  • G12.23.2 ENTERGY RIVER BEND STATION STATION SUPPORT MANUAL
  • EMERGENCY IMPLEMENTING PROCEDURE
  • CLASSIFICA TIONA CTIONS PROCEDURE NUMBER: *EIP-2-002 REVISION NUMBER: *23 Effective Date:
  • AUG 2 9 200O NOTE: SIGNATURES ARE ON FILE.

RECEIVED

  • INDE)XING INFORMATION AUG 2 9 2002 DOCUMENT CONTROL This procedure has been reviewed for 10CFR50.59 applicability.

10CFR50.59 screening for the programmatic exclusion of all EIP changes, approved by FRC 7/10/97, concludes that further review of changes to this procedure under 10CFR50.59 are not necessary.

REFERENCE USE

TABLE OF CONTENTS SECTION PAGE NO.

1 PURPOSE ................................................................................................................................ 2 2 REFERENCES ......................................................................................................................... 2 3 DEFINITIONS .......................................................................................................................... 2 4 RESPONSIBILITIES .......................................................................................................... 3 5 GENERAL ................................................................................................................................ 4 6 PROCEDURE ........................................................................................................................... 4 7 DOCUMENTATION ......................................................................................................... 4 ATTACHMENT 1 - NOTIFICATION OF UNUSUAL EVENT ............................................. 5 ATTACHM ENT 2 - ALERT .................................................................................................... 7 ATTACHMENT 3 - SITE AREA/GENERAL EMERGENCY ................................................ 10 ATTACHMENT 4 - SIREN CONTROL ENABLE FROM THE CONTROL ROOM ............ 13 ATTACHMENT 5 - TOXIC GAS RELEASE CHECKLIST .................................................. 15 lh",lP-*-NN'2 RIC,V - 23 PAGE 1 OF 16 EIP-2-00l2 REV - 23 AE106

PURPOSE This procedure describes the actions to be taken by the Recovery Manager/Emergency Director when an emergency condition has been classified as a Notification of Unusual Event (NOUE), Alert, Site Area or General Emergency, per EIP-2-001, Classification of Emergencies.

2 REFERENCES 2.1 ADM-0060, First Responder Emergencies 2.2 EIP-2-001, Classification of Emergencies 2.3 EIP-2-006, Notifications 2.4 EIP-2-007, Protective Action Recommendation Guidelines 2.5 EIP-2-012, Radiation Exposure Controls 2.6 EIP-2-014, Offsite Radiological Monitoring 2.7 EIP-2-024, Offsite Dose Calculations 2.8 EIP-2-026, Evacuation, Personnel Accountability, and Search and Rescue 2.9 EIP-2-028, Recovery 2.10 EPP-2-100, Procedure Review, Revision, and Approval 2.11 FPP-0010, Fire Fighting Procedure 2.12 RBNP-035, Hazardous Material Emergency Response Plan 3 DEFINITIONS 3.1 Augmentation - Actions taken to support onshift personnel or the Emergency Response Organization.

EIP-2-002 REV - 23 PAGE EIP-2-002 REV -23 PAGE 22 OF OF 16 16

4 RESPONSIBILITIES 4.1 Shift Manager:

4.1.1. assume the responsibilities and authority of the Recovery Manager and Emergency Director until properly relieved or until the emergency situation is terminated.

4.1.2. decide the Severe Accident Procedure mitigation strategy when applicable.

4.1.3. continue Shift Manager responsibilities, after being relieved or on termination of the emergency.

4.2 Recovery Manager:

4.2.1. provide overall management of River Bend Station (RBS) response activities.

4.2.2. provide notifications and make protective action recommendations to offsite authorities.

4.2.3. coordinate RBS response activities as required with offsite organizations.

4.2.4. ensure that offsite radiological conditions are measured and monitored.

4.2.5. review information for the media and the general public prior to release.

4.2.6. establish a Recovery Organization.

4.2.7. terminate the emergency.

4.3 Emergency Director:

4.3.1. assess and classify emergency conditions.

4.3.2. authorize doses in excess of 10CFR20 limits.

4.3.3. direct onsite activities in support of the Control Room.

4.3.4. authorize departures from license conditions or Technical Specifications in accordance with 10 CFR 50.54 (x).

EIP-2-002 REV - 23 PAGE EIP-2-002 REV -23 PAGE 33 OF OF 16 16

4.3.5. determine need for onsite evacuation, personnel accountability, and implement search and rescue as required.

5 GENERAL NONE 6 PROCEDURE NOTE The actions of this procedure may be completed in any sequence, however, the sequence presentedis recommended.

NOTE If the ControlRoom is evacuated, the Shift Manager, designated Communicator,and Chemistry Technician shall report to the TSC with their binders to perform the actions of this procedure.

6.1 NOTIFICATION OF UNUSUAL EVENT - The Recovery Manager and Emergency Director should use Attachment 1 as a guideline.

6.2 ALERT EMERGENCY - The Recovery Manager and Emergency Director should use Attachment 2 as a guideline.

6.3 SITE AREA EMERGENCY OR GENERAL EMERGENCY - The Recovery Manager and Emergency Director should use Attachment 3 as a guideline.

7 DOCUMENTATION 7.1 Attachments 1 - 3 and 5 - 8 of this procedure will be sent to Permanent Plant Files (PPF) per EPP-2-100 by the Manager - Emergency Preparedness.

i~p-?-rnn7 rQV. - 7 OF I16 PAGEF 44 OF PA*

ATTACHMENT 1 PAGE 1 OF 2 NOTIFICATION OF UNUSUAL EVENT INITIAL ACTIONS Date: Time: Action Completed Initials

1. Merge the Page Party/Gaitronics and make plant announcement.

WARBLE tone. "Attention in the plant. An UNUSUAL EVENT has been declared due to (brief cause of emergency)." (Repeat message)

WARNING If a personnel hazard is still within the Protected Area (high winds, toxic gas, armed intruders, etc...) consider delaying activation of the Emergency Response Organization pagers until the danger has passed.

2. Direct the Communicator to activate the onsite Emergency Response Organization pagers in accordance with EIP-2-006.
3. Direct the Communicator to notify the following:

3.1 Offsite authorities - Within 15 minutes of the declaration utilizing the Short Notification Message Form (SNMF).

- 3.2 NRC - Immediately after notifying state and local authorities and no later than one hour after declaring the emergency.

4. For toxic gas releases, refer to the actions of Attachment 5.
5. Evacuate onsite affected area(s), if needed, in accordance with EIP-2-026.

SUBSEQUENT ACTIONS

1. Periodically inform plant personnel of personnel hazards, plant line-ups, corrective actions and steps taken to mitigate the emergency.
2. Invoke 10 CFR 50.54 (x) for departures from license conditions or Technical Specifications.
3. Authorize and make log entries for all procedure deviations.

EIP-2-002 REV - 23 PAGE 5 OF 16

ATTACHMENT 1 PAGE 2 0F2 NOTIFICATION OF UNUSUAL EVENT SUBSEQUENT ACTIONS (Cont.'d)

4. Verify and update classification levels and onsite protective actions, as necessary.
5. Determine status of and need for persons previously sent to assembly and/or staging areas.
6. If additional manpower is needed, augment the staff.
7. Direct periodic status reports to the:

7.1 Offsite authorities - Long Notification Message Forms (LNMF) should be prepared as soon as possible following a Short Notification Message Form (SNMF) or when significant changes occur that don't warrant emergency escalation.

During extended emergencies time between LNMFs should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

7.2 NRC - Update as requested.

TERMINATION ACTIONS Date: Action Completed Initials

1. When NOUE conditions are no longer met, terminate the emergency.
2. Direct notification of the following of the emergency termination:

2.1 Offsite authorities - Direct the Communicator to use the Long Notification Message Form (LNMF).

2.2 NRC

3. Announce emergency termination twice over the Gaitronics.
4. If activated, deactivate the OSC.
5. Forward the originals of all documents generated by implementation of this procedure to the Manager - Emergency Preparedness.

gIP-2-O02 ETP-2-002 REV -23 PAGE 6OF 16

ATTACHMENT 2 PAGE 1 OF 3 ALERT INITIAL ACTIONS Date: Time: Action Completed Initials WARNING If a personnel hazard is still within the Protected Area (high winds, toxic gas, armed intruders, etc...) consider delaying activation of the Emergency Response Organization pagers until the danger has passed. If off-hours consider activating offsite ERO facilities.

1. Merge the Page Party/Gaitronics and make plant announcement.

WARBLE tone. "Attention in the plant. An Alert has been declared due to (brief cause of emergency). Activate all Emergency Response Facilities.

Escort all visitors to the Primary Access Point." (Repeat message)

2. Direct the Communicator to activate the onsite Emergency Response Organization pagers in accordance with EIP-2-006.
3. Direct the Communicator to notify the following:

3.1 Offsite authorities - Within 15 minutes of the declaration utilizing the Short Notification Message Form (SNMF).

3.2 NRC - Immediately after notifying state and local authorities and no later than one hour after declaring the emergency.

4. For toxic gas releases, refer to the actions of Attachment 5.
5. Evacuate onsite affected area(s), if needed, in accordance with EIP-2-026.
6. Dispatch personnel to sample and evaluate release of radioactive materials in accordance with EIP-2-014, as necessary.

SUBSEQUENT ACTIONS

1. Direct a chemistry technician to activate the Emergency Response Data System (ERDS). Must be performed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of an ALERT or higher emergency classification.

EIP-2-002 REV - 23 PAGE 7 OF 16

ATTACHMENT 2 PAGE 2 0F3 ALERT SUBSEOUENT ACTIONS (Cont.'d)

2. If desired, direct Security Shift Supervisor to perform a precautionary notification of all non-essential personnel, visitors, contractor personnel, and members of the public in the Owner Controlled Area.
3. Periodically inform plant personnel of personnel hazards, plant line-ups, corrective actions and steps taken to mitigate the emergency.

NOTE Ultimate authorityfor invoking 10 CFR 50.54(x) resides with the Emergency Director. If timely response precludes Emergency Directorauthorization,the minimal authority is an onshift licensedSRO.

4. Authorize and make log entries for all procedure deviations.
5. Verify and update classification levels and onsite protective actions, as necessary.
6. Determine status of and need for persons previously sent to assembly and/or staging areas.
7. Direct periodic status reports to the:

7.1 Offsite authorities - Long Notification Message Forms (LNMF) should be prepared as soon as possible following a Short Notification Message Form (SNMF) or when significant changes occur that do not warrant emergency escalation.

During extended emergencies time between LNMFs should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

7.2 NRC - Update as requested.

TERMINATION ACTIONS Date: Action Completed Initials

1. Terminate the emergency when the ALERT conditions are no longer met and the following have been accomplished:

1.1 The plant is in a stable condition.

1.2 Excessive releases of radioactivity to the environment have been terminated and no further potential for significant radioactivity releases exists.

1.3 No further potential for major damage to equipment exists.

EIP-2-002 REV - 23 PAGE 8 OF 16

ATTACHMENT 2 PAGE 3 OF3 ALERT TERMINATION ACTIONS (Cont'd) Action Completed Initials

2. Direct the notification of the following of the emergency termination:

2.1 Offsite authorities - Direct the Communicator to use the Long Notification Message Form (LNMF).

2.2 NRC

3. Announce emergency termination twice over the Gaitronics.
4. Direct the emergency facilities to deactivate.
5. Obtain concurrence from the NRC and deactivate the Emergency Response Data System (ERDS).
6. Forward the originals of all documents generated by the implementation of this procedure to the Manager - Emergency Preparedness.

EIP-2-002 REV - 23 PAGE 9 OF 16

ATTACHMENT 3 PAGE 1 OF 3 SITE AREA/GENERAL EMERGENCY INITIAL ACTIONS Date: Time: Action Completed Initials WARNING If a personnel hazard is still within the Protected Area (high winds, toxic gas, armed intruders, etc...) consider delaying activation of the Emergency Response Organization pagers until the danger has passed. If off-hours consider activating offsite ERO facilities.

1. Merge the Page Party/Gaitronics and make plant announcement.

WARBLE tone. "Attention in the plant. A (Site Area Emergency or General Emergency) has been declared due to (brief cause of emergency).

Activate all Emergency Response Facilities." (Repeat message)

2. Direct the Communicator to activate the onsite Emergency Response Organization pagers in accordance with EIP-2-006.
3. Evaluate protective actions offsite and implement EIP-2-007, as necessary.
4. Direct the Communicator to notify the following:

4.1 Offsite authorities - Within 15 minutes of the declaration utilizing the Short Notification Message Form (SNMF).

4.2 NRC - Immediately after notifying state and local authorities and no later than one hour after declaring the emergency.

5. For toxic gas releases, refer to the actions of Attachment 5.
6. Evacuate the Owner Controlled Area in accordance with EIP-2-026.
7. Dispatch personnel to sample and evaluate the release of radioactive materials in accordance with EIP-2-014, as necessary.
8. Initiate dose calculations in accordance with EIP-2-024, if due to radiological conditions.

EIP-2-002 REV - 23 PAGE 10 OF16 EIP-2-002 REV-23 PAGE lOOF 16

ATTACHMENT 3 PAGE 2 0F3 SITE AREA/GENERAL EMERGENCY INITIAL ACTION (Cont.'d)

9. At a General Emergency (if the Emergency Facilities are not manned) perform the following:

9.1 Contact the LOEP Operations Officer and verify that he is prepared to transmit the appropriate EAS message to the radio stations for broadcast.

9.2 Coordinate the siren sounding time with LOEP Operations Officer.

9.3 Activate the sirens at the agreed upon time using Attachment 4.

SUBSEQUENT ACTIONS

1. Direct a chemistry technician to activate the Emergency Response Data System (ERDS). Must be performed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of an ALERT or higher emergency classification.
2. Periodically inform plant personnel of personnel hazards, plant line-ups, corrective actions and steps taken to mitigate the emergency.

NOTE Ultimate authorityfor invoking 10 CFR 50.54(x) resides with the Emergency Director. If timely responseprecludes Emergency Directorauthorization,the minimal authority is on onshift licensed SRO.

3. Authorize and make log entries for all procedure deviations.
4. Verify and update classification levels.
5. Direct periodic status reports to the:

5.1 Offsite authorities - Long Notification Message Forms (LNMF) should be prepared as soon as possible following a Short Notification Message Form (SNMF) or when significant changes occur that do not warrant emergency escalation.

During extended emergencies time between LNMFs should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

5.2 NRC - Update as requested.

6. Determine status of and need for persons previously sent to assembly and/or stagiing areas.
7. Verify and update offsite protective actions, as necessary.

EIP-2-002 REV - 23 PAGE 11 OF 16

ATTACHMENT 3 PAGE 3 OF 3 SITE AREA/GENERAL EMERGENCY TERMINATION ACTIONS Date: Action Completed Initials

1. Terminate the emergency when the SITE AREA/GENERAL EMERGENCY conditions are no longer met and the following has been accomplished:

1.1 The reactor is shut down, is in a stable, safe configuration, and adequate core cooling is available.

1.2 Excessive releases of radioactivity to the environment have been terminated and no further potential for significant radioactivity releases exist.

1.3 Offsite concentrations of radioactivity in the atmosphere or in waterways have dispersed to near background levels, excluding ground deposition.

1.4 The State of Louisiana, the local parishes, and the NRC concur in terminating the emergency.

2. Direct notification of the following of the emergency termination:

2.1 Offsite authorities - Direct the Communicator to use the Long Notification Message Form (LNMF).

"2.2 NRC

3. Announce emergency termination twice over the Gaitronics.
4. Initiate recovery actions in accordance with EIP-2-028.
5. Direct the emergency facilities to deactivate.
6. Obtain concurrence from the NRC and deactivate the'Emergency Response Data System (ERDS).
7. Forward the originals of all documents generated by the implementation of this procedure to the Manager - Emergency Preparedness.

EIP-2-002 REV - 23 PAGE 12 OF 16 ETP-2-002 REV-23 PAGEIZOFI6

ATTACHMENT 4 PAGE I OF 2 SIREN CONTROL FROM THE CONTROL ROOM NOTE If the Siren ControlBox in the ControlRoom does not work, the siren sounding time may have to be changed.

Notify the EOFRecovery Managerwhen the EOFis operationalor LOEP if Control Room is performing ProtectiveAction Recommendations. If the Siren Control Box in the ControlRoom does not work; contact one of the following and direct them to enable the Siren System.

1. Emergency OperationsFacility (Backup)
2. Emergency Planningif available(normal working hours)
3. Telecommunications Department (Siren Computers)

CANCEL AN INADVERTENT SIREN SOUNDING

1. At the control room siren control box, insert key into the ENABLE key switch.
2. Place ENABLE key switch in the ON position and verify the white POWER lamp comes on.
3. Depress and hold the CANCEL pushbutton switch until the green CANCEL lamp comes on.
4. Verify that the yellow ACK lamp momentarily comes on.

The system is now canceled. In some instances the yellow ACK lamp will turn on more than once.

This is normal communications with the main siren computers. After two (2) minutes the system can be returned to the normal configuration. To return the system to the normal configuration perform the following.

