ROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 01/24/99 System:
A.1-1: Conduct of Operations JTA Task #: CPSES BANK: RO1803 Task
Title:
Perform QPTR Calculation KSA Ref: 2.1.20 Executing Procedures PEO:
RO:
3.9 SRO:
4.0 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 30 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
OPT-302 Tools, Equipment, Job Aids, etc:
Calculator OPT-302-1 Instructor Copy (Key)
OPT-302-1 Working Copy
ROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 01/24/99
ROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 4 Rev Date: 01/24/99 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
The Unit Supervisor assigns you to manually complete OPT-302, Calculating Power Tilt Ratio.
Terminating Conditions:
OPT-302 is ready for Shift Manager review and signature.
ROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 4 Rev Date: 01/24/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT
- 1 Operator reviews form OPT-302-1 with data already provided on the form Review Form OPT-302-1
- 2 Operator competes the QPTR in OPT-302.
CUE: All necessary data is already provided on the form provided.
TASK COMPLETE QPTR calculation within tolerance listed on the Examiner Data Sheet and all Acceptance Criteria satisfied.
ROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 4 Rev Date: 01/24/99 INITIATING CUE: The Unit Supervisor assigns you to manually perform OPT-302, Calculating Power Tilt Ratio.
ROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 01/24/99 System:
A.1-2: Conduct of Operations JTA Task #: ROA2 (NEW)
Task
Title:
Perform an RCS Inventory Balance KSA Ref: 2.1.23 Integrated Plant Procedures PEO:
RO:
2.8 SRO:
3.1 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 30 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
OPT-303 Tools, Equipment, Job Aids, etc:
Calculator Steam Tables OPT-303-1 (with initial and final data pre-recorded)
ROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 01/24/99
ROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 4 Rev Date: 01/24/99 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
The Unit Supervisor assigns you to manually complete OPT-303, RCS Water Inventory calculation. The data have already been collected over the previous two hours. Given OPT 303-1, perform steps 8.4.1.F,G,H, and I utilizing Steam Tables.
Terminating Conditions:
OPT-303 is ready for Shift Manager review and signature.
ROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 4 Rev Date: 01/24/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT
- 1 Operator locates all required forms to perform OPT.
Form OPT-303-1 prepopulated with data.
- 2 Operator completes the calculations per the key.
TASK COMPLETE
ROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 4 Rev Date: 01/24/99 INITIATING CUE: The Unit Supervisor assigns you to manually complete OPT-303, RCS Water Inventory calculation. The data have already been collected over the previous two hours. Given OPT 303-1, perform steps 8.4.1.F,G,H, and I utilizing Steam Tables.
OPT-303-1 R-8 UNIT 1 REACTOR COOLANT SYSTEM WATER INVENTORY DATA COLLECTION 8.2.1 8.3.2 PARAMETER COMPUTER POINT INST. NO.
INITIAL VALUE FINAL VALUE UNIT TIME N/A N/A 2154 0000 HR:MIN RC LOOP 1 TAVE T0400A 1-TI-412 587.70 587.60
F RC LOOP 2 TAVE T0420A 1-TI-422 590.70 590.60
F RC LOOP 3 TAVE T0440A 1-TI-432 588.70 588.50
F RC LOOP 4 TAVE T0460A 1-TI-442 590.10 590.00
F PRZR PRESS P0481A 1-PI-456 2232.0 2231.0 PSIG PRZR PRESS P6480A 1-PI-455A 2233.0 2231.0 PSIG PRZR PRESS P0482A 1-PI-457 2235.0 2233.0 PSIG PRZR PRESS P6483A 1-PI-458 2234.0 2233.0 PSIG PRZR LVL L6481A 1-LI-460A 58.40 58.47 PRZR LVL L6480A 1-LI-459A 59.99 60.03 PRZR LVL L6482A 1-LI-461 59.24 59.32 VCT TEMP T0140A 1-TI-116 97.80 97.60
F VCT PRESS P0139A 1-PI-115 35.30 35.01 PSIG VCT LVL L6112A 1-LI-112A 49.80 48.95 PRT TEMP T6485A 1-TI-468 88.2 88.3
F PRT PRESS P6485A 1-PI-469 2.11 2.30 PSIG PRT LVL L6485A 1-LI-470 81.0 81.0 RCDT TEMP N/A 1-TI-1058 79.5 79.5
F RCDT PRESS N/A 1-PI-1004 3.21 3.18 PSIG RCDT LVL L1003A 1-LI-1003 31.2 32.1 RCDT FLOW TOT N/A 1-QI-1014 0.0 0.0 GAL Data Recorded By: Initial Date Final Date
OPT-303-1 R-8 UNIT 1 REACTOR COOLANT SYSTEM WATER INVENTORY CALCULATION 8.4.1A, 8.4.1B MASS RCS Initial RCS TAVE (Average of all values)
Initial PRZR PRESS (Average of all values)
(Avg PRZR PRESS + 14.7)
Initial RCS Specific Volume (VI)
= 589.30 F
= 2248.2 psia
= 0.02270 ft3/lbm Final RCS TAVE (Average of all values)
Final PRZR PRESS (Average of all values)
(Avg PRZR PRESS + 14.7)
Final RCS Specific Volume (VF)
= 589.175 F
= 2246.70 psia
= 0.02269 ft3/lbm
- 97.32 M RCS 11420 ft3 11420 ft3 VI (ft3/lbm) VF (ft3/lbm)
=
lbm 8.4.1C, 8.4.1D, 8.4.1E MASS PRZR Initial PRZR PRESS (Average of all values)
(Avg PRZR PRESS + 14.7)
Initial PRZR Liquid Specific Volume (VIL)
Initial PRZR Vapor Specific Volume (VIV)
Initial PRZR Liquid Volume (VolI) TDM-804A
= 2248.20 psia
= 0.02697 ft3/lbm
= 0.15713 ft3/lbm
= 8057.09 gal M PRZR Initial VolI (gal) 13464 (gal) - VolI (gal)
+
(VIL (ft3/lbm)) (7.48 (gal/ft3)) (VIV (ft3/lbm)) (7.48 (gal/ft3))
= 44545.67 lbm Final PRZR PRESS (Average of all values)
(Avg PRZR PRESS + 14.7)
Final PRZR Liquid Specific Volume (VFL)
Final PRZR Vapor Specific Volume (VFV)
Final PRZR Liquid Volume (VolF) TDM-804A
= 2246.70 psia
= 0.02696 ft3/lbm
= 0.15730 ft3/lbm
= 8065.02 gal M PRZR Final VolF (gal) 13464 (gal) - VolF (gal)
+
(VFL (ft3/lbm)) (7.48 (gal/ft3)) (VFV (ft3/lbm)) (7.48 (gal/ft3))
= 44586.08 lbm lbm
OPT-303-1 R-8 M PRZR M PRZR Initial - M PRZR Final
=
- 40.41 UNIT 1 REACTOR COOLANT SYSTEM WATER INVENTORY CALCULATION - KEY 8.4.1F, 8.4.1G, 8.4.1H MASS VCT Initial VCT TEMP Initial VCT PRESS (VCT PRESS + 14.7)
Initial VCT Specific Volume (VI)
Initial VCT Volume (VolI) TDM-804A
= 97.80 F
= 50.0 psia
= 0.01612 ft3/lbm
= 1481.42 gal Final VCT TEMP Final VCT PRESS (VCT PRESS + 14.7)
Final VCT Specific Volume (VF)
Final VCT Volume (VolF) TDM-804A
= 97.60 F
= 49.710 psia
= 0.01612 ft3/lbm
= 1464.93 gal 136.28 M VCT VolI (gal) VolF (gal)
(VI (ft3/lbm)) (7.48 (gal/ft3)) (VF (ft3/lbm)) (7.48 (gal/ft3))
=
lbm 8.4.1I RCS TOTAL LEAKAGE
= 126 min
=
0.00 gpm Elapsed Time Total RCS Leakage M RCS (lbm) + M PRZR (lbm) + M VCT (lbm)
(Elapsed Time (min) (8.33 lbm/gal)
OPT-303-1 R-8 SOLUTION-KEY Determinine VCT Specific Volumes with Steam Tables using the specific volume for saturated liquid at a temparture equal to 1-TI-116 (VCT OUT TEMP)
Specific Volume for 96.0 degrees 0.016117 Specific Volume for 98.0 degrees 0.016123 Initial = extrapulating 97.8 degrees - delta btwn 96.0 to 98.0 is 0.000006 97.8 degrees is = to 90% of the delta which equals 0.0000054 Adding the delta to the 96.0 degrees value yields 0.0161224 (97.8 degree initial value)
Final = 97.6 degrees is = to 80% of the delta which equals 0.0000048 Adding the delta to the 96.0 degrees value yields 0.0161218 (97.6 degree final value)
Using the TDM 804A Volume (gallons) for 48% = 1446.5 gallons Volume (gallons) for 51% = 1504.7 gallons Extrapolating for 49.8% yields 60% of the delta(58.2) added to 1446.5 Using these values results in a Initial VCT Volume of 1481.42 gallons Extrapolating for 48.95% yields 31.7% of the delta(58.2) added to 1446.5 Using these values results in a Final VCT Volume of 1464.93 gallons Delta mass in VCT is equal to 136.28596 LBM Elapsed time is equal to 2154 subtracted from mid night (2400) = 126 minutes Total RCS Leakage is Delta Mass RCS = - 97.32 LBM (given)
Delta Mass PZR = - 40.41 LBM(given)
Delta Mass VCT = + 136.28596 LBM
OPT-303-1 R-8 TOTAL change in Mass - 1.44405 devided by the product of 126 times 8.33
= to - 0.0013758 which was rounded to 0.0 gpm UNIT 1 REACTOR COOLANT SYSTEM WATER INVENTORY CALCULATION 8.4.1F, 8.4.1G, 8.4.1H MASS VCT Initial VCT TEMP Initial VCT PRESS (VCT PRESS + 14.7)
Initial VCT Specific Volume (VI)
Initial VCT Volume (VolI) TDM-804A
= _______ F
= _______ psia
= _______ ft3/lbm
= _______ gal Final VCT TEMP Final VCT PRESS (VCT PRESS + 14.7)
Final VCT Specific Volume (VF)
Final VCT Volume (VolF) TDM-804A
= _______F
= _______ psia
= _______ ft3/lbm
= _______ gal M VCT VolI (gal) VolF (gal)
(VI (ft3/lbm)) (7.48 (gal/ft3)) (VF (ft3/lbm)) (7.48 (gal/ft3))
=
lbm 8.4.1I RCS TOTAL LEAKAGE
= _______ min Elapsed Time Total RCS Leakage
OPT-303-1 R-8
=
gpm M RCS (lbm) + M PRZR (lbm) + M VCT (lbm)
(Elapsed Time (min) (8.33 lbm/gal)
ROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 01/24/99 System:
A.2: Equipment Control JTA Task #: ROA3 (NEW)
Task
Title:
Identify Errors in a Faulted Clearance (Tagout)
KSA Ref: 2.2.13 Tagging and Clearance Proc.
PEO:
RO:
3.6 SRO:
3.8 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
STA-605, AClearance and Safety Tagging,@
Revision 14 OWI-110, AOperations Department Work Tools, Equipment, Job Aids, etc:
ROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 01/24/99 Control and Clearance Guideline,@ Revision 11 Dwg M1-206, Sheet 1
ROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 4 Rev Date: 01/24/99 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
The clearance was prepared by an Atrainee@ to replace 1AF-0143 and you have been asked by the Work Control Supervisor to review the prepared clearance as a qualified clearance preparer.
Identify the three substantive errors associated with this clearance.
Terminating Conditions:
Finishes review of the clearance and identifies 3 errors.
ROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 4 Rev Date: 01/24/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Provide candidate with completed copy of the initiating cue Candidate should review Admin JPM and initiating cue 2*
Identifies 3 errors Candidate identifies the following 3 errors:
not tagged
- 2. Service Water Suction Supply Valve - missing local tag for 1AF-0019 (also can be referred to as 1HV-2480)
Errors can be found in ANY order.
3 of 3 errors must be identified for the JPM to be sat.
TASK COMPLETE
ROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 4 Rev Date: 01/24/99 INITIATING CUE: The clearance was prepared by an Atrainee@ to replace 1AF-0143 and you have been asked by the Work Control Supervisor to review the prepared clearance as a qualified clearance preparer. Identify the three substantive errors associated with this clearance.
ROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 1 of 4 Rev Date: 01/05/00 System:
A.3: Radiation Control JTA Task #: ROA4 (NEW)
Task
Title:
Interpret a Survey Map and Answer 2 Questions KSA Ref: 2.3.10 Guard Against Pers. Exposure PEO:
RO:
2.9 SRO:
3.3 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
ROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 2 of 4 Rev Date: 01/05/00
References:
RPI-602 TS-5.7 Tools, Equipment, Job Aids, etc:
RPI-602-1 Completed Survey Map (key for examiner)
RPI-602-1 Survey Map (handed to applicant)
ROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 3 of 4 Rev Date: 01/05/00 KEY
- 1.
What is the maximum general area radiation level indicated on the survey map?
150 mR/hr
- 2.
What is the maximum contamination level indicated on the survey map?
21k cpm/100cm2 (swipe #7)
ROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 4 of 4 Rev Date: 01/05/00
- 1.
What is the maximum general area radiation level indicated on the survey map?
- 2.
What is the maximum contamination level indicated on the survey map?
ROA5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 3 Rev Date: 09/24/02 System:
A.4: Emergency Plan JTA Task #: ROA5 (NEW)
Task
Title:
EP General Access Training Questions KSA Ref: 2.4.39 RO=s EP Responsibilities PEO:
RO:
3.3 SRO:
3.1 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
ROA5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 3 Rev Date: 09/24/02
References:
EP General Access Training Plan Tools, Equipment, Job Aids, etc:
Questions must be answered without references.
