MONTHYEARL-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-117, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report L-2024-047, Proposed Use of a Subsequent ASME Code Edition and Addenda2024-03-28028 March 2024 Proposed Use of a Subsequent ASME Code Edition and Addenda L-2024-045, Report of 10 CFR 72.48 Plant Changes2024-03-27027 March 2024 Report of 10 CFR 72.48 Plant Changes L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2024-023, Unusual or Important Environmental Event - Turtle Mortality2024-03-0606 March 2024 Unusual or Important Environmental Event - Turtle Mortality L-2024-027, Safety Injection Tank Vent Through Wall Leakage2024-02-29029 February 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-015, 2023 Annual Radioactive Effluent Release Report2024-02-29029 February 2024 2023 Annual Radioactive Effluent Release Report L-2024-029, 2023 Annual Operating Report2024-02-28028 February 2024 2023 Annual Operating Report L-2024-026, Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules2024-02-27027 February 2024 Revised Reactor Vessel Materials Surveillance Capsule Withdrawal Schedules L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-175, Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report 2024-09-09
[Table view] Category:Report
MONTHYEARL-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) ML24047A2092024-02-22022 February 2024 Calendar Year 2023 Baseline Inspection Completion L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report ML22227A0532022-08-15015 August 2022 Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant ML22124A0112022-04-30030 April 2022 Scoping Summary Report - Final L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-015, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI2022-01-14014 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI L-2022-011, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld2022-01-12012 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout L-2021-178, Report of 10 CFR 50.59 Plant Changes2021-11-0808 November 2021 Report of 10 CFR 50.59 Plant Changes L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 ML19252A4002019-09-0909 September 2019 FPL to NRC, Notification of Smalltooth Sawfish Capture at St. Lucie L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML18096B3952018-04-0606 April 2018 Exhibit III Estimate of Construction Costs and Exhibit IV Technical Qualifications of Contractors ML18088B1952018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 9, Auxiliary Systems and Chapter 10, Steam and Power Conversion System ML18088B1942018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 11, Radioactive Waste Management System, Chapter 12, Radiation Protection, and Chapter 13, Conduct of Operations ML18088A0942018-03-29029 March 2018 Unit II Plants ECCS Performance Results L-2017-173, Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event2017-09-28028 September 2017 Environmental Protection Plan Report, Unusual or Important Environmental Event - Turtle Mortality - 09/11/2017 Event L-2018-081, Kld Engineering, Pc - 2017 Population Update Analysis2017-09-20020 September 2017 Kld Engineering, Pc - 2017 Population Update Analysis L-2017-117, Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-12017-06-20020 June 2017 Submittal of SL2-23 Outage, Owner'S Activity Report, Form OAR-1 L-2018-015, Plan of Study 316(b) Implementation2017-04-28028 April 2017 Plan of Study 316(b) Implementation L-2017-015, PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee.2016-04-30030 April 2016 PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee. ML16084A6162016-03-24024 March 2016 Submittal of Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant, Units 1 and 2 in St. Lucie County, Florida ML16063A0072016-02-26026 February 2016 Participation in Additional Work Under the Support for Applicant Action Items 1, 2, and 7 from the Final Safety Evaluation on MRP-227, Revision 0 PA-MSC-0983 R2 Cafeteria Task 8 and Acceptance Criteria for Measurement Of.. ML15352A0532016-01-0707 January 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f) Seismic Hazard Revaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights L-2015-297, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan2015-12-10010 December 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, and Submittal of Site FLEX Final Integrated Plan L-2015-300, ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report.2015-11-30030 November 2015 ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report. ML15314A1602015-10-29029 October 2015 St. Lucie, Units 1 and 2 - License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program L-2015-221, Report of 10 CFR 50.59 Plant Changes2015-10-16016 October 2015 Report of 10 CFR 50.59 Plant Changes ML15240A1542015-09-0808 September 2015 Staff Observations of Sump Strainer Head Loss Testing at Alden Laboratory for Generic Safety Issue 191 L-2015-206, ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-2062015-07-31031 July 2015 ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-206 L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 12015-06-30030 June 2015 Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1 L-2015-143, Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2015-05-14014 May 2015 Status of Required Actions for EA-12-049 Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events L-2015-272, 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 20152015-05-0808 May 2015 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 2015 