ML030300756

From kanterella
Jump to navigation Jump to search
J. M. Farley Unit 2, Inservice Inspection Report, Refueling 15, Interval 3, Period 1, Outage 1, Section 1.3
ML030300756
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/21/2003
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
References
NL-03-0167
Download: ML030300756 (158)


Text

1.3

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-3100 STEAM GENERATOR A ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RP NI NRI RI S01 X

S02 X

S03 X

S04 X

S05 x

S06 X

S07 x

S08 x

S09 X

510 x

Sil x

S12 x

S13 x

S14 x

S15 x

S16 x

S17 X

S18 x

S19 x

S20 x

S21 x

S22 X

S23 x

S24 x

S25 x

S26 X

S27 X

S28 x

S29 x

S30 x

S31 x

S32 x

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-3100 STEAM GENERATOR A ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI NRI RI N01 X

N02 X

N03 X

N04 X

N05 X

N06 X

N07 X

N08 X

N09 X

N10 X

Nil X

N12 X

N13 X

N14 X

N15 x

N16 x

N17 x

N18 X

N19 x

N20 x

N21 x

N22 x

N23 X

N24 x

N25 X

N26 x

N27 x

N28 X

N29 x

N30 X

N31 x

N32 X

STEAM GENERATOR A -

LOOP 1 Q2B21HOO1A CONTAINMENT BUILDING I-------------------- 4 135.88' OD.

426.88' CIRC.

CHANNEL HEAD TO -- /

TUBE SHEET WELD 1 (0" DATUM POINT IS CENTERLINE OF HOT LEG MANWAY)

MANWAY BOLTING' 1.875' DIA.

STUDS & NUTS #1 THRU #16 FOR HOT LEG S3 2

17 29-f

+

÷ 20 CROSS lOVER b 26 23 MANWVAY 2

MANWAY BOLTING' 1.875' DIA.

STUDS & NUTS #17 THRU #32 FOR CROSS OVER U

I11-e-dUI NJH JAR i13-,ULJu rt REV DATE BY CHK'D Southern Company Servic(

ALABAMA POWER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 7

0D C?'.

-4 I

Farley Nu(

.ant Visual Examination Record VT-1 C

SHAREIJ FNP-0-h 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S01 APR1-3100 S02F2V035 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA Li Yes Li B/W Li Yes I]

1/32* Division (Scale)

D Direct El Video Procedure No.

FNP-0-NDE-100.21 mi No Li Coior No El 1/32" Line (Gray Card)

Li Remote Revision No.

1 0

/

N/A Equipment Lighting Tools Examiner/initial Teny0 Carraher Level Sig.*

  • I

[ Mirror LI N/A Li Ambient

  • Scale Li Depth Gauge Li Level Examlner/lnltial N/A Level L-i Magnifier VJ Flashlight Li Micrometer Li Comparator L_

Sig.

N/A Li CCTV i Droplight Li Caliper Li Weld Gauge L_

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A 17 BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li El R

Loose Members Li Li Undercut Li L-Cracks Li Li Corrosion Build-up Li El Corrosion

[]

17 Gouges

[-2 L

i [

Gouges Li Li Evidence of Leakage EL

[2 W

Thread Damage Li11 Li Arc Strikes 0i 0i*

j Deformation IVi Li Cracks L]

Li R,

Protective Coating Wi 0i Other-Ei L

i Evidence of Leakage

[i Li Other "L EL "Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Parley NucE.

ant Visual Examination Record VT-1 S

SHAREL)

FNP-O--

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/ExamInation Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S02 APR1-3100 S02F2V036 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA Li Yes Di B/W Li Yes Ri 1/32' Division (Scale)

[i Direct El Video Procedure No.

FNP-0-NDE-100.21

[

No E Color

[

No Li 1/32" Une (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examinerfinitlai Teny0 Carraher Level

[M irror 7 N/A Li Ambient Scale Li Depth Gauge L -Level g

Examiner/Initial N/A Level Li Magnifier W Flashlight Li Micrometer L] Comparator El Sig.

N/A i CCTV I

l Droplight Li Caliper Li Weld Gauge

[1 1 Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-1 SAT SAT N/A R

BOLTS, STUDS, AND WASHERS VT-i SAT SAT N/A Ground Blend Material

[

Loose Members 0

11 Undercut

]

[]

[]

Cracks R

El Li Corrosion Build-up E

El R

Corrosion S-11 71 Gouges

[I L7 9

Gouges Li Li Evidence of Leakage Vi

]

Thread Damage El

-I Arc Strikes Li Li Deformation R]

]

Fi Cracks Li Li Protective Coating W]

E]

E]

Other**

Li Li Evidence of Leakage EL Li Other-Ei Li

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(

ant Visual Examination Record VT-1 C

SHAREDJ FNP-O-h 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S03 APR1-3100 S02F2V037 STEAM GEN. STUDS Photos Sketch Resolution Technique WO / WA NA 0- Yes El B/W El Yes R

1/32' Division (Scale)

El Direct L] Video Procedure No.

FNP-0-NDE-100.21

,r No EU Color 7] No El 1/32" Line (Gray Card)

El Remote Revision No.

1.0 I N/A Equipment Lighting Tools Examiner/initial TenyG Carraher Level SIg."

I

  • 1 Mirror F*1 N/A 01 Ambient W-1 Scale El Depth Gauge LI Level Examiner/lnitlal N/A Level Li Magnifier V, Flashlight Li Micrometer Li Comparator Si Sg.

N/A Li CCTV LI Droplight Li Caliper Li Weld Gauge El Date (Month-Day-Year) 9/17/2002

'UN-

  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Ew

]

5/

Loose Members

[]

El Undercut L

0 L

i l

Cracks El Li Corrosion Build-up El El

[]

Corrosion El Gouges 10 El W1 Gouges Di Li Evidence of Leakage Li Ei

[]

Thread Damage El

[]

Arc Strikes 0i L

I

[

Deformation 191]

0i Cracks

[]

[]

Protective Coating 9Li Ei Other-7]

[

Evidence of Leakage Li[]

Li Other **i[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined In-place under tension Revision 1.0

Farley Nu(

ant Visual Examination Record VT-1 SHAR§L)J FNP.4 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S04 APR1-3100 S02F2V038 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA D Yes D B/W Yes J 1/32" Division (Scale)

L* Direct EZ Video Procedure No.

FNP-0-NDE-100 21 W No El Color J No 1/32 Une (Gray Card)

D Remote Revision No.

1.0 I N/A Equipment Lighting Tools Examiner/InItial Terry G. Carraher Level S~~Sig.

I

[ j Mirror [] N/A El Ambient 7

Scale

,i Depth Gauge

[] Level Examiner/Initial N/ A Level

, Magnifier

--S Flashlight U

Micrometer 0- Comparator 0_

Sig.

N/A D CCTV D Droplight EI Caliper D Weld Gauge EII Date (Month-Day-Year) 9/17/2002 "UN-

  • UN E] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material D

E Loose Members I

El 11 Undercut El El Cracks 1

E]

El Corrosion Build-up El D

I Corrosion 0ill L]

Gouges Ii

[]

0 Gouges LI LI Evidence of Leakage Thread Damage ElI LI Arc Stnkes LI LI Deformation LI El Cracks

[]

[

Protective Coating LI Other-*

Li]

LI Evidence of Leakage FI L]

Other- *I LI

  • Provide details on unsat areas by use of supplemental data sheet
    • Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(-

ant Visual Examination Record VT-1 SHARLJ FNP-O-.

00.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S05 APR1-3100 S02F2V039 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA

[I Yes Ei B/W Li Yes 7

1/32" Division (Scale)

LM Direct El Video Procedure No.

FNP-0-NDE-100 21

.- No El Color

I No Ei 1/32" Line (Gray Card)

Li Remote Revision No.

1.0 N/A Equipment Lighting Tools Examiner/Initial Terry G Carraher Level S1g.

I

[] Mirror 3] N/A Li Ambient V Scale 0

Depth Gauge El Level Examiner/initial N/ A Level Li Magnifier

[

Flashlight i

Micrometer El Comparator Si Slg.

N/A LI CCTV I Droplight LI Caliper E] Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A R1 BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Matenal 17 E

Wj Loose Members

[]

i Undercut El 7,

7A Cracks "W

7 1i Corrosion Build-up I

[]

V, Corrosion Irv ]

Gouges Li L

L Gouges Li Li Evidence of Leakage

-i L-

/

Thread Damage Ei li Arc Stnkes E]

R 1 Deformation El El Cracks 9i i-1 Protective Coating 1:1 El Other-

[]

[]

Evidence of Leakage Li Li Other --

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nuc-ant Visual Examination Record VT-1 SHARLd I

FNP-0-Lh 00.21 Southern Nuclear Opearatinga Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-S06 APR1-3100 S02F2V040 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA El Yes El B/W Li Yes LS1 1/32" Division (Scale)

R Direct Li Video Procedure No.

FNP-0-NDE-100.21 L1 No 0i Color

[

No Li 1/32' Line (Gray Card) 71 Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examinerfiniti.l TerryG Carraher Level Sig.

I DV Mirror [] N/A El Ambient

[] Scale

[] Depth Gauge Li Level Examiner/Initial N/AA Level El Magnifier

  • Flashlight 0i Micrometer El Comparator 0i Sig.

N/A El CCTV Li Droplight EL Caliper EL Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-

'UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 0i

[

Loose Members ii Undercut zi

[]

[

Cracks Li

[]

Corrosion Build-up Li

[]

[

Corrosion 0i

[]

Gouges Li El

[]

Gouges Zi El Evidence of Leakage El El

[]

Thread Damage L[

Li Arc Strikes E]

Di W

Deformation

[]

Li Cracks

[

Protective Coating Li LI Other" 7i Li

[

Evidence of Leakage

'91 F]

Provide details on unsat areas by use of Other l

lV supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

ant Visual Examination Record VT-1

(

SHAREIJ FNPa C00.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S07 APR1-3100 S02F2V041 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA LI Yes Li B/W Li Yes L*7 1/32" Division (Scale)

Direct i] Video Procedure No.

FNP-0-NDE-100.21 SNo Li Color No 0I 1/32" Line (Gray Card)

LI Remote Revision No.

1.0 I N/A Equipment Lighting Tools Examiner/initial Terry

Carrahe, Level

[] M i rror L N/A Li Am bient

ExaminerlInitial N/A Level LI Magnifier

W Flashlight E] Micrometer Li Comparator Si Sig.

N/A Li CCTV Li Droplight Li Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A Se BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Ew Di I

Loose Members ii F

Undercut I]

Li W

Cracks

[i 0i Corrosion Build-up

[]

Re Corrosion ni

[]

Gouges

[]

Gouges Fi Li Evidence of Leakage Li Li Thread Damage 1[

Li Arc Strikes E:

El r

Deformation R]

EL Cracks

[]

L I

V Protective Coating W1 Ei Other-*

Li Li j

Evidence of Leakage L,

Li Other EL Li

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(-

Jant Visual Examination Record VT-1 C

SHARED FNP.O-4 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S08 APR1-3100 S02F2V042 STEAM GEN STUDS Photos Sketch Resolution Technique WO I WA NA LZ Yes E3 B/W E] Yes i 1/32" Division (Scale)

[] Direct z] Video Procedure No.

FNP-0-NDE-100.21

]

No LI Color

[] No LI 1/32 Une (Gray Card)

LI Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Terry Ca Level SMirror L N/A 39 Ambient

Examiner/Initial N/A Level Magnifier J Flashlight 01 Micrometer f-Comparator L_

Sig.

N/A Z] CCTV LI Droplight El Caliper El Weld Gauge LI Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-1 SAT SAT N/A 9

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material

[

Loose Members El Undercut 3

[

Cracks

_I LI Corrosion Build-up LI W]

[

Corrosion

[3 LI Gouges LI VI

ý Gouges LI Evidence of Leakage El El 9]

Thread Damage LI LI Arc Stnkes 11 El W

Deformation LI LI Cracks

[E

[3

/

Protective Coating El LI Other-El

[E

[]

Evidence of Leakage Di]

LI Other LI LI

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(,

Jant Visual Examination Record VT-1 SHARED FNP-O-**i 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S09 APR1-3100 S02F2V043 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA L] Yes El B/W El Yes R1/32 Division (Scale) 7 Direct Vi Video Procedure No.

FNP-0-NDE-100.21

,I No El Color 91 No El 1/32" Line (Gray Card)

El Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial TerryG Carraher Level SIg.*I

[F+ Mirror El N/A E Ambient

[ Scale El Depth Gauge El Level Examiner/Initial N/A Level El Magnifier

[

Flashlight

[] Micrometer

[] Comparator El Sig.

N/A Dl CCTV El Droplight El Caliper El Weld Gauge El I Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A W BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material w

R, Loose Members ii El Undercut 17 El S

Cracks El El Corrosion Build-up

[]

El R1 Corrosion El El Gouges El 1]

E l

Gouges El El Evidence of Leakage Ell El Thread Damage El El Arc Strikes El El

[

Deformation El El Cracks El El

[

Protective Coating 0l El Other-El El R

Evidence of Leakage El El Other **l[

El "Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nuf lant Visual Examination Record VT-1 SHARK)

FNP-O-100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S1O APR1-3100 S02F2V044 STEAM GEN. STUDS Photos Sketch Resolution Technique WO / WA NA Li Yes Li B/W Di Yes R

1/32' Division (Scale)

W Direct Li Video Procedure No.

FNP-0-NDE-100.21 S No Li Color W No El 1/32" Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Terry G Carraher Level S1g.

I E Mirror EI N/A

[] Ambient Vi Scale L Depth Gauge 01 Level Examlner/lnltlal N/ A Level L~lagnfie lashgh 0

Micrometer

[]comparator ED Sig.N/

LiMagnifier Wi Flashlight

-i~________

1.N/A EL CCTV Li Droplight Li Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A l]i BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li 7A Loose Members ii r]

Undercut Li Li Cracks E]

Li Corrosion Build-up

[I D

]

Corrosion 0i Li Gouges El Ei

[]

Gouges i

C]

Li Evidence of Leakage 1

D]

W Thread Damage R]

Li Arc Strikes El El R

Deformation Li[

D Cracks Li Li

[

Protective Coating Li Li Other-*_-

Li Evidence of Leakage Li

[]

Other "

Li Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nuý,.

lant Visual Examination Record VT-1 C

SHAREL)

FNP-O-l 100.21 Southern Nuciear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S1I APR1-3100 S02F2V045 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA l Yes 7i B/W L[ Yes W1 1/32" Division (Scale)

-7 Direct 0i V

Procedure No.

FNP-0-NDE-100.21

" No LI Color v No ri 1/32' Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Terry 0 Ca r

Level Scale Depth Gauge

__ Level Sig.

Mirror 71 N/A

, Ambient Examiner/* 1al N/ A Level r

Mcoee Cm prtr[

SIg.NA SMagnifier Flashlight Micrometer Comparator Sg N/A Li CCTV L Droplight L Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN WELDS AND BASE MATERIAL VT-1 SAT SAT N/A i BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 1i Li 7

Loose Members k

n

[

Undercut Li El V

Cracks Li[]

Li Corrosion Build-up Li Li k

Corrosion Li Li Gouges El El

ý]

Gouges Li Li Evidence of Leakage Li Li V

Thread Damage Li Li Arc Strikes Li El R

Deformation L[

Li Cracks Li L

Protective Coating Li Li Other-Li Li 9

Evidence of Leakage Li Li Other-Li Li "Provide details on unsat areas by use of supplemental data sheet.

  • Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu$

lant Visual Examination Record VT-1 SHAR~Lo FNP-04 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-S12 APR1-3100 S02F2V046 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA D Yes El B/W I] Yes W 1/32' Division (Scale)

Direct E] Video Procedure No.

FNP-0-NDE-100 21

/ No D1 Color S No 0i 1/32" Une (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Terry 0. C

ýer Level R

Sig.

SMirror [-ZN/A Ii Ambient Scale t] Depth Gauge

[] Level Examiner/initial N/A Level i Magnifier

[] Flashlight i

M Comparator

g.

N/A LI CCTV Li Droplight El Caliper LI Weld Gauge LI Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-1 SAT SAT N/A R-BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material

-1 1

V Loose Members E]

Fi Undercut EL El L/

Cracks 0I LI Corrosion Build-up LI LI L

Corrosion LI LI Gouges El

']

  • Gouges El 0]

Evidence of Leakage

[

E i Thread Damage L,[.

E]

Arc Strikes

[l

[]

[

Deformation ElI WI]

Cracks 7

[]

[

Protective Coating V

ID 17 Other-El

[]

R Evidence of Leakage V'

I]

Other~

L ]

Li Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley N(

'lant Visual Examination Record VT-1 SHAR'L)

FNP-0( 2 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APRI-3100-S13 APR1-3100 S02F2V047 STEAM GEN STUDS Photos Sketch Resolution Technique WO I WA NA

[] Yes 0I BAN L] Yes

[] 1/32" Division (Scale)

[] Direct w Video Procedure No.

FNP-0-NDE-100 21 SNo Li-F Color 7V No F]

1/32 Line (Gray Card)

KI Remote Revision No.

1 0

/ N/A Equipment Lighting Tools Examiner/initial Terry G Carraher Level

[I N/A Li Ambient

[ Scale F] Depth Gauge Li Level Sig.

11 1

Examlner/lnitlaý A

Level

,71Magnifier I'] Flashlight El Micrometer

,Comparator I--_

SIg.

NIA

[-CCTV Li Droplight Li Caliper Li Weld Gauge F-___

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN

-] WELDS AND BASE MATERIAL VT-I SAT N/A I]

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material R]

Loose Members

-]

F]

Undercut

-]

F Cracks F- -i Corrosion Build-up L1 L-

[

Corrosion W1]

L]

Gouges L[]

[E-Gouges L[

i/

Evidence of Leakage Li FLi Thread Damage

[]

K]

Arc Strikes Ei K]

W Deformation

[]

D LI Cracks LI

]

F1 Protective Coating

[))

Li F1 Other-

[]

F]

[

Evidence of Leakage F%11 F]

Other Wi ))

Provide details on unsat areas by use of supplemental data sheet Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu,(

lant Visual Examination Record VT-1 C

SHARED FNP-OC-100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S14 APRI-3100 S02F2V048 STEAM GEN. STUDS Photos Sketch Resolution Technique WO / WA NA

[] Yes 0i B/W E-Yes 1/32" Division (Scale) j Direct Vi Video Procedure No.

FNP-0-NDE-100.21 R No El Color r] No Li 1/32" Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examinerfinitial TerryG Carraher Level

[]Mirror r-TN/A LV Ambient

[ Scale Li Depth Gauge Li Level Sig.

Examinerfinltla** 'A Level 9

Flashlight El Micrometer Li Comparator El SIg.

N/A Li CCTV Li Droplight Li Caliper Li Weld Gauge El Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN EL WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Li -

Loose Members EL Li Undercut Li Ri Cracks ED Li Corrosion Build-up Li R-11 Corrosion Li Li Gouges L

Gouges Ri Li Evidence of Leakage i

Li Thread Damage Li EL Arc Strikes Li Li Deformation Li Li Cracks L]

_i Protective Coating Li[

Li Other" El EL Evidence of Leakage Li Li Other "

Li Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined In-place under tension Revision 1.0

Farley NucC

,ant Visual Examination Record VT-1

(

SHARED FNP-O--t 100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S15 APR1-3100 S02F2V049 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA ll Yes B/W L Yes 1/32" Division (Scale)

[] Direct 0 Video Procedure No.

FNP-0-NDE-100.21

[] No Li Color 5Z No L

1/32" Line (Gray Card)

E'l Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Terry G Carraher Level SIg.

I W-Mirror EL N/A E] Ambient Vi Scale Li Depth Gauge g

Level Examlner/Initlal N/A Level Li Magnifier

[

Flashlight Li Micrometer Li Comparator i

Sig.

N/A Li CCTV Li Droplight Li Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002 "UN-

  • UN EL WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material F

Loose Members Li Li Undercut i

Li

[

Cracks R

Li Li Corrosion Build-up Li Li

[

Corrosion FW1 Li Gouges El Li r

Gouges Li Li Evidence of Leakage

_li Li L

Thread Damage Li Li Arc Strikes L.

L r

Deformation Li Li Cracks Li D

Protective Coating Li En Other**

0i Li v

Evidence of Leakage Li Li Other Li Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined In-place under tension ANII Review Date Sr/ O.

9o, o

~

Reviewed By Level Date Revision 1.0 I

I

Farley Nu

- 'ant Visual Examination Record VT-1 SHAR~Lj FNP-O-(

100.21 Southern Nuclear Operating Company Plant I Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S16 APR1-3100 S02F2V050 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA El Yes Li B/W Li Yes R

1/32" Division (Scale)

R_ Direct Ei Video Procedure No.

FNP-0-NDE-100.21 S No I0 Color j No EL 1/32" Une (Gray Card)

Li Remote Revision No.

1.0 N/A Equipment Lighting Tools Examiner/initial Terry G Carraher Level

{--Mirror D N/A Li Ambient 0 1e Depth Gauge

[] Level Sig.

Examiner/Initial N/A Level L--Magnifier

[

Flashlight L

Micrometer i-Comparator Si Sig.

N/A EL CCTV EL Droplight Li Caliper Fl Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN L-WELDS AND BASE MATERIAL VT-1 SAT SAT N/A Ri BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El Li 0 Loose Members Li Li Undercut Pi Li Cracks S.i1 E]

Corrosion Build-up Li Li Corrosion Li Li Gouges EL El W

Gouges Li Li Evidence of Leakage EL EL W

Thread Damage Li Li Arc Strikes Li Li 7

Deformation Li L]

Cracks Li Li

/

Protective Coating WI]

Li Li Other-Li L

iV -

Evidence of Leakage Li Li Other **

Li Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(

'ant Visual Examination Record VT-1 SHARLD FNP-O-(

100.21 Southern Nuclear Operating ComDanv Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

APR1-3100-S17 APR1-3100 S02F2V051 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA 01 Yes El B/W L-Yes I 1/32' Division (Scale)

I] Direct E] Video Procedure No.

FNP-O-NDE-100.21

%7No NI Color

-V No Fi]

132" Une (Gray Card)

LI Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/initial Teny G Carraher Level SIg.*-

I

[ M ir r o r L I N / A E l A m b ie n t

[] S c a le

[] D e p th G a u g e L I L e v e l SrN A

Examiner/Initial NI A

Level LI Magnifier Flashlight El Micrometer

[] Comparator 0_

Sig.

N/A SCCTV L] Droplight El Caliper LI Weld Gauge

[]

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material I'

El

[]

Loose Members El Undercut E

))

0 V

Cracks 0i LI LI Corrosion Build-up 71 LI R]

Corrosion 0

El Gouges LI EL

%]

Gouges R]

L Evidence of Leakage li LI r

Thread Damage LI LI Arc Strikes I

L]

[]

Deformation

[]

LI LI Cracks

[] LI

]

Protective Coating LI LI Other-LI]

LI Evidence of Leakage LI LI Other **

LI LI Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments Examined in-place under tension

Farley Nuc lant Visual Examination Record VT-1 C

SHARED FNP-O-l 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-S18 APR1-3100 S02F2V052 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA Li Yes El B/W El Yes

[

1/32" Division (Scale)

[

Direct Li Video Procedure No.

FNP-0-NDE-100.21

[] No El Color 7 No Li 1/32' Line (Gray Card)

Li Remote Revision No.

1.0 I N/A Equipment Lighting Tools Examiner/Initial Terry G. C Level SMirror Di N/A Li Ambient i Scale Li Depth Gauge Li Level S

m Examiner/Initial NIA Level l Magnifier R Flashlight U Micrometer Comparator Li Sig.

N/A Li CCTV

[] Droplight Li Caliper II Weid Gauge El Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN SWELDS AND BASE MATERIAL VT-1 SAT SAT N/A Wi BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 01 El 7

Loose Members Ri n

Undercut E

El

[]

Cracks S/1 0

Corrosion Build-up i--1, Li S

Corrosion R[]i Gouges 0

El 7

Gouges S6 E]

El Evidence of Leakage 0

[E V

Thread Damage Li Li Arc Strikes Di

[]

Deformation El Li Cracks Li Li Protective Coating Li Li Other-Li Li Evidence of Leakage Ei ]i Other *i Li "Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

lant Visual Examination Record VT-1 SHARED FNP-0-t 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APRt-3100-S19 APRI-3100 S02F2V053 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA SYes 10 B/W El Yes R] 1/32' Division (Scale)

Direct ii Video Procedure No.

FNP-0-NDE-100 21

[

No Li Color S No 0i 1/32 Une (Gray Card)

L Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examlner/Inltlal Terry G Carraher Level Sig.