1. Place the ENABLE key switch in the OFF position.
2. Verify that the white POWER lamp goes off.
3. Store key.

EIP-2-002 REV - 23 PAGE 13 OF 16 EIP-2-002 REV-23 PAGE 13 0F16

ATTACHMENT 4 PAGE 2 OF 2 SIREN CONTROL FROM THE CONTROL ROOM ENABLE THE SYSTEM FOR PARISH ACTIVATION

1. At the control room siren control box, insert key into the ENABLE key switch.
2. Place ENABLE key switch in the ON position and verify the white POWER lamp comes on.
3. Depress and hold the ENABLE pushbutton switch until the blue ENABLE lamp comes on.
4. Verify that the yellow ACK lamp momentarily comes on.

The system is now enabled. In some instances the yellow ACK lamp will turn on more than once. This is normal communications with the main siren computers. At this time the Parish EOCs can activate their respective sirens. To return the system to the normal configuration perform the following.

1. Place ENABLE key switch to the OFF position.
2. Verify that the white POWER lamp goes off.
3. Verify that the blue ENABLE lamp goes off.
4. Remove and store key.

RBS CONTROL ROOM SIREN ACTIVATION SEQUENCE

1. At the control room siren control box, insert keys into ENABLE and ALL-CALL key switches.
2. Place ENABLE key switch in the ON position and verify the white POWER lamp comes on.
3. Place ALL-CALL key switch in the ON position and verify the blue ENABLE lamp comes on.
4. Verify that the yellow ACK lamp momentarily comes on.
5. Depress and hold the ALL-CALL pushbutton switch until the red ALL-CALL lamp comes on.
6. Verify that the yellow ACK lamp momentarily comes on.

The sirens will sound for three minutes and then shut down. In some instances the yellow ACK lamp will turn on more than once. This is normal communications with the main siren computers. To return the system to the normal configuration perform the following:

1. Place both ENABLE AND ALL-CALL switches to the OFF position.
2. Verify that the white POWER lamp goes off.
3. Verify that the blue ENABLE lamp goes off.
4. Remove and store the keys.

EIP-2-002 REV - 23 PAGE 14 OF 16

ATTACHMENT 5 PAGE 1 OF 2 TOXIC GAS RELEASE CHECKLIST Date: Time: Action Completed Initials A. Offsite Release - If a report is received from an offsite organization (for example, TEMBEC or Big Cajun #2) or governmental agency that a toxic gas is approaching River Bend Station:

1. Use a 10 mile EPZ map and the following table to determine whether the release is a threat to River Bend Station.

Industrial Facilities Within 5 Miles of River Bend Station Facility Distance Wind Direction (from)

Tembec (Crown Vantage) 3.4 miles 183 degrees Big Cajun #2 3.1 miles 235 defgees

a. If the release is determined to be a threat, then perform the following:
1. Direct those personnel deemed necessary to remain onsite to report to the Control Room.
2. Direct Security to institute protective measures for their officers.
3. Implement EIP-2-026 for evacuations as deemed necessary.
4. Direct Chemistry to monitor the Control Room.
5. Ensure operators are prepared to don SCBAs if needed.
6. Take other actions as deemed necessary to protect the health and safety of personnel.
7. Upon the determination that the hazard no longer exists, then refer to the recovery actions of Section C in this attachment.
b. If the release is not determined to be a threat, then monitor the situation.

EIP-2-002 REV - 23 PAGE 15 OF 16

ATTACHMENT 5 PAGE 2 OF 2 TOXIC GAS RELEASE CHECKLIST B. Onsite Release - If a report is received that a toxic gas is being released onsite:

I Determine whether the release is a threat to site personnel.

a. If the release is determined to be a threat, then perform the following:
1. Determine areas affected by the release.
2. Notify security of the potential or actual emergency condition and request that access control for the affected areas be implemented.
3. Implement EIP-2-026 for evacuations as necessary.
4. Direct Chemistry to monitor the Control Room if necessary.
5. Ensure operators are prepared to don SCBAs if needed.
6. Contact Environmental Services and inform of the situation.
7. Take other actions as deemed necessary to protect the health and safety of personnel.
8. Upon the determination that the hazard no longer exists, then refer to the recovery actions of Section C of this attachment.
b. If the release is not determined to be a threat, then monitor the situation.

C. Recovery Actions I1. If toxic chemicals actually entered the site boundary, then perform the following:

a. Post and restrict access to all below ground level areas.
b. Sample and determine that each restricted area has a safe environment prior to releasing the area for general access.

C. Request an engineering evaluation of the effects of the toxic chemicals on the site (i.e. atmospheric vented tanks, electrical equipment, mechanical components, plant compressed air systems, etc.)

EIP-2-002 EIP-2-002 REV -23 PAGE 16OF 16

  • G12.23.2 w - w ENTERGY RIVER BEND STATION STATION SUPPORT MANUAL
  • EMERGENCY IMPLEMENTING PROCEDURE
  • NOTIFICATIONS PROCEDURE NUMBER: *EIP-2-006 REVISION NUMBER: *30 Effective Date:
  • AUG 2 9 2002 NOTE: SIGNATURES ARE ON FILE.

RECEIVED REFERENCE USE AUG 2 9 200z

  • INDEXING INFORMATION DOCUMENT CONTROL This procedure has been reviewed for 10CFR50.59 applicability.

10CFR50.59 screening for the programmatic exclusion of all EIP changes, approved by the FRC on 7/10/97, concludes that further review of changes to this procedure under 10CFR50.59 are not required.

TABLE OF CONTENTS SECTION PAGE NO.

I PURPOSE ................................................................................................................................. 2 2 REFERENCES ......................................................................................................................... 2 3 DEFINITIONS .......................................................................................................................... 2 4 RESPONSIBILITY ......................................................................................................... 3 5 GENERAL ................................................................................................................................ 3 6 PROCEDURE ........................................................................................................................... 3 7 DOCUMENTATION ......................................................................................................... 4 ATTACHMENT 1 - CONTROL ROOM COMMUNICATOR ............................................... 5 ATTACHMENT 2 - TSC/CONTROL ROOM COMMUNICATOR ........................................ 7 ATTACHMENT 3 - NOTIFICATION MESSAGE FORM S .......................................................... 8 ATTACHMENT 4 - GUIDELINES FOR COMPLETING THE LONG, NMF ........................ 9 ATTACHMENT 5 - NMF VERIFICATION CHECKLIST ..................................................... 10 ATTACHMENT 6 - PAR VERIFICATION CHECKLIST .......................................................... 11 ATTACHMENT 7 - ACTIVATION OF THE ERO ................................................................ 12 EIP-2-006 REV - 30 PAGE 1 OF 14 EIP-2-006 REV -30 PAGE 1 OF14

I PURPOSE This procedure provides instructions for notifying offsite authorities and activating the River Bend Station Emergency Response Organization.

2 REFERENCES 2.1 Emergency Telephone Book 3 DEFINITIONS 3.1 Radioactive release - For the purpose of offsite notifications, and discussions with State and local authorities, a "release" will be determined to be occurring and the "Radioactive Release" on the Short and Long Notification Message Forms is marked "yes", when:

3.1.1. " any one of three effluent monitors indicates a value three times the High alarm set point OR 3.1.2. any two of the three effluent monitors indicate a value equal to or greater than the High alarm set point.

The three effluent monitors are:

TITLE NO.

Main Plant Exhaust Stack 4GE125 Radwaste Vent. Exhaust 4GE006 Fuel Bldg. Vent. Exhaust 4GE005 OR 3.1.3. an unmonitored release is detected at the site boundary using teams with survey instruments.

3.2 Short Notification Message Form (SNMF) - Used for declaration of an emergency classification or changes to the Protective Action Recommendations (PARs). Notification must be made to State and local EIP-2-006 REV - 30 PAGE 2 OF 14

authorities within approximately 15 minutes. The Short Notification Message Form contains information about the class of emergency, whether a release is taking place, potentially affected population and areas, and whether protective measures may be necessary.

3.3 Long Notification Message Form (LNMF) - Used for providing State and local authorities follow-up information. The LNMF is sent out as soon as possible following a SNMF. The LNMF is also sent out for any significant changes to plant conditions that do not require an emergency escalation or change in PARs. No more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> should be exceeded between any two LNMFs.

4 RESPONSIBILITY 4.1 Recovery Manager /Emergency Director (RM/ED) - ensure that notifications to State and local authorities, as well as the NRC, are completed as required by this procedure. Reviews and approves the SNMF and LNMF prior to transmittal to offsite authorities.

4.2 Communicator -when directed relays information concerning station status to offsite agencies. Performs message verification after NMF transmittal.

5 GENERAL NONE 6 PROCEDURE NOTE The actions of this procedure may be completed in any sequence, however, the sequence presentedis recommended.

6.1 Control Room Communicator 6.1.1. The Control Room Communicator should use Attachment 1 as a guideline.

EIP-2-006 REV - 30 PAGE 3 OF 14

6.2 TSC/Control Room Communicator 6.2.1. The TSC/Control Room Communicator should use Attachment 2 as a guideline.

7 DOCUMENTATION Attachments 1, 2, 5, 6, and 7 of this procedure will be sent to permanent plant files (PPF) per EPP-2-100 by the Manager - Emergency Preparedness.

EIP-2-006 REV - 30 PAGE 4 OF 14 EIP-2-006 REV-30 PAGE4OF14

ATTACHMENT 1 PAGE 1 OF 2 CONTROL ROOM COMMUNICATOR INITIAL ACTIONS Date: Time: Action Completed Initials

1. Ensure that the Emergency Support Package (ESP) Computer has control and is ready for message preparation and transmission.
2. Receive notification form from RM/ED for offsite notifications.
3. Make the following offsite notifications:

3.1 If time is short, first make notification of the emergency to the State and local authorities within 15 minutes of the declaration using the SNMF.

3.2 Activate the Emergency Response Organization. Perform this function by using a copy of Attachment 7.

4. Verify SNMF receipt by State and local authorities, using the State and Local Hot Line. Fill out a new NMF Verification Checklist (Attachment 5) for each message sent.

4.1 If an agency has not received the message, obtain message receipt verification from the other agencies, and re-transmit the message (ESP Computer) to the non-receiving party.

4.2 If the message is still not received, read it to the agency (s) line by line.

Message may be faxed as necessary.

4.3 If no contact is made with the location on the Hot Line, call the location on the commercial telephone to verify receipt of message. If commercial telephones are inoperable, the Civil Defense radio may be used.

5. If a General Emergency has been declared and Protective Action Recommendations (PARs) are being issued from the Control Room:

5.1 During the verification of message receipt on the Hot Line, inform LOEP and the Parish EOCs that you will call them back in five minutes for PAR confirmation.

5.2 After five minutes, contact LOEP and the five Parish EOCs. Using Attachment 6, verify that the Directors or the Assistant Directors of all Parishes and the Operations Officer at LOEP are on the Hot Line.

5.3 When verified on Hot Line, request the RM/ED to pick up the Hot Line for PAR verification and give the RM/ED the PAR Verification Checklist, Attachment 6.

EIP-2-006 REV - 30 PAGE 5 OF 14 EIP-2-006 REV-3D PAGE5OF14

ATTACHMENT 1 PAGE 2 OF 2 CONTROL ROOM COMMUNICATOR

6. Notify the NRC of the emergency after notifying the State and local authorities and no later than one hour after the declaration of the emergency.

The NRC Operations Center phone numbers are 1-301-816-5100 (main) and 1-301-951-0550 or 1-301-415-0550 (backups).

SUBSEQUENT ACTIONS

1. Make follow-up notifications to State and local authorities and the NRC as directed by the RM/ED. Verify receipt of each NMF using a new NMF Verification Checklist (Attachment 5).

1.1 Offsite authorities - Long Notification Message Forms (LNMF) should be prepared as soon as possible following a Short Notification Message Form (SNMF) or when significant changes occur that don't warrant emergency escalation.

During extended emergencies time between LNMFs should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Refer to Attachments 3 and 4 for details on LNMF completion.

1.2 NRC - Update as requested.

2. If directed by the RM/ED activate the ERO pagers for a higher classification.

TERMINATION ACTIONS Date: Action Completed Initials

1. Upon termination of the emergency, notify State and local authorities using the LNMF, unless relieved by the TSC.
2. Upon termination, ensure that the originals of all Attachments are forwarded to the Operations Shift Manager.

EIP-2-006 REV - 30 PAGE 6 OF 14

ATTACHMENT 2 PAGE I OF 1 TSC/CONTROL ROOM COMMUNICATOR INITIAL ACTIONS Date: Time: Action Completed Initials

1. Perform a turnover with the Control Room Communicator regarding the status of information provided to the NRC.
2. Communicate with the NRC using the ENS line. Maintain communications as requested by the NRC (LC #13626). The NRC Operations Center phone numbers are 1-301-816-5100 (main) and 1-301-951-0550 or 1-301-415-0550 (backups).

SUBSEOUENT ACTIONS

1. Provide the NRC with information updates as requested.
2. When relieved of ENS responsibilities by the ENS Communicator, establish communications on the status headset with the TSC Operations Support Coordinator and EOF Operations Advisor.
3. Ensure that the Operations Support Coordinator and the Operations Advisor are kept informed on plant conditions, evolutions, equipment status, medical emergencies, fire emergencies, hazardous material emergencies and any other information as necessary or as requested.

TERMINATION ACTIONS Date: Action Completed Initials

1. Upon termination, ensure that the originals of all Attachments are forwarded to the Operations Shift Manager.

EIP-2-006 EI--06 REV -30 PAGE 7OF 14

ATTACHMENT 3 PAGE 1lOF I NOTIFICATION MESSAGE FORMS NOTIFTCATTON MESSAGE FORM THIS IS RIVER BEND NUCLEAR STATION WITH VIX&SAGE NIJMBLA ___

DComm 0 C iTM. NO A&

qifm FJGATF.) (NA MF) 3 LMLNGtCENCY CLA.S%11IICAI ION:

M NOCIIIICAliON 01i LJNULJAL LVLI-l C.E SIlL ARLA L-MLRCLNCY .E TFNITP R El At FRT -] n El( LNLRAL LMLKCLNCY 4 CURRFNT EMERGENCY CLASSEFICATION ElDPLARATION El TFRMINATION Tinmo/Dsl ____________

5 RECOMMENDED PROTECTIVEC ACTIONS.

& 1 Eln Pnniznv Action". Rcvmima-dl At This. Tim. (4141to iturm 6)

B El LVACUIAIL C3 SHPITFPR

6. INCIDF'dT nDrSCRIPTIONdVPO)ATir/COMMYrNTS
7. Rh AC'OR. SHUtlDOWN? El NO 0El .-

S. METEOROLOCICAL DATA:

A We,d d-aoeaas FROX4__________ Dcgrt~ooat ________________MPH B SectorsAlIrectd (A-R)

C. Subbuity Cl-. CA-Cl).

0 Precipitation El Non El it... El Sleet E ISnow El Had El Ode _________

9 RELEASE L4FOUMATIONs A El No Releas,e(Go 4. tn. 13) C El] A RrLrCASI! )CCURRED OAUT STOPPLE). flwnon.. him_____

Release, Stoppe, at* h-s a lA RL'LLARL IS OCCURRING Lxpmosd lDsflttnm ____________ha.

Releame,Started a: ____________________

10. TYPK OF RKI.FASF.:

A El Raslacta,' Cases; a El R~doecls" A~rt-o..Pncoae C. E ts&omctxve LitIwde 11 RELEASE RATE:

A. NOBLE GASES __________ _CL/a B ZODINES Ci?,

12 KSI IMAl k: Olý PrOJKcrxo ovt-si rt DOE:

A Projiomonmr" _____ hots. bastedone LJ Field r ate El PIensD~ts B. (TEDE) WU DOSE COMU-,UTMXNT (Re-) C. (CDE) THYROID DOSE CONtOSITMENT (Rem)

Site Bowndacy _______ tunoleg______

2 niles; _______ 10 n=Les _______ 2 ne. ________ 10 ride,Ia _____

13 MESSAGKC APPROVED 81 rrrLF.

14 NMESAGE RECEIVED BYt. - flMC.

PRWO5IM CDR EIP-2-006 REV - 30 RV3 AEO18 OF 14 PAGE

ATTACHMENT 4 PAGE 1 OF I GUIDELINES FOR COMPLETING THE LONG NMF ESP COMM MANUAL METHOD River Bend and Message Number automatic Assign a message number. Number the messages sequentially Line I until the emergency is terminated.

2A Time/Date automatic upon transmission. 2A Enter Time/Date message was transrmtted.

2B Comm: Select facility from pull-down menu 2B Comm.: Enter facility name.

2C Tel. No.: Indicate "Hot Line" unless alternate 2C Tel. No: Indicate "Hot Line" unless alternate Line 2 method is being used, then enter alternate method is being used, then enter alternate method. method.

Line 3 Automatic from Short Form. If terrrunation message, Check appropriate classification or terrrunated.

check "terminated".

Line 4 Automatic from Short Form. For termination,check Check either declaration or termination. Enter time/date of "termination" and enter termination time/date. emergency declaration or terrmnation.

Check appropriate box(es). If PAR has been Check appropnate box(es). If PARs have been recommended, Line 5 recommended, select appropriate protective actions and indicate the scenario number.

indicate scenario number.