L-2016-052, TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182.2015-03-31031 March 2015 TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182. L-2015-091, ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR2015-03-31031 March 2015 ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2015-03-24024 March 2015 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report ML15083A2642015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report2015-03-10010 March 2015 St. Lucie, Units 1 and 2 - Submittal of Revision 0 to FPL-072-PR-002, Flooding Hazards Reevaluation Report L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-92015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End2015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End ML15083A2652015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 ML15083A2662015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 1092015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 2024-09-11
[Table view] Category:Technical
MONTHYEARL-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2022-046, Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal2022-04-13013 April 2022 Subsequent License Renewal Application Revision - Documents WCAP-18623-P/NP Revision 1 Submittal L-2022-015, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI2022-01-14014 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld - RAI L-2022-011, Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld2022-01-12012 January 2022 Relief Request Number 20 - Request for an Alternative to the Requirements of the ASME Code for Examination of Reactor Vessel Closure Head Control Element Drive Mechanism (CEDM) Housing 27 Canopy Seal Weld L-2021-142, Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 20212021-08-0303 August 2021 Westinghouse Report LTR-REA-21-1-NP, Revision 1, St. Lucie Nuclear Plant, Units 1 and 2, Subsequent License Renewal: Unit 1 Reactor Vessel, Vessel Support, and Bioshield Concrete Exposure Data, May 26, 2021 L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds ML18096B3952018-04-0606 April 2018 Exhibit III Estimate of Construction Costs and Exhibit IV Technical Qualifications of Contractors ML18088A0942018-03-29029 March 2018 Unit II Plants ECCS Performance Results ML18088B1942018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 11, Radioactive Waste Management System, Chapter 12, Radiation Protection, and Chapter 13, Conduct of Operations ML18088B1952018-03-29029 March 2018 Hutchinson Island Plant Units 1 and 2 - Chapter 9, Auxiliary Systems and Chapter 10, Steam and Power Conversion System L-2018-081, Kld Engineering, Pc - 2017 Population Update Analysis2017-09-20020 September 2017 Kld Engineering, Pc - 2017 Population Update Analysis L-2018-015, Plan of Study 316(b) Implementation2017-04-28028 April 2017 Plan of Study 316(b) Implementation L-2017-015, PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee.2016-04-30030 April 2016 PWROG-15105-NP PA-MSC-1288 PWR Rv Internals Cold-Work Assessment, Materials Committee. ML16084A6162016-03-24024 March 2016 Submittal of Biological Opinion for the Continued Operation of St. Lucie Nuclear Power Plant, Units 1 and 2 in St. Lucie County, Florida ML16063A0072016-02-26026 February 2016 Participation in Additional Work Under the Support for Applicant Action Items 1, 2, and 7 from the Final Safety Evaluation on MRP-227, Revision 0 PA-MSC-0983 R2 Cafeteria Task 8 and Acceptance Criteria for Measurement Of.. L-2015-300, ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report.2015-11-30030 November 2015 ANP-3352NP, Revision 1, Transition License Amendment Request, Technical Report. L-2015-206, ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-2062015-07-31031 July 2015 ANP-3428NP, Revision 0, St. Lucie Unit 2 Fuel Transition: Response to SNPB-RAI-1, Attachment 4 to L-2015-206 L-2015-177, Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 12015-06-30030 June 2015 Fuel Transition Small Break LOCA Summary Report, ANP-3345NP, Revision 1 L-2015-272, 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 20152015-05-0808 May 2015 1301103.401, Revision 0, Flaw Tolerance Evaluation of St. Lucie Surge Line Welds Using ASME Code Section XI, Appendix L, May 2015 L-2015-091, ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR2015-03-31031 March 2015 ANP-3396NP, Revision 0, Fuel Transition Supplemental Information to Support the LAR L-2016-052, TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182.2015-03-31031 March 2015 TN-5696-00-02, Revision 0, Technical Note Assessment of Laboratory PWSCC Crack Growth Rate Data Compiled for Alloys 690, 52, and 152 with Regard to Factors of Improvement (Foi) Versus Alloys 600 and 182. L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2015-03-24024 March 2015 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 1092015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Cover Page to Page 109 ML15083A2662015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End ML15083A2652015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End2015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Figure 4-10 Through the End L-2015-048, to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-92015-02-0606 February 2015 to FPL-072-PR-002, Flooding Hazards Reevaluation Report for St. Lucie Nuclear Power Plant Units 1 & 2. Table 2-1 Through Figure 4-9 L-2014-366, ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report2014-12-31031 December 2014 ANP-3352NP, Revision 0, St. Luice, Unit 2, Fuel Transition License Amendment Request, Technical