I S1 Mirror 1] N/A LI Ambient 7

Scale

[l Depth Gauge Li Level Examiner/lnltlal N/A Level

[7 Magnifier i Flashlight SI Micrometer fi Comparator LI Sg.

N/A EL CCTV I] Droplight El Caliper El Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN L] WELDS AND BASE MATERIAL VT-I SAT SAT N/A BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El 0i Loose Members LiI Li Undercut rm Li Cracks W]

E]

El Corrosion Build-up rv Li Corrosion Li[

Li Gouges Li Li

[

Gouges Li Li Evidence of Leakage El EL

[

Thread Damage Li Li Arc Strikes

[l Li

[

Deformation WLi F]

Cracks r-i EL R

Protective Coating r%14 L]

Other-Li Li

/_

Evidence of Leakage Lif lD Other *Li[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined In-place under tension

Farley Nu(

lent Visual Examination Record VT-1 SHARLj FNP-0..

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examinatlon Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S20 APR11-3100 S02F2V054 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA El Yes El B/W B3 Yes

[

1/32" Division (Scale)

W Direct E3 Video Procedure No.

FNP-0-NDE-100.21

[] No El Color 9' No 03 1/32 Line (Gray Card)

[] Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Teny 0 Ca

-Level SMirror 13 N/A F] Ambient W Scale L_ Depth Gauge

[] Level g

Examinerfinitial N/A Level 13 Magnifier S[M Flashlight Micrometer

[

Comparator j

Sig.

N/A LI CCTV 13 Droplight

[] Calper 13 Weld Gauge LI Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN 13 WELDS AND BASE MATERIAL VT-1 SAT SAT N/A R1 BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material w

1:1 Loose Members 13 Undercut 11 F3 -

Cracks 03 13 Corrosion Build-up 13

[]

56 Corrosion R3 13 Gouges El 13 S7 Gouges E3 R3 Evidence of Leakage 13 13 7

Thread Damage R

El]

1 Arc Strikes S, ]3

[

Deformation

[))

[]

Cracks 13 13 V

Protective Coating E3 13 Other**

13 13 Evidence of Leakage 13 13 Other E3

[]

"Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(,

Jant Visual Examination Record VT-1 SHAR~Lj FNP-0-.

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S21 APR1-3100 S02F2V055 STEAM GEN. STUDS Photos Sketch Resolution Technique WO / WA NA 0i Yes Di B/W El Yes 1/32 Division (Scale)

[

Direct 0 Video Procedure No.

FNP-0-NDE-100.21

ýJ No El Color V7 No Li 1/32" Line (Gray Card)

Li Remote Revision No.

1.0 N/A Equipment Lighting Tools Examiner/Initial Terry 0 C

-Level IV] Mirror Li N/A EL Ambient

, Scale 17 Depth Gauge Li Level Sig.

m c r

Examiner/lnitial N/A Level EL Magnifier 1 Flashlight Micrometer FComparator El Sig.

N/A Li CCTV D Droplight Li Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN L] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A 7

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material EL Li 7

Loose Members WI I

Li Undercut Ir Li

]

Cracks Li, Li Corrosion Build-up Li 7Z 1 Corrosion Li Li Gouges Li

[

Gouges W1 Li Evidence of Leakage Li Li Thread Damage V]

E]

L Arc Strikes Li Li

[

Deformation R]

Ll 0i Cracks Li Li

[

Protective Coating Wi Li Other-L Li 7

Evidence of Leakage Li L]

Other Vi Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nucc lant Visual Examination Record VT-1 C

SHARED)

FNP-O-L' 100.21 Southern Nuclear 0~rtn Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S22 APR1-3100 S02F2V056 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA Z Yes El B/W ED Yes W 1/32' Division (Scale)

[

Direct Videoo Procedure No.

FNP-0-NDE-100 21 SNo IE Color F No 1/32 Une (Gray Card)

I Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examinerlinitial Terry G. Ca*r=mb__

Level Sig.

if SMirror D N/A l Ambient W Scale

[] Depth Gauge

[] Level Examiner/Initial N/A Level LI Magnifier 5

Flashlight

[] Micrometer Comparator SI Sig.

N/A 0COT El Droplight II Caliper LI Weld Gauge LI Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN L7 WELDS AND BASE MATERIAL VT-1 SAT SAT N/A BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material

[]

Loose Members 0

0 Undercut R]

Cracks El El Corrosion Build-up 0

E]

WI 7

Corrosion E

F[7 Gouges

[]

[]

f Gouges El 0J Evidence of Leakage El RI i

Thread Damage LI LI Arc Strikes 11 LI 7

Deformation LI LI Cracks

[]

[E

__*1 Protective Coating 0I 1I Other-*

[

7 Evidence of Leakage 0[

El Other" LI F

Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu$

lant Visual Examination Record VT-1 C

SHARED FNP-O(-

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S23 APR1-3100 S02F2V057 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA

[]Yes El B/W El Yes Wi 1/32' Division (Scale)

Direct El Video Procedure No.

FNP-0-NDE-100 21

[] No El Color

' No Li 1/32 Une (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examinertinitlal Terry G Ca r

Level V Mirror D] N/A El Ambient

[ Scale Z Depth Gauge Li Level Sig.

Examiner/initlial N/ A Level

[Z Magnifier Flashlight Li Micrometer Li Comparator L

Sig.

N/A D-I CCTV Li Droplight

[] Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A I BOLTS, STUDS, AND WASHERS VT-I SAT SAT N/A Ground Blend Material i

El Loose Members 17

[]

Undercut

]

0i Cracks Li Li Corrosion Build-up 17 El R

Corrosion Li

[L Gouges Li Li J

Gouges Li Li Evidence of Leakage Li Li Thread Damage Li Li Arc Strikes Li El 9j Deformation Li Li Cracks li Li S

Protective Coating Li[

Li Other*

Li El

']

Evidence of Leakage EL 0i Other **i[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(

lant Visual Examination Record VT-1 SHAR L)

FNP-4,.

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S24 APR1-3100 S02F2V058 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA El Yes F0 B/W El Yes

[

1/32" Division (Scale)

[] Direct El Video Procedure No.

FNP-0-NDE-100.21

[J No LI Color

[] No I]

1/32" Une (Gray Card)

LI Remote Revision No.

1.0 I N/A Equipment Lighting Tools Examiner/initial Terry 0. Ca Level

[] M irror L --

I N A~

A m bient

  • S cale LI D epth G auge El Level g

M i Dto1 ExaminerfInitfal NI A Level LI Magnfier Flashlight S

Micrometer Comparator

[]_

Sig.

N/A 0] CCTV L, Droplight LI Caliper 0I Weld Gauge LI Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A 91 BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Loose Members Undercut 11 Cracks RI Corrosion Build-up EI ll

[

Corrosion

[I LI Gouges

[]

Gouges V]

E Evidence of Leakage 01 17 Thread Damage seI LD Arc Strikes El 1

7V Deformation LI LI Cracks 11 El

[]

Protective Coating

[I LI Other-0I El r/

Evidence of Leakage

[]

[I Other **

LI

[]

[

Provide details on unsat areas by use of supplemental data sheet.

"" Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(

lant Visual Examination Record VT-1 SHAR -J FNP-0--

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-S25 APR1-3100 S02F2V059 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA BYes B/W B-1 Yes 1/32" Division (Scale)

R, Direct B Video Procedure No.

FNP-0-NDE-100.21 SNo Li Color R No B] 1/32" Line (Gray Card)

B Remote Revision No.

1.0 I N/A Equipment Lighting Tools Examiner/initial Terry 0Ca e

Level Sig.

I SMirror F N/A LD Ambient

[] Scale B Depth Gauge EB Level Examiner/Initial N/ A Level B Magnifier

[] Flashlight Micrometer Comparator Si Sig.

N/A 0 CCTV Droplight B Caliper B Weld Gauge B

Date (Month-Day-Year) 9/17/2002

  • UN-

'UN L] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A Ni BOLTS, STUDS, AND WASHERS VT-1 SAT SAT NIA Ground Blend Material w

1:1 W

Loose Members

[V

[]

El Undercut El 01 S

Cracks 5B[

LI Corrosion Build-up B]

[7 R6 Corrosion

[]

E]

Gouges F-1

[]

Gouges E ))

Evidence of Leakage

[]

L 7

Thread Damage m l Arc Strikes E

B

[

Deformation

[B E]

Cracks B

B

[

Protective Coating B[

B1 Other-*

[

[

Evidence of Leakage R

B]

B.

Other B*[

B]

"Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nuc(

Jant Visual Examination Record VT-1 SHARED FNP-G(

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S26 APR1-3100 S02F2V060 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA

[] Yes 1E B/W

[1 Yes R

1/32 Division (Scale)

Direct D Video Procedure No.

FNP-0-NDE-100 21 1 Color

[

No 1/32" Line (Gray Card)

[

Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examiner/Initial Terry C0 r

Level Rl Mirror 7 N/A El Ambient Scale El Depth Gauge LI Level S

ExaminerfInitial N A Level LI Magnfier

  • Flashlight EI Micrometer 7I Comparator Sig.

N/A El CCTV LI Droplight El Caliper

[i Weld Gauge LI Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A VJ BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El El Loose Members W]

1:1 Undercut E

LI

[W Cracks LI LI Corrosion Build-up LI L7 Sj Corrosion F[1 Gouges EI S %1 Gouges LI LI Evidence of Leakage LI LI

[

Thread Damage 0I LI LI Arc Stnkes

[J LI R]

Deformation 0I El Cracks 0]

[]

[]

Protective Coating El MI LI Other-F EI LI

[]

Evidence of Leakage V]

Li ]

Provide details on unsat areas by use of Other E]

supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

Jant Visual Examination Record VT-1 SHAR J)

FNP-0-ht 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S27 APR1-3100 S02F2V061 STEAM GEN. STUDS Photos Sketch Resolution Technique WO / WA NA Li Yes El B/W Li Yes i 1/32" Division (Scale)

[j Direct r-Vidoo Procedure No.

FNP-0-NDE-100 21 SNo L7 Color 7V No Li 1/32' Une (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examinerlinitial Terry Ca*i Level Sig.

7] Mirror [] N/A Li Ambient V Scale Li Depth Gauge r-Level Examiner/Initial N/A Level Li Magnifier Flashlight Micrometer Comparator Si Sig.

N/A Li CCTV L Droplight EL Caliper EL Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li El 7v Loose Members Li Li Undercut Li Li 7

Cracks Li[

Li Corrosion Build-up Li Li R

Corrosion Li Li Gouges Li Li V}

Gouges EL Li Evidence of Leakage Li EL 7

Thread Damage Li

]l Arc Strikes L7 Li

[]

Deformation R

Li Li Cracks E

El k

Protective Coating Li Li Other"*

Li L]

W Evidence of Leakage Li Li Other Li Li Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

lant Visual Examination Record VT-1 S

SHAREL)

FNP-S-n 100.21 Southern Nucla Oprtinga Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S28 APR1-3100 S02F2V062 STEAM GEN STUDS Photos Sketch Resolution Technique WO I WA NA Yes Yes E

1/32" Division (Scale) j Direct I Video~

Procedure.No.

FNP-NDE-10 21 S No 0i Color

ýV] No Li 1/32 Line (Gray Card) i Remote Revision No.

1.0 N/A Equipment Lighting Tools Examinerlinitial Terry GCa Level Sig.*"

  • I LMirror L N/A Li Ambient V Scale El Depth Gauge Li Level Examiner/Initial N/A Level 1S Magnifier E

Fashlight Li Micrometer Li Comparator El Sig.

NA Li CCTV i Droplight L

Caliper L Weld Gauge El Date (Month-Day-Year) 9/17/2002 "UN-

  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A i BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El

[]

Loose Members R

El Undercut 0 [j Cracks Li[]

Li Corrosion Build-up 17 El 7

Corrosion Li;'

F, Gouges 0

EL W

Gouges L

li Evidence of Leakage

,I Li SE Thread Damage Li Li Arc Strikes ID Li Deformation Li Li Cracks Li Li V

Protective Coating Li Li Other-Li El V

Evidence of Leakage Li Li Other Li Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu 6,

'ant Visual Examination Record VT-1 C

SHARED)

FNP-O-I 100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-S29 APR1-3100 S02F2V063 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA ED Yes Dl BAN

[] Yes

-- 1/32" Division (Scale)

Direct LI Video Procedure No.

FNP-0-NDE-100 21 VNo LI Color ri No LI 1/32" Une (Gray Card)

EI Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examiner/Initial Terry G a Level SMirror L-N/A LR Ambient Scale LI Depth Gauge FI Level Sig.

If Examiner/initial N/ A Level

--I Magnifier Flashlight Si Micrometer L] Comparator LI Sg.

N/A EI CCTV LI Dropiight Ej Caliper El Weld Gauge LI _

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-1 SAT SAT N/A D BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material w

Loose Members F-11 Undercut LI LI Cracks RI LI Corrosion Build-up I

7V]

I Corrosion P

[]

0 Gouges LI LI

'j Gouges LI LI Evidence of Leakage LI El Thread Damage El FI Arc Strikes LI El W

Deformation El

[]

Cracks

[]

E]

S Protective Coating E]

EI Other-LI

[

Evidence of Leakage LI LI Other **I[

LI "Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined uomments Examined In-place under tension

Farley Nuc(

Jant Visual Examination Record VT-1 C

SHARED FNP-0-**

100.21 Plant / Unit Line Number/Examinatlon Area/Weld No.

Drawing Number Sheet Number Farley

/

APRt-3100-S30 APR1-3100 S02F2V064 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA H] Yes H1 B/W H Yes 1 1/32' Division (Scale)

W] Direct H Video Procedure No.

FNP-0-NDE-100.21

ýV No

[] Color

[1 No 0 1/32" Line (Gray Card)

H Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/lnitial Terry ( Carraher Level

'_SIg.

I t Mirror [ N/A H Ambient

I Scale H] Depth Gauge FH Level Examinerflnitial N/ A Level EH Magnifier

[

Flashlight H Micrometer H Comparator Si Sig.

N/A H CCTV i Droplight EH Caliper m Weld Gauge H

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN H WELDS AND BASE MATERIAL VT-1 SAT SAT N/A S6 BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material H1 E]

R Loose Members

[]

El D

Undercut H

H1

[]

Cracks Hl EH Corrosion Build-up 1

i Corrosion M

Gouges 11

[]

Gouges H

H Evidence of Leakage 0H H

[]

Thread Damage

[

H Arc Strikes 7

H]

[]

Deformation H

H Cracks H]

H3

[]

Protective Coating H]

Other-Hl H

W]

Evidence of Leakage H-1 Hl Other H*[

H][

Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined comments Examined In-place under tension Revision 1.0

Farley Nu, lant Visual Examination Record VT-1 C

SHARED FNP-*0 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APRI-3100-S31 APR1-3100 S02F2V066 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA El Yes

[I BAN E) Yes 1/32" Division (Scale)

[] Direct El Video Procedure No.

FNP-0-NDE-100.21 W1 No El Color W] No El 1/32" Line (Gray Card)

E] Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/initial Terry G. CarraLevel SIg.F*I

[]Mirror [] N/A El Ambient W Scale E Depth Gauge LI Level Examinerfinitial N/A Level

[]Magnifier R Flashlight El Micrometer E Comparator E_

Sig.

N/A El CCTV El Droplight L

Caliper El Weld Gauge El Date (Month-Day-Year) 9/17/2002 "UN-

  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material DL El

[]

Loose Members

[]lf El Undercut El El 1

Cracks R

El El Corrosion Build-up 1l l

W_

i Corrosion FEl El Gouges El El 7

Gouges El El Evidence of Leakage El El W

Thread Damage El El Arc Stnkes El El

[

Deformation El El Cracks El El

[

Protective Coating E]

El Other-El El

[

Evidence of Leakage El El Other **

R]

El

" Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined Comments Examined in-place under tension

Farley Nu, lant Visual Examination Record VT-1 SHAR O FNP-0-1.

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

APR1-3100-S32 APR1-3100 S02F2V067 STEAM GEN. STUDS Photos Sketch Resolution Technique WO I WA NA El Yes El B/W L-Yes 7e 1/32 Division (Scale)

Rj Direct El Video Procedure No.

FNP-0-NDE-100.21 SNo 0i Color V1 No El 1/32' Line (Gray Card)

LI Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Terry G C Level SIg.

I

[]Mirror [i] N/A Li Ambient Ri Scale El Depth Gauge Li Level Examiner/initial N/A Level El Magnifier Flashlight EL Micrometer Li Comparator Si SIg.

N/A i-CCTV Droplight Li Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Li

[

Loose Members Li1 Li Undercut Li Li r

Cracks EL El Corrosion Build-up EL EL

  • i Corrosion SRI EL Gouges Li EL 9j Gouges R

EL Li Evidence of Leakage Li Li 7"

Thread Damage Li Li Arc Strikes L]

El W]

Deformation Li411 Li Cracks Li EL 7

Protective Coating Li Li Other-Li Li

[

Evidence of Leakage Li Li Other Li Li

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

tnt Visual Examination Record VT-1 SHARL-0 Plant I Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

APR1-3100-NO1 APR1-3100 S02F2V002 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes l B/W

[]Yes 1/32" Division (Scale)

Direct El Video Procedure No.

FNP-0-NDE-100.21 SNo Li Color W1 No I

1/32" Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/init*I Level

[]Mirror E] N/A E! Ambient S

Scale Li Depth Gauge Li Level Sig.

1I Examiner/initial N/A Level

[] Magnifier R Flashlight El Micrometer Li Comparator Si sg.

N/A 0i CCTV El Droplight 17 Caliper Li Weld Gauge Li Date (Month-Day-Year)

_______________________9/17/2/17200

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-1 SAT SAT N/A Si BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material

[

11 V

Loose Members Li Li Undercut Li El 5

Cracks Li LI Corrosion Build-up Li i

R l Corrosion Li Li Gouges El EL V

Gouges Li Li Evidence of Leakage 7

_i Thread Damage Li Li Arc Strikes Ri

,i 1

Deform1ation IV ]i Cracks 0

E []

I Protective Coating W7 Li Other"*

ED Evidence of Leakage Li Li Other Li Li Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Southern Nuclear Operating nermtnno Comments Examined In-place under tension FNP-O-i',

00.21

Farley NuC ant Visual Examination Record VT-1 C

SHAREW FNP-O-N, 00.21 Plant /

Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-N02 APRI-3100 S02F2V003 STEAM GEN NUTS Photos Sketch Resolution Technique WO I WA NA Yes 7-B/W 1/32" Division (Scale)

Direct

- Yes

_BW Yes 3DvisonScee Video Procedure No.

FNP-0-NDE-I00 21 Color Vj No 1/32" Line (Gray Card)

L Remote Revision No.

1 0

/

N/A Equipment Lighting Tools Examlner/lnltlal Ter Q Carrahe Level Ej N/A L Ambient

- Scale

'-7 Depth Gauge LJ Level Sig.

Examiner/initial N/ALel F Mgiir'IMicrometer

__' Comparator 11Ea*e/IiilN Level

.. Magnifier S Flashlight Mre Comparao i

Sig.

N/A K] CCTV Li Droplight CaliperL Weld Gauge Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN

[7 WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

'S BOLTS, STUDS, AND WASHERS VT-i SAT SAT N/A Ground Blend Material Loose Members

-L Undercut Cracks

[7 L]

Corrosion Build-up V] 1 CorrosionLi Gouges Gouges L.

[]

Evidence of Leakage 71 Thread Damage r]

_T Li Arc Strikes

-]

r Deformation El Ell Cracks L

7 j

Protective Coating F-Li Other-*

Evidence of Leakage Other **

]

]

Provide details on unsat areas by use of supplemental data sheet Provide details on other areas examined Conmments=

Exa~mnrined

  • P h-l~

1-4 VVIII~ii*I

~V

ýUIII I

UI

-I;I I

Farley Nu,$

ant Visual Examination Record VT-1 R

SHARWO FNP-0-*N 00.21 Southern Nuclear Operating Company Plant I Unit Line Number/Examinatlon Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N03 APR1 -3100 S02F2V004 STEAM GEN NUTS Photos Sketch Resolution Technique WO I WA NA EZ Yes E B/W BE Yes 5# 1/32" Division (Scale) 7 Direct El Video Procedure No.

FNP-0-NDE-100.21 Wj No E] Color S] No 1:1 1/32' Line (Gray Card)

Z Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Terry G. Carraher Level S Mirror LI N/A El Ambient W, Scale El Depth Gauge II Level Sig.

ExaminerfInitial N/A Level LI Magnifier

[

Flashlight

[S] Mirometer LI Comparator LI Sg.

WA LI CCTV El Droplight LI Caliper LI Weld Gauge LI Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-1 SAT SAT N/A BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material

[]

FV Loose Members WI LI Undercut El

]f Cracks L]

[]

Corrosion Build-up

[]

E Corrosion LI LI Gouges 0

0 Gouges LI1 D

Evidence of Leakage E]

El V

Thread Damage LI1 M

Arc Strikes R]

LI

[

Deformation

,LI El Cracks VI 1

Protective Coating

[I

[]

Other**

El SRI Evidence of Leakage EI lI Other LI[][

  • Provide details on unsat areas by use of supplemental data sheet.
    • Provide details on other areas examined Comments Examined in-place under tension

Farley Nu, ant Visual Examination Record VT-1 SHAR dL FNP,--.-

00.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N04 APR1-3100 S02F2V005 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes E] B/W El Yes

[] 1/32" Division (Scale)

[

Direct El Video Procedure No.

FNP-0-NDE-100 21 1P No El Color

[j No El 1/32" Line (Gray Card)

El Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial T Level Sig.Lel

-j Mirror El N/A El Ambient L* Scale E Depth Gauge

[i Level Examiner/Initial *A Level El Magnifier W Flashlight El Micrometer El Comparator Si Slg.

WA El CCTV El Droplight El Caliper El Weld Gauge El Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El F]

[]

Loose Members El Undercut I]

[]

9 Cracks F]

El E1 Corrosion Build-up El El 7,0 Corrosion V]

E]

El Gouges

]

[]

f]

Gouges

[]

El lI Evidence of Leakage El El

[

Thread Damage El Dl Arc Strikes El El S/

Deformation Dl Fl Cracks El El

[]

Protective Coating VEl 0

Other-El 91F1 Evidence of Leakage LI El Other~ **l[

El Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nuc ant Visual Examination Record VT-1 C

SHAREIJ FNP 14 00.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N05 APR1-3100 S02F2VO06 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes L-B/W El Yes 1/32 Dvision (Scale)

] Direct

[] Video Procedure No.

FNP-0-NDE-100 21 7 No Li Color

[

No 1i 1/32' Une (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/InItala rrahL, -'

Level rý- Mirror [] N/A Ei Ambient

  • Scale L0 Depth Gauge Li Level Sig.

Examiner/Initial N/A Level 0- Magnifier Flashlight El Micrometer El Comparator Sig.

N/A El CCTV Li Droplight El Caliper

[I Weld Gauge Ei Date (Month-Day-Year) 9/17/2002 "UN-

  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

'R BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material EL 0i SV Loose Members i []

EE Undercut

[]

Li Cracks Li

[1 Corrosion Build-up Li L]

Corrosion Li[

El Gouges I

E] i 7V Gouges

[]

Li

[]

Evidence of Leakage 0

E]

5 Thread Damage 0i 0I Arc Strikes Li El V

Deformation Li Li Cracks El 0

j Protective Coating Li Li Other-E El k

Evidence of Leakage Ei Li Other**

Li Li

[

Provide details on unsat areas by use of supplemental data sheet

"" Provide details on other areas examined Comments Examined in-place under tension

Farley NucC Ant Visual Examination Record VT-1 C

SHAREO FNP-C-N,-

00.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N06 APR1-3100 S02F2V007 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA E: Yes Li B/W El Yes W 1/32' Division (Scale)

S] Direct 13 Video Procedure No.

FNP-O-NDE-100.21

_j No

[] Color W] No EL 1/32" Line (Gray Card)

EL Remote Revision No.

1 0

/ N/A Equipment Lighting Tools Examiner/initial Terry G. Carraher 1 57Level SMirror Li N/A Li Ambient

'9 Scale Li Depth Gauge Li Level Sig.

Examiner/Initial X Level Li Magnifier VJ Flashlight Li Micrometer Li Comparator L_

sig.

N/A LCCTV Li Droplight EL Caliper Li Weld Gauge Li Date (Month-Day-Year)

____________9/17/2002

  • UN-
  • UN.

Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Li W

Loose Members i

E]

EL Undercut Li EL

[]

Cracks 99 Li Corrosion Build-up Li EL

[]

Corrosion Li Li Gouges Li Li

[

Gouges Li Li Evidence of Leakage Li Li

[

Thread Damage Li Li Arc Strikes Li Li

[

Deformation Li Li Cracks iD Li

[]

Protective Coating IV]

Li Other-E Li 7

Evidence of Leakage Li11 Li Other' "i[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined ommemlSlt:

E-xamll*ine Illplace under tension

(

Farley Nuw(,

.int Visual Examination Record VT-1 C

SHARELU FNP-0-N 00.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination ArealWeld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N07 APR1-3100 S02F2V008 STEAM GEN. NUTS Photos Sketch Resolution Technique WO / WA NA I

Yes 0i B/W D Yes 7

1/32' Division (Scale)

[

Direct w Video Procedure No.

FNP-0-NDE-100 21 j No 7 Color

[

No E-1/32" Line (Gray Card)

Li Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examiner/Init G

er Level r-1 Sig.

-__ N/A L_ Ambient 9 Scale Depth Gauge Li Level Examiner"in tial N/A Level Magnifier 5;" Flashlight Micrometer L Comparator Si SIg.

NIA

__-- CCTV

-i Droplight L

Caliper L Weld Gauge

[-

Date (Month-Day-Year) 9/17/2002 S*UN-UN SWELDS AND BASE MATERIAL VT-i SAT SAT N/A 9] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 7i Loose Members Li

[II Undercut Li Cracks Li El Corrosion Build-up E]

Li

[

Corrosion Li Li Gouges Li 0i 1 Gouges

[i Li Evidence of Leakage Li Li Thread Damage El Li Arc Strikes Wi i

[6 Deformation Li 01 Cracks Li El

[

Protective Coating 7]6 LF Other-El El 9

Evidence of Leakage El Li1 "Provide details on unsat areas by use of Other Li W1 supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu,(

int Visual Examination Record VT-1 SHARLU FNP-O 00.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examinatlon Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N08 APR1-3100 S02F2V009 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes L[ B/W

[]Yes j 1/32' Division (Scale)

Direct Di Video Procedure No.

FNP-0-NDE-100.21 VNo Li Color j No L

1/32' Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools ExaminerfAnt Ca Level scaleDepthGaugeSig.

I

,*Mirror Li N/A

[] Ambient

  • Scale Li Depth Gauge Li Level ExaminerlInitIal N/A Level

'Magnfier Flashlight i

Micrometer Li Comparator Li Sig.

N/A El CCTV EL Droplight Li Caliper EL Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Li Loose Members Li Li Undercut Li Li Cracks Li Li Corrosion Build-up Li Li 7

Corrosion W1 Li Gouges

_1 Li V

Gouges Li Li Evidence of Leakage Cl li Thread Damage Li Li Arc Strikes L]

Li Deformation Li Li Cracks Li Li 1 Protective Coating Vi Li Other**

Li Li Evidence of Leakage EL EL Other Li

[

Li "Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined Comments Examined in-place under tension

Farley Nu 1 Ant Visual Examination Record VT-1 SHARL-Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-N09 APR1-3100 S02F2V010 STEAM GEN. NUTS Photos Sketch Resolution Technique WO / WA NA El Yes Li B/W

[]Yes S

1/32 Division (Scale)

. Direct El Video Procedure No.

FNP-0-NDE-100.21 7 No Ei Color 7 No El 1/32" tine (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examlner/Initial Tea;. G.ar Level S Ig.(

I SMirror Li N/A Li Ambient Scale El Depth Gauge El Level Examiner/Initial N/

Level

[I Magnifier V Flashlight El Micrometer

[

Comparator E_

Sig.

N/A Li CCTV Li Droplight El Caliper Li Weld Gauge El Date (Month-Day-Year) 9/17/2002 "UN-

  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

'R BOLTS, STUDS, AND WASHERS VT.1 SAT SAT N/A Ground Blend Material E]

Loose Members r_1 Undercut fl

[]

[

Cracks Li Li Corrosion Build-up Li Z

Corrosion

[i Li Gouges L]

[

7V Gouges E]

Li Evidence of Leakage i-9i 7 Thread Damage Lilf El Arc Strikes El 0i 7

Deformation r]

Li 0

Cracks 0

Li

[]

Protective Coating R]

El Other-0 F]

W Evidence of Leakage EL Di Other Li V]

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension FNP--G(.

00.21 Southern Nucla letn Company

Farley Nuc(

mnt Visual Examination Record VT-1 C

SHAREu FNP-O-N 00.21 Plant I Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-NlO APR1-3100 S02F2V011 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes El B/W El Yes

[

1/32" Division (Scale)

Direct Li Video Procedure No.

FNP-0-NDE-100.21 VNo Li Color

[

No Li 1/32* Une (Gray Card)

L] Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examinerflnitial Terry G. Carrahe Level W]- Mirror 0 N/A Li Ambient 9j Scale Li Depth Gauge El Level Sig.

Fný-

II Examiner/56rN/A Level LIMagnifier Flashlight D. Micrometer L-Comparator Si Sig.

N/A Li CCTV El Droplight 71 Caliper

[] Weld Gauge El Date (Month-Day-Year)

_________________9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A i BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Loose Members Li11 EF Undercut w

1 wj Cracks LiI[

Li Corrosion Build-up Li Li

[

Corrosion Wi Li Gouges El Li R

Gouges

[]i[

Li Evidence of Leakage El Li 7/

Thread Damage Li Li Arc Strikes Di Li S7 Deformation Li Li Cracks Li D

7 [

Protective Coating Fi Li Other-Li Li

[

Evidence of Leakage Li Li Other*

Li

[

Li Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments Examined in-place under tension

Farley Nul,.l Jnt Visual Examination Record VT-1 C

SHARELI FNP-O-N.

00.21 Plant / Unit Line Number/Examination ArealWeld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N11 APR11-3100 S02F2VO12 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA Li Yes El B/W L] Yes

[

1/32" Division (Scale)

[] Direct Video Procedure No.

FNP-0-NDE-100.21

,VNo

[] Color W] No 7

1/32" Une (Gray Card)

Li Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examiner/initial Tlampecrra Level L[] Mirror Fi N/A Li Ambient

[] Scale Li Depth Gauge

[E Level I

Examlner/Inlt &

A-Level El Magnifier

[

Flashlight Li Micrometer El Comparator Si Sg.

N/A Fi CCTV L] Droplight El Caliper

-i Weld Gauge Li Date (Month-Day-Year) g/t17/2002

  • UN-
  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A RE BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Li

[]

Loose Members EL El Undercut Li EL W

Cracks Fi Li Corrosion Build-up Li Li Corrosion Li Li Gouges EL Li V

Gouges Ei Li Evidence of Leakage Li W,

Thread Damage El Li Arc Strikes Li Li

[I Deformation Fi Li Cracks Wi Li

[

Protective Coating Ei Li Other"*

Li Li Evidence of Leakage IVi Li Other-i]

Li

  • Provide details on unsat areas by use of supplemental data sheet.
    • Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(.

lant Visual Examination Record VT-1 SHAR L)

C FNP-I 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N12 APR1-3100 S02F2V013 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA Li Yes 13 B1W L] Yes

[] 1/32" Division (Scale)

[i Direct

[i Video Procedure No.

FNP-0-NDE-100 21

[

No El Color R No El 1/32' Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/InltliI Te Carr Level

  • Mirror E] N/A Li Ambient R Scale El Depth Gauge Li Level Sig.

11 ExamInerfinltla.A Level Li Magnifier

]

Flashlight El Micrometer Li Comparator El Sig.

N/A El CCTV Li Droplight Li Caliper El Weld Gauge E]

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[i BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Ew R1 Loose Members Ei Li Undercut

[]

El R7 Cracks Li Li Corrosion Build-up Li El R1 Corrosion El Gouges E]

E]

R]

Gouges W1 E]

El Evidence of Leakage

[

Thread Damage Li Li Arc Strikes Li Li

[]

Deformation

[]

Li Li Cracks Li Li Protective Coating Ei]

Li Other"*

Li L

r Evidence of Leakage Li1 Li Other Li

[

[]

Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments Examined in-place under tension

Farley Nu( -

,ant Visual Examination Record VT-1 R

SHAR~LD FNP-O-i 100.21 Southern Nuclea~r 0 neratln r*'nmn Pn/UtiNmeEm toAar Ved No. DrwigumerSh Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-N13 APR1-3100 S02F2VO14 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes Li B/W Li Yes 1/32' Division (Scale)

RV Direct Li Video Procedure No.

FNP-0-NDE-I00 21 EZ No Li Color

[

No Li 1/32' Line (Gray Card)

El Remote Revision No.

1.0 I N/A Equipment Lighting Tools ExaminerfinitlIal Te rrahe Level Fj Mirror Li N/A F i Ambient R1 Scale Li Depth Gauge Li Level Sig.l n fnIe I

l Li M agnifier 1

Flashlight i M ic rom eter EL C om parator El S___i____________

ig.

N/A Li CCTV Li Droplight Li Caliper Li Weld Gauge L_

Date (Month-Day-Year)

_______________________9/17/2/17200 "UN-

  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A Si BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material L]

EL

[]

Loose Members P]i Li Undercut Li Eli S

Cracks S/1

  • L El Corrosion Build-up Li Li 7

Corrosion Li Li Gouges Li Li 7

Gouges E Li Li Evidence of Leakage Li Li 7

Thread Damage 7

Li Li Arc Strikes Li EL W

Deformation Se Li L

Cracks EL i]

7 Protective Coating R

Li L]

Other-"

El L

7 Evidence of Leakage

[

Ri Li Other" Li Li

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley NuCC(_

Jant Visual Examination Record VT-1 C

SHAREL)

FNP-0-I 100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N14 APR1-3100 S02F2VO15 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA

[] Yes II B/W EI Yes

[

1/32 Division (Scale)

[] Direct LI Video Procedure No.

FNP-0-NDE-100 21 SNo LI Color R No I

1/32' Une (Gray Card)

L0 Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examinerflnitial Te her Level

[]Mirror OIN/A El Ambient Vi Scale El Depth Gauge I Levelg M i Micrometer E Comparator F7 ExaminerfInitial hA Level W7 Magnifier Flashlight M

ro%

N/A El CCTV L Droplight LI Caliper LI Weld Gauge

[]

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-1 SAT SAT N/A 9

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Matenal 0

E]

R]

Loose Members F

[]

F Undercut LI ED 7j Cracks I]

LI Corrosion Build-up FI L

I V

Corrosion

,,i V]

El

[]

Gouges 0

[]

R Gouges WL1 LI Evidence of Leakage LI DI

[

Thread Damage V1I LI Arc Strikes EL El R

Deformation L 0]

F1 Cracks El 7

S Protective Coating L1 I

1]

Other-*

LI LI Evidence of Leakage Li]

Other **I[

LI Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nuck, lant Visual Examination Record VT-1 D

SHAREL)

FNP-O-K 100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

APR1-3100-N15 APR1-3100 S02F2V016 STEAM GEN. NUTS Photos Sketch Resolution Technique WO / WA NA El Yes El B/W E] Yes 3

1/32' Division (Scale)

V Direct El Video Procedure No.

FNP-0-NDE-100.21

[

No El Color W1 No EL 1/32" Line (Gray Card)

El Remote Revision No.

1 0

/ N/A Equipment Lighting Tools ExaminerfInitlal Ter G Carraher Level SMirror El N/A El Ambient

  • Scale El Depth Gauge El Level Sig.

El Magnifier MExaminerinitial Level FMir Flashlight El Micrometer El Comparator 0l Sig_.

N/A El CcO El Droplight El Caliper El Weld Gauge El Date (Month-Day-Year)

_________________9/17/2002

'UN-

'UN WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

-]

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material E-l El 9]

Loose Members R

0 El Undercut El

]

7j Cracks REl El Corrosion Build-up

,l El

[

Corrosion 9El El Gouges El l-1 Gouges R]

E]

Evidence of Leakage El El Thread Damage El El Arc Strikes El El R

Deformation

[]l El Cracks Ell

[]

Protective Coating El E]

Other" El El

[

Evidence of Leakage El El Other""

El El Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

lant Visual Examination Record VT-1 SHAR

  • J FNP-O-0,-

100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N16 APRI-3100 S02F2V017 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA Li Yes Li B/W El Yes i 1/32" Division (Scale) 9] Direct El Video Procedure No.

FNP-0-NDE-100.21 V No II Color 91 No Li 1/32" Line (Gray Card)

] Remote Revision Ne.

1.0 N/A Equipment Lighting Tools Examiner/Initial TerryG Carraher Level Li N/A L Ambient V Scale Li Depth Gauge Li Level Sig.

Examiner/initial N/A Level Li Magnifier Flashlight El Micrometer Li Comparator El Sig.

N/A

,- CCTV El Droplight Li Caliper Li Weld Gauge E]

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[W BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material

[

F-r Loose Members i--

1 Undercut Di 7

Cracks 0i 0i Corrosion Build-up 1

Corrosion Gouges El7 Gouges Ri Li Evidence of Leakage Di D

7V Thread Damage S6 Li Arc Strikes 0

ri-- 1 Deformation Li Li Cracks Li Li R

Protective Coating Li Li Other-F 1 7 l

Evidence of Leakage Li 1]

Other Li

[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

Farley Nu(

lant Visual Examination Record VT-1 SHAR -0 FNPertn C100.21 Southern Nuc FlerOraing Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N17 APR1-3100 S02F2VO18 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes 0I B/W El Yes 3

1/32' Division (Scale)

Direct El Video Procedure No.

FNP-0-NDE-100 21 jNo D Color 41 No El 1/32" Line (Gray Card)

LI Remote Revision No.

1 0 I N/A Equipment Lighting Tools Examiner/initial Terry G r

Level S1g.."-

I

, S M irro r E N /A E l A m b ie n t

[ i S c a le L I D e p th G a u g e L I L e v e l mi n n N / A L v Examiner/initial N/A Level LI Magnifier R] Flashlight LI Micrometer LI Comparator Sig.

N/A LI CCTV LI Droplight LI Caliper LI Weld Gauge LI Date (Month-Day-Year) 9/17/2002 "UN-

  • UN L

WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

'W BOLTS, STUDS, AND WASHERS VT.1 SAT SAT N/A Ground Blend Material LI LI

1.

Loose Members L1 LI Undercut EL El F

Cracks EL LI Corrosion Build-up 0I EL 7

Corrosion LI LI Gouges LI LI R]

Gouges El LI Evidence of Leakage LI L

I

]

Thread Damage L]

EL Arc Stnkes LI El l Deformation R]

LI F

Cracks LI LI E

Protective Coating El LI Other-LI LI

[

Evidence of Leakage LI L]

Other**

LI LI "Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

lant Visual Examination Record VT-1 C

SHAREL FNP-O-(

100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley I

2 APR1-3100-N18 APR1-3100 S02F2VO19 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes El B/W" D Yes

[

1/32" Division (Scalp)

S6 Direct z] Video Procedure No.

FNP-0-NDE-100 21 SNo ED Color Vj No D 1/32" Line (Gray Card)

D Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/initial Te er Level

[] Mirror 5D N/A El Ambient W Scale D] Depth Gauge El Level Sig.

1i Examiner/initial N/

Level 0 Magnifier

[] Flashlight

[

Micrometer L Comparator D

Sig.

N/A D CCTV El Droplight D Caliper D Weld Gauge,

Date (Month-Day-Year)

___________________________9/17/2002 "UN-

  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El Rl Loose Members W]

F]

El Undercut y

[

[

Cracks

[j]

Ii Corrosion Build-up 0

E

[

Corrosion

[]

0 Gouges El El V

Gouges V]

F Evidence of Leakage El E]

[]

Thread Damage Irv*]

Fl Arc Strikes E [i 71 Deformation

[]

[

[I]

Cracks

[

E D

Protective Coating

[]

El Other-"

E El

[

Evidence of Leakage El E1 Other""*

El E

Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

lant Visual Examination Record VT-1

(

SHARED)

FNP-O-2

-100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N19 APRI-3100 S02F2V020 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA E1 Yes 71 B/W E1 Yes Y

1132 Division (Scale) 0i Direct 71 Video Procedure No.

FNP-0-NDE-100 21

[] No El Color 91 No 71 1/32" Line (Gray Card)

[] Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial Ter rraher Level 7-/ Mirror [] N/A E] Ambient 7-Scale Z] Depth Gauge EL Level Sig.

Examlnerlinltlal N/A Level

[_ Magnifier

[] Flashlight El Micrometer 71 Comparator LS

_ig.

N/A 71 CCTV 71 Droplight 71 Caliper 71 Weld Gauge 71 Date (Month-Day-Year)

_____________________________9/17/2002

  • UN-
  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

5.

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material E]

E1 S6 Loose Members 71 71 Undercut

[]

71 V Cracks LI 71 Corrosion Build-up 71 01

[]

Corrosion R1 Gouges 71 E1 R

Gouges E1 F1 Evidence of Leakage 7:1 71

[

Thread Damage F1 71 Arc Strikes 71 71 W]

Deformation 71 71 Cracks 71 71 R

Protective Coating 71 71 Other-E1 71 W

Evidence of Leakage 71 71 Other 91 71 Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

r Farley Nucm' Jant Visual Examination Record VT-1

(

SHARE,_)

FNPSO-100.21 Soulthenm N-ll*l Fnrsln ~a.

VViithmm i is

. S//*/

~

nl S

Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

APR1-3100-N20 APR1-3100 S02F2V021 STEAM GEN NUTS Photos Sketch Resolution Technique WO I WA NA D Yes 13 1/W Li Yes

[] 1/32" Division (Scale)

Z] Direct El Video Procedure No.

FNP-0-NDE-100 21

[] Nao L Color

[

No 10 1/32" Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examiner/Initial TeLry.

er Level Sig.

[ Mirror [] N/A El Ambient

[

Scale Li Depth Gauge Li Level i Magnifier Flashlight Li Micrometer L7 Comparator Examiner/Initial N/A Level gSig.

N/A Li CCTV EL Droplight Li Caliper Li Weld Gauge Li Date (Month-Day-Year)

___________________9/17/2002 "UN-

  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material li Li Loose Members Li[

Li Undercut Li Li

[]

Cracks Ri L0 Corrosion Build-up li El 7

Corrosion Li Li Gouges Li El

[

Gouges EL Li Evidence of Leakage F--

Li W

Thread Damage Li, EL Arc Strikes El Li

[

Deformation Li Li Cracks El Li

[

Protective Coating Li Li Other-Li Li Evidence of Leakage Other Li

[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Vl,/I~lI*II n,-~IIIt v acelJdll UIIUer*

Lensll)onl

Farley NuL

)ant Visual Examination Record VT-1 C

SHARED)

C FNP-0-t-100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-N21 APR1-3100 S02F2V022 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA Dl Yes El B/W El Yes

[I 1/32 Division (Scale)

[] Direct El Video Procedure No.

FNP-O-NDE-100.21 W No El Color

[] No El 1/32' Une (Gray Card)

E] Remote Revision No.

1 0

/ N/A Equipment Lighting Tools Examiner/Initial Terry G. Carra Level

-- I

~~Sig.

7

ýI

  • Mirror El N/A 0l Ambient V Scale EL Depth Gauge El Level Examiner/Initial N/A Level El Magnifier

[

Flashlight El Micrometer El Comparator Si Sg.

N/A El CCTV El Droplight El Caliper El Weld Gauge El Date (Month-Day-Year)

_________________9/17/2002

  • UN-
  • UN El WELDS AND BASE MATERIAL VT-I SAT SAT N/A

[

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El El Loose Members El El Undercut El El

[

Cracks ElI El Corrosion Build-up El El

[

Corrosion El/

El Gouges El El Gouges El El Evidence of Leakage El El

[

Thread Damage El El Arc Strikes E]

El

]

Deformation El

[]

Cracks El El R

Protective Coating El El Other-El ] El

]

Evidence of Leakage El El Other-*

El E1 l

]

"Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined C.omments axamined in-place under tension

Farley Nu(

lant Visual Examination Record VT-I SHAR'L)

FNP-O(-

100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N22 APR1-3100 S02F2V023 STEAM GEN NUTS Photos Sketch Resolution Technique WO I WA NA El Yes 0i B/W El Yes W 1/32" Division (Scale)

[

Direct 0 Video Procedure No.

FNP-0-NDE-100.21 SNo El Color

_1 No Li 1/32' Line (Gray Card)

El Remote Revision No.

1 0

/

N/A Equipment Lighting Tools Examl raher Level Rl Mirror El N/A Li Ambient 7V Scale m Depth Gauge El Level S

Examiner/initial N/A Level LMagnifier

ý Flashlight

[S Micrometer Li Comparator Li Sig.

N/A L] CCTV 17 Droplight El Caliper

[] Weld Gauge Li Date (Month-Day-Year)

_____________________________9/17/2002 r--

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Di

-[

Loose Members Undercut El

[]

i Cracks

-i Li Corrosion Build-up Ei

[]

r Corrosion Rj 0

M Gouges Li L

[j Gouges IV]

EL 0

Evidence of Leakage L

l Li Thread Damage Wi Li Arc Stnkes Li Li

[

Deformation L_

7i Cracks Li Li l

Protective Coating Li Li Other-L Li

[

Evidence of Leakage IV Li Other **

Li Li

  • Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments Examined in-place under tension

Farley Nu(

lant Visual Examination Record VT-1 SHAR J)

FNP-O-r 100.21 Southern Nuclear QOeratina Comoanv Plant I Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N23 APR1-3100 S02F2V024 STEAM GEN NUTS Photos Sketch Resolution Technique WO I WA NA l Yes Li B/W LI Yes 1/32' Division (Scale)

Direct LI Video Procedure No.

FNP-0-NDE-100.21 71 No E] Color No L

1/32 Line (Gray Card) i Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examiner/Initial Terry G Carraher Level Sig.

[] N/A L Ambient

%ti Scale

[] Depth Gauge El Level Examiner/initial *A Level Li Manfe

[

lslih

] Micrometer Li Comparator Li _________SIg.NI L*Manfir

[

Flashlight Si.N/A Li CCTV I

Droplight L Caliper r-Weld Gauge

[]

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN

[] WELDS AND BASE MATERIAL VT-1 SAT SAT N/A R

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Ll w]

R Loose Members F1 El D

Undercut El Li r

Cracks Li Li Corrosion Build-up Li

[

Corrosion IV L0 Gouges F7 Li

ý Gouges Li, 0L Evidence of Leakage Li Li 7

Thread Damage Li Li Arc Strikes D i

'Li Deformation 6

E]

Li Cracks

[7 Li 7

Protective Coating Li Li Other-Li Li W

Evidence of Leakage Li

[]

Other Ei Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined comments Examined in-place under tension

Farley NucJ(_

jant Visual Examination Record VT-1 C

SHAR L,,vthan w

iiuIar Ulh&II

  • I,ly Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N24 APR1-3100 S02F2V025 STEAM GEN. NUTS Photos Sketch Resolution Technique WO / WA NA LI Yes B/

BWN

[]Yes 1/32' Division (Scale)

R Direct El Video Procedure No.

FNP-O-NDE-100 21 V No I Color

[] No LI 1/32" Une (Gray Card)

LI Remote Revision No.

10 N/A Equipment Lighting Tools Examiner/inltlal Terry 0.rraher Level 61g.

Wj Mirror 0, N/A EL Ambient Vi Scale EL Depth Gauge LI Level n

Examiner/Initial N/ A Level LI Magnifier R Flashlight LI Micrometer EL Comparator LI Examiner/initial 61g.

N/A EL CCTV LI Droplight LI Caliper LI Weld Gauge lI Date (Month-Day-Year)

  • UN-Date (Month-Day________9/17/2002 EUN-

"UN LI WELDS AND BASE MATERIAL VT-I SAT SAT N/A V BOLTS, STUDS, AND WASHERS VT-i SAT SAT N/A Ground Blend Material LI

]

LI V

Loose Members LI LI Undercut LI LI J

Cracks LI LI Corrosion Build-up LI LI

[]

Corrosion LI LI Gouges

[]

LI F

Gouges R]

LI Evidence of Leakage LI LI 0

Thread Damage LI LI Arc Strikes LI L

Deformation LI LI Cracks z

LI Protective Coating LI LI Other**

  • L..*

LI

[%

Evidence of Leakage LI LI Other~ **I[

LI Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension FNP-O-100.21 Southern Nil~n I

nnrfn nn*

Farley Nuc(

'ant Visual Examination Record VT-1 C

SHARED FNP-O-I 100.21 Soutllherrn Mud-l~l 0~npln

  1. 1 mnr%

'J ompJrI*yJ. I Plant / Unit Line Number/Examination AreaiWeld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N25 APR1-3100 S02F2V026 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA El Yes Bl B/W El Yes

[

1/32" Division (Scale)

Direct

[]Video Procedure No.

