Letter Sequence Other |
---|
|
|
MONTHYEARML0310105332003-04-10010 April 2003 Ltr, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (Tac No. MB8382) Project stage: Other ML0311500052003-04-22022 April 2003 Proposed Exigent License Amendment Request Change No. WBN-TS-03-11 - Emergency Core Cooling System - Venting Hot Leg Injection Lines - Response to Nrc'S Questions Project stage: Request ML0312203012003-05-0101 May 2003 Tech Spec Pages for Amendment 43, Venting of the Hot Leg Safety Injection Lines of the Emergency Core Cooling System Project stage: Other ML0312104922003-05-0101 May 2003 License Amendment No. 43, Venting of the Hot Leg Safety Injection Lines of the Emergency Core Cooling System Project stage: Acceptance Review 2003-04-22
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML24172A1382024-07-16016 July 2024 Exemption from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - FRN ML24172A1402024-07-16016 July 2024 Exemption from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - FRN ML24089A1142024-06-21021 June 2024 Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24130A0012024-05-16016 May 2024 April 2024, Issuance of Multiple Exemptions Regarding Security Notifications, Reports, and Recording Keeping ML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24082A0692024-04-19019 April 2024 FRN for CBS Exemption Decision Watts Bar ML24082A0762024-04-12012 April 2024 FRN: EA-FONSI Availability Watts Bar Combo ML24009A1722024-02-16016 February 2024 Environmental Assessment and Finding of No Significant Impact Related to an Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods (EPID L-2023-LLA-0039) - Federal Register Notice ML23073A2992023-04-0303 April 2023 – Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (FRN) ML23073A2762023-04-0303 April 2023 – Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) ML22129A0712022-05-0909 May 2022 Federal Register Notice (Correction) ML22117A1862022-04-29029 April 2022 Exemptions from the Requirements of 10 CFR Part 26, Section 26.205(d)(7) (EPID L-2022-LLE-0017) (Exemption) ML21063A1372021-03-18018 March 2021 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, Opportunity to Request Hearing,Order Imposing Procedures for SUNSI Document Access(Frn) ML21063A1362021-03-18018 March 2021 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, Opportunity to Request Hearing,Order Imposing Procedures for SUNSI Document Access(Lette ML20358A2202021-01-0505 January 2021 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Sig. Hazards Consideration, and Opportunity for Hearing SUNSI ML20358A2192021-01-0505 January 2021 Cover Letter with Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Sig. Hazards Consideration, and Opportunity for Hearing SUNSI ML20034D6422020-02-12012 February 2020 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures: March ML19337A0312019-12-11011 December 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 12/17/2019 ML19298A6472019-10-31031 October 2019 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Opportunity for a Hearing ML19298A4772019-10-31031 October 2019 Federal Register Notice: Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Application; Opportunity to Comment; Request a Hearing, and Petition for Leave to Intervene ML19241A2962019-09-0606 September 2019 Transmittal of Individual Federal Register Renotice for License Amendment Request TSTF-50 ML19241A2952019-09-0606 September 2019 Individual Federal Register Renotice for License Amendment Request TSTF-500 ML19112A0112019-07-25025 July 2019 Exemption from the Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50 ML19112A0522019-07-25025 July 2019 Federal Register Notice: Watts Bar Nuclear Plant, Units 1 and 2 - Exemption from the Requirements of 10 CFR Section 50.46 and Appendix K to 10 CFR Part 50 ML19168A0842019-06-26026 June 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 07/02/2019 ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML19042A3062019-02-15015 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 2/26/2019 ML18332A0132019-02-0606 February 2019 Federal Register Notice ML18332A0142019-02-0606 February 2019 Environmental Assessment and Finding of No Significant Impact Related to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, NRC-2019-0046, Federal Register Notice2019-02-0606 February 2019 Federal Register Notice ML18306A4682018-11-0808 November 2018 Individual Notice of Consideration of Issuance of Amendments to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML18306A4802018-11-0808 November 2018 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 ML18200A2142018-08-21021 August 2018 FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 2 NRC-2014-0045, FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 22018-08-21021 August 2018 FRN; Tennessee Valley Authority, Browns Ferry Nuclear Plant Units 1, 2 and 3, Sequoyah Nuclear Plant, Units 1 and 2, Watts Bar Nuclear Plant, Units 1 and 2 ML18200A1922018-08-21021 August 2018 Withdrawal of Amd Request to Change Implementation Date for Emergency Action Level Scheme ML18173A1792018-08-0707 August 2018 OEDO-17-00070 - Notice of Issuance of Director'S Decision, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and Japan C ML18189A0032018-07-11011 July 2018 FRN: Watts Bar Nuclear Plant, Unit 1, Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18172A3042018-06-22022 June 2018 Tennessee Valley Authority - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene ML18173A0532018-06-22022 June 2018 Ind. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards ... ML18128A3062018-06-0404 June 2018 Federal Register Notice on Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Application; Opportunity to Request a Hearing and to Petition for Leave to Intervene; Order Imposing Procedures (Docket Nos. 50-390 and 50-391; NRC-2018-01 ML18128A2932018-05-30030 May 2018 Letter, Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing ML18039A8922018-02-14014 February 2018 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards Consideration Determination, and Opportunity for Hearing (CAC Nos. MF8912-13; EPID L-2016-0034) L-2016-003, Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards Consideration Determination, and Opportunity for Hearing (CAC Nos. MF8912-13; EPID L-2016-0034)2018-02-14014 February 2018 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Sig. Hazards Consideration Determination, and Opportunity for Hearing (CAC Nos. MF8912-13; EPID L-2016-0034) NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17200A0652017-08-30030 August 2017 OEDO-17-00070 - Acknowledgement FRN, Paul Gunter, Beyond Nuclear, 2.206 Petition for Emergency Enforcement Action Per 10 CFR 2.206 at Listed U.S. Reactors with Forged Components and Parts Manufactured at France'S AREVA-Le Creusot Forge and 2024-07-16
[Table view] Category:Letter
MONTHYEARIR 05000390/20250102024-11-0404 November 2024 Notification of an NRC (FPTI) (NRC Inspection Report 05000390/2025010 0500039/ 2025010) (RFI) CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements 05000391/LER-2024-001, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-03-27027 March 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) 2024-09-05
[Table view] |
Text
April 10, 2003 Mr. J. A. Scalice Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
WATTS BAR NUCLEAR PLANT, UNIT 1-NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING (TAC NO. MB8382 )
Dear Mr. Scalice:
Enclosed is a copy of the subject notice for your information. This notice relates to your amendment application for Watts Bar Nuclear Plant, Unit 1, dated April 8, 2003. The amendment would revise, for one time only, a portion of Surveillance Requirement (SR) 3.5.2.3 of the Watts Bar Technical Specifications for the emergency core cooling system (ECCS). The revision would extend, until the refueling outage in the fall of 2003, the verification that the ECCS safety injection hot leg injection lines are full of water. SR 3.5.2.3 currently requires a verification frequency of 31 days.
This notice has been sent to the Office of the Federal Register for publication.
Sincerely,
/RA/
Kahtan N. Jabbour, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-390
Enclosure:
Notice cc w/encl: See next page
ML031010533 OFFICE PDII-2/PM PDII-2/LA PDII-2/SC NAME KJabbour BClayton AHowe DATE 04/09/2003 04/09/2003 04/10/2003 7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-390 NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE, PROPOSED NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION, AND OPPORTUNITY FOR A HEARING The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of an amendment to Facility Operating License No. NPF-90, issued to Tennessee Valley authority (TVA the licensee), for operation of the Watts Bar Nuclear Plant (WBN), Unit 1, located in Rhea County, Tennessee.
The proposed amendment would revise, for one time only, a portion of Surveillance Requirement (SR) 3.5.2.3 of the Watts Bar Technical Specifications (TS) for the emergency core cooling system (ECCS). The revision would extend, until the refueling outage in the fall of 2003, the verification that the ECCS safety injection hot leg injection lines are full of water. SR 3.5.2.3 currently requires a verification frequency of 31 days.
The reason for the exigency is due to an emergent issue that occurred when recent ultrasonic testing of the safety injection system hot leg injection piping identified a quantity of gas at the piping high points. TVA stated that it could not have reasonably avoided this exigency. Until questions were raised on the way this SR was performed, TVA had no indication that the safety injection system hot leg injection lines had accumulated gas.
Before issuance of the proposed license amendment, the Commission will have made
findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commissions regulations.
Pursuant to 10 CFR 50.91(a)(6), for amendments to be granted under exigent circumstances, the NRC staff must determine that the amendment request involves no significant hazards consideration. Under the Commissions regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendment would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. As required by 10 CFR 50.91(a), the licensee has provided its analysis of the issue of no significant hazards consideration, which is presented below:
- 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
No. The design function of the emergency core cooling system (ECCS) is to provide core cooling and reactivity control for various design bases accidents.