Report ML14149A1952013-02-0404 February 2013 Pacific Northwest National Laboratory Technical Letter Report for Evaluation of Alternative to 10 CFR 50.55a(G)(6)ll)(F)(4) for Limitations to Volumetric Examination of Dissimilar Metal Welds L-2012-427, Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic2012-11-30030 November 2012 Q4116-R-002, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic ML12340A3522012-11-30030 November 2012 St. Lucie, Unit 1, 12Q4116-RPT-001, Rev. 0, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Force Recommendation 2.3: Seismic ML12097A2682012-04-17017 April 2012 Biological Assessment for Formal Section 7 Consultation at the St. Lucie Plant, Units 1 and 2 L-2012-072, ANP-3067, Rev. 1, St. Lucie, Unit 1 EPU - Information to Support NRC Review of RCS Depressurization with Pressurizer Overfill2012-02-29029 February 2012 ANP-3067, Rev. 1, St. Lucie, Unit 1 EPU - Information to Support NRC Review of RCS Depressurization with Pressurizer Overfill L-2012-072, ANP-2903Q2(NP), Rev 0, St. Lucie, Unit 1 - EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding, Attachment 32012-02-29029 February 2012 ANP-2903Q2(NP), Rev 0, St. Lucie, Unit 1 - EPU Cycle Realistic Large Break LOCA Summary Report with Zr-4 Fuel Cladding, Attachment 3 ML12061A2492012-02-29029 February 2012 ANP-3067, Rev. 1, St. Lucie, Unit 1 EPU - Information to Support NRC Review of RCS Depressurization with Pressurizer Overfill L-2011-471, ANP-3057(NP), Revision 0, St. Lucie Unit 1 EPU - Responses to NRC Questions SRXB-58, SRXB-59, and SRXB-60.2011-10-31031 October 2011 ANP-3057(NP), Revision 0, St. Lucie Unit 1 EPU - Responses to NRC Questions SRXB-58, SRXB-59, and SRXB-60. L-2011-389, Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request2011-09-22022 September 2011 Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request L-2011-311, ANP-3019NP, Revision 0, St. Lucie Unit 1 EPU - Information to Support NRC Review of Steam Generator Tube Rupture, Attachment 22011-08-31031 August 2011 ANP-3019NP, Revision 0, St. Lucie Unit 1 EPU - Information to Support NRC Review of Steam Generator Tube Rupture, Attachment 2 L-2011-342, ANP-3028(NP), Revision 0, St. Lucie Plant, Unit 1 EPU RAIs - Nuclear Performance & Code (Snpb)2011-08-31031 August 2011 ANP-3028(NP), Revision 0, St. Lucie Plant, Unit 1 EPU RAIs - Nuclear Performance & Code (Snpb) L-2011-228, 103-87735, Heated Water Plan of Study2011-06-30030 June 2011 103-87735, Heated Water Plan of Study L-2011-206, ANP-2903(NP), Revision 1, St. Lucie Nuclear Plant, Unit 1 - EPU Cycle Realistic Large Break LOCA Summary Report with ZR-4 Fuel Cladding, Attachment 72011-05-31031 May 2011 ANP-2903(NP), Revision 1, St. Lucie Nuclear Plant, Unit 1 - EPU Cycle Realistic Large Break LOCA Summary Report with ZR-4 Fuel Cladding, Attachment 7 ML11153A0492011-05-31031 May 2011 ANP-3000(NP), Rev. 0, St. Lucie Nuclear, Unit 1 - EPU-Information to Support License Amendment Request, Attachment 6 L-2011-206, ANP-3000(NP), Rev. 0, St. Lucie Nuclear, Unit 1 - EPU-Information to Support License Amendment Request, Attachment 62011-05-31031 May 2011 ANP-3000(NP), Rev. 0, St. Lucie Nuclear, Unit 1 - EPU-Information to Support License Amendment Request, Attachment 6 L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B Additional Codes and Methods2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix B Additional Codes and Methods L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix D, List of Key Acronyms2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix D, List of Key Acronyms L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a Safety Evaluation Report Compliance2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix a Safety Evaluation Report Compliance L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix F, Camereron Ultrasonics Engineering Reports, Cover2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix F, Camereron Ultrasonics Engineering Reports, Cover L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix E, Supplement to Licensing Report Section 2.4.1 Reactor Protection, Engineered Safety Feature Actuation, and Control Systems L-2011-021, St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix G, Holtec Report No. HI-2104753, St. Lucie Unit 2 Criticality Analysis for EPU and Non-EPU2011-02-25025 February 2011 St. Lucie, Unit 2 - License Amendment Request for Extended Power Uprate, Attachment 5; Appendix G, Holtec Report No. HI-2104753, St. Lucie Unit 2 Criticality Analysis for EPU and Non-EPU 2024-09-11
[Table view] |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 FP3L March 28, 2003 L-2003-086 EA-03-09(IV)(F)(2)
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Order (EA-03-009) Relaxation Requests 1 and 2 Examination Coverage of Reactor Pressure Vessel Head Penetration Nozzles - Supplemental Data On February 11, 2003 the NRC issued Order (EA-03-009) requiring specific inspections of the reactor pressure vessel (RPV) head and associated penetration nozzles at pressurized water reactors. Pursuant to the procedure specified in Section IV, paragraph F of the Order, Florida Power & Light (FPL) requests relaxation from the requirements specified in Section IV, paragraph C.(1)(b)(i) for St. Lucie Unit 2 for the reactor pressure vessel head (RPVH) penetration nozzles for which ultrasonic testing requirements can not be completed as required. Relaxation is also requested from the requirements specified in Section IV, paragraph C.(1)(a) for an area of the reactor head surface that is inaccessible for visual inspection.