FNP-0-NDE-100.21

[

No El Color

[

No El 1/32" Line (Gray Card)

El Remote Revision No.

1 0

/N/A Equipment Lighting Tools Examiner/Initial Teny G Carrah Level Vi Mirror E] N/A El Ambient R

Scale El Depth Gauge El Level Sig.

Examiner/in-'al N/A Level El Magnifier W Flashlight E Micrometer El Comparator Sig.

N/A I] CCTV El Droplight El Caliper El Weld Gauge El Date (Month-Day-Year) 9/17/2002 "UN-

  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A S/

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 7,

El R

Loose Members E] l:1 Undercut El El 9J Cracks IV El El Corrosion Build-up El El 9

Corrosion

[]El El Gouges El E

W]

Gouges El El Evidence of Leakage El 0

[El Thread Damage

[l El Arc Strikes El El S/

Deformation El El Cracks El El R]

Protective Coating El El Other-E El R1 Evidence of Leakage El El Other

  • El El

[

Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nut(

ant Visual Examination Record VT-1 SHARuu ear LrLINg Company Plant / Unit Line Number/Examination ArealWeld No.

Drawing Number Sheet Number Farley

/

APR1-3100-N26 APR1-3100 S02F2V027 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA Li Yes Li B/W Li Yes 1/32 Division (Scale)

[/1 Direct Li Video Procedure No.

FNP-0-NDE-100 21

ýI No E-Color r1 No El 1/32" Line (Gray Card)

Li Remote Revision No.

1 0

/ N/A Equipment Lighting Tools Examiner/Initial Ter G Carraher Level V Mirror El N/A Vi Ambient Scale

[] Depth Gauge g

Level.

Li Magnifier 0

Fashlight Li Micrometer Li Comparator i

Examinerlinitial NýA Level Manfe lslgtSig.

N/A Li CCTV El Droplight EL Caliper

[] Weld Gauge El Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN i

WELDS AND BASE MATERIAL VT-1 SAT SAT N/A R

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material Li Li R

Loose Members L][i Li Undercut Li Li Cracks EL Li Corrosion Build-up Li Li W

Corrosion El Li Gouges Li Li Gouges Li

[]

Evidence of Leakage Li Li

[

Thread Damage EL li Arc Stnkes Li Li 7

Deformation E]

Li Cracks

[]

iD 9

Protective Coating Li Li Other-Li EL rk Evidence of Leakage Li Li Other Li

[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension SHARLD FNP-0-4, 100.21 Q-#uairgLhE~pn

Farley Nu c, ant Visual Examination Record VT-1

(

SHAREL)

FNP-oOr 100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-N27 APR1-3100 S02F2V028 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA D Yes M

B/W

[

Yes W7 1/32' Division (Scale)

RD' Direct Video Procedure No.

FNP-0-NDE-100 21

'-j' No I Color No Dl 1/32" Line (Gray Card)

ED Remote Revision No.

1.0

/ N/A Equipment Lighting Tools Examlner/Initlal Terry G. Carraher Level El N/A ED Ambient W Scale D Depth Gauge

[ Level Sig.

Examiner/Initial N/A Level IMagnifier 1

Fashlight

[

Micrometer El Comparator D_

sig.

N/A

[ CCTV 0 Dropiight El Cairper D Weld Gauge Date (Month-Day-Year)

_______________________9/17/9/17200

'UN.

  • UN WELDS AND BASE MATERIAL VT-1 SAT SAT N/A B

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 11 E]

S Loose Members i R Undercut "W"

Cracks Lr.]

El Corrosion Build-up LI LI j

Corrosion D

Gouges 0

[]

Gouges L]

LI Evidence of Leakage

[]

1:

Thread Damage EI lI Arc Strikes ID LI 0

Deformation LI L]

Cracks F]

DJ Protective Coating D-

[]

Other-*

LI R 7 Evidence of Leakage

[]

Other *0 F_]

Provide details on unsat areas by use of supplemental data sheet.

    • Provide details on other areas examined uomments Examined In-place under tension Revision 1.0

Farley NucE

'ant Visual Examination Record VT-1 C

SHARED FNP-O-100.21

  • nuhnr ilPI~lrNP-r0t-n 100.21ni Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N28 APR1-3100 S02F2V029 STEAM GEN. NUTS Photos Sketch Resolution Technique WO / WA NA I Yes Li BAW

[

Yes 1/32" Division (Scale)

Vd Direct

[]Video Procedure No.

FNP-0-NDE-100.21 Vi No K Color R-No J 1/32" ine (Gray Card)

K RemoteRis 1.0

/'N/A Equipment Lighting Tools Examiner/initial Terry G Ca Level SM irror

__- N /A L A m bient VS cale D epth G auge Level E ai n 7

7 Examiner'/nM'/ ALel Magnifier

%_ Flashlight Micrometer Comparator

_-.__Sig.

N/A L CCTV K Droplight Caliper

'_ Weld Gauge L__

Date (Month-Day-Year) 9/17/2002 "UN-

  • UN K WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[i BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material EJ R

Loose Members Undercut E

R Cracks

-E Corrosion Build-up

[I Re I Corrosion 0 K Gouges

[

Gouges K

Evidence of Leakage K

K

]

Thread Damage K

K Arc Strikes

[]

K

ý_i Deformation 0 K Cracks K

K Protective Coating R

Kl K1 Other-"

[]

[

Evidence of Leakage

[]K[

K]

Other **

El K:.[1

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension

Farley Nuc-ant Visual Examination Record VT-1 D

SHAREL)

C FNP-0-h 100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N29 APR1-3100 S02F2V030 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA DI Yes

[I B/W 7I Yes i 1/32 Division (Scale)

E Direct 0I Video Procedure No.

FNP-0-NDE-100 21 V No LI Color V No LI 1/32" Line (Gray Card)

LI Remote Revision No.

1.0

/

N/A Equipment Lighting Tools Examiner/Initial Te arr Level SMirror Ew N/A L Ambient Vj Scale LI Depth Gauge LI Level Sig.

n

=

. f it Examiner/Inltial Ai<

Level El Magnifier Flashlight

[

Micrometer

[

Comparator

_Sig.

N/A FI CCTV El Droplight LI Caliper LI Weld Gauge I]

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN Ill WELDS AND BASE MATERIAL VT-1 SAT SAT N/A

[] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El El R

Loose Members se 0

11 Undercut

]

[]

[W1 Cracks F0 LI El Corrosion Build-up LI L

[]

Corrosion LI LI Gouges El LI W

Gouges LI LI Evidence of Leakage LI LI

[]

Thread Damage V]

LI Arc Strikes LI LI

[

Deformation R1

]l Cracks EL LI 7

Protective Coating nI LI Other-EL LI W

Evidence of Leakage LI lI Other-LI LI 1

Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments Examined in-place under tension ANII Review Date Reviewed By Level Date S..

(

Revision 1.0 (I

Farley Nu(

,ant Visual Examination Record VT-1 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley 2

APR1-3100-N30 APR1-3100 S02F2V031 STEAM GEN. NUTS Photos Sketch Resolution Technique WO / WA NA D Yes

[] B/W

[] Yes 1/32" Division (Scale) rIV Direct rz Video Procedure No.

FNP-0-NDE-100 21 SNo

[] Color

-- No LI 1/32" Une (Gray Card)

LI Remote Revision No.

1.0 N/A Equipment Lighting Tools Examiner/initial Te rraher Level Sig.

[] Mirror [7 N/A El Ambient

  • Scale L Depth Gauge LI Level Examiner/initial N/ A Laval LI Magnifier

[

Flashlight El Micrometer ED Comparator mriSig.

N/A LI CCTV LI Droplight El Caliper

[] Weld Gauge L_

Date (Month-Day-Year)

F~at (Moth-ay-Yar)9/17/2002

  • UN-
  • UN LI WELDS AND BASE MATERIAL VT-I SAT SAT N/A R

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 11

[]

R Loose Members E]

R Undercut E]

El 7

Cracks LI Cl Corrosion Build-up LI I

7 Corrosion l

El Gouges 0

S/7j Gouges LI LI Evidence of Leakage

[]

LI r

Thread Damage LI LI Arc Strikes EI L]

L Deformation LI EL Cracks El Sel Protective Coating MI LI Other-LI I

5.

Evidence of Leakage

,LI 1_1 Other **

LI

[]

,I

  • Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension SHARLD FNP-(

'100.21 Soullha-KI.l~

  • ,,*ll..r.--..

Farley Nuc

,ant Visual Examination Record VT-1 C

SHARED SHAREL) p0. a,,GC oImpa ll y

Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N31 APR1-3100 S02F2V032 STEAM GEN. NUTS Photos Sketch Resolution Technique wO I WA NA SYes L B/AN L Yes

[i 1/32' Division (Scale)

I Direct Li Video Procedure No.

FNP-0-NDE-100.21 SNo LU Color No 7-- 1/32' Line (Gray Card)

Li Remote Revision No.

1.0

/ N/A Equipment Lighting Tools ExaminerfInitial Te G. Carrahe Level V Mirror IL N/A Ambient

['

Scale Depth Gauge Level L] Magnifier V-fashlight Li Micrometer Comparator L_

Examlner/Initla

/IA Level FlslgtSig.

N/A Li CCTV 7l Drplight EL Caliper

[] Weld Gauge

[]

Date (Month-Day-Year)

Droplight__Date__________________9/17/2002

  • UN-

"UN LU WELDS AND BASE MATERIAL VT-1 SAT SAT N/A i BOLTS, STUDS, AND WASHERS VT-I SAT SAT N/A Ground Blend Material i-R-

Loose Members Li1 Li Undercut Ei Cracks Li 0i Corrosion Build-up Li l i

L Corrosion EL 0i Gouges Li Li r

Gouges Li Li Evidence of Leakage 7l Li Thread Damage 15[1 Li Arc Strikes Li Li

[]

Deformation EL ni Cracks w

L

[

Protective Coating 0i Li Other-EL Li

[

Evidence of Leakage Li Li Other~ **[

Li Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in-place under tension FNP-O(-

100.21 Revision 1.0

Farley Nuc(_

iant Visual Examination Record VT-1 SHARED)

FNP-O-r 100.21 Southern Nuclear Operating Company Plant I Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-3100-N32 APR1-3100 S02F2V033 STEAM GEN. NUTS Photos Sketch Resolution Technique WO I WA NA 0 Yes El B/W 1-Yes

[

1/32" Division (Scale)

[1 Direct El Video Procedure No.

FNP-O-NDE-100.21 Ij No ED Color rj No D 1/32" Une (Gray Card)

El Remote Revision No.

1.0 I N/A Equipment Lighting Tools Examiner/Initial TeintG Carbpr Level Ej AmientSig.

5] Mirror 7 N/A sl Ambient i Scale El Depth Gauge L] Level Examiner/inlt

/A Level El Magnifier Vi Flashlight El Micrometer El Comparator Si]

Sg.

N/A El CCTV I

Droplight El Caliper El Weld Gauge El Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN WELDS AND BASE MATERIAL VT-1 SAT SAT N/A Se BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material El El

[]

Loose Members

[]

11 n

Undercut D

El R]

Cracks El 11

[]

Corrosion Build-up L]

El R1 Corrosion

[ý]

El E

Gouges E]

Ri Gouges

[l El Evidence of Leakage D

R1 Thread Damage Rl El Arc Strikes EI D

l R

Deformation R

El Fl Cracks

[]

[]

[]

Protective Coating El l]

Other*"

l

[

Evidence of Leakage

[-

El Other **

El]

[]

Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments Examined in-place under tension Revision 1.0

1.4

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-4100 REACTOR COOLANT PIPE LOOP 1 ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NPI RI NI NRI RI NI NM I

RI 25RDM X

X 26RDM X

X

.5 44-.5 I -

.1BI.

I. -

£ U

44-

.5-5-4-5I.

I. .5 9

4 4-

.5-1-4 I. -.

5 U 99-

  • 14-5 I. -

I -.

5 I-4---4-4-4-4-5-I.-1-I.

1-4-4-4-4-4-4-I

-4 1-4-4-4-4-4-4-I

-4 1-4-4-4-4-4-4-I I-I.

l-4-4-4-4-4-4------l I-I.

1-4-4-4-4-4 1-4-I.

I-t-I-t-4-4-4-4-4-I l-t-I-*-4-4-4-4-4-I.

FNP-2-M-097 CONTAINMENT REACTOR COOLANT PIPE APRJ-4100 LOOP I REACTOR COOLANT PUMP TE-412 11 C/D, (REF.)

APR1-4103---

U--208713 6"CCA-22

,-3CA1 20(BC) 24]

CAPPED STEAM APRI-4105

/

I-4 GENERATOR 4"CCA-15 131' CA-12H 18(3C) 26R(DM)

APR1-4102--6

?.

21(BC) 17(BC) 5R CAPRI-4106

\\.

22(C)

APR1-4108 -

APR1-406 41206238

..--23(C)c zD-206238

,,-X25R(DM) 12 TE-412-U-208713 4

S- _ --

\\

A PR' I-4 10 4

\\ --

U - 2 02 2 2 4 14(DM)

TE-413 1-' CA"-

15(BC) 6,DCCA (REF.)

r AP I -42'CA101 2TYPE DULANTITY FNP-FIG CAL BLOCK TE42\\

TE-1 BUTT WELD 2

VARIES 012 E-4B3

-BUT

___T VARIE 012

/APR-33__

TE42 A/3 BUTT 'WELD 1

3" Oi1 N/A SOB RE.

CKET 'WELDS 0

N/A

,N/A N/A (REF.)

I DISSIMILA ALA

. LA 4-0 0A 0 4oo C,

6 p,0.

£

).

-u CL QL o

uC L

.~-0 L W L

L o L OLU L>.

C1 0.c W

o X

a~O wo o uA~.

u a,

5-CIMP SUPPORT 3

N/A 037 N/A LINE NUMBER.Q2-B13-CCA-10 BOUNDARY DIAGRAM D-356354 SH. I Q2-BI3-CCA-12 REFERENCE ISO'S D-515996 SH I AND SH LINE SIZF2 7.5'I,D.CCA-10;29"I.D, CCA-11,31'I.D.CCA-12,3"CCA-19 4

3-15-02 DFV JAR REV. IN REF. TO DCP 97-2-9316, 001-0061 DEW 0

11-22-91 SDH JAR ISSUED PER PCN S-91-2-7763, CAB/JAR HGM KCFOrAl-DML REV.

DATE BY CHK'D DESCRIPTION APPR I APPR 2 APPR 3 APPR 4 Southern Company Services, Inc. f-o B13-REACTOR COOLANT-LOOP 1

METAL WELDSZA_1 VARIE1 012 ALA-RV-7 BRANCH CONN 5

A 4

014 ALA/APR-33 BRANCH CONN 3

4 (

014 N/A VELDED SUPP 0

N/A N/A N/A I)

ALABAMA POWER COMPANY SCS DRAWING NUMBER SHEET REV.

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 1

A-356454 17 4

I

WELD EXAMINATION

SUMMARY

SHEET Sheet NoL S02F2S080 Weld Number:

APR1-4100-25RDM Examination Area:

SAFE-END TO NOZZLE Flur No.

Procedure Cal Block Exam Requirements APR1-4100 FNP-0-NDE-100.5 ALA-53 B-F/B5.70/

FNP-0-NDE-100.31 The following data sheets are included in this package Data Sheet No.

Angle Results Remarks S02F2P003 NI S02F2U046 45 NI S02F2U048 Weld Profile Comments:

Nozzle limits examination. 75% coverage. See RR-46 (Descie lirmtation In comments)

Percent on required area examined - Surface 100 Percent of required volume examined - Volumeftc 75 Relief Request Number/Required?

RR-46 Code Case used (ff applicable)

N/A IER Number (if applicable)

N/A ITS Revlew__ J Date:________

I I

C Farley Nuclear Plant Ultrasonic Calibration and Examination Record SHý ýED FNP-0-NDE-100.31 Southern Nuclear Operating Company Unit Sketch/Component Number Date Sheet No.

2 APR1-4100.25RDM 9/24/2002 S02F2U046 Page of Procedure/Rev./TCN Couplant/Batch No.

f ThermometerSN/Cal Due Date Linearity Sheet No.

FNP-0-NDE-100.31 80 N/A Ultragel II I

01125 48890 2/5/2003 S02F2L005 Instrument Search Unit i

Calibration Block Axial Scan Calibration Circ Scan Calibration Isrmn ItvlyI OI 3

Instrument Staveley/SONIC 136 Transducer Mfg.

KBA Cal. Blk. No ALA-53 Cal.

Signal Sweep Wmax Cal.

I Signal Sweep Wmax SraNo1390KRefl.

Amp.

Div.

RefI.

Amp.

Div, Serial No. 136-905K Serial Number 008NXR/008NXV Thickness 4.76 1/4 70 1 5 1.22 1/4 55 1.5 1.35 Axial dB Circ dB Model No.

SWS Cal. Temp 80 °F 1/2 -

8-0 30-"

245 1

80 3-2.71 3/4 80

4.

5 3

-6 3-.

6-5.

4 3 8 Reference 85 0 734 Size I No.

1 0 Shape Round Cal. In 7.50 3T 80 4.5 3 65 3/4 67_ -

__38-_

iT 80 60 485 IT 80 67 50 Scanning 85 0 734 Frequency/Mode 1 0/ Shear Cal. Chk.

NA "A" Dimension 95"C Calibration Remarks:

Reject OFF Cal. Out 10 35 Nom Angle 45° NA Frequency 1Angle 45*

Ref. BIk. No.

N/A Mode RL Cable Type / No. Conn. RG174/0 Reflector/dB NA/NA Damping 500 OHMS Cable Length 12' BNC/BNC Amp/Sweep NA % 1 NA 94

° Configuration -

SAFE-END TO NOZZLE Results lIndi %

Length NRI RI-N N°ODAC I LI Lmax L2 NA NA NA Wo Loc.

Weld C/L Reference Measurement Sweep Position WI Wmax W2 SI Smax ILo Loc.

TDC Th-ickness 32 1 "<-

CIL

-1 1Notes:

Examination/Limitation Remarks:

Nozzle limits 2 Scan Cal gain was used as scan gain per SNC Level III Examination repeated PSI Exam 45°RL scan only Total Length Crown Width Total Length of Weld Examined Extent of Perpendicular Scans (W)

Extent of Parallel Scans (L) of Weld 138 19" 5 (L)

NL 2 (L)

NA 7 and 8 (W)

NL 5-From NL to NL 2-From NA to NA From (5)

NL _to (2)

NL Primary Examiner Level

/n Initials i Assistant Examiner Level Initials Non-Technical Review Datie*

Joseph D Funyak SNC NDE Level 111111 view

-fý7 0 Pa aVden Yp.

Date i Percentage of q-L7 *o Z, Code Coverage 7 ANII Review Revision 8 0 Comp Temp.

Scan Dir.

NI 8

7 0

5 0

&Lký

Farley Nuclear Plant Liquid Penetrant Examination Record Unit Component Number 2

APR1-4100-25RDM Thermometer Mfg/Ser. No.

PTC I 48881 Cal. Due Date 2/5/2003 Surface Temp.

104 0 F Component Configuration SAFE-END TO NOZZLE S

SHARED Procedure/Rev./TCN FNP-0-NDE-100 5 FNP-O-N.jE-100.5 PT-F-FORM 001 Southern Nuclear Operating Company

/ 60 I N/A Penetrant Materials Manufacturer Magnaflux Cleaner I Remover Penetrant Developer Type SKC-S SKL-SP SKD-S2 of Length Coverage

% of Area Coverage Sheet No.

S02F2P003 Page I

of I

Batch 02E05K 96J02K 02G07K 100 Date 100 9/2112002 Id, No.

Results DwellTime Indication Desc. / Exam Limitations I etc.

NA NI 10 NA Remarks NA Ical Review Date

-Date Revision 6.

Farley Nuclear Plant S HARE FNP-0-NDE-100.35 Ultrasonic Weld Profile Report S A E Southern Nuclear Operating Company Plant/Unit

, Weld Number I Sheet Number I Date Farleyl 2 APR1-4100-25RDM S02F2U048 1

9/24/2002 ISO/Drawing Number Couplant/Batch Number Instrument Manufacturer APR1-4100 I

Ultragel II

/

01125 1

Staveley Material Type Calibration Standard/Serial Number Model Number Serial Number SS 4846 SONIC 136 136-905K Examiner SNT Level Search Unit Manufacturer IType Size Joseph D. Funyak 7

11-.A,

,--*i IKAC 7

Examiner SNT Level Serial Number Frequency NI A N/A F14920SP 225 MHz Weld Examination Record No.

I Indication No Component Configuration/Flow NA i

NA Location Component Temp °F Thermometer SIN LMAX Weld CIL WMAX TDC 94 PTC 48890 FLOW WELD EDGE COMPONENT M, -L tLE T. MEASUREMENTS O.D. PROFILE WELD EDGE COMPONENT PPE WELD CL

-I T

/

F s.i SA "

5/.

-,ts,", 4.

q.i"-],.

,~

T. MEASUREMENT EACH IN.

REMARKS:

NDE LlI,,

Level I Date Non-Technical Review IDate

/

/"

Revision 1.

WELD EXAMINATION

SUMMARY

SHEET Sheet No S02F2S081 Weld Number APR1-4100-26RDM Examinaton Area:

NOZZLE TO SAFE-END Figure Na Procedure Cal Block Exam Requirements APR1-4100 FNP-0-NDE-100.5 ALA-53 B-F/B5.70/

FNP-0-NDE-100.31 The following data sheets are included in this package*

Data Sheet No.

Angle Results Remarks S02F2P004 NI S02F2U047 45 NI S02F2U049 Weld Profile Comments:

Nozzle limits examination. 75% coverage. See RR-46 (Describe lhnitation In comments)

Percent on required area examined - Surface 100 Percent of required volume examined - Volumetric 75 Relief Request NumberdRequired?

RR-46 Code Case used (if applicable)

N/A IER Number (if applicable)

N/A

/

I' ITS Review__

Date: _-_2__-_

Farley Nuclear Plant Ultrasonic Calibration and Examination Record SHý RED FNP-O-NV)E-100.31 Southern Nuclear Operating Company Unit Sketch/Component Number Date Sheet No.

2 APRi -41 00-26RDM 9/24/2002 J

S02F2U047 Page_(-_ of/

PrceurelRev.IN-CplnBac No.

FhermometerSN/Cal Due Date Linearity Sheet NO.

FNP-0-NDE-100 31 8 0 N/A Ultragel 11 1

01125 48890 2/5/2003 S02F2L_005 Instrument 1Search Unit Calibration Block Axial Scan Calibration Clrc Scan Calibration Instrument Staveley / SONIC 136 Transducer Mfg.

KBA Cal. 81k. No ALA-53 Cal.

Signal Sweep Wmax Cal.

Signal Sweep Wmax Serial No. 136-905K SraNubr 08X/0XV Tikes46Refi.

Amp.

Div.

Refl. IAmp.

Div.

1/4 70 1.5 1 22 1/4 55 1.5 135 Axiald13 Clrc dB Model No.

SWS Cal. Temp 80 OF

_1/_2 80-30 25 1/2 80 30 2.71 Reference 850 734 SizelINo.

1 0 Shape Round ICal. In 7,50 3/4

-80 45 365 3/4-65 4 5

_38 1T 80

-60 485 1T 80 6.7 50 Scanning 85 0 73.4 Frequency/Mode 1 0 /Shear Cal. Chk.

NA "eetOF"A" Dimension 95" a.Ou 03 Calibration Remarks:

Nom Angle 45*

NA Frequency 1.0 MesAge 4

Ref. 61k. No.

N/A Mode RL Cable Type I No. Conn. RG174 /10 Reflector/dB NA/NA Damping 500 OHMS Cable Length 12' BNC/BNC Amp/Sweep NA %/I NA Scan Dir.

N 8

7 0

2 94-NOZZLE TO SAFE-END

-Results ln

%JLengiji L __NRI RI No. JDAC Li Lmax NA L2 V Re-fe-renrc-e _M~eas~u~remeint WI Wmax W2 Wo Loc.

WeI C/L Sweep Position

_J SI Smax S2 Lo Loc.

