment Branchs Review of License Termination Plan During Virtual Meeting Dated May 20, 2024 3F0524-03, Annual Financial Report and Certified Financial Statement2024-05-30030 May 2024 Annual Financial Report and Certified Financial Statement 3F0524-01, Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan2024-05-0909 May 2024 Response to Request for Additional Information for the Environmental Assessment of the License Termination Plan 3F0424-03, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report 3F0424-02, – 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 – 2023 Annual Radioactive Effluent Release Report 3F0424-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-12012 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-04, Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 42024-02-23023 February 2024 Independent Spent Fuel Storage Installation Security Plan, Security Training and Qualification Plan, and Safeguards Contingency Plan, Revision 4 3F0224-05, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-22022 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0224-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-0808 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-19019 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0124-01, Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version)2024-01-18018 January 2024 Response to Request for Additional Information for the Additional Information Assessment of the License Termination Plan for Crystal River, Unit 3 Nuclear Generating Plant (Public Version) 3F0623-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-06-0101 June 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0423-03, 2022 Annual Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Annual Radiological Environmental Operating Report 3F0423-02, 2022 Annual Radioactive Effluent Release Report2023-04-18018 April 2023 2022 Annual Radioactive Effluent Release Report 3F0423-01, 2022 Individual Monitoring NRC Form 5 Report2023-04-0404 April 2023 2022 Individual Monitoring NRC Form 5 Report 3F0323-03, Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2023-03-31031 March 2023 Decommissioning Funding Plan for Independent Spent Fuel Storage Installation 3F0323-02, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20222023-03-29029 March 2023 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2022 3F0323-01, Onsite Property Insurance Coverage2023-03-0202 March 2023 Onsite Property Insurance Coverage 3F0123-01, Proof of Financial Protection2023-01-26026 January 2023 Proof of Financial Protection 3F1222-01, Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan2022-12-12012 December 2022 Nuclear Power Station - License Amendment Request 262 Addition of License Condition 2.C.21, License Termination Plan 3F0522-03, Notification of Revised Decommissioning Cost Estimate2022-05-26026 May 2022 Notification of Revised Decommissioning Cost Estimate 3F0522-01, Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 20222022-05-17017 May 2022 Safety Analysis Report, Quality Assurance Program and 10 CFR 50.59 - 10 CFR 72.48 Report - May 2022 3F0422-02, 2021 Annual Radiological Environmental Operating Report2022-04-0606 April 2022 2021 Annual Radiological Environmental Operating Report 3F0322-01, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20212022-03-30030 March 2022 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2021 3F0322-03, Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1)2022-03-10010 March 2022 Drug and Alcohol Testing Error at HHS-Certified Laboratory, Per 10CFR26.719(c)(1) 3F0322-02, 2021 Individual Monitoring NRC Form 5 Report2022-03-0707 March 2022 2021 Individual Monitoring NRC Form 5 Report 3F0222-01, ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)2022-02-0909 February 2022 ADP CR3, LLC - Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb) 3F0222-02, Onsite Property Insurance Coverage2022-02-0909 February 2022 Onsite Property Insurance Coverage 3F0122-01, License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications2022-01-26026 January 2022 License Amendment Request to Remove from the Facility Operating License, Appendix B, Environmental Protection Plan (Non-Radiological) Technical Specifications 3F0122-02, Proof of Financial Protection2022-01-17017 January 2022 Proof of Financial Protection 3F0122-03, Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report2022-01-17017 January 2022 Complex - Environmental Protection Plan Report: 2021 Sea Turtle Rescue and Recovery Summary Report 3F1021-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-10-21021 October 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0921-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C)2021-09-29029 September 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004 (Minor) (Rev. C) 3F0921-01, to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a2021-09-14014 September 2021 to License Amendment Request, Revision 0, ISFSI Security Plan, Revision a 3F0721-01, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-07-13013 July 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 