Enter description from Short Form. May add Enter description from Short Form. May add information as Line 6 information as necessary. Use this line to correct any necessary. Use this line to correct any previous errors.

previous errors.

Line 7 Indicate if the reactor is shutdown. If yes, enter Indicate if the reactor is shutdown. If yes, enter the time/date.

time/date.

Information for Lines 8A-C can be found on Information for Lines 8A-C can be found on CADAP on the CADAP on the "values" screen. A backup to CADAP "values" screen. A backup to CADAP for meteorological data is Line 8 for meteorological data is the meteorological tower the meteorological tower printer.

printer. 8A - Enter wind direction and speed.

8A - Enter wind direction and speed. 8B - Enter the affected sectors according to the 8B - Enter the affected sectors according to the current wind direction.

current wind direction. 8C - Enter stability class.

8C - Enter stability class. 8D - Check appropriate box.

8D - Check appropriate box.

NOTE: 8A-C are automatically completed when dose data is imported from CADAP.

Determine if there is a release. Determne if there is a release.

9A If no release, check block A and proceed to 9A If no release, check block A and proceed to line 13. line 13.

Line 9 9B/C If release has occurred or is occurring, 9B/C If release has occurred or is occurring, check B or C as appropriate and enter check B or C as appropriate and enter duration and time release started/stopped. duration and time release started/stopped.

When checking B & C, be sure to import When checking B & C, be sure to import appropriate dose data. appropriate dose data.

Indicate the type of release. If there is no core damage, Indicate the type of release. If there is no core damage, check Line 10 check 10A. If there is clad damage or fuel melt, check bOA. If there is clad damage or fuel melt, check bOA & lOB. If 10A & 10B. If the release is a liquid release, check 10C. the release is a liquid release, check 10C.

Line 1I Imported from CADAP Enter release rate. DRMS provides release rates M uCi/sec.

These rates must be converted to Ci/sec. CADAP also provides this information through Notepad.

12A Enter numbers of hours used and method 12A Enter numbers of hours used and method Line 12 - used in dose calculation. used in dose calculation.

12B Import from CADAP. 12B Obtain from CADAP results.

Line 13 Enter Recovery Manager's name and "RM/ED" as title. Enter Recovery Manager's name and "RM/ED" as title. RM RM must review and approve NMFs prior to must review and approve NMFs prior to transmission.

transmission.

Line 14 Leave blank. For use by parishes. Leave blank. For use by parishes.

EIP-2-006 REV - 30 PAGE 9 OF 14

ATTACHMENT 5 PAGE I OF I NMF VERIFICATION CHECKLIST Ensure at least one of the agencies in each of the following rows receives the message.

MESSAGE #_ _

MSG. REC'D FACILITY PHONE # Hot Line # (Y/N/NA)

La. Dept. of Environmental Quality 9-765-0160 371 (LDEQ) (M-F - 8AM to 4PM only, LOEP will notify all other times)

La. Office of Emergency Preparedness 9-925-7500 (24-hr. pt.) 361 (LOEP) (State EOC)

West Feliciana Parish (WFP) EOC 9-635-4792 351 24-HR. PT. 9-635-3241 352 East Feliciana Parish (EFP) EOC 9-634-7269 341 24-HR. PT. 9-683-5459 342 Pointe Coupee Parish (PCP) EOC 9-694-9014 331 24-HR. PT. 9-694-3737 332 East Baton Rouge Parish (EBRP) EOC 9-389-2100 311 24-HR. PT. 9-389-3300 312 West Baton Rouge Parish (WBRP) EOC 9-346-1581 321 24-HR. PT. 9-343-9234 321 Mississippi Emergency Management 9-1-800-222-6362 (24 hr. pt.) 381 Agency (MEMA) 9-1-601-352-9100 (alternate)

Mississippi Highway Patrol (MHP) 9-1-601-987-1530 (backup) 382 Parish EOCs and LOEP Operations Officer informed of 5-minute PAR verification phone call YES NO NA Message Verified Communicator Signature/KCN Time/Date EIP-2-006 REV - 30 PAGE 10 OF 14

ATTACHMENT 6

.PAGE 1 OF I PAR VERIFICATION CHECKLIST Scenario # Recommended: Date:

Communicator verifies that correct individuals are on the Hot Line by placing a check mark on the appropriate line. The RM will verify approved scenario and initial the form.

WEST FELICIANA PARISH: RM Initial On Line Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

EAST FELICIANA PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

POINTE COUPEE PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

WEST BATON ROUGE PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

EAST BATON ROUGE PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

STATE OF LOUISIANA LOEP Operations Officer Siren Sounding Time:

EIP-2-006 REV - 30 PAGE 11 OF 14

ATTACHMENT 7 PAGE 1 OF 3 ACTIVATION OF THE ERO NOTE If the Pagersystem has already been used to activate the Emergency Response Organization (ERO) at an ALERT or higher classification, any subsequent classificationsdo not requirepager activation.

Obtain the classification from the Operations Shift Manager.

Classification:

NOTE If a hazardis presently onsite that may jeopardize respondingERO members, the OperationsShift Managershould considerusing the DialogicsScenario which directspersonnel to offsitefacilities.

2. Use the following to determine the Dialogics Scenario ID to be used.

Dialogics Scenario ID:

Event Scenario ID Notification of Unusual Event 101 Alert 102 Site Area Emergency 103 General Emergency 104 Alert. (Staff offsite emergency facilities.) 105 Site Area Emergency. (Staff offsite emergency facilities.) 106 General Emergency. (Staff offsite emergency facilities.) 107

3. Dial 1131, 4345, or 5145 on the plant phone system. If the plant phone system is inoperable, dial 381-4345 or 635-5145 on a direct line.
4. Immediately upon hearing the voice prompt, enter the security code below followed by the #

sign. This code is also available in the Control Room and through Emergency Preparedness.

I D Security Code Initials Date EIP-2-006 REV - 30 PAGE 12 OF 14

ATTACHMENT 7 PAGE 2 OF 3 ACTIVATION OF THE ERO CA UTION:

If Dialogicsstates that the scenario is invalid, hangup and repeat steps 3 and 4. The security code was not entered quickly enough to be accepted by the system.

5. When prompted, enter the Scenario ID, from step 2 above followed by the # sign.
6. When prompted to start the scenario, immediately press 3 and #, then hangup.
7. Log time ERO activated.
8. Verify that pagers in the Control Room have sounded within approximately 3 minutes after ERO activation time in step 7.

If not, refer to page 3 of this attachment for the alternate method of activating the ERO.

9. Upon completion, notify RM/ED.

Signature / KCN Date EIP-2-006 REV - 30 PAGE 13 OF 14

ATTACHMENT 7 PAGE3 0F3 ACTIVATION OF THE ERO Alternate Method of ERO Activation

1. Activate the pagers by dialing 4605 or 5105 on the plant phone system. If the plant phone system is inoperable, dial 381-4605, 635-5105, or 635-6864 on a direct line.
2. Enter 2000 as the pager number.
3. Enter the four digit security code. Emergency Preparedness posts the code in the space below in the Control Room copies.

/ /

Security Code Initials Date

4. When prompted key in the appropriate code as written from the following:
1) Enter **02 (Notification of Unusual Event)
2) Enter **03 (Alert)
3) Enter **04 (Site Area Emergency)
4) Enter **05 (General Emergency)
5) Enter **10 (Alert. Staff offsite facilities.)
6) Enter **11 (Site Area Emergency. Staff offsite facilities.)
7) Enter **12 (General Emergency. Staff offsite facilities.)
5. When page is accepted, hang up.
6. Log time pagers activated.
7. Verify that pagers in the Control Room have sounded within approximately 30 seconds after the time logged in step 6. If not, begin calling the ERO using the Emergency Telephone Book.
8. Upon completion, notify RMIED.

Signature/KCN Date EIP-2-006 REV - 30 PAGE 14 OF 14

  • G12.23.2

- w ENTERGY RIVER BEND STATION STATION SUPPORT MANUAL

  • EMERGENCY IMPLEMENTING PROCEDURE
  • OPERATIONS SUPPORTCENTER PROCEDURE NUMBER: *EIP-2-016 REVISION NUMBER: "*21 Effective Date:
  • AUG 2 9 2002 NOTE: SIGNATURES ARE ON FILE.

RECEIVED

  • INDEXING INFORMATION AUG 2 9 2002 DOCUMENT CONTROL REFERENCE USE

TABLE OF CONTENTS SECTION PAGE NO.

1 PU RP O SE ................................................................................................................................. 2 2 R EFEREN C E S ......................................................................................................................... 2 3 D EFINIT ION S .......................................................................................................................... 2 4 RESPONSIBILITIES .......................................................................................................... 3 5 G EN ERA L ................................................................................................................................. 5 6 PR O C ED U R E ........................................................................................................................... 5 7 DOCUMENTATION .......................................................................................................... 6 ATTACHMENT 1 - OSC DIRECTOR .................................................................................... 7 ATTACHMENT 2 - OSC MANAGER ..................................................................................... 9 ATTACHMENT 3 - SENIOR RADIATION PROTECTION TECHNICIAN ........................ 12 ATTACHMENT 4 - OSC/CR HABITABILITY TECHNICIAN ............................................ 16 ATTACHMENT 5 - STATUS COMMUNICATOR .................................................................... 17 ATTACHMENT 6 - OSC SUPPORT PERSONNEL .............................................................. 18 ATTACHMENT 7 - TSC VENTILATION EMERGENCY MODE OPERATIONS ............. 21 ATTACHMENT 8 - TSC/OSC VIDEO LINK ........................................................................ 23 ATTACHMENT 9 - LOG FORM ........................................................................................... 25 ATTACHMENT 10 - OPERATIONS SUPPORT CENTER ORGANIZATION .................... 26 ATTACHMENT 11 - OPERATIONS SUPPORT CENTER FLOOR PLAN ........................ 27 ATTACHMENT 12 - OSC WORK TEAM BRIEF GUIDELINE ........................................... 28 ATTACHMENT 13 - OSC PERSONNEL CHECKLIST ....................................................... 29 ATTACHMENT 14 - TEAM WORK ORDER (TYPICAL) .................................................. 30 EIP-2-016 REV -21 PAGE 1 OF 30

PURPOSE This procedure provides instructions for activation, operation, and deactivation of the Operations Support Center (OSC).

2 REFERENCES 2.1 EIP-2-012, Radiation Exposure Controls 2.2 EIP-2-015, Post Accident Sampling Operations 2.3 RP-104, Personnel Contamination Events 2.4 RSP-0213, Control and Handling of Radioactive Material 2.5 RPP-0006, Radiological Surveys 3 DEFINITIONS 3.1 Activation - The process of assembling personnel, verifying equipment operability, and making a facility ready to support the emergency response.

3.2 Operational - Status of an emergency facility declared by the appropriate facility manager upon determining that the facility is adequately staffed and equipment is set up and available to perform the emergency functions assigned to that facility.

3.3 Habitable - For the purpose of this procedure, the term habitable is based solely on radiological conditions, however, the OSC Director may declare the OSC uninhabitable based upon other conditions.

3.4 Augmentation - Actions taken to support onshift personnel or the Emergency Response Organization.

EIP-2-016 REV - 21 PAGE 22 OF 30 EIP-2-016 _ REV- 21 PAGE 0F30

4 RESPONSIBILITIES 4.1 OSC Director - direct and control the OSC, coordinate all OSC emergency response activities, and keep the Emergency Director informed about OSC activities.

4.2 OSC Manager(s) - ensure that the OSC is activated, ensure OSC Team Work Orders are completed for all work teams dispatched, assume the responsibilities of OSC Director when the OSC Director is not available, keep the OSC Director informed of the status of OSC operations, and ensure OSC staff provide support functions per the applicable section(s) of this procedure.

4.3 Senior Radiation Protection Technician (SRPT) - assist in making the OSC operational, coordinate the activities of Radiation Protection personnel, ensure all work teams dispatched in the plant are briefed and debriefed.

4.4 Status Communicator(s) - receive information pertaining to current plant parameters and action initiated by the Control Room and/or TSC and update the status board with current information and Work Team status.

4.5 Administrative Support Personnel - provide administrative and clerical support to the OSC staff.

4.6 Mechanical Maintenance Personnel - Implement repair and corrective actions as directed by the OSC Director.

4.7 Electrical Maintenance Personnel - Implement repair and corrective actions as directed by the OSC Director.

4.8 I & C Maintenance Personnel - Implement repair and corrective actions as directed by the OSC Director.

4.9 Operations Personnel - assist the OSC teams on plant / operational matters, fire brigade, or search and rescue as directed by the OSC Director.

EIP-2-016 REV - 21 PAGE 33 OF 30 EIP-2-016 REV -21 PAGE 0F30

4.10 Nutlear Chemistry Technician Personnel - support accident assessment efforts by obtaining and analyzing plant radiochemistry and chemistry samples, perform dose assessment in the Control Room tintil the TSC is operational and serve as a member of the offsite Radiological Monitoring Team as directed by the OSC Director.

4.11 Radiation Protection Technician Personnel - provide personnel monitoring and dosimetry for emergency response personnel; provide radiation protection coverage for repair and corrective actions, search and rescue, first aid, and fire fighting; assist in access control to radioactive contaminated areas; provide for personnel monitoring during an evacuation of site personnel; and assist with radiation protection tasks as directed by the Senior Radiation Protection Technician including radiological briefing and debriefing of teams.

4.12 Habitability Technician - complete the check of emergency equipment and perform initial and periodic habitability surveys of the Control Room and OSC; keep the Radiation Protection Coordinator and Senior Radiation Protection Technician informed of CR and OSC habitability; maintain the OSC contamination control point, and perform other actions as directed by the Senior Radiation Protection Technician.

4.13 Fire Brigade - provide fire suppression and protection activities as required. Fire Brigade members may perform other functions as directed when fire brigade emergency response is not required.

4.14 First Responder Team - provide emergency care or treatment to ill or injured personnel before medical assistance can be obtained during an emergency. First Responder Team members may perform other functions as directed when medical emergency response is not required.

4.15 Search and Rescue - search for missing or troubled plant personnel and return them safely to the facility. Search and Rescue Team members may perform other functions as directed when search and rescue emergency response is not required.

EIP-2-016 REV - 21 PAGE 4 OF 30 ETP-2-016 REV-21 PAGE 4 OF 30

5 GENERAL 5.1 Attachment 10, Operations Support Center Organization Chart is a typical makeup for the OSC.

5.2 Attachment 11, Operations Support Center Floor Plan is a typical setup for the OSC.

5.3 The OSC may be activated at any time, and shall be activated at an Alert, Site Area Emergency, or General Emergency declaration. Once activated, the OSC shall become operational as soon as possible after declaration of any of these emergency classifications. When OSC minimum staffing can be accomplished with onsite personnel, it is the goal to become operational within 45 minutes. Otherwise, it is the goal to be operational in 90 minutes.

5.4 Situations may arise where personnel responding to an emergency will not be able to access the emergency response facilities in the protected area (e.g. terrorist event). In these situations, TSC personnel should man the Emergency Operations Facility located in the Training Center.

Operations Support Center personnel should be staged in the Training Center classrooms and carry out the applicable steps of this procedure.

EOF personnel will report to the Alternate EOF in Baton Rouge. Joint Information Center personnel should be directed to the Alternate JIC.

6 PROCEDURE NOTE The actions of this proceduremay be completed in any sequence, however, the sequencepresented is recommended.

6.1 OSC Director 6.1.1. The OSC Director should use Attachment 1 as a guideline.

Document pertinent information on Attachment 9.

EIP-2-016 REV - 21 PAGE 5 OF 30 EIP-2-016 REV -21 PAGE 5 0F30

NOTE An OSC Managerfrom each discipline- I&C, Mechanical, and Electrical- are assigned to respond at the ALERT level however all three are not requiredfor minimum staffing.

6.2 OSC Manager(s) 6.2.1. The OSC Manager should use Attachment 2 as a guideline.

Document pertinent information on Attachment 9.

6.3 Senior Radiation Protection Technician 6.3.1. The Senior Radiation Protection Technician should use Attachment 3 as a guideline. Document pertinent information on Attachment 9.

6.4 OSC/CR Habitability Technician 6.4.1. The OSC/CR Habitability Technician should use Attachment 4 as a guideline. Document pertinent information on Attachment 9 or survey forms as appropriate.

6.5 Status Communicator(s) 6.5.1. The Status Communicator(s) should use Attachment 5 as a guideline.

6.6 OSC Support Personnel 6.6.1 The OSC Support Personnel should use Attachment 6 as a guideline. Document pertinent actions on Attachment 9, Work Order or other appropriate forms such as survey forms.

7 DOCUMENTATION Attachment 1-7, 9, and 13-14 of this procedure will be sent to Permanent Plant Files (PPF) per EPP-2-100 by the Manager - Emergency Preparedness.