Attachments 1 and 2 to this letter provide relaxation requests. As demonstrated in the attachment hereto, the requested relaxation meets item IV.F.(2) of the Order, as compliance with this Order for the specific areas described in the requests would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
FPL requests approval of the subject relaxation by April 21, 2003, the currently scheduled date for St. Lucie Unit 2 reactor reassembly. The refueling outage completion is currently scheduled for May 20, 2003.
Please act George Madden at (772) 467-7155 if there are any questions about the relaz tgO Very uly yours, Donal igan Vice President St. Lucie Plant Attachments an FPL Group company
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 1 ST. LUCIE UNIT 2 RELAXATION REQUEST NO.1 FROM US NRC Order EA-03-009 Hardship or unusual difficulty without compensating i ncrease in level of q uality or safety.
- 1. ASME COMPONENTS AFFECTED St. Lucie (PSL) Unit 2 has 102 ASME Class 1 reactor pressure vessel (RPV) head penetrations (including the vent).
The St. Lucie Unit 2 Order Inspection Category in accordance with Section (IV.A.) is currently determined as "high" based on 14.0 EDY at this refueling outage' (RFO).
FPL Drawing No. 2998-3130, Rev. 3 (PSL-2)
- 2. US NRC ORDER EA-03-009 APPLICABLE EXAMINATION REQUIREMENTS:
The NRC issued an Order 2 EA-03-009 on Februay 11, 2003 establishing interim inspection requirements for reactor pressure vessel heads of pressurized water reactors.Section IV.C. of the Order states the following:
All Licensees shall perform inspections of the RPV head using the following techniques and frequencies:
(1) For those plants in the high category, RPV head and head penetration nozzle inspections shall be performed using the following techniques every refueling outage (a) Bare metal visual examination of 100% of the RPV head surface (including 360° around each RPV head penetration nozzle), and (b) Either:
(i) Ultrasonic testing of each RPV head penetration nozzle (i.e.,
nozzle base material) from two inches above the J-groove weld to the bottom of the nozzle and an assessment to determine if leakage has occurred into the interference fit zone, OR FPL letter L-2002-185, 'St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389, Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head Penetration Nozzle Inspection Programs," R. S. Kundalkar to NRC, September 11, 2002.
2 US NRC Letter EA-03-009, 'Issuance Of Order Establishing Interim Inspection Requirements For Reactor Pressure Vessel Heads At Pressurized Water Reactors," from Samuel J. Collins (NRC) to all Pressurized Water Reactor Licensees, Dated February 11, 2003.
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 2 (ii) Eddy current testing or dye penetrant testing of the wetted surface of each J-Groove weld and RPV head penetration nozzle base material to at least two inches above the J-groove weld.
Relaxation is requested from part IV.C.(1)(b)(i) of the Order to perform ultrasonic testing (UT) of the RPV head penetration inside the tube from two inches above the J-groove weld to the bottom of the penetration at St. Lucie Unit 2.
Specifically, the relaxation is related to UT examination of a limited portion of the non-pressure boundary portion of the end of the RPV penetration nozzle equal to or greater than one inch below the weld to the bottom of the nozzle.
- 3. REASON FOR REQUEST:
Pursuant to Order Section IV.F.(2) "Compliance with the Order for specific nozzles would result in hardship or unusual difficulty, without a compensating increase in the level of quality and safety", FPL is requesting this relaxation for St. Lucie Unit 2. The 91 CEDM nozzles contain areas that will have less coverage than required by the NRC Order. The Order requires examination from two inches above the J-groove weld to the bottom of the RPV head penetration nozzle. The reduced coverage is caused by the nozzle configuration, and the limitations of probe design used for the Ultrasonic (UT) examination. Specifically, actual coverage below the weld, in the non-pressure boundary portion of the nozzle, is precluded by the threaded area used for attachment of the guide cone as shown in Figure 1.
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 3 A: 4.050" Noom B: 2.728" Nom 2 = 1 inch Weld I
-1.25 inch Threaded Gui Drawing Not To Scale Cone Recess Figure 1: Typical RPV Nozzle with Threaded Guide Funnel
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 4
- 4. PROPOSED ALTERNATIVE AND BASIS FOR USE:
The proposed alternative is to perform the UT examination to the extent practical.