3F0621-02, Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S2021-06-16016 June 2021 Reporting Related to the National Pollutant Discharge Elimination System (NPDES) Permit Id FL0A00004-001-IW1S 3F0421-05, 2020 Individual Monitoring NRC Form 5 Report2021-04-27027 April 2021 2020 Individual Monitoring NRC Form 5 Report 3F0421-04, ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization2021-04-13013 April 2021 ADP CR3, LLC - Supplement to Application for Order Approving Indirect Transfers of Control of Licenses in Connection with Internal Corporate Reorganization 3F0421-03, Proof of Financial Protection2021-04-0707 April 2021 Proof of Financial Protection 3F0421-01, 2020 Annual Radioactive Effluent Release Report2021-04-0606 April 2021 2020 Annual Radioactive Effluent Release Report 3F0421-02, 2020 Annual Radiological Environmental Operating Report2021-04-0606 April 2021 2020 Annual Radiological Environmental Operating Report 3F0321-07, (XEG)-DOE/NRC Forms 741 742 and 743C2021-03-30030 March 2021 (XEG)-DOE/NRC Forms 741 742 and 743C 3F0321-06, Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 20202021-03-29029 March 2021 Annual Decommissioning and Irradiated Fuel Management Financial Status Report for 2020 3F0321-01, License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual2021-03-17017 March 2021 License Amendment Request, Revision to Independent Spent Fuel Storage Installation (ISFSI)-Only Emergency Plan, Draft a, and ISFSI Only Emergency Action Level Bases Manual 3F0321-02, License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a2021-03-17017 March 2021 License Amendment Request, Rev. 0, ISFSI Security Plan, Rev. a 3F0321-05, Onsite Property Insurance Coverage2021-03-15015 March 2021 Onsite Property Insurance Coverage 3F0321-03, Report of Investigation Pursuant to 10 CFR 20, Appendix G2021-03-0909 March 2021 Report of Investigation Pursuant to 10 CFR 20, Appendix G 2024-08-21
[Table view] |
Text
Progress Energy Crystal River Nuclear Plant Docket No 50-302 Operating License No DPR-72 April 15, 2003 3F0403-05 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
Subject:
Crystal River Unit 3 - Completion of the Large Bore Piping Program, Focused Approach
Dear Sir:
The purpose of this letter is to inform the NRC of the completion of the Modified Large Bore Piping Program (Focused Approach) implemented at Crystal River Unit 3 (CR-3) to re-validate the design code and licensing basis of large bore safety-related piping at CR-3.
The Focused Approach was discussed during a meeting held between the NRC staff and representatives of Progress Energy Florida, Inc. (Florida Power Corporation) on September 27, 1999. A written description of the approach was provided to the NRC by letter dated December 13, 1999, "Modified Large Bore Piping Project Description and Withdrawal of the Commitment for Performing Reactor Coolant System Class 1 Attachment Piping Fatigue Analysis."
The attachment to this submittal provides a background summary of the development of the program into the Focused Approach, the accomplishments of the program and provides closure to the commitments made to implement a Large Bore Piping Project.
This submittal is requesting no action from the NRC. Licensee Event Report (LER) 50-302/97-040-00, Inadequate Engineering Documentation for Safety-Related Large Bore Piping Analysis and Pipe Supports, identified the issue at CR-3. The LER was closed in NRC Integrated Inspection Report 50-302/98-07 dated August 31, 1998.
This letter establishes no new regulatory commitments.
If you have any questions regarding this submittal, please contact Mr. Sid Powell, Supervisor, Licensing and Regulatory Programs at (352) 563-4883.
Sincerely,
/ James H. Terry ()
(Engineering Manag~r JHT/lvc Attachment xc: NRR Project Manager Regional Administrator, Region II Senior Resident Inspector Progress Energy Forida, Inc.
Crystal River Nuclear Plant 15760 W. Powerline Street X
Crystal River, FL 34428
PROGRESS ENERGY FLORIDA, INC.
CRYSTAL RIVER UNIT 3 DOCKET NUMBER 50-302/LICENSE NUMBER DPR-72 ATTACHMENT
U. S. Nuclear Regulatory Commission Page 1 of 2 3F0403-05 Attachment
Background
In mid-1996, Crystal River Unit 3 (CR-3) identified concerns regarding the adequacy of the engineering documentation to support the qualification of the large bore safety-related piping analysis and pipe supports (Reference 1). These concerns were evaluated by an independent reviewer, Wais and Associates, Inc., who performed a review of existing support and piping analysis calculations as well as a plant inspection of piping and supports. The report, generated at the conclusion of the review, identified several issues that were potential safety concerns. In 1997, the results of the review and report were entered into the CR-3 Corrective Action Program as Precursor Card (PC) 97-0048. An evaluation of the suspected Design Bases discrepancies was subsequently performed. This evaluation determined the large bore piping systems were capable of performing their safety function despite the concerns discussed in the PC. Due to the generic aspects of the issues, a voluntary Licensee Event Report, (LER 97-040-00 (Reference 2),
was prepared.
