Letter Sequence Approval |
---|
|
|
MONTHYEARML0213002692002-05-16016 May 2002 Biweekly Notice Memo, Notice of Consideration, Revising TS 3.6.6 Surveillance Requirements 3.6.6 to Verify Each Spray Nozzle on the Containment Spray Ring Headers at the Top of Containment Dome Is Unobstructed Project stage: Other ML0228805962003-02-20020 February 2003 Issuance of Amendment Nos. 126 & 126, Respectively, Revising Technical Specifications 3.6.6, to Change the Frequency of Surveillance Requirement 3.6.6.8 as Listed Project stage: Approval ML0305103442003-02-20020 February 2003 Technical Specifications 3.6.6, Containment Spray and Cooling Systems. Project stage: Other 2002-05-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000456/20240032024-11-12012 November 2024 Integrated Inspection Report 05000456/2024003 and 05000457/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums RS-24-098, Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality2024-10-23023 October 2024 Units 1 and 2 - Supplement to License Amendment Request to Revise Technical Specifications 3.7.15, Spent Fuel Pool Boron Concentration, 3.7.16, Spent Fuel Assembly Storage, 4.3.1, Fuel Storage, Criticality ML24291A0012024-10-17017 October 2024 Submittal of Core Operating Limits Report, Cycle 25 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-095, Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals2024-10-10010 October 2024 Relief Request I4R-19 and I4R-26, Associated with the Fourth and Fifth Inservice Inspection Intervals ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary IR 05000456/20240112024-09-12012 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000456/2024011 and 05000457/2024011 ML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000456/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2024005 and 05000457/2024005) ML24225A1112024-08-13013 August 2024 Notification of NRC Fire Protection Team Inspection Request for Information ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000456/20240022024-08-0808 August 2024 Integrated Inspection Report 05000456/2024002 and 05000457/2024002 ML24172A1252024-07-26026 July 2024 Environmental Assessment and Finding of No Significant Impact Related to a Requested Increase in Ultimate Heat Sink Temperature (EPID L-2024-LLA-0075) - Transmittal Letter ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24164A2132024-06-13013 June 2024 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Braidwood Nuclear Plant RS-24-057, License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink2024-06-0404 June 2024 License Amendment to Technical Specification 3.7.9, Ultimate Heat Sink IR 05000456/20240102024-05-31031 May 2024 License Renewal Phase 1 Report 05000456/2024010 RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24136A0132024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report ML24136A2452024-05-15015 May 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000457/2024004 ML24128A1212024-05-0707 May 2024 Response to Braidwood and Dresden FOF Dates Change Request (2025) ML24122A6522024-05-0101 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000456/20243012024-04-29029 April 2024 NRC Initial License Examination Report 05000456/2024301; 05000457/2024301 RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A0052024-04-25025 April 2024 Transmittal of Braidwood Station, Unit 1, Core Operating Limits Report, Braidwood Unit 1 Cycle 25 IR 05000456/20240012024-04-24024 April 2024 Integrated Inspection Report 05000456/2024001 and 05000457/2024001 ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) IR 05000457/20240902024-04-19019 April 2024 Final Significance Determination for 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Dilution Issue - NRC Inspection Report 05000457/2024090 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24094A2692024-04-0303 April 2024 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report, WCAP-17451-P, Revision 2, Reactor Internals Guide Tube Wear Westinghouse Domestic Fleet Operational Projections RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML24067A3252024-03-0707 March 2024 U.S. Department of Energy, Office of Legacy Management, 2023 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites ML24066A0122024-03-0606 March 2024 Operator Licensing Examination Approval Braidwood Station, Units 1 and 2, March 2024 IR 05000456/20244012024-03-0505 March 2024 Cyber Security Inspection Report 05000456/2024401 and 05000457/2024401 (Public) IR 05000456/20230062024-02-28028 February 2024 Annual Assessment Letter for Braidwood Station, Units 1 and 2 (Report 05000456/2023006 and 05000457/2023006) ML24057A3022024-02-26026 February 2024 Regulatory Conference Supplemental Information ML24047A2382024-02-20020 February 2024 Regulatory Conference to Discuss Risk Associated with 2b Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak 2024-09-23
