ML030580735

From kanterella
Jump to navigation Jump to search
Emergency Response Manual, Contents and Revision Status - Part 1
ML030580735
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 02/20/2003
From:
North Atlantic Energy Service Corp
To:
Office of Nuclear Reactor Regulation
References
-RFPFR
Download: ML030580735 (121)


Text

SEABROOK STATION ADMINISTRATIVE PROCEDURE Emergency Operations Facility Operations ER 3.3 Rev. 34 SORC Review: 03-007 Date: 2-12-03 Effective Date: 0 -a.0--o5 EXPIRATION DATE a-ai -o5 Procedure Owner:

S. Perkins-Grew

ER 3.3 Page 2 Rev. 34 Contents and Revision Status Contents Page No.

Cover I Contents and Revision Status 2 1.0 OBJECTIVES 6 2.0 RESPONSIBILITIES 6 2.1 Response Manager 6 2.2 EOF Coordinator 6 2.3 Dose Assessment Specialist 6 2.4 Technical Assistant 6 2.5 Offsite Monitoring Coordinator 6 2.6 Security Coordinator 6 2.7 Radiological Assistant 7 2.8 Administrative Services Coordinator 7 2.9 HPN Communicator 7 2.10 Licensing Coordinator 7 2.11 Industry Liaison 7 2.12 EOF Support Staff 7 2.13 METPAC Operator 7 2.14 Document Control Center Coordinator 7 2.15 Material and Logistics Coordinator 7 2.16 Dosimetry Records Personnel 7 2.17 Dose Assessment Personnel 7

ER 3.3 Page 3 Rev. 34 Contents and Revision Status Contents Page No.

2.18 ERO Technical Liaison 8 2.19 Training Center Staff 8 2.20 Offsite Monitoring Communicator 8 3.0 PRECAUTIONS 8 4.0 PREREQUISITES 9 5.0 ACTIONS 10 5.1 Dose Assessment Personnel Checklist 10 5.2 Response Manager 10 5.3 EOF Coordinator 10 5.4 Dose Assessment Specialist 10 5.5 Technical Assistant 10 5.6 Offsite Monitoring Coordinator 10 5.7 Security Coordinator 10 5.8 Radiological Assistant 10 5.9 Administrative Services Coordinator 10 5.10 HPN Communicator 11 5.11 Licensing Coordinator 11 5.12 Industry Liaison 11 5.13 EOF Support Staff 11 5.14 METPAC Operator 11 5.15 Document Control Center Coordinator 11

ER 3.3 Page 4 Rev. 34 Contents and Revision Status Contents Page No.

5.16 Material and Logistics Coordinator 11 5.17 Dosimetry Records Personnel 11 5.18 ERO Technical Liaison 11 5.19 Training Center Staff 11 5.20 Offsite Monitoring Communicator 11

6.0 REFERENCES

12 7.0 ATTACHMENTS Figure 1 Emergency Operations Facility Layout 13 Figure 2 Emergency Operations Facility Staff 14 Figure 3 Emergency Access Control Measures for the EOF 15 Figure 4 Instructions for Operating the Standby Diesel Generator 16 Figure 5 EOF Sample Return Area Layout 17 Figure 6 Release Definition 18 Figure 7 Loss of Power to the EOF 19 Figure 8 Emergency Operations Facility Lighting Plan 20 Figure 9 Emergency Operations Facility Electrical Plan 21 Figure 10 Deleted 22 Figure 11 Offsite Monitoring and Sampling Team Deployment Flowchart 23 Figure 12 EOF Dosimetry Issue Flowchart 24 Figure 13 TEDE YTD Transit Card 25 Figure 14 EOF Dosimetry Return Card 26 Figure 15 EOF Dosimetry Return Flowchart 27 Figure 16 Post-Emergency Organizations 28 Figure 17 Summary of Changes 29-30 Rev./Chg.

ER 3.3B Emergency Response Personnel Requiring Site Access 33 ER 3.3C Dose Assessment Personnel Checklist 34 ER 3.3D Response Manager Checklist 34 ER 3.3E EOF Coordinator Checklist 34 ER 3.3F Dose Assessment Specialist Checklist 34

ER 3.3 Page 5 Rev. 34 Contents and Revision Status Rev./Chg.

ER 3.3G Radiological Status Board Update Form 33 ER 3.3H Technical Assistant Checklist 33 ER 3.31 Offsite Monitoring Coordinator Checklist 34 ER 3.3J Security Coordinator Checklist 33 ER 3.3K Radiological Assistant Checklist 34 ER 3.3L Administrative Services Coordinator Checklist 34 ER 3.3M ERO Staff Planning 33 ER 3.3Q HPN Communicator Checklist 33 ER 3.3R Licensing Coordinator Checklist 33 ER 3.3S Industry Liaison Checklist 34 ER 3.3W EOF Support Staff Checklist 34 ER 3.3Y METPAC Operator Checklist 33 ER 3.3Z Document Control Center Coordinator Checklist 33 ER 3.3AA Material and Logistics Coordinator Checklist 34 ER 3.3DD Dosimetry Records Personnel Checklist 34 ER 3.3EE Emergency Worker Call-In Report 33 ER 3.3GG Exposure Tracking Sheet 33 ER 3.311 Emergency Dosimetry Issue Log 33 ER 3.3KK ERO Technical Liaison Checklist 33 ER 3.3LL Training Center Staff Checklist 33 ER 3.3MM Offsite Monitoring Communicator Checklist 34

ER 3.3 Page 6 Rev. 34 1.0 OBJECTIVES This procedure specifies the actions required to activate and operate the Emergency Operations Facility (EOF). It also provides instruction for recovery from Site Area Emergency or General Emergency conditions.

2.0 RESPONSIBILITIES 2.1 Response Manager

1. Provides overall direction to the emergency response organization.
2. Authorizes notification of offsite authorities, approves protective action recommendations, and approves company news releases.
3. Authorizes requests for external assistance (e.g., INPO, NEI).
4. Obtains NRC and State concurrence of a plan for termination of emergency conditions.
5. Provides management direction and guidance to the Site Emergency Director in the effort to return the Station to a safe condition once the emergency mitigation phase of a Station response has been completed.

2.2 EOF Coordinator

1. Coordinates radiological and protective action assessment activities conducted from the EOF.
2. Performs State notifications.

2.3 Dose Assessment Specialist

1. Determines projected/actual offsite dose conditions from radiological release data.
2. Develops initial projected information regarding the location and extent of contamination of the environment following the termination of a release and its eventual complete dispersal. Coordinates the evaluation of sample analysis data obtained from all groups performing ingestion pathway sampling and develops information useful for the establishment of long-term protective actions.

2.4 Technical Assistant Coordinates technical assessment and support activities conducted from the EOF.

2.5 Offsite Monitoring Coordinator Coordinates offsite radiological monitoring and sampling during an emergency.

2.6 Security Coordinator Coordinates security response actions during an emergency.

ER 3.3 Page 7 Rev. 34 2.7 Radiological Assistant Coordinates radiological control measures at the EOF.

2.8 Administrative Services Coordinator Provides administrative support and obtains additional resources to support the emergency effort.

2.9 HPN Communicator Maintains Health Physics Network (HPN) communication with the NRC.

2.10 Licensing Coordinator Coordinates interfaces with regulatory agencies during an emergency.

2.11 Industry Liaison Coordinates interfaces with industry organizations and the Joint Owners during an emergency.

2.12 EOF Support Staff Provides administrative and clerical support.

2.13 METPAC Operator Operates the METPAC Computer System.

2.14 Document Control Center Coordinator

1. Coordinates retrieval of documents maintained in the EOF Document Control Center.
2. Coordinates INPO Nuclear Network activities.

2.15 Material and Logistics Coordinator Provides the EOF staff with the resources necessary to complete their assignments and assists in the acquisition of those resources not readily available.

2.16 Dosimetry Records Personnel Issues dosimetry, tracks doses of offsite monitoring teams and dose reporting for emergency response personnel. Coordinates with Framatome TLD Van Coordinator as requested.

2.17 Dose Assessment Personnel Provides administrative and clerical support to the Dose Assessment Specialist.

2.18 ERO Technical Liaison Notifies and interacts with the New Hampshire Public Utilities Commission (NHPUC) and the Massachusetts Emergency Management Agency (MEMA) Nuclear Engineer.

ER 3.3 Page 8 Rev. 34 2.19 Training Center Staff Assists the Technical Assistant with monitoring plant operational data.

2.20 Offsite Monitoring Communicator Relays messages to and from offsite teams and maintains a continuous log of field team location and radiological data.

3.0 PRECAUTIONS

1. Activation of the New Hampshire Incident Field Office (IFO) is not the responsibility of the Seabrook Station emergency response organization.
2. When notified of an Alert or higher emergency classification level, primary and subject-to-call responders should report immediately to their emergency response facilities. TSC primary responders may receive a briefing directly from Control Room staff. EOF primary responders should call appropriate TSC staff to be briefed.

ER 3.3 Page 9 Rev. 34 4.0 PREREQUISITES

1. An Alert, Site Area Emergency or General Emergency has been declared in accordance with Procedure ER 1.1, Classification of Emergencies.
2. Prior to declaring Recovery, the following plant conditions exist:
a. Radiation levels of in-station areas are stable or are decreasing with time.
b. As appropriate to the emergency condition, the reactor and associated systems are in a safe and stable condition as indicated by the following:

(1) The reactor is shut down and criticality controls are in effect (only if reactor shutdown was required by the emergency condition).

(2) The core is being adequately cooled.

(3) Control has been established over containment pressure and temperature.

(4) An adequate heat transfer path to an ultimate heat sink has been established.

(5) Primary system pressure is under control.

c. Any fire, flooding, earthquake or similar initiating events are either under control or have ceased.
d. Releases of radioactive material to the environment are either under control or have ceased.
e. Specified corrective emergency actions have been completed and the Station is in the appropriate operating mode, and notifications are complete.
3. Framatome support will be implemented in accordance with appropriate Framatome procedures.

ER 3.3 Page 10 Rev. 34 5.0 ACTIONS NOTE Telephone numbers for contacts referenced in the checklists are available in the Emergency Response Telephone Directory.

5.1 Dose Assessment Personnel Checklist Refer to form ER 3.3C, Dose Assessment Personnel Checklist, for required actions for this position.

5.2 Response Manager Refer to form ER 3.3D, Response Manager Checklist, for required actions for this position.

5.3 EOF Coordinator Refer to form ER 3.3E, EOF Coordinator Checklist, for required actions for this position.

5.4 Dose Assessment Specialist Refer to form ER 3.31F, Dose Assessment Specialist Checklist, for required actions for this position.

5.5 Technical Assistant Refer to form ER 3.3H, Technical Assistant Checklist, for required actions for this position.

5.6 Offsite Monitoring Coordinator Refer to form ER 3.31, Offsite Monitoring Coordinator Checklist, for required actions for this position.

5.7 Security Coordinator Refer to form ER 3.3J, Security Coordinator Checklist, for required actions for this position.

5.8 Radiological Assistant Refer to form ER 3.3K, Radiological Assistant Checklist, for required actions for this position.

5.9 Administrative Services Coordinator Refer to form ER 3.3L, Administrative Services Coordinator Checklist, for required actions for this position.

ER 3.3 Page 11 Rev. 34 5.10 HPN Communicator Refer to form ER 3.3Q, HPN Communicator Checklist, for required actions for this position.

5.11 Licensing Coordinator Refer to form ER 3.3R, Licensing Coordinator Checklist, for required actions for this position.

5.12 Industry Liaison Refer to form ER 3.3S, Industry Liaison Checklist, for required actions for this position.

5.13 EOF Support Staff Refer to form ER 3.3W, EOF Support Staff Checklist, for required actions for this position.

5.14 METPAC Operator Refer to form ER 3.3Y, METPAC Operator Checklist, for required actions for this position.

5.15 Document Control Center Coordinator Refer to form ER 3.3Z, Document Control Center Coordinator Checklist, for required actions for this position.

5.16 Material and Logistics Coordinator Refer to form ER 3.3AA, Material and Logistics Coordinator Checklist, for required actions for this position.

5.17 Dosimetry Records Personnel Refer to form ER 3.3DD, Dosimetry Records Personnel Checklist, for required actions for this position.

5.18 ERO Technical Liaison Refer to form ER 3.3KK, ERO Technical Liaison, for required actions for this position.

5.19 Training Center Staff Refer to form ER 3.3LL, Training Center Staff Checklist, for required actions for this position.

5.20 Offsite Monitoring Communicator Refer to form ER 3.3MM, Offiste Monitoring Communicator Checklist, for required actions for this position.

ER 3.3 Page 12 Rev. 34

6.0 REFERENCES

1. ER 1.1, Classification of Emergencies
2. ER 2.0, Emergency Notification Documentation Forms Procedure
3. ER 3.5, Media Center Operations
4. ER 4.3, Radiation Protection During Emergency Conditions
5. ER 5.2, Site Perimeter and Offsite Monitoring and Environmental Sampling
6. ER 5.3, Operation of the METPAC System
7. ER 5.4, Protective Action Recommendations
8. GN1332.00, Security Response to a Declared Radiological Emergency
9. NRC Inspection Report No. 50-443/86-18-01
10. Memo SEP901118, NHPUC Contacts During Emergencies
11. METPAC User's Manual
12. Ingest System Manual for Seabrook Station
13. Technical Description of the SB METPAC System
14. SS# 25564, Establishing Efficiencies for Field Calculations of Radioactive Activity on Air Sample Cartridges, June 16, 1986
15. NRC Inspection Report No. 50-433/89-19
16. Health Physics Department Procedures
17. ER 4.6, Offsite Monitoring and Decontamination
18. Memorandum SEP921168
19. NRC Inspection Report No. 50-443/94-15
20. SEP#20000030, Response to A/R #00004326 from CR #00-1882

ER 3.3 Page 13 Rev. 34.- -

FIGURE 1 CALLED EMERGENCY OPERATION FACILITY LAYOUT NOTEsLAYCE/TIS TYPICAL II II MEDIA I I EOF I

I IFO CENTER I I

EOUIPMENT SYMBOLS EOF EMERGENCY RESPONSE ORGANIZATION PERSONNEL LEGEND I - ADMINISTRATIVE 16 31 - SECvR7r SECURITY COORDINATOR ANSDER MACHINE SERVICES COORDINATOR rSTAFF 17 --- MA'ERIAL AND LOGISTICS MMINAT,*OR METPAC OPERATOR 32- PERSONNEL <*RADIO 2- EOF SUPPORT 33- NH OEM LIAISON ppRNTER 18 - NHPtIC REPRESENTATIVE 3- OFFS/TE MON COMMUNmcATOR 19- MAC DIRECTOR OF SITE OPERATIONS 34-NH CPH NLIAISON r FAX A

4-- ASST.EMERGENCr NEWS MANAGER 35 - MEDIA CENTER TECHNICAL AD/ISOR (EOF)

CENTER COORDINATOR 20g-tRC EMERGENCYRESPONSE COORIWNATOR ff PERSONAL COMPUTER 5- DOCUMENT CONTROL 21 - N/*C ENV.COSE ASSESSMUENT COORDINATOR 36 - TECHNICAL ASSISTANT 6- DOSE ASSESSMENT SPECIALIST 37 - TRAININGCENTER STAFF X PHONE 22- NRC OPERATIONS TEAM LEADER 7- MEDIA CENTER SUPPORT STAFF

?J2- NRC PROTECTIVE MEASJRES COORDINATOR 38 - MEMA SMUONiTOR 8- DOSIMETRY RECORDS PERSONNEL 39--FRAUATOME ElV. SAMPLE COORDINATOR 24--MNC PUBLIC AFFAIRS COORDINATOR 9- MEDIA CENTER TECHNICAL ADV/SOR (MC) 40 - FRAMATOME TLD COaRDINATOR r PORTAMONfIOR 25--NRC REACTOR SAFETY COORDINATOR 10- EMERGENCY NEWS MANAGER 4/ -- EO TECHNICAL. UAIO*N CLOSED CipaCitr TV 25 - NRC GT ULINSONC*ORDINATOR It- EOF COORNATOR COORDINATOR 42 -- NRC HPN COMMUNICATOR 27 - OFFSfTE MONITORING 12- FEMA PIO 43 - NRC PUC. COMMUNICATOR 28 - RADI1OLDGICAL ASSISTANT 13- HPN COMMUNICATOR 44 - WESTIMNGII.SE REPS 29-- RESPONSE MANAGER 14- INDUSTRY UAISON 30 - FEMA LIAISON 45 - MDPH

/5- LICENS*NG COORDINATOR 46 --NH PIO 47 - RESERVED 48 - DOSE ASSESSMENT PERSONNEL 49 --MA PCO 50 -- NRC STATUS SUJMMARYf COORDINATOR 51 - OCPH MONITORING COORDINATOR I

ER3.3 Page 14 Rev. 34 Figure 2 Emergency Operations Facility Staff ER33F2

ER 3.3 Page 15 Rev. 34 Figure 3 Emergency Access Control Measures for the EOF 10/16/02 PORTAL MONITOR FENCE LINE MEDIA EMERGENCY VEHICLE FRISK AREA STATION MONITORING TEAM DISPATCH AREA WASTE STORAGE DRUMS MAIN ENTRANCE PORTAL MONITOR CLEAN WALKWAY il IFO/EOF/MEDIA CENTER STAFF PARKING AREA ------I 1. ALL MONITORING TEAMS RETURNING TO THE EOF WILL BE REQUIRED TO REPORT l

TO THE EMERGENCY VEHICLE FRISK AREA TO CHECK THEIR VEHICLE FOR J CONTAMINATION.

