MONTHYEARML0233801922002-12-0606 December 2002 YT20020284/LTR-02-0670 - Response to Laurence O. Toole Ltr. Resolution No. 593 of 2002 - Rockland County Radiological Emergency Preparedness Plan - Indian Point Nuclear Generating, Unit No. 2 Project stage: Other ML0306901142003-03-25025 March 2003 Response to Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, Dated September 30, 1996 (TAC Nos. M96793 and M96793) Project stage: Other 2002-12-06
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 2024-09-06
[Table view] |
Text
March 25, 2003 Mr. P. E. Katz, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 RESPONSE TO GENERIC LETTER 96-06, ASSURANCE OF EQUIPMENT OPERABILITY AND CONTAINMENT INTEGRITY DURING DESIGN-BASIS ACCIDENT CONDITIONS, DATED SEPTEMBER 30, 1996 (TAC NOS. M96792 AND M96793)
Dear Mr. Katz:
Generic Letter (GL) 96-06, Assurance of Equipment Operability and Containment Integrity During Design-Basis Accident Conditions, dated September 30, 1996, included a request for licensees to evaluate cooling water systems that serve containment air coolers to assure that they are not vulnerable to waterhammer and two-phase flow conditions. The Constellation Energy Group (previously the Baltimore Gas and Electric Company) provided its assessment for the Calvert Cliffs (CC1-2) Units 1 and 2 letter dated January 28, 1997, and additional information provided in letters dated May 2, 1997, February 20, 1998, June 30, 1998, July 20, 1998, November 30, 1998, July 25, 2002, and December 3, 2002. The Nuclear Regulatory Commission (NRC) staff has completed its review of these letters and provide the following evaluation concerning (1) thermal overpressurization and (2) waterhammer and two phase flow.
THERMAL OVERPRESSURIZATION In its submittal of January 28, 1997, CC1-2 identified six penetrations potentially vulnerable to a water solid volume that may be subjected to an increase in pressure due to heating of trapped fluid. The affected six lines are: Reactor Coolant Pump Seal Controlled Bleed Off Lines; Plant Service Water Lines; Refueling Pool Recycle Inlet Lines; Containment Plant Heating Outlet Lines; Containment Plant Heating Inlet Lines; and, Refueling Pool Outlet to Fuel Pool Cooling Lines. CC1-2 determined that the affected lines are operable based on the criteria in Appendix F of Section III of the American Society of Mechanical Engineers Boiler Pressure and Vessel Code (ASME Code). For its long term corrective actions, CC1-2 committed to update plant Operating Instructions to include draining prior to returning the unit to operation, install pressure relief devices, or add insulation to the piping section, as required.
In response to the staffs request for additional information of May 6, 1998, CC1-2 in its submittal of July 20, 1998, stated that it has updated its plant Operating Instructions to require draining of the Plant Service Water Lines, the Refueling Pool Recycle Inlet Lines, and the Refueling Pool Outlet to Fuel Pool Cooling Lines, prior to returning the unit to operation following outages. CC1-2 also performed thermal transient analysis of the Containment Plant Heating Inlet and the Containment Plant Heating Outlet Lines, taking credit for the insulation,
P. E. Katz and determined that the lines meet the design basis limits provided in the Updated Final Safety Analysis Report (UFSAR). In the original configuration, the Reactor Coolant Pump Seal Controlled Bleed Off Line was not insulated. CC1-2 has modified this line to include insulation.
CC1-2 performed thermal transient analysis of the modified Reactor Coolant Pump Seal Controlled Bleed Off Line and determined that the piping meets the UFSAR design basis limits.
The staff finds this evaluation reasonable and acceptable.
WATER HAMMER AND TWO PHASE FLOW Based primarily on the information that was provided in letters dated January 28, 1997, July 25, 2002, and December 3, 2002, it is the NRC staffs understanding that the waterhammer scenarios discussed in GL 96-06 will be prevented by placing the service water pumps on step 0" in the loading sequence of the emergency diesel generator so that flow is restored to the containment air coolers before bulk boiling occurs, thereby eliminating the potential for any significant waterhammer to occur. Based on conservative assumptions as discussed in CC1-2's letter dated December 3, 2002, we understand that after the loading sequence modifications have been made, the minimum time from pump start to bulk boiling is predicted to be 1.4 seconds. Finally, the staff understands that CC1-2 has performed conservative calculations that demonstrate that Calvert Cliffs does not experience conditions in the service water system that would result in two-phase flow. The staff is satisfied with CC1-2's response and consider the waterhammer and two-phase flow elements of GL 96-06 to be closed.
CONCLUSION The NRC staff finds that CC1-2's corrective actions are reasonable and provide an acceptable resolution for the issue of thermally-induced pressurization of piping runs penetrating the containment and eliminating potential waterhammer and two phase flow to occur. We request that you inform the NRC when the necessary modifications have been fully implemented for our status tracking in the Project Managers Report.
Sincerely,
\RA\
Guy S. Vissing, Senior Project Manager, Section 1 Project Directorate Division of Licensing and Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 cc: See next page
ML030690114 *Response provided; no significant changes OFFICE PM/PDI-1 LA/PDI-1 SC/PDI-1 SC/EMEB SC/SPLB*
NAME GVissing SLittle PTam for RLaufer JFair SWeerakkody DATE 3/21/03 3/24/03 3/21/03 3/19/03 02/11/2003 Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 cc:
President Kristen A. Burger, Esquire Calvert County Board of Maryland Peoples Counsel Commissioners 6 St. Paul Centre 175 Main Street Suite 2102 Prince Frederick, MD 20678 Baltimore, MD 21202-1631 James Petro, Esquire Patricia T. Birnie, Esquire Counsel Co-Director Constellation Power Source Maryland Safe Energy Coalition 111 Market Street P.O. Box 33111 Baltimore, MD 21202 Baltimore, MD 21218 Jay E. Silberg, Esquire Mr. Loren F. Donatell Shaw, Pittman, Potts, and Trowbridge NRC Technical Training Center 2300 N Street, NW 5700 Brainerd Road Washington, DC 20037 Chattanooga, TN 37411-4017 Mark Geckle Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean, Manager Nuclear Programs Power Plant Research Program Maryland Dept. of Natural Resources Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406