EIP-2-016 REV - 21 PAGE 660F30 OF 30 EIP-2-016 REV-21 PAGE

ATTACHMENT I PAGE 1 OF 2 OSC DIRECTOR Actions Completed ACTIVATION Date: Time: Initial

1. Announce that no eating, drinking, or chewing is allowed until habitability is determined. Ensure that status is posted on OSC status board.
2. If the OSC is determined to be uninhabitable, obtain concurrence from the Emergency Director and relocate OSC personnel to the TSC.
3. Direct personnel to sign in and activate the facility.
4. Receive briefing from the Emergency Director on plant and emergency status, and work teams dispatched from the Control Room.
5. Brief OSC personnel on plant status.
6. The OSC Manager and SRPT checklists are complete and personnel are prepared to perform functional responsibilities.
7. All minimum staffing personnel are present or accounted for. Since some OSC personnel may be performing tasks in the field during OSC activation, it is not necessary for all minimum staffing personnel to be physically present in the OSC.
a. Operations Support Center Director or Manager
b. Senior Radiation Protection Technician
c. Nuclear Chemistry Technicians (Only I required for minimum staffing)
d. Radiation Protection Technicians (Only 1 required for miiiimum staffing)
e. Mechanical Maintenance (Only I required for minimum staffing)
f. Electrical Maintenance (Only 1 required for minimum staffing)
g. I & C Technicians (Only I required for minimum staffing)
7. Notify TSC that the OSC is operational.
8. Announce to the OSC that the OSC is operational.

SUBSEQUENT ACTIONS

1. Remain in the immediate OSC area unless relieved by an OSC Manager.
2. Ensure that the TSC/OSC Video Link is operational.
3. Direct an individual to initiate a ventilation check using Attachment 7.

EIP-2-016 REV - 21 PAGE 7 OF 30 EIP-2-O1 6 REV-21 PAGE7OF3O

ATTACHMENT 1 PAGE 2 OF 2 OSC DIRECTOR

4. Coordinate OSC activities with the TSC Maintenance Support Coordinator as follows:
a. Coordinate and continuously monitor work team priorities.
b. Report the dispatch of work teams.
c. Report status of work teams dispatched.
d. Request any additional equipment or materials needed.
e. Report on work teams returning to the OSC and final status.
5. Direct the OSC Manager(s) to brief work teams on actions to be performed and to have an OSC Work Order form filled out for each work team dispatched.
6. Conduct periodic OSC briefings on plant conditions and tasks in progress.
7. Keep the Emergency Director informed on OSC operations.
8. Ensure that Work Orders are fully completed from all work teams that have completed their assignments.
9. If decision is made to relocate the OSC, implement the relocation section of this procedure.

RELOCATION NOTE This section is applicable if the OSC Directordeclaresthe OSC uninhabitable.

1. Brief the OSC members of plan to relocate to the TSC. OSC personnel will normally occupy a room adjacent to the main TSC area.
2. Notify teams dispatched of OSC relocation.
3. Direct OSC Manager to ensure work orders, dispatched work team status, applicable procedures, handheld radios, respirators, SCBA's, spare SCBA bottles, and equipment as required are relocated to the TSC.
4. Direct the OSC relocation to the TSC DEACTIVATION
1. Deactivate the OSC when directed by the Emergency Director.
2. Direct the OSC Managers to deactivate the OSC.

EIP-2-016 REV - 21 PAGE 8 OF 30

ATTACHMENT 2 PAGE 1 OF 3 OSC MANAGER Actions Completed ACTIVATION Date: Time: Initial I. Periodically announce that no eating, drinking, or chewing is allowed until habitability is determined.

2. Obtain habitability status from the SRPT.
3. Assume the OSC Director's responsibilities during absence of the OSC Director.
4. Determine the operational status of the following equipment:

(circle one)

At least one Riyer Bend CBX extension Yes/No

  • Inplant/Services Building Gaitronics System Yes/No
  • Portable radios (six) Yes/No
  • TSC intercom Yes/No
5. Ensure OSC door # SB109-18 is locked.(See Attachment 11 for location).
6. Ensure OSC personnel have carded in on the accountability card reader or accounted for on the status board. If card reader is inoperable, prepare and maintain a list of names and badge numbers to manually maintain accountability.
7. Ensure that work teams dispatched by the Control Room are posted to the OSC status boards and accounted for.
8. Inform the OSC Director when prepared to assume functional duties.

EIP-2-016 REV - 21 PAGE 9 OF 30 EIP-2-O1 6 REV-21 PAGE9OF3O

ATTACHMENT 2 PAGE 2 OF 3 OSC MANAGER SUBSEQUENT ACTIONS

1. Augment the OSC staff as necessary by contacting the TSC Administrative Coordinator. Call the Safety Representative to report to the OSC, if necessary.
2. Direct OSC support personnel to complete the OSC PERSONNEL CHECKLIST and report any activity not qualified to perform.
3. Determine the operational status of the TSC/OSC Video Link.
4. Obtain a status from the work teams dispatched by the Control Room and complete the applicable information on a Work Order, documenting teams dispatched before OSC activation.

Track these work teams to completion of assignment.

5. Ensure an OSC Team Work Order is completed for all work teams dispatched. Individuals sent to perform functions in the Services Building or Control Room habitability surveys do not require an OSC Team Work Order but should be tracked.
6. Compose work teams, include a Radiation Protection Technician if necessary.
7. Check qualifications of search and rescue team members as necessary. At least 1 team member must be trained in search and rescue techniques and at least 1 team member must be trained in "theuse of radiation survey instruments.
8. Brief work teams on actions to be performed by the team using Attachment 12 as a guideline and direct a SRPT to provide a brief, if applicable.
9. Ensure that OSC status boards are kept updated.
10. Obtain a radio to monitor work team communications.
11. Give the work team a copy of the OSC Team Work Order. Place the original in a file and inform the OSC Director that the team has been dispatched.
12. When work teams return to the OSC, complete the OSC Team Work Order form and ensure a SRPT completes a radiological debriefing, and fills out their section of the form.
13. Review the OSC Team Work Order with the OSC Director for any further actions required. If further action is required, document it in the Task Status section of the OSC Team Work Order form and have a work team briefed and sent back to the plant.

EIP-2-016 REV - 21 PAGE PG 10003 OF 30 EIP-2-01 6 RV-1

ATTACHMENT 2 PAGE 3 OF 3 OSC MANAGER SUBSEQUENT ACTIONS (Cont'd)

14. If no further actions are required, sign or have the OSC Director sign the OSC Team Work Order form in the Task Disposition section.
15. Provide the Status Communicator with current Work Order information for status board update.
16. Maintain a file of active and completed Work Orders.
17. Establish long term relief rotation by requesting the Administrative Coordinator in the TSC to call necessary personnel.
18. Implement the relocation section of this procedure when directed by the OSC Director.

RELOCATION NOTE This section is applicableif the OSC Directordeclares the OSC uninhabitable.

1. Direct OSC personnel to relocate work orders, work team status, applicable procedures, all handheld radios, respirators, SCBA's, spare SCBA bottles, instruments and equipment as required to the TSC.

DEACTIVATION

1. When directed by the OSC Director, have OSC staff deactivate the OSC.
2. Ensure that all equipment is returned and report damaged or missing equipment to the Manager Emergency Preparedness.
3. Ensure that all documentation is forwarded to the Manager - Emergency Preparedness.

EIP-2-016 REV - 21 PAGE 11 OF30

ATTACHMENT 3 PAGE 1 0F4 SENIOR RADIATION PROTECTION TECHNICIAN Actions Completed ACTIVATION Date: Time: " Initial

1. Evaluate radiological conditions in the OSC and CR. Ensure that surveys are initiated, reviewed, and habitability determined, as necessary, using the following guidelines, and make appropriate recommendations to the OSC Director. Provide pertinent information to the RP Coordinator.
a. Facility habitability is based on a maximum dose limit of 5 rem TEDE over an assumed 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift.
b. A combination of 200 mRlhr to the whole body (Deep Dose Equivalent) plus an airborne concentration of 5E-6 jiCi/cc radioiodine in the facility equates to a TEDE of approximately 5 rem in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
2. Evaluate need for temporary boundary to Emergency Locker.
3. Ensure the distribution of pocket/electronic dosimeters to OSC and Control Room personnel and announce the frequency at which individuals should read their dosimeters. As necessary, direct the issuing of TLDs using page 4 of this Attachment.
4. As required, establish a contamination cofitrol point to the OSC. If needed, coordinate with TSC Habitability Technician the establishment of a clean path between OSC and TSC.
5. Inform the OSC Director when prepared to assume functional duties.

EIP-2-016 REV - 21 PAGE 12 OF 30

ATTACHMENT 3 PAGE 2 0F4 SENIOR RADIATION PROTECTION TECHNICIAN SUBSEQUENT ACTIONS NOTE During a classified emergency, the RBS administrative controls are suspended, however, every effort shall be made to maintainpersonnel exposure within the limits establishedby IOCFR20.

1. Ensure radiological briefings are conducted for all work teams dispatched, as appropriate.

Ensure appropriate sections of the OSC Team Work Order form are completed. Other Radiation Protection personnel may be assigned to conduct radiological briefings and debriefings.

2. Ensure the work team is debriefed and the OSC Team Work Order is completed whenever work teams return and give the completed form to the OSC Manager(s).

CAUTION During a Fuel Handling Accident where the spent fuel is greater than 30 days old, 85Kr (10.7 year half-life) is the principle gaseous isotope available for release. It is important in this case to take (RO-2/2A) open window as well as closed window readings since the primary dose from this isotope is Shallow Dose Equivalent. The 0"I/y emission ratio is approximately 240.

3. Dispatch plant monitoring teams, as requested. Keep the OSC Director informed of plant monitoring team activities and radiological conditions.
4. Review surveys, determine habitability, and make appropriate recommendations to the OSC Director.
5. Coordinate with the Radiation Protection Coordinator on the use of KI in accordance with EIP-2-012.
6. Monitor and record exposure of OSC personnel. Keep the OSC Manager and Radiation Protection Coordinator informed of exposures and margins.
7. Provide a Radiation Protection Technician or Chemistry Technician to act as Offsite Team Coordinator in the TSC when directed by the RPC.

EIP-2-016 REV - 21 PAGE 13 OF 30

ATTACHMENT 3 PAGE 3 0F4 SENIOR RADIATION PROTECTION TECHNICIAN RELOCATION NOTE This section is applicable if the OSC Directordeclaresthe OSC uninhabitable.

1. Relocate equipment required for continued emergency response to the TSC. (Respirators, SCBA's, spare SCBA bottles, PCs, logs, exposure records, instruments, etc. as required to the TSC.)
2. Evaluate the need to move the contamination control points and relocate as necessary.
3. Relocate to the TSC as directed.

DEACTIVATION

1. When directed by the OSC Director, deactivate the OSC.
2. Ensure that all dosimeters and TLDs that were issued are collected.
3. Ensure that all monitoring instrumentation is operable then turn power OFF and store in the proper location. Report problems to the OSC Manager.
4. Ensure that all documentation is forwarded to the OSC Manager.

EIP-2-016 REV - 21 PAGE 14 OF 30 EIP-2-O1 6 REV-21 PAGE 140F30

ATTACHMENT 3 PAGE 4 OF 4 SENIOR RADIATION PROTECTION TECHNICIAN TLD Tracking Log (Typical)

Date:

TLD# Name (Last,First,MI)Print SSN Returned

.4. 7 4

.4. 4

.1. 4

.4. 4 4 4 4 4

+ 4 .4.

+ *4.

4 7 4 1 4 1

.4. 4 4

.4. 4 4 4 4 4

+ 4 4 4

.4. 7

.4.

  • 4. 1 7

.4. 4. .4.

.4. 4 4 4 4 4

  • 4. 1 7

+ +

.4. 4. .4.

.4. 4. 4 4 4 4

.4 4 .4.

4 4 4 4 t 7 L I 4

__________ L I h EIP-2-016 REV - 21 PAGE 15 OF 30 EIP-2-O1 6 REV-21 PAGE 15 0F30

ATTACHMENT 4 PAGE 1 OF 1 OSC/CR HABITABILITY TECHNICIAN ACTIVATION Date: Time: Action Completed "Initial

1. Perform operational checks on monitoring equipment prior to use.
2. Perform radiation and airborne radioactivity surveys in accordance with RPP-0006, Radiological Surveys or applicable attachments of EIP-2-014, Offsite Radiological Monitoring, to ensure that the OSC and CR are habitable.

Report results to the SRPT.

3. Inform the SRPT when prepared to perform functional responsibilities.

SUBSEOUENT ACTIONS

1. Establish a contamination control point in accordance with Radiation Protection Procedures as directed. Coordinate with the TSC Habitability Technician the establishment of a clean path between OSC and TSC, if required.
2. Periodically perform surveys of the OSC and CR.

RELOCATION NOTE This section is applicable i the OSC Directordeclares the OSC uninhabitable.

1. Relocate to the TSC as directed.

DEACTIVATION

1. When directed by the OSC Director, deactivate the OSC.
2. Ensure that all monitoring instrumentation is stored and operable. Report any problems to the SRPT.
3. Ensure that all documentation is forwarded to the SRPT.

EIP-2-016 REV - 21 PAGE 16 OF 30

ATTACHMENT 5 PAGE I OF I STATUS COMMUNICATOR Actions Completed ACTIVATION Date: Time: " Initial

1. Update status boards with current information.
2. Request information on work teams already dispatched and update status board.
3. Ensure that OSC personnel are logged-in on the status board.
4. Inform the OSC Manager when prepared to assume functional duties.

SUBSEQUENT ACTIONS

1. Continually update status boards.
2. Record chronology of events on log form.
3. Ensure that work team status and priority are current.
4. Assist the OSC Manager as necessary.

RELOCATION NOTE This section is applicable if the OSC Directordeclares the OSC uninhabitable.

1. Relocate to the TSC as directed.

DEACTIVATION

1. When directed by the OSC Manager, deactivate the OSC.
2. Ensure that all documentation is forwarded to the OSC Manager.

EIP-2-016 REV - 21 PAGE 17 OF 30 EIP-2-O1 6 REV-21 PAGE 170F30

ATTACHMENT 6 PAGE 1 OF 3 OSC SUPPORT PERSONNEL ACTIVATION

1. Sign in on the OSC status Board.
2. Perform duties as directed.

SUBSEQUENT ACTIONS

1. Radiation Protection Technicians
a. Perform an operability check on all survey instruments prior to use.
b. Assume the SRPT responsibilities when the SRPT is not available.
c. Assist with radiation protection tasks as directed by the SRPT, including conducting briefs and debriefs.
d. Provide support for fires, medical, and assembly area activities, as directed.
e. If the EOF is relocated, perform the duties of the Offsite Team Coordinator in the TSC, as required.
2. Chemistry Technicians
a. Perform an operability check on all survey instruments prior to use.
b. Perform samples as directed by the Chemistry/Core Damage Assessment Coordinator.
c. Perform PASS preparatory actions and PASS actions in accordance with EIP-2-015, Post Accident Sampling Operations, as directed by the Chemistry/Core Damage Assessment Coordinator.
d. If the EOF is relocated, perform the duties of the Offsite Team Coordinator in the TSC, as required.

EIP-2-016 REV -21 PAGE 18OF 30

ATTACHMENT 6 PAGE 2 OF 3 OSC SUPPORT PERSONNEL SUBSEOUENT ACTIONS (cont'd)

3. Maintenance Personnel
a. Receive task and radiological briefing before going on assignment.
b. Ensure that a radio is provided for communications with the OSC Director/Manager.
c. Ensure that you have proper tools, equipment and safety measuresbefore going on assignment.
d. Ensure that debriefing is conducted on return to OSC.
e. Ensure that Status Board is updated to reflect your current status.
f. Obtain tools and equipment from the emergency locker or from the tool room as necessary to complete task.
g. Perform an operability check on instruments prior to use.
h. If qualified, perform function of Fire Brigade member and Search and Rescue Team member as directed.
4. Administrative Personnel
a. Assist in log keeping as necessary.

b Copy and distribute material as necessary.

c. Establish and maintain a manual accountability list, as directed.

d Verify OSC support personnel have completed OSC Personnel Checklist

e. Perform other duties as directed by the OSC Manager.
5. Operations Personnel
a. Assist the OSC teams on plant / operational matters, Fire Brigade, or Search and Rescue as directed.

6 Other personnel in the OSC perform duties as directed by the OSC Manager.

EIP-2-016 REV - 21 PAGE 19 OF 30 EIP-2-O1 6 REV-21 PAGE 190F30

ATTACHMENT 6 PAGE 3 OF 3 OSC SUPPORT PERSONNEL RELOCATION NOTE This section is applicableif the OSC Directordeclares the OSC uninhabitable.

1. Relocate to the TSC as directed.
2. Relocate logs, tools, instruments, and equipment as directed.

DEACTIVATION

1. When directed by the OSC Manager, deactivate the OSC.
2. Ensure that all documentation is forwarded to the OSC Manager.

EIP-2-016 REV - 21 PAGE 20 OF 30 EIP-2-O1 6 REV-21 PAGE 20 OF 30

ATTACHMENT 7 PAGE 1 OF 2 TSC VENTILATION EMERGENCY MODE OPERATIONS NOTE Duringa LOCA, the TSC Ventilation System will automaticallygo into the emergency mode andproper system operationshould be verified. For other emergency situations,the system will have to be manually placed in the emergency mode. Operation is identicalduring a LOCA or other emergency. SOP-0056may also be used to shift TSC Ventilation System to the emergency mode.