-- HAVING COMPLETED THIS ACTION, THEY SHOULD PROCESS THROUGH THE PORTAL MONITOR PRIOR TO RE-ENTERING THE EOF.

2. A RADIOLOGICAL ACCIDENT WHICH CREATES SURFACE CONTAMINATION WILL REQUIRE THE RADIOLOGICAL ASSISTANT TO ESTABLISH TWO FRISKING STATIONS, ONE AT THE VEHICLE FRISK AREA AND ONE AT THE SAMPLE RECEIPT STATION INSIDE THE MONITORING TEAM DISPATCH AREA.

ALL CONTAMINATED PERSONNEL WILL BE

3. MOBILE NEWS MEDIA VANS REQUIRING CABLE REQUIRED TO ENTER VIA ROUTE 1 CONNECTION TO THE MEDIA CENTER WILL BE (ie,THE POTENTIAL CONTAMINATION ZONE)

ALLOWED TO PARK IN THE VICINITY OF AND REPORT TO THE RADIOLOGICAL THE MEDIA ENTRANCE TO THE MEDIA ASSISTANT WHEREUPON PERSONNEL DECON CENTER. THEY WILL BE ALLOWED TO TAMINATION EFFORTS, INCLUDING SHOWERING, ENTER/EXIT VIA ROUTE 3. WILL BE INITIATED. ALL RESPONDING CREDENTIALED NEWS MEDIA REPRESENTATIVES PERSONNEL WHO HAVE NOT BEEN EXPOSED WILL BE DIRECTED TO WALK TO THE TO THE PLUME WILL BE ALLOWED TO MEDIA CENTER ENTRANCE VIA ROUTE 3.

ENTER/EXIT THE EOF THROUGH THE E010012 NH IFO VIA ROUTE 2.

ER3.3 Page 16 Rev. 34 Figure 4 Instructions for Operating the Standby Diesel Generator 1.0 STARTING

1. Start the engine from the Emergency Generator Control Panel in the EOF utility room.
2. Depress the engine START button and hold until engine starts. If start does not occur within 30 seconds, refer to readiness checks listed on form ER 3.3LL.
3. Allow engine to run for 5 minutes to warm up.

2.0 LOADING/UNLOADING GENERATOR

1. Turn all yellow color-coded circuit breakers labeled "CU2" and "AH2" (located on Panel 1C) to the "OFF" position.
2. Push "TRANSFER TO EMERGENCY" switch on the TRANSFER SWITCH PANEL that is located to the right of the utility room exterior door. The generator is now supplying building load.
3. Log start and run hours, water temperature, oil pressure and charge amps in diesel log book located in utility room next to outside door.
4. To unload the generator and return to utility power, push the "RETRANSFER TO NORMAL" switch on the TRANSFER SWITCH PANEL.
5. Turn all yellow color-coded circuit breakers labeled "CU2" and "AH2" (located on Panel 1C) to the "ON" position.

3.0 STOPPING ENGINE

1. Allow 5 to 10 minutes of unloaded run time to cool generator and engine.
2. Depress the engine STOP button to stop engine.
3. Verify engine stops and reset the fuel rack trip on the engine per readiness check instructions on form ER 3.3LL.

EPLAN:E010498 DON 01/10/03 ER 3.3, Page 17 FIGURE 5 Rev. 34 EOF SAMPLE RETURN AREA LAYOUT SSAMPLING LOCKER [ LOCKER I T EO PERSONNEL

  • MONITORING TEAM STEP OFF DISPATCH AREA PAD FRISKER CHECK / WASTE SOURCE ° CONTAINER CABINET SAMPLE TRANSFER TABLE FRISKER I SAMPLE WINDOW PORT WASTE STANCHION DECON SHOWER CONTAINER 0

(* ROLL UP EPLAN:EO10498.DGN 01/10/03 n0nP PMT "RANCE IJ ',.J '* I\ I=. I *I I

(

ER3.3 Page 18 Rev. 34 Figure 6 Release Definition A "release" for purposes of completing form ER 2.OB, State Notification Fact Sheet, Block 5, is defined as follows:

Radioactive material is being released to the environment as indicated by A. Radiation monitoring effluent alarms (Alert or High).

OR B. Response Manager judgement that a radiological release has occurred and been terminated, or is continuing.

AND C. Release of material is directly attributed to the event.

2. A "release" for purposes of requiring offsite dose assessment (i.e., a METPAC run) is defined as follows:

A. Wide Range Gas Monitor (WRGM) High Alarm (RM-6528-4).

OR B. Main Steam Line Monitor High Alarm with an Open ASDV or SRV on the affected main steam line.

OR C. The results of effluent analysis or site boundary monitoring indicate dose rate> .06 mrem/hr.

3. During an Alert, Site Area Emergency or General Emergency, a "release" for purposes of requiring activation of the remote monitoring and decontamination area at Schiller Station is the same as number 2 above.

ER 3.3 Page 19 Rev. 34 Figure 7 Loss of Power to the EOF

1. EOF lighting and power circuits are shown in Figure 8, Emergency Operations Facility Lighting Plan, and Figure 9, Emergency Operations Facility Electrical Plan. These figures are also displayed on the door to the EOF utility room.
2. On Figure 8, EOF overhead lighting fixtures that would be powered by the EOF emergency diesel generator are displayed in bold. The lighting fixtures powered by the diesel generator are also identified on the emergency power panels 2A and 2B.
3. Figure 8 also shows the locations of emergency flood lights that would illuminate automatically when normal AC power is lost in the EOF prior to activation of the emergency diesel generator.
4. On Figure 9 wall outlets and power strips that would be powered by the EOF emergency generator are displayed in bold. The outlets and power strips powered by the diesel generator are also identified on emergency power panels 2A and 2B.
5. If normal AC power is lost in the EOF, the Administrative Services Coordinator should ensure that all EOF and Media Center computers are turned off prior to start-up of the emergency diesel generator.
6. When emergency power to the EOF is started, the Administrative Services Coordinator should call in appropriate Specialty Technical Assistants for the follow-ing:

IRG to assist restarting EOF personal computers and communications equipment if necessary.

Computer Engineering to assist restarting the MPCS and Security computer if necessary.

0 Site Services to assist resetting HVAC thermostats.

I ER 3.3 Page 20

£l4446y wna momLTh 2SA~DIT Rev. 34 FIGURE 8 46 46.001 CALLED ----

EMERGENCY OPERATIONS FACILITY D&UMS.ERSM1 LIGHTING PLAN Lwri 1.If.

200 MAIN / PANEL 1C PANEL 10 111 PANEL 2A EMERGENCY POWER-]i PANEL 1A 200 MAIN /PANEL 1B -

L u;-- 1 -. I 2 4~- C... .~4 U..

9 32A 42 4so 4cuf to rMPm 5302-1

  • 2 4 F.- L -Ma 4 M4 4...4P414446e0-2 W4. 4.9441.04 44494W14.P* .~11tPW 1 V51. U 7

to w 32 a.41..4.14~.444 0I .2 io4

  • . rp...OM.c 140 a.

s we a121 to P 7 -- L5 a .- a..2.640 0 4~a- _ _ _

2 W- 24 a LW- , 440441 -

eua a- (4.4144 4

251 24 a m Is w .. 4.1. .. a 444.a-41 IIIt a ~~ ~ ~ Ar 4141 rs-1.

21V 2 .W 44 44 21 25 S 0 .