ROA5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 3 Rev Date: 09/24/02 TO BE ANSWERED WITHOUT REFERENCES QUESTION #1:
List 4 means of reporting emergencies to the Control Room:
QUESTION #2:
List the two potential Relocation Centers to which personnel will be directed to proceed for monitoring in the event of a Site Evacuation:
ROA5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 3 Rev Date: 09/24/02 ANSWER KEY QUESTION #1:
List 4 means of reporting emergencies to the Control Room:
(MUST GET 3 OUT OF 4 CORRECT)
- 1. TELEPHONE
- 2. GAI-TRONICS
- 3. TWO-WAY RADIOS
- 4. REPORTING DIRECTLY TO THE CONTROL ROOM QUESTION #2:
List the two potential Relocation Centers to which personnel will be directed to proceed for monitoring in the event of a Site Evacuation:
(MUST GET BOTH CORRECT)
CLEBURNE STEPHENVILLE
SROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 5 Rev Date: 04/26/99 System:
A.1-1: Conduct of Operations JTA Task #: CPSES BANK: RO1010 Task
Title:
Perform Shutdown Margin Calculations KSA Ref: 2.1.23 Integrated Plant Procedures RO:
3.9 SRO:
4.0 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 30 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
OPT-301, AReactor Shutdown Margin Verification@
Technical Specifications Tools, Equipment, Job Aids, etc:
OPT-301 OPT-301-9 SOR
SROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 5 Rev Date: 04/26/99 Startup and Operation Report Core Operating Limits Report COLR
SROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 5 Rev Date: 04/26/99 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
It is now December 15 at 0700. Unit-1 tripped from 100% power, equilibrium conditions 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> ago. All rods are fully inserted, RCS Tave is 375F and the boron concentration is 1250 ppm from a sample taken 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the trip. Core burnup is 8000 MWD/ MTU. The computer program is unavailable and you are to perform a manual Shutdown Margin Verification per OPT-301, A Reactor Shutdown Margin Verification@. Assume Core #9.
Terminating Conditions:
Shutdown Margin Verification has been completed per OPT-301 and OPT-301-9 filled out correctly.
SROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 5 Rev Date: 04/26/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Obtains OPT-301 and a working copy of form OPT-301-9 OPT-301 open for reference 2
Completes top portion of OPT-301-9 Unit NO.; Cycle No:
use current cycle; Mode: 3; Current date and time per cue.
3 Enters the RCS boron concentration on line A.1 and sample time.
Enters 1250 ppm on line A.1 4
Enters RCS Tave on line A.2 Enters 375F on line A.2 5
Enters core burnup on line A.3 and checks the appropriate box.
Enters 8000 and check MOL box.
6 Enters number of stuck RCCAs on line A.4.
Enters 0 on line A.4 for no stuck RCCAs.
7 Refers to COLR and determines SDM reactivity requirement for present MODE. Enters value in line A.5.
Enters 1300 on line A.5.
Candidate may know from memory the requirement of 1.3%K/K which is 1300 pcm.
8 Determines the uncorrected minimum boron concentration from SOR table 5.13 and enters on line B.1.
Refers to SOR table 5.13 and enters correct value on line B.1.
- 9 Determines A.1 B.1 and credit must be taken for Xe and Sm.
A.1 B.1. Must take credit for Xe and Sm by performing section 8.1.4 and 8.1.5.
10 Enters data for C.1 and C.2.
Data given in initiating cue.
11 Determine Xe worth using SOR, table 5.21 and enters on line C.3 and checks box to indicate from SOR.
Enters value from SOR table 5.21 on line C.3.
12 Determines Sm worth using Enters value from SOR
SROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 5 Rev Date: 04/26/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT SOR, table 5.24 and enters on line C.4 and checks box to indicate from SOR.
table 5.24 on line C.4.
13 Determines the IBW using table 5.8 from SOR and enters value on line D.1.
Enters IBW from table 5.8 of SOR on line D.1 14 Determines value for most reactive RCCA from table 5.16 of SOR and enters value on line D.2.
Enters value of most reactive RCCA from table 5.16 of SOR and enters on line D.2.
15 Performs calculation of OPT-301-9, line D.3 to determine worth correction and enters value on line D.3.
Performs calculation of OPT-301-9, line D.3, using 0 for RCCAs and enters value on line D.3.
16 Determines boron correction factor from Figure 5.36 of SOR and enters on line D.4.
Enters value for boron correction factor from Figure 5.36 of SOR on line D.4.
17 Performs calculation of OPT-301-9, line D.5, to determine the IBW for minimum SDM and enters results on line D.5.
Performs calculation of line D.5 to determine IBW for minimum SDM and enters on line D.5
- 18 Determine if SDM requirements are met and completes line F.1.
Verifies boron concentration entered on line A.1 line D.6 and circles YES on line F.1.
TASK COMPLETE
SROA1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 5 Rev Date: 04/26/99 INITIATING CUE:
It is now December 15 at 0700. Unit-1 tripped from 100% power, equilibrium conditions 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> ago.
All rods are fully inserted, RCS Tave is 375F and the boron concentration is 1250 ppm from a sample taken 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after the trip. Core burnup is 8000 MWD/ MTU. The computer program is unavailable and you are to perform a manual Shutdown Margin Verification per OPT-301, A Reactor Shutdown Margin Verification@. Assume Core #9.
OPT-301-9 Page 1 of 1 R-3 SHUTDOWN MARGIN KEY Unit 1 Cycle 9 MODE Date Time
- 1.
PLANT CONDITIONS A.2_ RCS Boron ppm
@ Date Time A.3 Burnup MWD/MTU
[ ] BOL [ ] MOL
[ ] EOL A.2 Tave OF A.4 No. of Stuck RCCAs A.5 COLR Shutdown Margin Requirement pcm B.1 UNCORRECTED MIN BORON FOR SDM at A.2 and A.3 1429 ppm
- 3.
[ ]
N/A C.1 Shutdown: Date 15 Dec Time 0000 Duration 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> C.2
[ ] Power
[X] Power at Trip 100 %RTP C.3 Xenon Worth
[X] SOR
[ ] PC
( - ) 4242 pcm C.4 Samarium Worth [X] SOR
[ ] PC
( - ) 923 pcm
- 4.
SHUTDOWN MARGIN BORON CONCENTRATION
[ ]
N/A D.1 IBW at B.1
( - ) 13640.8 pcm D.2 Most Reactive RCCA Worth
( + )
881 pcm D.3 Worth Correction [ C.3 + C.4 + (A.4
- D.2) ]
( - ) 5165 pcm D.4 Boron Correction Factor at C.3 + C.4 0.974 D.5 IBW for Minimum SDM [ (D.1 - D.3) / D.4 ]
( - ) 8702 pcm D.6 SDM Boron Concentration at D.5 and A.2 898.95 ppm
- 5.
SUBCRITICAL MARGIN
[X]
N/A E.1 IBW at A.1 and A.2
( - ) pcm E.2 Total Worth [(E.1
- D.4) + C.3 + C.4 + (A.4
- D.2)]
( ) pcm E.3 Subcritical Margin (D.1 + A.5 - E.2)
( ) pcm
- 6.
ACCEPTANCE CRITERIA SATISFIED INITIALS F.1 A.1 > B.1 AND A.4=0 OR A.1 > D.6 YES NO Comments: ASSUMPTIONS: Trip at 0000 on the 15th of Dec. Unit is 1 and Core # 9 (SOR)
And Subcritical Margin not performed(optional)
Performed By: Date:
OPT-301-9 Page 1 of 1 R-3 Reviewed By: Date:
Shift Manager: Date:
Operations Management: Date:
OPT-301-9 Page 1 of 1 R-3 SHUTDOWN MARGIN Unit Cycle MODE Date Time A PLANT CONDITIONS A.1 RCS Boron ppm
@ Date Time A.3 Burnup MWD/MTU
[ ] BOL [ ] MOL
[ ] EOL A.2 Tave OF A.4 No. of Stuck RCCAs A.5 COLR Shutdown Margin Requirement pcm B.1 UNCORRECTED MIN BORON FOR SDM at A.2 and A.3 ppm C. XENON AND SAMARIUM WORTH
[ ] N/A C.1 Shutdown: Date Time Duration hours C.2
[ ] Power
[ ] Power at Trip
%RTP C.3 Xenon Worth
[ ] SOR
[ ] PC
( - ) pcm C.4 Samarium Worth
[ ] SOR
[ ] PC
( - ) pcm D. SHUTDOWN MARGIN BORON CONCENTRATION
[ ] N/A D.1 IBW at B.1
( - ) pcm D.2 Most Reactive RCCA Worth
( + )
pcm D.3 Worth Correction [ C.3 + C.4 + (A.4
- D.2) ]
( - ) pcm D.4 Boron Correction Factor at C.3 + C.4 D.5 IBW for Minimum SDM [ (D.1 - D.3) / D.4 ]
( - ) pcm D.6 SDM Boron Concentration at D.5 and A.2 ppm E. SUBCRITICAL MARGIN
[ ] N/A E.1 IBW at A.1 and A.2
( - ) pcm E.2 Total Worth [(E.1
- D.4) + C.3 + C.4 + (A.4
- D.2)]
( ) pcm E.3 Subcritical Margin (D.1 + A.5 - E.2)
( ) pcm
- 7.
ACCEPTANCE CRITERIA SATISFIED INITIALS F.1 A.1 > B.1 AND A.4=0 OR A.1 > D.6 YES NO Comments:
Performed By: Date:
Reviewed By: Date:
Shift Manager: Date:
OPT-301-9 Page 1 of 1 R-3
SROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 11/05/02 System:
A.1-2: Conduct of Operations JTA Task #: SROA2 (NEW)
Task
Title:
Review a Faulted Calorimetric KSA Ref: 2.1.25 Obtain/Interp. Performance Data PEO:
RO:
2.8 SRO:
3.1 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
SROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 11/05/02
References:
OPT-309, AUnit Calorimetric@
Tools, Equipment, Job Aids, etc:
Completed (faulted) Form OPT-309-12 Calculator
SROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 4 Rev Date: 11/05/02 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
A calorimetric has been performed. You are the shift manager, and the completed Form OPT-309-12 has been given to you for shift manager review. Review the form and identify the four errors.
Terminating Conditions:
Four errors in OPT-309-12 have been identified.
SROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 4 Rev Date: 11/05/02 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Review the form and identify 4 errors (as indicated on the key)
TASK COMPLETE
Page 5 of 4 Rev Date: 11/05/02 SROA2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure INITIATING CUE: A calorimetric has been performed. You are the shift manager, and the completed Form OPT-309-12 has been given to you for shift manager review. Review the form and identify the four errors.
SROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 01/24/99 System:
A.2: Equipment Control JTA Task #: SROA3 (NEW)
Task
Title:
Identify Errors in a Faulted Clearance (Tagout)
KSA Ref: 2.2.13 Tagging and Clearance Proc.
PEO:
RO:
3.6 SRO:
3.8 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
STA-605, AClearance and Safety Tagging,@
Revision 14 OWI-110, AOperations Department Work Tools, Equipment, Job Aids, etc:
SROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 01/24/99 Control and Clearance Guideline,@ Revision 11 Dwg M1-206, Sheet 1
SROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 4 Rev Date: 01/24/99 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
The clearance was prepared by an Atrainee@ to replace 1AF-0143 and you have been asked by the Work Control Supervisor to review the prepared clearance as a qualified clearance preparer.
Identify the three substantive errors associated with this clearance.
Terminating Conditions:
Finishes review of the clearance and identifies 3 errors.
SROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 4 Rev Date: 01/24/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Provide candidate with completed copy of the initiating cue Candidate should review Admin JPM and initiating cue 2*
Identifies 3 errors Candidate identifies the following 3 errors:
not tagged
- 2. Service Water Suction Supply Valve - missing local tag for 1AF-0019 (also can be referred to as 1HV-2480)
Errors can be found in ANY order.
3 of 3 errors must be identified for the JPM to be sat.
TASK COMPLETE
SROA3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 4 Rev Date: 01/24/99 INITIATING CUE: The clearance was prepared by an Atrainee@ to replace 1AF-0143 and you have been asked by the Work Control Supervisor to review the prepared clearance as a qualified clearance preparer. Identify the three substantive errors associated with this clearance.
SROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 1 of 4 Rev Date: 01/05/00 System:
A.3: Radiation Control JTA Task #: SROA4 (NEW)
Task
Title:
Interpret a Survey Map and Answer 2 Questions KSA Ref: 2.3.10 Guard Against Pers. Exposure PEO:
RO:
2.9 SRO:
3.3 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
SROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 2 of 4 Rev Date: 01/05/00
References:
RPI-602 TS-5.7 Tools, Equipment, Job Aids, etc:
RPI-602-1 Completed Survey Map (key for examiner)
RPI-602-1 Survey Map (handed to applicant)
SROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 3 of 4 Rev Date: 01/05/00 KEY
- 1.
What is the maximum general area radiation level indicated on the survey map?
150 mR/hr
- 2.
What is the maximum contamination level indicated on the survey map?
21k cpm/100cm2 (swipe #7)
SROA4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure: Questions Page 4 of 4 Rev Date: 01/05/00
- 1.
What is the maximum general area radiation level indicated on the survey map?
- 2.
What is the maximum contamination level indicated on the survey map?
SROA5.1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 01/05/00 System:
A.4: Emergency Plan JTA Task #: SROA5.1 (MOD)
Task
Title:
Event Classification KSA Ref: 2.4.41 EAL Classifications PEO:
RO:
2.3 SRO:
4.1 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
SROA5.1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 01/05/00
References:
Procedure EPP-201, AAssessment of Emergency Action Levels, Emergency Classification and Plan Activation@
Tools, Equipment, Job Aids, etc:
Static simulator - following Scenario Run Day 1 (the scenario is actually Scenario 1)
SROA5.1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 4 Rev Date: 01/05/00 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
THIS NEEDS TO BE COMPLETED IN CONJUNCTION WITH SCENARIO 1. Scenario 1 should be run on Day 2 of simulator runs. Do this JPM after the scenario is completed with the simulator in Afreeze.@
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
The simulator is in freeze. Based upon the current plant conditions and events during the scenario, determine the emergency classification and make applicable Protective Action Recommendations.