AT HVL-PNL261 VTSC PANEL, VERIFY HVL-HS420, HVL-FN1 OUTSIDE AIR FAN IS PLACED TO AUTO.

2 AT VTSC PANEL, VERIFY HVL-MIC-414, EMERGENCY OUTSIDE AIR MOISTURE CONT. IS PLACED TO AUTO.

3 AT VTSC PANEL, VERIFY HVL-HS-421, AHU-1 START-STOP SWITCH IS PLACED TO START.

4 AT VTSC PANEL, PLACE HVL-HS-223, STOP-NORMAL-EMER. AHU-2 TO EMERGENCY AND VERIFY THE FOLLOWING:

4.1 HVL-AOD-202, EMERGENCY OUTSIDE AIR opens.

4.2 HVL-FN-7, EMERGENCY OUTSIDE AIR is running.

4.3 HVL-FN-8, NORMAL EXHAUST AIR AIR FAN stops.

4.4 HVL-AOD-208, NORMAL OUTSIDE AIR DAMPER closes.

4.5 HVL-AOD 216, NORMAL EXHAUST AIR DAMPER POS. closes.

4.6 HVL-AOD 218, EMER. EXHAUST AIR DAMPER opens.

4.7 HVL-FN-9, EMER. EXHAUST AIR FAN, starts.

EIP-2-016 REV - 21 PAGE 21 OF 30

ATTACHMENT 7 PAGE 2 OF 2 TSC VENTILATION EMERGENCY MODE OPERATIONS NOTE During a LOCA, the following step is not required.

5 AT VTSC PANEL, PLACE HVL-HS420, HVL-FN1 OUTSIDE AIR FAN IN THE RUN POSITION.

6 AT VTSC PANEL, VERIFY HVL-PDI-407, BUILDING PRESSURIZATION IS READING A POSITIVE PRESSURE IN THE TSC.

7 IF TSC PRESSURE IS NOT POSITIVE, THEN RAISE BUILDING PRESSURE BY PERFORMING ANY OF THE FOLLOWING:

"* Adjust HVL-PDC-407, BLDG. PRESSURIZATION CONTROL.

"* Place HVL-HS-406, TOILETS EXHAUST FAN Switch in the STOP position.

"* Place HVL-HS-422, EMERGENCY OUTSIDE AIR FAN to the MAN position.

8 CHECK THE FOLLOWING:

8.1 HVL-FN1, OUTSIDE AIR FAN is running.

8.2 HVL-AOD-41 1, EMERGENCY OUTSIDE AIR is open.

8.3 HVL-AOD-408, LOCAL OUTSIDE AIR DAMPER is closed.

NOTE HVL-AOD426, REMOTE OUTSIDEAIR DAMPER is operationalbut is isolatedwith a blankplateinstalled on the intake side of the ductwork to prevent airflowpast the damper.

8.4 Verify HVL-HS-428, LOCAL-REMOTE EMER. OUTSIDE AIR selector switch is in LOCAL with the following damper indications:

8.4.1. HVL-AOD-427, LOCAL AIR FILTER INLET is open.

8.4.2. HVL-AOD-426, REMOTE OUTSIDE AIR DAMPER is closed.

8.5 HVL-AHUI, TSC AIR HANDLING UNIT is running.

EIP-2-016 REV - 21 PAGE 22 OF 30 EIP-2-O1 6 REV-21 PAGE22OF3O

ATTACHMENT 8 PAGE 1 OF2 TSC/OSC VIDEO LINK A. MONITOR:

1. Using remote control, verify monitor powers up:

(If monitor does not come on, ensure master power is depressed.

If monitor still does not come on, replace batteries and/or verify remote switch on the back of the TV is on.)

a. Line A button selects (remote) ceiling mount camera.
b. Line B button selects Video switcher.
2. Manual Operation, when remote control fails or is not used:

(If monitor is in standby, turn power off and then back on.)

a. The Main Control Key, when pressed, illuminates all control keys and indicators on the front panel.
b. Press the Main Control Key again to extinguish them.

B. VIDEO SWITCHER: OSC LOCATION

1. Input #1 - Selects TSC Wolf Visualizer
  1. 2 - Selects OSC Wolf Visualizer
  1. 3 - Selects OSC ceiling mount camera
  1. 4 - Vacant
2. BNC #1 - Connection for Wolf Visualizer video output #1 cable
3. BNC #2 - Connection for Wolf Visualizer video (switched) output #2 cable NOTE Spare coaxial cable is in the Emergency Supply locker.

D. VISUALIZER SETUP

1. Verify arm is extended upward to its full length to minimize focus problems.
2. Video output #1 connects to BNC #1, located on Video Switcher.
3. Video (switched) output #2 connects to BNC #2, located on Video Switcher.
  • Plug in under table.

IRIP-2-016 RJFV - 21 PAGE 23 OF 30 FiP-2-O1 6 REV-21 PAGE23OF3O

ATTACHMENT 8 PAGE 2 OF 2 TSC/OSC VIDEO LINK

4. Verify main power switch (on the back of the unit) is turned on. The power indicator on the remote control should bb illuminated.
5. Verify power switch on the Wolf Visualizer remote control is (ON) =

[1]. (Remote is located on the slanted portion of the Visualizer.)

6. Verify Visualizer control panel "Input" switch is on.

E. VISUALIZER AS AN OVERHEAD PROJECTOR

1. Place your subject material on the working surface.
2. Turn the lamp on to illuminate the object by pressing the "lamp on" button on the Wolf Visualizer remote. (Remote is located on the slanted portion of the Visualizer.) If lamp does not come on, rotate the lamp selector knob on the front of the Visualizer to energize the standby lamp.
3. Tilt the reflector head so that your object is illuminated.
4. Select the enlargement required with the ZOOM keys on the remote control.
5. Adjust the sharpness with the FOCUS keys on the remote control. Should the illuminated area seem hazy, use the light focus/slide-focus control located on the side of the unit.

F. VISUALIZER AS A VIDEO CAMERA TO SCAN SUBJECTS IN THE ROOM

1. Tilt the reflector head.
2. Turn off the light with the LIGHT key on the Wolf Visualizer remote control.

EIP-2-016 REV - 21 PAGE 24 OF 30 EIP-2-O1 6 REV -21 PAGE 24 OF 30

ATTACHMENT 9 PAGE I OF 1 LOG FORM (Typical)

Name Date Position Page _ of TIME ACTIVITY EIP-2-016 REV - 21 PAGE 25 EIP-2-Ol 6 REV-21 PAGE 25 OF OF 30 30

ATTACHMENT 10 PAGE I OF 1 OPERATIONS SUPPORT CENTER ORGANIZATION EMERGENCY

- i - -.

JDIRECTOR (TSC)

(rsc CMISsTRYI I r CORE DAMAGEI OSC

  • MAINUTENANCE
  • ASSESSMENT -s SUPPORT COORDINATORD COORDINATOR

, (Tsc) _ (TSC)

RADIATION SENIOR PROTECTION PROTECTION COORDINATOR OSC (TSC) TECHNICIAN SP) MANAGERS OSC E STATUS OMMUN:CATOR(I I C L- - DI I WESEARCH=AN RESCUE TEAM FIRST FIRE SSPONDERS BRIGADE I L - - - ' L L -

N-m ELI - -

IN OSC PRIMARY REPORTING OTHER LOCATION - - - - SECONDARY REPORTING

- -- -0 PROO006M CDR EIP-2-016 REV - 21 PAGE 26 OF 30

ATTACHMENT 11 PAGE 1 OF I OPERATIONS SUPPORT CENTER FLOOR PLAN (TYPICAL)

DOOR SBI09-18 .Ium I-I TO SECOND FLOOR STAIRS I I Lrz OUT OSC AREA 3 CARD READER CARD IN READERJ 8

6U OPERATIONS SUPPORT CENTER SERVICES BUILDING 2ND FLOOR RADIATION PROTECTION CONTROLLED AREA (EL. 109' - 31 -

PROO005M.CDR PAGE EIP-2-016 EIP-2-016 REV - 21 REV-21 PAGE 2727 OF OF 3030

ATTACHMENT 12 PAGE I OF I OSC WORK TEAM BRIEF GUIDELINE (TYPICAL)

THE WORK TEAM BRIEF MAY INCLUDE THE FOLLOWING ITEMS:

1. Brief on the task to be accomplished
2. Location of task and best route to get there.
3. Radiological conditions for the route and task location.
4. Radiological protection measures to be taken.
5. Other conditions (temperature, operating equipment in area, tagout required, spare parts, etc)
6. Heat stress (ADM-0068) requirements planned.
7. Procedures required and contingency if deviation required.
8. Necessary equipment, tools, instruments, etc identified and located.
9. Task role assignments made.
10. Brief on communications expectation and portable radio provided to team to communicate with the OSC.

NOTES:

EIP-2-016 REV - 21 PAGE 28 OF 30

ATTACHMENT 13 PAGE 1 OF 1 OSC PERSONNEL CHECKLIST OSC PERSONNEL CHECKLIST (TYPICAL)

NAME: POSITION:

Declared pregnant female Y I N (If Y, report to OSC Director.)

Obtain TLD

__Logged on to RWP (if applicable)

_ Verify Respirator/Fit Quals Date

_ Verify SCBA /Fit Quals -Date Obtain PD/Electronic Dosimetry Obtain Dose margin mr

__OSC Check-in and keycard in

__RP meter Qualified YES I NO

__Multiskill Qualified (YES NO - Circle Crafts)

(Mech., Elec., I & C, Ops, RP, Chem., Env.)

__Heat Stress Evaluation complete, if required

__Flashlight Obtained (Field crews)

__Search and Rescue Training

_ Confined Space Training: Entry/Technician Rescue

__Hazmat Training Other qualifications:

EIP-2-016 REV - 21 PAGE 29 OF 30

ATTACHMENT 14 PAGE I OF 1 TEAM WORK ORDER (TYPECAL)

Time Initiated:

TASK DESCRIPTION - OSC DIRECTOR/MANAGER TASK TASK LOCATION: BLDG. AREA ELEVATION BRIEFING COMPLETE Team Member Name/KCN Dept. *Dose Time Time ** Dose Margin Out In Received RADIATION PROTECTION BRIEFING/DEBRIEFING RP COVERAGE SCBA/SPEAK EASY __DOSIMETRY SURVEY DATA SURVEY INSTRUMENTS. TRAVEL PATH PC'S/RESPIRATORS SPARE SCBA BOTTLES - EQUIP. OPER. CHECK

  • DOSE MARGIN KI DOSE LIMIT: TURNBACK DOSE RATE:

RPT/KCN

    • DEBRIEF TEAM - OBTAIN DOSE RECEIVED.

RPT/KCN TASK STATUS "

OSC DIRECTOR/MANAGER / KCN DATE ETP-2-016 EIP-2-016 REV -21 PACE 30OF 30

  • G12.23.2 ENTERGY RIVER BEND STATION STATION SUPPORT MANUAL
  • EMERGENCY IMPLEMENTING PROCEDURE
  • TECHNICAL SUPPORT CENTER PROCEDURE NUMBER: *EIP-2-018 REVISION NUMBER: *25 Effective Date:
  • AUG 2 9 2002 NOTE: SIGNATURES ARE ON FILE.

REFERENCE USE RECEIVED AUG 2 9 2002

  • INDEXING INFORMATION DOCUMENT CONTROL This procedure has been reviewed for IOCFR50.59 applicability.

IOCFR50.59 screening for the programmatic exclusion of all EIP changes, approved by the FRC on 7/10/97, concludes that further review of changes to this procedure under 10CFR50.59 are not necessary.

TABLE OF CONTENTS SECTION PAGE NO.

1 PU RPO SE ................................................................................................................................. 2 2 REFEREN C ES ......................................................................................................................... 2 3 D EFIN ITIO N S .......................................................................................................................... 2 4 RESPONSIBILITIES .......................................................................................................... 4 5 GEN ER AL ................................................................................................................................ 5 6 PRO C ED U RE ........................................................................................................................... 5 7 DOCUMENTATION ......................................................................................................... 7 ATTACHMENT 1 - EMERGENCY DIRECTOR .......................................................................... 8 ATTACHMENT 2 - TSC MANAGER .................................................................................... 13 ATTACHMENT 3 - ADMINISTRATIVE COORDINATOR ................................................ 19 ATTACHMENT 4 - COMMUNICATOR ............................................................................... 26 ATTACHMENT 5 - RADIATION PROTECTION COORDINATOR ................................... 30 ATTACHMENT 6 - MAINTENANCE SUPPORT COORDINATOR ................................... 35 ATTACHMENT 7 - REACTOR ENGINEER ........................... *.......... :................................. 37 ATTACHMENT 8 - ENGINEERING COORDINATOR ....................................................... 38 ATTACHMENT 9 - MECHANICAL/ELECTRICAL ENGINEERS ...................................... 39 ATTACHMENT 10 - OPERATIONS SUPPORT COORDINATOR ..................................... 40 ATTACHMENT 11 - CHEMISTRY/CORE DAMAGE ASSESSMENT COORD ................ 42 ATTACHMENT 12 - SECURITY COORDINATOR ............................................................ 44 ATTACHMENT 13 - TSC HABITABILITY TECHNICIAN ................................................ 46 ATTACHMENT 14 - DATA FACILITY COORDINATOR .................................................. 49 ATTACHMENT 15- STATUS COMMUNICATOR ............................................................ 50 ATTACHMENT 16 - ENS COMMUNICATOR ................................................................... 51 ATTACHMENT 17 - ADMINISTRATIVE SUPPORT PERSONNEL ................................. 52 ATTACHMENT 18 - PROTECTIVE ACTION RECOMMENDATIONS (PARs) ................ 53 ATTACHMENT 19 - LOG FORM ......................................................................................... 56 ATTACHMENT 20 - TECHNICAL SUPPORT CENTER ORGANIZATION CHART ..... 57 ATTACHMENT 21 - TECHNICAL SUPPORT CENTER FLOOR PLAN ............................ 58 ATTACHMENT 22 - TSC STAFF TO EOF RELOCATION GUIDELINES ....................... 59 EIP-2-018 REV - 25 PAGE 1 OF 59

I PURPOSE This procedure provides instructions for the activation, operation and deactivation of the Technical Support Center (TSC).

2 REFERENCES 2.1 COP-1050, Post Accident Estimation of Fuel Core Damage 2.2 EIP-2-001, Classification of Emergencies 2.3 EIP-2-012, Radiation Exposure Controls 2.4 EIP-2-014, Offsite Radiological Monitoring 2.5 EIP-2-015, Post Accident Sampling Operations 2.6 EIP-2-024, Offsite Dose Calculations 2.7 EIP-2-026, Evacuation, Personnel Accountability, and Search and Rescue 2.8 EIP-2-028, Recovery 2.9 RPP-0006, Radiological Surveys 2.10 Commitment 15578 3 DEFINITIONS 3.1 Activation - The process of assembling personnel, verifying equipment operability, and making a facility ready to support the emergency response.

3.2 Augmentation - Actions taken to support onshift personnel or the Emergency Response Organization.

3.3 Habitable - For the purpose of this procedure, the term habitable is based solely on radiological conditions, however, the TSC Manager may declare the facility uninhabitable based on other conditions.

EIP-2-018 REV - 25 PAGE 2 OF 59

3.4 Lohig Notification Message Form (LNMF) - Used for providing State and local authorities follow-up information. The LNMF is sent out as soon as possible following a SNMF. The LNMF is also sent out for any significant changes to plant conditions that do not require an emergency escalation or change in PARs. No more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> should be exceeded between any two LNMFs.

3.5 Operational - Status of an emergency facility declared by the appropriate facility manager upon determining that the facility is adequately staffed and equipment is set up and available to perform the emergency functions assigned to that facility.

3.6 Radioactive release - For the purpose of offsite notifications, and discussions with State and local authorities, a "release" will be determined to be occurring and the "Radioactive Release" on the Short and Long Notification Message Forms is marked "yes", when:

3.6.1 Any one of three effluent monitors indicates a value three times the High alarm set point OR 3.6.2 Any two of the three effluent monitors indicate a value equal or greater than the High alarm set point.

The three effluent monitors are:

TITLE NO.

Main Plant Exhaust Stack RMS-RE125 Channel 4 (4GE125)

Radwaste Vent. Exhaust RMS-RE006 Channel 4 (4GE006)

Fuel Bldg. Vent. Exhaust RMS-RE005 Channel 4 (4GE005)

OR 3.6.3 An unmonitored release is detected at the site boundary by teams with survey instruments.

3.7 Short Notification Message Form (SNMF) - Used for declaration of an emergency classification or changes to the Protective Action Recommendations (PARs). Notification must be made to State and local authorities within approximately 15 minutes. The Short Notification Message Form contains information about the class of emergency, whether a release is taking place, potentially affected population and areas, and whether protective measures may be necessary.

EIP-2-018 REV - 25 PAGE 3 OF 59

4 RESPONSIBILITIES 4.1 Emergency Director:

4.1.1 assess and classify emergency conditions.

4.1.2 authorize doses in excess of 10CFR20 limits.

4.1.3 direct onsite activities in support of the Control Room.

4.1.4 authorize departures from license conditions or Technical Specifications in accordance with 10 CFR 50.54 (x).