2 21714 S.0. 2144**22 27 4270p4 14614C" 25 x4 -ca4W 23 24.14. 2732 2T MO 4-.,..v 5-30 -PANEL 2B REG. EMERGENCY POWER 2,

204.514 33 34 297 mt. t U 34440 OS132 5..4

~

a40 I~

~~~~~m 2W."*

6 cm1410.

17 MI (41 464 6.544 29 44 44st4.-4 FOd~a. a6- 33 MAIN4?460 31U E.v- - TDW CD 04 1 M.4Ma4 Loll r.. 74.4N'M

.... s *.uy32 30 Ml Ia OO 5-10MR`001 4.01 43307 -b 44 4.0 P...

  • .~,4. T 01441P444 9...

1240 P' 14440 a -a lip 4460.na -

ez

ER 3.3 Paze 21 tb m--a& -Trmm x i oN=

T*r* t4 R ev. 34 HO WAIM TANKS-3 2.1 FIGURE 9 CALLED.----

EMERGENCY OPERATIONS FACILITY 9 .

B0G~C roton mr ELECTRICAL PLAN E -MFSTsmd FE51 CLO=CM=TY

ER 3.3 Page 22 Rev. 34 Figure 10 (Deleted)

ER 3.3 Page 23 Rev. 34 Figure 11 Offsite Monitoring and Sampling Team Deployment Flowchart OMC - Offsite Monitoring Coordinator OMST - Offste Monitoring and Sampling Teams OSC - Operational Support Center RAE - Remaining Allowable Exposure Fife Form ER 3.3GG and ER 4.3 Figure 4 as appropnate p Ip-w~vsjoer3-3f 1 vsd

ER 3.3 Page 24 Rev. 34 Figure 12 EOF Dosimetry Issue Flowchart Offsite Monitoring and Samphng Teams Year to Date Radiological Controls Coordinator Self Reading Pocket Dosimeter Thermoluminescent Dosimeter p lapwviwsto\er3-3f12 vsd

-- A.-

ER 3.3 Page 25 Rev. 34 Figure 13 TEDE YTD Transit Card TEDE YTD TRANSIT CARD Name:

SSN:

TEDE YTD: mrem estimate/record Dose Limit Extended to mrem Initial

ER 3.3 Page 26 Rev. 34 Figure 14 EOF Dosimetry Return Card EOF DOSIMETRY RETURN Name:

TLD#:

SRPD Estimated Dose:

Comments:

ER 3.3 Page 27 Rev. 34 Figure 15 EOF Dosimetry Return Flowchart Direct personnel to the Radiological Assistant Log SRPD results and TLD information on Form ER 3.311 Forward TLD to DE&S TLD Coordinator for readout as required Fill out exposure records when results are available SRPD - Self Reading Pocket Dosimeter TLD - Thermoluminescent Dosimeter g lap-w\visiole3-3f15 vsd

( ( C ER 3.3 Page 28 Rev. 34 Figure 16 Post-Emergency Organizations 10/17/02 COMPLETION OF RECOVERY CLEANUP OUTSIDE PREREQUISITES OWNER CONTROLED MET AREA NORMAL EMERGENCY

RESPONSE

ORGANIZATION STATION ORGANIZATION OFFSITE DOSE EVENTTEAMS ENGINEERINGSUPPORT ASSESSMENT EXTERNAL SUPPORT CORE DAMAGE ASSESSMENT ORGANIZATIONS MEDIARELATIONS OPERATIONS (WESTINGHOUSE)

ONSITE DOSE ASSESSMENT, STATEAND ONSITE REGULATORY CONTAMINATION CONTROL.

LOCALRELATIONS PROGRAMS WASTE SERVICES OFFSITE FEDERALRELATIONS. MAINTENANCE AND FEMA. DOE, EPA.NRC. ETC CORRECTIVE ACTIONS INDUSTRIAL RELATIONS WORKCONTROL INPO. NEI.ANS,NEIL.ETC RECOVERY EMERGENCY ORGANIZATION/ LONG-TERM RESPONSE TRANSITION tECOVERY PHASE "iF,=PHASE PHASE All above are 1-shift positions

-- n p;-

m,_

w p.-

E070170

ER 3.3 Page 29 Rev. 34 Figure 17 Summary of Changes (Sheet I of 2)

Rev. 34:

On Figure1, revised EOFdiagram to show changes to the Media Centerfacility and relocation ofMEMA representatives(CR 02-12446).

On Figure2, identified Framatomesupportstaff in lieu of DE&S support staff.

On Figure5, EOFSample Return Area Layout, showedfrisker station in lieu ofportal monitor.

On Figure 8, revised the EOF emergency power lightingplan (CR 02-12446).

On Figure 9, revised the EOF emergency power electricalplan (CR 02-12446).

On form ER 3.3 C, clarifieddocument distributioninstructionsthat allows copying documents in onepackagefor distribution and addedMEMA to the distribution list (CR 02-14069).

On form ER 3.3D, added a step thatdirects the Response Managerto coordinatea facility briefing schedule with the Site Emergency Directorand added briefingguidancebased on Operations Good Practice019 (CR 02-1343 6 and CR 02-12440).

On form ER 3.3D, referencedINPO in lieu of Framatomeas sourcefor obtainingindustry assistanceto meet resourcerequestsfrom the states and deleted reference to Framatomeas a component of a recovery organization(SEP#20022107).

On form ER 3.3E, revised instructionsfor EOF Coordinatorto notify the state via the Nuclear Alert System (NAS) to accountfor new NAS equipment (CR 02-02421).

On form ER 3.3E, deleted instructionsfor the EOF Coordinatorto obtain dose assessment supportfrom Framatome(SEP#2002107).

On form ER 3.3E, added a step directingthe EOF Coordinatorto have support stafftelefax completedforms ER 2.OB to the Site Emergency Director(CR-02-12437).

On form ER 3.3L, referenced the EOFAnswering Unit in lieu of CallDirector.

On form ER 3.3L, added steps for the AdministrativeServices Coordinatorto monitorEOF status boardsto ensure they are accurateand current (CR 02-14069 and CR 02-13806).

On form ER 3.3L, clarifiedinstructionsfor calling out IRG supportservices (CR 02-16494).

On form ER 3.3L, deleted references to the FramatomeEngineeringSupport Center and to the FramatomeDE&S Emergency MutualAssistance Agreement (SEP#2002107).

ER 3.3 Page 30 Rev. 34 Figure 17 Summary of Changes (Sheet 2 of 2)

On form ER 3.3S, deleted a step directingthe Industry Liaison to contact the Framatome EngineeringSupport Centerfor a site team response (SEP#2002107).

Onform ER 3.3W, added a step for thie EOFSupport staff assignedto the Response Manager to contact the TSC logkeeper to obtain or verify information (CR 02-12434).

On form ER 3.3W, referenced use ofform ER 3.3EEfor recordingemployee messages left on the EOF answering unit.

On form ER 3.3AA, deleted step for the MaterialsandLogistics Coordinatorto obtain equipment resources through FramatomeEngineeringSupport Center.

Rev. 33:

Throughout the procedure updated company names (e.g., changed DE&S to Framatome ANP DE&S, North Atlantic to Seabrook Station, NU to FPL Group).

Rev. 32:

In Figure 1 removed NH Rumor Control function from EOF/IFO diagram.

In Figure 3 corrected EOF entry instructions when contamination is present.

In Figure 16 provided more detailed guidance for recovery organization components.

On form ER 3.3D revised instruction for Response Manager to review EOF organization requirements against the EOF sign-in board. Instruct the Response Manager to obtain status of EOF staffing from the Administrative Services Coordinator.

On form ER 3.3H removed references to DE&S ESC in Technical Assistant checklist.

On form ER 3.3L added placekeeping spaces for specific tasks that the Administrative Services Coordinator is required to implement beyond the Activation steps in the Administrative Services Coordinator checklist.

EMERGENCY RESPONSE PERSONNEL REQUIRING SITE ACCESS The Security Department is requested to badge the following individuals for site access and to provide the route to be taken to access the site. These individuals have been briefed on the plant conditions, to report.

have received the required dosimetry, and have been instructed on to whom they are DATE NAME AFFILIATION SIGNATURE

_____ J I. I I - i -+ I

_____ 4. 4 I 4 I-

_____ .1. 1 t 4 I t

_ I_ I1 i

_____ I I I

- -I_ - 4- 1

_____ I I I I -i-i

_ JI_

_____ 4. 4 t

______ I I t 4 1 t

_ _ __ I t

_____ L I 1 1. i

_ __ _ I 1- i

_____ 1 + I

- I1

___________ t

_____ 4. 1 t INDUSTRY LIAISON SIGNATURE ER 3.3B Rev. 33 Page 1 of 1

DOSE ASSESSMENT PERSONNEL CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the Dose Assessment Personnel emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Verify operability of copy machines and adequacy of the paper supply.
e. Ensure the paper trays are present for documentation handling.
f. Assist METPAC Operator and Dose Assessment Specialist in establishing adequate supply of dose assessment forms.
2. ACCIDENT ASSESSMENT
a. Obtain logger trend printouts from the Technical Assistant and provide it to the METPAC Operator.
b. After each run of METPAC, copy the following documents into one package for distribution and distribute as follows:

Documents Distribution

1. METPAC Input Data Log - Response Manager (hand-deliver)
2. METPAC Output Printout - EOF Coordinator (hand-deliver)
3. Plume Plot - HPN Communicator (hand-deliver)
4. Status Board Update Form (ER 3.3G) - MA Health Dept.* (MDPH)

(Updated forms ER 3.3G are produced - NRC Protective Measures Coordinator*

as METPAC printouts) - NH Public Health* (NHOCPH)

- Maine Health Dept.*(MEDHE)

- MA Emergency Management (MEMA)

  • Place in the appropriate mail slot in the Dose Assessment Room.
c. Update the Radiological Status Board in the Emergency Operations area, including current meteorological conditions, as directed by the Dose Assessment Specialist.
d. Depict approximate plume location on the plume EPZ map based on METPAC plume plots or as otherwise directed.
3. DEACTIVATION Place original documentation in chronological order and provide to the Dose Assessment Specialist.

ER 3.3C Rev. 34 Page 1 of 1

RESPONSE MANAGER CHECKLIST INITIAL ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain the Response Manager emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Direct the Administrative Services Coordinator to assign an individual to maintain a log for you using form ER 2.OE, Emergency Facility Log.
e. Contact the Site Emergency Director (SED) or Short Term Emergency Director (STED) to obtain a briefing on the following:

(1) Station status (2) radiological releases, if applicable (3) classification (4) notifications completed (5) protective action recommendations (PARs) status

f. Determine EOF staffing status from the Administrative Services Coordinator.
g. Brief the EOF Staff on the emergency status using the EOF page system, as conditions warrant.
h. Ensure the EOF Staff has completed or is nearing completion of the activation sections of its checklists.
i. The following personnel should be present before the EOF is declared activated:

(Protected: Ref. 6.19)

(1) Response Manager (2) EOF Coordinator (3) Dose Assessment Specialist (4) Offsite Monitoring Coordinator (5) Administrative Services Coordinator (6) Technical Assistant (7) ERO Technical Liaison (8) Personnel for 2 offsite monitoring teams (2 monitors and 2 drivers)

ER 3.3D Rev. 34 Page 1 of 8

RESPONSE MANAGER CHECKLIST (Continued) lNITIAL

j. Assume the following non-delegable responsibilities from the Site Emergency Director (SED). (Protected: Ref. 6.9)

(1) Authorization of PARs (2) Authorization of State notifications (3) Authorization of news releases (4) Authorization of requests for industry emergency response assistance

k. Declare the EOF activated.
1. Inform the SED of EOF activation.
2. ACCIDENT ASSESSMENT/MITIGATION
a. Establish a briefing schedule with the Site Emergency Director (e.g., on the half hour, etc.) to avoid trying to contact one another during scheduled facility briefings.
b. Obtain regular plant status briefings from the SED.
c. Conduct regular briefings for the EOF Staff.
d. Document and periodically review "action items" needed to respond to the emergency (e.g., what is needed, who is responsible, due dates/times, priorities, coordination among affected facilities and individuals, etc.).
e. Ensure that "action item" assignments, expectations and priorities are communicated to the appropriate individuals.
3. CLASSIFICATION
a. If the EOF staff recognizes a dose or dose rate condition that meets or exceeds 12 series Initiating Conditions on form ER 1.1 A, notify the SED immediately to reclassify the emergency.

CAUTION State notifications shall be initiated within 15 minutes of reclassification of the event.

b. After the SED reclassifies the emergency, authorize the EOF Coordinator to notify the states.

ER 3.3D Rev. 34 Page 2 of 8

RESPONSE MANAGER CHECKLIST (Continued)

4. PROTECTIVE ACTION RECOMIMENDATIONS (PARs)

CAUTION State notifications shall be initiated within 15 minutes of Response Manager Approval of a new PAR.

a. Review proposed PARs as provided by the EOF Coordinator.
b. Authorize the PAR by signature in Block 6 of form ER 2.0B.
c. Direct the EOF Coordinator to make necessary PAR notifications.
d. Convene a meeting of available State and Federal agency representatives to discuss Seabrook Station's PAR and receive input from the offsite organizations on their intended actions/responses.
e. Review each step listed above upon reclassification of the event.
5. NOTIFICATIONS AND BRIEFINGS
a. Authorize State notifications; review and sign forms as required.

NOTE The criteria to be used in determination of a radiological release are in Figure 6.

b. Notify and provide a briefing to FPL Group executive management.
c. Conduct regular briefings with the EOF staff by meeting in the operations horseshoe area or by using the EOF public address system as appropriate. Consider holding a staff briefing:

(1) At intervals agreed to with the Site Emergency Director (2) Following a significant change in accident conditions (3) Following a change in emergency classification level (4) Following a change in radiological conditions (5) Following a change in protective action recommendations (6) Following a change in response actions or priorities ER 3.3D Rev. 34 Page 3 of 8

RESPONSE MANAGER CHECKLIST (Continued)

d. Conduct EOF staff briefings with the following format in mind:

(1) Beginning: This is a brief (2) Review: Discuss what has happened in a brief sequence of events (3) Input: Does anyone have any questions or anything to add (4) Expectations: Where are we going, what are the concerns, what are our priorities (5) Finnish: The brief is over

e. Ensure the Media Center, through the Technical Advisor, is apprised of changing plant status and response actions.
f. Review and approve news statements, if generated.
g. Conduct periodic briefings with State and Federal response officials.

(1) Prior to a briefing, perform the following:

0 Direct the Administrative Services Coordinator to coordinate EOF activities while you are in the briefing.

0 Identify Seabrook Station ERO personnel who should attend.

  • Determine the status of any action items committed to in previous briefings (e.g., requests for information).

9 Identify an individual to document the briefing and any commitments.

0 If the NRC is attending the briefing, instruct the Licensing Coordinator to attend and capture any commitments made to the NRC.

0 Focus on keeping the briefing short and concise.

0 Ascertain the status of media briefings taking place in the media center and how media are responding to information being released by Seabrook Station and state public information officers.

(2) A suggested briefing agenda follows:

  • Introductions
  • Current emergency classification level
  • Brief summary of events to date
  • Current plant status - discuss plant stability (degrading, stable or improving - see Supplemental Material #03-01) 0 Status of event mitigation actions and event prognosis
  • Results of radiological assessments

& Protective action recommendations (by Seabrook Station ERO)

  • Protective actions actually implemented (by States)
  • Summary of Federal and State response activities ER 3.3D Rev. 34 Page 4 of 8

RESPONSE MANAGER CHECKLIST (Continued)

  • Level of media and political interest
  • Review available answers to any open questions from prior briefings
  • Open discussion/question and answer session
  • Time of next briefing (3) Following the briefing, ensure that action items and commitments discussed in the briefing are assigned to the appropriate individuals.
6. STAFFING/EQUIPMENT NEEDS
a. Direct requests for additional staffing or equipment resources to the Administrative Services Coordinator.
b. Monitor and approve requests for assistance to various industry and support groups (e.g., Westinghouse and INPO), as necessary.
c. If the State of New Hampshire or Massachusetts requests additional support staff or resources, consider asking INPO for help in meeting these requests through industry mutual assistance. If industry support is requested for state monitoring and decontamination activities, instruct INPO to have the contacted utility ensure that designated personnel are not part of the Massachusetts Nuclear Incident Advisory Team (QNAT).
7. PLANNED RELEASES
a. Review Section 1 of form ER 3.1M, Planned Radiological Releases Data. Discuss the information with the Site Emergency Director.
b. Review Sections 2 and 3 of form ER 3.1M. Discuss the information with the EOF Coordinator. When possible, discuss protective actions associated with the pending release and obtain concurrence of offsite authorities before a planned release is authorized.
c. Complete Section 4 of form ER 3.1M.
d. Direct the SED to implement the release and associated sampling and monitoring actions.
e. Direct the EOF Coordinator to inform the States of the release and its projected duration.
f. Direct the Emergency News Manager to draft a news statement on the event.
g. Notify offsite authorities when the action has been completed.

ER 3.3D Rev. 34 Page 5 of 8

RESPONSE MANAGER CHECKLIST (Continued)

8. EMERGENCY TERMINATION AND RECOVERY 2

When the risk posed by the emergency is clearly decreasing or has ceased, de-escalation or closeout of the emergency is appropriate. A combination approach is used and summarized in the table below.

Classification Event Closeout Event Closeout Downgrading via via Recovery?

Allowed? Termination?

Unusual Event N/A Yes No Alert Yes Yes No Site Area Emergency with no Yes Yes No long-term station damage Site Area Emergency with Yes No Yes; may occur long-term station damage after downgrading General Emergency Yes No Yes; may occur after

____________________________________ ____________ downgrading NOTE Prior to downgrading an emergency classification from a Site Area Emergency or a General Emergency, perform the following:

(1) Confer with the Site Emergency Director, Technical Assistant and EOF Coordinator to verify that the EALs which required the current classification are no longer met by existing (and/or projected) operational or radiological parameters.

(2) Review the basis for downgrading with cognizant State and Federal authorities.

(3) Inform state authorities that no protective action recommendations will be made when the emergency classification is downgraded. The states must decide whether to maintain or modify previous protective action decisions.

a. Confer with the Site Emergency Director, Technical Assistant and EOF Coordinator to determine whether actual/potential conditions warrant entry into a recovery mode.
b. If recovery is appropriate, direct the Site Emergency Director, Technical Assistant and EOF Coordinator to confer with their respective staffs and determine whether any radiological and/or operational conditions exist which would preclude entry into a recovery mode.

ER 3.3D Rev. 34 Page 6 of 8

RESPONSE MANAGER CHECKLIST (Continued)

NOTE Conditions required for declaring recovery are listed in Section 4, Prerequisites.

c. Direct the Site Emergency Director to develop an onsite recovery organization and shift schedule.
d. Designate an interim Recovery Manager to initiate development of an integrated recovery organization. Consider other members of the Response Manager pool for this assignment. Direct the Technical Assistant and EOF Coordinator to support the interim Recovery Manager in developing an offsite recovery organization and shift schedule.
e. Refer to Figure 16, Post-Emergency Organizations, for guidance for structuring the organizations from the emergency phase through the transitional phase to the recovery phase.

(1) The recovery organization should, to the degree practical, draw upon the functional departments and capabilities of the normal FPL Group Nuclear organization.

(2) As needed, new recovery organization positions may be created.

(3) ERO positions may be carried over into the recovery organization if desired.

(4) Consider structuring the recovery organization such that offsite impacts on station recovery activities are minimized, i.e., keeping long-term governmental, regulatory, media, public and financial interface points at offsite locations (e.g.,

the EOF).

f. The organizational structure should take into account incident specifics and consider outside support organizations such as (1) FPL Group (2) Westinghouse (3) Resources coordinated through INPO