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24163A3922024-06-25025 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0075)- Letter ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22173A1812022-08-11011 August 2022 Issuance of Amendment No. 229 to Remove License Condition ML22173A2142022-08-10010 August 2022 Issuance of Amendments Nos. 228 and 228 Revision of Technical Specifications for the Ultimate Heat Sink ML22145A5862022-06-0303 June 2022 R. E. Ginna Correction to Pages Issued for Amendments Nos. 225, 225, 227, 227, & 148, Respectively, Regarding Issues Identified in Westinghouse Documents ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML22021B6592022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000) (Letter) ML22031A2762022-02-0101 February 2022 Issuance of Indemnity Agreement Amendments-Enclosure 2 ML22021B6602022-02-0101 February 2022 Issuance of Amendments Related to Order Approving Transfer of Licenses (EPID L-2022-LLM-0000)-Enclosure 1 ML21314A2182022-01-18018 January 2022 Audit Plan in Support of Review of License Amendment Request Regarding the Ultimate Heat Sink ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21154A0462021-07-13013 July 2021 Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink ML21090A0152021-04-0707 April 2021 Correction to Amendment Nos. 219 and 219 Regarding Revision of Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20245E4192020-09-24024 September 2020 Issuance of Amendments Nos. 218 and 218 Revision of Technical Specifications for the Ultimate Heat Sink ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20118C4292020-06-0909 June 2020 Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink ML20111A0002020-05-0101 May 2020 Issuance of Amendment No. 209, Revision Technical Specification 5.5.9, Steam Generator (SG) Program, for One-Time Revision to Frequency of SG Tube Inspections (Exigent Circumstances) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20034G5462020-03-12012 March 2020 Issuance of Amendments Revising Instrument Testing and Calibration Definitions ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML19266A5272019-10-0808 October 2019 Issuance of Amendments to Eliminate Second Completion Times from Technical Specifications ML19190A0812019-08-28028 August 2019 Issuance of Amendments Regarding Limiting Condition of Operation for Inoperability of Snubbers ML19170A3112019-06-19019 June 2019 Redacted Braidwood Station, Units 1 & 2, and Byron Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Appendix 5.1 (Public Version Pages 1-76 and 129-287) ML19168A1192019-06-17017 June 2019 Redacted Braidwood Station, Units 1 & 2, Amendment 28 to Fire Protection Report, Chapter 2.4, Safe Shutdown Analysis. (Public Version Pages 1-19 and 1726-1742) RS-19-017, Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control2019-06-14014 June 2019 Application to Remove the Table of Contents from Technical Specifications and Place It Under Licensee Control ML18302A2272018-12-12012 December 2018 Issuance of Amendments No. 200 and 205 Regarding Axial Flux Difference Technical Specifications ML18291A9802018-11-0808 November 2018 Issuance of Amendment Nos. 199 Regarding Use of TORMIS for Assessing Tornado Missile Protection ML18264A0922018-10-22022 October 2018 Issuance of Amendment Nos. 198, 198, 204, and 204, Respectively, Regarding Adoption of Title 10 of the Code of Federal Regulations Section 50.69 CAC Nos. MG0201, MG0202, MG0203, and MG0204; EPID-L 2017-LLA-0285) ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18065A5292018-06-27027 June 2018 Issuance of Amendments Regarding Clarification of Rod Position Requirements (CAC Nos. MF9951-9954; EPID L-2017-LLA-0249) ML18067A1812018-06-0404 June 2018 Correction to Technical Specification Amendment Identification Format ML18054B4362018-04-30030 April 2018 Issuance of Amendments Regarding Control Room Ventilation Temperature Control System (CAC Nos. MF9932, MF9933, MF9934, and MF9935; EPID L-2017-LLA-0247) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17088A7032017-07-0505 July 2017 Issuance of Amendments to Regarding Request to Delete Obsolete License Conditions and Make Administrative Changes to Technical Specifications (CAC Nos. MF9338-MF9341) ML17073A0672017-05-26026 May 2017 Issuance of Amendments Revising the Technical Specification Requirements for the Inservice Testing Program (CAC Nos. MF8238 - MF8256) 2024-09-10