Terminating Conditions:
Event is classified as a SITE AREA EMERGENCY
SROA5.1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 4 Rev Date: 01/05/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Provide candidate with completed copy of the initiating cue Candidate should review Admin JPM and initiating cue 2
Candidate determines emergency classification for Loss of Offsite Power Candidate determines that the classification for Loss of Offsite Power would be a NOUE (EPP-201)
Candidate should evaluate both events and then based on the individual classifications determine the Aoverall@
classification 3
Candidate determines emergency classification for loss of electrical power Candidate determines that loss of electrical power would be classified as an: SAE
-5A True
-5B True
-5C True
-5D False 4*
Candidate determines the overall classification Candidate determines that the overall classification would be:
SAE TASK COMPLETE
SROA5.1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 4 Rev Date: 01/05/00 INITIATING CUE: The simulator is in freeze. Based upon the current plant conditions and events during the scenario, determine the emergency classification and make applicable Protective Action Recommendations.
SROA5.2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 01/05/00 System:
A.4: Emergency Plan JTA Task #: SROA5.2 (MOD)
Task
Title:
Event Classification KSA Ref: 2.4.41 EAL Classifications PEO:
RO:
2.3 SRO:
4.1 Operator=s Name:
Performance Environment:
ADMIN CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
SROA5.2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 01/05/00
References:
Procedure EPP-201, AAssessment of Emergency Action Levels, Emergency Classification and Plan Activation@
Tools, Equipment, Job Aids, etc:
Static simulator - following Scenario 2
SROA5.2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 4 Rev Date: 01/05/00 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
THIS NEEDS TO BE COMPLETED IN CONJUNCTION WITH SCENARIO 2. Scenario 2 should be run on Day 1 of simulator runs. Do this JPM after the scenario is completed with the simulator in Afreeze.@
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
The simulator is in freeze. Based upon the current plant conditions and events during the scenario, determine the emergency classification and make applicable Protective Action Recommendations.
Terminating Conditions:
Event is classified as a SITE AREA EMERGENCY
SROA5.2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 4 Rev Date: 01/05/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Provide candidate with completed copy of the initiating cue Candidate should review Admin JPM and initiating cue 2
Candidate determines emergency classification for ATWT Candidate determines that the classification for ATWT would be a SITE AREA EMERGENCY
-6D True
-6E True
-6F False Candidate should evaluate both events and then based on the individual classifications determine the Aoverall@
classification 3
Candidate determines emergency classification for SGTR Candidate determines that SGTR would be classified as an:
ALERT 4*
Candidate determines the overall classification Candidate determines that the overall classification would be:
SITE AREA EMERGENCY TASK COMPLETE
SROA5.2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 4 Rev Date: 01/05/00 INITIATING CUE: The simulator is in freeze. Based upon the current plant conditions and events during the scenario, determine the emergency classification and make applicable Protective Action Recommendations.
JPMS1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 11 Rev Date: 05/18/99 System:
Reactor Coolant JTA Task #: CPSES BANK: RO1102 Task
Title:
Start/Stop RCP (ALTERNATE PATH)
KSA Ref: SF4.003.A4.06 PEO:
RO:
2.9 SRO:
2.9 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 min Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
SOP-108A(B), AReactor Coolant Pump@
Tools, Equipment, Job Aids, etc:
SOP-108A/B (Working Copy). Reset to Heatup IC.
JPMS1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 11 Rev Date: 05/18/99 Rack in #3 RCP breaker using Remote Function RCR14. Override Ammeter for RCP #3 to max when pump is started and delete override when pump is stopped.
Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to Manipulate any plant components.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
IPO-001, "Plant Heatup From Cold Shutdown to Hot Standby", has progressed to the point of starting the third Reactor Coolant Pump per SOP-108A. All prerequisites have been met and all steps have been completed through step 5.1.G in SOP-108A. All seal flows are within limits. You are directed to start #3 RCP continuing with step 5.1.H of SOP-108A.
Terminating Conditions:
The #3 RCP and its associated oil lift pump has been stopped.
JPMS1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 7 Rev Date: 05/18/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Verify the alarms on ALB-5A are clear CUE: Alarms clear.
The following alarms are checked clear:
1.2 ANY RCP SEAL 1 LKOFF FLO HI 1.6 ANY RCP SEAL WTR INJ FLOW LO 2.2 ANY RCP SEAL 1 P LO 3.1 ANY RCP SEAL WTR STANDPIPE LVL HI 3.2 ANY RCP SEAL 2 LKOFF FLO HI 4.1 ANY RCP SEAL WTR STANDPIPE LVL LO 3.4 RCP 3 UP BRG L/O RESVR LVL HI/LO 3.5 RCP 3 LOW BRG L/O RESVR LVL HI/LO 2
Verify proper cooling water flows.
CUE: u-FI-4683 indicates 175 gpm.
CUE: u-FI-4685 indicates 8 gpm.
CUE: u-FI-4684 indicates 355 The following parameters are checked within the specified limits:
RCP 3 UP BRG L/O CLR CCW RET FLO u-FI-4683 indicates 150-190 gpm
RCP (CB-03)
JPMS1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 7 Rev Date: 05/18/99 gpm.CUE: u-FI-4686 indicates 40 gpm 3 LOW BRG L/O CLR CCW RET FLO u-FI-4685 indicates 5 to 10 gpm RCP 3 MOTOR AIR CLR CCW RET FLO u-fi-4684 indicates 340 to 380 gpm RCP 3 THBR CLR CCW RET FLO u-FI-4686 indicates 35 to 55 gpm 3
Initiate trending of data for the affected RCP if not previously done.
CUE: The Relief RO has initiated trending as required.
The plant computer is trending the points specified per SOP-108 4
Ensure the breaker for the #3 RCP is racked in.
CUE: The breaker was previously racked in.
The #3 RCP breaker is racked in (verified by dispatching a PEO to check RCP #3 breaker on uA3 LOCALLY).
5 Ensure the overcurrent trip selector switch is in the ACOLD LOOP@ position CUE: The selector switch was previously placed in this condition.
The #3 RCP Overcurrent Trip Selector switch is placed in the ACOLD LOOP@ position (verified by dispatching a PEO to check the switch is in the proper position at the RCP #3 Breaker on uA3 LOCALLY).
6 Station personnel at #3 RCP to observe the pump.
CUE: The RCP is not accessible Operator asks if the RCP is accessible.
JPMS1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 7 Rev Date: 05/18/99
- 7 Start the #3 RCP oil lift pump CUE: Green light OFF Red light ON.
1/u-PCPX3-LP, RCP 3 OIL LIFT PMP, switch taken to the ASTART@
position B candidate verifies green light off and red light on and should mark time to verify pump runs for 2 minutes prior to starting #3 RCP.
8 Check OIL PRESS permissive interlock (blue light) lit.
CUE: Blue light ON.
Candidate verifies Blue AOIL PRESS@ light lit.
- 9 Start the #3 RCP CUE: Green light OFF Red light ON.
1/u-PCPX3 taken to the START 2 minutes after the oil lift pump start. Candidate verifies Green light off and Red light on.
10 Verify Alarm 2.1 on ALB-5B clear.
CUE: Window 2.1 is DARK ANY RCP FAIL TO START Alarm 2.1 on ALB-5B is clear.
11 VERIFY #3 RCP undervoltage TSLB goes out.
CUE: White light not lit.
Candidate verifies TSLB-4, 3.2, RCP 3 BUS UNDERVOLT NOT lit.
12 Verify #3 Loop flow increases within 10 seconds.
CUE: Loop flow is increasing Candidate checks #3 loop flow on u-FI-434/35/36, RC LOOP 3 FLO
- 3 RCP should be stopped if flow does not increase within 10 sec.
13 Verify #3 RCP motor amps have decreased to less than or equal to 750 amp within one Candidate checks #3 motor current on u-II-RCP3, RCP3 MOTOR
- 3 RCP should be stopped if motor current does not
JPMS1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 7 Rev Date: 05/18/99 minute CUE: Meter for motor amps is pegged high.
CURRENT, and observes it does not decrease within 1 minute.
decrease to less than or equal to 750 amps in one minute.
14 Inform the SRO of problem with motor amps.
CUE: SRO acknowledges report.
SRO informed of problem.
- 15 Stop #3 RCP.
CUE: Green light ON Red light OFF.
Candidate momentarily places 1/u-PCPX1, #3 RCP to STOP.
16 Stop the #3 RCP oil lift pump CUE: Blue and Red lights off.
Green light on.
TASK COMPLETE Candidate should take switch 1/u-PCPX3-LP.
RCP 3 OIL LIFT PUMP, to the stop position after RCP #3 has operated greater than 1 minute OR if #3 RCP has been stopped.
JPMS1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 7 of 7 Rev Date: 05/18/99 INITIATING CUE:
IPO-001, "Plant Heatup From Cold Shutdown to Hot Standby", has progressed to the point of starting the third Reactor Coolant Pump per SOP-108A. All prerequisites have been met and all steps have been completed through step 5.1.G in SOP-108A. All seal flows are within limits. You are directed to start #3 RCP continuing with step 5.1.H of SOP-108A.
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 7 Rev Date: 1/04/00 System:
Containment Cooling Systems JTA Task #: CPSES BANK: RO1703 Task
Title:
Restore Containment Cooling KSA Ref: SF5.022.A4.01 PEO:
RO:
3.6 SRO:
3.6 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
EOP-0.0A, AReactor Trip or Safety Injection@,
SOP-814, AVentilation Chilled Water System@,
Tools, Equipment, Job Aids, etc:
Load an at Power IC, enter malfunction RP14A &
RP14B then delete malfunction, wait two minutes, reset SI, sequencer and phase A. Enter EDR33 &
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 7 Rev Date: 1/04/00 EDR 36 to CLOSE, ensure all pipe penetration fans off with green flags.
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 7 Rev Date: 1/04/00 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
Unit 1 is recovering from a Safety Injection. The Unit Supervisor has directed you to restore Containment Cooling to service per EOP-0.0A, Attachment 9, step 4. SI has been reset and power restored to all MCCs. CCW non-safeguards loop is aligned. HVAC Centrifugal Chillers X-03 and X-04 are unavailable. Containment Phase A isolation has been reset.
Terminating Conditions:
Terminate, once at least one Reactor Coolant Pipe Penetration Ventilation Fan is started.
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 7 Rev Date: 1/04/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Ensure 1-HS-4650, VENT CHLR CCW SPLY & RET LV is open.
CUE: 1-HS-4650 handswitch indication is red. The chilled water containment isolation valves were closed on Phase A isolation signal.
Operator visually verifies BHS_4650 to be open by red light indication on the handswitch at CB-3.
CUE: If asked inform operator:
Vent Chillers X-05 & X-06 have CW aligned from Unit 1
CUE: 1-HS-6082 handswitch indication is red.
Take handswitch 1-HS-6082 to the open position and verify red light indication on the handswitch on CB-3 Steps 2 through 4 may be done in any order.
CUE: 1-HS-6083 handswitch indication is red.
Take handswitch 1-HS-6083 to the open position and verify red light indication on the handswitch on CB-3.
CUE: 1-hs-6084 HANDSWITCH INDICATION IS RED. All chilled water Recirc pumps are tripped.
Take handswitch 1-HS_6084 to the open position and verify red light indication on the handswitch on CB-3.
5 Ensure CH WTR RECIRC PMP 1 OR 3 running.
CUE: Depending on which pump was started: X-HS-6055 or X-HS-6057 handswitch indication is red. X-FI-6073 indicates 150 gpm.
Take handswitch X-HS-6055 (pump 1) or X-HS-6057 (pump 3) to the start position and verify red light indication on the handswitch. Flow may be verified on X-FI-6073.
Steps 5 and 6 may be done in any order.
Do not let applicant swap pumps incorrectly.
6 Ensure CH WTR RECIRC Take handswitch X-
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 7 Rev Date: 1/04/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
CUE: Depending on which pump was started: X-HS-6056 or X-HS-6058 handswitch indication is red.
X-FI-6073 indicates 2500 gpm.
HS-6056 (pump 2) or X-HS-6058 (pump 4) to the start position and verify red light indication on the handswitch. Flow may be verified on X-FI-6073.
7 Place the remaining two CH WTR RECIRC PMPS to AUTO After Stop Position.
CUE: Depending on which pumps were taken to AUTO After Stop:
X-HS-6055 X-HS-6056 X-HS-6057 X-HS-6058 Handswitch indication is green.
Take handswitches for the chiller pumps not started to the AUTO After Stop Position X-HS-6055 X-HS-6056 X-HS-6057 X-HS-6058 Verify green light indication on the handswitch.
Pumps in this step may be operated in any order.
NOTE: If PEO asked status of CW Booster Pumps, report pumps X-12 &
X-13 running 8
Dispatch PEO to start HVAC CENTRIFUGAL WATER CHILLER X-01 and X-02.
CUE: HVAC chillers X-01 and X-02 are running.
Operator uses radio or Gaitronics to dispatch PEO to start HVAC CENTRIFUGAL CHILLERS X-01 and X-02.
Note: May only start one chiller.
- 9 Start CNTMT FN CLR FN1.
CUE: 1-HS-5405A handswitch indication is red.
Take handswitch 1-HS-5405A to the start position and verify red light indication on the handswitch Note: Only 3 CNTMT Fan coolers need be started. May be done in any order.
- 10 Start CNTMT FN CLR 2.
CUE: 1-HS-5409A handswitch indication is red.
Take handswitch 1-HS-5409A to the start position and verify red light indication on the handswitch.
- 11 Start CNTMT FN CLR FN3.