g. Direct key recovery organization members to prepare written prioritized work plans required to (1) maintain long-term Station stability (2) confirm the status of systems and equipment (3) confirm radiation and contamination conditions (4) repair damaged systems and equipment (5) remove contamination (6) maintain doses to recovery personnel ALARA ER 3.3D Rev. 34 Page 7 of 8

RESPONSE MANAGER CHECKLIST (Continued)

(7) minimize industrial hazards to recovery personnel (8) facilitate reentry into all Station areas (9) maintain communications with the media and the public (10) maintain communications with State authorities (11) maintain communications with regulatory agencies

h. Consider need for special re-entry and recovery procedures, including the following:

(1) Exposure guidelines/ALARA (2) Work Control requirements (3) In-plant safety practices (4) Equipment maintenance, repair or replacement (5) Component design changes/modifications

i. As needed, direct development, review and approval of new or revised procedures.
j. Review procedure NM 11800, Hazardous Condition Response Plan, to identify additional recovery considerations.
k. Review and approve the recovery organization and a master action plan.
1. Review the proposed recovery organization, action plans, and the date and time for entry into the recovery mode with the following:

(1) NRC representatives (2) FEMA representatives (3) State emergency response officials

m. Brief key ERO managers on the recovery organization, action plans, and date and time for entry into recovery mode.
n. Direct the Emergency News Manager to issue a news statement concerning entry into the recovery mode.
o. Provide recovery assistance to State authorities, as requested.
p. Direct the administrative, financial and legal support necessary for the recovery organization.
9. DEACTIVATION Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3D Rev. 34 Page 8 of 8

EOF COORDINATOR CHECKLIST INITIAL ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain the EOF Coordinator's emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Maintain a log using form ER 2.OE, Emergency Facility Log.
f. Obtain a briefing from the Response Manager.
g. If the Response Manager is unavailable, contact the Site Emergency Director (SED) for a briefing on the following:

(1) Station status (2) radiological releases, if applicable (3) classification (4) offsite notification status (5) protective action recommendations (PARs) status

h. Ensure that the HPN Communicator maintains the Health Physics Network (HPN), if requested to do so by the NRC.
i. Inform the Response Manager when responsibility for notifications and protective action recommendations can be assumed.
j. If a radiological release has occurred or is in progress, advise the Administrative Coordinator and the Security Coordinator concerning release instructions for personnel in the Inprocessing Center assembly area.
k. Obtain copies of all completed State notification forms from the TSC (fax from the Site Emergency Director).

ER 3.3E Rev. 34 Page 1 of 6

EOF COORDINATOR CHECKLIST (Continued)

2. ACCIDENT/DOSE ASSESSMENT NOTE The criteria to be used in determination of a Radiological Release are in Figure 6.
a. Coordinate offsite radiological and protective action assessments with the Dose Assessment Specialist and Offsite Monitoring Coordinator.
b. As needed, obtain Station operational data from the Technical Assistant.
c. As needed, obtain onsite radiological data from the HP Coordinator.
3. CLASSIFICATION CAUTION General Emergency Initiating Condition 12e is based on dose versus dose rate.
a. Review offsite dose projections or field monitoring data which may affect the emergency classification or protective action recommendations.
b. Inform the Response Manager immediately when dose or dose rate estimates exceed a 12 series Initiating Condition contained on form ER 1.1A.
4. PROTECTIVE ACTION RECOMMENDATIONS (PARs)

CAUTION When performing PAR assessments using ER 5.4A, obtain Critical Safety Function Status Tree (CSFST) information from the Technical Assistant.

CAUTION When completing ER 5.4A during a General Emergency, remember that the radiological criteria used to select a PAR Group B is based on the TEDE and adult thyroid CDE dose at 5 miles, not dose rate.

a. As changes in station and radiological conditions warrant, complete form ER 5.4A, Plume Exposure Protective Action Recommendation (PAR) Worksheet.
b. If a new PAR is identified by completion of ER 5.4, complete form ER 2.OB, State Notification Fact Sheet, with the PAR results.

ER 3.3E Rev. 34 Page 2 of 6

EOF COORDINATOR CHECKLIST (Continued)

c. Review form ER 2.OB with the Response Manager and obtain his authorization.
d. Transmit the information on ER 2.OB to the State Emergency Operations Centers using the Nuclear Alert System (NAS) Group Call Number A2. If the NAS Group Call number fails, establish contact the backup method in Supplemental Material 97 "Nuclear Alert System (NAS) and Backup Phone Instructions.".
e. Verify that State personnel have correctly received ER 2.0B information by asking one or both to read back the information.
f. Notify the appropriate State and NRC personnel present at the EOF of any PARs transmitted to the State EOCs, and give them a copy of form ER 2.OB.
g. Direct an EOF Support Staff to fax completed forms ER 2.OB to the Site Emergency Director in the TSC.
h. Periodically review protective actions implemented by State authorities, including precautionary actions. Ensure that protective action-related information is posted and kept current on the protective action status board.
i. When the evaluation process above results in no PAR, carefully review the Station conditions and prognosis with the Response Manager and Technical Assistant.

Depending on the results of this review, consider issuing a precautionary PAR that is appropriate to the Station prognosis.

j. If a projected dose based on field measurement data is TEDE > 1 rem or CDE Thyroid > 5 rem at 10 miles downwind or farther, do the following:

(1) Consult with NRC and DOE dose assessment personnel to determine if their models obtain similar dose projections.

(2) Review the dose projections with MA, ME, and NH public health personnel present at the EOF.

(3) Determine with MA, ME, and NH public health and emergency management personnel present at the EOF what public protective actions are warranted for specific jurisdictions beyond the 10 mile EPZ jurisdictions.

CAUTION Ensure that public protective actions within the 10 Mile EPZ have been completed before PARs are recommended for the public beyond the 10 Mile EPZ.

ER 3.3E Rev. 34 Page 3 of 6

EOF COORDINATOR CHECKLIST (Continued)

(4) Complete form ER 2.OL, State Notification of Protective Action Recommendations Beyond the 10 Mile EPZ.

(5) Obtain the Response Manager's approval signature on form ER 2.OL.

(6) Notify the states via telephone numbers shown on form ER 2.OL.

(7) Direct an EOF Support Staff to fax completed forms ER 2.OL to the Site Emergency Director in the TSC.

(8) Post PAR and specific towns affected on the EOF accident time log board.

5. NOTIFICATIONS CAUTION Notifications shall be initiated within 15 minutes upon reclassification of the event or formulation of a new PAR.
a. Complete form ER 2.OB following reclassification, change in radiological release condition or to recommend protective actions. The definition of a "release" as used in Block 5 of the form is provided in Figure 6.
b. If notification is for a downgraded emergency classification, check "None" in block 3 of form ER 2.OB.
c. Review form ER 2.OB with the Response Manager and obtain his authorization.
d. Transmit the information on ER 2.OB to the State Emergency Operations Centers using the Nuclear Alert System (NAS) Group Call number A2. If the NAS Group Call number fails, establish contact the backup method in Supplemental Material 97 - "Nuclear Alert System (NAS) and Backup Phone Instructions."
e. Verify that State personnel have correctly received ER 2.OB information by asking one or both to read back the information.
f. Notify the appropriate State and NRC personnel present at the EOF of any notifications transmitted to the State EOCs, and give them a copy of form ER 2.OB.
g. Direct an EOF Support Staff to fax completed forms ER 2.OB to the Site Emergency Director in the TSC.

ER 3.3E Rev. 34 Page 4 of 6

EOF COORDINATOR CHECKLIST (Continued)

h. Direct the HPN Communicator to report changes in emergency status, offsite radiological status, and protective action recommendations to the NRC via the Health Physics Network phone.
i. When contact is established with State personnel present at the EOF, provide them periodic updates of plant and radiological conditions. Use form ER 2.OC, Follow-up Information Form, for this purpose if State personnel request it.
j. If State personnel are not present at the EOF, use form ER 2.OC to transmit follow-up information as requested to the State EOCs.
6. STAFFING/EQUIPMENT NEEDS Direct requests for additional staffing or equipment resources to the Administrative Services Coordinator.
7. RELEASE OF ASSEMBLY AREA PERSONNEL
a. Inform the Administrative Services Coordinator if station radiological conditions require directing site personnel to the Remote Monitoring Area.
b. Inform the Administrative Services Coordinator if the Health Physics Coordinator recommends use of alternate transportation to the Remote Monitoring Area as a contamination control measure.
8. PLANNED RELEASES
a. Upon receipt of form ER 3.1M from the Site Emergency Director, direct the Dose Assessment Specialist to complete Section 2 of the form.
b. Using the dose rate information from Part C of Section 2 of form ER 3.1M, evaluate appropriate protective actions associated with the planned release using Procedure ER 5.4, Protective Action Recommendations, and document the results on form ER 2.OB, State Notification Fact Sheet. Obtain the Response Manager's authorization and report the results to the states.

NOTE Use Section 3 of form ER 5.4A to complete the required evaluation referenced by Step b above. The wind direction used should be the forecasted wind direction for the period that the release is to be initiated. The release duration used should be the actual time it would take to vent the entire source term through the defined release path.

c. Having completed Section 2 of form ER 3.1M, coordinate discussions with offsite authorities (NH, MA, NRC). The following topics should be reviewed:

ER 3.3E Rev. 34 Page 5 of 6

EOF COORDINATOR CHECKLIST (Continued)

(1) Reason for release, (2) Meteorological conditions and forecast information, (3) Protective actions currently in effect, (4) Additional Protective Actions required as a result of a planned release, (5) Offsite agency concerns regarding a planned release, particularly the release start time, (6) Appropriate media announcements regarding a planned release, (7) Monitoring activities associated with the planned release condition, and (8) Reporting requirements concerning release termination.

d. After discussing the planned release with offsite authorities, complete Section 3 of form ER 3.1M. Sign in the appropriate space and provide the entire form to the Response Manager.
e. Notify the remaining EOF representatives of the planned release.
f. Direct the Dose Assessment Specialist to appropriately position Offsite Monitoring Teams and periodically report any recorded field observation.
9. REENTRY AND RECOVERY
a. Provide reentry and recovery support as directed by the Response Manager.
b. Recommend that represented organizations make full use of available assessment resources at the EOF and other locations for the prompt determination of reentry and recovery strategies.
c. Ensure that Seabrook Station provides the required services and equipment to expedite the assessment of radiological samples taken in support of reentry and recovery activities.
d. Coordinate arrangements for use of additional sampling and measurement teams from other utilities as needed.
10. DEACTIVATION Submit all emergency documentation to the Administrative Services Coordinator ER 3.3E Rev. 34 Page 6 of 6

DOSE ASSESSMENT SPECIALIST CHECKLIST INITIAL ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain the Dose Assessment Specialist emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephone for operability.
e. Obtain an event and response briefing from the EOF Coordinator or the Response Manager.
f. Ensure the METPAC computer is activated in accordance with Procedure ER 5.3, Operation of the METPAC System.
g. Periodically advise the EOF Coordinator as the activation status of the dose assessment, dosimetry, and offsite monitoring functions.
h. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. ACCIDENT ASSESSMENT
a. Direct the activities of personnel performing dose assessment, dosimetry, and offsite monitoring functions.
b. Control activities and noise levels in the dose assessment area to minimize distractions to dose assessment and offsite monitoring staff. (Protected: Ref. 6.20)
c. Until the METPAC Operator reports, operate the METPAC computer in accordance with Procedure ER 5.3. The batch option should be used to quickly analyze plume data when a release has been in progress prior to initial operation of METPAC.

NOTE If using the Dose Assessment Specialist computer to do this, select the MS DOS option to access the METPAC screen or allow the system to time out in 30 seconds.

d. Direct activities of the METPAC Operator, including selection of program analysis and output options. Ensure the METPAC Operator verifies meteorology data on the Tracking Reports against input data. (Protected: Ref. 6.20)

ER 3.3F Rev. 34 Page 1 of7

DOSE ASSESSMENT SPECIALIST CHECKLIST (Continued)

NOTE If a two-phase flow release from a Main Steam Line (MSL) has been identified, instruct the METPAC Operator to execute steam line pathway 3. This pathway incorporates the correction factors for the calculation of TEDE and thyroid CDE. (Protected: Ref. 6.12)

e. If a radiological release is in progress, confer with the Technical Assistant to obtain an estimated time when the release will be terminated (i.e., release parameters return to within Technical Specification allowable limits). Provide this information to the METPAC Operator.

NOTE The release rate calculation switches from the low to mid range channel at approximately I10E-2 IýtCi/cc.

f. When the potential for stack release exists, the following actions should be periodically initiated in order to properly evaluate which WRGM should be used for off-site dose projections.

" Record the results of the WRGM low, medium and high range monitors using the Logger Trend Report below:

1NG222 CA PLANT VENT LO RANGE GAS gCi/cc 1NG223 CA PLANT VENT MID RANGE GAS .Ci/cc 1NG224 CA PLANT VENT HI RANGE GAS itCi/cc

" Calculate the stack concentration using the following equation:

STACK CONCENTRATION (1iCi/cc) = Value A / Value B x CF where A = 1CC225 CA PLANT VENT DISCH RATE (ptCi/sec) from Logger Trend Report B = 1CC225PF PF PLANT VENT DISCH FLOW (scfm) from Logger Trend Report CF = FLOW RATE CONVERSION FACTOR = 2.12 E-3 sec-ft3/min-cc

"* Compare the calculated stack concentration to the values in the above step. Use the monitor response which is within 10% of the calcuated monitor response for dose assessment evaluations.

g. Use the Dose Assessment Specialist's METPAC computer to evaluate any "worst case" or "what if' release scenarios to assist in the Protective Action Recommendation review process.

ER 3.3F Rev. 34 Page 2 of 7

DOSE ASSESSMENT SPECIALIST CHECKLIST (Continued)

h. As needed, obtain onsite radiological data from the HP Coordinator.
i. After each METPAC run, provide copies of the following items to the Dose Assessment Personnel for intra-facility distribution:

- METPAC Input Data Log (or logger trend printout)

- METPAC Output Printout

- Plume Plots

- Status Board Update Form

j. Provide any additional input to the Dose Assessment Personnel for updating status boards.
k. Obtain weather forecast information by calling National Weather Services (NWS) at the numbers listed in the emergency response telephone directory or, as a backup, by calling the PSNH Control Center in Manchester (also listed in the emergency response telephone directory). Tune the weather services radio maintained in the dose assessment room to the 162.550 frequency for area forecast information.

Periodically review data reported by field monitoring team and compare with METPAC projections.

m. As appropriate, direct METPAC runs based on actual sample isotopic analysis results or field monitoring data, instead of the METPAC accident default isotopic mix.
n. Periodically review status boards to verify that they contain current radiological and meteorological information.
o. Designate laboratories (e.g., Framatome Environmental Lab, NH and MA state labs) to receive monitoring and field environmental samples for analysis, and brief the EOF Coordinator, Offsite Monitoring Coordinator and Radiological Assistant of required support arrangements.
p. Provide overall direction to designated laboratory managers in determining which field samples are to be analyzed and their priority.
q. As needed, refer to the following technical references maintained in the EOF dose assessment work area:

- Procedure ER 5.3 for METPAC program capabilities and limitations

- METPAC SB Technical Description

- METPAC User's Manual

- EPA 400 for information on Protective Action Guides (Supplemental Material 94-07)

- Ingest System Manual for Seabrook Station ER 3.3F Rev. 34 Page 3 of 7

DOSE ASSESSMENT SPECIALIST CHECKLIST (Continued)

3. CLASSIFICATIONS
a. Periodically check the 12 series Initiating Conditions in Procedure ER 1.1 and monitor the status of the associated EALs expressed in dose rate (i.e., 12a, 12b and 12d) and in dose (i.e., 12e).
b. Inform the EOF Coordinator immediately when dose or dose rate estimates exceed any 12 series Initiating Condition contained on form ER 1.1A, or any PAR criteria contained on form ER 5.4A. The METPAC "PAGS" Report should be consulted when making this determination.
4. STAFFING/EQUIPMENT NEEDS
a. Direct requests for additional staffing or equipment resources to the EOF Coordinator.
b. Determine requirements for TLD readouts with Dosimetry Records Personnel.
c. When notified by the Security Coordinator that personnel are to be dispatched from the EOF to the site, provide a recommendation as to the best site access route(s) to use based on dose considerations and contamination levels.
5. PLANNED RELEASES
a. Obtain the latest weather forecast from NWS or the PSNH Control Center.
b. Enter in Section 2 of form ER 3. 1M the current meteorological conditions and forecasted data for the period of release as specified in Section 1.
c. Evaluate the radiological conditions for the 15-minute time interval during which form ER 3.1M is being completed.

(1) Record the projected straightline centerline dose rate at 0.6, 2, 5 and 10 mile distances in Part B of Section 2 of form ER 3.1M.

(2) Record any available field data indicating the location and time of the report.

d. Evaluate the projected doses resulting from the planned release and record in Part C of Section 2 of form ER 3.1M.

ER 3.3F Rev. 34 Page 4 of 7

DOSE ASSESSMENT SPECIALIST CHECKLIST (Continued)

NOTE Use the containment vent option using the data recorded in Section 1 of form ER 3.1M. The Dose Assessment Specialist has to determine the forecasted meteorological conditions appropriate to the selected release period.

e. Assuming persistence of the selected meteorological conditions, determine and record the projected doses associated with the release condition.
f. Provide any comments or concerns regarding the planned release condition in the space provided.
g. Sign Parts A, B and C of Section 2 of form ER 3.1M, attach the corresponding dose estimate printouts or plume plots, and forward to the EOF Coordinator.
6. OFFSITE MONITORING
a. Establish an appropriate environmental monitoring and sampling program in concert with the Offsite Monitoring Coordinator and Radiological Assistant.