The LER documented the concerns and the assessment of the ability to perform the required safety function as discussed above. With that LER and subsequent correspondence, CR-3 committed to a "... comprehensive and rigorous inspection, revalidation and/or re-qualification of CR-3 safety-related large bore piping and pipe supports...," (References 2 and 3). The LER was closed by the NRC in Reference 5. The revalidation commitment and effort continued, but was modified and redirected as a "focused approach." The changes were discussed in a meeting with the NRC staff on September 27, 1999, as documented in Reference 6. A written description of the approach discussed during that meeting was provided in Reference 7. The expectation of the Focused Approach was to: identify all the known issues, categorize the issues, address the issues through evaluation or analysis and identify and fix the outliers. This was to be accomplished with the application of a two-phase focused approach to the large bore piping issue.
Large Bore Piping Program (Focused Approach)
The first phase consisted of the evaluation of all identified issues to determine if they represented a deviation from the CR-3 licensing basis. To accomplish this, the focused approach developed a listing of the issues identified with the original external review. The list also included issues identified during other independent assessments and during the development of the re-qualification calculations performed prior to the transition to the focused approach. The final listing included 51 areas of concern; some were considered to be of very small significance but were included for completeness. With the issues identified and listed, the focused approach evaluated each of those issues in an effort to determine if it represented a potential deviation from the CR-3 licensing basis. These assessments were documented in a set of "Engineering Evaluations."
With the completion of the first phase evaluations, the Focused Approach was able to conclude the majority of the issues did not represent deviations from the licensing basis. However, the first phase evaluations identified issues which required in depth assessment in order to establish compliance with the licensing basis. These issues were addressed as part of the second phase of the Focused Approach.
The second phase performed a detailed evaluation of the licensing basis issues that were identified during the first phase. These assessments involved the development of improved
U. S. Nuclear Regulatory Commission Page 2 of 2 3F0403-05 Attachment technical / licensing basis justification or analysis packages. These analyses either addressed an issue generically or evaluated every specific example of an issue. If an issue could not be resolved with a generic technical assessment, all the piping systems, containing that attribute of concern, were re-qualified. This necessitated reviews of existing piping analyses and support drawings to identify all specific examples of a given issue. With the completion of the analyses, all identified licensing basis concerns had been evaluated and non-conforming supports and/or
-piping segments were identified. Each non-conformance was evaluated for operability, in accordance with Generic Letter 91-18, and determined to be operable. As the non-conformances were identified, they were entered in to the CR-3 Corrective Action Program and corrective actions are underway.
Conclusion All the areas of concern, identified with the LER and subsequent developmental activities, have been reconciled to the plant licensing basis. The evaluations, combined with the analyses efforts, provide documentation supporting CR-3's piping and pipe support compliance with design and licensing basis. The Focused Approach engineering evaluations and issue closure were documented in a summary calculation (Reference 8). The summary calculation, with the licensing basis documentation and the individual calculations, prepared during the Focused Approach, provide a retrievable source for validation of piping system compliance.
References
- 1. FPC to NRC letter, 3F1 197-36, dated November 10, 1997, Additional Information for SSFI Items. SSFI dated October 6, 1997 through October 24, 1997, NRC Inspection No. 50-302/97-14
- 2. FPC to NRC letter, 3F1297-23, dated December 4, 1997, Licensee Event Report (LER) 50-302/97-040-00: Inadequate Engineering Documentation for Safety-Related Large Bore Analysis and Pipe Supports
- 3. FPC to NRC letter, 3F1297-36, dated December 18, 1997, Large Bore Piping and Pipe Support Calculations - Response to NRC Request for Additional Information (TAC No.
M99948) 4 FPC to NRC letter, 3F0298-09, dated February 9, 1998, Non-Restart Follow-up Items
- 5. NRC to FPC letter, 3N0898-1 1, dated August 31, 1998, NRC Integrated Inspection Report 50-302/98-07
- 6. NRC to FPC letter, 3N1099-11, dated October 15, 1999, Summary of Meeting on September 27, 1999, Concerning Crystal River Unit 3 Large Bore Piping Project
- 7. FPC to NRC letter, 3F1299-03, dated December 13, 1999, Modified Large Bore Piping Project Description and Withdrawal of the Commitment for Performing Reactor Coolant System Class 1 Attachment Piping Fatigue Analysis
- 8. FPC Calculation S02-0017, Revision 0, Resolution Of The Large Bore Piping Program, Focused Approach