CUE: 1-HS-5413A handswitch indication is red.
Take handswitch 1-HS-5413A to the start position and verify red light indication on the
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 7 Rev Date: 1/04/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT handswitch.
- 12 Start CNTMT FN CLR FN 4.
CUE: 1-HS-5417A handswitch indication is red.
Take handswitch 1-HS-5417A to the start position and verify red light indication on the handswitch.
- 13 Start CRDM VENT FN 1.
CUE: 1-HS-5421 handswitch indication is red.
Take handswitch 1-HS-5421 to the start position and verify red light indication on the handswitch.
Note: Only 1 CRDM Vent Fan need be started.
- 14 Start CRDM VENT FN 2.
CUE: 1-HS-5423 handswitch indication is red.
Take handswitch 1-HS-5423 to the start position and verify red light indication on the handswitch.
- 15 Start NEUT DET WELL FN CLR FN 9 & DMPR CUE: 1-HS-5435 handswitch indication is red.
Take handswitch 1-HS-5435 to the start position and verify red light indication on the handswitch.
Note: Only 1 neutron detector well fan cooler need be started.
- 16 Start NEUT DET WELL FN CLR FN 10 & DMPR.
CUE: 1-HS-5440 handswitch indication is red.
Take handswitch 1-HS-5440 to the start position and verify red light indication on the handswitch.
- 17 Start RC PIPE PENET AREA VENT FN 1.
CUE: 1-HS-5461 handswitch indication is red.
Take handswitch 1-HS-5461 to the start position and verify red light indication on the handswitch.
Note: Must start 1 or 2 Vent Fan
- 18 Start RC PIPE PENET AREA VENT FN 2.
CUE: 1-HS-5463 handswitch indication is red.
Take handswitch 1-HS-5463 to the start position and verify red light indication on the handswitch Note: Must start 1 or 2 Vent Fan
- 19 Start RC PIPE PENET AREA VENT FN 3.
Take handswitch 1-HS-5465 to the start Note: Must start 3 or 4 Vent Fan
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 7 of 7 Rev Date: 1/04/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT CUE: 1-HS-5465 handswitch indication is red.
position and verify red light indication on the handswitch
- 20 Start RC PIPE PENET AREA VENT FN 4.
CUE: 1-HS-5467 handswitch indication is red.
TASK COMPLETE Take handswitch 1-HS-5467 to the start position and verify red light indication on the handswitch Note: Must start 1 or 2 Vent Fans
JPMS2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 8 of 7 Rev Date: 1/04/00 INITIATING CUE: Unit 1 is recovering from a Safety Injection. The Unit Supervisor has directed you to restore Containment Cooling to service per EOP-0.0A, Attachment 9, step 4. SI has been reset and power restored to all MCCs. CCW non-safeguards loop is aligned. HVAC Centrifugal Chillers X-03 and X-04 are unavailable. Containment Phase A isolation has been reset.
JPMS3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 5 Rev Date: 01/24/01 System:
CVCS JTA Task #: CPSES BANK: RO1336 Task
Title:
Rx M/U Water Malfunction (ALTERNATE PATH)
KSA Ref: SF2.004.A4.07 PEO:
RO:
3.9 SRO:
3.7 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
ABN-105 ACVCS Malfunctions@
SOP-104A(B) ARx M/U & Chem. Cont. System@
SOP-507A(B) ADemin. & RX M/U Water Syst.@
Tools, Equipment, Job Aids, etc:
Simulator Setup: IC-15, enter CV01A, trip #1 Rx MU Pump, with RSCU code 1 when dilution started. IO alarm ALB-1, C.5 (ON) and ZL-5349AB (ON) when
JPMS3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 5 Rev Date: 01/24/01 ALM-011A(B)
ALM-061A(B)
TDM-203A(B) pump trips.
JPMS3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 5 Rev Date: 01/24/01 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
You have just relieved the shift and Reactor power is 50%. The Unit Supervisor directs you to perform a normal dilution of 50 gallons to prepare to raise power.
Terminating Conditions:
PEO dispatched to start Common RMUW pump.
JPMS3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 5 Rev Date: 01/24/01 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Place 1/u-LCV-112A in HUT position CUE: HUT Ared@ light on 1/u-LCV-112A 1/u-LCV-112A in HUT position and associated red light is lit.
only if deemed necessary per NOTE in SOP-104A Section 5.1.3.
2 Monitor VCT level and pressure during dilution.
CUE: u-L1-112A indicates 48% and u-P1-115 indicates 19 psig.
Monitor u-L1-112A and u-P1-115 during dilution.
3 Go to ASTOP@ 1/u-MU RCS MU MAN ACT CUE: 1/u-MU green light on 1/u-MU RCS MU MAN ACT in ASTOP@
4 Place 43/u-MU RCS MU MODE SELECT in ADILUTE@
43/u-MU RCS MU MODE SELECT in ADILUTE@
5 Set u-FK-111 to desired flow.
CUE: RMUW Pot set to desired flow.
u-FK-111 set as desired.
6 Set u-FY-111B ARCS MU BATCH FLO@ flow to 50 gallons.
CUE: u-FY-111B set to 50 gal Set u-FY-111B ARCS MU BATCH FLO@ to 50 gal 7
Go to start on 1/u-MU, RCS MU MAN ACT CUE: The following alarms come in:
RMUW LO PRESS, on ALB-1, 2.5 RMUW PMP 1/COMM 1/u-MU, RCS MU MAN ACT IN ASTART@
Activate the following malfunctions:
CV09A with MFA1 Activate IOs ALB-1, C/5 to
JPMS3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 5 Rev Date: 01/24/01 OVRLOAD TRIP, on ALB-1, 3.5 RCS MU FLO DEV on ALB-6A 3.7 CUE: Tell the applicant that, even though he likely would not leave his station as RO to investigate the alarms, he should now, for the sake of this JPM, respond to the alarms as he were the BOP.
CN ZL-5349AB to ON STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 8
Identify the affected pump on u-ZL-5349A RMUW PMP 1 and X-ZL-5350A COMM RMUW PMP.
CUE: Green and white light lit on u-ZL-5349A, green light on X-ZL-5350A.
Monitor status of lights u-ZL-5349A and x-ZL-5350A.
9 Go to stop on 1/u-MU, RCS MU MAN ACT CUE: 1/u-MU, RCS MU MAN ACT IN ASTOP@
1/u-MU, RCS MU MAN ACT IN ASTOP@
Give Copy of ALM-0011A and ALM-0061A 10 Dispatch PEO to check for damage on RMUW PMP 1 per ALM-0011A (3.5) 11 Refers to SOP-507A to start common RMUW PMP X-01 Give Copy of SOP-507A 12 Ensures Pump Handswitch X-HS-5350, RMUW PUMP X-01 is in STOP.
CUE: PEO will execute procedure steps as directed by operator.
13 Verify 43/u-MU, RCS MU MODE SELECT is NOT in ALTERNATE DILUTE or MANUAL Mode.
JPMS3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 5 Rev Date: 01/24/01 14 Isolate, or direct isolation of X-01 RMUW Pump from Unit 2 per Step D of SOP-507 5.3.1 15 Align, or direct alignment of X-01 RMUW Pump to Unit 1 per Step E of SOP-507 5.3.1 16 Close RMUW PMP X-01 DISCH VLV (XDD-0049)
Observe note to minimize time the pump is operated with the Discharge valve closed.
17*
Place Pump X-01 in Auto and verify it starts, then slowly open the discharge valve.
TASK COMPLETE
JPMS3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 7 of 5 Rev Date: 01/24/01 INITIATING CUE: You have just relieved the shift and Reactor power is 50%. The Unit Supervisor directs you to perform a normal dilution of 50 gallons to prepare to raise power.
JPMS4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 4 Rev Date: 11/02/98 System:
Component Cooling Water System JTA Task #: CPSES BANK (MOD): RO3608 Task
Title:
Shift CCW Pumps with CCW Pump Trip (ALTERNATE PATH)
KSA Ref: APE.026.AK3.04 PEO:
RO:
3.5 SRO:
3.7 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
SOP-502A, ACCW System@
ABN-502, AComponent Cooling Water System Malfunction@
Tools, Equipment, Job Aids, etc:
ABN-502, Simulator: 1) Load 50% IC-15
- 2) Insert and activate MALF-CC03B
JPMS4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 4 Rev Date: 11/02/98
- 3) Insert and activate MALF-CC02B
JPMS4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 5 Rev Date: 11/02/98 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to Manipulate any plant components.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
NOTE to EXAMINER: during the CCWP shift, CCWP2 will trip off after CCWP1 has been secured. CCWP1 fails to autostart when CCWP2 trips, so the operator will have to manually restart CCWP1. The operator may attempt to trip the reactor based on loss of CCW instead of attempting to restart CCWP1; if he attempts a reactor trip, stop him and end the JPM (failure). The Reactor must not be tripped because it would interfere with another JPM being conducting concurrently.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
The Unit is operating at 50% power. The Unit Supervisor directs you to shift CCW pumps (start CCWP2, and secure CCWP1 per SOP-502) in preparation for maintenance.
Terminating Conditions:
CCWP1 Running again (after CCWP2 trips off)
JPMS4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 5 Rev Date: 11/02/98 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Ensure SSWP2 is running CUE: SSWP2 indication is RED.
Operator visually verifies SSWP2 is running by verifying handswitch indication is RED.
Give applicant a copy of SOP-502A 2
Ensure oil level in bearing housings for CCWP2 are normal.
CUE: bearing housing oil levels are normal.
Operator directs someone to verify oil level for CCWP2.
- 3 Start CCWP2 CUE: u-HS-4519A handswitch light indication is RED.
Take handswitch u-HS-4519A to the start position and verify red light indication on the handswitch.
4 Ensure the following equipment are removed from service before securing CCWP1:
RHR Pumps 1-01, CS Pumps 1-01/03/
CUE: Listed Pumps are removed from service.
Same as Element.
RHR and CS pumps that are loads supplied from the CCWP1 should be secured before securing the CCWP1.
- 5 Stop CCWP1 CUE: u-HS-4518A handswitch light indication is green.
(CCWP2 trips): u-HS-4519A green light and white trip light lit Operator holds the u-HS-4518A handswitch in STOP until flow and pressure stabilize and then releases handswitch.
WARNING:
Operator MAY attempt to trip RX (per section 6.0 of ABN-502A ALoss of all CCW Flow@)
JPMS4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 5 Rev Date: 11/02/98 lit.
Annunciator Alarms: CCWP 2 OVRLOAD/TRIP, CCW TRN A/B SFGD LOOP PRESS LO, CCW HX 2 OUT
& RECIRC FLO LO, CCW HX 2 SPLY FLO LO when CCWP2 trips; BUT, operator SHOULD go to section 2.0 of ABN-502A ACCW Pump Trip@ and attempt to start CCWP1; DO NOT allow operator to trip RX (it would interfere with JPMS3 running concurrently).
6 Verify unaffected train CCW Pump B RUNNING.
NOTE: CCWP1 fails to auto start, and must be manually restarted.
CUE: u-HS-4518A handswitch light indication is green.
Operator recognizes that CCWP 1 is not running by noting u-HS-4518A handswitch indication is GREEN on CB-3 If operator attempts to trip the RX, DO NOT allow RX trip, and terminate the JPM.
- 7 Manually Start u-HS-4518A CCWP 1 CUE: u-HS-4518A RED light lit and flow restored.
Take handswitch u-HS-4518A to the start position and verify red light indication on the handswitch and flow restored.
Give applicant a copy of ABN-502 if he wishes to refer to it.
TASK COMPLETE
JPMS4.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 5 Rev Date: 11/02/98 INITIATING CUE: The Unit is operating at 50% power. The Unit Supervisor directs you to shift CCW pumps (start CCWP2, and secure CCWP1 per SOP-502) in preparation for maintenance.
JPMS5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 5 Rev Date: 5/9/98 System: Loss of IRNI JTA Task #: CPSES BANK: RO1819 Task
Title:
Respond to IR NIS Malfunction (ALTERNATE PATH)
KSA Ref: APE.033.AK3.02 AO: RO: 3.6 _SRO: 3.9 Operator=s Name:
PLANT CONTROL ROOM SIMULATOR PERFORMED SIMULATED DISCUSSED Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature: Date:
Comments (list all steps not satisfactorily completed):
References:
ABN-702, AIntermediate Range Instrumentation@
7247D05, Sh.3 7247D05, Sh. 4 Tools, Equipment, Job Aids, etc:
For simulator setup, initialize ~50% power IC, and go to RUN. Enter malfunction NI02A @ 1E-3.
JPMS5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 5 Rev Date: 5/9/98 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to Manipulate any plant components.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
You are the Reactor Operator.
The plant is at ~ 50% power and reducing load for TS compliance. The IR NIS channel N35 failed high. Perform the actions required for the failed IR detector, as the shutdown continues.
Tech Spec concerns will be addressed by the Unit Supervisor.
Terminating Conditions:
After P-6 status is verified.
STEP #
- Critical ELEMENT STANDARD NOTES SAT UNSAT 1
Verify Reactor NOT tripped.
CUE: Reactor Shutdown in progress. Power level 50% and Various indications of plant power could be used NI, N-16, Power L on PCS to verify power
JPMS5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 5 Rev Date: 5/9/98 STEP #
- Critical ELEMENT STANDARD NOTES SAT UNSAT decreading as indicated on NI-41/44.
level 2
Verify Reactor power >P-6 setpoint (1E-10 amps).
CUE: PCIP, 2.5, is LIT. NI-36 reads (~ 1 x 10-4 amps)
Permissive window PCIP, 2.5, SR RX TRIP BLK PERM P-6, checked. (should be LIT)
NI-36 (u N-I-36B or N-36 meter at DR drawer)
> 1-10-10 amps 3
Verify power level greater that P-10 setpoint (10%).
CUE: Reactor Shutdown in progress. Power level 50% and decreading as indicated on NI-41/44.