TD I"<-

C/L Notes:

Thickness NA NA Examination/Limitation Remarks:

Nozzle limits 2 Scan Cal gain was used as scan gain per SNO Level Ill. Examination repeated PSI Exam 45*RL scan only Total Length ConWdhTotal Length of Weld Examined Extent of Perpendicular Scans (W)

IExtent of Parallel Scans (L) of Weld 138" 1 185" 15(L)

NA 2 2(L)

NL 7 and 8 (W)

NL 5-From NA to NA 2-From NA to NL From (5)

NL to (2)

NL Primary Examiner Level lifilals Assistant Examiner Level Initials Non-Technical Review Dt Joseph D Funyak SNC NDE Level

~Review 1 II J$.~~2 Paul Valden it 4

Date Percentage of ANI -I -Review U

te

~~

0 7-e - o 5-

/

Date Revision 8 0

-1

Farley Nucl ear Plant Liquid Penetrant Examination Record C

SHARED FNP-0-i,41E-100.5 PT-F-FORM 001 Southern Nuclear Operating Company Unit 2

Component Number APR1-4100-26RDM Thermometer Mfg/Ser. No.

PTC Procedure/Rev./TCN FNP-0-NDE-100 5

1 I 48881 Cal. Due Date 2/5/2003 Surface Temp.

104 0 F 1 60

/ N/A Penetrant Materials Manufacturer Magnaflux Cleaner I Remover Penetrant Developer Type SKC-S SKL-SP SKD-S2 Component Configuration

% of Length Coverage II NOZZLE TO SAFE-END

% of Area Coverage II End. No.-

Results DwellT-me Indication Desc. I Exam Limitations / etc.

Remarks NA NI 10 NA NA Sheet No.

S02F2P004 Page I of

-I-Batch 02E05K 96J02K 02G07K 00 Date 00 9/21/2002 Revision 6.

Farley Nuclear Plant A

DFNP-0-NDE-100.35 Ultrasonic Weld Profile Report S A E Southern Nuclear Operating Company Plant/Unit Weld Number I Sheet Number Date Farley!

2 APR1-4100-26RDM I

S02F2U049 I

9/24/2002 ISO/Drawing Number Couplant/Batch Number Instrument Manufacturer APRI-4100I Ultragel II I

01125 Staveley Material Type I Calibration StandardlSerial Number Model Number Serial Number SS 4846 SONIC 136 136-905K Examiner I(,(\\\\.

SNT Level Search Unit Manufacturer IType

,Size Joseph D. Funyak

[

I KBA CR

.75 Examiner SNT Level Serial Number 1 Frequency N/A NIA F14920SP 1

2.25 MHz Weld Examination Record No.

Indication No Component ConfigurationlFlow NA NA NOZZLE TO PIPE Location Component Temp °F I Thermometer SIN LMAX Weld C/L WMAX TDC 94 PTC 48890 FLOW

ý WELD EDGE COMPONENT

/0o-zLEI T. MEASUREMENTS O.D. PROFILE WELD EDGE COMPONENT P, PE E-1.,&

WELD CL I

t.

4 SAS 4q 4.

T. MEASUREMENT EACH o 2,_

IN.

REMARKS:

NDE L-III Review Level Date Non-Technical Review Date I F

/

/

Revision 1.

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-4101 12" RHR TAKE-OFF (HOT LEG) LOOP 1 ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI NRI RI Q2EIIlV001B (B)

X Q2EllIV016B (B) x

= 7:ý 1= t - V 2 iINn c3EWr, I !)Nl^ Ja INV-ld dV3-13nN A3-IaVj W -id3SDF

-ETE I LNV-1003 alOL13V3a AETE -JOJ:)Ul 'SGDIAJarý AU-OdUC3 ujaujýxicc, NOlidjd:!3a a AH nva I "\\--d

+/-LL-

.1-9 1

E91-L-2-16-S -N3d d3d GYISSIý 5 v T-F H a

-sj, IE-22-11, 3 C. I U A I

I A ý F-I 14-oP-,

91-VJD.2!

3ZIS 3NI HS I

,OSI HS 9i-v33-Em-2-o a---ENnN 3N!

W 09 1 L

Farley Nu cf'_

)ant Visual Examination Record VT-1 C

SHARED C

FNP-04 100.21 Southern Nuclear Operating Company Plant I Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-4101-QV001B (B)

APR1-4101 S02F2V068 VALVE BOLTING Photos Sketch Resolution Technique WO I WA NA 0l Yes Fl B/W 0

Yes R1 1/32" Division (Scale)

Direct 01 Video Procedure No.

FNP-0-NDE-100 21 V No El Color W_ No 10 1/32" Line (Gray Card)

El Remote Revision No.

1.0

/ N/A Equipment Lighting Tools ExaminerfInitial Manfred Greli Level Ve, cal El ept Gaue LvelSig.

[V Mirror E] N/A E Ambient Scale L] Depth Gauge L] Level Examiner/Initial N/A>'

Level El Magnifier

[

Flashlight

[L Micrometer Si Comparator E]

Sig.

N/A El CCTV El Droplight El Caliper Fl Weld Gauge L]

Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN El WELDS AND BASE MATERIAL VT-1 SAT SAT N/A S] BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material 10 El R

Loose Members

[l El Undercut 7l

[]

Cracks

[]

El El Corrosion Build-up 7-0]

7 Corrosion 0

0E Gouges El El

[]

Gouges Z/

E]

El Evidence of Leakage El El

[]

Thread Damage

[]l El Arc Strikes El E,

Deformation 0l El Cracks E

El

[]

Protective Coating El El Other-El El 7

Evidence of Leakage

[]El El Other "*L_

El Provide details on unsat areas by use of supplemental data sheet.

"Provide details on other areas examined Comments NA Revision 1.0

Farley NuC lant Visual Examination Record VT-1 C

SHAREL)

FNP-O-100.21 Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

APR1-4101-OVO16B (B)

APR1-4101 S02F2V111 VALVE BOLTING Photos Sketch Resolution Technique WOIfWA NA SYes D-1 B/W Li Yes V

1/32" Division (Scale) v Direct F. Video Procedure No.

FNP-0-NDE-100 21 v_ No L-7 Color v No t--

1/32" Line (Gray Card)

Li Remote Revision No.

1.0 I

N/A Equipment Lighting Tools Examiner/Initial Terry G Carr er Level v S Mirror

[N/A J Ambient

  • Scale Depth Gauge Li Level Examiner/InItial N/A Level

- M icrom eter Com parator

,r-I Sig.Le l

. Magnifier V' Flashlight

" 'o.N/A CCTV Droplight Caliper Weld Gauge Date (Month-Day-Year) 9/18/2002

  • UN-
  • UN WELDS AND BASE MATERIAL VT-1 SAT SAT N/A V

BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material

[_

Loose Members

_-]

[]

Undercut r

Cracks V

]

[1-_

Corrosion Build-up

'v Corrosion L-L_

Gouges

[

[7 V

Gouges r

F]

Evidence of Leakage Thread Damage F]

-]

Arc Strikes j

v Deformation

_i

[.

Cracks 1

7 Protective Coating Other-*

L]

Li V

Evidence of Leakage 1

Other "i Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined Comments Examined in place - under tension Revision 1.0

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-4102 12" ACCUMULATOR DISCHARGE (COLD LEG) LOOP 1 ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI NRI RI Q2E21V032A (B)

X I

i i-w-

i-i 0-i-

1-0 5

i t

w-m-

i-a i

i I

i i

i m

i N

i I 4-I l-t-I-*-4-f 4-4-I A

i i

m m

i 9

i p

0 m

i i

i i

i m

s I

a-5 a

i w

i i

v i

i i -

0 i

i m

m i

m i

v 0

12' ACCUMULATOR DISCHARGE (COLD LEG)

LOOP I

-3/4"CCA-24(REF.)

(AEr.)

'U O)

(9D

Farley Nu* 2

'lant Visual Examination Record VT-1 CS SHARED C

FNP-OI-100.21 Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-4102-0V032A (B)

APRi-4102 S02F2V112 VALVE BOLTING Photos Sketch Resolution Technique WO I WA NA Yes H B/W H Yes 1/32" Division (Scale)

Direct Li Video Procedure No.

FNP-0-NDE-100 21

'v; No F] Color

' No 1/32" Line (Gray Card)

.] Remote Revision No.

1 0

/

N/A Equipment Lighting Tools Examlnero rry G Carr Level

%'Mirror N/A Ambient Scale Depth Gauge r i Level Sig.

I -

A Examiner/Initial N/A Level

- Magnifier r

Flashlight i

Micrometer Comparator Slg.

N/A

-J CCTV Droplght Caliper Weld Gauge Li Date (Month-Day-Year)

Droplight Date_______________

9/18/2002

  • UN-
  • UN i

WELDS AND BASE MATERIAL VT-1 SAT SAT N/A BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Matenal Loose Members

-J[

L]

Undercut Cracks LI Corrosion Build-up 1

0/

Corrosion

]

L_]

Gouges 7

V, Gouges r-]

Evidence of Leakage Thread Damage I

L]

1i Arc Strikes Deformation VI F]

Cracks H

Protective Coating F

r-I Other-Evidence of Leakage

-I Other~

F*][-,

Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined CoUmments ExaminImlreU in place - under tension

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-4109 2" and 1 %" SEAL INJECTION LOOP 1

Farley Nu(

'Ilant Visual Examination Record VT-1 SHAR L)O Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-4109-FLG-1 APR1-4109 S02F2VO01 FLANGE BOLTING Photos Sketch Resolution Technique WO I WA NA Li Yes L B/W El Yes

[

1/32" Division (Scale)

R Direct El Video Procedure No.

FNP-0-NDE-100.21

[

No i Color V No Li 1/32" Line (Gray Card)

Li Remote Revision No.

1 0

/ N/A Equipment Lighting Tools Examiner/lnltlas Carraher Level S~~~Sig.

F' I

[ Mirror Lý N/A Li Ambient Scale Li Depth Gauge Li Level Examiner/lnlital N/A Level Li Magnifier 1 Flashlight

[] Micrometer 7i Comparator Li Sig.

N/A LCCTV Li Droplight L

Caliper Li Weld Gauge Li Date (Month-Day-Year) 9/17/2002

  • UN-
  • UN.

Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A N! BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material L]

Li R]

Loose Members IVi Li Undercut Li Li w

Cracks LiI Li Corrosion Build-up El Li 5

Corrosion SLi1 0i Gouges Li Li

[

Gouges Li[

E L

Evidence of LeakageLi Li 7

Thread Damage Li Li Arc Strikes Li

[]

Deformation Li Li Cracks Li Li

[

Protective Coating Li]

l

[]

Other-Li L

r Evidence of Leakage Wi E

L Other-Li L

Provide details on unsat areas by use of supplemental data sheet.

Provide details on other areas examined FNP-0-[i

.- 100.21 Southern Nuclear Operating Company CUommintls SUIlIIIg exarmIie in -place under tension

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-4302 12" ACCUMULATOR DISCHARGE (COLD LEG) LOOP 3 ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI INRM RI Q2E21V032C(B) x Q2E21V037C (B) I X

m i

i m-v

-i I-t-t-*-4-4-.5-I 0

i v

m I

i 9

v i

0 A

i i

m i

i 0

i i

ff i

i i

m i

i m

i i

i

12' ACCUMULATOR DISCHARGE (COLD LEG)

.LOOP 3 3/4 'CCA -,?

189*'" 7 r2.R7 31

  • U7 r

14 J4 mJ 9J-

1.

L INE NUMB*ER, Q-2-E21-CCA-24

]BOUNflARY DIAGF LINE SIZE 12' CCA-24 0

1-22--91----

l*',

DTY E

O>XMY SM:K" IF£,-

CAL X 2*IC)(REF.)

"FOR CONT. SEE APRI-4 300 A.- 27.5' I.D. CCA-10

Farley Nu (

lant Visual Examination Record VT-1 SHARLO Southern Nuclear Operating Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-4302-QV032C (B)

APR1-4302 S02F2V119 VALVE BOLTING Photos Sketch Resolution Technique WO I WA NA

[iYes B/W Li-1 Yes W 1/32" Division (Scale) 1 Direct

_] Video Procedure No.

FNP-0-NDE-100 21 V No F] Color

"'4, No Di 1/32" Line (Gray Card)

Li Remote Revision No.

1 0

/

N/A Equipment Lighting Tools ExaminerfInitial Terry G. Carr r

Level Sig.

Wj Mirror I] N/A DI Ambient Vi Scale 1 Depth Gauge El Level

2Mg, Examiner/nitial N/ A Level Magnifier

-Flashlight

] Micrometer Comparator EI Sig.

N/A CCTV Droplight LI Caliper

[] Weld Gauge

[-_

Date (Month-Day-Year) 9/21/2002

  • UN-
  • UN

[I-WELDS AND BASE MATERIAL VT-1 SAT SAT N/A V BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material F]

V]

i Loose Members El Undercut 7] 1 W,

Cracks F]

F]

Corrosion Build-up El 0

V3 Corrosion F]

Gouges Li D]

W Gouges Li F]

Evidence of Leakage

[]

[]

Thread Damage

ýi L_

L_

Arc Strikes El Ei,

Deformation

_j D]

Cracks Li F]

Protective Coating

-i Li Other-F[]

F Evidence of Leakage

-J1 Other LA Provide details on unsat areas by use of supplemental data sheet

    • Provide details on other areas examined Comments Examined Inplace-under tension Revision 1.0

Farley Nu(

'lant Visual Examination Record VT-1 C

SHAREL)

FNP-0-i 100.21 Southern Nuclear Operatinq Company Plant / Unit Line Number/Examination Area/Weld No.

Drawing Number Sheet Number Farley

/

2 APR1-4302-0V037C (B)

APR1-4302 S02F2V113 VALVE BOLTING Photos Sketch Resolution Technique WO / WA NA

_ Yes B/W

_] Yes 1/32' Division (Scale)

_ Direct 71 Video Procedure No.

FNP-0-NDE-100 21

%-. No

-_ Color V; No 1/32" Line (Gray Card)

- Remote Revision No.

1 0

/

N/A Equipment Lighting Tools Examlner al Pau DiValere' Level Sig.

D, v%

Mirror E N/A Ambient v Scale

,Depth Gauge W Level al

/

E 7:micrometer Comparatorllia N/A_

Leg.vN/

Magnifier

ýV Flashlight Comparator Sig.

N/A C,--V Caliper Weld Gauge F-7e(MnhDa-er r-]CT

  • Droplight Ca-e 2TV DrWeldo t

Date (Month-Day-Year) 9/19/2002

  • UN-
  • UN Li WELDS AND BASE MATERIAL VT-1 SAT SAT N/A Vi BOLTS, STUDS, AND WASHERS VT-1 SAT SAT N/A Ground Blend Material j -]

Loose Members Li

[]

Undercut Cracks LI

[I Corrosion Build-up I -

Corrosion

[_

LI Gouges f-Gouges

[7 Evidence of Leakage Thread Damage

-]

Arc Strikes Deformation I

Li Cracks..

Protective Coating 1

Li Other** -

Evidence of Leakage

'S Lj

-I Other*

Li i

Provide details on unsat areas by use of supplemental data sheet Provide details on other areas examined Comments Examined in place-under tension

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-4501 6" PRESSURIZER SAFETY LINE ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NIJ NRJI RI NI NRI RI I DM X

EX 4.4.1.4a 5-4.

-4.-a. 4.

a. -

I -

.4-a 5-4.

4.-.S.-

4-4-4.-I a

54.-I.

.5.

44.
4. -

I 4

4 4-4 if 1

I -

  • t-t 4.-

I -

.9-5 I-t-I-*-4-+-4-4-4-I 5-4.14.

.L L

£

.1 a

5-4.

I -

a. -
4.
4.

.4

.L a

5-4.

I -

a.
i.

£

.1

.4 a

5-4.-I

.5.

51.

£ -

.A -

a 5-4.-I-

a. -

S -

I. -

a. 

.&

a 5-4.-I-

.. 4.

a. -.

4-4.

a 5-4.-I-a. 4.-..-

4-4-5 4.-

4.-I-a.

4-4.-4.-

4-4-5 4.-I.-

1-4. 4.-a.-

4-4-5 4.-

4.-I-

4.
44.

4-4-5

FN-- M-057 APRI-4501 CONTIMN NOZZLE ABOVE(REF.)

  1. 9(REF.)

JIKTVELDI BRNC

ý H /A F-NP-F-r N/A I CLI.

SUPPORTI3 1 N/A T037

-T

/IA LINE NUM13ER, D-2-B13-CCA-20 BOUNDARY DIAGRAM 13-35635,4 SH. 2-EFERENCE ISO'S D3-515453 SH. I LINE SIZEt6' CCA-20 CFAL. -RLDK APP-1 NAL.

N/A N/A 011-22-91 SDH JAR JISSUED PER PCN S-91-2-7763, CAB/AHON RKC:/A DML REV.

DATE BY CI4('

]XSCR~flIN APPRJ A PPR.21 APP3 APPRA Souxthern Comipany Services, InceBBIT= REACTOR COOLANT ALABAMA POW~ER COMPANY JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 SCS DRAVING NUMBRER SH=

PEV.

A-35CD454 57 6' PRESSURIZER SAFETY LINES 6.

Mi u 1 L

I

WELD EXAMINATION

SUMMARY

SHEET Sheet Noa S02F2S082 Weld Nunber APR1-4501-1DM Examination Area:

PRZ NOZZLE TO SAFE-END Fiqure No.

Procedure Cal Bloek Exam Requirements APR1-4501 FNP-0-NDE-100.5 ALA-5 B-F/B5.40/

FNP-0-NDE-100.31 The following data sheets are included In this package, Data Sheet No.

Angle Results Remarks S02F2P002 NI S02F2U021 45 NRI S02F2U022 45 NRI S02F2U023 450 NRI S02F2U024 60 NRI Comments:

Ultrasonic examination limited by nozzle geometry. Examination volume with composite 45/ 60 examinations was 92%. Surface examination was 100%. No relief request required. Examination was performed with shear and refracted longitudinal waves.

(Describe limitatin In comments)

Percent on required area examined - Surface Percent of required volume examined - Voiwnetric Relief Request NumnberdRequired?

Code Case used (if applicable)

IER Number (if applicable)

ITS Review:.

A--

4 100 92 N/A N/A N/A Date: 2-27-o2-

/

/

Farley Nuclear Plant Ultrasonic Calibration and Examination Record SH. IED FNP-0-NUE-100.31 Southern Nuclear Operating Company Unit Sketch/Component Number Date Sheet No.

2 APR1-4501-1DM 9/20/2002 S02F2U021 Page_

of __

Procedure/Rev.rTCN Couplant/Batch No.

ThermometerSN/Cal Due Date Linearity Sheet No.

FNP-0-NDE-100 31 8 0 N/A Ultragel II I

01125 48890 2/5/2003 S02F2L005 Instrument Search Unit Calibration Block I Axial Scan Calibration Circ Scan Calibration Instrument Staveley/SONIC 136 Transducer Mfg.

KBA Cal. BIk. No ALA-5 Cal.

Signal Sweep Wmax Cal.

Signal Sweep Wmax Serial No. 136-905K Serial Number 00TD6H Thickness 0906 Refl.

Amp.

Div.

Refl.

Amp.

Div.

ID 80 2.5 180 ID 80 26 1.10 Axial dB Circ dB Model No.

MSWQC Cal. Temp 94 *F OD 35 50 1.65 OD 58 53 2.10 Reference 30 6 38 0 Size I No.

.375 Shape Round Cal. In 11 30 ID2 75

.... 245 NA Scanning 426 500 Frequency/Mode 2 25 / Shear Cal. Chk.

1415 "A" Dimension

.30 CaCalibration Remarks:

Reject OFF Cal. Out 15:38 Norm Angle 45 o NA Frequency 2Angle 45 Ref. BIk. No.

4846 Mode P/E Cable Type I No. Conn. RG174 / 0 ReflectorldB FSH / 30 6 Damping 500 OHMS Cable Length 6'

AmplSweep 24 % I 2 2 Comp Temp.

94 oý Configuration -

PRZ NOZZLE TO SAFE-END Scan' Results

-nd]- -

Length Dir.

NI.

[.

-1No....

DAC LI Lmax L2 8

NA 7

NA 5

NA 2

NA lWo Loc.

oLc DM Interface J

Lo Loc TDC Reference Measurement Sweep Position Thickness WI Wmax W2 S1 Smax S2 1"<-

CIL

-->1" Notes:

Examination/Limitation Remarks:

All W measurements taken from DM Interface Maintained a 10% ID Noise Level Throughout Exam k__Co..

ok Cu ae Total Lengthf Crown Width Total Length of Weld Examined Extent of Perpdndi of Weld 243/4" 2"

5 (L)

NL 2 (L)

NL 7 and 8 (W)

NL 15-From

.50" Primary Examiner Level Initials Assistant Examiner Level Paul Valden II VV Joseph D Funyak II SNC NDEL v IllIlR, Date Percentage of 0Z7ot Code Coverage cular Scans (W) to NL 2-F Jitia Is ANII Review qS-

'-Z7-oZ.

V I -Extent of Parallel Scans (L)

"rom NL to NL From (5)

NL to (2)

NL Non-Technical Reviev Date Date

""/v Revision 8 0

~ ~~~~~~~~~~~A q---7el.

-j-wJl*2 P

I, 7--

0 Iýt isý

'ý;_

-ý G9 I I o9i

Farley Nuclear Plant Ultrasonic Calibration and Examination Record SH. _ED FNP-0-NUE-100.31 Southern Nuclear Operating Company Unit Sketch/Component Number Date Sheet No.

2 APR1-4501-1DM 9/20/2002 S02F2U022 Page __ of ProcedurelRev.TCN

-T Couplant/Batch No.

ThermometerSNICal Due Date Linearity Sheet No.

FNP-0-NDE-100 31 8 0 N/A/

Ultragel II I

01125 48890 2/5/2003 S02F2L005 Instrument Instrument Staveley / SONIC 136 Serial No. 136-905K Axial dB Circ dB Reference 730 Scanning Reject Frequency Mode Damping 73 0 NA NA OFF 2.25 Dual 500 OHMS Comp Temp.

94 OF Scan Results Dir.

NI I

NRI 5

2 Search Unit Transducer Mfg.

RTD Serial Number 00-1158 Model No.

45° TRL 2 Size/No.

2(8x14) Shape Rect FrequencylMode 2 0 / Long "A" Dimension 40 Nom Angle 45

  • Meas Angle 450 Cable Type I No. Conn. RG174 /0 Cable Length 2 (6')

Configuration -

PRZ NOZZLE TO SAFE-END m

Length RI No.

IDAC LI Lmax L

Calibration Block Cal. B1k. No ALA-5 Thickness Cal. Temp Cal. In Cal. Chk.

Cal. Out Ref. Blk. No.

ReflectorldB Amp/Sweep 0 906 94 OF 11.32 1423 1540 4846 2"RAD/41 0 80 %/ 80 Reference Measurement W1 Wmax W2 2

Axial Scan Calibration Circ Scan Calibration Cal.

Signal Sweep Wmax Cal.

Signal Sweep Wmax Refl.

Amp.

Div.

Refl.

Amp.

Div.

3/4 ID 80 80 35

__ 5._1 _

75 90O__

NA NA Calibration Remarks:

No 1/4T hole Cal Due to Near Field. This calibration was utilized for axial scans only We Loc.

ILo Loc.

DM Interface TDC Sweep Position Thickness S1 Smax

$2 C.L

->1 Notes:

NA NA Examination/Limitation Remarks:

All W measurements taken from DM Interface Maintained a 10% ID Noise Level throughout exam 4

e t

C P

9Z 70

.A49 Total Length I Crown Width Total Length of Weld Examined Extent df Perpendicular Scans NW)

I Extent of Parallel Scans (L) of Weld 24 3/4" 2"

5 (L)

NL 2 (L)

NL 7 and 8 (W)

NL 5-From

.50" to NL 2-From NL to NL From (5)

NL to (2)

NL Primary Examiner Level Initials Assistant Examiner Level f

inlis Non-Technical Review Date Paul Valden II Joseph D Funyak 11

(

jc 0&41j_

ý1, SNC NDE Love Il/ie

/

Date Percentage of ANI ReviewU Date L IRevw

/1/

DCodeCoverage Revision 8 0

, AJ

C Farley Nuclear Plant Ultrasonic Calibration and Examination Record SH' *Z ED FNP-0-NUE-100.31 Unit SketchlComponent Number Date Sheet No.

2 JAPR1-4501-1DM 9/21/2002 S02F2U023 Page of ProcedurelRev./TCN Couplant/Batch No.

ThermometerSN/Cal Due Date Linearity Sheet No.

FNP-0-NDE-100 31 80 N/A Ultragel II

/

01125 48890 2/5/2003 S02F2L005 Instrument Search Unit Calibration Block Axial Scan Calibration Circ Scan Calibration Instrument Staveley /SONIC 136 T

M R

Transducer Mfg.