This is defined as "the examination shall be performed to include two inches above the weld down as far as UT data can be acquired below the weld." FPL anticipates acquiring UT data to the maximum extent possible. This minimum dimension of area examined (approximately 1 inch below the weld) exists on the downhill side of the nozzle and increases towards the uphill side.
Basis For Relaxation The scope of the examination is to perform a 3600 volumetric examination from two inches above the J-groove weld down to the bottom of the RPV penetration nozzles. The 91 St. Lucie Unit 2 CEDM nozzles are used for a variety of functions, but present similar examination conditions. These RPV penetration nozzles have an inside threaded end and permanently attached externally threaded guide cones. Due to this design condition, the UT beam can not be transmitted into the nozzle material in the area of the externally threaded guide cones. This nozzle design condition results in an area of the tube material that can not be examined with the UT rotating probe examination technique.
Therefore, the UT examination technology currently available for the St. Lucie Unit 2 RPV penetration nozzle inspections will result in areas where data can not be acquired below the weld at the end of the nozzle.
Although the Order provides for ultrasonic testing (UT) and assessment of leakage, or surface examination eddy current testing (ECT) or dye penetrant testing (PT) to assess the condition of the vessel head penetration nozzles and J-groove welds, our inspection vendor does not currently have eddy current capability to examine the missing nozzle material. The available method for performing outside surface inspections is manual PT. Preparation and inspection of the subject outside surfaces would increase exposure, without obtaining information leading to a corresponding increase in safety, due to the low stresses in the affected zones. Additionally, examination of the inside portions of the nozzles is not practical. This could only be accomplished by removal of the 91 guide cones and the development of special tooling to inspect the threaded nozzle surface.
To evaluate the significance of the lack of UT inspection coverage, the inspection coverage data was broken into two distinct regions. These regions include the nozzle base material from two inches above the weld to one inch below the weld, and from equal to or greater than one inch below the weld. FPL anticipates acquiring UT data to the maximum extent possible (approximately one inch below the weld minimum).
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 5 To determine the significance of the lack of UT examination coverage, the effect of a postulated axial and circumferential flaw in the nozzle material was evaluated relative to the areas of examination coverage identified above.
From two inches above the weld to one inch below the weld: The areas of prime interest because of the safety concern for nozzle ejection and loss of coolant accident (LOCA) are circumferential cracks located in the nozzle material at the weld root and above the weld. This is also the area that axial cracks would have to propagate to in order for a leak to occur through the RPV penetration nozzle material. The UT examinations of the RPV penetration nozzles will have bounded this area (the safety significant region), by providing complete 3600 coverage of the nozzle base material (from two inches above the weld to one inch below the weld). Therefore, reliable assurance is provided to conclude that safety significant circumferential flaws do not exist at or above the weld root.
Equal to or greater than one inch below the weld to the bottom of the nozzle: Axial flaws in the area of non-coverage in the nonpressure boundary nozzle base material below the weld are of no structural significance, however, a postulated flaw could grow above the weld to the point of leakage followed by wastage and/or potential initiation of an outside diameter (OD) circumferential flaw.
To determine the significance of an axial flaw that is contained in the nonpressure boundary nozzle material in the uninspected region equal to or greater than one inch below the weld, a flaw tolerance approach is used. A flaw evaluation was performed postulating an axial flaw in the area of missed coverage below the weld using WCAP-16038-P 3 . A through wall flaw is postulated in the nozzle material from the bottom of the penetration to one half-inch from the bottom of the weld. The flaw evaluation in WCAP-16038-P is based on St. Lucie Unit 2 specific stresses in the nozzle penetrations. Since the stresses equal to or greater than one inch below the weld are too low to propagate an axial flaw, the WCAP-16038-P flaw evaluations start at one-half inch below the weld, and evaluate the time to propagate the flaw in the nozzle to the bottom of the weld (start of the pressure boundary portion of the nozzle material or toe of the J-groove weld). Assuming a through wall flaw below the weld, with the flaw end located at one-half inch below the weld (which is in the area of complete UT examination coverage), an axial flaw would take greater than 5 years of operation (Figures 6-12 through 6-20 in WCAP-16038-P) in any nozzle location to grow to the point of contact with the weld. This time period is significantly greater than the current inspection frequency of every refueling cycle (18 months for St. Lucie Unit 2) identified in NRC Order EA-03-009. As an added conservatism, this evaluation does not attempt to evaluate the time for the axial flaw to grow from the bottom of the weld through the pressure boundary. Figure 3StructuralIntegrity Evaluationof Reactor Vessel UpperHead Penetrationsto Support Continued Operation:St.
Lucie Unit 2, Westinghouse Electric Co. LLC, WCAP-16038-P Revision 0, March 2003.
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 6 flaw to grow from the bottom of the weld through the pressure boundary. Figure 2 provides a graphical presentation of the above flaw evaluation discussion for the outer most penetration location.