[Table view] Category:Safety Evaluation
MONTHYEARML24164A0032024-09-10010 September 2024 Issuance of Amendment Nos. 235 and 235 Revision of Technical Specifications for the Ultimate Heat Sink ML24194A0222024-07-22022 July 2024 Issuance of Relief Proposed Alternative Request Associated with Pressurizer Examinations ML24057A0372024-03-26026 March 2024 Proposed Alternative from Certain Requirements Contained in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23241A9092023-09-19019 September 2023 Enclosure 2 - Non-Proprietary - Review of License Renewal Commitment Number 10 Safety Evaluation ML23188A1292023-07-26026 July 2023 Issuance of Amendment Nos. 233 and 233 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23087A0762023-07-13013 July 2023 Issuance of Amendment Nos. 232 and 232 Revision of Technical Specifications for the Ultimate Heat Sink ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML22293B8052022-11-30030 November 2022 Constellation Energy Generation, Llc_Fleet - Request to Authorize Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22307A2462022-11-10010 November 2022 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (EPIDs L-2021-LLR-0035 and L-2021-LLR-0036) ML22210A0312022-08-30030 August 2022 Issuance of Amendments Nos. 230, 230, 230, and 230, Respectively, Regarding Adoption of Technical Specifications Task Force Traveler (TSTF) 501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML22173A1812022-08-11011 August 2022 Issuance of Amendment No. 229 to Remove License Condition ML22173A2142022-08-10010 August 2022 Issuance of Amendments Nos. 228 and 228 Revision of Technical Specifications for the Ultimate Heat Sink ML22095A2702022-05-12012 May 2022 Issuance of Amendment Nos. 227, 227, 229, 229, and 245, Respectively, Regarding Adoption of TSTF 273, Safety Function Determination Program Clarifications ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22026A4892022-03-22022 March 2022 Issuance of Amendment Nos. 225, 225, 227, 227, and 148, Respectively, Regarding Issues Identified in Westinghouse Documents (EPID L-2021-LLA-0066) Nonproprietary ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21280A0782021-10-27027 October 2021 Proposed Alternative to Use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-893 (Epids L-2020-LLR-0147 and L-2020-LLR-0148) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21134A0062021-08-0303 August 2021 Proposed Alternatives to the Requirements of the American Society of Mechanical Engineers Boiler & Pressure Vessel Code (Epids L-2020-LLR-0099 and L-2020-LLR-0100) ML21154A0462021-07-13013 July 2021 Issuance of Amendments Nos. 222 and 222 Revision of Technical Specifications for the Ultimate Heat Sink ML21166A1682021-06-25025 June 2021 ML21060B2812021-04-0202 April 2021 Issuance of Amendments Nos. 221, 221, 224, and 224 Regarding Technical Specifications 3.8.1, AC Sources-Operating ML21054A0082021-03-10010 March 2021 Issuance of Amendment Nos. 220 and 220 One-Time Deferral of Steam Generator Tube Inspections ML21063A0162021-03-0808 March 2021 Relief from the Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Alternative to 10 CFR 50.55a(z)(2) ML21039A6362021-02-17017 February 2021 R. E. Ginna - Proposed Alternative to Use the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-885 ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20317A0012020-12-28028 December 2020 Non-Proprietary, Issuance of Amendment Nos. 219, 219, 223, and 223, Revise Loss-of-Coolant Accident Methodology in TS 5.6.5, Core Operating Limits Report (COLR) ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20245E4192020-09-24024 September 2020 Issuance of Amendments Nos. 218 and 218 Revision of Technical Specifications for the Ultimate Heat Sink ML20163A0462020-09-18018 September 2020 Issuance of Amendments Nos. 217, 217, 221, and 221, Revise Technical Specification 5.6.6 to Allow Use of Areva Np Topical Report BAW-2308 ML20167A0072020-09-11011 September 2020 R. E. Ginna - Issuance of Amendment Nos. 216, 216, 220, 220, and 143 - Adoption of TSTF-567, Rev. 1, Add Containment Sump Technical Specifications to Address GSI-191 Issues ML20149K6982020-09-10010 