With gas potentially entrained in the safety injection system hot leg injection piping, the primary considerations would be maintenance of adequate core cooling and prevention of water hammer resulting from initiation of flow to the reactor core for mitigation of a design basis event. In the event of a postulated large break loss of coolant accident (LBLOCA), the reactor coolant system (RCS) will de-pressurize rapidly, ECCS injection from the refueling water storage tank (RWST) will occur, followed by cold leg recirculation, and then hot leg recirculation. No flow will exist in the hot leg injection piping until hot leg recirculation is initiated.
TVA reviewed the Nuclear Steam Supply System (NSSS) vendors previous bounding evaluation performed on the effects of injecting the nitrogen gas contained in the four safety injection system accumulators into the RCS following a LOCA. The mass of nitrogen for the accumulators assumed to be injected into the RCS is significantly greater than the mass of gas that could reasonably be expected to exist in the safety injection hot leg injection lines. Therefore, the injection of the postulated gas in the hot leg injection lines would have an insignificant effect on the cooldown of the RCS in the hot leg recirculation mode.
If a layer of gas existed, it would flow to the core by mixing with the water in the line. If a solid bubble were conservatively assumed with the RCS depressurized, the pressure from the pump would push any entrained gas to the RCS hot legs
as the hot leg injection valves opened and the safety injection pump came up to operating speed. The two separated water volumes would travel to the RCS hot legs at near the same velocity and would not impact one another. No significant water hammer would occur.
For the design basis small break LOCA (SBLOCA) and the SBLOCA that is smaller than the design basis 4-inch pipe size break, the hot leg swapover is the same, although delayed, for the SBLOCA scenario as for the LBLOCA. No significant water hammer would occur.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
No. The proposed change to the WBN TS and its associated bases do not introduce any new accident initiator mechanisms. The exclusion of hot leg injection piping from the ECCS water inventory surveillance does not cause the initiation of any accident nor create any new credible limiting single failure.
Further, the change does not result in any event previously deemed incredible being made credible since, as discussed above, there are no new adverse impacts associated with the introduction of gas into the reactor core from those previously evaluated. Further, there is no adverse impact created by a potential water hammer situation.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any previously evaluated.
- 3. Does the proposed change involve a significant reduction in a margin of safety.
No. The exclusion of safety injection system hot leg injection piping from the ECCS water inventory surveillance does not result in a condition where the design, material, and construction standards that were acceptable prior to this change are altered. The potential to introduce gas from the hot leg injection piping into the reactor core during postulated large and small break LOCA accidents does not adversely affect design assumptions for emergency core cooling or reactivity control. Since adverse water hammer events are not postulated, the proposed changes to TS and its associated Bases will have no affect on the availability, operability, or performance of the WBN ECCS systems.
Therefore, the subject change does not involve a significant reduction in margin of safety.
The NRC staff has reviewed the licensees analysis and, based on this review, it appears that the three standards of 10 CFR 50.92(c) are satisfied. Therefore, the NRC staff
proposes to determine that the amendment request involves no significant hazards consideration.
The Commission is seeking public comments on this proposed determination. Any comments received within 14 days after the date of publication of this notice will be considered in making any final determination.
Normally, the Commission will not issue the amendment until the expiration of the 14-day notice period. However, should circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license amendment before the expiration of the 14-day notice period, provided that its final determination is that the amendment involves no significant hazards consideration. The final determination will consider all public and State comments received. Should the Commission take this action, it will publish in the Federal Register a notice of issuance. The Commission expects that the need to take this action will occur very infrequently.
Written comments may be submitted by mail to the Chief, Rules and Directives Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and should cite the publication date and page number of this Federal Register notice. Written comments may also be delivered to Room 6D59, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland, from 7:30 a.m.
to 4:15 p.m. Federal workdays. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland.
The filing of requests for hearing and petitions for leave to intervene is discussed below.
By May 16, 2003, the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating license and any person whose interest may
be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene. Requests for a hearing and a petition for leave to intervene shall be filed in accordance with the Commissions "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. Interested persons should consult a current copy of 10 CFR 2.714, which is available at the Commissions Public Document Room, located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland, and available electronically on the Internet at the NRC Web site http://www.nrc.gov/reading-rm/doc-collections/cfr/. If a request for a hearing or petition for leave to intervene is filed by the above date, the Commission or an Atomic Safety and Licensing Board, designated by the Commission or by the Chairman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition; and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 2.714, a petition for leave to intervene shall set forth with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors: (1) the nature of the petitioners right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioners property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioners interest. The petition should also identify the specific aspect(s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to 15 days prior to the first prehearing conference scheduled
in the proceeding, but such an amended petition must satisfy the specificity requirements described above.