11.7 I1151H JUI 11 3 -
e ill I I I I I I I I I I .I I I I I . I I I I . I I I . . . I . . . . . . . . -. - - . . . . . - - - - i i i i r " . . .. ..
E
, 09 11 IIIIIII 11 11 IIHIIIIIIII11III 11 HIIHY] 11 1111 Ill 11 11 11 11 1111 III I S
a 109, "t lWr,26 N p -54
, avg 1, TdN'
_j 7-po 14AQSV,
,Cadillac, M ka Ik t,5, N c 1073 2 Pl '4 101 IRAQI By I
9! 9 1' I I I I I I II I I. I I I I I 9.
9:
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Period (Year)
Figure 2: Through-Wall Axial Flaws Located in the 55.3 Degrees Row of Penetrations, Uphill Side - Crack Growth Predictions (From Figure 6-19, WCAP-16038-P)
Hoop Stress Distribution Figures 3 to 9 provided below (Appendix E, Figures E-1 through E-7 of WCAP-16038-P), show the hoop stress distribution as a function of distance from the bottom of the weld. These are the same nozzles whose stress distribution is shown in Figures 5-4 through 5-7 of WCAP-16038-P. These figures provide assurance that the stress levels below one inch are quite low, thereby reducing the potential for cracking.
Effect of Yield Stress Level on the Trend in Stresses Below The Weld The trend in stresses in a typical head penetration is not affected by the yield stress used in the analysis. Westinghouse stress evaluations are done using a cyclic stress-strain curve determined from laboratory tests carried out on actual
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 7 head penetration material. The equivalent 0.2% offset yield for this curve is about 50 ksi.
Therefore, compliance with the requirement for UT coverage to the bottom of the nozzle is unnecessary in that the inspection limitation does not preclude UT examination of the portion of these nozzles that are of primary interest. There are no concerns with the structural integrity of the RPV penetration nozzles that could be caused by axial cracking in the missed coverage areas in the nonpressure boundary portion of the nozzle material below the weld, due to the permanently attached threaded cones, for a period of > 5 years of operation.
This conclusion is based on the following results:
- UT inspection of the most highly stressed portion of the nozzle (the weld heat affected zone) is unaffected by this limitation,
- UT of the interference fit zone above the weld (for leakage assessment) is unaffected by the limitation, and
- Cracks initiating in the unexamined bottom portion (nonpressure boundary) of the nozzle would be of minimal safety significance with respect to pressure boundary leakage or nozzle ejection, since this portion of the nozzle is below the pressure boundary and any cracks would have to grow through the examined portion of the tube to reach the pressure boundary.
A hardship or unusual difficulty without a compensating increase in level of quality or safety, would result if physical modifications (removal of the permanently attached cones), or development of new UT equipment, were pursued to achieve the complete coverage in the nonpressure boundary portion of the RPV nozzle material below the weld as required by the Order.
- 5. DURATION OF PROPOSED ALTERNATIVE:
This relaxation is applicable to the April/May 2003 refueling outage (SL1-14) for PSL-2.
- 6. PRECEDENTS The technical basis for this relaxation request has been previously reviewed and approved by the NRC for Turkey Point Unit 3, Docket No. 50-250, and TAC No.
MB7990.
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment I Page 8 80,000 70,000 60,000 50,000 C. 40,000 0
to at 30,000 0.
20,000 10,000 0
-10,000
-20,000 X-0.00 3 00 Distance from Bottom of Weld (In)
I *Inside --- Outside Figure 3: Hoop Stress Vs Distance from Bottom of Weld Plot for the Center CEDM Penetration
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 9 Inspection Zone 4 80,000 70,000 60,000 50,000 c 40,000 4"'
- 0. 30,000 CL 0
o 20,000 10,000 0
-10,000 - -4
. . . . . I . I . . . I I I . I . . . I . . I .
-20,000 00 050 1 0 1.50 2.00 2.50 3.00 Distance from Bottom of Weld (in)
Figure 4: Hoop Stress Vs Distance from Bottom of Weld Plot for the 7.8 Degrees Row of Penetration, Downhill Side
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 10 Inspection Zone]
70,000 60,000 I
K 50,000 -$ 4. 4 .4 4. .4 40,000 - + - .4-I .4 4. .4--
a.
w 30,OCI0 I Xl- i-I I 4. 4-0 0 N Cn
- a. 20,OC 0
0 io,0C 0
-1o,oC 0_,
________________ _______ J.L..JaJ..L.
nn nr
-Lu,uuu -
0.00 0 50 1.00 1.50 2.00 2.50 300 3 50 Distance from Bottom of Weld (in)
-- Inside Outside Figure 5: Hoop Stress Vs Distance from Bottom of Weld Plot for the 7.8 Degrees Row of Penetration, Uphill Side
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 11 l Inspection Zone I 100,000 80,000 60,000 0.