September 2020 Issuance of Amendment Nos. 215, 215, 219, and 219 Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML20232A1712020-09-0101 September 2020 Request to Use Alternative Code Case OMN-26 ML20153A8042020-07-31031 July 2020 Co. - Issuance of Amendments Revising Emergency Action RA3 ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20118C4292020-06-0909 June 2020 Issuance of Amendments Revision of Technical Specifications for the Ultimate Heat Sink ML20133K0932020-05-14014 May 2020 Relief from the Requirements of the ASME Code ML20111A0002020-05-0101 May 2020 Issuance of Amendment No. 209, Revision Technical Specification 5.5.9, Steam Generator (SG) Program, for One-Time Revision to Frequency of SG Tube Inspections (Exigent Circumstances) ML20113F0412020-04-30030 April 2020 Proposed Alternative to the Submittal Schedule for Certain Reports (COVID-19) ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML19331A7252020-02-14014 February 2020 Issuance of Amendments Revising Emergency Action Levels ML20028E3992020-02-0404 February 2020 Proposed Alternative to Use ASME Code Case N-879 ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19240B1122019-09-0909 September 2019 Proposed Alternative to the Requirements of the American Society of Mechanical Engineers Code 2024-09-10
[Table view] |
Text
February 20, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS (TAC NOS. MB4851 AND MB4852)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 126 to Facility Operating License No. NPF-72 and Amendment No. 126 to Facility Operating License No. NPF-77 for the Braidwood Station, Unit Nos. 1 and 2, respectively. The amendments are in response to your application dated April 19, 2002, supplemented by your letters dated September 9, 2002, and January 3, 2003.
The amendments revise Technical Specifications (TS) 3.6.6, Containment Spray and Cooling Systems, to change the frequency of Surveillance Requirement (SR) 3.6.6.8 from 10 years to Following maintenance that could result in nozzle blockage OR Following fluid flow through nozzles. The proposed frequency of Following maintenance that could result in nozzle blockage is consistent with similar changes previously approved by the NRC on other dockets.
This safety evaluation addresses Braidwood Station Units 1 and 2 only. The NRC staffs evaluation of the Byron Units 1 and 2 will be addressed separately.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Mahesh Chawla, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457
Enclosures:
- 1. Amendment No. 126 to NPF-72
- 2. Amendment No. 126 to NPF-77
- 3. Safety Evaluation cc w/encls: See next page
Braidwood Station Units 1 and 2 cc:
Regional Administrator, Region III Illinois Emergency Management U.S. Nuclear Regulatory Commission Agency 801 Warrenville Road Division of Disaster Assistance &
Lisle, IL 60532-4351 Preparedness 110 East Adams Street Illinois Department of Nuclear Safety Springfield, IL 62701-1109 Office of Nuclear Facility Safety 1035 Outer Park Drive Chairman Springfield, IL 62704 Will County Board of Supervisors Will County Board Courthouse Document Control Desk-Licensing Joliet, IL 60434 Exelon Generation Company, LLC 4300 Winfield Road Attorney General Warrenville, IL 60555 500 S. Second Street Springfield, IL 62701 Ms. C. Sue Hauser, Project Manager Westinghouse Electric Corporation George L. Edgar Energy Systems Business Unit Morgan, Lewis and Bockius Post Office Box 355 1800 M Street, NW Pittsburgh, PA 15230 Washington, DC 20036-5869 Joseph Gallo Braidwood Station Manager Gallo & Ross Exelon Generation Company, LLC 1025 Connecticut Ave., NW, Suite 1014 35100 S. Rt. 53, Suite 84 Washington, DC 20036 Braceville, IL 60407-9619 Ms. Bridget Little Rorem Site Vice President - Braidwood Appleseed Coordinator Exelon Generation Company, LLC 117 N. Linden Street 35100 S. Rt. 53, Suite 84 Essex, IL 60935 Braceville, IL 60407-9619 Howard A. Learner Senior Vice President, Nuclear Services Environmental Law and Policy Exelon Generation Company, LLC Center of the Midwest 4300 Winfield Road 35 East Wacker Dr., Suite 1300 Warrenville, IL 60555 Chicago, IL 60601-2110 Vice President U.S. Nuclear Regulatory Commission Mid-West Operations Support Braidwood Resident Inspectors Office Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 79 4300 Winfield Road Braceville, IL 60407 Warrenville, IL 60555 Ms. Lorraine Creek Chairman, Ogle County Board RR 1, Box 182 Post Office Box 357 Manteno, IL 60950 Oregon, IL 61061