Checks power level on NI-41/44. (Could also check PCIP 1.6 Rx Window Lit and/or TSLB=s NC-41M, 42M, 43M, and 44 M lit.
4 Verify Reactor power reduction NOT in progress or required.
CUE: Reactor Shutdown in progress and required.
Load decrease in progress, performing plant shutdown.
- 5 Bypass failed IR channel high flux trip prior to reducing power below P-
- 10.
CUE: Switch is in BYPASS LEVEL TRIP BYPASS light and ALB-6D, 4.1, both LIT.
CUE: Power level is still above P-
- 10.
N35 LEVEL TRIP switch on NIS cabinets taken to BYPASS (prior to reducing power below 10% as indicated on the PR NIS). The following are checked:
LEVEL TRIP BYPASS light on Intermediate Range drawer N35.
Annunciator window ALB-6D, 4.1, SR.IR TRIP BYP.
At NIS rack (cabinet)
On CB-07 6
Verify P-6 interlock in required state.
Permissive window PCIP, 2.5, SR RX TRIP BLK PERM P-6, checked.
JPMS5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 5 Rev Date: 5/9/98 STEP #
- Critical ELEMENT STANDARD NOTES SAT UNSAT TASK COMPLETE
JPMS5.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 5 Rev Date: 5/9/98 INITIATING CUE:
You are the Reactor Operator.
The plant is at ~ 50% power and reducing load for TS compliance. The IR NIS channel N35 failed high. Perform the actions required for the failed IR detector, as the shutdown continues.
Tech Spec concerns will be addressed by the Unit Supervisor.
JPMS6.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 7 Rev Date: 11/02/98 System:
Emergency Core Cooling System JTA Task #:
Title:
Fill the Accumulators (ALTERNATE PATH)
KSA Ref: SF2.006.A1.13 PEO:
RO:
3.5 SRO:
3.7 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 min Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
References:
SOP-202A(B), ASafety Injection Accumulators Tools, Equipment, Job Aids, etc:
Use malfunction SI02D to drain accumulator 4 to 45%;
remove malfunction and clear associated containment
JPMS6.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 7 Rev Date: 11/02/98 SOP-201A(B), ASafety Injection System@
sump alarms; go to FREEZE; after initiating cue, go to run; after termination criteria met, go to freeze.
Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to Manipulate any plant components.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
Accumulator #4 level is 45% and pressure is near the lower limit. The Unit Supervisor has directed you to refill the accumulator to 52%
Terminating Conditions:
Accumulator #4 level has been adjusted to ~52% and pressure is between 623 psig and 644 psig.
JPMS6.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 7 Rev Date: 11/02/98 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Verify the RCS cold leg temperature is greater than 350°F.
CUE: All temperatures indicate greater than 350°F Operator checks RCS cold leg temperature indication on CB-05.
Give operator SOP-202A(B) section 5.4.1 ARaising Accum Level@ and SOP-201A(B), 5.4.1, AStarting an SIP in Recirc@
2 Verify SIS is in standby.
CUE: SIS in standby per SOP-201A(B) Section 5.1.
All Prereq's in SOP-201A, Section 2.1 are met.
Unit Supervisor informs operator SIS is in standby.
3 Verify RCS pressure greater than 1700 psig.
CUE: RCS pressure indicates 2235 psig Operator checks RCS pressure indication on CB-05 4
Verify SIP recirculation flowpath.
CUE: When valve position is checked, each green light DARK, red light LIT.
The following valve positions are checked:
u-8806 OPEN u-8814 A & B OPEN u-8813 OPEN 5
Verify that lube oil level is normal, for pump being started.
CUE: When PEO is called, state: lube oil level is normal.
PEO called to check lube oil level for the pump to be started.
Operator may use PCS points listed in SOP-201A(B) to monitor the SIP being started.
6 Verify that lube oil cooler SSW return flow is normal for pump being started.
CUE: SSW flow is normal
JPMS6.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 7 Rev Date: 11/02/98 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT
- 7 Start the desired SIP.
CUE: The SIP red light LIT, pump disch. press. is normal Handswitch for selected SIP taken to START and indication checked: 1/u-APSI1 or 1/u-APSI2 8
Verify SIP recirculation flow of 38 to 50 gpm.
CUE: WHEN PEO is called state: u-FI-968 reads 43 gpm.
PEO called to read flow on u-FI-968.
- 9 Open 1/u-8888, ACCUM FILL ISOL VLV.
CUE: Valve 1/u-8888 red light LIT, green DARK Handswitch for 1/u-8888 held in OPEN position and position checked.
Handswitch for 1/u-8871 held in OPEN position and position checked.
- 11 Open 1/u-8878D, ACCUM 4 FILL VLV.
CUE: Valve 1/u-8878D red light LIT, green DARK Handswitch for 1/u-8878D placed in OPEN position and position checked.
- 12 Monitor accumulator 4 level CUE: Accumulator 4 levels are _ 52%.
The following meters are checked:
u-LI-956 u-LI-957 If done on SIM operator should wait until level is 50%- 54% before continuing.
- 13 Close 1/u-8878D, ACCUM 4 FILL VLV.
CUE: Valve 1/u-8878D green light LIT, red DARK. When independent verification is requested, then inform that it Handswitch for 1/u-8878D placed in closed position and position checked.
Independent verification is necessary for the completion of this step either now or at the completion
JPMS6.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 7 Rev Date: 11/02/98 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT has been done.
of this procedure.
14 Ensure that accumulator 4 level is between 39% - 61% and record level.
CUE: Accumulator 4 level indicates _52%.
The following meters are checked:
u-LI-956 u-LI-957 15 Close 1/u-8871 and 1/u-8888.
CUE: Both valves indicate green light LIT, red DARK.
The following valves are closed:
____1/u-8871
____1/u-8888 16 Stop the SI Pump and place its handswitch in AUTO.
CUE: SI Pump handswitch in AUTO.
Pump switched off and handswitch placed in AUTO.
17 Verify 1/1-8821A(B) SIP 1(2)
XTIE VLV open.
CUE: Valves indicates red light LIT, green DARK.
Verify 1/1-8821A(B)
- 18 Ensure Accumulator #4 pressure is 623-644psig.
CUE: 1-PI-966 and 1-PI-967 indicate 655 psig.
Check Accum. 4 pressure 623-644 psig:
____1-PI-966
____1-PI-967
- 19 Close 1/1-8880, SI/PORV ACCUM N2 ISOL VLV.
CUE: Valves indicates green light LIT, red DARK.
Close 1/1-8880, SI/PORV ACCUM N2 ISOL VLV.
20 Cycle 1-HC-943, ACCUM 1-4 VENT CTRL, to vent N2 header.
CUE: Valve cycled.
Cycle 1-HC-943, ACCUM 1-4 VENT CTRL, to vent N2 header.
- 21 Open 1/1-8875D, ACCUM 4 N2 SPLY/VENT VLV.
CUE: Valves indicates red light LIT, green DARK.
Open 1/1-8875D, ACCUM 4 N2 SPLY/VENT VLV.
JPMS6.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 7 Rev Date: 11/02/98
- 22 Throttle open 1-HC-943, ACCUM 1-4 VENT CTRL and shut when pressure 623-644 psig.
CUE: Valve cycled. 1-PI-966 and 1-PI-967 indicate 640 psig.
Throttle open 1-HC-943, ACCUM 1-4 VENT CTRL and shut when pressure 623-644 psig.
____1-PI-966
____1-PI-967 TASK COMPLETE
JPMS6.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 7 of 7 Rev Date: 11/02/98 INITIATING CUE: Accumulator #4 level is 45% and pressure is near the lower limit. The Unit Supervisor has directed you to refill the accumulator to 52%
JPMC1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 6 Rev Date: 04/26/99 System:
Reactor Protection System JTA Task #: CPSES BANK: RO1601 Task
Title:
Place Failed Pressurizer Pressure Channel in Trip Condition KSA Ref: SF7.012.A4.04 PEO:
RO:
3.3 SRO:
3.4 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 10 Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
JPMC1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 6 Rev Date: 04/26/99
References:
ABN-705, APressurizer Pressure Instrumentation Malfunction@
Tools, Equipment, Job Aids, etc:
Working copy of ABN-705, Att 2,3,4
JPMC1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 6 Rev Date: 04/26/99 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
Cues for indications and controls need not be given if this JPM is performed on an operating simulator.
NOTE to EXAMINER: Attached is a drawing of the Protection Cabinet 7300, in which a number of test switches will be manipulated; the examiner should inspect the panel (a mockup of which is in the simulator lab) prior to conducting the JPM to familiarize himself with the switch locations within the panel.
Instructions:
Make or simulate all written and/or oral reports as if the evolution is actually being performed.
You are expected to discuss the steps that you would take to include an identification of what switches/indications you would use.
Initiating Cue:
A failure low of Pressurizer pressure channel PT-455 has occurred during full power operation.
The alternate channel has been selected for control and recording. You are directed to place the appropriate bistables in the tripped condition and verify the appropriate alarms and trip status lights.
Terminating Conditions:
The appropriate bistables have been placed in the tripped condition and verified utilizing the appropriate annunciator alarms and trip status lights.
JPMC1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 6 Rev Date: 04/26/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Locate the appropriate bistable test switches.
Protection set 1, card frame 8.
- 2 Place SW-1 on Card 72 in the CLOSED position.
CUE: SW-1 is in the CLOSED (DOWN) position.
SW-1 is on card 72; 1st row and 7th column from right of frame 8.
Simulated placed in the CLOSED (DOWN) position.
- 3 Ensure BS-1 and BS-2 on card 21 in the NORM position.
CUE: The bistable switches are in the NORM (UP) position.
Top 2 bistable switches on card 21 (1st row and 6th column from right of frame 8) checked in the NORM (UP) position.
- 4 Ensure BS-1, BS-2, BS-3 and BS-4 on card in the NORM (UP) position.
CUE: The bistable switches are in the NORM (UP) position.
All bistable switches on card 22 (top row and 2nd column from right of frame 8) checked in the NORM (UP) position.
- 5 Place SW-5 on card 74 in the CLOSED (DOWN) position.
CUE: The bistable switch is in the CLOSED (DOWN) position.
The switch is on card 74 (2nd row and 7th column from right of frame 8) simulated placed in the CLOSED (DOWN) position.
6 Ensure BS-1, BS-2, BS-3 and BS-4 on card 46 are in the NORM (UP) position.
CUE: The bistable switches are in the NORM (UP) position.
All bistable switches on card 46 (2nd row and 2nd column from right of frame 8) checked in the NORM (UP) position.
JPMC1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 6 Rev Date: 04/26/99 7
Verify appropriate annunciator alarms ON.
CUE: Annunciator windows ALB-5B, 3.4 and 4.4; ALB-5C, 1.5, 2.5, 2.6, 3.1 and 3.5 and ALB-6D, 2.13,3.10 and 3.14 are all lit.
The annunciator windows listed in ABN-705 (18 of 26) are checked:
8 Verify appropriate trip status lights ON.
CUE: Trip status lights TSLB-1, 1.7, TSLB-3. 1.1, TSLB-5, 1.2, 1.3, 1.8 and 1.9 and TSLB-9, 1.3, 1.4, 1.5, and 1.9 are LIT.
The trip status lights listed in ABN-705 (19 of 26) are checked:
TASK COMPLETE.
JPMC1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 6 Rev Date: 04/26/99 INITIATING CUE:
A failure low of Pressurizer pressure channel PT-455 has occurred during full power operation. The alternate channel has been selected for control and recording. You are directed to place the appropriate bistables in the tripped condition, and verify the appropriate annunciator alarms and trip status lights.
JPMP1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 6 Rev Date: 4/06/01 System:
Emergency Plant Evolutions JTA Task #: CPSES BANK (M0D): AO5407A Task
Title:
In Response to a Fire in the Control Room or Cable Spreading Room, Perform PEO #1 Actions to Achieve Hot Shutdown (AB Actions Only) (***TIME CRITICAL***)
KSA Ref: APE.068.AA1.22 PEO:
X RO:
4.0 SRO:
4.3 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 minutes Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
JPMP1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 6 Rev Date: 4/06/01
References:
ABN-803A(B), "Response to a Fire in the Control Room or Cable Spreading Room" Tools, Equipment, Job Aids, etc:
ABN-803A(B), Attachment 3 Gloves, flashlight, valve operator, radio Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
For JPM=s which are to be APERFORMED@, cues for indications and controls need not be given.
NOTE to EXAMINER: This is a TIME CRITICAL JPM; Since the Initiating Cue tells the applicant that he has already completed steps A through H, it can be assumed that the applicant would already be inside the Aux. Building prior to the commencement of this JPM. Therefore, hand the applicant his cue and procedure outside the RCA, but DO NOT START the CLOCK until you are inside the Auxilliary building. INFORM THE APPLICANT WHEN YOU START THE CLOCK.
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use.
Initiating Cue:
The Reactor has been tripped and the Control Room evacuated in response to a fire in the Cable Spreading Room, and ABN-803A(B), "Response to a Fire in the Control Room or Cable Spreading Room", has been initiated. As PEO No. 1, you have obtained your radio for communications and have completed Attachment 3, through step h. Place charging in service and control seal injection per Attachment 3. THIS IS A TIME CRITICAL JPM, BUT THE CLOCK WILL NOT START UNTIL AFTER YOU HAVE MADE YOUR RCA ENTRY - THE EXAMINER WILL INFORM YOU WHEN THE CLOCK STARTS. FROM THAT TIME, YOU
JPMP1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 6 Rev Date: 4/06/01 WILL HAVE 19 MINUTES TO COMPLETE THE JPM.
Terminating Conditions:
The operator reports seal injection flow is established.
JPMP1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 6 Rev Date: 4/06/01 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT
- 1 Proceed to AB 810 outside the Charging Pump Valve Room and manually open u-LCV-112E, RWST to CVCS Suction.
CUE: u-LCV-112E indicates in the OPEN position.