U, 40,000 UI g
CL) 0.
0 0
20,000 I -
0
.~~~~~~_ _=
-20,000 CD.0O 0.50 i0 1.50 2 00 2.50 3.00 Distance from Bottom of Weld (in) 1--lnside - Outside Figure 6:Hoop Stress Vs Distance from Bottom of Weld Plot for the 29.1 Degrees Row of Penetration, Downhill Side
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 12 ILnpeton Zone I 70,000 ___________ ___ -I 60,000 U
50,000 I\
40,000 F
- a. 30,000 uo
.S 20,000 Cn
.0 0
o 10,000
\\ \" -== a 0
I `
I\ P
-10,000
-20,000
. I I I . I . I . I I . . . I I . I I I . I . .
-30,000 0.( 00 1.00 2.010 p0 1 4.00 5.00 6.00 Distance from Zottom of Weld (in)
- -- Inside -- Outside I Figure 7:Hoop Stress Vs Distance from Bottom of Weld Plot for the 29.1 Degrees Row of Penetration, Uphill Side
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 13 I Inspection Zone l1 100,000 EI 80,000 60,000 a.
'A 40,000 a.
to U) 0 20,000 0
0 Z:: i
-20,000 I
. . . . . I . I . . . . . . . . . I . . . . . .
-40,000 a).00 0.50 1. 0 1.50 2 00 2.50 3.00 4- Distance from Bottom of Weld (in) i + Inside m Outsidel Figure 8: Hoop Stress Vs Distance from Bottom of Weld Plot for the 49.7 Degrees Row of Penetration, Downhill Side
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 1 Page 14 Inspection Zonel 60,000 50,000 40,000 30,000 -
- o. 20,000 -
U, 10000 0.
o 0
-10,000
-20,000
-30,000 0.00 1.00 2.00 3 00 4 00 5 00 610 7.00 8 00 Distance from Bottom of Weld (in)
--- Inside - Outside Figure 9: Hoop Stress Vs Distance from Bottom of Weld Plot for the 49.7 Degrees Row of Penetration, Uphill Side
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 2 Page 1 ST. LUCIE UNIT 2 RELAXATION REQUEST NO.2 FROM US NRC Order EA-03-009 Hardship or unusual difficulty without compensating increase in level of quality or safety
- 1. ASME COMPONENTS AFFECTED St. Lucie (PSL) Unit 2 has 102 ASME Class 1 reactor pressure vessel (RPV) head penetrations (including the vent).
The St. Lucie Unit 2 Order Inspection Category in accordance with Section (IV.A.) is currently determined as 'high' based on 14.0 EDY at this refueling outage1 (RFO).
FPL Drawing No. 2998-1714, Rev. 3 FPL Drawing No. 29984331, Rev. 2 FPL Drawing No. 29984318, Rev. 2 FPL Drawing No. 29984319, Rev. 3 FPL Drawing No. 2998-4332, Rev. 2
- 2. US NRC ORDER EA-03-009 APPLICABLE EXAMINATION REQUIREMENTS:
The NRC issued an Order 2 on Februay 11, 2003 establishing interim inspection requirements for reactor pressure vessel heads of pressurized water reactors.
Section IV.C. of the Order states the following:
All Licensees shall perform inspections of the RPV head using the following techniques and frequencies:
(1) For those plants in the high category, RPV head and head penetration nozzle inspections shall be performed using the following techniques every refueling outage (a) Bare metal visual examination of 100% of the RPV head surface (including 3600 around each RPV head penetration nozzle), and (b) Either:
(i) Ultrasonic testing of each RPV head penetration nozzle (i.e.,
nozzle base material) from two inches above the J-groove weld to FPL letter L-2002-185, 'St. Lucie Units 1 and 2, Docket Nos. 50-335, 50-389, Turkey Point Units 3 and 4, Docket Nos. 50-250 and 50-251, Response to NRC Bulletin 2002-02, Reactor Pressure Vessel Head Penetration Nozzle Inspection Programs," R. S. Kundalkar to NRC, September 11, 2002.
2 US NRC Letter EA-03-009, Issuance Of Order Establishing Interim Inspection Requirements For Reactor Pressure Vessel Heads At Pressurized Water Reactors, from Samuel J. Collins (NRC) to all Pressurized Water Reactor Licensees, Dated February 11, 2003.
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 2 Page 2 the bottom of the nozzle and an assessment to determine if leakage has occurred into the interference fit zone, or (ii) Eddy current testing or dye penetrant testing of the wetted surface of each J-Groove weld and RPV head penetration nozzle base material to at least two inches above the J-groove weld.