Not later than 15 days prior to the first prehearing conference scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter. Each contention must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner shall provide a brief explanation of the bases of the contention and a concise statement of the alleged facts or expert opinion which support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to those specific sources and documents of which the petitioner is aware and on which the petitioner intends to rely to establish those facts or expert opinion.
Petitioner must provide sufficient information to show that a genuine dispute exists with the applicant on a material issue of law or fact. Contentions shall be limited to matters within the scope of the amendment under consideration. The contention must be one which, if proven, would entitle the petitioner to relief. A petitioner who fails to file such a supplement which satisfies these requirements with respect to at least one contention will not be permitted to participate as a party.
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.
If the amendment is issued before the expiration of the 30-day hearing period, the Commission will make a final determination on the issue of no significant hazards consideration. If a hearing is requested, the final determination will serve to decide when the hearing is held.
If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing held would take place after issuance of the amendment.
If the final determination is that the amendment request involves a significant hazards consideration, any hearing held would take place before the issuance of any amendment.
A request for a hearing or a petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, or may be delivered to the Commissions Public Document Room, located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland, by the above date. Because of continuing disruptions in delivery of mail to United States Government offices, it is requested that petitions for leave to intervene and requests for hearing be transmitted to the Secretary of the Commission either by means of facsimile transmission to 301-415-1101 or by e-mail to hearingdocket@nrc.gov. A copy of the request for hearing and petition for leave to intervene should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, and because of continuing disruptions in delivery of mail to United States Government offices, it is requested that copies be transmitted either by means of facsimile transmission to 301-415-3725 or by e-mail to OGCMailCenter@nrc.gov. A copy of the request for hearing and petition for leave to intervene should also be sent to General Counsel, Tennessee Valley Authority, 400 West Summit Hill Drive, ET 11A, Knoxville, Tennessee 37902, attorney for the licensee.
Nontimely filings of petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a determination by the
Commission, the presiding officer or the presiding Atomic Safety and Licensing Board that the petition and/or request should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
For further details with respect to this action, see the application for amendment dated April 8, 2003, which is available for public inspection at the Commissions Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management Systems (ADAMS) Public Electronic Reading Room on the Internet at the NRC web site http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, 301-415-4737, or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 10th day of April 2003.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Kahtan N. Jabbour, Senior Project Manager, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
Mr. J. A. Scalice Tennessee Valley Authority WATTS BAR NUCLEAR PLANT cc:
Mr. Karl W. Singer, Senior Vice President Mr. Paul L. Pace, Manager Nuclear Operations Licensing and Industry Affairs Tennessee Valley Authority Watts Bar Nuclear Plant 6A Lookout Place Tennessee Valley Authority 1101 Market Street P.O. Box 2000 Chattanooga, TN 37402-2801 Spring City, TN 37381 Mr. James E. Maddox, Acting Vice President Mr. Larry S. Bryant, Manager Engineering & Technical Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority 6A Lookout Place P.O. Box 2000 1101 Market Street Spring City, TN 37381 Chattanooga, TN 37402-2801 Senior Resident Inspector Mr. William R. Lagergren Watts Bar Nuclear Plant Site Vice President U.S. Nuclear Regulatory Commission Watts Bar Nuclear Plant 1260 Nuclear Plant Road Tennessee Valley Authority Spring City, TN 37381 P.O. Box 2000 Spring City, TN 37381 Rhea County Executive 375 Church Street General Counsel Suite 215 Tennessee Valley Authority Dayton, TN 37321 ET 11A 400 West Summit Hill Drive County Executive Knoxville, TN 37902 Meigs County Courthouse Decatur, TN 37322 Mr. Robert J. Adney, General Manager Nuclear Assurance Mr. Lawrence E. Nanney, Director Tennessee Valley Authority Division of Radiological Health 6A Lookout Place Dept. of Environment & Conservation 1101 Market Street Third Floor, L and C Annex Chattanooga, TN 37402-2801 401 Church Street Nashville, TN 37243-1532 Mr. Mark J. Burzynski, Manager Nuclear Licensing Ms. Ann P. Harris Tennessee Valley Authority 341 Swing Loop Road 4X Blue Ridge Rockwood, Tennessee 37854 1101 Market Street Chattanooga, TN 37402-2801