ML022950410

From kanterella
Jump to navigation Jump to search
Corrected Technical Specification Page for Amendments 201 and 206, Page 3.31-16
ML022950410
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/21/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML022950410 (1)


Text

RPS Instrumentation 3.3.1 Table 3 3.1-1 (page 4 of 8)

Reactor Protection System Instrumentation APPLICABLE MODES RBQUIRED SURVELANC ALLOWABLE CHANNELS CONDITIONS RB7UUREMENIS VALUE FUNCTION

17. Reactor Trip System Interlocks 2 R SR 3 3.1.11 > IE-10 amp a Intermediate Range 2 (d)

Neutron Flux, P-6 SR 3 3.1.12

b. Low Power Reactor Tnps Block, P-7 1 4 S SR33 1.11 < 10% RTP (1) Power Range Neutron Flux SR 3 3 1.12 2 S SR 3 3.1 11 < 10% turbine power (2) Turbine Impulse 1 Pressure SR 3 3 1 12
c. Power Range Neutron <50%RTP 1 4SR 3 3.1 11 Flux, P-8 SR 33 1 12
d. Power Range Neutron 4 < 50% RTP Flux, P-9 k 4 SR 3.3 1.11 SR 3 3.1 12 e Power Range Neutron >8%RTPand 1,2 4 R SR331 11 Flux, P-10 < 10% RTP SR 3.3 1.12 1,2 2 trains Q SR 3 3.1.4 NA 18 Reactor Trip Breakers (RTBs) 3(a), 4(a), 5 (a) 2 trains T SR 3.3 1 4 NA 1.2 I each per U SR 3 3.14 NA
19. Reactor Tnp Breaker Undervoltage and Shunt Trip RTB Mechanisms (a), 5 (a) I each per T SR 3 3 1 4 NA 3 (a), 4 RTB (continued)

(a) With the RTBs closed and the Rod Control System capable of rod withdrawal (d) Below the P-6 (Intermediate Range Neutron Flux) interlock (k) With I of 2 circulating water pump breakers closed and condenser vacuum > 22 "Hg Point Beach 3.3.1-16 Unit 1 - Amendment No. 201 Unit 2 - Amendment No. 206