RTD Cal. Bik. No ALA-5 Cal.

Signal Sweep Wmax Cal.

Signal Sweep Wmax Serial No. 136-905K Refl.

Amp.

Div.

Refl.

Amp.

Div.

Serial Number 00-1158 Thickness 0.906 NA 3/4 80 35

.75 Axial dB Circ dB Model No.

45* TRL 2 Cal. Temp 94 *F

.NA..

ID 80 51

__.90 Reference NA 730 SizelNo.

2(8x14)

Shape Rect Cal. In 810 Scanning NA 73 0 Frequency/Mode 2 0 / Long Cal. Chk.

0855 "A" Dimension 40 Calibration Remarks:

Reject OFF Cal. Out 10 05 Nom Angle 45" ° No 1/4T hole Cal Due to Near Field This calibration was utilized for Circ Scans Frequency 225 Ref. Blk. No.

4846 only.

Meas Angle 45 ° e.Bk

o.

44 ny Mode Dual Cable Type I No. Conn. RG174 /0 Reflector/dB 2"RAD/41.0 Damping 500 OHMS Cable Length 2 (6')

Amp/Sweep 80 % I 8 0 Cr, T.-

-1 P

NZ TS S...

93o1:t...

PRZ NOZZLE TO SAFE-END S-can-Results......

Ind Length Di NI NRI RI No. DAC LI Lmax 8

NA 7

1 NA Swo Loc.

_1.....

DM Interface r

Reference Measurement Sweep Position L2 WI Wmax W2 S1 Smax S2 T Lo Loc.

TDC Thickness.

1"*<-

CIL

->1"l Notes:

Examination/Limitation Remarks:

All W measurements taken from DM Interface. Maintained a 10% ID Noise Level Throughout Exam Total Length

'Crown Width I Total Length of Weld Examin of Weld 24 3/4" 2"

5 (L)

NL 2 (L)

NL Primary Examiner Level Initials Paul Valden II SNC NDE Levelll/lll Reviw w

A--7 1 72 q,-'/s/6,o

ýf?',)

ri _

9- _7-.,

ed Extent of P~rpendicular Scans (W)

Extent of Parallel Scans (L) 7 and 8 (W)

NL 5-From

.50" to NL 2-From NL to NL From (5)

NL to (2)

NL Assistant Examiner Level Initials Non-Technical Review Date Joseph D Funyak I

9 CtA 1a.

Date Percentage of ANII Review Date Code Coverage qat Revision 8 0 4(_c, 0s;

%11

C Farley Nuclear Plant Ultrasonic Calibration and Examination Record SHE. ZED FNP-0-NUE-100.31 Southern Nuclear One~ratinn Cornm-n~

Unit Sketch/Component Number Date I Sheet No.

2-APR1-4501-1DM 9/20/2002j S02F2U024 Page of Procedure/Rev.TCN CoupantBatch No.

ThermometerSNICal Due Date Linearity Sheet No.

FNP-0-NDE-100 31 80 N/A Ultragel II I

01125 48890 2/5/2003 S02F2L005 Instrument Search Unit Calibration Block Axial Scan Calibration Clrc Scan Calibration Instrument Staveley / SONIC 136 Transducer Mfg.

RTD Cal.

.k.

No ALA-5 Cal.

Signal Sweep Wmax Cal.

Signal Sweep Wmax Serial No. 136-905K Refl.

Amp.

Div.

Refl.

Amp.

Div.

3/4 80 31 1.15 NA Axial dB Circ dB Model No.

60* TRL 2 Cal. Temp 94 °F D

0 8

46 155 -

NA Reference 800 NA Size/INo.

2(8x14)

Shape Cal. In 1140-Scanning 800 NA FrequencylMode 2 0 / Long Cal. Chk.

1430 "A" Dimension

.40 Calibration Remarks:

Reject OFF Cal. Out 15 42 Nom Angle 60 R

No 1/4T hole Cal Due to Near Field This scan was utilized for Axial scans only.

Frequency 2.25 Rf ~.N.

44 Meas Angle 60

  • Mode Dual Cable Type I No. Conn. RG174 /0 Reflector/dB 2"RAD/45 0 Damping 500 OHMS Cable Length 2 (6')

Amp/Sweep 80 % I 50 Comn Tern I

e PRZ NOZZLE TO SAFE-END Scan Results d

Length Dir.

NRI J I No. IDAC L Li Lmax L

5

-NA 2

NA Lo Lc.

DM Interface Lo Loc.

TDC 7

Reference Measurement1]

Sweep Position

-Thickness J

W1 Wmax W2

$1S Smax S2 1<-

C/L

->1" Notes:

Examination/Limitation Remarks:

All W measurements taken from DM Interface Maintained a 10% ID noise level throughout exam Total Length Crown Width I Total Length of Weld Examined Extent/of Perpendicular Scans (e*)

L to()

of Weld 24 3/4" 2"

5 (L)

NL 2 (L)

NL 7 and 8 (W)

NL 5-From NL to

.50" 2-From NL to NL rEm of Parailel Scans (L)

Primary Examiner Level Initials Assistant Examiner Level Initials Non-Techncal Review Date Paul Valden cP/

Joseph D Funyak

,1 q-

  1. -0.-'

Date Percentage of ANII Review 0

.Date SC NE L I 11/11YRReso Code Coverage/

0 I

Revision 8 0 vv00,p,, *Hlao

Farley Nuclear Plant Q1-A i

FNP-0-NDE-1 00.35 Ultrasonic Weld Profile Report SHARED Southern Nuclear Operating Company Plant/Unit I Weld Number Sheet Number Date Farley/

2 APR1-4501-1DM S02F2U064 9/2012002 ISO/Drawing Number Couplant/Batch Number 1 Instrument Manufacturer APRI-4501 Ultragel II I

01125 Staveley Material Type Calibration StandardlSerial Number Model Number Serial Number SS 4846 SONIC 136 136-905K Examiner SNT Level

!Search Unit Manufacturer

.Type Size Paul Valden II KBA F/HP 50 Examiner V

SNT Level Serial Number Frequency Joseph D. Funyak III E10606 5.0 MHz Id Examination Record No.

Indication No Component ConfigurationlFlow NA NA PRZ NOZZLE TO SAFE END Location Component Temp °F I Thermometer SIN LMAX DM Interface WMAX TDC 94 PTC 48890 FLOW WELD EDGE WELD EDGE COMPONENT WELD CL I

COMPONENT 1iazu G-L T. MEASUREMENTS O.D. PROFILE T. MEASUREMENT EACH IN.

REMARKS:

NDE L

,RIIIII.eview Level Date

'Non-TefinicalRe Date

"/ v/

I Revision 1.

I F

< -S -

Farley Nuclear Plant Liquid Penetrant Examination Record Unit I

Component Number 2

APR1-4501-1DM Thermometer Mfg/Ser. No.

PTC Cal. Due Date 2/5/2003 Surface Temp.

I 48890 94 0 F Component Configuration PRZ NOZZLE TO SAFE-END Ind. No.

Results DwellTimei NA NI 10 SHARED Procedure/Rev.ITCN FNP-0-NDE-100 5 FNP-0-NDE-100.5 PT-F-FORM 001 Southern Nuclear Operating Company I60 I N/A S03200

.an Sheet No.

Penetrant Materials Manufacturer Magnaflux Cleaner I Remover Penetrant Developer Type SKC-S SKL-SP SKD-S2

/of

/

Batch 99J01K 96J02K 96J08K

% of Length Coverage 100 Date I% of Area Coverage 100 9/2012002

% o AR e maC vr agk0 09 2 0 2 0 Indication Desc. I Exam Limitations I etc.

NA NA Primary Examiner Joseph D Funyak SNC NDE Level II/I ASNT Level Initials Date Assistant Examiner Paul Valden Percentage of Code Coverage ASNT Level Initials ANII Review Non-Technical Review 4MO" Atch Date q-te Date Revision 6.

Remarks D*nl=

I 60 I N/A

1.5

NO EXAMINATIONS SCHEDULED THIS OUTAGE

1.6

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-5100 REACTOR COOLANT PUMP A ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI NRI RI Cs-I x__

CS-2 X

CS-3 X

t-1-4-I-f-I-I-+-f-4 U. -

.1-4

-5I



1.
1. -

£ 4.-4-4-4.-I-4-5-4-I.

.5

4.

4 4-

.5-1-4-5-4.-I.-

4.

4.

4441 454.4.

4.

t-4-t-I-I-4-I-4 f-I

4. 4.5

I

.L5 L -

L -

U.

CONTAINMENT 1 E

C. PUMP SUPPORTS AND 49R1-5100P STPUCTURES AND R. C. PUMP (TYPICAL PUMPA, B AND C)

190, PUMP SUPPORT COMPONENTS FL YWHEEL TRANSDUCER PROBE -

1.02" RED KEYWAY (3)

STEAM GENERATER

--REACTOR COOLANT PUMP GENERATOR D -

GAGE HOLE 1.03" TYP.

GAGE HOLES -

1.03' DIA I I I

I I I

I I REACTOR COOLANT PUMP FL YWHNF71 I

VENDOR MANUAL U-252242 7-21-57 HSK I TLS REVISED PER REA 96-1295 REv.o I DEW I:

___i_

0 111-22-91g SDH I jAR ISSUED PER PCN S-91-2-7763.

ICAB/RI HGM IRKC/AHI DML REv DATE Y

CHK'DI DESCPIPTION i APPPI I APPP2 I ADPR.3 I APPR4 Sou.thern Company Services, IncF.o REACTOR COFOLANT PUMP ALABAMA POWER COMPANY scs DRAVWNG NJMEER I SHEET REv JOSEPH M FARLEY NUCLEAR PLANT UNIT 2 A-356454 67 1

0 01 Li F LY W H I-- L

Farley Nuclear Plant Support Examination Record VT-3 SHARED FNP-0-NDE-1 00.23 Southern Nuclear ODeratina Comoanv Plant/ Unit System/Support No WO/WAISTP Sheet No.

-arley /

2 APR1-5100-CS-1 N/A S02F2V120 Hanger Type Type Exam/Technique Procedure/Version Exam Date REACTOR COOLANT PUMP 2A 02B41 P001 VT-3 J Direct FNP-0-NDE-100.23

/ 5 0 / N/A 9/21/2002 Examiner Signat

/

Level Resolution Tools Flashlight, mirror, scale Paul DiValero 1,1 1/32" Division (Scale)

Examiner Signature Level N/A N/A 1/32" Line (Gray Card)

Ii EXAMINATION LIST:

Acceptable/

Deformation or structural degradation of fasteners, springs, clamps, or other support items.

A Missing, detached, or loosened support items.

Ac Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices.

kny crack or linear indication.

Ac Fluid loss or lack of fluid indication (hydraulic snubber only).

Other conditions Ac Spring Can Hot and Cold Time of Exam Positions (draw sketch)

N/A Constant Spring Hanger (Sketch setting of pointer and setting location of the hot (red) and cold (white) stickers)

Identification Plate Calibrated Load Setting N/A Comments:

I NDE Level i/1ill Review Version 'o 1

Date:

"-v71 Q.

Unacceptable/ NA cceptable cceptable N/A ceptable N/A

ceptable N/A ANII Review Sketch (if applicable) t

-r

r.

V I

Date:

/

Page -L of I

Support Examination Record VT-3 i

  • r-' i I L IJ Southern Nuclear Operating Company Plant/ Unit System/Support No WO/WA/STP Sheet No.

Farley /

2 APR1-5100-CS-2 N/A S02F2V121 Hanger Type Type Examrrechnique Procedure/Version Exam Date

I4AIIrfl REACTOR COOLANT PUMP 2A Q2B41 P001 v'r-3

/ Direct FNP-0-NDE-1 00 23

/ 5 0 / N/A 9/21/2002 Examiner Signature Level Resolution Tools Flashlight, mirror, scale Paul DiValerio

,, 11 1/32" Division (Scale)

Examiner Signature Level N/A N/A 1/32" Line (Gray Card)

EXAMINATION LIST:

Deformation or structural degradation of fasteners, springs, clamps, or other support items.

Missing, detached, or loosened support items.

Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices.

,ny crack or linear

'indication.

Fluid loss or lack of fluid indication (hydraulic snubber only).

Other conditions Spring Can Hot and Cold Positions (draw sketch)

Constant Spring Hanger (Sketch setting of pointer and setting location of the hot (red) and cold (white) stickers)

Acceptable/ Unacceptable! NA Acceptable Acceptable N/A Acceptable N/A Acceptable Time of Exam N/A N/A Identification Plate Calibrated Load Setting N/A Comments:

Sketch (if applicable)

Farley Nuclear Plant FNP-0-NDE-1 00.23 I

Farley Nuclear Plant Support Examination Record VT-3 SHARED FNP-0-NDE-1 00.23 Southern Nuclear ODeratina Cor anv Plant/ Unit System/Support No WO/WA/STP Sheet No.

Farley /

2 APR1-5100-CS-3 N/A S02F2V122 Hanger lype Type Exan/Technique REACTOR COOLANT PUMP 2A 02B41P001 I

VT-3

/

ProcedureVersion FNP-0-NDE-100 23

/ 5 0 / N/A Exam Date 9/21/2002 Examiner Signatur Paul DiValeno, Examiner N/ A EXAMINATION LIST:

Deformation or structural degradation of fasteners, springs, clamps, or other support items.

Missing, detached, or loosened support items.

Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices.

,ny crack or linear indication.

Fluid loss or lack of fluid indication (hydraulic snubber only).

Other conditions Spring Can Hot and Cold Positions (draw sketch)

Constant Spring Hanger (Sketch setting of pointer and setting location of the hot (red) and cold (white) stickers)

Resolution 1/32" Division (Scale) 1/32" Line (Gray Card)

Acceptable/ Unacceptable/ NA Acceptable Acceptable N/A Acceptable N/A Acceptable Time of Exam N/A N/A Identification Plate Calibrated Load Setting N/A Comments:

Tools Flashlight, mirror, scale Sketch (if applicable)

Page -- L of--/

ýV I

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR1-5300 REACTOR COOLANT PUMP C ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NPI RI NI NRI RI FW1 X

1-4-f 3-4-f 3t-I-t-4-4-*-4-4-1 i

m m

i i

i 0

1 1

m I

F

r.cI

C

-JI-I

[]CI

Farley Nuclear Plant Liquid Penetrant Examination Record Unit SHARED Component Number APRI-5300-FW1 Thermometer MfglSer. No.

PTC I 48890 Cal. Due Date 2/5/2003 Surface Temp.

88 o F ProcedurelRev./TCN FNP-0-NDE-100.5 FNP-0-1guE-100.5 PT-F-FORM 001 Southern Nuclear Operating Company

/ 60

/ N/A Penetrant Materials Manufacturer Magnaflux Cleaner I Remover Penetrant Developer Component Configuration R C. PUMP FLYWHEEL Ind. No.

Results Dwell Time Indication Desc. I Exam Limitations I etc.

NA NRI 10 NA Type SKC-S SKL-SP SKD-S2 Sheet No.

S02F2PO05 Page t of I Batch 99J01K 96J02K 96J08K

% of Length Coverage 100 Date

% of Area Coverage 100 9/25/2002 Remarks NA Primary Examiner ASNT Level Initials Assistant Examiner ASNT Level Initials Non-Technical Review John W Bell II i3 N/A N/A SNC NDE Level I/1ll Review Date Percentage of Code AN"I Review

~jq-z 7-I Coverage C

D Date Date Revision 6.

1.7

CLASS 1 SYSTEM LEAKAGE TEST

Farley Nuclear Plant Visual Examination Record VT-2 (ISI)

SHARED C

FNP-0-NL._-100.22 Southern Nuclear Operating Company Plant / Unit Data Package Drawing Number Farley 2

160.1-1 D-356354-1 & 2, D-356355-1 & 2, D-356356-1, D-35635 WO / WA No.

System Boundaries Procedure No.

FNP-0-NDE-100.22 SEE ATTACHED SHEETS FOR THE SYSTEM BOUNDARY.

Revision No. 5

/N/A Examiner Level_

SLTHE CLASS 1 SYSTEM WAS EXAMINED IN SERVICE UNDER NORMAL OPERATING CONDITIONS. THE S~Level

_"T'r--e EXAMINATION INCLUDED ALL VENTS, DRAINS, INSTRUMENT LINES, AND TEST CONNECTIONS WITHIN THE Date (Month-Day-Year)

BOUNDARIES SKETCH Examination (Per Para. 7.5)

USatnsat

  • Provide details on unsat areas Comments ANII Review Date Reveed By Level Date

/

,;31,,o,-o.a Revision 5

C J. M. Farley Nuclear Plant - Unit 2, Class I Pressure IS Bdry Component Test Dwg No.

REACTOR VESSEL PRESSURE RETAINING BOUNDARY Q2B13111001 160.1-1 D-356354-I RV HEAD VENT NOZZLE Q2B 111001 160.1-1 D-356354-1 CRDM PENETRATION NOZZLES AND SEAL WELDS (65)

Q2BI IHOO1 160.1-1 D-356354-1 INCORE PENETRATION INSTRUMENTATION NOZZ. (50)

Q2BIIHOO1 160.1-1 D-356354-1 STEAM GENERATORS Q2B2111001A 160.1-1 D-356354-1 Q2B21 t1001 B 160.1-1 D-356354-1 Q2B21HOO1C 160.1-1 D-356354-1 PRESSURIZER PRESSURE RETAINING BOUNDARY Q2B31K001 160.1-1 D-356354-2 HEATER PENETRATION WELDS (78)

Q2B31K001 160.1-I D-356354-2 R. C. PUMPS Q2B41POOA-N 160.1-1 D-356354-2 Q21341P00IB-N 160.1-1 D-356354-2 Q2B41 POO IC-N 160.1-1 D-356354-2 14" CCA-34 (A) (LOOP 2) 160.1-i D-356354-2 3/4" CCA-34 (B) (LOOP 2) 160.1-I D-356354-2 3/4" CCA-34 (C) (LOOP 2) 160.1-1 D-356354-2 3/4/" CCB-38 (LOOP 2) 160.1-1 D-356354-2 Coord Loc Dwg D-6 D-6 D-6 D-6 C-3 E-3 C-10 G-4 G-4 B-2 G-2 B-Il G-3 G-4 G-5 G-3 D-205050 D-205050 D-205050 D-205050 D-205050 D-205050 D-205050 D-205050 D-205050 D-205051 D-205051 D-205051 E7860 E7860 E7860 E7860 Evaluation/

Insulation/

Notes I A/Y/6 IA/Y/6 I A/Y/6 IA/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 IA/Y/6 IA/Y/6 I A/Y/6 IA/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 IAIY/6 Remarks LOOP I, TUBE SIDE LOOP 2, TUBE SIDE LOOP 3, TUBE SIDE EXAMINE ALL NOZZLES LOOP I LOOP 2 LOOP 3 CLASS 2 HYDRO TESTED WITH CLASS I, TESTED FROM VALVE QV023A, QV023C 160.1-1-6 Rev.: 5 C

.NP-2-M-100

J. M. Farley Nuclear Plant - Unit 2, Class I

(.NP-2-M-100 Pressure IS[ Bdry Test Dwg No.

Coord Loc Dwg 160.1-I D-356354-2 G-4 160.1-1 D-356354-2 G-5 3/4" CCA-35 (LOOP 2) 3/8" CCB-55 3/4" CCB-55

'" CCB-36 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 3/4" CCB-37 (LOOP 3) 3/8" CCB-37 (SS) 31" CCB-54 (LOOP 2) 3/8" CCB-54

%" CCB-56 (LOOP 2) 3/8" CCB-56 D-356354-2 D-356347-1 D-356347-1 D-356354-2 D-356354-1 D-356354-1 D-356347-1 G-3 B.2 B-2 H-3 C-7 D-9 C-2 160.1-1 D-356347-1 C-2 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 D-356354-2 D-356347-2 D-356354-1 D-356347-1 D-2 F-2 F-4 B-2 E7860 E7860 E7860 E9810,,E9825, E9826,E9925 E7860 E7860 E7667,E7668, E7998,E7999 E7615 E9832 E9809,E9832, E9870 E7814 E9800,E9825, E98 10,E9826 E9930 E7614 E9937,E9840, E9809,E9812 E9818,E9819 I A/YI6 I AIY/6 I A/YI6 I A/Y/6 IA/N/

IA/Y/6 I A/Y/6 I A/Y/6 IAIY/6 I A/Y/6 IA/N/

I AIY/6 I A/N/

I A/N/

I AIY/6 I A/N/

CLASS 2 HYDRO TESTED WITH CLASS 1, TESTED TO VALVE QV023B CLASS 2 HYDRO TESTED WITH CLASS 1, TESTED TO VALVE QV023C CLASS 2 HYDRO TESTED WITH CLASS I, PENETRATION NO. 57 (P15 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (P15 SYS)

VISUAL EXAM DURING CLASS I HYDRO TEST (INCLUDES 1", %", & 3/8" LINES)

CLASS 2 HYDRO TESTED WITH CLASS 1. (P15 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I, PENETRATION NO. 58 (P15 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I, PENETRATION NO. 58 (P15 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (P15 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1, (PEN NO.

52) (P15 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1. (PI5 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1, (PEN NO.

58) (P15 SYS)

IA/NI 160.1-1-7 Rev.: 5

(

Component Evaluation/

Insulation/

Notes Remarks

(7 (7

(.

J. M. Farley Nuclear Plant - Unit 2, Class 1 Pressure IS Bdry Test Dwg No.

Coord Loc Dwg I" CCA-4 (LOOP 3)

I" CCA-31

%" CCA-3 I I" CCA-47A (LOOP 1)

'A" CCB-47A I" CCB-47A I" CCA-47B (LOOP 2)

%" CCB-47B I" CCB-47 (B)

I" CCA-47C (LOOP 3)

I" CCB-47C

%" CCB-47C 1" CCB-63 (A)

I" CCB-63 (B) 2" CCA-9 (LOOP 2) 2" CCA-21 (LOOP i) 2" CCB-21 (L I) 3" CCB-21 160.1-1 160.1-I 160.1-I 160.1-I 160.1-I 160.1-I 160.1-1 160.1-I 160.1-I 160.1-I 160.1-I 160.I-I 160.1-I D-356354-I D-356356-I D-356354-1 D-356354-1 D-356356-I D-356356-I D-356356-1 D-356356-1 D-356356-1 D-356356-1 D-356356-1 D-356356-I D-356356-I B-10 C-6 D-7 E-7 F-5 F-5 F-5 F-5 F-5 F-5 F-5 F-5 F-5 E7525 E7526 E8042 E7558,E8042 E7886 E7886 E7886 E7887 E7887 E7887 E7841 E7841 E7841 160.1-I D-356354-1 E-7 E8042 160.1-1 D-356354-1 E-8 E8042 160.1-I D-356356-1 C-3 E7817,E7818 160.1-1 D-356355-1 E-2 E7803 160.1-1 D-356355-1 F-3 E7803,E7804, E7805,E7806 160.1-1 D-356355-1 F-4 EG2-423 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y16 I AY/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I AJY/6 FROM 2" CCA-17 TO CVCS EX. LETDOWN TESTED TO QV247 R. V. VENT LINE, TO VALVE QV014A R. V. VENT LINE, TO VALVE QV014A CLASS 2 tHYDRO TESTED WITH CLASS I TO QVI02A, QVI03A. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS i. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (E2 1 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I TO QVI02C, QVI03C (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1.

CLASS 2 HYDRO TESTED WITH CLASS I.

CLASS 2 HYDRO TESTED WITH CLASS i, (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1, TESTED TO CTMT WALL, PENETRATION (NO. 19) (LOOP 1) (E21 SYS) 160.1-1-8 Rev.: 5

  • 'NP-2-M-100 Component Evaluation/

Insulation/

Notes Remarks

J. M. Farley Nuclear Plant - Unit 2, Class I Component 2" CCA-2 1 (LOOP 2) 2" CCB-21 (L2) 2" CCA-21 (LOOP 3) 2" CCB-21 (L3) 2". CCA-26 (LOOP 1) 2" CCB-22 (LI)

Pressure ISI Bdry Test Dwg No.