MANUALLY OPEN u-LCV-112E by DISENGAGING the Motor Clutch and rotating the Handwheel counter clockwise (left). Observe local position indication (open).
u-LCV-112E, RWST to CVCS Suction Valve is located in Aux.
Bldg. 810' on the Southside (Northside)
Corridor.
The clutch disengage lever must be depressed until the LEVER is held in-place mechanically, after the handwheel has been rotated.
Transfer CCWP AREA FAN COOLER 09 CONTROL TO LOCAL START CCWP AREA FAN COOLER 09 CUE: When Transfer Switch, u-HS-5800B, is taken to Local, Green light is ON.
CUE: When Control Switch, u-HS-5800C, is taken to CLOSE, Green light is OFF and Red light is ON.
Transfer CCWP AREA FAN COOLER 09 control to LOCAL and START CCWP AREA FAN COOLER 09, using TRANSFER SWITCH (u-HS-5800B) and CONTROL SWITCH (u-HS-5800C)
Transfer and start will be accomplished in the CCW PUMP u ROOM located on AB 810' TRANSFER SWITCH is a 2-position maintain switch. LOCAL POSITION is to the right.
U1 switch in CCW Pump 1-01 Room, U2 switch in hall outside CCW Pump 2-01 room.
JPMP1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 6 Rev Date: 4/06/01 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT If performing this JPM on Unit 1 then perform Step 3, then go to Step 6.
If performing this JPM on Unit 2 then go to Step 4 and Step 5, then Step 6
- 3 (Unit 1 only)
Manually OPEN 1-8111 CCP 1 & 2 MINI-FLOW VALVE CUE: 1-8111 indicates in the OPEN position.
Manually OPEN 1-8111 by disengaging the motor clutch and rotating the handwheel counter clock-wise (left). Observe local position indication.
1-8111 is located in the Charging Pump Valve Room.
- 4 (Unit 2 only)
Manually OPEN 2-8512B, CCP 2-01 ALT MINIFLOW DNSTRM ISOL VLV.
CUE: 2-8512B indicates in the OPEN position.
Manually OPEN 2-8512B by disengaging the motor clutch and rotating the handwheel counter - clock-wise (left). Observe local position indication (OPEN).
2-8512B is located in the Unit 2 822 Blender Room.
- 5 (Unit 2 only)
Manually OPEN 2-8511A, CCP 2-01 ALT MINIFLO UPSTRM ISOL VLV.
CUE: 2-8511A indicates in the OPEN position.
Manually OPEN 2-8511A by disengaging the motor clutch and rotating the hand-wheel counter clock-wise (left). Observe local position indication (OPEN).
2-8511A is located in the Unit 2 822 Blender Room.
- 6 (Units 1 & 2)
Manually CLOSE u-LCV-112C, VCT OUTLET ISOLATION.
CUE: u-LCV-112C indicated in the CLOSED position.
Manually CLOSE u-LCV-112C by disengaging the motor clutch and rotating the handwheel clock-wise (right). Observe local position indication (CLOSED).
u-LCV-112C is located in each respective Unit's Charging Pump Valve Room.
- 7 Manually CLOSE u-8483B-RO, CCP u-01/ u-02 CHRG FLO CTRL VLV CLOSE u-8483-R0 by rotating the handwheel u-8483 can be operated locally in
JPMP1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 6 Rev Date: 4/06/01 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT OUT VLV RMT OPER CUE: u-8483-R0 indicates in the CLOSED position.
clock-wise (right). Observe local position indication (CLOSED).
each respective unit's Charging Pump Valve Room or Remotely in each respective Unit's Blender Room.
8 Contact the RO and inform him that the charging pump may be started.
CUE: Charging Pump has been started.
CUE: RO directs opening u-8483B, CCP u-01/ u-02 CHRG FLO CTRL VLV OUT VLV RMT OPER, 2 full turns and report back.
The RO is contacted by either 2-way radio or gaitronics.
- 9 Throttle OPEN u-8483B-R0, CCP u-01/ u-02 CHRG FLO CTRL VLV OUT VLV RMT OPER, is 2 turns open. RO contacted.
CUE:RO understands u-8483B is 2 turns open.
Throttle OPEN u-8483B RO 2 full turns by rotating the handwheel or Remote Operator counter clock-wise (left) and reports back to the RO at the RSP.
TASK COMPLETE
JPMP1.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 7 of 6 Rev Date: 4/06/01 INITIATING CUE: The Reactor has been tripped and the Control Room evacuated in response to a fire in the Cable Spreading Room, and ABN-803A(B), "Response to a Fire in the Control Room or Cable Spreading Room", has been initiated. As PEO No. 1, you have obtained your radio for communications and have completed Attachment 3, through step h. Place charging in service and control seal injection per Attachment 3. THIS IS A TIME CRITICAL JPM, BUT THE CLOCK WILL NOT START UNTIL AFTER YOU HAVE MADE YOUR RCA ENTRY - THE EXAMINER WILL INFORM YOU WHEN THE CLOCK STARTS. FROM THAT TIME, YOU WILL HAVE 19 MINUTES TO COMPLETE THE JPM.
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 8 Rev Date: 01/24/99 System:
Steam Generator Tube Rupture JTA Task #: CPSES BANK: AO3528 Task
Title:
Locally Isolate Ruptured S/G KSA Ref: EPE.038.EA1.32 PEO:
X RO:
4.6 SRO:
4.7 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 20 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 8 Rev Date: 01/24/99
References:
EOP-3.0A(B),
Steam Generator Tube Rupture Tools, Equipment, Job Aids, etc:
EOP-3.0A(B), Attachment 4
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 8 Rev Date: 01/24/99 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
For JPM=s which are to be APERFORMED@, cues for indications and controls need not be given.
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use.
Initiating Cue:
Procedure EOP-3.0A(B), "Steam Generator Tube Rupture" is in progress. The Control Room has directed you to perform attachment 4 as part of Step 3 (Isolate Flow From Ruptured SG(s))
Terminating Conditions:
All valves that require local isolation as per attachment 4, have been closed.
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 8 Rev Date: 01/24/99 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT
- 1 CUE: 1-HS-3228 will NOT close from Control Room.
Locally close 1SA-0005, U1 MS to AUX STM ISOL VLV CUE: Valve closes.
Valve closed Located Unit 1 TB 778= NE Corner
- 2 CUE: The Control Room attempted to close the Steam Dump Valves but the valves did NOT close.
Locally close the following valves:
1MS-0185, STM DMP TO CNDSR 1-A VLV 2369A UPSTRM ISOL VLV 1MS-0186, STM DMP TO CNDSR 1-A VLV 2370B UPSTRM ISOL VLV 1MS-0187, STM DMP TO CNDSR 1-A VLV 2370F UPSTRM ISOL VLV 1MS-0188, STM DMP TO CNDSR 1-A VLV 2370G UPSTRM ISOL VLV 1MS-0189, STM DMP TO CNDSR 1-A VLV 2369B UPSTRM ISOL VLV All valves closed.
All valves located in TB 803= South of Main Condenser
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 8 Rev Date: 01/24/99 1MS-0190, STM DMP TO CNDSR 1-A VLV 2370D UPSTRM ISOL VLV 1MS-0191, STM DMP TO CNDSR 1-B VLV 2369C UPSTRM ISOL VLV 1MS-0192, STM DMP TO CNDSR 1-B VLV 2370C UPSTRM ISOL VLV 1MS-0193, STM DMP TO CNDSR 1-B VLV 2370H UPSTRM ISOL VLV 1MS-0194, STM DMP TO CNDSR 1-B VLV 2370J UPSTRM ISOL VLV 1MS-0195, STM DMP TO CNDSR 1-B VLV 2370A UPSTRM ISOL VLV 1MS-0196, STM DMP TO CNDSR 1-B VLV 2370E UPSTRM ISOL VLV CUE: All valves close.
- 3 LOCALLY CLOSE THE FOLLOWING VALVES:
1MS-0520, STM DMP STM TRAP 1-18 UPSTRM ISOL VLV 1MS-0522, STM DMP STM TRAP 1-19 UPSTRM ISOL VLV All valves closed.
All valves located in TB 803= South of Main Condenser
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 8 Rev Date: 01/24/99 1MS-0524, STM DMP STM TRAP 1-20 UPSTRM ISOL VLV 1MS-0526, STM DMP STM TRAP 1-21 UPSTRM ISOL VLV 1MS-0528, STM DMP STM TRAP 1-22 UPSTRM ISOL VLV 1MS-0530, STM DMP STM TRAP 1-23 UPSTRM ISOL VLV 1MS-0532, STM DMP STM TRAP 1-24 UPSTRM ISOL VLV 1MS-0534, STM DMP STM TRAP 1-25 UPSTRM ISOL VLV 1MS-0536, STM DMP STM TRAP 1-26 UPSTRM ISOL VLV 1MS-0538, STM DMP STM TRAP 1-27 UPSTRM ISOL VLV 1MS-0540, STM DMP STM TRAP 1-28 UPSTRM ISOL VLV 1MS-0542, STM DMP STM TRAP 1-29 UPSTRM ISOL VLV CUE: All valves close.
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 7 of 8 Rev Date: 01/24/99
- 4 CUE: The Main Feedwater Pumps are NOT being used to supply the Steam GeneratorsOn the North side of the MFW pump skids, close the following valves.
1MS-0254, FWPT 1-A HP STM SPLY ISOL VLV 1MS-0253, FWPT 1-B HP STM SPLY ISOL VLV UE: All valves closed Both valves closed.
Valve located on North side of each FWP skid
- 5 Locally close the following valves:
1VD-0421, MS D/POT 1-03 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0424, MS D/POT 1-04 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0425, MS D/POT 1-09 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0426, MS D/POT 1-02 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0427, MS D/POT 1-28 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0428, MS D/POT 1-10 TO CNDSR 1-A DRN A ISOL VLV All valve closed All valves accessible from operating deck located in the Vent and Drain Valve Alley above the EHC Skid center section.
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 8 of 8 Rev Date: 01/24/99 1VD-0429, MS D/POT 1-20 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0430, MS D/POT TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0431, MS D/POT 1-13 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0432, MS D/POT 1-19 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0433, MS D/POT 1-01 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0436, MS D/POT 1-12 TO CNDSR 1-A DRN HDR A ISOL VLV 1VD-0437, MS D/POT 1-11 TO CNDSR 1-A DRN HDR A ISOL VLV CUE: All valves close.
- 6 LOCALLY CLOSE THE FOLLOWING VALVES:
1MS-0028, SG 1-01 SMPL VLV 1MS-0065, SG 1-02 SMPL VLV 1MS-0136, SG 1-04 SMPL VLV 1MS-0291, SG 1-03 SMPL VLV All valves closed.
All 4 valves located at Unit 1 TB 778= East Wall behind Vent chiller #5, 10 up
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 9 of 8 Rev Date: 01/24/99 CUE: All valves close.
TASK COMPLETE
JPMP2.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 10 of 8 Rev Date: 01/24/99 INITIATING CUE: Procedure EOP-3.0A(B), ASteam Generator Tube Rupture@ is in progress. The Control Room has directed you to perform attachment 4 as part of Step 3 (Isolate Flow From Ruptured SG(s).
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 1 of 6 Rev Date: 02/01/00 System:
Emergency Diesel Generator JTA Task #: CPSES BANK: AO6311A Task
Title:
Perform a Local Emergency Start of a DG (RCA ENTRY REQUIRED)
KSA Ref: SF6.064.A4.01 PEO:
X RO:
4.0 SRO:
4.3 Operator=s Name:
Performance Environment:
PLANT CONTROL ROOM SIMULATOR Performance Method:
PERFORMED SIMULATED DISCUSSED Time to complete JPM:
Estimated 15 min.
Actual The operator=s performance was evaluated against the standards contained in this JPM and was determined to be:
SATISFACTORY UNSATISFACTORY Reason, if unsatisfactory:
Evaluator=s Signature:
Date:
Comments (list all steps not satisfactorily completed):
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 2 of 6 Rev Date: 02/01/00
References:
SOP-609A(B), Diesel Generator System Tools, Equipment, Job Aids, etc:
SOP-609A(B) Section 1 through 4 and Section 5.2 of SOP-609A(B).
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 3 of 6 Rev Date: 02/01/00 Safety Considerations:
If this JPM is to be performed in the plant/control room, the candidate is NOT to manipulate any plant components unless he/she has permission from the Shift/Unit Supervisor.
Comments:
For JPM=s which are to be APERFORMED@, cues for indications and controls need not be given.
NOTE: Step 9 (checking operating parameters) does NOT need to be performed for a RO and SRO because all are in spec. and no action is required.
Instructions:
You may use any approved reference materials, including logs. Make or simulate all written/oral reports as if the evolution is actually being performed. You are expected to discuss all steps you would take, including identifying what switches/indications you would use Initiating Cue:
You have been directed to perform a Local Emergency Start of Train A(B) DG for testing. An Engine Water Roll Check, all prerequisites and all Maintenance Department pre-start activities have been performed. The Prompt Team and Chemistry have been informed. The Aslow start@ is NOT being performed. The DG is an auto-start status. This test does not meet the Surveillance Test requirements.
Terminating Conditions:
Train A(B) DG is running.
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 4 of 6 Rev Date: 02/01/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT 1
Notify Control Room Notify Control Room
- 2 Start auxiliary lube oil pump by placing handswitch (u-HS-3411-1 Train A or u-HS-3412-1 Train B) in HAND.
CUE: Auxiliary lube oil pump RED (ON) light is LIT and GREEN (OFF and AUTO) lights are DARK. Pressure on lube oil pressure gauge (u-PI-3411B-1B Train A or u-PI-3412B Train B) is 56 psig.
Handswitch in HAND position and the lube oil pump running.
Lube oil pressure should be 40-60 psig.
Do not run auxiliary lube oil pump in HAND for more than 1 minute per shift without running the DG.
Auxiliary lube oil pump handswitch is located on the Local Engine Control Panel.
