MSIVs and Non-Return Check Valves 3.7.2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME C.
(continued)
C.3 Verify MSIV and non-Once per 7 days return check valve in the affected flowpath are closed and the MSIV is de-activated.
D.
Required Action and D.1 Be in MODE 3.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time of Condition C not AND met.
D.2 Be in MODE 4.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.7.2.1
NOTE -------------------------
Only required to be performed in MODE 1.
Verify closure time of each MSIV is within limits.
In accordance with the Inservice Testing Program SR 3.7.2.2
NOTE---------------
Only required to be performed in MODE 1.
Verify each MSIV actuates to the isolation 18 months position on an actual or simulated actuation signal.
SR 3.7.2.3 Verify each main steam non-return check valve In accordance can close, with the Inservice Testing Program
)
Point Beach 3.7.2-2 Unit 1 - Amendment No. 230 Unit 2 - Amendment No. 235