Braidwood Station Units 1 and 2 Exelon Generation Company, LLC Mr. John L. Skolds, President Regulatory Assurance Manager - Braidwood Exelon Nuclear 35100 S. Rt. 53, Suite 84 Exelon Generation Company, LLC Braceville, IL 60407-9619 4300 Winfield Road Warrenville, IL 60555 Senior Vice President Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director Licensing Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Counsel, Nuclear Mid-West Regional Operating Group Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing Braidwood and Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
February 20, 2003 Mr. John L. Skolds, President Exelon Nuclear Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
BRAIDWOOD STATION, UNITS 1 AND 2 - ISSUANCE OF AMENDMENTS (TAC NOS. MB4851 AND MB4852)
Dear Mr. Skolds:
The U.S. Nuclear Regulatory Commission (Commission) has issued the enclosed Amendment No. 126 to Facility Operating License No. NPF-72 and Amendment No. 126 to Facility Operating License No. NPF-77 for the Braidwood Station, Unit Nos. 1 and 2, respectively. The amendments are in response to your application dated April 19, 2002, supplemented by your letters dated September 9, 2002, and January 3, 2003.
The amendments revise Technical Specifications (TS) 3.6.6, Containment Spray and Cooling Systems, to change the frequency of Surveillance Requirement (SR) 3.6.6.8 from 10 years to Following maintenance that could result in nozzle blockage OR Following fluid flow through nozzles. The proposed frequency of Following maintenance that could result in nozzle blockage is consistent with similar changes previously approved by the NRC on other dockets.
This safety evaluation addresses Braidwood Station Units 1 and 2 only. The NRC staffs evaluation of the Byron Units 1 and 2 will be addressed separately.
A copy of the Safety Evaluation is also enclosed. The Notice of Issuance will be included in the Commission's biweekly Federal Register notice.
Sincerely,
/RA/
Mahesh Chawla, Project Manager, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457
Enclosures:
- 1. Amendment No. 126 to NPF-72
- 2. Amendment No. 126 to NPF-77
- 3. Safety Evaluation cc w/encls: See next page DISTRIBUTION:
PUBLIC GDick CRosenberg SWeerakkody PD3-2 r/f AStone, RIII RDennig ACRS, T2E26 MChawla OGC, O15B18 AMendiola GHill (8), T5C3 RLobel ADAMS Accession Number: ML022880596
- See previous concurrence OFFICE PM:LPD3-2 LA:LPD3-2 SC:SPLB SC:RORP OGC SC:LPD3-2 NAME MChawla THarris *SWeerakkody *RDennig *RHefling LRaghavan for AMendiola DATE 2/26/03 2/27/03 01/31/03 02/03/03 02/06/03 2/25/03 OFFICIAL RECORD COPY
EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-456 BRAIDWOOD STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 126 License No. NPF-72
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated April 19, 2002, as supplemented by letters dated September 9, 2002, and January 3, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-72 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 126 and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by LRaghavan for/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: February 20, 2003
EXELON GENERATION COMPANY, LLC DOCKET NO. STN 50-457 BRAIDWOOD STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 126 License No. NPF-77
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment by Exelon Generation Company, LLC (the licensee) dated April 19, 2002, as supplemented by letters dated September 9, 2002, and January 3, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commissions rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-77 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A as revised through Amendment No. 126 and the Environmental Protection Plan contained in Appendix B, both of which were attached to License No. NPF-72, dated July 2, 1987, are hereby incorporated into this license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
- 3. This license amendment is effective as of the date if its issuance and shall be implemented within 30 days of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA by LRaghavan for/
Anthony J. Mendiola, Chief, Section 2 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: February 20, 2003
ATTACHMENT TO LICENSE AMENDMENT NOS. 126 AND 126 FACILITY OPERATING LICENSE NOS. NPF-72 AND NPF-77 DOCKET NOS. STN 50-456 AND STN 50-457 Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by amendment number and contains marginal lines indicating the area of change.