b. Provide the Offsite Monitoring Coordinator with meteorological data and dose projections which may affect the deployment or activities of monitoring teams.
c. In the event of an unmonitored radiological release, coordinate with the Health Physics Coordinator for dispatch of an onsite or offsite monitoring team(s) to obtain, and periodically monitor, actual site boundary dose rates (or as close to the site boundary as practical).

CAUTION Inform OMST members of potential KI side effects if they are allergic to shellfish or iodide. Replace any OMST members who know they have such allergies in lieu of directing them to ingest KI.

d. Consider the need to direct offsite monitoring and sampling (OMST) team personnel to ingest potassium iodide (1I) tablets. The use of KI should be considered for team member's where the projected thyroid CDE is greater than or equal to 5 rem.

ER 3.3F Rev. 34 Page 5 of 7

DOSE ASSESSMENT SPECIALIST CHECKLIST (Continued)

7. REENTRY AND RECOVERY Short-Term Actions NOTE The objective during the implementation of short-term actions is to develop a potential contamination pattern in order to establish the initial sampling strategies in conjunction with the offsite organizations.
a. Following the termination of the release, obtain either the 1-131 deposition pattern or the most reliable estimate of the thyroid dose, Hth, for each sector block of the affected area.

To acquire this pattern, it may be necessary to use the METPAC thyroid TID printout (Refer to Technical Description of the SB METPAC System), the Engineering Support Center (ESC) resources, or other resources to account for actual versus predicted iodine release components.

NOTE A sector block is an area defined by a one-mile by 22.5 degree region.

b. Evaluate area contamination levels using the following method for total period of interest:

TID x 22.0 gCi m-2 rem Where TD) = Total Integrated Thyroid Dose in rem obtained from the F6, F7 function of METPAC.

c. Prepare a map using the METPAC thyroid TID affected sector information, to aid in the development of sampling strategies.
d. Refer to Supplemental Material 99-12 for operating the INGEST program on the Dose Assessment Specialist's computer.
e. Collect available environmental sample data (i.e., soil, vegetation or air samples) which have undergone gamma spectral analysis for radionuclide identification. Enter the reported sample radionuclide concentrations in the Ingest program. The program will calculate exposures to deposited materials and compare the projected year one dose to the PAG for relocation (i.e., 2 rem).

ER 3.3F Rev. 34 Page 6 of 7

DOSE ASSESSMENT SPECIALIST CHECKLIST (Continued)

INITIAL Long-Term Actions NOTE The objective of long-term actions is to coordinate, correlate and manage all sampling and measurement data from all groups and provide reports and visual aids of the data in a cohesive form.

a. Direct the METPAC Operator or other available personnel to enter the offsite sample and measurement data into the Ingest program per the Ingest System Manual.
b. Periodically run the reports and plot 10 mile and 50 mile maps of the sample areas. The maps will indicate whether an area has exceeded the committed effective dose equivalent PAG of 0.5 rem or the committed dose equivalent to an organ PAG of 5 rem.
c. Participate in meetings with offsite organizations. Obtain all available sets of environmental data and merge results using Ingest to produce more comprehensive reports.
8. DEACTIVATION Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3F Rev. 34 Page 7 of 7

( R (.

RADIOLOGICAL STATUS BOARD UPDATE FORM INITIATED BY ANALYSIS TIME STATUS BOARD CURRENT STATUS BOARD UPDATE FORM METEOROLOGICAL CONDITIONS LATEST MET DATA UPDATE WIND DIRECTION WIND SPEED STABILITY CLASS CURRENT CONDITONS FROM DEGREES MPH WEATHER =

___ HRS FORECASTED CONDITIONS:

DOSE RATE PROJECTIONS DOSE RATE MEASUREMENTS IF CURRENT CONDITIONS WITH PREVIOUS CONDITIONS OFF SITE MONITORING PERSIST (STRAIGHTLINE PAG MODEL) INCLUDED (VARIABLE TRAJECTORY MODEL) REPORTED CONDITIONS AFFECTED DOSE RATE AFFECTED DOSE RATE AFFECTED DOSE RATE MI/SECTOR ARRIVAL REM/HR MI/SECTOR ANALYSIS REM/HR MI/SECTOR TIME DIRECT ADULT COMPASS PT TIME TEDE THY COMPASS PT TIME TEDE THY COMPASS PT READING THY CDE R/HR REM/HR 0.6/ / /

2.0/ / /

5.0/ / /

10.0/ / /

/ / / _

/ _ _/ / _ _ _ _

/ / _ _ _ _ / _ _ _ _ _ _ _

/ _ _ _ _ _ _ _/ _ _ _ _ _/ _ _ _ _ _ _ _

ER 3.3G Rev. 33 Page 1 of I

TECHNICAL ASSISTANT CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the Technical Assistant emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephone for operability.
e. Obtain a briefing from either the EOF Coordinator or the Response Manager.
f. Verify operability of the Main Plant Computer System (MPCS) terminal. If the terminal is not operating properly, request the Administrative Services Coordinator to call-out a Computer Engineer or Technician to make repairs.
g. Review plant status information available on the MPCS.
h. Review plant status with the Response Manager.
i. Verify that the current emergency classification is correct.
j. Direct a member of the Training Center Staff to trend plant data and activate the Logger Trend (Log Name - EOF), using the BOP/EMERGENCY RESPONSE menu on the MPCS workstation. Refer to Supplemental Material 99-06 for SDS Operations instructions. Once activated, a multi-page report of the plant process parameters will be printed every 15 minutes on the EOF logger. Provide the first page of the Logger Trend printout (Dose Assessment Data Points) to the METPAC Operator. The remaining pages are for trending purposes.
k. Contact the Emergency Operations Manager to determine plant status.
1. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. ACCIDENT ASSESSMENT
a. Assess and interpret operational data and trends for the Response Manager. Respond to questions as required.
b. Assign a Training Center Staff member to update the operational trend status board and the system status board.

ER 3.3H Rev. 33 Page 1 of 4

TECHNICAL ASSISTANT CHECKLIST (Continued)

c. As requested, provide briefings and logger trend printouts to the Dose Assessment Specialist and ERO Technical Liaison.
d. Maintain an organized set of computer printouts.
e. If a reactor trip has occurred, confer with the Emergency Operations Manager to determine if the Critical Safety Function Status Trees (CSFSTs) have been verified, i.e.,

MPCS displays are accurate based on hardwired indications. Advise the Training Center Staff when the CSFSTs have been verified.

f. Periodically review status boards to verify that they contain current operational and response information.
g. If a Westinghouse emergency response representative is stationed at the EOF, request the Westinghouse representative to keep you informed of the results from any core damage assessments as they become available. Provide this information to the Response Manager, Licensing Coordinator and NRC Reactor Safety Coordinator.
3. NOTIFICATIONS Provide information to the NRC over the telephone if the TSC is unable to perform this function. If available, use the FTS-2000 handset. A commercial phone may be used as a backup.

NOTE In addition to verbal communication with the NRC, the TSC maintains an Emergency Response Data System (ERDS) link with NRC headquarters. The data transmitted via this electronic link are shown in Supplemental Material 99-07.

4. ACCIDENT MITIGATION
a. If radiological conditions do not preclude use of the Station simulator and where deemed appropriate, coordinate the development of simulated operational sequences with the Emergency Operations Manager.
b. Direct members of the Training Center organization to run proposed operational sequences on the Station simulator.

ER 3.3H Rev. 33 Page 2 of 4

TECHNICAL ASSISTANT CHECKLIST (Continued)

5. PROTECTIVE ACTION RECOMMENDATIONS CAUTION Due to the time required for plant equipment to change states following a reactor trip or containment isolation signal, a Critical Safety Function Status Tree (CSFST) may briefly proceed along one path before changing to another.

For example, if containment pressure exceeds 18 psig, the containment (Z)

CSFST will briefly indicate a red path while the containment isolation valves are closing and then indicate an orange path after all valves have closed.

Exercise appropriate judgment when using the CSFSTs for protective action decision-making.

a. Provide the EOF Coordinator with operational data needed to prepare protective action recommendations. Expedite providing this information when the fifteen minute PAR notification clock is running.
b. If a radiological release is in progress, determine, in conjunction with the Emergency Operations Manager, an estimated time when the release will be terminated (i.e., release paraineters return to within Technical Specification allowable limits). Provide this information to the Dose Assessment Specialist.
6. STAFFING/EQUIPMENT NEEDS
a. Assist the Response Manager with planning and scheduling of resources.
b. Assist the Emergency Operations Manager planning and scheduling of resources.
c. In the event of a power loss at the EOF, direct a Training Center Staff member to start the standby diesel generator using the instructions provided in Figure 4.
d. In the event of a total or partial Main Plant Computer System (MPCS) failure, consider the following guidance as appropriate to the extent and nature of the failure:

(1) Designate an individual to receive data from the TSC. Personnel assigned to this role should have a basic working knowledge of station operations, operating parameters, and the MPCS.

(2) Remind the assigned individual to use forms ER 2.OH through K to facilitate data transfer activities.

ER 3.3H Rev. 33 Page 3 of 4

TECHNICAL ASSISTANT CHECKLIST (Continued)

(3) Contact the Technical Services Coordinator and specify who at the EOF should receive data (and their phone number), and at what desired frequency (e.g., as needed, an established callback schedule, continuous open line, etc.). Set realistic expectations for data flow timeliness given current conditions and constraints at the site.

(4) Brief the Response Manager and EOF Coordinator on the compensatory arrangements for data transfer, including realistic expectations for timeliness and other limitations.

(5) If forms ER 2.0H through K are used, copies of the completed sheets should be provided to the individual(s) maintaining the operational and system status boards so that the data can be posted.

(6) Consider the need for headsets for the individual receiving data.

(7) If available, consider use of a telecopy machine to facilitate inter-facility communication of data.

(8) Request the Reactor Engineer to coordinate dispatch of appropriate Computer Engineering personnel to the EOF to make needed repairs to computer equipment.

7. REENTRY AND RECOVERY -,._J Provide reentry and recovery support as directed by the Response Manager.
8. DEACTIVATION
a. Direct a member of the Training Center Staff to deactivate the Logger Trend (Log Name EOF), using the BOP/EMERGENCY RESPONSE menu on the MPCS workstation.
b. Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3H Rev. 33 Page 4 of 4

OFFSITE MONITORING COORDINATOR CHECKLIST INITIAL ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain the Offsite Monitoring Coordinator emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Immediately report any problems with the field team radio to the Dose Assessment Specialist.
f. If more than 2 monitoring team monitors or drivers are available for assignment to field monitoring teams, determine which individuals shall be initially assigned. Any excess personnel should be directed to return to their homes and await further instructions.
g. Advise the Administrative Services Coordinator of the staffing arrangements for the field monitoring teams.
h. Perform a source check on the three (3) portal monitors located at entrances to the EOF/Media Center by using Supplemental Material 99-13.
i. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. OFFSITE MONITORING
a. Review station emergency operational, radiological and meteorological conditions with the EOF Coordinator and Dose Assessment Specialist.
b. Provide an initial briefing to the NH Monitoring Team Coordinator and Nuclear Incident Advisory Team (NIAT) Field Team Coordinator, and determine any State monitoring support needs.
c. Coordinate requests from State organizations regarding field team dispatch and sample analysis.
d. As ERO monitoring team personnel report, group them in teams consisting of one monitor and one driver. Assign them to two offsite monitoring and sampling teams by number (1 and 2).

ER 3.31 Rev. 34 Page 1 of5

OFFSITE MONITORING COORDINATOR CHECKLIST (Continued)

e. Ensure that all monitoring team personnel log in and out on the EOF personnel roster.
f. Consider the following guidelines for obtaining vehicles for use by the monitoring and sampling teams.

(1) Commandeer any available Seabrook Station vehicles located at the EOF.

(2) If vehicles are still needed, request the Administrative Services Coordinator to obtain Newington Station vehicles.

(3) If vehicles are still needed, request that offsite monitoring team personnel use personal vehicles.

(4) If vehicles are still needed, request the Administrative Services Coordinator to obtain additional Seabrook Station vehicles.

(5) Request assistance in obtaining special vehicle types (e.g., all-terrain 4-wheel drive) from the Administrative Services Coordinator, if they are needed.

g. Ensure that the teams complete their Offsite Monitoring and Sampling Team Predeployment Checklist, form ER 5.2A.
h. Provide a blanket extension up to 4500 mrem/current year for the offsite monitoring teams.
i. Have monitoring personnel request Dosimetry Records personnel to establish current-quarter dose information.
j. Notify Dosimetry Records personnel of any further (i.e., greater than 4500) exposure limit changes.
k. As survey teams report they are ready for dispatch, inform the Dose Assessment Specialist.
1. In coordination with the NIAT Field Team Coordinator and the NH Monitoring Team Coordinator, brief teams on station emergency conditions, projected plume location, and exposure considerations using form ER 5.2B, Offsite Monitoring and Sampling Team Briefing Form.

The NH Monitoring Team Coordinator and NIAT Field Team Coordinator retain the right to assign their monitoring teams.

With the NH and NIAT Team Coordinators, establish a consecutive numerical designator for each ERO, NH, and NIAT team (e.g., 1-8).

ER 3.31 Rev. 34 Page 2 of 5

OFFSITE MONITORING COORDINATOR CHECKLIST (Continued)

m. As directed by the Dose Assessment Specialist, review the location of the projected plume, local population, and meteorological considerations and dispatch the survey teams to traverse these offsite areas. Direct offsite teams to identify the locations of maximum ground level concentration and plume boundaries at various locations, if possible.
n. Ensure that precise survey locations are identified. In many cases monitoring at the site boundary may not be feasible because of the terrain.
o. Direct offsite team members to read SRPDs at appropriate frequencies based on prevailing radiological conditions.
p. Evaluate the benefit of respiratory protection, considering the radiological hazard and interference with the performance of required action.
q. Determine the need to dispense potassium iodide (KI) tablets to emergency response personnel based upon a projected or actual thyroid CDE > 5 rem. Administering KI after an uptake may limit thyroid CDE depending on time after exposure.
r. Direct the Offsite Monitoring Communicator to maintain communications with all offsite monitoring and sampling teams via the VHF radio system.
s. Direct the Offsite Monitoring Communicator to relay messages to and from offsite survey teams and to maintain a continuous log of location and radiological data on the Field Survey/Air Sample Calculation Worksheet, form ER 5.2C.
t. As survey teams call in radiological data, calculate the particulate and iodine activity concentration of the samples using the formula on form ER 5.2C. Notify the Dose Assessment Specialist, the NIAT Field Team Coordinator, and the NH Monitoring Team Coordinator when offsite data becomes available.
u. For higher activity samples place an R02 or R02A on the collection face of the cartridge open window. Divide the dose rate (net) of the sample by 0.5 mR/hr/gCi to determine sample activity. (Protected: Ref. 6.1) 1-131 pCi/cc = Net (mR/hr)

(.5 mR/hr/pCi)(Vol. ft3)(28,320 cc/ft3)

v. Attempt to identify actual plume characteristics and centerline values. Review offsite team distribution with the NIAT Field Team Coordinator and NH Monitoring Team Coordinator, and assign locations in accordance with the estimated plume characteristics.

ER 3.31 Rev. 34 Page 3 of 5

OFFSITE MONITORING COORDINATOR CHECKLIST (Continued)

w. Evaluate and control the radiological exposures being accumulated by offsite teams.

Update teams on plant emergency conditions, plume location and exposure considerations.

x. When appropriate or upon completion of their assignments, direct survey teams to report to the EOF for sample delivery.
y. As air sample analysis data becomes available, notify the Dose Assessment Specialist.
z. When appropriate, discuss environmental sampling strategy (sample type, location, laboratory resources, and priority) with the Dose Assessment Specialist.

aa. After sampling strategy discussions, coordinate team deployment with the NIAT Field Team Coordinator and the NH Monitoring Team Coordinator.

bb. Using form ER 5.2B, Offsite Monitoring and Sampling Team Briefing Form, brief environmental sampling teams on expected radiological conditions and type/location of environmental samples to be obtained cc. Consider the following guidelines for environmental sampling:

(1) Using the fifty-mile maps, identify up to three different sample locations per team.

(2) Direct sample teams to contact the EOF upon arrival and prior to departure from each sample location.

(3) With Seabrook Station Environmental Sampling Teams, review appropriate procedure steps listed in the Radiological Services Environmental Procedures, and document any deviation from procedure on form ER 5.2B.

(4) As Environmental Sampling Teams return, direct the Radiological Assistant to maintain facility contamination control measures, review completed Environmental Lab Sample Submission Form ER 5.2E for errors, and weigh and package samples as appropriate for shipment.

(5) Evaluate type of analysis using Figure 2, Analysis Matrix, as a guideline. Instruct the Radiological Assistant to ensure appropriate analyses are checked off in the Analysis To Be Performed section of form ER 5.2E.

ER 3.31 Rev. 34 Page 4 of 5

OFFSITE MONITORING COORDINATOR CHECKLIST (Continued)

(6) Prioritize, coordinate and direct environmental sample dispatch to the Framatome Environmental Laboratory located in Westborough, MA. Notify the Dose Assessment Specialist if special courier services are required to transport samples to Westborough. Also request assistance in obtaining any special sample transport permits.

(7) As environmental sample analysis data becomes available from the Framatome Environmental Laboratory, notify the Dose Assessment Specialist.

3. CLASSIFICATION Inform the Dose Assessment Specialist immediately when dose or dose rate estimates/measurements exceed any 12 series Initiating Conditions contained on form ER L.1A. A wall-mounted copy of this form is maintained in the Technical Assistant work area.
4. SAMPLE ANALYSIS
a. Coordinate transportation arrangements for environmental samples from the EOF to selected laboratories with the Dose Assessment Specialist and Radiological Assistant.

Radiological Assistants are qualified to prepare and package radioactive materials for shipment.

b. Coordinate obtaining required sample transportation staffing and resources with the EOF Coordinator, Dose Assessment Specialist and Radiological Assistant.