- 3 Stop auxiliary lube oil pump by placing handswitch (u-HS-34111 Train A or u-HS-3412-1 Train B) in OFF then AUTO.
CUE: Auxiliary lube oil pump RED (ON) light is DARK and GREEN (OFF and AUTO) lights are LIT.
Auxiliary lube oil pump NOT running and handswitch in AUTO position.
Diesel must be started within 60 seconds of stopping Aux.
lube oil pump.
If not started within 60 seconds must repeat above step of JPM.
- 4 Take local control of DG by placing the Master Switch (u-HS-3413-3b, RLMS Train A or u-HS-3414-3B, RLMS The Master Switch in LOCAL position.
Master Switch is located on Local Generator Control Panel.
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 5 of 6 Rev Date: 02/01/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT Train B) in LOCAL.
CUE: The Master Switch is in the LOCAL position.
- 5 Start the DG by placing the local emergency Stop-Start handswitch (u-HS-3413-4B, LOC/EMER/MAN/START Train A or u-HS-3414-4B LOC/EMER/MAN/START Train B) in START.
CUE: Engine rpm is increasing.
Local emergency Stop-Start handswitch in START position and engine running.
Local emergency Stop-Start handswitch is located on the Local Generator Control Panel.
6 Verify auxiliary lube oil pump handswitch (u-HS-3411-1 Train A or u-HS-3412-1 Train B) in AUTO and pump not running.
CUE: Auxiliary lube oil pump RED (ON) light DARK and GREEN (OFF and AUTO) lights are LIT. Pump handswitch is in AUTO.
Auxiliary lube oil pump handswitch in AUTO position and pump NOT running.
7 Stop Auxiliary jacket water pump by placing handswitch (u-HS-3415-1 Train A or u-HS-3416-1 Train B) in OFF and then AUTO. Verify pump is not running.
CUE: Auxiliary jacket water pump RED (ON) light DARK and GREEN (OFF and AUTO) lights are LIT. Pump Auxiliary jacket water pump handswitch in AUTO position and pump NOT running.
Auxiliary jacket water pump handswitch is located on the Local Engine Control Panel.
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 6 of 6 Rev Date: 02/01/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT handswitch is in AUTO.
8 Verify DG voltage is building and engine speed is normal.
CUE: DG voltage is increasing and engine speed is 450 rpm (60Hz). If Operator asks, voltage is 7000V.
DG voltage increasing and engine speed is between 440 and 475 RPM.
DG voltage is read on the Local Generator Control Panel.
Engine speed is read on the Local Engine Control Panel.
9 Check operating parameters:
Lube oil pressure Turbo oil pressure, left bank Turbo oil pressure, right bank Jacket water pressure Fuel oil pressure, black-engine driven pump Engine speed CUE:
L/O press = 53 psig T/O LF press = 28 psig T/O RF press = 27 psig (NOTE: procedure refers to T/O RF and LF as AT/O RB and LB@)
JW press = 23 psig FO black press = 42 psig Engine speed = 450 rpm Lube oil pressure Turbo oil pressure, left front Turbo oil pressure, right front Jacket water pressure Fuel oil pressure, black-engine driven pump Engine speed RUNNING and READY TO LOAD lights are located on the Local Engine Control Panel.
NOTE: TASK may be TERMINATED without having a Reactor Operator Log any of these values SINCE all will be in spec.
and no action is required TASK COMPLETE
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 7 of 6 Rev Date: 02/01/00 STEP#
- Critical ELEMENT STANDARD NOTES SAT/
UNSAT
JPMP3.r2 Comanche Peak Steam Electric Station ILE-11/2002 Job Performance Measure Page 8 of 6 Rev Date: 02/01/00 INITIATING CUE:
You have been directed to perform a Local Emergency Start of Train A(B) DG for testing. An Engine Water Roll Check, all prerequisites and all Maintenance Department pre-start activities have been performed. The Prompt Team and Chemistry have been informed. The Aslow start@ is NOT being performed. The DG is an auto-start status. This test does not meet the Surveillance Test requirements.
Revision 2 Appendix D Scenario Outline Form ES-D-1 Facility:
CPSES Scenario No.:
1 Op-Test No.:
11/2002 Examiners:
Howard Bundy Operators:
Mike Murphy Tom McKernon Fred Sanchez Note:
(NEW) SRO Admin A.5-1, Emerg. Class. with this Scenario (SAE).
Initial Conditions:
Full power steady state; BOL; Equilibrium Xenon; EDG 1-01 is out of service for maintenance (12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> into LCO).
(IC Info.: IC-15, EGR06 - DG1 out of service with sw. in Apull out@)
(PRELOAD - MET Tower Data B> wind from 180)
Turnover:
The plant has been at 100% power for the last 15 days. Severe thunderstorm warning and high winds issued and ABN-907, Sec. 5 completed. Maintenance has been trouble shooting problems with the 1-01 HTR Drain Pump, and requests the pump be secured within the next 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. Management has directed a power reduction to 70% at 15%/hour to support securing the 1-01 HTR Drain Pump. EDG 1-01 is out of service for maint., and OPT-215 was completed 1 hr ago.
Event No.
Malf.
No.
Event Type*
Event Description 1
T=0 N (SRO)
R (RO)
N (BOP)
Reduce power to 70%
2 (Cue)
T=12 RX05A I (SRO)
I (RO)
Pressurizer level transmitter LT-459 fails low [value=0, ramp over 1 min]
(NOTE: initiate Event 2 on Chief Examiner=s cue) 3 T=22 TC05A C (SRO)
C (BOP)
- 1 Main turbine control valve fails closed (NOTE: initiate Event 3 prior to completion of actions for Event 2) 4 T=32 ED06G C (ALL)
Loss of 1D3 bus 5 (Cue)
T=40 T=44 RC03D C (RO)
C (SRO)
RCP 4 vibration - initial severity @ 9 mils and ramp severity to 25 mils over 6 min. High vib. alarm on RCP 4 (shaft) alarms at 15 mils & increasing @
approx 3 mils/min.
(NOTE: must provide cue for vibration monitor readings - increasing at 3 mils/min - when applicant goes to look)
Manual Rx Scram due to high RCP 1-04 vibrations, no SI. Enter EOP-0.0A and then transition to EOS-0.1A.
6 T=49 ED01 M (ALL)
Lighting strike in switchyard - loss of offsite power. EDG 1-02 starts and loads (NOTE: E6 to be initiated 5 minutes after RX Trip)
(NOTE to Simulator Operator: Call RO and report lighting strike in switchyard and high winds with wind speed of 105 mph (sustained))
7 T=E6+3 EG07B C (ALL)
EDG 1-02 trips (overspeed) - loss of all power. Transition to ECA-0.0A and possibly ABN-601.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
1 Page 1
of 1
Event
Description:
Reduce power to 70%
Time RO BOP SRO Applicant's Actions or Behavior Review IPO-003A, Power Operations Notifies the Dispatcher prior to reducing load Notifies Chemistry and Radiation Protection if power reduction will be greater than 15% in one hour Notifies Reactor Engineering of power reduction greater than 25%
Calculates the amount of boration required Calculates the rate of boration Reviews AFD guidance Sets in the desired unloading rate on the LOAD GRADIENT device Initiates boration Lowers the LOAD REFERENCE device in incremental steps to control the power decrease Maintains AFD within the target band Maintains rods above the rod insertion limit Maintain Tavg within 1F of Tref
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
2 Page 1
of 3
Event
Description:
Pressurizer level transmitter LT-459 fails low Time RO BOP SRO Applicant's Actions or Behavior Recognizes indications that pressurizer level transmitter LT-459 failed low:
LI459A, pressurizer level channel I, indicates low Letdown isolates Pressurizer low level heater cutoff PRZR LVL LO (5B-3.6)
Informs SRO Refers to ABN-706, Pressurizer Level Instrumentation Malfunction, and directs operators Stops load decrease and Assists as directed Transfers LS-459D, PRZR LVL CTRL CHAN SELECT, to an operable alternate control channel prior to RX trip Verifies automatic control restoring pressurizer level to program Verifies instruments on common instrument line - NORMAL Ensures LS-4590E, LR-459 PRZR LVL SELECT selected to a valid channel Directs I&C to place bistable BS-1, Cab 01, Frame 08, Card 47, test switch in TEST and verify channel test status light ON
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
2 Page 2
of 3
Event
Description:
Pressurizer level transmitter LT-459 fails low Time RO BOP SRO Applicant's Actions or Behavior Verifies trip status panel TSLB-5 indicator 1.1 ON and Notes verification in Unit Log Restores letdown:
Ensures charging flow through regenerative heat exchanger Opens LCV-459 and LCV-460, letdown isolation valves Takes manual control of PK-131, LTDN HX OUT PRESS CTRL, and opens the valve to ~30% demand Opens the desired orifice isolation valve Adjusts PK-131, LTDN HX OUT PRESS CTRL, to obtain approximately 310 psig on PI-131, LTDN HX OUT PRESS, then places in automatic Adjusts TK-130, LTDN HX OUT TEMP CTRL to obtain approximately 95F on TI 130, LTDN HX OUT TEMP, then places in automatic Recloses pressurizer heater group C feeder breaker by placing PRZR CTRL HTR GROUP C control switch in the ON position
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
2 Page 3
of 3
Event
Description:
Pressurizer level transmitter LT-459 fails low Time RO BOP SRO Applicant's Actions or Behavior Refers to Technical Specifications:
Reactor Trip Instrumentation T. S. Table 3.3-1 Item No. 11 Accident Monitoring T. S. Table 3.3-6 Item No. 5 Initiates repairs per STA-606 Initiates a ONE Form per STA-421 as applicable
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
3 Page 1
of 1
Event
Description:
- 1 Main Turbine control valve fails closed Time RO BOP SRO Applicant's Actions or Behavior Determines turbine/reactor power change - informs SRO Ensure rod control and steam dumps maintain RCS temperature Determines turbine control valve closed Directs and Implements ABN-401:
- 1.
Verifies S/G level control, PRZR level control, and PRZR pressure control working correctly
- 2.
Verify turbine load stable and match LOAD REFERENCE indication with existing load
- 3.
Reduce turbine load until all operable HP control valves indicate <100% open
- 4.
Check status of ALL main turbine stop and control valves Notify PSO, plant management, and prompt team Note for simulator operator - If asked, as PEO, report no apparent reason for #1 CV closure
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
4 Page 1
of 1
Event
Description:
Loss of 1D3 Bus Time RO BOP SRO Applicant's Actions or Behavior Performs actions of ALM-0102 After performing a board walkdown, observes that 1D3 voltage is pegged low (1-CB-11) and announces loss of 1D3 bus Alarms Indications: 1ALB-10B (2.19) and (3.19)
(this can be difficult to identify - will require some good analysis)
Send PEO to equipment to check (PEO reports that he is unable to determine cause)
Determines that RCPs can not be tripped from control room Refers to T/S 3.3.1 and TRM 13.8.32A
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
5 Page 1
of 1
Event
Description:
High Vibration on RCP 1-04 (shaft)
Time RO BOP SRO Applicant's Actions or Behavior Directs and Implements ABN-101 Trip the reactor due to high rate of RCP vibration increase. Make plant announcement Go to EOP-0.0A Stop RCP 1 locally (call to have AO open breaker)
Note: Trip the reactor due to high RCP vibration - preventing a challenge to plant safety and a degradation of any barrier to fission product release (App D, Step D.1.a)
Directs and Implements EOP-0.0A Transitions to EOS-0.1A (since no SI has occurred)
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
6 Page 1
of 1
Event
Description:
Switchyard lighting strike - loss of offsite pwr (EDG 1-02 starts and loads)
Time RO BOP SRO Applicant's Actions or Behavior Direct and Implement ABN-601 Section 5 Check 6.9 KV safeguard buses energized (Train B)
Check 6.9 KV non-safeguard buses energized Check Blackout Sequencer Check switchyard buses - will be de-energized Perform Attachment 20 Refer to EPP-201 B> classify as NOUE Verify numerous transformer/switchyard status Re-energize various buses (next event before this can be completed)
Shift briefing, various announcements, contact distribution, and contact Prompt team Note to Simulator Operator: Call RO and report lighting strike in switchyard and high winds. Load Met Tower with wind speed of 105 mph (sustained)
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
7 Page 1
of 2
Event
Description:
EDG 1-02 trips on overspeed B> Loss of all power Time RO BOP SRO Applicant's Actions or Behavior Direct and Implement ECA-0.0A Verify Rx trip Verify turbine trip Check RCS isolated Verify AFW flow > 460 gpm Power can not be restored to AC safeguards bus - go to ABN-601, Step 6 Initiate DC bus load shedding - Control Room calls and has someone begin to load shed - local actions Depressurize intact SGs to 270 psig Send PEO to check on EDG trip (PEO reports that the trip was on overspeed)
Direct and Implement ABN-601 Note: EDG will not be returned before the end of the scenario.
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
1 Event No:
7 Page 2
of 2
Event
Description:
EDG 1-02 trips on overspeed B> Loss of all power Time RO BOP SRO Applicant's Actions or Behavior After SG pressures have been stabilized - end of scenario (based on Chief Examiner)
Note: Depressurize intact SGs C> Reduce temp and press of RCS to reduce RCP seal leakage and minimize RCS inventory loss (no way to makeup). (preventing a challenge to plant safety (App D, Step D.1.a))
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Scenario Outline Form ES-D-1 Facility:
CPSES Scenario No.:
2 Op-Test No.:
11/2002 Examiners:
Howard Bundy Operators:
Mike Murphy Tom McKernon Fred Sanchez Note:
(NEW) SRO Admin A.5-2, Emerg. Class. with this Scenario (SAE).
Initial Conditions:
75% power and steady; BOL.