4.1.5 determine need for onsite evacuation, personnel accountability, and implement search and rescue as required.

4.2 Recovery Manager:

4.2.1 provide overall management of River Bend Station (RBS) response activities.

4.2.2 provide notifications and make protective action recommendations to offsite authorities.

4.2.3 coordinate RBS response activities as required with offsite organizations.

4.2.4 ensure that offsite radiological conditions are measured and monitored.

4.2.5 review information being released to the Joint Information Center (JIC).

4.2.6 establish a Recovery Organization.

4.2.7 terminate the emergency.

4.3 TSC Manager - ensures that TSC is activated, manages TSC staff/resources in mitigation efforts, assesses plant conditions and recommends potential mitigation actions, ensures that notification message forms are properly filled out and completed on time, and that TSC staff provide support functions per the applicable section(s) of this procedure.

EITP-2-01 R REV - 25 PAGE 4 OF 59 ETP-2-O1 S REV -25 PAGE 4 OF 59

5 GENERAL 5.1 Attachment 20, Technical Support Center Organization Chart is a typical makeup for the TSC.

5.2 Attachment 21, Technical Support Center Floor Plan is a typical setup for the TSC.

5.3 The TSC may be activated at any time, and shall be activated at an Alert, Site Area Emergency, or General Emergency declaration. Once activated, the TSC shall become operational as soon as possible after declaration of any of these emergency classifications. When TSC minimum staffing can be accomplished with onsite personnel, it is the goal to become operational within 45 minutes. Otherwise, it is the goal to become operational in 90 minutes.

5.4 Situations may arise where personnel responding to an emergency will not be able to access the emergency response facilities in the protected area (e.g. terrorist event). In these situations, TSC personnel should man the Emergency Operations Facility located in the Training Center and carry out the applicable steps of this procedure. Operations Support Center personnel should be staged in the Training Center classrooms.

EOF personnel will report to the Alternate EOF in Baton Rouge to assume their duties as per EIP-2-022. Joint Information Center personnel should be directed to the Alternate JIC in Baton Rouge.

6 PROCEDURE NOTE The actions of this proceduremay be completed in any sequence, however, the sequencepresentedis recommended.

6.1 Emergency Director 6.1.1 The Emergency Director should use Attachment 1 as a guideline. Document pertinent information on Attachment 19.

6.2 TSC Manager 6.2.1 The TSC Manager should use Attachment 2 as a guideline.

Document pertinent information on Attachment 19.

EIP-2-018 REV - 25 PAGE 5 OF 59

6.3 Adininistrative Coordinator 6.3.1 The Administrative Coordinator should use Attachment 3 as a guideline. Document pertinent information on Attachment 19.

6.4 Communicator 6.4.1 The Communicator should use Attachment 4 as a guideline.

6.5 Radiation Protection Coordinator 6.5.1 The Radiation Protection Coordinator should use Attachment 5 as a guideline. Document pertinent information on Attachment 19.

6.6 Maintenance Support Coordinator 6.6.1 The Maintenance Support Coordinator should use Attachment 6 as a guideline. Document pertinent information on Attachment 19.

6.7 Reactor Engineer 6.7.1 The Reactor Engineer should use Attachment 7 as a guideline.

Document pertinent information on Attachment 19.

6.8 Engineering Coordinator 6.8.1 The Engineering Coordinator should use Attachment 8 as a guideline. Document pertinent information on Attachment 19.

6.9 Mechanical/Electrical Engineers 6.9.1 The Mechanical Engineers and the Electrical Engineers should use Attachment 9 as a guideline. Document pertinent information on Attachment 19.

6.10 Operations Support Coordinator 6.10.1 The Operations Support Coordinator should use Attachment 10 as a guideline. Document pertinent information on Attachment 19.

6.11 Chemistry/Core Damage Assessment Coordinator 6.11.1 The Chemistry/Core Damage Assessment Coordinator should use Attachment 11 as a guideline. Document pertinent information on Attachment 19.

EIP-2-018 REV - 25 PAGE 6 OF 59

6.12 Security Coordinator 6.12.1 The Security Coordinator should use Attachment 12 as a guideline. Document pertinent information on Attachment 19.

6.13 TSC Habitability Technician 6.13.1 The TSC Habitability Technician should use Attachment 13 as a guideline. Document pertinent information on Attachment 19.

6.14 Data Facility Coordinator 6.14.1 The Data Facility Coordinator should use Attachment 14 as a guideline. Document pertinent information on Attachment 19.

6.15 Status Communicator 6.15.1 The Status Communicator should use Attachment 15 as a guideline.

6.16 ENS Communicator 6.16.1 The ENS Communicator should use Attachment 16 as a guideline. Document pertinent information on Attachment 19.

6.17 Administrative Support Personnel 6.17.1 The Administrative Support Personnel should use Attachment 17 as a guideline. Document pertinent information on Attachment 19.

7 DOCUMENTATION Attachments 1-18 and 19 of this procedure will be sent to Permanent Plant Files (PPF) per EPP-2-100 by the Manager - Emergency Preparedness.

EIP-2-018 REV - 25 PAGE 7 OF 59

ATTACHMENT 1 PAGE 1 OF 5 EMERGENCY DIRECTOR ACTIVATION Date: Acition Completed Initial NOTE If the TSC has been directed to man the EOFdue to inaccessibility to the protected area,refer to Attachment 22for additionalguidance.

1. Review status of emergency with the Shift Manager including offsite notifications and any work teams dispatched out of the Control Room.
2. Brief the TSC/OSC staff on the status of the emergency.
3. Review habitability determination and if necessary provide direction on evacuation of the TSC, OSC, or CR.
4. When informed by the TSC Manager that minimum staffing is available and ready to perform functions, announce that the TSC is operational and inform the EOF.

SUBSEQUENT ACTIONS Brief OSC Director on teams dispatched from the Control Room.

NOTE If the EOFis operational,RM duties can be transferreddirectly to the EOFfrom the ControlRoom.

2. When the TSC is ready to assume control:

2.1 Contact the Shift Manager.

2.1.1 Ensure that message control and dose assessment is transferred to the TSC.

2.1.2 Transfer RM/ED duties from the Shift Manager.

2.1.3 Request Shift Manager to make a sitewide announcement of change in RMIED duties.

2.2 Announce that the TSC has assumed RM/ED duties from the Control Room.

2.3 Inform the EOF that the TSC has assumed control.

EIP-2-018 REV - 25 PAGE 8 OF 59

ATTACHMENT 1 PAGE 2 OF 5 EMERGENCY DIRECTOR SUBSEQUENT ACTIONS (Cont.'d)

NOTE Items with an asterisk(*) are only performed if responsible for Recovery Managerduties.

3. Coordinate the transfer of Recovery Manager duties with the EOF.
4. Remain in the immediate TSC area, unless relieved by the TSC Manager.
5. Periodically update the TSC/OSC on plant conditions and emergency actions in progress.
6. Review and make emergency classification declarations in accordance with EIP-2-001, Classification of Emergencies.
7. Direct a Limited or Building Evacuation in accordance with EIP-2-026, Attachment 1, if unexpected radiological hazards or other emergency conditions occur which jeopardize personnel safety.
8. At an Alert, if desired, direct the Security Coordinator to perform a precautionary notification of all non-essential personnel, visitors, contractor personnel, and members of the public within the Owner Controlled Area.
9. At declaration of a Site Area Emergency or higher or if conditions jeopardize onsite personnel, refer to EIP-2-026, Attachment 2.
10. Determine the status of and need for persons sent to assembly areas and staging areas.
  • 11. Review and approve notification message forms for transmittal.

NOTE ProtectiveAction Recommendations (PARs) must be developed within 15 minutes of a GeneralEmergency or data availability which requiresupgradingthe PARs.

  • 12. Issue Protective Action Recommendations as necessary.
a. Using Attachment 18, formulate Protective Action Recommendations (PARs) using dose projections, field monitoring data, or plant conditions.
b. Review and discuss the protective actions to be recommended for the general public with the RP Coordinator.

EIP-2-018 REV - 25 PAGE 9 OF 59

ATTACHMENT 1 PAGE 3 0F5 EMERGENCY DIRECTOR SUBSEQUENT ACTIONS (Cont.'d)

c. Ensure the Siren System has been enabled in the Control Room or EOF before setting the siren sounding time with the State and local parishes.
d. Provide PARs to State and local authorities within 15 minutes.

Once State and local authorities receive the PARs, the State and local authorities will have approximately 5 minutes to review the PARs.

e. When the Directors of all parishes and the Operations Officer (LOEP) are on the Hotline, verify the PARs (Scenario Number) each parish intends to implement.
f. Write the scenario number approved and initial each parish choice on the PAR Verification Checklist provided by the Communicator.
g. Obtain siren sounding time from Operations Officer and document on PAR Verification Checklist.
  • 13. Revise PARs based on wind shifts when advised by the Radiation Protection Coordinator.
  • 14. If doses > 1 rem TEDE or > 5 rem CDE are projected at 10 miles, ensure LDEQ is aware of the need for protective actions beyond 10 miles.
15. Direct development and prioritization of corrective actions to mitigate the emergency.
16. Authorize departures from a license condition or a Technical Specification in accordance with 10 CFR 50.54 (x).
17. Authorize emergency response personnel to receive radiation exposures in excess of 10 CFR 20 limits as required in accordance with EIP-2-012, Radiation Exposure Controls.
18. Direct the Chemistry/Core Damage Assessment Coordinator to initiate PASS preparatory actions and PASS sample actions, as necessary.
19. Keep the Recovery Manager informed of the status of onsite emergency response activities.

-20. If the OSC becomes uninhabitable, it will relocate to the TSC Conference Room. As necessary, assist the OSC Director in relocation.

21. If the EOF is relocated to the Alternate EOF, assume duties as the Recovery Manager until the Alternate EOF is operational.
22. If the TSC is relocating, refer to Relocation Actions portion of this checklist.

EIP-2-018 REV - 25 PAGE 10 OF 59

ATTACHMENT 1 PAGE 4 OF 5 EMERGENCY DIRECTOR SUBSEQUENT ACTIONS (Cont.'d)

  • 23. Terminate the emergency in accordance with the following criteria:

ALERT - Terminate the emergency when the Alert conditions are no longer met and the following have been accomplished:

1. The plant is in a stable condition.
2. Excessive releases of radioactivity to the environment have been terminated and no further potential for significant radioactivity releases exists.
3. No further potential for major damage to equipment exists.

SAE/GE- Terminate the emergency when the SAE/GE conditions are no longer met and the following has been accomplished:

1. The reactor is shut down, is in a stable, safe configuration, and adequate core cooling is available.
2. Excessive releases of radioactivity to the environment have been terminated and no further potential for significant radioactivity releases exists.
3. Offsite concentrations of radioactivity in the atmosphere or in waterways have dispersed to near background levels, excluding ground deposition.
4. The State of Louisiana, the local Parishes and the NRC concur in terminating the emergency.
  • 24. Notify the NRC and offsite authorities of the emergency termination.
  • 25. When a Site Area or General Emergency has been terminated, implement EIP-2-028, Recovery.

EIP-2-018 REV - 25 PAGE 11 OF 59

ATTACHMENT 1 PAGE 5 OF 5 EMERGENCY DIRECTOR RELOCATION ACTIONS

1. If the TSC becomes uninhabitable, the following personnel and their functions will transfer to the Control Room. These personnel should relocate with their facility procedure binders.

Emergency Director To report to the Shift Manager's desk to assume ED functions.

Reactor Engineer To report to the RE desk to provide support to operations.

Radiation Protection Coordinator To report to CADAP to perform dose assessment.

Operations Support Coordinator To report to the Shift Manager's desk to assist the ED.

TSC Communicator To report to the Communicator's desk to assume offsite communications if necessary.

ENS Communicator- To report to the Communicator's desk to resume NRC communications.

2. The following personnel will report to the Main Control Room Brief Room to resume OSC functions. They should relocate with radios, SCBAs (with spare bottles), procedures, and forms.

OSC Director- To provide briefings and control teams.

Electrician (1)

Mechanic (1)

I&C Technician (1)

Radiation Protection Technician (1) To perform habitability assessment and team coverage.

Senior Radiatiofi Protection Technician-To assist in team briefings and control offsite teams if necessary.

3. Determine with the Recovery Manager the disposition of remaining OSC and TSC personnel.
a. Send to EOF to be utilized as additional resources (engineers).
b. Send home to remain on standby.

DEACTIVATION

1. After receiving direction from the Recovery Manager, instruct the TSC Manager to deactivate the facility.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 12 OF 59

ATTACHMENT 2 PAGE 1 OF 6 TSC MANAGER ACTIVATION Date: Action Completed Initial NOTE If the TSC has been directed to man the EOF due to inaccessibility to the protectedarea, refer to Attachment 22for additionalguidance.

1. Ensure TSC PA system is turned on for the OSC to hear briefings.
2. Periodically announce that no eating, drinking, or chewing is allowed until habitability is determined.
3. Obtain status of habitability of the TSC from the RP Coordinator. Make announcement of status.
a. If the TSC is uninhabitable, obtain concurrence from the Emergency Director and implement the Relocation Action portion of this checklist.
4. When the TSC is determined to be habitable, make announcement.
5. All minimum staffing personnel have completed the activation portion of their checklist and are prepared to perform functional responsibilities:
a. Emergency Director
b. Operations Support Coordinator C. Radiation Protection Coordinator
d. Communicator
e. Reactor Engineer (NOTE: RE may be located in Control Room.)
6. Inform the Emergency Director that the TSC is ready to be declared operational.

EIP-2-018 REV - 25 PAGE 13 OF 59

ATTACHMENT 2 PAGE 2 OF 6 TSC MANAGER SUBSEQUENT ACTIONS NOTE Items with an asterisk(*) are only performed if the TSC is responsiblefor Recovery Managerduties.

NOTE Notifications to State and Local authoritiesmust be made within approximately 15 minutes of a declarationofan emergency or Protective Action Recommendation (PAR) change using the Short Notification Message Form.

1. Assist Emergency Director (ED) with transfer of RM/ED duties, as necessary.
2. Ensure status boards are updated.
3. Ensure the OSC Director has had the TSC ventilation system placed in the emergency mode.
4. Relieve the Emergency Director as necessary. Remain in the immediate TSC area when functioning as the Emergency Director and make appropriate announcements.
  • 5. Prepare the appropriate Short Notification Message Form (SNMF).
  • 6. As soon as possible following the SNMF, prepare a Long Notification Message Form (LNMF) as shown on page 5 of this attachment. Refer to page 6 of this attachment for directions on completing the LNMF.
  • 7. Prepare a LNMF when significant changes to plant conditions occur that do not require an emergency escalation or change in PARs. During extended emergencies, time between LNMFs should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

NOTE The TechnicalSupport Guidelines may be used to assess accident conditions.

EIP-2-018 REV - 25 PAGE 14 OF 59

ATTACHMENT 2 PAGE 3 OF 6 TSC MANAGER SUBSEQUENT ACTIONS (Cont.'d)

8. Coordinate TSC staff activities:
a. Collection, retention, and transmittal of plant emergency conditions information.
b. Design and installation of short term instrumentation and controls modifications.
c. Design and installation of system modifications.
d. Development of guidance for Operations personnel on the protection of the reactor core.
9. Ensure the Administrative Coordinator develops a long-term relief rotation list for the Control Room, TSC, and OSC.
10. Keep the Emergency Director informed of all activities.
11. If the OSC becomes uninhabitable, assist OSC Director in relocation of OSC personnel to the TSC Conference Room.

"12. Upon termination of the emergency, ensure that notifications are made to State and local authorities using the Long Notification Message Form.

RELOCATION ACTIONS

1. If the TSC becomes uninhabitable, the following personnel and their functions will transfer to the Control Room. These personnel should relocate with their facility procedure binders.

Emergency Director To report to the Shift Manager's desk to assume ED functions.

Reactor Engineer To report to the RE desk to provide support to operations.

Radiation Protection Coordinator To report to CADAP to perform dose assessment.

Operations Support Coordinator To report to the Shift Manager's desk to assist the ED.

TSC Communicator To report to the Communicator's desk to assume offsite communications if necessary.

ENS Communicator- To report to the Communicator's desk to resume NRC communications.

EIP-2-018 REV - 25 PAGE 15 OF 59

ATTACHMENT 2 PAGE 4 OF 6 TSC MANAGER RELOCATION ACTIONS (Cont.'d)

2. The following personnel will report to the Main Control Room Brief Room to resume OSC functions. They should relocate with radios, SCBAs (with spare bottles), procedures, and forms.

OSC Director- To provide briefings and control teams.

Electrician (1)

Mechanic (1)

I&C Technician (1)

Radiation Protection Technician (1)

Senior Radiation Protection Technician-To assist in team briefings and control offsite teams if necessary.

3. Consult with the Emergency Director on disposition of remaining personnel.
a. Send to EOF as additional resources (engineers).
b. Send home to remain on standby.

DEACTIVATION

1. When directed by the Emergency Director, announce deactivation of the TSC.
2. Ensure that all equipment is returned. Report all damaged and/or missing equipment to the Manager - Emergency Preparedness.
3. Direct the TSC Communicator to terminate ERDS after receiving NRC concurrence.
4. Ensure that all documentation is forwarded to the Manager - Emergency Preparedness.