5. STAFFING/EQUIPMENT NEEDS
a. Direct requests for additional staffing or equipment resources to the Dose Assessment Specialist.
b. If the Remote Monitoring Area (RMA) at Schiller Station has been activated, request Dose Assessment Specialist permission to dispatch any excess offsite monitoring team monitors to assist the Health Physics Technicians with RMA monitoring and decontamination activities.
c. Monitor Remote Monitoring Area communications through the Offsite Monitoring Communicator. Report manpower, equipment or other assistance needs of the Remote Monitoring Area to the Dose Assessment Specialist and Radiological Assistant.
6. REENTRY AND RECOVERY Provide reentry and recovery support as directed by the Dose Assessment Specialist.
7. DEACTIVATION Submit all documentation to the Administrative Services Coordinator.

ER 3.31 Rev. 34 Page 5 of 5

SECURITY COORDINATOR CHECKLIST INITIAL ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain the Security Coordinator emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Direct EOF security personnel to implement appropriate checklists in GN1332.00, Security Response to a Declared Radiological Emergency.
f. Contact the Security Shift Supervisor at the site to determine accountability status and any Station security problems.
g. Brief the Administrative Services Coordinator on Station and EOF security status.
h. When notified by the Emergency News Manager that the Media Center is activated and ready for news media arrival, instruct the EOF Access Gate Security Officer to direct news media representatives to the Media Center entrance.
i. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. CLASSIFICATION Provide the Response Manager with input regarding any security threat which may exceed an 18-series Emergency Action Level contained in Procedure ER 1.1, Classification of Emergencies.
3. RESPONSE ACTIONS
a. Coordinate Seabrook Station interface with law enforcement agencies.
b. Implement Procedure GN1332.00 as applicable.
c. Provide periodic updates on emergency conditions and response actions to the Guard Island Supervisor.
d. Periodically consult with the TSC Health Physics Coordinator concerning the need for onsite security personnel to observe any special radiation protection precautions resulting from the event. As requested, direct onsite security personnel to coordinate their movements with the OSC.

ER 3.3J Rev. 33 Page 1 of 2

SECURITY COORDINATOR CHECKLIST (Continued)

4. STAFFING/EQUIPMENT NEEDS
a. Direct requests for additional staffing or equipment resources to the Administrative Services Coordinator.
b. When informed that response personnel will proceed to the site from the EOF (e.g.,

second shift, industry support) perform the following:

(1) Confer with the Dose Assessment Specialist as to the appropriate site access route(s) and Station radiological conditions.

(2) Advise the onsite security lead of the impending arrival of personnel at the site (e.g., who, their purpose).

(3) As needed, provide a briefing to personnel proceeding to the site concerning site access route(s), site layout, reporting locations, and any special security considerations.

c. Coordinate establishment of shift schedules for security personnel with the Administrative Services Coordinator.
d. Ensure the NRC site team has access to designated NRC parking in the EOF parking lot, and coordinate access by the NRC equipment van to the EOF to unload equipment.
e. Coordinate parking area arrangements with Newington Station management and appropriate NH State and local law enforcement agencies. Consider using Schiller Station property for overflow parking and coordinate with Schiller Station management.
5. RELEASE OF ASSEMBLY AREA PERSONNEL
a. Consult with the Administrative Services Coordinator to determine if personnel should be sent home or to the Remote Monitoring Area.
b. If the Remote Monitoring Area is to be used, inform the Security Shift Supervisor to set up appropriate traffic control based on the exit route.
6. REENTRY AND RECOVERY Provide reentry and recovery support as directed by the Response Manager.
7. DEACTIVATION Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3J Rev. 33 Page 2 of 2

RADIOLOGICAL ASSISTANT CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the Radiological Assistant emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Obtain a radiological status briefing from the Offsite Monitoring Coordinator.
f. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. OFFSITE MONITORING/SAMPLING SUPPORT
a. Assist the Offsite Monitoring Coordinator with the dispatch of monitoring and sampling teams.
b. Contact the EOF security officer each time a team is dispatched or a team is returning.
c. Establish and maintain the sample receipt and transfer process within the EOF.
3. RADIATION/CONTAMINATION CONTROLS
a. Obtain dosimetry and exposure status from Dosimetry Records Personnel.
b. Establish appropriate radiological and sample return controls using Figures 3 and 5 as guidance. For detail, refer to Supplemental Material 98-01.
c. Post the emergency support room as a "Radiological Materials Area" (e.g., affix a pocket sign to the door).
d. Ensure all personnel entering the EOF Radiologically Controlled Area (RCA) have obtained proper dosimetry.
e. Brief the Offsite Monitoring Coordinator and Dosimetry Records Personnel on EOF contamination monitoring and control measures once the teams have been dispatched.

ER 3.3K Rev. 34 Page 1 of 4

RADIOLOGICAL ASSISTANT CHECKLIST (Continued)

f. Direct monitoring and decontamination activities conducted at the EOF. Obtain guidance as needed from the Dose Assessment Specialist and the Offsite Monitoring Coordinator.
g. Direct returning monitoring and sampling teams to park their vehicles parallel to one another inside the potential contamination zone shown on Figure 3.
h. If a portal monitor at an EOF entrance alarms, do the following:

NOTE Notification of an alarming portal monitor may occur via the intercom in the Field Team Dispatch Area or in the EOF Radio Room. Refer to Supplemental Material 99-05 for operation of the intercom system.

1) Respond to the portal monitor location.
2) Identify the person who caused the portal monitor to alarm.
3) Direct the person to pass through the portal monitor a second time.
4) If the portal monitor alarms again, direct the person to go outside through the same entrance where the portal monitor is located and to proceed to the EOF decontamination area.
5) Attempt to determine the location of contamination on the person.
6) Implement appropriate decontamination methods.

If a portal monitor at an EOF entrance fails to operate properly, do the following:

1) Disconnect power to the portal monitor.
2) If the failed portal monitor is at the NH IFO or the main EOF entrance, close off the entrance and direct personnel to enter through the entrance with the operating portal monitor.
3) If the portal monitor is at the Media Center entrance or in the EOF decontamination area, set up a manual frisker station.
4) If necessary to support manual monitoring of personnel entering the Media Center or other location, request the Administrative Services Coordinator to obtain qualified personnel to operate the frisker station.
j. Document personnel and vehicle contamination using Procedure ER 4.6 as guidance.
k. Establish and monitor a sample storage area.
4. REMOTE MONITORING AREA SUPPORT
a. Assist Remote Monitoring Area Health Physics Technicians in obtaining monitoring and decontamination kits and equipment.

ER 3.3K Rev. 34 Page 2 of 4

RADIOLOGICAL ASSISTANT CHECKLIST (Continued)

b. Issua two portable radios to the Remote Monitoring Area Health Physics Technicians for coimmunications between the monitoring area, decontamination facilities, and Emergency Operations Facility.
c. Receive reports of assistance required by the Remote Monitoring Area staff from the Offsite Monitoring Coordinator and provide direction and/or assistance as needed.
5. FRAMATOME SUPPORT
a. Notify the Dose Assessment Specialist and Offsite Monitoring Coordinator upon arrival of the Framatome Mobile Environmental Lab.
b. Allow the Framatome Mobile Environmental Lab vehicle (and any arriving NRC equipment vehicles) to park next to the EOF entrance to the left of the roll-up door (facing the building) inside the potential contamination zone show on Figure 3.
c. Coordinate placement of the Framatome Mobile Environmental Lab.
d. Assist Framatome Environmental Lab personnel in establishing their activities at the EOF.
6. ENVIRONMENTAL SAMPLE PREPARATION
a. Accept environmental samples from sample collection teams and survey them for removable contamination on the outside of containers and/or paperwork. Decontaminate or re-bag any samples with removable contamination.
b. Review all forms to ensure that information is correct and the form is complete. Pay particular attention to sample location; the sample location indicated on form ER 5.2E should match the sample location marked on the environmental sample. Guidance for completing this form is in Procedure ER 5.2, Figure 3, Environmental Lab Sample Submission Form Instructions.
c. Evaluate type of analysis using ER 5.2, Figure 1, Analysis Matrix, as a guideline. Ensure appropriate analyses are checked off in the Analysis To Be Performed section of form ER 5.2E. Request guidance for additional analysis from the Offsite Monitoring Coordinator.
d. Weigh sample material as necessary and package for shipment.
e. Assist the Offsite Monitoring Coordinator in making transportation arrangements for environmental samples.
f. Inform the Offsite Monitoring Coordinator when samples are ready for transport.

ER 3.3K Rev. 34 Page 3 of 4

RADIOLOGICAL ASSISTANT CHECKLIST (Continued)

7. STAFFING/EQUIPMENT NEEDS Direct requests for additional staffing or equipment resources to the Offsite Monitoring Coordinator.
8. DEACTIVATION Submit all emergency documentation to the Offsite Monitoring Coordinator.

ER 3.3K Rev. 34 Page 4 of 4

ADMINISTRATIVE SERVICES COORDINATOR CHECKLIST INITLAL ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain the Administrative Services Coordinator emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Synchronize Emergency Operations Facility clocks with the Main Plant Computer digital time display.
e. Check status boards in the EOF operations area, dose assessment area, EOF conference room, and NRC room and ensure they are cleared of outdated and unrelated information and notations.
f. Turn on and test the Response Manager public address system.
g. Check workstation telephones for operability.
h. Assign an EOF Support Staff person to monitor calls on the EOF Answering Unit. Direct that individual to implement form ER 3.3W.
i. Assign one EOF Support Staff person to maintain a log for the Response Manager. Direct that individual to implement form ER 3.3W.
j. Assign one EOF Support Staff person to the Media Center. Direct that individual to report to the Emergency News Manager.
k. Assign one EOF Support Staff person to maintain the EOF Chronolog and to access other screens on the Administrative Services Coordinator PC.
1. If any of the following EOF positions are not staffed within 60 minutes of the emergency declaration, implement applicable section 3 actions immediately to fill the position(s)

(1) Response Manager (2) EOF Coordinator (3) Dose Assessment Specialist (4) Offsite Monitoring Coordinator (5) Technical Assistant (6) ERO Technical Liaison (7) Personnel for 2 offsite monitoring teams (2 monitors and 2 drivers)

ER 3.3L Rev. 34 Page 1 of 7

ADMINISTRATIVE SERVICES COORDINATOR CHECKLIST (Continued)

INITIAL

m. Obtain an event and response briefing from the Response Manager.
n. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. EOF OPERATIONS
a. As soon as practical after EOF activation, initiate a brief discussion of State interface responsibilities and expectations with the Response Manager, Technical Assistant and EOF Coordinator. Discuss ways that the Response Manager may be insulated from requests that can be answered or handled by others. The goal is to allow the Response Manager to focus on overall management of Seabrook Station ERO response efforts.
b. Coordinate EOF activities during those periods when the Response Manager, EOF Coordinator and Technical Assistant are in conference.
c. Periodically monitor EOF status boards, including the Emergency Classification Level and Radiological status boards, to determine if they are being kept current. As needed, obtain additional assistance to ensure that status boards are properly maintained.
d. Monitor the EOF chronological log to ensure information posted is accurate and complete. As new information is added to the PC-based electronic log, check the information to ensure its accuracy.
3. INITIAL STAFFING AND SHIFT SCHEDULING
a. Review the sign-in boards for the EOF and the Media Center, and document the individuals filling each first shift ERO position on form ER 3.3M, ERO Staff Planning.

NOTE Form ER 3.3M has been downloaded to the Administrative Services Coordinator's PC and the PC located in the DCC. Either PC may be used instead of a hard copy form. Access by clicking the icon labeled ER 3.3M.

b. Call out telephone and radio system technicians from IRG listed in the Alternate Staffing tab of the Emergency Response Telephone Directory, and direct them to report to the EOF. Upon arrival, they should be instructed to remain on standby to effect telephone or radio system repairs, as needed.
c. During a daytime response (i.e., 0700 to 1630), perform Steps 3.d. through 3.u. During an off-hours response (i.e., 1630 to 0700), proceed to Step 3.k and perform Steps 3.k.

through 3.u.

ER 3.3L Rev. 34 Page 2 of 7

ADMINISTRATIVE SERVICES COORDINATOR CHECKLIST (Continued)

INITIAL

d. Contact the Assembly Area Coordinator.

(1) Provide a brief summary of emergency conditions.

(2) Using the ERO Roster at your workstation, determine if any individuals qualified to fill vacant first shift ERO positions at the EOF or Media Center are available at the Assembly Area.

(3) Request the Assembly Area Coordinator to brief identified individuals to report to their assigned facilities. Document which individuals were dispatched to which facilities on form ER 3.3M.

(4) Inquire as to the status of any personnel requested by the Maintenance Coordinator.

(5) Request the Assembly Area Coordinator to fax you copies of completed forms ER 3.3M for the Control Room, TSC and OSC when they are available.

NOTE If the emergency is declared during an outage, the Assembly Area Coordinator will also provide copies of contact telephone number listings for non-NAESCO craft personnel and vendor technical representatives. Retain this information to support the return-to-work callout of these individuals once the emergency is terminated.

e. Obtain a briefing from the EOF Coordinator on site radiological conditions potentially or actually affecting the vicinity of the Assembly Area. Also determine whether or not personnel released from the Assembly Area need to proceed to the Remote Monitoring Area at Schiller Station.
f. Contact the Maintenance Coordinator in the TSC and determine the following:

(1) Whether the Assembly Area should be deactivated based on onsite needs and radiological conditions. _

(2) Which personnel, if any, should remain staged at the Assembly Area instead of being released.

(3) Time the Assembly Area should be deactivated.

ER 3.3L Rev. 34 Page 3 of 7

ADMINISTRATIVE SERVICES COORDINATOR CHECKLIST (Continued)

I1NITIAL

g. Request the Security Coordinator to specify which egress route should be used by personnel released from the Assembly Area
h. Brief the Response Manager on plans for Assembly Area deactivation and release of personnel.
i. Contact the Assembly Area Coordinator, and perform the following:

(1) Provide a briefing on plans for Assembly Area deactivation and release of personnel.

(2) Remind the Assembly Area Coordinator that ALL second-shift personnel, including those assigned to onsite facilities, must report to the EOF prior to relieving first-shift personnel.

(3) Discuss release instructions to be given to personnel at the Assembly Area including where they should go, the route to use, and a time that second-shift personnel should report to the EOF.

NOTE Under most circumstances, Assembly Area personnel will leave the site, either to their homes or to the Remote Monitoring Area, in their own vehicles.

(4) If informed by the EOF Coordinator that alternate transportation should be used to transport Assembly Area personnel to the Remote Monitoring Area, perform the following actions:

(a) Contact the New Hampshire IFO Coordinator and request assistance to obtain the requisite number of buses (36 persons/bus) for dispatch to the site to transport personnel to the Remote Monitoring Area.

(b) Arrange with the Security Coordinator to have the buses met at the site access road, directed to the appropriate location on site to pick up Assembly Area personnel, and provided with a map to the Remote Monitoring Area (ER 3.6, Figure 2).

(c) Contact the Assembly Area Coordinator to advise that buses have been directed to the site to transport personnel to the Remote Monitoring Area.

j. Inform the Security Coordinator when the Assembly Area has been deactivated.

ER 3.3L Rev. 34 Page 4 of 7

ADMINISTRATIVE SERVICES COORDINATOR CHECKLIST (Continued)

INITIAL

k. If the initial response is an off-hours response (i.e., 1630 to 0700), obtain the Community Alert Network Reports telefaxed to the EOF.

Receive a briefing from the Maintenance Coordinator concerning the status of onsite ERO vacancies and staffing needs.

m. Using the ERO Roster at your workstation, call out additional personnel as needed to fill open first-shift ERO positions. Document the results on form ER 3.3M.
n. Develop a list of second-shift responders and establish two 12-hour shifts consisting of personnel qualified for their respective positions. Document the results on form ER 3.3M, ERO Staff Planning.

(1) Contact Framatome management for names of second shift personnel responding to ERO facilities. Numbers are in Section B5 of the Emergency Telephone Directory. Inform Framatome management of Seabrook Station Fitness-for-Duty requirements (Security Manual, Chapter 7) and provisions for voluntary alcohol testing at the EOF.

(2) Coordinate development of shift schedules for security personnel with the Security Coordinator.

(3) When completed, provide a copy of the second shift roster to the Dosimetry Records Personnel.

NOTE If FINIS is not available to confirm RAEs for second-shift personnel, have the EOF Coordinator establish a blanket authorization for the ERO with the concurrence of the Response Manager.

o. Contact second-shift personnel.

(1) Confirm their assignment to the second shift.

(2) Specify time they should report to the EOF.

(3) Remind individuals assigned to onsite facilities that they must report to the EOF prior to relieving first-shift personnel.

ER 3.3L Rev. 34 Page 5 of 7

ADMINISTRATIVE SERVICES COORDINATOR CHECKLIST (Continued)

INITIAL (4) Remind individuals contacted of Fitness-for-Duty requirements (Security Manual, Chapter 7) and provisions for voluntary alcohol testing at the EOF.

(5) Provide a telephone number to call in case they are delayed or unable to report.

p. If individuals identified for second-shift duty have been evacuated from their homes and cannot be contacted, request the Emergency News Manager prepare and issue a news statement with instructions for Seabrook Station ERO members to contact the EOF.
q. Provide the time that second-shift ERO responders are to report to the EOF to the Emergency News Manager (ENM) and request the ENM to update the Seabrook Station Employee Information Line.
r. Assign EOF support staff at the EOF Answering Unit to periodically check the Seabrook Station Employee Information Line for messages using Supplemental Material 98-08 and to document any call-ins by ERO personnel on form ER 3.3EE, Emergency Worker Call In Report. Make additional adjustments to shift schedules as required by the call-ins.