(IC-14; RP01 - Failure of automatic RX trip; RP13C - Manual RX trip failure <both>; TC07C - Automatic main turbine trip failure <both>; Fault 1B4 to prevent manual RX trip by de-energizing the bus)
Turnover:
The previous shift just completed turbine valve testing and the shift has been directed to return to 100% (8%/hr< rate of increase <10%/hr). Diesel Generator 1 should be returned to service in about 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. OPT-215 was completed on DG-1 1 hr ago.
Event No.
Malf.
No.
Event Type*
Event Description 1
T=0 N (SRO)
R (RO)
N (BOP)
Increase reactor power back to 100%
2 (Cue)
T=10 RX04C I (SRO)
I (RO)
S/G 3 Level Transmitter LT-553 fails low (If RO or BOP goes to place bistables in trip, start E3) 3 T=19 TP04A C (SRO)
C (RO)
Main Feedwater pump A TPCW blockage [value=100%, ramp over 5 min]
- 4 T=27 FW03B RP01 C (ALL)
M (ALL)
Feedwater pump B trips; failure of automatic and manual reactor trip; failure of automatic main turbine trip.
- 5 SG01C M (ALL)
S/G#4 tube rupture [value=750 gpm, insert when reactor is tripped]
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
- = insert in conjunction with S/D or trip of AA@ MFP
- = insert when reactor is tripped.
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
1 Page 1
of 1
Event
Description:
Increase reactor power to 100%
Time RO BOP SRO Applicant's Actions or Behavior Provide shift briefing Initiate RCS dilution using SOP-104A Set the desired loading rate on the LOAD GRADIENT device Slowly raise the LOAD REFERENCE device to 1150 MW while controlling the rate of turbine power increase Note to Simulator Operator: 4 minutes after Crew assumes the watch, call the control room and tell them that the National Weather Service has issued a severe thunderstorm warning with the possibility of high winds for Somervell County (next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />)
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
2 Page 1
of 1
Event
Description:
S/G 3 Level Transmitter LT-553 fails low Time RO BOP SRO Applicant's Actions or Behavior Direct and Implement the actions of ABN-710 Verifies controlling level channel failed Manually controls feedwater to S/G 1-03, using 1-FK-530 Select alternate 1-LS-539C for S/G 3 Check stable level, and feed/steam flow matched, then place controller in auto and check for proper response Refers to:
T/S 3.3.1, 3.3.2 B> within 6 hrs place channel in trip T/S 3.3.3-1 B> no action Contacts Prompt Team and Ops Management
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
3 Page 1
of 2
Event
Description:
Main Feedwater Pump A TPCM Blockage Time RO BOP SRO Applicant's Actions or Behavior Recognizes indications of main feedwater pump A TPCW blockage:
FWPT A/B L\\O FILT OUT PRESS LO (7.B-2.10)
Informs SRO Assists as directed Refer to ALB-7B 1.11, FWPT A/B L\\O FILT OUT PRESS LO and directs annunciator response actions Determine if either feed pump is tripped Ensure FWPT A emergency oil pump is running (HS-3299)
Monitor PI-3305, FWPT A HYD OIL SPLY PRESS Monitor PI-3307, FWPT A BRG L\\O SPLY PRESS If hydraulic oil pressure is <175 psig or bearing oil pressure is <7 psig ensure the standby oil pump is in service (HS-3297, FWP A MOP A or HS-3298, FWPT A MOP B)
Monitor FWPTA bearing and oil drain temperatures on the Plant Computer
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
3 Page 2
of 2
Event
Description:
Main Feedwater Pump A TPCM Blockage Time RO BOP SRO Applicant's Actions or Behavior If any oil drain temperature is > 180F or bearing temperature is
> 225F, shutdown FWPT A If bearing temperature is > 240F, trip FWPT A Refers to ABN-302, Feedwater, Condensate, Heater Drain System Malfunction, and directs operators
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
4/5 Page 1
of 4
Event
Description:
Feedwater Pump B trips; failure of automatic and manual reactor trips; failure of automatic main turbine trip; SG-4 tube rupture Time RO BOP SRO Applicant's Actions or Behavior Recognizes loss of main feedwater:
Main Feedwater Pump B tripped Informs SRO Directs operators to manually trip the reactor Enters EOP-0.0A, Reactor Trip or Safety Injection, and directs operators Attempt to manually trip reactor from both trip switches Inform SRO reactor did not trip Transitions to FRS-0.1A, Response to Nuclear Power Generation/ATWT, Step 1, and directs operators Verifies control rods inserting at greater than 48 steps per minute OR manually insert control rods Manually trips turbine Verifies total AFW flow is greater than 860 gpm
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
4/5 Page 2
of 4
Event
Description:
Feedwater Pump B trips; failure of automatic and manual reactor trips; failure of automatic main turbine trip; SG-4 tube rupture Time RO BOP SRO Applicant's Actions or Behavior Directs operator in performing FRS-0.1A subsequent actions Check if reactor tripped Initiate Emergency Boration of RCS:
Ensures at least one CCP running Verifies charging flow is greater that 30 gpm Starts available boric acid pump Opens Emergency Boration valve 1-8104 Verifies emergency boration flow Checks PRZR pressure less than 2335 psig Dispatch an operator to locally trip the reactor (NOTE: Allow RX trip breakers to be opened after Emergency Boration begins)
Check if turbine tripped Verify reactor subcritical (may return to EOP-0.0 if reactor tripped)
Check SG level
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
4/5 Page 3
of 4
Event
Description:
Feedwater Pump B trips; failure of automatic and manual reactor trips; failure of automatic main turbine trip; SG-4 tube rupture Time RO BOP SRO Applicant's Actions or Behavior Ensure all dilution paths isolated Check for reactivity insertion from uncontrolled cooldown Check MSIVs and bypass valves closed Transitions to EOP-0.0A, Reactor Trip Or Safety Injection (when RX trip brkrs open), and directs operators
-Verify RX trip, Turbine trip, & power to safeguards busses
-Check SI Status (transition to EOS-0.1A if no SI required)
-continue with either EOP-0.0A or EOS-0.1A until symptoms indicate Tube Rupture and transition to EOP-3.0A.
Transitions to EOP-3.0A, Steam Generator Tube Rupture, and directs operators Check if RCP=s should be stopped Identify Ruptured SG At least one SG must remain available for RCS cooldown Adjust ruptured SG atmospheric controller setpoint to 1160 psig.
Check Ruptured SG atmospheric - CLOSED
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
2 Event No:
4/5 Page 4
of 4
Event
Description:
Feedwater Pump B trips; failure of automatic and manual reactor trips; failure of automatic main turbine trip; SG-4 tube rupture Time RO BOP SRO Applicant's Actions or Behavior Close ruptured SG main steamline isolation and ensure bypass valve closed Pull-Out steam supply valve handswitch from ruptured SG to TDAFW pump Verify Blowdown isolation valve(s) from ruptured SG -
CLOSED Terminate scenario at completion of step 4 of EOP-3.0A (SG are isolated) or as directed of Chief Examiner.
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Scenario Outline Form ES-D-1 Facility:
CPSES Scenario No.:
3 Op-Test No.:
11/2002 Examiners:
Howard Bundy Operators:
Mike Murphy Tom McKernon Fred Sanchez Note:
(BANK) This scenario is an unused spare from the 2001 CPSES exam Initial Conditions:
30% power and steady. (IC-11)
Turnover:
No equipment is out of service. Train A equipment is in service. FWP repairs have been completed by the previous shift. You have been directed to return to 100% power @8%/hr not to exceed 10%/hr. Start at IPO-003A step 5.4.10 and SOP-308A step 5.1.20 for the power increase.
Event No.
Malf.
No.
Event Type*
Event Description 1
T=0 N (SRO)
N (BOP)
R (RO)
Increase Reactor power back to 100%
2 (Cue)
T=13 MS13A I (RO)
I (BOP)
I (SRO)
MSL 1 Press Instrument PI-2325 fails high (100%)
3 T=16 RX08A I (RO)
I (SRO)
PZR press transmitter PT-455 fails at 2300# (ramps over 45 seconds) 4 T=16 RX15A C (RO)
C (SRO)
PZR spray flow control valve failure (PCV-455B) @ 70%
severity. Failure occurs at the instant that the RO takes pressure control to manual. (Removing faulty card - PCV-455B CTRL (RXR96) - allows spray valve to go back to closed) 5 T=22 FW16 C (RO)
C (BOP)
C (SRO)
Lowering vacuum on main condenser due to loss of vacuum breaker water seal (5% severity) 6 T=35 TC06C MS07A MS10A1
@100%
M (ALL)
M (ALL)
Main turbine spurious trip and MSIV #1 closes causing SG1 Safety MS-021 to fail open
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
3 Event No:
1 Page 1
of 1
Event
Description:
Increase Rx Power - approx 8%/hr Time RO BOP SRO Applicant's Actions or Behavior Increase reactor power per IPO-003A Provide shift briefing Calc amount of dilution needed to raise power to 1145 MWe (Rx Eng data)
Initiate dilution and outward rod motion Set desired loading rate on the LOAD GRADIENT device Raise the LIMIT LOAD device to >1180 MW Raise the LOAD REFERENCE device to increase turbine load Verify proper rod bank insertion, overlap, and sequencing
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
3 Event No:
2 Page 1
of 1
Event
Description:
MSL #1 Press Instrument (PI-2325) Fails High Time RO BOP SRO Applicant's Actions or Behavior Refers to ALM-0064A and diagnosis ARV open by control board indications Directs and Implements ABN-709, Section 2.0 Determines PI-2325 failed high and ZL-2325 indicates valve open Ensures SG 1 press <1125 psig and manually closes ARV Notifies Chemistry to determine if release permit is required Contacts Prompt Team and initiates repairs
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
3 Event No:
3 Page 1
of 1
Event
Description:
PZR PT-455 Fails at 2300# (with a 45 sec ramp)
Time RO BOP SRO Applicant's Actions or Behavior Recognizes PT-455 failing at 2300#
PRZR PRESS DEV HI alarm (5C-4.3)
Directs response per ABN-705 Section 2.3 Verify PORV closed Place 1-PK-455A, PRZR MASTER PRESS CTRL in MANUAL and adjust for current RCS pressure Transfer pressure control to alternate channel and return 1-PK-455A to AUTO Verify automatic control restoring PRZR press to 2235#
(NOTE: the Spray valve is now stuck open (Event 4), but the operator may not yet notice that pressure is not being restored until some time later when the effects of the stuck open spray valve become more noticeable)
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
3 Event No:
4 Page 1
of 1
Event
Description:
PZR Spray Valve PCV-455 fails to 70% open Time RO BOP SRO Applicant's Actions or Behavior Determines PRZR Spray Valve RC Loop 1 is stuck open Directs Actions of ABN-705, Section 3.3 Attempts to close Spray Valve PK-455B (NOTE: will not close from control room)
(NOTE: If operator perceives that pressure is decreasing in an uncontrolled manner, he will trip the RX rather than proceed with the following steps; if he trips the RX, then initiate Event 6)
Verifies load less than 40% per IPO-3A Ensures all PRZR heaters are on Directs I&C to de-energize Spray Valve PCV-455B by removing 1-PCY-0455B Driver Card Note to Simulator Operator: After 1 minute, remove/pull PCV-455B Ctrl Drive Card and remove malfunction RX15A using remote function RXR96. Report back to control room that card has been removed.
Check PRZR pressure trending to normal Contact Plant Management and initiate repairs Critical Task B> Rx does not trip on low press
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
3 Event No:
5 Page 1
of 1
Event
Description:
Main Condenser Air In-leakage Time RO BOP SRO Applicant's Actions or Behavior Determines Condenser Vacuum Lowering Directs Actions of ABN-304, Section 3.0 Starts all available condenser vacuum pumps Notifies Shift Manager and Load Dispatcher of imminent load reduction Reduces turbine load as necessary per IPO-3A (NOTE: an aggressive load reduction at this low power may cause fluctuations in turbine control which may lead operator to trip the turbine; if they trip the turbine, then initiate Event 6)
Notifies Chemistry of excessive air in-leakage Dispatches personnel to check for leaks Note to Simulator Operator: 2 minutes after being dispatched as PEO to check for leakage paths, remove Malf FW16 and report back that Amain condenser vacuum breaker loop seal was empty and has been refilled@
Stop unnecessary CEVs per SOP-309 Critical Task - Turbine/Rx trip does not occur as a result of the low condenser vacuum fault.
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
3 Event No:
6 Page 1
of 2
Event
Description:
Turbine Spurious trip, MSIV #1 closure, Stm Line Safety Valve 1MS-0021 fails open Time RO BOP SRO Applicant's Actions or Behavior Determines #1 MSIV closed and STM Safety is failed open MSIV 1 NOT OPEN alarm (7A-1.12)
Refers to ALM-0071A (step 1.A directs RX trip)
Trips the reactor Directs and implements EOP-0.0 Verifies Rx trip and bypass brks open, all rod bottom lights on, neutron flux decreasing, and turbine tripped Verifies power to AC SFGD buses Verifies SI actuated or is required Determines SG1 is FAULTED and transitions to EOP-2.0 Directs and Implements EOP-2.0 Closes all MSIV=s and checks bypasses closed Isolates #1 S/G including #1 MSL supply to TDAFWP Checks for SGTR by verifying Secondary Rad levels -- normal
- BOLD INDICATES CRITICAL STEP
Revision 2 Appendix D Operator Actions Form ES-D-2 Op-Test No:
11/2002 Scenario No:
3 Event No:
6 Page 2
of 2
Event
Description:
Turbine Spurious trip, MSIV #1 closure, Stm Line Safety Valve 1MS-0021 fails open Time RO BOP SRO Applicant's Actions or Behavior Transitions to EOP-1.0 Directs and Implements EOP-1.0 Check if RCPs should be stopped Check for faulted S/Gs Check intact S/G levels and Secondary Rad levels Transition to EOS-1.1 Terminate scenario when Crew transitions to EOS-1.1 or at the discretion of the Chief Examiner
- BOLD INDICATES CRITICAL STEP