EIP-2-018 REV - 25 PAGE 16 OF 59

ATTACHMENT 2 PAGE 5 OF 6 TSC MANAGER NOTIFICATION MESSAGE FORM I. THIS IS RIVER BEND NUCLEAR STATION WITH MESSAGE NUMBER B COMM C. TEL NO

2. A/

ITIME/DATE) (NAME)

3. EMERGENCY CLASSIFICATION:

A. E'- NOTIFICATION OF UNUSUAL EVENT C. El SITE AREA EMERGENCY E E TERMINATED B - ALERT D -- GENERAL EMERGENCY

4. CURRENT EMERGENCY CLASSIFICATION DECLARATION - TERMINATION Time/Date /

5.

RECOMMENDED PROTECTIVE ACTIONS:

A. I No Protective Actions Recommended At This Time (Go to item 6).

B. -' EVACUATE

"-l SHELTER

6. INCIDENT DESCRIPTION/UPDATE/COMMENTS
7. REACTOR SHUTDOWN? "- NO 0 YES Tame/Date
8. METEOROLOGICAL DATA:

A. Wand direction FROM Degrees at MPH B Sectors Affected (A-R)

C. Stability Class (A-G)

D Precipitation l-None -- Rain El Sleet snow S [-- Haa I-' Other

9. RELEASE INFORMATION:

A. [:"] No Release (Go to item 13) C M A RELEASE OCCURRED BUT STOPPED, Duration his Release Stopped at hrs B E-1 A RELEASE IS OCCURRING- Expected Duration hrs Release Started at hrs

'II 10. TYPE OF RELEASE:

A. El Radioactive Gases B. El Radioactive Airborne Particulates C. El Radioactive Liquids

11. RELEASE RATE:

A. NOBLE OASES CI/a B IODINES CI/a

12. ESTIMATE OF PROJECTED OFF-SITE DOSE:

A Projections for _ hours based on El Field Data E Plant Data B. (TEDE) W8 DOSE COMMITMENT (Rem) C. (CDE) THYROID DOSE COMMITMENT (Rem)

Sate Boundary 5 raleas Sate Boundary s mile_

2 miles 10 miles 2 rmles 10 mules

13. MESSAGE APPROVED BY: TITMP1, 14 MESSAGE RECEIVED BY: TIME.

PROOOI 5M.CDR, EIP-2-018 REV - 25 PAGE 17 OF 59

ATTACHMENT 2 PAGE 6 OF 6 TSC MANAGER GUIDELINES FOR COMPLETING THE LNMF ESP COMM MANUAL METHOD Message Number automatic Assign a message number. Number the messages sequentially Line I until the emergency is terminated.

2A Time/Date automatic upon transmission. 2A Enter Time/Date message was transrmutted.

2B Comm: Select facility from pull-down menu. 2B Comm.: Enter facility name.

2C Tel No : Indicate "hotline" unless alternate 2C Tel. No.: Indicate "hotline" unless alternate Line 2 method is being used, then enter alternate method. method is being used, then enter alternate method.

Line 3 Automatic from Short Form. If terrrunation message, Check appropriate classification or terminated.

check "terminated"..

Line 4 Automatic from Short Form. For termination, check Check either declaration or termination. Enter time/date of "termination" and enter termination time/date, emergency declaration or termination.

Check appropriate box(es). If PAR has been Check appropriate box(es). If PARs have been recommended, Line 5 recommended, select appropriate protective actions and indicate the scenario number.

indicate scenario number.

Enter description from Short Form. May add Enter description from Short Form. May add information as Line 6 information as necessary. Use this line to correct any necessary. Use this line to correct any previous errors.

previous errors.

Line 7 Indicate if the reactor is shutdown. Information should Indicate if the reactor is shutdown. Information should be be obtained from Operations. If yes, enter time/date, obtained from Operations. If yes, enter the time/date.

Information for Lines 8A-C can be found on CADAP on Information for Lines 8A-C can be found on CADAP on the the "values" screen. A backup to CADAP for "values" screen. A backup to CADAP for meteorological data is Line 8 meteorological data is the RM-21 printer in the TSC the RM-21 printer in the TSC Computer Room (SB 123-04).

Computer Room (SB 123-04). 8A - Enter wind direction and speed.

8A - Enter wind direction and speed. 8B - Enter the affected sectors according to the 8B - Enter the affected sectors according to the current current wind direction.

wind direction. 8C - Enter stability class.

8C - Enter stability class. 8D - Check appropriate box.

8D - Check appropriate box.

NOTE: 8 A-C are automaticallycompleted when dose data is importedfrom CADAP.

Deterrrune if there is a release. Determine if there is a release.

9A If no release, check block A and proceed to line 13. 9A If no release, check block A and proceed to line 13.

9B/C If release has occurred or is occurring, 9B/C If release has occurred or is occurring, Line 9 check B or C as appropriate and enter check B or C as appropriate and enter duration and time release started/stopped. duration and time release started/stopped.

When checking B & C, be sure to import When checking B & C, be sure to import appropriate dose data. appropriate dose data.

Indicate the type of release. If there is no core damage, Indicate the type of release. If there is no core damage, check Line 10 check 10A. If there is clad damage or fuel melt, check 10A. If there is clad damage or fuel melt, check IOA & 10B. If IOA & lOB. If the release is a liquid release, check IOC. the release is a liquid release, check 10C.

Line 11 Imported from CADAP Enter release rate. DRMS provides release rates in uCi/sec.

These rates must be converted to Ci/sec. CADAP also provides this information through Notepad.

12A Enter numbers of hours used and method 12A Enter numbers of hours used and method Line 12 used in dose calculation. used in dose calculation.

12B Import from CADAP. 12B Obtain from CADAP results.

Line 13 Enter Recovery Manager/Emergency Director's name Enter Recovery Manager/Emergency Director's name and and "RM/ED" as title. RM/ED must review and approve "RM/ED" as title. RMIED must review and approve NMFs NMFs prior to transmission. prior to transmission.

Line 14 Leave blank. For use by parishes. Leave blank. For use by parishes.

EIP-2-018 REV - 25 - PAGE 18 OF 59

ATTACHMENT 3 PAGE 1 OF 7 ADMINISTRATIVE COORDINATOR ACTIVATION Date: Action Completed Initial

1. Call in Administrative personnel for the TSC and the OSC, using the Emergency Telephone Book located in the Administrative Coordinator's binder.
2. Verify that all required TSC staff members are present. If positions remain to be filled, obtain the Dialogics callout log from the TSC fax to determine which TSC staff members have responded. Call additional staff members as required.
3. Check with the TSC Data Facility Coordinator and verify that all TSC administrative equipment is functional. If problems or non-functional equipment is identified, improvise with the use of alternate equipment or initiate actions to repair or replace non-functional equipment.
4. Print daily report and ensure distribution.

SUBSEQUENT ACTIONS

1. Monitor TSC gaitronics speaker volume and adjust if necessary.
2. Verify with NRC personnel that the FTS 2001 phone lines are operational. Report any problems to the NRC Operations Center using a commercial phone and the numbers listed on the NRC phone.
3. Obtain a list of personnel located in the Protected Area from Security.

This information can be utilized for later shift compliments.

4. Coordinate with the Admin/Logistics Advisor the procurement of additional supplies and resources as directed by the TSC staff.

Coordinate delivery with the Admin/Logistics Advisor and the Security Coordinator. Notify TSC staff personnel of Estimated Time of Arrival for requested materials or resources. If the EOF has relocated, coordinate this with the Corporate Emergency Center (CEC) on the Corporate Hotline.

5. Using pages 3-7 of this attachment develop a staffing rotation list for TSC, OSC, and Control Room personnel. Contact the EOF Admin/Logistics Advisor for EOF RP technician and Chemistry technician staffing needs and the approved access route for responding personnel. Along with the TSC Manager, determine shift times.

Coordinate with the Operations Support Coordinator to identify additional operations personnel needs. Contact the individuals on the list and inform them of the time that they are scheduled to report to the site and the approved route. Unless directed to do otherwise by the Operations Support Coordinator, call out (2) additional NCOs and (2) NEOs to augment the next shift.

EIP-2-018 REV - 25 PAGE 19 OF 59

ATTACHMENT 3 PAGE 2 0F7 ADMINISTRATIVE COORDINATOR SUBSEQUENT ACTIONS (Cont'd)

6. Call the Admin/Logistics Advisor for updated information on any injured personnel. Periodically update the TSC Manager on the injured person(s) status.

RELOCATION ACTIONS If TSC is relocating

1. Relocate as directed by the TSC Manager.

DEACTIVATION

-1. When directed by the TSC Manager, deactivate the TSC.

2. Ensure that all equipment, procedures, and drawings are properly stored.
3. Have administrative staff collect all documentation.
4. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 20 OF 59

ATTACHMENT 3 PAGE 3 OF 7 ADMINISTRATIVE COORDINATOR OSC STAFF ROTATION (12-Hour Shifts) 1st Shift 2nd Shift 3rd Shift 4th Shift Date: Date: Date: Date:

Position Time: Time: Time: Time:

OSC Director (1)

Manager Electrical (1)

Manager Mechanical (1)

Manager I & C (1)

Status Communicator (1)

OSC Admin Support (1)

Sr. RP Technician (1)

Mechanical Maintenance (Ask Maint. Support Coordinator)

Electrical Maintenance (Ask Maint. Support Coordinator)

I&C Maintenance (Ask Maint. Support Coordinator)

EIP-2-018 REV - 25 PAGE 21 OF 59

ATTACHMENT 3 PAGE 4 OF 7 ADMINISTRATIVE COORDINATOR OSC STAFF ROTATION (Cont.'d)

(12-Hour Shifts) 1 st Shift 2 nd Shift 3 rd Shift 4 th Shift Date: Date: Date: Date:

Time: Time: Time: Time:

Radiation Protection Technicians OSC (Ask RP Coordinator)

TSC EOF Chemistry Technicians OSC (Ask Chemistry/Core Damage Assessment Coordinator) EOF EIP-2-018 REV - 25 PAGE 22 OF 59

ATTACHMENT 3 PAGE 5 OF 7 ADMINISTRATIVE COORDINATOR TSC STAFF ROTATION (12-Hour Shifts) 1st Shift 2nd Shift 3rd Shift 4th Shift Date: Date: Date: Date:

Position Time: Time: Time: Time:

V V *w. .1.

Emergency Director (1)

TSC Manager (1)

Reactor Engineer (1)

Mechanical Engineer (Ask Engineering Coordinator)

Electrical Engineer (Ask Engineering Coordinator)

Engineering Coord. (1)

Ops. Support Coord. (1)

Maintenance Support Coordinator (1)

Radiation Protection Coordinator (1)

Chemistry/Core Damage Assessment Coord. (1)

Security Coordinator (1)

Status Communicator (1) Facility Coord. (1)

Data Facility Coord. (1)

EIP-2-018 REV - 25 PAGE 23 OF 59

ATTACHMENT 3 PAGE 6 OF 7 ADMINISTRATIVE COORDINATOR TSC STAFF ROTATION (Cont.'d)

(12-Hour Shifts) 1st S3hift 2nd Shift 3r d Shift 4th Shift Datie: Date: Daite: Date:

Position Tim e: Time: Tii ne: Time:

Administrative Coordinator (1)

-l t I TSC Communicator (1)

I I I ENS Communicator (1)

-4 9 9 Administrative Support (Determined by Admin Coordinator)

EIP-2-018 REV - 25 PAGE 24 OF 59

ATTACHMENT 3 PAGE 7 OF 7 ADMINISTRATIVE COORDINATOR CONTROL ROOM STAFF ROTATION (12-Hour Shifts) 1st Shift 2nd Shift 3rd Shift 4th Shift Date: Date: Date: Date:

Position Time: Time: Time: Time:

Shift Manager (1 min)

Control Room Supervisor (1 min)

Nuclear Control Operators (3 min)

Nuclear Equipment Operators (4 min)

Shift Technical Advisor (1 min)_____ __

TSC/CR Communicator (1 min)

Additional Support EIP-2-018 REV - 25 PAGE 25 OF 59

ATTACHMENT 4 PAGE 1 OF 4 COMMUNICATOR ACTIVATION Date: Action Completed Initial

1. Verify activation of Emergency Response Data System (ERDS).
2. Verify the operability of the following communications equipment:

"* State and Local Hotline, call the Emergency Operations Center (LOEP) at 361.

"* Emergency Shutdown Line, call the OSC at 202.

"* Civil Defense Radio Console, call LOEP

"* ESP Computer

3. Inform TSC Manager when prepared to perform functional responsibilities.

SUBSEQUENT ACTIONS NOTE Notifications to State and local authoritiesmust be made within approximately 15 minutes of a declarationof an emergency or Protective Action Recommendation (PAR) change using the Short Notification Message Form (SNMF).

1. Contact the Main Control Room Communicator to receive a status on offsite notifications.
2. Assume responsibility for notifications when directed by the ED.
3. Assist the TSC Manager in completing the appropriate Notification Message Form (NMF). Ensure that the RP Coordinator reviews all dose data prior to RM/ED review and approval to transmit. When directed, make notifications of the emergency to State and local authorities.
4. Verify NMF receipt with State and local authorities. Complete a new NMF Verification Checklist (page 3) for each message sent.
5. If an agency has not received the message, obtain message receipt verification from the other agencies and re-transmit the message (ESP Computer) to the non-receiving party.
6. If the message is still not received, read it to the agency(s), line by line. Message may be faxed as needed.

EIP-2-018 REV - 25 PAGE 26 OF 59

ATTACHMENT 4 PAGE 2 OF 4 COMMUNICATOR SUBSEQUENT ACTIONS (Cont'd)

7. If no contact is made with a location on the Hotline, call the location on the commercial telephone to verify receipt of message. If commercial telephones are inoperable, the Civil Defense Radio may be used.
8. If Protective Action Recommendations (PARs) are issued from the TSC:
a. During the verification of message receipt on the Hotline, inform LOEP and the Parish EOCs that you will call them back in five minutes for PAR confirmation.
b. After five minutes, contact LOEP and the five Parish EOCs. Using the PAR Verification Checklist on page 4, verify that the Directors or the Assistant Directors of all Parishes and the Operations Officer at LOEP are on the Hotline.
c. When verified, request the RM/ED to pick up the Hotline for PAR verification and give the RM/ED the PAR Verification Checklist.
9. Make follow-up notifications to State and local authorities as directed by the RM/ED.
10. Maintain a file of all notification message forms and verification checklists.
11. Ensure that Administrative personnel copy and distribute all Notification Message Forms to TSC staff.
12. Contact the EOF Communicator with status of offsite notifications.
13. Transfer notifications to the EOF Communicator when directed býy the Emergency Director.

RELOCATION ACTIONS If TSC is relocating, report to Communicator's desk in the Control Room with appropriate supplies to assume offsite notifications should the need arise.

If EOF is relocating, receive turnover from EOF Communicator and resume responsibilities for offsite notifications.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure all messages are cleared and ESP Computer control is returned to the Control Room.
3. Ensure all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 27 OF 59

ATTACHMENT 4 PAGE 3 0F 4 COMMUNICATOR NMF VERIFICATION CHECKLIST Ensure at least one of the agencies in each of the following rows receives the message.

MESSAGE #

MSG. REC'D FACILITY PHONE # Hotline # (Y/N/NA)

La. Dept. of Environmental Quality 9-765-0160 371 (LDEQ) (M-F - 8AM to 4PM only, LOEP will notify all other times)

La. Office of Emergency Preparedness 9-925-7500 (24-hr. pt.) 361 (LOEP) (State EOC)

West Feliciana Parish (WFP) EOC 9-635-4792 351 24-HR. PT. 9-635-3241 352 East Feliciana Parish (EFP) EOC 9-634-7269 341 24-HR. PT. 9-683-5459 342 Pointe Coupee Parish (PCP) EOC 9-694-9014 331 24-HR. PT. 9-694-3737 332 East Baton Rouge Parish (EBRP) EOC 9-389-2100 311 24-HR. PT. 9-389-3300 312 West Baton Rouge Parish (WBRP) EOC 9-346-1581 321 24-HR. PT. 9-343-9234 321 Mississippi Emergency Management 9-1-800-222-6362 (24 hr. pt.)

Agency (MEMA) 9-1-601-352-9100 (alternate) 381 Mississippi Highway Patrol (MYHP) 9-1-601-987-1530 (backup) 382 1 Parish EOCs and LOEP Operations Officer informed of 5-minute PAR verification phone call YES NO NA Message Verified Communicator Signature/KCN Time/Date EIP-2-018 REV - 25 PAGE 28 OF 59

ATTACHMENT 4 PAGE 4 OF 4 COMMUNICATOR PAR VERIFICATION CHECKLIST Scenario # Recommended: Date:

Communicator verifies that correct individuals are on line by placing a check mark on the appropriate line. The RM/ED will verify approved scenario and initial the form.