s. Provide the NH IFO Radiological Exposure Clerk with a list of names of those personnel that will require access to the exclusion area for shift turnover.
t. Ensure that all relief personnel reporting to the Station receive an accident briefing from the Industry Liaison.
u. Ensure that all relief personnel receive appropriate dosimetry prior to departure to the Station.
4. STAFFING/EQUIPMENT NEEDS
a. Coordinate responses to requests for additional staffing and equipment resources.
b. Coordinate arrangements for acquisition and distribution of food and beverages to Seabrook Station emergency response facilities.
c. Provide direction to the Material and Logistics Coordinator.
d. As needed, direct the Industry Liaison to request staffing and equipment resources from industry support groups.

ER 3.3L Rev. 34 Page 6 of 7

ADMINISTRATIVE SERVICES COORDINATOR CHECKLIST (Continued)

e. If the EOF loses normal AC power requiring activation of the stand-by diesel generator, refer to Figure 7 for guidance.
f. If an employee is killed or seriously injured while performing response duties, coordinate notification of the victim's family (next-of-kin).
g. Review procedure NM 11800, Hazardous Condition Response Plan, to identify additional logistical and recovery considerations that may be useful in responding to the emergency.

Brief the Response Manager on any recommendations.

h. Monitor and help coordinate requests for assistance to various industry and support groups (e.g., Framatome, FPL Group, Westinghouse or INPO). Periodically brief the Response Manager on the status of requests and responses.
5. EMERGENCY TERMINATION AND RECOVERY
a. Provide reentry and recovery support as directed by the Response Manager
b. If the emergency was declared during an outage, perform the following steps:

(1) Contact the Outage Coordinator and request that all contact telephone number listings for non-Seabrook Station craft personnel and vendor technical representatives not already provided be forwarded to you.

(2) Develop a return-to-work callout plan for the above outage workers with the Response Manager. Consider who will perform callout and what information will be provided.

(3) Brief appropriate personnel on the return-to-work callout plan.

(4) If needed, direct procurement of additional dosimetry required to support the processing of outage workers through the EOF (e.g., from Station stock, vendor, etc.).

6. DEACTIVATION
a. Collect all ERO emergency-related documentation.
b. Provide copies of documentation as requested.
c. Ensure that appropriate emergency-related documentation is archived.

ER 3.3L Rev. 34 Page 7 of 7

(7 ERO STAFF PLANNING Date/Time:

Date/Time:

LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS EMERGENCY RESPONSE POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Shift Manager Control Room Unit Supervisor Control Room Work Control Supervisor Control Room Control Room Operator Control Room Control Room Operator Control Room Nuclear Systems Operator Control Room Nuclear Systems Operator Control Room Nuclear Systems Operator Control Room Nuclear Systems Operator Control Room Nuclear Systems Operator Control Room Fire Fighter / EMT Control Room I I I t I I

_ _ _ _ __ _ _ _ _ _ _ I _ _ _ _ I _ _ I__ _ _ 1_ _ _ _ _ I j_

I_ _ _ _ _ _ _ _

ER 3.3M Rev. 33 Page 1 of 15

(7 C-ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

ER 3.3M Rev. 33 Page 2 of 15

( (7 (7 ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

BOP Support Engineer TSC (C306)

DE&S Radiological Advisor TSC Electrical Support Engineer TSC (C306)

Emergency Operations Manager TSC Engineering Coordinator TSC ENS Communicator TSC Health Physics Coordinator TSC I&C Support Engineer TSC (C306)

Maintenance Coordinator TSC NSSS Support Engineer TSC (C306)

Nuclear Safety Advisor TSC Operations Technician TSC Reactor Engineer TSC ER 3.3M Rev. 33 Page 3 of 15

( C (

ERO STAFF PLANNING (Continued)

Date/Time:

LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS EMERGENCY RESPONSE POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Site Emergency Director TSC Technical Services Coordinator TSC TSC Electrical Engineer TSC TSC Logkeeper TSC TSC Mechanical Engineer TSC TSC RMD Personnel TSC TSC Work Control Supervisor TSC ER 3.3M Rev. 33 Page 4 of 15

I

( (7 ERO STAFF PLANNING (Continued)

Date/Time:

ER 3.3M Rev. 33 Page 5 of 15

( (7 (3 ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Chemistry Coordinator OSC Chemistry Technician OSC Chemistry Technician OSC Control Room Operator OSC Control Room Operator OSC Electrical Maintenance Personnel OSC Electrical Maintenance Personnel OSC Health Physics Technician OSC Health Physics Technician OSC Health Physics Technician OSC Health Physics Technician OSC ER 3.3M Rev. 33 Page 6 of 15

,. C C ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Health Physics Technician OSC I&C Personnel OSC I&C Personnel OSC Mechanical Maintenance Personnel OSC Mechanical Maintenance Personnel OSC Nuclear Systems Operator OSC Nuclear Systems Operator OSC Nuclear Systems Operator OSC Nuclear Systems Operator OSC Nuclear Systems Operator OSC OSC Coordinator OSC Rad Controls Coordinator OSC Specialty Technical Assistant OSC ER 3.3M Rev. 33 Page 7 of 15

(/

( (..

ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Specialty Technical Assistant OSC Specialty Technical Assistant OSC Storekeeper OSC Technical Specialist Coordinator OSC Work Control Supervisor OSC ER 3.3M Rev. 33 Page 8 of 15

( ( C ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

ER 3.3M Rev. 33 Page 9 of 15

( C C ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Administrative Services Coordinator EOF DCC Coordinator EOF Dose Assessment Personnel EOF Dose Assessment Specialist EOF Dosimetry Records Personnel EOF EOF Coordinator EOF EOF Support Staff EOF EOF Support Staff EOF EOF Support Staff EOF EOF Support Staff EOF EOF Support Staff EOF ERO Technical Liaison EOF HPN Communicator EOF ER 3.3M Rev. 33 Page 10 of 15

( C C ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Industry Liaison EOF Licensing Coordinator EOF Material & Logistics Coord EOF METPAC Operator EOF Offsite Mon Team - Driver EOF Offsite Mon Team - Driver EOF Offsite Mon Team - Monitor EOF Offsite Mon Team - Monitor EOF Offsite Monitoring Communicator EOF Offsite Monitoring Coordinator EOF Radiological Assistant EOF Response Manager EOF Security Coordinator EOF ER 3.3M Rev. 33 Page 11 of 15

C (7 C ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Security Officer EOF Security Officer EOF Security Officer EOF Technical Assistant EOF Training Center Staff EOF Training Center Staff EOF ER 3.3M Rev. 33 Page 12 of 15

( (

ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial) 4- 4 + 4 t

-I- 4 4 4 I I

____________________ . 4 -f + 4 4 4- 1 1 4 4- 1

____________________ 4 4. 4 4 4- 4 4 4- 4 4 t t 4 + I I -I-1 4 1 1 t J 4 4 4 -f t

___________________________________ J_______________ L________________ I I ________________ -.

ER 3.3M Rev. 33 Page 13 of 15

( C÷ (7 ERO STAFF PLANNING (Continued)

Date/Time:

EMERGENCY RESPONSE LOCATION FIRST SHIFT BADGE SECOND SHIFT HOME COMMENTS POSITION (Last Name, NO. (Last Name, PHONE NO.

First Initial) First Initial)

Emergency News Manager Media Ctr Technical Advisor Media Ctr Technical Adviser Media Ctr Media Center Support Staff Media Ctr Media Center Support Staff Media Ctr Media Center Support Staff Media Ctr Media Center Support Staff Media Ctr Media Center Support Staff Media Ctr Media Center Support Staff Media Ctr Media Center Support Staff Media Ctr Media Center Support Staff Media Ctr ER 3.3M Rev. 33 Page 14 of 15

( C (7 ERO STAFF PLANNING (Continued)

Date/Time:

ER 3.3M Rev. 33 Page 15 of 15

HPN COMMUNICATOR CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the HPN Communicator emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Obtain a briefing from the EOF Coordinator or Dose Assessment Specialist.
f. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. NOTIFICATIONS
a. As requested by the NRC, establish the Health Physics Network (HPN) and maintain communications per instructions provided by the NRC individual initiating the call.
b. Use the HPN Event Notification Worksheet, form ER 2.0G, to record radiological information and data.

- Obtain onsite radiological data from the Health Physics Coordinator.

- Obtain offsite radiological data and PARs from the EOF Coordinator or Dose Assessment Specialist.

NOTE Consider using a telecopier to provide copies of HPN forms to the NRC.

c. Periodically brief the EOF Coordinator, Dose Assessment Specialist and Licensing Coordinator on the status of HPN notifications.
d. If time permits, assist the Dose Assessment Specialist with posting and distributing radiological data in the EOF. (Protected: Ref. 6.20)
3. STAFFING/EQUIPMENT NEEDS Direct requests for additional staffing or equipment resources to the EOF Coordinator.

ER 3.3Q Rev. 33 Page 1 of 2

HPN COMMUNICATOR CHECKLIST (Continued)

4. DEACTIVATION Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3Q Rev. 33 Page 2 of 2

LICENSING COORDINATOR CHECKLIST ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain Licensing Coordinator's emergency response position materials from the tote-box at your work station initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Report to and obtain a briefing from the Administrative Services Coordinator.
f. Obtain copies of NRC notification forms (ER 2.0D) completed by the Control Room or TSC from the Emergency Operations Manager.
g. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. NOTIFICATION As needed, assist the Technical Assistant in supporting open NRC telephone communications if this function is transferred to the EOF. Use form ER 2.OD to support this activity.
3. LICENSING ACTIONS Coordinate resolution of all licensing and permit-related issues that may arise during the emergency.
4. NRC INTERFACE
a. Notify the Technical Services Coordinator of any NRC responders who will be reporting to the site. Provide as much information as is available (e.g., number of personnel, names, expected arrival time at the site, etc.).
b. Facilitate site access arrangements for NRC Site Response Team members with the Security Coordinator.
c. As time permits, check NRC workstations and telephones prior to their arrival at the EOF.
d. Obtain information issued to the States and the NRC during the emergency.

(1) Contact the EOF Coordinator for copies of State notifications (forms ER 2.OB and 2.0C).

ER 3.3R Rev. 33 Page 1 of 4

LICENSING COORDINATOR CHECKLIST (Continued)

(2) Contact the Health Physics Network (HPN) Communicator for copies of HPN notifications (form ER 2.0G).

(3) Contact the Emergency Operations Manager for copies of Emergency Notification System (ENS) notifications (form ER 2.0D).

e. Obtain copies of Seabrook Station news statements.
f. Obtain copies of State news releases and EAS messages/advisories.
g. Upon arrival of NRC response personnel at the EOF, perform the following:

(1) Offer them the appropriate NRC position identification badges stored at your workstation.

(2) Coordinate the interface between NRC response team members and the Seabrook Station ERO (e.g., introductions, workstation locations, etc.).

(3) Provide copies of State and NRC notification forms, news releases and EAS messages/advisories issued to date.

(4) Complete the table shown on Page 4 of this checklist. Consider distributing copies to appropriate personnel in the EOF (Seabrook Station, State and Federal).

h. Identify the appropriate NRC personnel at the EOF who should receive Seabrook Station news statements, and request the Media Center Support Staff to make distribution to these individuals as news statements are issued.
i. Make periodic inquiries of NRC personnel and determine if their needs are being met:

(1) Facility workstations (phones, power outlets, seating, etc.).

(2) Information flow and availability (adequate, timely, etc.).

(3) Commitments made in meetings or briefings (being met on time, etc.).

(4) State news releases and EAS messages/advisories (received in a timely manner, etc.)

j. Attend briefings conducted for NRC response personnel, and document the following:

(1) Attendees ER 3.3R Rev. 33 Page 2 of 4

LICENSING COORDINATOR CHECKLIST (Continued)

(2) Briefing topics and discussions (3) NRC requests for information or action (4) Commitments made to the NRC, including due dates or times (5) Individuals assigned to respond to NRC requests or commitments

k. Periodically track the status of actions items needed to meet NRC requests or commitments. Advise the Response Manager of any actions which will not be complete by the committed due date/time.
5. STAFFING/EQUIPMENT NEEDS Direct requests for additional staffing or equipment resources to the Administrative Services Coordinator.
6. DEACTIVATION Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3R Rev. 33 Page 3 of 4

LICENSING COORDINATOR CHECKLIST (Continued)

KEY PERSONNEL FROM RESPONDING ORGANIZATIONS AND AGENCIES 9SEABRQ OK-7STATION- EMBRGENG Y4W-2-j I A2 V RESPONSE MANAGER _

TECHNICAL ASSISTANT EOF COORDINATOR ADMINISTRATIVE SERVICES COORDINATOR LICENSING COORDINATOR SECURITY COORDINATOR EMERGENCY NEWS MANAGER

"-NUCLE.AkRIEGULATORY-COMNM1SSION TNAE }

DIRECTOR OF SITE OPERATIONS REACTOR SAFETY COORDINATOR PROTECTIVE MEASURES COORDINATOR EMERGENCY RESPONSE COORDINATOR SAFEGUARDS/SECURITY COORDINATOR PUBLIC AFFAIRS TECHNICAL BRIEFER GOVERNMENT LIAISON COORDINATOR

-&STATEOFýNEW-HAMISBIRR(EsU NAIA-^ ý NHOEM EOF LIAISON NH OHM RAD HEALTH TECH ADVISOR

-ý,COMMONWEAL--Tlf OF- MASSACHIJSETTS'I-rS --

NAME--:

MEMA EOF LIAISON MDPH COORDINATOR

-FEDERADERALEMERGENC-YMANAGEDEN4T  : .N E .

-DEPARTET OF,-ENERGY- ;K-,-'ý->5- ~ ~. AE>

.: A-,- -' , I - - "

I 4

ER 3.3R Rev. 33 Page 4 of 4

INDUSTRY LIAISON CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the Industry Liaison's emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Report to and obtain a briefing from the Administrative Services Coordinator.
f. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. WESTINGHOUSE
a. Notify the Westinghouse Energy Systems Business Unit Emergency Response Team.

(1) Provide an event briefing.

(2) Establish a periodic callback schedule.

(3) Provide your telephone number and the DCC telecopy number.

3. INPO
a. Notify INPO (1) Provide an event briefing.

(2) Inform the Duty Officer that Seabrook Station news statements will be faxed to INPO and request the appropriate fax number.

(3) Request that INPO response personnel enter the contents of Seabrook Station news statements on to Nuclear Network.

(4) Establish a periodic callback schedule.

(5) Provide your telephone number and the DCC telecopy number.

b. Ensure DCC Coordinator has the correct INPO telefax number and telefaxes approved news statements to INPO.

ER 3.3S Rev. 34 Page 1 of 4

INDUSTRY LIAISON CHECKLIST (Continued)

c. If needed, develop other messages for transmittal on Nuclear Network and request INPO to enter.
d. As requested, review the INPO Resources Manual (or call INPO) to ascertain what equipment and personnel are available for responding to the emergency.
e. As approved by the Response Manager, request resources through INPO.
4. AMERICAN NUCLEAR INSURERS (ANI)
a. Provide an event briefing.
b. Establish a periodic callback schedule.
c. Provide your telephone number and the DCC telecopy number.
5. NUCLEAR ELECTRIC INSURANCE LIMITED/NUCLEAR MUTUAL LIMITED
a. Provide an event briefing.
b. Establish a periodic callback schedule.
c. Provide your telephone number and the DCC telecopy number.
6. NUCLEAR ENERGY INSTITUTE (NEI)
a. Notify NEI (1) Provide an event briefing.

(2) Inform the individual that Seabrook Station news statements will be faxed to NEI and request the appropriate fax number.

(3) Establish a periodic callback schedule.

(4) Provide your telephone number and the DCC telecopy number.

b. Ensure the DCC Coordinator has the correct telefax number and telefaxes approved news statements to NEI.

ER 3.3S Rev. 34 Page 2 of 4

INDUSTRY LIAISON CHECKLIST (Continued)

7. OTHER CONTACTS
a. Ensure the DCC Coordinator telefaxes approved news statements to Joint Owners.
b. If contacted by a Joint Owner representative, provide information as requested.
c. As requested, contact other utilities for additional support.
8. VISITORS REPORTING TO THE EOF OR THE SITE NOTE For events that have resulted in a release of radioactive materials to the environment, all individuals reporting to the site should be
1. Radiation worker qualified at Seabrook Station, or
2. Radiation worker qualified at another commercial nuclear power plant, or
3. Broadly familiar with the concepts of ionizing radiation and contamination as a result of their normal work activities.
a. Notify the EOF Coordinator of any visitors who will be reporting to the EOF or the site.

Request input for visitor briefings.

b. Notify the Security Coordinator of any visitors who will be reporting to the EOF or the site. Request input for visitor briefings.
c. Notify the Technical Services Coordinator of any visitors who will be reporting to the site. Request input for visitor briefings.
d. Notify the Health Physics Coordinator of any visitors who will be reporting to the site.

Request input for visitor briefings.

e. Brief visitors on the following:

(1) where to report (2) ERO interfaces/counterparts (3) accident and response status (4) travel and access route(s) to the EOF or site (if needed)

ER 3.3S Rev. 34 Page 3 of 4

INDUSTRY LIAISON CHECKLIST (Continued)

(5) radiological or other precautions (6) instructions to report to the Dosimetry Records Personnel for dosimetry (if needed)

f. Ensure all personnel reporting to the site obtain a pass from the NH IFO Radiological Exposure Clerk allowing entry into the exclusion area.
g. Instruct all visitors who will be reporting to the site to complete form ER 3.3B upon receiving their briefing.
h. Submit form ER 3.3B to the Security Coordinator for processing of site visitors.
i. Notify the Technical Services Coordinator when personnel reporting to the site have departed from the EOF.
9. DEACTIVATION Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3S Rev. 34 Page 4 of 4

EOF SUPPORT STAFF CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Report to the Administrative Services Coordinator for assignment.
c. Obtain the EOF Support Staff emergency response position materials from the tote-box at your work station and initiate this checklist.
d. Attach your Station badge to the green identification tag located at your workstation.
e. Verify date and time on EOF fax machines and correct them if necessary.
2. ADMINISTRATIVE SUPPORT
a. If you are assigned to support the Response Manager, implement the following actions:

(1) Report to the Response Manager.

(2) Monitor Response Manager actions and communications, and log noteworthy items on:

(a) The electronic log PC, or, if this PC is not available, (b) Form ER 2.OE, Emergency Facility Log.

(3) If requested, accompany the Response Manager to conferences. Record noteworthy items such as (a) discussions with the NRC or States concerning PARs; (b) approval of news statements; and (c) classification changes.

(4) At the direction of the Response Manager, contact the TSC Logkeeper to obtain or verify information. The TSC Logkeeper can be contacted at the Site Emergency Director telephone number in the Emergency Telephone Directory.

(5) At the termination of the emergency, submit the log to the Administrative Services Coordinator.

b. If assigned to monitor the EOF Answering Unit, implement the following actions:

(1) Periodically monitor the Answering Unit for messages left for EOF staff. The message window on the unit will indicate the number of messages recorded.

(2) Access messages by pressing and releasing any "MBox" button that is lit.

ER 3.3W Rev. 34 Page 1 of 3

EOF SUPPORT STAFF CHECKLIST (Continued)