160.1-I 160. I-I 160.1-I 160.1-1 160.1-I 160.1-1 3" CCB-22 D-356355-1 D-356355-1 D-356355-I D-356355-1 D-356355-1 D-356355-1 Coord Loc Dwg D-2 E7807 F-3 E7806 C-3 E-4 C-3 C-4 160.1-I D-356355-I B-5 2" CCA-26 (LOOP 2) 2" CCB-22 (L2) 2" CCA-26 (LOOP 3) 2" CCB-22 (L3) 2" CCA-29 (LOOP 1) 2" CCB-30 (LI) 160.1-I 160.1-1 160.1-I 160.1-I 160.1-I 160.I-I 3" CCB-30 (LI) 2" CCB-30 (L2) 2" CCB-30 (L3)

D-356355-I D-356355-I D-356355-I D-356355-1 D-356355-I D-356355-I B-3 B-5 C-3 A-5 G-4 G-4 160.1-I D-356355-1 G-3 160.1-1 D-356355-1 H-3 160.1-I D-356355-1 11-3 E7808 E7806 E7862 E7861 EG2-415 E7862 E7861 E7862 E7861 E7812 E7809 EG2-413 E7809 E7809 Evaluation/

Insulation/

Notes I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I AIY/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 Remarks TO Q2E21V062B CLASS 2 HYDRO TESTED WITH CLASS I. (LOOP 2)

TO (E21 SYS)

TO QV062A CLASS 2 HYDRO TESTED WITH CLASS I. (LOOP 3)

TO (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS]. (LOOP I)

(E21 SYS). SEE RR-30.

CLASS 2 HYDRO TESTED WITH CLASS I THRU PENETRATION (NO. 20) (LOOP 1) TO QV063 (E21 SYS). SEE RR-30.

TESTED TO Q2E2IQV066B CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 2)

(E21 SYS). SEE RR-30.

TESTED TO Q2E2 I QV066A CLASS 2 HYDRO TESTED WITH CLASS I. (LOOP 3)

(E21 SYS). SEE RR-30.

TO 6" CCA-27 (EG2-408)

CLASS 2 HYDRO TESTED WITH CLASS I. (LOOP 1)

TO QV078A (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1, PENETRATION (NO. 81) (LOOP I) TO QV068 (E21 SYS). SEE RR-30.

CLASS 2 HYDRO TESTED WITH CLASS I. (LOOP 2)

TO QV078B (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP 3)

TO QV078C (E21 SYS) 160.1-1-9 Rev.: 5 C

(-

. NP-2-M-100

J. M. Farley Nuclear Plant - Unit 2, Class I C

. NP-2-M-100 Component 2" CCA-29 (LOOP 2) 2" CCA-30 (LOOP I) 2" CCB-31 (L I) 2" CCB-31 (L2)

.2" CCB-31 (L3) 3" CCB-31 (L I) 2" CCA-30 (LOOP 2) 3" CCA-5 (LOOP I) 2" CCA-17 3" CCA-6 (LOOP 1) 160.I-I 160.1-I 160.1-1 160.1-I 160.1-I 160.I-I 160.1-I 160.1-1 160.1-I 160.1-I 160.1-I 160.1-I 3" CCB-9 3" CCA-7 (LOOP 2) 1/" CCB-45 3" CCB-10 3" CCB-21 (B)

Pressure ISI Bdry Test Dwg No.

160.1-I 160.1-I 160.1-I D-356355-I D-356355-I D-356355-I D-356355-1 D-356354-1 D-356356-1 D-356354-1 D-356354-1 D-356356-1 D-356356-I D-356354-1 D-356356-1 D-356356-1 D-356356-1 D-356355-1 Coord Loc Dwg G-3 G-3 11-2 160.1-I D-356355-1 H-2 160.1-I D-356355-1 H-2 E7812 E7812 E781 I E78 I1 E7811 G-2 A-2 A-2 A-2 C-5 A-2 B-3 0-4 B-2 B-4 B-4 F-6 E7812 EG2-113,EG2 608 EG2-608 E7616 EG2-101,EG2 608 EG2-608 EG2-606 EG2-100 EG2-608 E7819 EG2-606 EG2-42 I,EG2 423 Evaluation/

Insulation/

Notes I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 IA/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I AIY/6 I A/Y/6 IA/Y/6 I A/Y/6 I AIYI6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 Remarks TESTED TO Q2E2 I V078B TO 6" CCA-27 (EG2-408)

CLASS 2 HYDRO TESTED WITH CLASS 1. (LOOP I)

TO QV079A (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (LOOP 2)

TO QV079B (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (LOOP 3)

TO QV079C (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I THRU PENETRATION (NO. 80) TO QV072 (LOOP I) (E21 SYS). SEE RR-30.

TESTED TO Q2E2 I V079B TESTED TO VALVE QVOO I A CLASS 2 HYDRO TESTED WITH CLASS I BETWEEN QV243 & QV 113 (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (E21 SYS)

TESTED TO VALVE QV016A,B (G-7). SEE RR-30.

160.1-1-10 Rev.: 5 C

160.1-1 D-356355-1 J-5 EG2-415

J. M. Farley Nuclear Plant - Unit 2, Class I Component

/" CCB-2 i I" CCB-23 4" CCB-15 (LOOP 1)

." CCB-57 4" CCB-15 (LOOP 2)

'" CCB-57 2" CCA-15 6" CCA-20 (A)

%" CCB-39 6" CCA-20 (B) 3/4A" CCB-39 6" CCA-20 (C)

/" CCB-39 6" CCA-20 (RL) 3" CCA-20 (A) 3" CCA-20 (B) 6" CCA-22 (LOOP I)

A" CCB-22 6" CCB-32 Pressure IS! Bdry Test Dwg No.

Coord Loc Dwg 160.1-I D-356355-1 D-6 EG2-421,EG2 423 160.1-1 D-356355-1 D-6 EG2-421,EG2 423 160.1-1 D-356354-1 B-5 EG2-112 160.1-I D-356354-2 F-7 EG2-112 160.1-1 D-356354-2 E-7 E7514 160.1-1 D-356354-1 G-4 EG2-112 160.1-1 D-356354-2 F-8 EG2-112 160.1-1 D-356354-2 F-7 E7514 160.1-1 D-356354-2 E-6 E7816 160.1-1 D-356354-2 E-4 EG2-453 60.1-1 D-356354-2 D-4 EG2-453 60.1-1 D-356354-2 D-4 EG2-453 60.1-1 D-356354-2 D-3 EG2-453 60.1-1 D-356354-2 E-3 EG2-453 60.1-1 D-356354-2 D-2 EG2-453 60.1-1 D-356354-2 E-3 EG2-453 60.1-1 D-356354-2 D-2 EG2-453 60.1-1 D-356354-2 E-2 EG2-453 60.1-1 D-356354-1 B-5 EG2-101 60.1-1 D-356355-1 D-2 EG2-409 60.1-1 D-356355-2 H-I EG2-409 60.1-1 D-356355-2 G-2 E7635,E7864 60.1-1 D-356355-2 G-2 EG2-414 Ii 14 Evaluation/

Insulation/

Notes I A/Y/6 I AY/6

!IA/Y/6 I AIY/6 I A/Y/6 I A/Y/6 IA/Y/6 I A/Y/6 IAIY/6 IJAN16 IA/Y/6 I A/Y/6 IA/Y/6 I A/Y/6 I AIY/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 IAIY/6 I A/Y/6 I A/Y/6 Remarks TO VALVE QV009 TO PRESSURIZER SPRAY.

CLASS 2 HYDRO TESTED WITH CLASS 1.

TO PRESSURIZER SPRAY.

CLASS 2 HYDRO TESTED WITH CLASS 1.

TO Q2E21VI09 TO PRESSURIZER RELIEF TANK TESTED TO VALVE QV030A TO PRESSURIZER RELIEF TANK TESTED TO VALVE QV030B TO PRESSURIZER RELIEF TANK TESTED TO VALVE QV030C TO PRESSURIZER RELIEF TANK TESTED TO VALVES QV053 TESTED TO VALVES QV061 FROM SIS HI & LO HD. INJ CLASS 2 HYDRO TESTED WITH CLASS I. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1. (E21 SYS) 160.1-1-1l Rev.: 5

(

C. NP-2-M-100

C Pressure ISI Bdry Test Dwg No.

Component 8" CCA-22 10" CCB-32 6" CCA-22 (LOOP 2)

"6" CCB-32 4" CCA-22 10" CCB-32 6" CCA-22 (LOOP 3) 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 6" CCB-32 8" CCA-22 10" CCB-32 6" CCA-27 (LOOP I) 6" CCB-29 10" CCB-29 D-356355-1 D-356355-2 D-356354-1 D-356355-1 D-356355-2 D-356355-2 D-356355-1 D-356355-2 D-356354-I D-356355-I D-356355-2 D-356355-2 D-356355-I D-356355-2 D-356354-I D-356355-I D-356355-1 D-356355-2 Coord Loc Dwg D-3 G-3 G-5 D-I F-I F-2 D-3 F-2 C-7 C-2 E-I E-2 C-3 F-3 D-5 F-2 F-4 E-1 EG2-409 EG2-414 EG2-100 EG2-412 EG2-412 EG2-414 EG2-412 EG2-414 EG2-454 EG2-454,EG2 411 EG2-41 I EG2-414 EG2-41 I EG2-414 EG2-101 EG2-408 EG2-414 EG2-414 Evaluation/

Insulation/

Notes I A/Y/6 I A/Y/6 I AIY/6 I A/Y/6 IA/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I AIY/6 I A/Y/6 I AIY/6 I A/Y/6 I AIY/6 I A/Y/6 I A/Y/6 I A/Y/6 Remarks CLASS 2 HYDRO TESTED WITH CLASS I THRU PENETRATION (NO. 17) (E21 SYS)

FROM SIS HI & LO HD. INJ CLASS 2 HYDRO TESTED WITH CLASS 1. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (E21 SYS)

FROM SIS HI & LO HD. INJ CLASS 2 HYDRO TESTED WITH CLASS 1. (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I, TO QV023B, TIIRU PENETRATION (NO. 15) (E21 SYS)

FROM SIS HI & LO HD. INJ CLASS 2 HYDRO TESTED WITH CLASS I. (E21 SYS)

CLASS 2 HYDRO TESTED WITlH CLASS I, UP TO QV044, PENETRATION (NO. 101) (E21 SYS) SEE RR-30.

160.1-1-12 Rev.: 5 c

J. M. Farney Nuclear Plant - Unit 2, Class 1 C

. NP-2-M-100

C (J

J. M. Farley Nuclear Plant - Unit 2, Class I Component 6" CCA-27 (LOOP 2) 6" CCA-28 (LOOP 3) 2" CCA-28 2" CCA-30 12" CCA-16 (B) (LOOP 1) 2" CCB-34 12" CCA-16 (B) (LOOP 3) 3/4" CCB-34 12" CCA-24 (LOOP 1)

Y4" CCB-53 3/4" CCB-54 12" CCB-24 12" CCA-24 (LOOP 2) 3/4" CCB-53 3/4" CCB-54 Pressure IS[ Bdry Test Dwg No.

160.1-1 160.1-I 160.1-I 160.1-1 160.1-1 160.1-1 160.1-I 160.1-1 160.1-I 160.1-1 160.1-1 160.I-I 160.1-I 160.1-I 160.1-I D-356354-1 D-356355-I D-356354-1 D-356355-1 D-356355-1 D-356355-1 D-356354-1 D-356358-1 D-356354-1 D-356354-1 D-356358-1 D-356354-1 D-356354-I D-356355-2 D-356355-2 Coord Loc Dwg E-5 G-3 D-7 H-I G-2 G-2 C-4 E-2 C-4 C-8 G-2 C-9 B-5 D-2 C-2 160.1-1 D-356355-2 D-2 160.1-I 160.1-I 160.1-1 160.1-I D-356355-2 D-356354-1 D-356355-2 D-356355-2 C-3 G-4 D-6 C-5 160.1-1 D-356355-2 D-5 EG2-100 EG2-412 EG2-41 i,EG2 454 EG2-454 E7810 E7810 EG2-101 EG2-012 EG2-101 EG2-454 EG2-454 EG2-101 EG2-410 E7588 E7588 EG2-424 EG2-100 EG2-410 E7589 E7589 Evaluation/

Insulation/

Notes I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I AIY/6 I AIY/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 Remarks FROM SIS HI & LO HD. INJ FROM SIS HI & LO HD. INJ TO QV078C TO QV079C TO RHRS TESTED TO QV013A TO RHRS TESTED TO PT 402 FROM SIS ACCUMULATOR I TESTED TO VALVE Q2E21V037A CLASS 2 HYDRO TESTED WITH CLASS 1 TO VALVE QV054A (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I TO VALVE QV039A (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS I. (E21 SYS)

FROM SIS ACCUMULATOR NO. 2 CLASS 2 HYDRO TESTED WITH CLASS I. TO QV054B (E21 SYS)

CLASS 2 HYDRO TESTED WITH CLASS 1. TO QV039B (E21 SYS) 160.1-1-13 Rev.: 5

"(,NP-2-M-100

C

(

Component 12" CCB-24 12" CCA-24 (LOOP 3)

Pressure IS! Bdry Test Dwg No.

160. 1-I 160.1-I 160.1-1 D-356355-2 D-356354-I D-356355-2 Y" CCB-53

  • /" CCB-54 12" CCB-24 Coord Loc Dwg C-5 A-7 E-2 EG2-424 EG2-454 EG2-4 I 0,EG2 454 Evaluation/

Insulation/

Notes Remarks I AIY/6 CLASS 2 HYDRO TESTED WITH CLASS I. (E21 SYS)

IA/Y/6 FROM SIS ACCUMULATOR NO. 3 I A/Y/6 IA/Y/6 CLASS 2 HYDRO TESTED WITH CLASS I TO QV054C.

(E21 SYS)

I A/Y/6 CLASS 2 HYDRO TESTED WITH CLASS I TO QV039C.

(E21 SYS)

IA/Y/6 CLASS 2 HYDRO TESTED WITH CLASS I, TO QV038C.

(E21 SYS)

IA/Y/6 PRESSURIZER SURGE LINE 1 A/Y/6 IA/Y/6 RC PUMP 2A TO REACTOR VESSEL (COLD LEG)

IA/Y/6 RCP 2B TO REACTOR VESSEL IA/Y/6 REACTOR COOLANT PUMP 2C TO REACTOR VESSEL I A/Y/6 REACTOR VESSEL TO S/G 2A (HOT LEG)

I A/Y/6 REACTOR VESSEL TO S/G 2 IA/Y/6 REACTOR VESSEL TO STEAM GENERATOR 2C I

A/Y/6 STEAM GENERATOR 2A TO RC PUMP 2A SUCTION.

IA/Y/6 CLASS 2 HYDRO TESTED WITH CLASS 1. TO VALVES QV008A, QV009A, QVOIOA, QVOI I A IAIY/6 TESTED TO VALVE QV012 I A/Y/6 160.1-1 D-356355-2 D-7 E7590 160.1-I D-356355-2 E-7 160.1-I D-356355-2 D-8 14" CCA-18 (LOOP 2) 27.5" CCA-10 (LOOP 1) 27.5" CCA-10 (LOOP 2) 27.5" CCA-10 (LOOP 3) 29" CCA-I I (LOOP I) 29" CCA-I I (LOOP 2) 29" CCA-I I (LOOP 3) 31" CCA-12 (LOOP 1) 3/4" CCB-33 3/4" CCB-27 3 1" CCA-12 (LOOP 2) 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 160.1-1 D-356354-I D-356354-2 D-356354-I D-356354-I D-356354-I D-356354-I D-356354-I D-356354-I D-356354-I D-356354-I D-356354-I D-356354-1 F-3 J-6 B-4 G-5 B-9 C-5 E-5 C-8 C-I C-2 H-2 G-I E7590 EG2-424 E5365 E5365 E5366 E5367 E5368

'E5366 E5367 E5368 E5366 E7607 E7616 E5367 160.1-1-14 Rev.: 5

(

J. M. Farley Nuclear Plant - Unit 2, Class I rNP-2-M-100

J. M. Farley Nuclear Plant - Unit 2, Class I C

NP-2-M-100 Component 1"

CCB-33 2" CCA-17 3 1" CCA-12 (LOOP 3)

%" CCB-33 2" CCA-17 Pressure IS[ Bdry Test Dwg No.

Coord Loc Dwg 160.1-1 D-356354-1 D-2 E7608 160.1-I D-356354-1 H-2 E7591 160.1-I D-356354-1 B-12 E5368 160.1-I D-356354-I C-1 I E7609 160.1-I D-356354-I B-1 I E7525 Evaluation/

Insulation/

Notes I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 I A/Y/6 Remarks CLASS 2 HYDRO TESTED WITH CLASS I. TO VALVES QV008B, QV009B, QVO 01B, QVOI IB.

TESTED TO VALVE QVOO1B CLASS 2 HYDRO TESTED WITH CLASS I. TO VALVES QVO08C, QVo09C, QVOIOC, QVOI IC TESTED TO VALVE QVOIC 160.1-1-15 Rev.: 5 C

1 10/27/02 04:11:31 FARLEY NUCLEAR PLANT FIGURE 1 VISUAL EXAMINATION RECORD VT-2 FNP-0-NDE-100.22 RTYPE: L1.09 SOUTHERN NUCLEAR OPERATING COMPANY Unit TPNS or System No.

Component or System Name Examination Area Drawing Number Examination Sheet Number 2

Q2B11H0001 Reactor Vessel U214660 1 of 1 Type of Pressure Test WO/WA Number S 02006366 0 System Leakage Test per 1989 Edition of ASME Section XI El System Functional Test Examiner Signature Level El System Leakage Test per 1992 Edition of ASME Section XI El System Inservice Test Ste

,r III (for Code Case N-416-1 use) at(oha

-Year)

Date (Month-Day-Year)

El System Hydrostatic Test El System Pnemmutic Test October 27, 2002 Give a brief description of the examination area boundary: All accessible areas of reactor vessel, inclidintc vessel closure head flanie, four (4) conoseal assemblies and two (2) aravloc assemblies Date and Time System to be Examined Put in Service: 10126/02 09:40 Date and Time of Examination: 10/27/02 02:10 Check each box that applies to the examination area and indicate SAT or UNSAT for each:

El Insulated Weld Repair Area El SAT 0l UNSAT 0l Uninsulated Weld Repair Area El SAT E-UNSAT El Insulated Weld Joint 0l SAT El UNSAT 0l Uninsulated Weld Joint El SAT E-UNSAT El Insulated Piping System Bolted Connection El SAT El UNSAT El Uninsulated Piping System Bolted Connection 0 SAT El UNSAT El Insulated Valve Bolted Connection El SAT El UNSAT or El Uninsulated Valve Bolted Connection

[E SAT

[E UNSAT El Insulated Pump Bolted Connection El SAT El UNSAT El Uninsulaitcd Pump Bolted Connection El SAT El UNSAT 0l Insulated Vessel Bolted Connection 0 SAT El UNSAT El Uninsulated Vessel Bolted Connection El SAT El UNSAT This examination area El does [E does not contain borated water Explain all UNSAT area% below or on attached sheets.

Comments None Version 5.0 Page I of 1

10/27/02 04:17:19 FIGURE 1 VISUAL EXAMINATION RECORD VT-2 FARLEY NUCLEAR PLANT

(

FNP-0-NDE-100.22 RTYPE: L1.09 SOUTHERN NUCLEAR OPERATING COMPANY Unit TPNS or System No.

Component or System Name Examination Area Drawing Number Examination Sheet Number 2

Q2C56K0001 Seal Table U212853 1 of 1 Type of Pressure Test WO/WA Number M 02005270 0 System Leakage Test per 1989 Edition of ASME Section XI El System Functional Test Examiner Signature Level E] System Leakage Test per 1992 Edition of ASME Section XI El System Inservice Test Steve

,la III (for Code Case N-416-1 use)

Date (Month-Day-Year)

El System Hydrostatic Test El System Pneumatic Test October 27, 2002 Give a brief description of the examination area boundary: All accessible areas of the seal table Date and Time System to be Examined Put in Service: 10/26/02 09:40 Date and Time of Examination: 10/27/02 02:30 Check each box that applies to the examination area and indicate SAT or UNSAT for each:

El Insulated Weld Repair Area El SAT El UNSAT El Uninsulated Weld Repair Area El SAT El UNSAT El Insulated Weld Joint 0l SAT El UNSAT El Uninsul:ted Weld Joint El SAT El UNSAT El Insulated Piping System Bolted Connection El SAT El UNSAT El Uninsulated Piping System Bolted Connection 0

SAT El UNSAT El Insulated Valve Bolted Connection El SAT El UNSAT or El Uninsulated Valve Bolted Connection El SAT El UNSAT El Insulated Pump Bolted Connection El SAT El UNSAT El Uninsulated Pump Bolted Connection El SAT

[E UNSAT El Insulated Vessel Bolted Connection El SAT El UNSAT El Uninsulated Vessel Bolted Connection El SAT El UNSAT This examination area 0 does [] does not contain borated water Explain all I'"SAT areas below or on attached sheets.

Comments No active leaks noted.

Version 5.0 Page I of I

2.1

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR2-3500 RHR HEAT EXCHANGER A ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI NRI RI A

X 4

X

.u.

I -

.9-U

-9.

U -

I. -

I. -

£ 91-1-1-4-I-1-4-4-4 i

i

RESIDUAL HEAT EXCHANGER (A)

JAPR2-3500 DATUH=

TOP DEAD CENTER OF OUTLET NOZZLE.

OUTLET PLAN VIEW VENDOR MANUAL U-4166801 MATERIAL SHELL' 0.875' T ASTH 240 TYPE 304 NOZZLES: 0.875' T ASTM 182 TYPE 316 WELDS SHELL TO FLANGE (#A) AND HEAD TO SHELL (#B)

DIAMETER 139,75" CIRCUMFERENCE 11124.878' (FNP FIG.-024)

CAL. BLOCK JALA-32 REINFORCED NOZZLE TO VESSEL VELDS, 1.2,3. & 4 DIAMETER 10' CIRCUMFERENCE 31.4- (FNP FIG.-027)

FLANGE BOLTING 48 -

1,375' DIA. BOLTS 1

7-23-97 HSK ILS lREVISEIJ PER REA 96-1295 REV.O I DEW I

0 11-22-911 UH JAR IISSUED PER PCN S-91-2-7763.

ICAB/R HGM IRKC/AHI DML REV.

DA~TE AY CW4(D I ECFc41N IAMAR.I APPR. I PPR.3 NAPP Southern Company Services, Incfo-RESIDUAL HEAT EXCHANGER (A)

ALABAMA POWER COMPANY

=se DVM NuKK7 ME

-v.

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 1

AUXILIARY EL. 83'-0*

ROOM 2128

[,1

.1.

FNP-2-M-09:

WELD EXAMINATION

SUMMARY

SHEET Sheet No. S02F2SO01 Weld Numben APR2-3500-A Examination Area:

RESIDUAL HX SHELL TO FLANGE Floure No.

Procedure Cal Block Exam Requirements APR2-3500 FNP-0-NDE-1 00.31 ALA-32 C-A/C1.10/

The following data sheets are included in this package:

Data Sheet No.

Angle Results Remarks S02F2U001 45 NI S02F2UO02 60 NI S02F2U005 Weld Profile Comments:

No 2 scan due to flange configuration.

Weld length is 125", only 93" scanned (74%), limited by reinforment plate.

5 scan - 46 and 60 degree volumetrtac coverage was 50%, due to austenitic weld. 5 scan composite coverage was 37% (.5 x.74). 7 and 8 scan were 100%. 4 scans / 237 = 59.25%.

(Descrbe limitation in comments)

Percent on required area examined - Surface NA Percent of required volume examined - Volumetric 59 Relief Request Number/Required?

needed Code Case used (if applicable)

NA IER Number (if applicable)

D /

NA Date:I (q

C Farley Nuclear Plant Ultrasonic Calibration and Examination Record Si-f IED FNP-0-NUE-100.31 Southern Nuclear Operating Company Unit Sketch/Component Number Date Sheet No.

2 APR2-3500-A 9/13/2002 S02F2U001 Page I

of

/

Procedure/Rev.ITCN Couplant/Batch No.

ThermometerSN/Cal Due Date Linearity Sheet No.

FNP-0-NDE-100 31 80 N/A Ultragel II 01125 48881 2/5/2003 S02F2L001 Instrument Search Unit Calibration Block Axial Scan Calibration Circ Scan Calibration Instrument Staveley /SONIC 136 Transducer Mfg.

KBA Cal. BIk. No ALA-32 Cal.

Signal Sweep Wmax Cal.

Signal Sweep Wmax Serial No. 136-905K Serial Number 00TD6H Thickness 088 Refl.

Amp.

Div.

Refl.

Amp.

Div.

1T 80 25 88 1T 80 25 88 Axial dB Circ dB Model No.

MSWQC Cal. Temp 76 -F

-2T 50 50 1 74 2T 50 5 0 1.74 3T 30 7 5 2 52 3T 30 7.5 2 52 Reference 28 28 Size / No.