Remove Page Insert Page 3.6.6-3 3.6.6-3
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 126 TO FACILITY OPERATING LICENSE NO. NPF-72, AND AMENDMENT NO. 126 TO FACILITY OPERATING LICENSE NO. NPF-77 EXELON GENERATION COMPANY, LLC BRAIDWOOD STATION, UNIT NOS. 1 AND 2 DOCKET NOS. STN 50-456 AND STN 50-457
1.0 INTRODUCTION
By application dated April 19, 2002, as supplemented by letters dated September 9, 2002, and January 3, 2003, Exelon Generation Company, LLC (the licensee) requested changes to the Technical Specifications (TSs) for the Braidwood Station, Units 1 and 2, and Byron Station Units 1 and 2. The supplementary letters dated September 9, 2002, and January 3, 2003, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination as published in the Federal Register on June 11, 2002 (67 FR 40023).
The proposed changes would revise Technical Specifications (TS) 3.6.6, Containment Spray and Cooling Systems, to change the frequency of Surveillance Requirement (SR) 3.6.6.8 from 10 years to Following maintenance that could result in nozzle blockage OR Following fluid flow through nozzles. The proposed frequency of Following maintenance that could result in nozzle blockage is consistent with similar changes previously approved by the NRC on other dockets.
This safety evaluation addresses Braidwood Station Units 1 and 2 only. The NRC staffs evaluation of the Byron Units 1 and 2 will be addressed separately.
2.0 REGULATORY EVALUATION
10 CFR Part 50 Appendix A contains General Design Criteria (GDC) for nuclear power reactors. In particular, GDC 40 requires that the containment heat removal system be designed to permit periodic functional testing. The containment spray system is included in the containment heat removal system.
The Westinghouse Standard Technical Specifications, Volume 1, Revision 2, dated June 2001, NUREG-1431, SR 3.6.6.A.8 specifies a testing frequency of 10 years for the nozzle blockage test. While this is not a requirement, it has been the staff and industrys current judgment of an acceptable frequency for this test.
3.0 TECHNICAL EVALUATION
The containment heat removal systems for the Braidwood Station consist of the reactor containment fan cooler system and the containment spray system. The containment spray system actuates automatically (on a High-3 containment pressure signal) or remote-manually from the control room. The containment spray system has two safety functions. The containment spray system removes heat from the containment atmosphere following a design basis loss-of-coolant accident (LOCA) or main steam line break accident inside containment.
This ensures that the containment pressure does not exceed the containment design pressure.
The containment spray system also removes iodine and other radionuclides from the containment atmosphere following a LOCA.
The containment spray system is described in Section 6.5.2, Containment Spray Systems, of the Braidwood Station Updated Final Safety Analysis Report (UFSAR). It consists of two independent 100 percent capacity trains with no common headers. The nozzles are made of corrosion resistant stainless steel and are of a swirl chamber design without any internal parts which could cause clogging. The system includes six spray headers, each with a different number of nozzles ranging from 39 nozzles in Ring Header 1 to 120 nozzles in Ring Header 5.
The minimum area flow path in the containment spray system is the spray nozzle. The licensee states that the nozzle orifice will pass particles less than 0.375 inches in diameter.
Technical Specification Surveillance Requirement 3.6.6.8 currently requires a test every 10 years to ensure that the containment spray system nozzles are not obstructed. The test is currently done, according to the licensees April 19, 2002, letter, with the spray inlet valves closed. Hot air is blown through test connections downstream of the spray inlet valves and thermographs confirm flow from each nozzle. The TS Bases accompanying the proposed change discuss the use of flowing low pressure air or smoke to detect blockage. Both hot air, low pressure air, or smoke are acceptable methods that are used by the industry.
One postulated mode of blockage of the spray headers and nozzles is solid boric acid accumulation in the spray lines or nozzles due to evaporated borated water. The spray headers are maintained dry and are isolated from the water in the containment spray system by normally closed, containment isolation valves (CS007A/B motor operated valves outside containment, and CS008A/B check valves inside containment). Since these valves are containment isolation valves they are subject to leakage rate testing in accordance with 10 CFR Part 50 Appendix J. In addition, the height of the water in the header upstream of the containment isolation valves corresponds to the water level in the refueling water storage tank (RWST) which is the initial borated water source for the containment spray system. Therefore, borated water cannot reach the spray nozzles without a containment spray system actuation.