(3) Record the time, date and content of each telephone message in the applicable sections of form ER 3.3EE and provide the completed forms to the Administrative Services Coordinator.

(4) When the last stored message is played, the unit will announce, "End of message."

After recording the last message, delete messages by pressing and releasing the "delete" key followed by pressing and releasing the lit "MBox" button.

(5) At the termination of the emergency, submit the telephone message log to the Administrative Services Coordinator.

(6) Provide assistance to the DCC Coordinator or other EOF staff as directed by the Administrative Services Coordinator (e.g., send copies, make copies of documents, deliver copies, etc.).

(7) At the direction of the Administrative Services Coordinator, periodically check the Seabrook Station Employee Information Line for messages using Supplemental Material 98-08. Provide messages to the Administrative Services Coordinator.

c. If assigned to maintain the electronic EOF Chronolog, do the following:

(1) Refer to Supplemental Material 97-01, EOF Logkeeper PC Instructions.

(2) When the EOF Chronolog screen is filled, print out a hard copy of the log.

(3) Post the hard copy of the log, in sequence, on the EOF accident time log status board.

d. If assigned to the Media Center, implement the following actions:

(1) Report to the Emergency News Manager (ENM).

(2) Copy approved news statements and bulletins at the direction of the ENM and distribute in accordance with distribution instructions in ER 3.5. Ask the Media Center Support Staff or Technical Advisor for assistance in identifying personnel and locations on the distribution list.

(3) Do not leave the Media Center Operations Room unattended when other Media Center personnel are away from their work stations. Obtain other EOF Support Staff assistance to complete copying or distribution tasks.

(4) Monitor telephones in the Media Center Operations Room, answer telephones when Media Center personnel are away from their work stations, and log telephone messages.

ER 3.3W Rev. 34 Page 2 of 3

EOF SUPPORT STAFF CHECKLIST (Continued)

(5) Monitor telecopiers in the Media Center and deliver telecopied material to intended recipients.

(6) At the termination of the emergency, submit all documentation to the Emergency News Manager.

ER 3.3W Rev. 34 Page 3 of 3

METPAC OPERATOR CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the METPAC Operator's emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Activate the M[ETPAC computer in accordance with Procedure ER 5.3, Operation of the METPAC System.
f. Inform the Dose Assessment Specialist when the METPAC system is operational.
2. ACCIDENT ASSESSMENT Perform offsite dose projections using the METPAC computer as directed by the Dose Assessment Specialist.
3. CLASSIFICATIONS Inform the Dose Assessment Specialist immediately when dose or dose rate projections exceed any of is the 12-series Initiating Conditions contained on form ER 1.1A. A wall-mounted copy of this form maintained in the Technical Assistant work area.
4. STAFFING/EQUIPMENT NEEDS Direct requests for additional staffing or equipment resources to the Dose Assessment Specialist.
5. REENTRY AND RECOVERY
a. Provide reentry and recovery support as directed by the Dose Assessment Specialist.
b. Enter offsite sampling and measurement data into the Ingest program in accordance with the Ingest System Manual for Seabrook Station.
c. Provide guidance to personnel assigned to assist in the Ingest program data entry process.

ER 3.3Y Rev. 33 Page 1 of 2

METPAC OPERATOR CHECKLIST (Continued)

d. Produce requested reports and plots in accordance with the Ingest System Manual for Seabrook Station.
6. DEACTIVATION Submit all emergency documentation to the Dose Assessment Specialist.

ER 3.3Y Rev. 33 Page 2 of 2

DOCUMENT CONTROL CENTER COORDINATOR CHECKLIST INITIAL ACTIVATION

a. Sign in on the EOF roster board.
b. Obtain the Document Control Center Coordinator's emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Report to Administrative Services Coordinator for an accident briefing.
f. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. NOTIFICATIONS
a. Telefax approved news statements to INPO and NEI.
b. If requested by the Administrative Services Coordinator to access the INPO Nuclear Network, to access the ERO Staff Planning form (ER 3.3M), to access PASSPORT, or to send a pager message, refer to Supplemental Material 97-11 for instructions.
c. Telefax approved news statements to the Joint Owner Contacts listed in the Emergency Response Telephone Directory.
d. Contact a representative of each Joint Owner using the telephone numbers listed in the Emergency Telephone Directory. Inform them that a Seabrook Station news statement has been telefaxed and provide the telefax number to which it was sent.
e. Provide telecopier support as requested.
3. ACCIDENT ASSESSMENT Coordinate and support document retrieval for the EOF staff.
4. DEACTIVATION
a. Restore/replenish controlled document files used by the EOF staff, as necessary.
b. Submit all emergency documentation, including Nuclear Network transmissions, to the Administrative Services Coordinator.

ER 3.3Z Rev. 33 Page 1 of 1

MATERIAL AND LOGISTICS COORDINATOR CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the Material and Logistics Coordinator's emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
e. Report to Administrative Services Coordinator for an accident briefing.
f. Maintain a log using form ER 2.OE, Emergency Facility Log.
2. STAFFING/EQUIPMENT NEEDS
a. Obtain and coordinate vendor support of the ERO response effort.
b. Confer with the Administrative Services Coordinator and determine if an inventory department (warehouse) individual should be called out to assist with locating or receiving materials.
c. Coordinate and establish logistical arrangements for ERO response personnel (e.g., food, lodging, transportation, supplies).
d. Interact with the Industry Liaison to obtain equipment resources through industry sources (e.g., INPO, FP&L).
e. Advise the Security Coordinator of any scheduled personnel arrivals or product deliveries to ERO facilities (onsite or offsite).
f. If a radiological release has occurred, advise the EOF Coordinator of any scheduled personnel arrivals or product deliveries to the site.
g. As needed, contact a service provider for any onsite or offsite emergency facility telephone or equipment repairs.
h. Confer with the Administrative Services Coordinator to determine if video recording/playback equipment is desired at the EOF.
i. Request additional assistance, as needed, from the Administrative Services Coordinator.

ER 3.3AA Rev. 34 Page 1 of 2

MATERIAL AND LOGISTICS COORDINATOR CHECKLIST (Continued)

3. DEACTIVATION Submit all emergency-related documentation to the Administrative Services Coordinator.

ER 3.3AA Rev. 34 Page 2 of 2

DOSIMETRY RECORDS PERSONNEL CHECKLIST INITIAL

1. ACTIVATION
a. Sign in on the EOF roster board.
b. Obtain the Dosimetry Records Personnel emergency response position materials from the tote-box at your work station and initiate this checklist.
c. Attach your Station badge to the green identification tag located at your workstation.
d. Check workstation telephones for operability.
2. EMERGENCY DOSIMETRY PROCESSING NOTE Refer to Figure 12 for an overview of the process described below.
a. Preparation (1) Verify FINIS Computer terminal operability. Refer to Supplemental Material 99-11 for accessing FINIS on the PC at the Dosimetry Records work station.

(2) Begin rezeroing hi and lo range Self-Reading Pocket Dosimeters (SRPDs).

(3) Arrange dosimetry on TLD rack for Offsite Monitoring and Sampling Teams (OMST) in preparation for personnel issue. Include in each group a high and low range SRPD and a TLD.

b. Offsite Monitoring and Sampling Team (OMST) Initial Deployment (1) Obtain the names of OSMT personnel from the Offsite Monitoring Coordinator.

(2) Initiate form ER 3.3GG, Exposure Tracking Sheet, for each OMST member.

(3) Perform the following steps to determine exposure status (see Figure 11).

(a) Sign on to FINIS - RPMS

& S5 0 14 RPM

  • 4 RPETRANS 0 20 RPEWBSUM ER 3.3DD Rev. 34 Page 1 of 6

DOSIMETRY RECORDS PERSONNEL CHECKLIST (Continued)

(b) Determine the current TEDE Year To Date (YTD) for an individual as follows:

RPEWBSUM [SS#, security badge (4 digit) or name]

(c) If FINIS-RPMS is unavailable, contact the Dosimetry Issue Technician at the OSC for the current TEDE YTD exposure status.

(d) Enter the value established for the current TEDE YTD on form ER 3.3GG, Part I.

(e) Subtract the TEDE YTD from the administrative limit (4500 mrem) and enter the value for the Remaining Allowable Exposure (RAE) on form ER 3.3GG, Part I.

(f) If the RAE is less than 3000 mrem, inform the Offsite Monitoring Coordinator that an exposure extension may be required and note in Part III of form ER 3.3GG.

(g) If extension is required, ensure Figure 4 of ER 4.3, Emergency Dose Limit Extension, is completed. Call the Site Emergency Director for approval of individual exposure extension and note approval on the SED signature block. Using Figure 4 of ER 4.3, complete Part III of form ER 3.3GG.

(4) Enter the current RAE (or extended RAE if extension is given) on form ER 5.2B, Offsite Monitoring and Sampling Team Briefing Form, when requested.

(5) Issue TLD by using form ER 3.311, Emergency Dosimetry Issue Log.

(6) Enter the TLD number on form ER 3.3GG, Part IV.

(7) Give the individual the assigned TLD along with a high and low range SRPD and write his/her name on the TLD.

(8) Instruct the individual to return dosimetry to the EOF Dosimetry Records Personnel following use unless otherwise directed by the Offsite Monitoring Coordinator.

(9) File form ER 3.3GG pending return of dosimetry.

(10) File Figure 4 of ER 4.3 as appropriate.

ER 3.3DD Rev. 34 Page 2 of 6

DOSIMETRY RECORDS PERSONNEL CHECKLIST (Continued)

c. OMST Exposure Tracking (1) Each time an OMST member returns from the field, record date, time, and SRPD reading on form ER 3.3GG, Part IV.

(2) Determine new RAE by subtracting the SRPD reading from the current or extended RAE, whichever is greater, and document on form ER 3.3GG, Part IV.

Note return time on form ER 3.311.

(3) If the TLD readout is requested, make arrangements with Framatome laboratory or forward the TLD to the Framatome TLD Coordinator if present in the EOF. Refer to step 2.f, Dosimetry Return, below.

(4) Upon receipt of TLD dose results, fill out the appropriate sections on forms ER 3.3GG and ER 3.311.

(5) Calculate the revised RAE using form ER 3.3GG, Part IV.

(6) Notify the Offsite Monitoring Coordinator if the TLD and SRPD values differ by more than a factor of 2.

(7) Notify the Offsite Monitoring Coordinator of the TLD results and indicate on form ER 3.311 in the "Notification Made" column.

d. Offsite Monitoring and Sampling Team (OMST) Redeployment (1) Perform the following steps to determine exposure status:

(a) Initiate a new form ER 3.3GG for each OMST member.

(b) Fill in the current RAE using the revised RAE from the member's previous form ER 3.3GG.

(c) The Offsite Monitoring Coordinator will determine if an exposure extension is necessary. Fill out Part Ill of form ER 3.3GG, as appropriate.

(d) If an extension is given, ensure Figure 4 of ER 4.3 is completed.

(e) Issue TLD and SRPD per Steps 2.b.4 through 2.b.10.

e. Personnel Deployment to the Site (1) Issue dosimetry to personnel authorized site access per form ER 3.3B.

ER 3.3DD Rev.

Page 34 3 of 6

DOSIMETRY RECORDS PERSONNEL CHECKLIST (Continued)

(2) Obtain a completed form ER 3.3M, ERO Staff Planning from the Administrative Services Coordinator and begin dosimetry issue process for second shift personnel.

(3) Initial Deployment to the Site (a) If the individual is a currently monitored Seabrook radiation worker, determine if the TEDE YTD from the Exposure Status Report (ESR) is greater than 3000 mrem.

(b) If the individual's TEDE YTD is greater than 3000 mrem, notify the Radiological Controls Coordinator (RCC) at the OSC for further instructions.

(c) If the individual is not a currently monitored Seabrook radiation worker, ensure form ER 3.3GG, Part 11, Current Year Exposure, is completed.

Unless official final dosimetry results are available, the current year exposure is considered an estimate.

(d) Complete TEDE YTD Transit Card for the individual (see Figure 13).

(e) Issue dosimetry per step 2.e.5.

(4) Redeployment to the Site Issue dosimetry per step 2.e.5.

(5) Dosimetry Issue (a) If it is determined that site TLDs can be used, proceed to Step 2.e.6.

(b) Using form ER 3.311, Emergency Dosimetry Issue Log, enter the following for Seabrook Worker: date, time, and security badge number. For all others enter date, time, social security number, name and organization.

(c) Attach a TEDE YTD Transit Card (Figure 13) to the TLD, as appropriate.

Apply label to the TLD with the individual's name.

(d) Give the individual the TLD along with a hi and lo range SRPD.

(e) If dosimetry is requested for State emergency workers, the State emergency organization is responsible for exposure records and controls.

Record issue of dosimetry only.

ER 3.3DD Rev. 34 Page 4 of 6

DOSIMETRY RECORDS PERSONNEL CHECKLIST (Continued)

(6) Instruct the individual to return the dosimetry to the EOF Dosimetry Records Personnel following use unless otherwise directed by supervisory personnel.

f. Dosimetry Return (1) Verify that all returned dosimetry has been surveyed for contamination. If not surveyed, direct personnel to the Radiological Assistant.

(2) Dosimetry assigned to an individual not requiring readout may be reused by the same individual for subsequent shifts.

(3) Prioritize TLD readout from SRPD estimates according to the following, unless otherwise directed.

(a) 0-1000 mR Low Priority (b) 1001-2000 mR High Priority (c) 2001-3000+ mR Immediate Readout (4) Log all dosimetry returned for processing on form ER 3.311 even if not originally issued from the EOF. If SRPD results and/or comments are listed on the EOF Dosimetry Return (Figure 14), fill out the appropriate sections of form ER 3.311.

(5) Separate SRPDs and set aside for rezeroing.

(6) Forward TLDs for readout to the Framatome TLD Coordinator in the EOF for processing.

(7) Obtain the TLD report when readout is complete and update TLD and exposure records as follows:

(a) For whole body dosimetry indicate DDE, LDE and SDE-ME on form ER 3.311.

(b) For extremity dosimetry enter value under SDE-ME heading on form ER 3.311.

(8) Notify the following of dose results, as appropriate:

(a) Personnel deployed to site - Dosimetry Issue Technician at OSC.

(b) OMST Personnel - OMC at EOF.

ER 3.3DD Rev. 34 Page 5 of 6

DOSIMETRY RECORDS PERSONNEL CHECKLIST (Continued)

(c) MA State Personnel - Director of Radiation Control Program.

(d) NH State Personnel - NH Radiation Exposure Clerk.

(e) Additional notification per special instructions.

(f) Any exposure greater than 4.5 rem - Dose Assessment Specialist.

g. Expanded Dosimetry Response (1) Determine the projected dosimetry needs of the Station response organization. If the level exceeds available supplies, notify the Dose Assessment Specialist.

(2) Inform the Dose Assessment Specialist of the Framatome van arrival and subsequent activation to full status.

(3) Inform the Framatome TLD Coordinator of badge volume needed for issue in preparation of whole body badge TLD system turnover.

(4) Obtain the badge supply and coordinate issuance.

(5) Continue emergency dosimetry issue using Framatome TLD badges and rezeroed SRPDs. Indicate badge type (Framatome) on form ER 3.311.

(6) Continue coordinating dose records update.

3. DEACTIVATION
a. Document results of all emergency dosimetry analyses.
b. Reissue dosimetry to recovery organization for RCA access.
c. Submit all emergency documentation to the Administrative Services Coordinator.

ER 3.3DD Rev. 34 Page 6 of 6

EMERGENCY WORKER CALL-IN REPORT This report documents call-ins by ERO individuals who have been evacuated from their home, who are required to be away from their home for a period of time, or who have questions or problems concerning the emergency.

1. Name of caller:
2. ERO Position:
3. Number to be reached at:
4. Are you scheduled to work second shift? yes no
5. Have you or might you be evacuated? yes no
6. Will you be staying at a location more than 30 miles from the EOF? yes no If yes, where
7. Will you need lodging? yes no
8. Is a call back required? yes no
9. Additional Comments:
10. Routed to the Administrative Services Coordinator at:

hours, date.

by:

Signature ER 3.3EE Rev. 33 Page 1 of 1

EXPOSURE TRACKING SHEET Page of_

Part I OSMT Yes No Name Security Badge# SSN -

(optional/use when no badge#)

Emergency Administrative Limit mrem Current TEDE YTD mnremn Current RAE mremn Part II Current Year Exposure (Non-Seabrook Employees)

Mailing Ikdclress DOB/ /

Company Onsite Contact Have you been monitored for occupational radiation exposure during the current calendar year?

YES NO If YES, current year exposure is:

DDE* LDE* SDE SDE TEDE* TODE*

WB* ME* Check one: Individual's Estimate Written Estimate Record Dose

  • All Exposure calculated in REM Individual's Signature Date Part III Exposure Extension Required? YES - NO, Dose Limit Extended to rnrem Extended RAE mrem ER 3.3 GG Rev. 33 Page 1 of 4

EXPOSURE TRACKING SHEET (Continued)

Part IV TLD NO.

Return Date / Time SRPD mrem New RAE Return Date / Time SRPD mrem New RAE Return Date / Time SRPD mrem New RAE Return Date / Time SRPD mrem New RAE Return Date / Time SRPD mrem New RAE SRPD Total mrem**

TLD DDE Dose mrem**

Revised RAE mrem Note: See subsequent pages of form for instructions to fill out this form.

    • Notify the Offsite Monitoring Coordinator if SRPD total and TLD DDE Readout differ by a factor of 2.

Comments:

ER 3.3GG Rev. 33 Page 2 of 4

EXPOSURE TRACKING SHEET (Continued)

INSTRUCTIONS FOR FILLING OUT FORM Page of  : Refers to number of pages per individual.

PART I Current TEDE YTD: To be filled in only for initial TLD issue at start of emergency, determine from FINIS, if available, or call Dose Tracking Technician at the OSC. For subsequent TLD issue, fill in N/A.

Current RAE: For initial TLD issue, subtract CURRENT TEDE YTD value from 4500; for subsequent TLD issue, use REVISED RAE value from previous TLD readout.

PART II & PART III Exposure Extension Required: For initial deployment, the CURRENT RAE must be at least 3000 mrem. If less than 3000 mrem, extension is required; for redeployment, the Offsite Monitoring Coordinator will determine the need for extension.

Dose Limit Extended to: Fill in if there is an EXPOSURE EXTENSION REQUIRED; otherwise, fill in N/A.

Extended RAE: Subtract 4500 mrem from DOSE LIMIT EXTENDED TO value.

Add this new value to the CURRENT RAE. If no EXPOSURE EXTENSION REQUIRED, this is N/A.

PART IV TLD No.: Fill in as appropriate based on the TLD issued.

Return Date/Time: Record date and time each time OSMT member returns from field with SRPD reading.

SRPD: Record reading from lo or hi range SRPD, whichever is greater.

New RAE: For initial SRPD reading, subtract that value from the CURRENT RAE (CRAE-SRPD) or the EXTENDED RAE (ERAE-SRPD) if an extension was given; subsequent SRPD readings are subtracted from the previous NEW RAE (NRAE-SRPD).

SRPD Total: Add up all SRPD readings and fill in value.

ER 3.3GG Rev. 33 Page 3 of 4

EXPOSURE TRACKING SHEET (Continued)

TLD H300T Dose: Obtain this data from the TLD dose report or the Emergency Dosimetry Issue Log.

Revised RAE: Use the CURRENT RAE value or EXTENDED RAE, if one is given, and subtract the TLD DDE DOSE value from this value (CRAE-DDE or ERAE-DDE) and fill in value.

ER 3.3GG Rev. 33 Page 4 of 4

(. (7 (7 Page of EMERGENCY DOSIMETRY ISSUE LOG TLD tt DATE TIME TIME BADGE NAME ssu ORG SRPD READOUT TLD DOSE (mR) NOTIFICATION ISSUED RETND NO. (OPTL) (OPTL) (OPT) DOSE FILENAME MADE mR D S L S D D D D E E E- E E- D M wB E

. . E ER 3.311 Rev. 33 Page 1 of 1