Relaxation is requested from part IV.C.(1)(a) of the Order to perform "bare metal visual examination of 100% of the RPV head surface (including 360° around each RPV head penetration nozzle)" at St. Lucie Unit 2. Specifically, FPL is unable to completely comply with this requirement due to inaccessibility of a portion of the RPV head surface for inspection, where the shroud support ring and vertical panels of reflective metal insulation (RMI) inside the shroud meet the RPV head and the horizontal RMI support legs are positioned.
- 3. REASON FOR REQUEST:
Pursuant to Order Section IV.F "all Licensees shall notify the Commission if: (1) they are unable to comply with any of the requirements of Section IV, or (2) compliance with any of the requirements of Section IV is unnecessary." FPL is requesting this relaxation for St. Lucie Unit 2. FPL is unable to comply with the requirement for 100% visual examination coverage due to lack of access and proposes that the requirement is unnecessary in that the inaccessibility of a small percentage of the head surface due to the vertical RMI panels, horizontal panel support legs, and shroud ring do not preclude performance of an effective bare metal visual examination of the RPV head to identify evidence of wastage. A side view of the RPV head showing the shroud ring location and RMI is shown in Figure 1 and Figure 2.
Figure 1: Picture showing Shroud Support Ring Location
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 2 Page 3 I' I I
71\ " ;i - --
%Mt AT fl4MU.T1O) .\
-ragtLaCnM Br IKtSPTIaN HOLES \
AND 1.1 PLU
. U111UILT: asU V W161-PS-1) m Horizontal Reflective Metal Insulation Support Legs 32 total, 31-2.5" x 1.25" &
1-2 x .63" IN"
. £A f MATING SURFACE REF Figure 2: RPV Head Side View showing Insulation Panel Location
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 2 Page 4
- 4. PROPOSED ALTERNATIVE AND BASIS FOR USE:
FPL proposes to achieve substantial compliance with the 100% requirement by conducting a bare metal visual examination of the RPV head surface to the extent practical, excluding the inside of the 54 RPV stud holes. Specifically, the examination will include a visual examination of 3600 around each RPV head penetration nozzle for evidence of leakage and examination of the bare head surface within the vertical RMI panels and outside of the shroud ring for evidence of wastage.
BASIS FOR RELAXATION:
The scope of the examination is to perform a bare metal visual examination of 100% of the RPV head surface (including 360° around each RPV head penetration nozzle). The St. Lucie Unit 2 RPV top head surface has areas of inaccessibility due to the presence of the shroud ring and the vertical panels of RMI inside the shroud coming in contact with the RPV head, and horizontal RMI support legs. Improving access to these inaccessible areas, including removal of the horizontal panel support legs, for visual examination would require major disassembly of the CEDM coil stacks and lifting of the shroud and shroud ring to allow access for the destructive RMI removal causing a substantial increase in radiation dose and the potential for damage to removed components. The performance of this disassembly is not practical and does not enhance the quality of the examination because the RPV head penetration nozzles, where leakage would originate, are not located in or adjacent to the inaccessible area:
the required 3600 visual examination around each RPV head penetration nozzle is unaffected by the this limitation Also, the head surface immediately uphill and downhill of the inaccessible area will be examined for evidence of boric acid leakage under the RMI or shroud support structure.
In November 2001, FPL performed a bare metal visual examination of the accessible portions of the RPV head inside the RMI, including 3600 visual examination around each RPV head penetration nozzle, to identify any evidence of leakage from the 102 penetrations. There were no indications of staining leading downhill on the head surface or evidence of leakage identified around the 102 penetrations.
It can be concluded that a hardship or unusual difficulty without a compensating increase in level of quality or safety would result if physical modifications were performed to achieve the complete coverage of the RPV head base material required by the Order. These modifications would include coil stack disassembly, to accommodate lifting of the shroud ring, and removal of the vertical RMI panels to permit examination.
St. Lucie Unit 2 Docket No. 50-389 L-2003-086 Attachment 2 Page 5 This conclusion is based on the following results:
- Visual examination during SL2-14 of the base material adjacent to the penetrations for evidence of leakage will be performed (360° coverage will be obtained).
- Visual examination during SL2-14 of the RPV head base material adjacent to the interior of the RMI and exterior of the shroud ring will be performed for evidence of staining and material wastage.
- An assessment during SL2-14 to determine if leakage has occurred into the interference fit zone will be performed.
- A UT inspection during the SL2-14 of the nozzle base material of the 102 penetrations will be performed as part of the UT inspection.
. The previous bare head visual examination SL2-13, including 3600 around each RPV head penetration nozzle, identified no evidence of leakage, or staining leading downhill toward the RMI.
- 5. DURATION OF PROPOSED ALTERNATIVE:
This relaxation is applicable to the April/May 2003 refueling outage (SL2-14) for PSL-2.