.375 Shape Round Cal. In 15'30 30 75

__2 3T 30 7.5 25 Scanning 40 40 Frequency/Mode 2 25 / Shear Cal. Chk.

1640 "A" Dimension 25 Calibration Remarks:

Reject OFF Cal. Out 17 40 Nom Angle 450 NA Frequency 2.25 45 Ref. BIk. No.

4846 Mode P/E Cable Type/ No. Conn. RG174/0 ReflectorldB SDH /28 Damping 500 OHMS Cable Length 6'

Amp/Sweep 20 % / 2 0 uomp Temp 92

°C"on iguration -

RESIDUAL HX SHELL TO FLANGE W° Loc"Weld C/L Lo Loc.

TDC Scan Results

__.__-nd-Length Reference Measurement Sweep Position Thickness Dir.

NI NRI RI No DAC LI Lmax ax W2 S1 Smax S2 1"<-

C/L

-1 Notes:

8 N/A 7

N/A N/A Examination/Limitation Remarks:

No 2 Scan due to flange configuration 5 Scan limited by reinforcement plates.

As noted from previous examination - 93" / 125" examined Total Length I Crown Width Total Length of Weld Examined I Extent of Perpendicular Scans (W) of Weld 125" 1.0" 5 (L) 93 2 (L)

N/A 7 and 8 (W) 125" 5-From Toe to N/L

2. From I Extent of Parallel Scans (L)

N/A to N/A From (5)

N/L to (2) 5" Primary Examiner Level Joseph D. Funyak II Assistant Examiner Level Initials I Non-Technical Review John W. Bell 11 Qhi

-lWaijon0chia &_

V Date

-Percentage of A

Review a' K0,'

Code Coverage Date q...

-vj-oL.

Date Revision 8 0

Farley Nuclear Plant Ultrasonic Calibration and Examination Record SH 7 _ZED C

FNP-0-NuE-100.31 Southern Nuclear Operating Company Unit I

SketchlComponent Number Date Sheet No.

2 APR2.3500-A 9/13/2002 S02F2U002 Page of ProcedurelRevJTCN Couplant/Batch No.

I ThermometerSNICaI Due Date Linearity Sheet No.

FNP-0-NDE-100 31 80 N/A Ultragel iI I

01125 48881 2/5/2003 S02F2L001 Instrument Search Unit Calibration Block Axial Scan Calibration Circ Scan Calibration Instrument Staveley/SONIC 136 Transducer Mfg.

KBA Cal. B1k. No ALA-32 Cal.

Signal Sweep Wmax Cal.

Signal Sweep Wmax Serial No. 136-905K Serial Number 00TD6F Thickness 088 Refi.

Amp.

Div.

Refl.

Amp.

Div.

IT ---- 80 2 5 1.31 N/A Axial dB Circ dB Model No.

MSWQC Cal. Temp 76 °F 2T 35 50 2 60 N/A Reference 43 2 N/A Size I No.

375 Shape Round Cal. In 15 50 3T 18 7.5 385 N/A Scanning 55 2 N/A FrequencylMode 2 25 / Shear Cal. Chk.

17.00 "A" Dimension 35 Calibration Remarks:

Reject OFF Cal. Out 17:43 Nom Angle 60° N/A Frequency 2 25 Ref. Blk. No.

4846 Meas Angie 56 ° e.8k.N.

44 Mode PIE Cable Type/ No. Conn. RG174/0 ReflectorldB SDH/432 Damping 500 OHMS Cable Length 6'

Amp/Sweep 38 % I 2 2 LComp lemp.

92

o.

Configuration -

RESIDUAL HX SHELL TO FLANGE cian_

Results I-nd Length ir.

NII NRI RI NO-DAC LI Lmax L2 5

N/A Reference Measurement WI Wmax W2 Wo Loc.

Lo Loc.

SWeld CIL TDC Sweep Position Thickness SI Smax S2 1"<-

CIL

->I" Notes:

Exami nation/Limitation Remarks:

See Limitations from 45* data (S02F721.001)

Total Length Crown Width Total Length of Weld Examined Extent of Perpendicular Scans (W)

Extent of Parallel Scans (L) of Weid 125" 1.0" 5 (L) 93 2 (L)

N/A 7 and 8 (W)

N/A 5-From TOE to NIL 2-From N/A to N/A From (5)

N/A to (2)

N/A Primary Examiner Level I "

sI/

Joseph D. Funyak II SNC NDE Level IlIII Review Assistant Examiner Level Initials lNon-Technical John W Bell

,1

/TiDate T Percentage of Review-I Rview Code Coverage Date Date vis1on 80 Revision 8 0

Farley Nuclear Plant A

R FNP--NDE-100.35 Ultrasonic Weld Profile Report S HARE Southern Nuclear Operating Company Plant/Unit Weld Number Sheet Number Date Farley/

2 APR2-3500-A S02F2U005 911312002 ISO/Drawing Number Couplant/Batch Number Instrument Manufacturer APR2-3500 Ultragel II 1

01125 Staveley Material Type Calibration Standard/Serial Number Model Number Serial Number SS 4846 j

SONIC 136 136-905K Examiner I SNT Level Search Unit Manufacturer Type Size Joseph D. Funyak II KBA 1 F/HP i

25 Examiner SNT Level Serial Number I Frequency N/A NIA 00B6PH 5

MHz Weld Examination Record No.

Indication No Component Configuration/Flow N/A N/A RHR HX SHELL TO FLANGE Location Component Temp °F I Thermometer SIN LMAX 90 CWTDC WMAX Weld C/L 92 I

PTC 48881 FLOW WELD EDGE COMPONENT WELD EDGE Z

COMPONENT T. MEASUREMENTS O.D. PROFILE ii



T. MEASUREMENT EACH

.25 IN.

REMARKS:

NDE LiR Level Date jNon-Technical Review Date 7 --

-lq D

Revision 1.

/

\\

I

Farley Nuclear Plant Ultrasonic Instrument Qualification Record SHARED FNP-0-NDE-100.32 Southern Nuclear Operating Company istrument Sheet No.

S02F2L001 Manufacturer Model Serial No.

Staveley SONIC 136 136-905K Transducer Manufacturer Size Frequency Serial No.

KBA

.50 2.25 MHZ 009TNR Reference Standard Type Serial No.

Mini Angle Beam 4846 Horizontal Linearity Back RefI.

Signal Position Back Refi.

Signal Position 1

1.0 6

6.0 2

2.0 7

7.0 3

3.0 8

80 4

40 9

9.0 5

50 10 10.0 Screen Height Linearity Amplitude Ha 100 FSH 90 FSH 80 FSH 70 FSH 60 FSH Amplitude Hb 51 46 40 35 30 Amplitude Ha 50 FSH 40 FSH 30 FSH 20 FSH 10 FSH Amplitude Hb 24 19 14 10 4

Amplituae Control Linearity Indication Set at %

Indication Limits dB Control Change Instrument Indication of Full Screen

% of Full Screen

% of Full Screen 80%

32% to 48%

-6 dB 40 80%

16% to 24%

-12 dB 19 40%

64% to 96%

+6 dB 80 20%

64% to 96%

+12 dB 83 Instrument Qualification Results Horizontal Linearity Screen Height Linearity Amplitude Control Linearity Acceptable E-Acceptable E

Acceptable E Remarks NONE Examiner Joseph D. Funyak Level Examiner NI A Level Date Initials II Initials N/A 9/12/2002 Level Date P-f~ I

I1 Revision 3.

'/7 DE Le 111/111 vie A. ý--

Farley Nuclear Plant Liquid Penetrant Examination Record SHARED FNP-0-,.JE-100.5 PT-F-FORM 001 Southern Nuclear Operatinq Company Unit Component Number Procedure/RevJTCN Sheet No.

2 APR2-3500-4 FNP-0-NDE-1005

/ 6.0

/ N/A S02F2P001 Page I

of Thermometer Penetrant Materials Mfg/Ser. No.

PTC

/ 48647 MrTve Batch Manufacturer Magnafiux Cleaner I Remover SKC-S 99J01 K Cal. Due Date 2/5/2003 Penetrant SKL.SP 96J02K Surface Temp.

92 0 F Developer SKD-S2 96J08K Component Configuration

% of Length Coverage 100 Date RESID HX REINF PLATENSL WELD

% of Area Coverage 100 9/13/2002 Ind. No. I Results I Dwell Time Indication Desc. / Exam Limitations I etc.

Remarks N/A NI 10 N/A N/A Primary Examiner ASNT Level Initials Assistant Examiner ASNT Level.- 1 Initials Non-Technical Review Date John W. Bell II S NC N DE LevlIi Rie AwAJ 3 Jo seph D. Funyak "Date Percentage of Code

/

Coverage 100 ANII Review Date 1

Revision 6.

77 Aw G jo

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR2-5130 RESIDUAL HEAT REMOVAL PUMP A ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI NRI RI cs-i x

CS-2 X

CS-3 X

-4 9

m

I APR2-5130 AUXILIARY EL. 83*-0" ROOM 2129 REMOVAL PUMP (A)

ZERO REF.

(1.0' CASING DRAIN)

B247 CS-3 CS-2 2

RESSURE RETAINING BOLTING, 24 -

1.125 DIAMETER FVENDOR MANUAL U-277513 3 SUPPORTS 2 11-PI-971 TLS I JAR IREVISED'PER REA 97-1566 REV. 0 EW 0

11-22-911 ýIgH I JAR JISSUED PER PCN S-91-2-7763.

jCAB/Rl HGM IR-C/AHIDML REZV.

ZATE Iv BY CT DEC~CRD4N APPM I APPU2 APPR.3 IPPN.4 Southern Conpany Services, Inc rIRESIDUAL HEAT REMOVAL PUMP (A)I RESIDUAL HEAT II L

ALABAMA POVER COMPANY SCs ZAv; NBuuPE JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 1

A-356454 122 1 FNP-2-M-09

System/Support No APR2-5130-CS-1 Hanger Type RHR PUMP (A) 02E11P001A-A Farley Nuclear Plant Support Examination Record VT-3 Examiner Signatur Paul DiValerio Examiner Signature N/A EXAMINATION LIST:

Deformation or structural degradation of fasteners, springs, clamps, or other support items.

Missing, detached, or loosened support items.

Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices.

mny crack or linear indication.

Fluid loss or lack of fluid indication (hydraulic snubber only).

Other conditions Spring Can Hot and Cold Positions (draw sketch)

Constant Spring Hanger (Sketch setting of pointer and setting location of the hot (red) and cold (white) stickers)

Resolution 1/32" Division (Scale) 1132" Line (Gray Card)

Acceptable! Unacceptable/ NA Acceptable Acceptable N/A Acceptable N/A N/A Time of Exam NA N/A Identification Plate Calibrated Load Setting NA Comments:

NA iew Tools Flashlight, Mirror, 6" Scale I- ________________________

Sketch (if applicable)

Page.

ofI FNP-0-NDE-1 00.23 S H AR ED Southern Nuclear Operating Company WOIWAISTP Sheet No.

NA S02F2V149 Type ExamiTechnique Procedure/Version Exam Date VT-3

/ Direct FNP-0-NDE-100.23

/ 5 0 / N/A 9/19/2002 Rianu unit

-arley /

2 I

Farley nuclear Pnlan FNP-0-NDE-100.23 Support Examination Record VT-3 SHA RE D Southern Nuclear Operating Company Plant/ Unit System/Support No WO/WNSTP Sheet No.

carley/

2 APR2-5130-CS-2 NA S02F2V150 K

Hanger Type Type Exam/Technique Procedure/Version Exam Date RHR PUMP (A) Q2E11P001A-A VT-3

/ Direct FNP-0-NDE-100.23

/ 5 0 / N/A 5/19/2002 Examiner Signature Level Resolution Tools Flashlight, Mirror, 6" Paul DiValerio y./_

II Scale Paul Dialerio 1/32" Division (Scale)

Scl Examiner Signature-Level N/A N/A 1/32" Line (Gray Card)

Li EXAMINATION LIST:

Sketch (if applicable)

Acceptable!/Unacceptable!/NA Deformation or structural degradation of fasteners, springs, clamps, or other support items.

Acceptable Missing, detached, or loosened support items.

Acceptable Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices.

N/A kny crack or linear 4ndication.

Acceptable Fluid loss or lack of fluid indication (hydraulic snubber only).

N/A Other conditions N/A Spring Can Hot and Cold Time of Exam N/A Positions (draw sketch)

NA Constant Spring Hanger (Sketch setting of pointer and setting location of the hot (red) and cold (white) stickers)

Identification Plate Calibrated Load Setting NA Comments:

NA NDE Level l/1ill Review Date:

ANII Review Date:

Version 5.0 Page /

of I*

I li!

I z,*l _==

Farley Nuclear Plant Support Examination Record VT-3 SHARED FNP-0-NDE-100.23 Southern Nuclear Operatinq Company Plantl Unit System/Support No WO/WA/STP Sheet No.

ýarley /

2 APR2-5130-CS-3 NA S02F2V151 Hanger Type Type Exam/Technique Procedure/Version Exam Date RHR PUMP (A) Q2E11P001A-A VT-3

/ Direct FNP-0-NDE-100.23 5 0 / N/A 9/19/2002 Examiner Signature Level Resolution Tools Flashlight, Mirror, 6" Paul DiValerio

.'/K II Scale Paul

____n

1/32" Division (Scale)

Examiner Signature Level N/A N/A 1/32" Line (Gray Card)

El EXAMINATION LIST:

Deformation or structural degradation of fasteners, springs, clamps, or other support items.

Missing, detached, or loosened support items.

Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices.

\\ny crack or linear indication.

Fluid loss or lack of fluid indication (hydraulic snubber only).

Other conditions Spring Can Hot and Cold Positions (draw sketch)

Constant Spring Hanger (Sketch setting of pointer and setting location of the hot (red) and cold (white) stickers)

Acceptable/ Unacceptable/ NA Acceptable Acceptable N/A Acceptable N/A N/A Time of Exam N/A NA Identification Plate Calibrated Load Setting NA Comments:

NA NDE Level 111111 Review I

Ii Versio( 5.0 /

Page Lof(

Date:

ANII Review

V

?

o?

Sketch (if applicable)

Date: 1z'/ I-Version( 5.0 /1 Page __

Of /

I

2.2

NO EXAMINATIONS SCHEDULED THIS OUTAGE ii

2.3

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR2-4100 MAIN STEAM LINE-LOOP 1 ITEM NO VOLUNIERIC SURFACE VISUAL REMARKS NI NRM RI NI NRI RI NI NRI RI 2MS-R613 X

IER-002 I-I.

I-t-t-t-4-4-4-I-4-4.

t U. 4.-

4.-4-6a U -

t 1* 4-4-4-6-a U

t I -

44.
4.

445 V -

t I 4.

-4.

4.
  • 4-5 if -

t 1*

44

-4. 4.

-5

FNP-2-M-097 CONTAINMENT MAIN STEAM LINE JAPR2-4100 LOOIP 1 1

DPT 314' CONN 010A LvP 17LS iyr V' RT PL 3

Cr' 4LS 3/4' EBB-1---i 4

16LS 4

1'RT PLUG ~475, Li iR 14' F

454 4 7T4 2MS-R95(W.S.)

w I

S*

o~~n 11LS *OLS 9LS W.P. EL. 149'--51"'

WP EL 149' 5

1 1,,. -F -o EL. 14

'-7 (REF.)

7-VA 7LS nP r 18LS 00 BR V CONN NOTE 14LS

1. (NWA)

NONESSENTIAL WELDED ATTACHMENT 13 LEFT FROM DELETED HANGER.

L 4-0 0

C I

00. X CL 00 L

L 0

C 00*

.c C6 inL C

04 C

.. 0 C

CL L c

L 0

0

'A 0 0

l-I rm, 0

C- 0 gU C U

004 O1.N3 (IA w C ruý 0~

EUMI

  • UPPURTI (7).

037 N/A LINE NUMBER: 0-2-Nil-EBB-I BOUNDARY DIAGRAM D-356350 SH. I REFERENCE ISO'S D-515003 SH. 1 LINE SIZE:32' EBB-I 4

3-15-02:

I DFV lAP IP-F KIN PFP Tn nrp Q7-;-O'l1-.

n

.. nneI r

I-I n,7 REV.

DATE BY CHK'D DESCRIPTION APPR 1 APPR 2 APPR.3 APPR.4 Southern Company Services, Inc,,or Nll MAIN STEAM ALABAMA POWER COMPANY SCS DRAWING NUMBER SHEET REV.

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2

- -356454 I

K I PLUGj 1-13LS 14 15R-1 4

N/A TYPE QU*bQITY SIZE FNP-FIG CAL BLOCK BUTT WELD 18 )/N 321 030 ALA-24 LONG SEAM WELD 17f 4 \\ 32" 030 ALA-24 SOCKET WELD

"-j

'm -//A N/A N/A BRANCH CONN oj N/A N/A N/A ELDED.. SUPP Z

N/A 028 N/A N/A

Farley Nuclear Plant Support Examination Record VT-3 SHARED FNP-0-NDE-100.23 Southern Nuclear Operating Company FIdrIllU UiIII

'arley /

2

\\......

Hanger Type SPRING CAN WIATT System/Support No APR2-4100-2MS-R613 IType Exam[Technique VT-3 IDirect WOIWAISTP NA Sheet No.

S02F2V133 ProcedureNersion I Exam Date FNP-0-NDE-100 23

/ 5.0 / N/A 9/26/2002 Tools Flashlight, Mirror, 6" i

Scale Examiner Signature Level SNIA 1/32" Line (Gray Card)

EXAMINATION LIST:

Deformation or structural degradation of fasteners, springs, clamps, or other support items.

Missing, detached, or loosened support items.

Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices

\\ny crack or linear

.,Kindication Fluid loss or lack of fluid indication (hydraulic snubber lonly).

Other conditions Spring Can Hot and Cold Positions (draw sketch)

Constant Spring Hanger I(Sketch setting of pointer and

!setting location of the hot (red) and

!cold (white) stickers)

Acceptable/ Unacceptable! NA Acceptable Acceptable N/A Unacceptable N/A Unacceptable*

Time of Exam N/A 11 45 Sketch (if applicable)

Identification Plate Calibrated Load Setting

Comments:

Reference attached sketches and photos COlJ 4

ý3fj,

,4 L 133co)-

i 7321 I

.5j Q~czpDe P4 C

p.-4ý:

00

%QZ.-

T-ba-7,------

Date:

Page) of Examiner Signature JohnW Bell

  • A.P.

a-t N/A Level I Resolution Ill 1132" Division (Scale)

NDE Level 111111 Review Date:

ANII Review jn-oi_

II

[ Type Exam/Technique

, v-r-3 I Direct i

  • J

¥ v

i

LE r-T SPElto G C A ýJ I)F-FL, J-

-3 /4 ApqQ--4[Co VIEWEb FACioc-.,

.V.

SPRIQG CAtýj Go-whig-L SME 18 TI PEE 1--s3t) llosl;-n.

LLLLXSTP-A'T\\\\3E WEA9-OtJ SP'Z"JG CAIa Wt#jbot,,,

B 0-tr Ct F-A CO-P Lo #,.b =w-b ( C-ATc rz-4T LoAb TWDIýA-Topa, 14,ýS GotLGC's

-311 o" L.

' -7 3w AK tACI:

F?- V133

-To ýk P..) 6 s t-f-13 -?- (o -0 lbsIsm 9320 loraso ilgeo

ý-5310 14,380 14-Cý 15970

VIEWEb PACoic, P,. V, SP(Ztklr. CA.1 GiumKiEL SI-LE IS MLUJ-STP-A-TkJE TiPE E V-ý3t) 16sl ;-A.

-7 WCAR otJ SPP-ILC CAN Witibovi it BOTTOM L-oAb --CMýt LA-tOet 4*r 4 -

I 4G4o L-lDAb=-FJbI(-ATop-A&;S GOUGES AýJ'-114AS MlSALIC)"PE-QT IN Tr 0 #,)

ANC) ei 502 FZV135 3 of ý 9-/--G-oz

,7t;*,ýj b icL-L-

T ý:Dsr A-r, ot,.j tj

'SIM:

o-f'V L

q eýý

EXAMINATION

SUMMARY

FOR UNIT 2 INTERVAL 3 PERIOD 1 OUTAGE 1 DRAWING APR2-4101 MAIN STEAM LINE ITEM NO VOLUMERIC SURFACE VISUAL REMARKS NI NRI RI NI NRI RI NI NRI RI 2MS-R511 X

.1-I I -



A. I a -

L -

A. -

£ 4LA

4. 4-6-4.-I 4-4-4.

I' -

I -

.969 164

9.

4.

I -

.9-6-P

.4-*

-4.-9.-

99

9*4

9.

4.

.5.-

93195 I. -

I -.

4. -I-4-5-I

.4 

I. -

I -

A

4. 4

5I

.4 5...

A. -

I -

.5.

FNP-P-M-flq:

IMAIN STEAM ROOD 24 MAIN STEAM LINE Al IAPR2-4101 Vol rORCONT. SEE

\\,--/ -j TYPE

____Y

=MFW CAJ-.hCK X VaD 4

34--

ON A-23 X WED 4

3Z2 03M MAL24 3317 VEU.

4 I.

036

.A~o-If Dum V=.

5 911 02 LA-38 LEM SENVL 3

3461r 036 ALA-23 S03=T VELD s

W/A N/A N/A BRAN40 CmO4 5

qV 034 M.AL-E22 MMANC C5W I

034 ALA-23 w

&- m I



---w-4-.ii.





VELLLL 11".

L4&w. 14rrUK I r



I N/A NfA 037 N/A LINE NUMBERe 0-2-NII-EBB-1 IBOUNDARY DIAGRAM D-356 350 SK I Q-2-NII-EBB-3 0-2-NII-EBB-6 IREFERENCE ISO'S D-515004 SH. I LINE SIZE' 34.~55, 32', & 9' EBB-3 ID-515604 SH. I IQ 8' EBB-6. 6. EfBD--I IN REF, TO DCP 95-2-8925, 001-005 E

0 11-22-91 -SIH JAR ISSUED PER PCN S-91-2-7763, CAR/

HGM RCADMIL KEV.

, f T E BY CWT' OSCRWTD4 APPFRZ APPR.2 APPR.3 AP?

SOU-he~rn Comp =ny Services, IcfrN1-MAIN STEAM ALABAMA PO~WER COMPANY USc MAW= HUM=

J~ S v

JOSEPH K4 FARLEY NUCLEAR PLANT F-1 I UNIT 2 1j A-1645 N/A FNP-P-M-flq' I

45.-(REF.)

9 f9' r~i

,oil(%/'

I ILS b:1)9 (REF.)

(E.

3

~FUR CONT. SEE-\\

EDD6(RF.,./34.550' 0.1.

X 3Z' O.U 1'

EB-6(RF.)VELD TRANSIT1ION 28 27 23 5-1 F13R CONT.

SEE ABOVE 24GREF.)

31 32 OS 00 43-N 3 33 f%%&

Farley Nuclear Plant A

FNP-0-NDE-100.23 Support Examination Record VT-3 SHARED Southern Nuclear Operating Company

! Plant!/Unit Rv~tf.ml.,tnnn,4 Id.,.......

S.

Y..

A/TP Sheet No.

--arley /

2 APR2-4101-2MS-R511 NA S0FV2 Hanger Type Type Exam/Technique Procedure/Version Exam Date 2 DIRECTIONAL RESTRAINT W/STANC (3)I VT-3 IDirect iFNP-0-NDE-1 00 23 1 5 0 NINA,912312002 Examiner Signature Level Resolution Tools Falshhight, Mirror, 6" Joseph D. Funyak 0 ý ý 'a 1132" Division (Scale)

Scale Examiner Signature I Level I

IN/A i

N/A 1132" Line (Gray Card)

EXAMINATION LIST:

Deformation or structural degradation of fasteners, springs, clamps, or other support items Missing, detached, or loosened support items.

Arc strikes, weld spatter, paint scoring, roughness, or general corrosion on close tolerance machined or sliding surfaces or on the wire strands of Wear devices.

\\ny crack or linear indication.

Fluid loss or lack of fluid indication (hydraulic snubber only)

Acceptable/ Una Acceptable Acceptable Acceptable Acceptable I

Il//Jtt Other conditions N/A Spring Can Hot and Cold Time of Exam N/A Positions (draw sketch)

NA Constant Spring Hanger (Sketch setting of pointer and setting location of the hot (red) and cold (white) stickers)

Identification Plate Calibrated Load Setting NA IComments:

INA Page t of I Sketch (if applicable) icceptable/ NA NIA I

kit^