Another possible blockage source is debris (foreign material) in the system. The licensees September 9, 2002, letter states that routine maintenance and calibrations are routinely performed on the containment spray system. During this work the system may be open and the
licensees foreign material exclusion (FME) program would then be in effect. This letter describes the licensees FME program. Inventory of all material used and capture of all foreign material created (such as from grinding, welding, and machining) are important aspects of this program. The licensee also describes steps to be taken if control of foreign material is lost. In this case, a recovery plan would be developed and approved by the system engineer or a cognizant management individual before it is implemented. The staff requested more information from the licensee related to the effectiveness of the FME program at the Braidwood Station, both generally and specifically concerning the containment spray system. The licensee replied to this request in a letter dated January 3, 2003. Details of the surveillances requiring opening of the system are discussed as well as the FME procedures and the status of the FME program at Braidwood station. This is discussed further below.
Performance History at Braidwood The licensees September 9, 2002, letter describes the past testing done to ensure that there is no debris in the system. As part of pre-operational testing, the containment spray system was tested at full flow from the RWST to the reactor cavity with a blind flange installed downstream of a tee connection in the discharge line between the vertical riser and the nozzles.
Subsequently, in 1991 both units were tested by blowing hot air through the risers. A thermograph of each nozzle confirmed that there was no blockage.
Therefore, it appears that the spray nozzles were unobstructed as of the last flow test.
The Licensees January 3, 2003, letter states that all maintenance work packages that breached the containment spray system downstream of the containment isolation valves since the last containment spray surveillance test in 1991 were reviewed. Each package had a positive indication that the system was left clean and free of foreign material. Therefore, the staff has confidence that no foreign material entered the containment spray systems at each unit since the last flow test.
Past events in which there was a loss of foreign material control in other systems were discussed in the January 3, 2003, letter and the trend of the loss of foreign material control events was analyzed. The staff considers the licensees response to each of these events to have been appropriate and that the current status of the foreign material efforts at Braidwood station are acceptable. This is based on the information in the licensees January 3, 2003, letter and NRC inspection activity at the Braidwood station.
Industry Experience and Failure Mechanisms Review of industry experience using the NRCs Sequence Coding and Search System for Licensee Event Reports indicates that spray systems of similar design are highly reliable (i.e.,
not susceptible to plugging). The staff reviewed industry experience and found that, with a few exceptions, once tested after construction, containment spray nozzles have not been subject to blockage. There have been several exceptions. In the case of one pressurized water reactor (PWR), a chemical added to the inner surface of a spray system pipe to eliminate corrosion detached and the loose material blocked some spray nozzles. Spray piping in PWRs is corrosion resistant, particularly at Braidwood; therefore, this failure mechanism is not applicable to Braidwood. The licensee for another PWR found debris, identified as construction debris, in
the spray nozzle headers. The fraction of blockage was not significant and the sprays remained functional. The debris was found by visual observation, not by an air flow test.
Summary As a result of reviewing the licensees request to revise the testing frequency for the containment spray nozzles from 10 years to following maintenance which could result in nozzle blockage OR following fluid flow through the nozzles, and reviewing and assessing all the applicable information provided by the licensee, including information in the Braidwood UFSAR, the staff concludes that the design of the Braidwood containment spray systems, the past history of these spray systems, and the licensees FME controls provide reasonable assurance that the potential for nozzle obstruction is acceptably low. The FME controls provide protection against the introduction of foreign materials into open piping during maintenance or testing and require post-maintenance verification of system cleanliness and freedom from foreign materials. In addition, our review of industry-wide experience has not demonstrated a problem with the licensees proposed change. Therefore, the staff finds the amendment request acceptable.
A similar TS change for the Perry Nuclear Power Plant, Unit 1, was approved by Amendment 113 issued June 29, 2000, and for the Clinton Power Station, Unit 1, by Amendment 146 issued March 28, 2002. Since then, the NRC has approved similar requested changes to the containment spray system surveillance requirement for several other nuclear power plants.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Illinois State official was notified of the proposed issuance of the amendment. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (67 FR 40023). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: Richard Lobel Date: February 20, 2003