WEST FELICIANA PARISH: RM/ED Initial On Line Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

EAST FELICIANA PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

POINTE COUPEE PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

WEST BATON ROUGE PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

EAST BATON ROUGE PARISH:

Director of Emergency Preparedness Assistant Director APPROVED SCENARIO #

STATE OF LOUISIANA LOEP Operations Officer Siren Sounding Time:

EIP-2-018 REV - 25 PAGE 29 OF 59

ATTACHMENT 5 PAGE 1 OF 5 RADIATION PROTECTION COORDINATOR ACTIVATION Date: Action Completed Initial NOTE If no release is occurringor has occurred,the TSC may be presumed to be radiologicallyhabitablewithout conducting surveys.

I1. Using the following guidelines, evaluate radiological conditions and determine habitability of the TSC. Provide results to TSC Manager and post on status board.

Facility habitability is based on a maximum dose limit of 5 rem TEDE over an assumed 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift.

A combination of 200 mR/hr to the whole body (Deep Dose Equivalent) plus an airborne concentration of 5E-6 pCi/cc radioiodine in the facility equates to a TEDE of approximately 5 rem in 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

NOTE If DRMS or meteorologicaltower information is unavailablein thefacility, have an individualdispatched to the ControlRoom to relay data. The onsite hotline, if available, may be used to relay this information.

2. Ensure that the RM-1 1 module of the DRMS is operable, as follows:
a. Ensure that the RM-1 1 console and printer power switches are in the "ON" position.
b. Check RM- 11 console screen brightness by turning "BRIGHTNESS" button.
c. If display does not appear on screen, flip "ALTERNATE/

PRIMARY" selector switch from one position to the other.

d. Press any "Grid" button and display should appear on screen.

EIP-2-018 REV - 25 PAGE 30 OF 59

ATTACHMENT 5 PAGE 2 OF 5 RADIATION PROTECTION COORDINATOR ACTIVATION (CONT'D)

e. If display does not appear on screen, perform the following:
1. Obtain panel key from TSC key box.
2. Proceed through door SB123-04 to room #303 (Cable chase room) to check breaker(s).
3. Check breaker #27 and #29 on Panel #1VBN-PNL-06A.
4. If breaker(s) has tripped, reset breaker by taking switch to "OFF" position, then to the "ON" position.
5. Proceed as described in step "a." above.
3. Ensure that the RM-21 module of the DRMS is operable as follows:
a. Type "HELP MET" RETURN to obtain current meteorological information.

Type "HELP RAD" RETURN to obtain plant effluent and meteorological information.

Type "HELP" RETURN to view the "help" menus.

4. Verify operability of the onsite hotline. Call the OSC at 202.
5. Inform the TSC Manager when prepared to assume functional responsibilities.

EIP-2-018 REV - 25 PAGE 31 OF 59

ATTACHMENT 5 PAGE 3 OF 5 RADIATION PROTECTION COORDINATOR SUBSEQUENT ACTIONS

1. Check RP technician response to the Dialogics callout and current on-shift RP staffing. Have Administrative Coordinator contact additional technicians as necessary for the following:

NOTE Offsite teams are expected to report in 75 minutes and be readyfor deployment as soon as possible but no later than 90 minutes following notification.

a. OSC Support (9)

C b. EOF as Habitability Technician

c. TSC as Habitability Technician
d. Offsite teams (2)
2. Obtain status of any monitoring teams previously dispatched by the Control Room.
3. As required, ensure the distribution of pocket dosimeters and TLDs to TSC personnel and announce the frequency at which they should be read.
4. As required, direct the establishment of a TSC contamination control point outside door # SB123-19.
5. Ensure OSC dispatches qualified personnel to refill SCBA bottles.
6. Review all notification message forms containing radiological data prior to transmission.
7. Periodically assess TSC habitability.
8. Assess plant radiological conditions and effectiveness of accident mitigation strategies.
9. Review dose projection calculations with the Emergency Director and keep him informed of offsite radiological data, both real time and projected doses.
10. If the TSC is issuing Protective Action Recommendations, perform the following:
a. Using Attachment 18, recommend offsite Protective Action Recommendations to the Emergency Director, as necessary. Provide information without delay.
b. Provide information for the applicable sections of the Notification Message Forms.

EIP-2-018 REV - 25 PAGE 32 OF 59

ATTACHMENT 5 PAGE 4 OF 5 RADIATION PROTECTION COORDINATOR SUBSEOUENT ACTIONS (Cont'd)

c. After initial PAR implementation, assuming no change in dose projections that would require an increase in PARs, wind shifts which change the scenario number, may trigger an increase in PARs to a higher level. To determine the appropriate PAR, review the emergency scenario maps and the National Weather Service (NWS) forecast. In addition, if NWS indicates continued wind shifts, consider the following:

Present PARs - Evacuate 2 mile radius, evacuate 5 miles downwind, shelter the 10 mile radius and evacuate schools, institutions and recreation areas in the 5 mile radius (minimum PARs)

Wind shifts - Evacuate 5 mile radius and shelter the 10 mile radius.

(Scenario #12)

Present PARs - Evacuate 5 mile radius, evacuate 10 miles downwind, shelter the remaining 10 mile radius and evacuate schools, institutions and recreation areas in the 10 mile radius.

Wind shifts - Evacuate 10 mile radius. (Scenario #27)

d. When PARs are issued, provide recommended routes for personnel and deliveries into RBS.
e. If doses > I rem TEDE or > 5 rem CDE thyroid are projected at 10 miles, estimate the projected dose at 15, 20 and 25 miles as appropriate and inform the Emergency Director of the distance and downwind areas at which a PAG is estimated to be exceeded.

Estimate radiation doses beyond 10 miles using the following factors:

These ratios may be used regardless of Stability Class, Wind Speed or Time After Shutdown when the Core State = "Fuel Melt" Radiation Dose at 15 miles = dose at 10 miles x 0.387 Radiation Dose at 20 miles = dose at 10 miles x 0.267 Radiation Dose at 25 miles = dose at 10 miles x 0.226 Ratios are applicable to either TEDE or CDE, although CDE Thyroid will normally be the dominant factor.

EIP-2-018 REV - 25 PAGE 33 OF 59

ATTACHMENT 5 PAGE 5 OF 5 RADIATION PROTECTION COORDINATOR SUBSEQUENT ACTIONS'(Cont'd)

11. Coordinate with the OSC Director to dispatch personnel for radiological and environmental monitoring in accordance with EIP-2-014, Offsite Radiological Monitoring.
12. Upon declaration of a Site Area Emergency or higher, assist the Emergency Director in determining the evacuation egress point and assembly area to be used in the Owner Controlled Area evacuation. Dispatch two Radiation Protection Technicians, as a minimum, to perform monitoring and decontamination (see EIP-2-026).
13. Coordinate with the Security Coordinator on protective actions for security personnel.
14. Monitor for radiological release that may impact evacuees at Assembly Area or personnel at staging area. Inform Emergency Director of need to relocate evacuees or personnel, as necessary.
15. Determine personnel exposure margins. Assist the Emergency Director in authorizing emergency exposure limits in excess of 10 CFR 20 in accordance with EIP-2-012, Radiation Exposure Controls.
16. Advise the Emergency Director on the use of Potassium Iodide (KI) in accordance with EIP-2-012. KI is stored in the decontamination room, second floor services building, Main Control Room, and TSC RP lockers.
17. Assist the Radiation Protection Advisor in obtaining Emergency Director authorization for use of KI by offsite teams.

RELOCATION ACTIONS If the TSC is relocating:

1. Receive dose assessment turnover from Chemistry/Core Damage Assessment Coordinator and report to CADAP computer in control room to assume those responsibilities as needed.

Take laptop dose assessment computer and battery charger located in TSC RP locker.

2. Assume normal RP Coordinator responsibilities in control room to support mitigation activities.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 34 OF 59

ATTACHMENT 6 PAGE 1 OF 2 MAINTENANCE SUPPORT COORDINATOR ACTIVATION Date: Action Completed Initial

1. Obtain the status of work teams dispatched by the Control Room and/or the OSC.
2. Ensure that the TSC/OSC Video link is operational.

SUBSEQUENT ACTIONS

1. Ensure that OSC is placing TSC ventilation in the emergency mode.
2. Ensure that the Enigineering Coordinator and TSC Manager are advised on status of repairs and corrective actions in the plant.
3. Ensure initiation of Work Orders and coordinate repair and corrective actions with the OSC Manager.
4. Coordinate work team dispatch by obtaining the work team NAME and PRIORITY from the Emergency Director.
5. Ensure that work teams receive briefings from the Engineering Coordinator or Mechanical/Electrical Engineers as applicable.
6. Post the work team on the TSC/OSC Video link, using the Video link form (Page 2 of this attachment).
7. Track personnel leaving the TSC envelope. Advise the OSC to expect their arrival in that facility and that they should be tracked as a team.

RELOCATION ACTIONS TSC is relocating:

1. Relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 35 OF 59

ATTACHMENT 6 PAGE 2 OF 2 MAINTENANCE SUPPORT COORDINATOR (Typical)

Note: All teams must have a priority assigned by the Emergency Director.

Time:

Priority Assignment B = In Briefing 0 = out

.1. +

1* T

+ 1 4

EIP-2-018 REV - 25 PAGE 36 OF 59

ATTACHMENT 7 PAGE 1 OF I REACTOR ENGINEER ACTIVATION Date: Action Completed Initial

1. Inform the TSC Manager if in the Control Room and estimate your time of arrival in the TSC.

SUBSEQUENT ACTIONS NOTE The Technical Support Guidelinesmay be used to assess accident conditions.

1. Along with the Chemistry/Core Damage Assessment Coordinator and Technical Advisor analyze core parameters to determine core conditions. Use COP - 1050, Post Accident Estimation of Fuel Core Damage.
2. Review proposed plant operations and assess the effect on core condition.
3. Develop recommendations on plant operations that would improve or stabilize core conaitions.

4.. Keep the Chemistry/Core Damage Assessment Coordinator and Technical Advisor informed on core conditions.

5. Report to the Control Room, as necessary, and return to the TSC.

RELOCATION ACTIONS If the TSC is relocating:

1. Transfer to Reactor Engineer workstation in control room and resume functions.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV- 25 PAGE 37 OF 59

ATTACHMENT 8 PAGE I OF I ENGINEERING COORDINATOR ACTIVATION Date: Action Completed Initial

1. Obtain plant status from the Operations Support Coordinator.
2. Ensure that the engineering staff are assembled and prepared to perform their functional responsibilities.
3. Contact the Engineering Support Advisor on engineering activities underway.

SUBSEQUENT ACTIONS

1. Provide advice on plant repair and corrective actions.

NOTE The TechnicalSupport Guidelines may be used to assess accidentconditions.

2. Consult with Maintenance Support Coordinator on maintenance operations. Follow up on OSC activities.
3. Provide briefings to the work teams on maintenance operations, as necessary.
4. Direct the activities of the engineering staff.
5. Request EOF engineering assistance as needed.
6. Keep the Engineering Support Advisor and the TSC Manager informed of engineering activities.
7. Assess the need for additional engineering specialists. Make recommendations to the TSC Manager.

RELOCATION ACTIONS If TSC is relocating

1. Relocate as directed by the TSC Manager.

DEACTIVATION I. When directed by the TSC Manager, deactivate the TSC.

2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 38 OF 59

ATTACHMENT 9 PAGE I OF I MECHANICAL/ELECTRICAL ENGINEERS ACTIVATION Date: Action Completed Initial

1. Obtain plant status from the Engineering Coordinator.
2. Ensure that prints and drawings are available. If not, have the Data Facility Coordinator assist in obtaining what is needed.
3. Set up the flip chart for tracking engineering activities.
4. Verify engineering computers are functional.
5. Inform the Engineering Coordinator when prepared to perform functional responsibilities.

SUBSEOUENT ACTIONS

1. Provide advice on plant repair and corrective actions.
2. Consult with the Engineering Coordinator on maintenance operations.
3. Provide repair team briefings as requested.
4. Inform the Maintenance Support Coordinator prior to leaving the TSC to go to the OSC for work team assignments.
5. Track engineering activities on the flip chart for TSC staff information.
6. Keep the Engineering Coordinator informed of activities.

RELOCATION ACTIONS If TSC is relocating:

1. Relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the Engineering Coordinator, deactivate the TSC.
2. Ensure that all documentation is forwarded to the Engineering Coordinator.

EIP-2-018 REV - 25 PAGE 39 OF 59

ATTACHMENT 10 PAGE 1 OF 2 OPERATIONS SUPPORT COORDINATOR ACTIVATION Date: Action Completed Initial I. Verify ERIS monitor is operational. If power is not available, perform the following:

a. Obtain panel key from TSC key box.
b. Proceed through door SB123-04 to room #303 (Cable chase room).
c. Check breaker panel 1VBN-PNL06.
d. If the main breaker and/or other breakers have tripped, switch to the "OFF" position, then switch to the "ON" position.
2. If ERIS monitor is inoperable, obtain plant parameters from the Control Room.
3. Inform the TSC Manager when prepared to perform functional responsibilities.

SUBSEQUENT ACTIONS

1. Establish contact with the TSC/CR Communicator.
2. Identify operators in the field and teams dispatched by the Shift Manager to the-Maintenance "SupportCoordinator.
3. Ensure that the Emergency Director is kept informed of:
a. Current plant conditions.
b. Actions being performed or anticipated to mitigate the accident.
c. Repairs and investigations initiated.

NOTE The TechnicalSupport Guidelines may be used to assess accidentconditions.

4. Follow the EOPs/SAPs and keep the Emergency Director informed on status.
5. Keep the Operations Advisor and the Shift Manager informed of activities.
6. Review emergency classification and recommend upgrading of the emergency in accordance with EIP-2-001, Classification of Emergencies.

EIP-2-018 REV - 25 PAGE 40 OF 59

ATTACHMENT 10 PAGE 2 OF 2 OPERATIONS SUPPORT COORDINATOR RELOCATION ACTIONS If TSC is relocating:

1. Relocate to control room to assist Emergency Director as necessary.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 41 OF 59

ATTACHMENT 11 PAGE 1 OF 2 CHEMISTRY/CORE DAMAGE ASSESSMENT COORDINATOR ACTIVATION Date: Action Completed Initial

1. Verify the operability of CADAP.
2. Verify operability of the offsite/onsite monitoring team radio by contacting the following locations:

"* EOF on the OFF/RAD channel

"* OSC on the ON/RAD channel

3. Inform the RP Coordinator when prepared to perform functional responsibilities.

SUBSEQUENT ACTIONS NOTE The Technical Support Guidelines may be used to assess accident conditions.

1. As necessary, contact the Chemistry Technician in the Control Room to receive a turnover on dose assessment activities. Assume control of dose assessment when directed by the Emergency

- Director (ED).

2. Check chemistry technician response to the Dialogics callout and current on-shift chemistry technician staffing. Have Administrative Coordinator contact additional technicians as necessary for the following:
a. OSC support (2)
b. Offsite teams (2)
3. Perform dose assessment calculations in accordance with EIP-2-024, Offsite Dose Calculations. Provide results to RP Coordinator.
4. Keep RP Coordinator informed of changes in wind direction.
5. Coordinate with Reactor Engineer in analyzing core parameters. To determine core conditions, use COP - 1050, Post Accident Estimate of Fuel Core Damage. Provide information to the TSC Manager and Technical Advisor.
6. Verify operability of backup CADAP computer stored in the TSC RP locker.

Place the lap top computer battery on charge.

EIP-2-018 REV - 25 PAGE 42 OF 59

ATTACHMENT 11 PAGE 2 OF 2 CHEMISTRY/CORE DAMAGE ASSESSMENT COORDINATOR SUBSEQUENT ACTIONS (cont'd)

7. Recommend the performance of PASS preparatory actions and PASS sample actions in accordance with EIP-2-015, Post Accident Sampling Operations, as necessary.
8. Direct PASS activities through the Maintenance Support Coordinator.
9. Develop and implement methods to process liquid and gaseous radioactive waste accumulated during the emergency.

RELOCATION ACTIONS If the TSC is relocating:

1. Provide dose assessment turnover to RP Coordinator and relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 43 OF 59

ATTACHMENT 12 PAGE 1 OF 2 SECURITY COORDINATOR ACTIVATION Date: Action Completed Initial

1. Notify the alarm station(s) of presence in TSC.
2. Ensure that the lock plates of TSC doors SB 123-03 and SB 123-01 are flipped and the doors are locked and signs posted. Activate card reader on door SB123-12. Ensure that TSC personnel have carded in on the accountability card reader.
3. If card reader is inoperable, prepare manual list of personnel and maintain accountability.
4. Obtain from Security Alarm Station compensation positions and locations.
5. Verify that the OSC card reader is activated. If inoperable, ensure that the OSC Manager maintains a manual list of personnel.
6. Verify that the Control Room card reader is activated. If inoperable, ensure that the Shift Manager maintains a manual list of personnel.

SUBSEOUENT ACTIONS NOTE:

Priorto a formal OCA evacuation, the Emergency Directormay direct Security to notify members of the public known to be in the OCA to evacuate River Bend property. Security may maký this notification using any communications method (i.e., telephone, direct contact, etc.).

1. Begin preparations for possible Owner Controlled Area evacuation. Contact local law enforcement to determine any impediments to routes leaving the site (e.g. bridges out, toxic releases, etc.) Inform Emergency Director as needed.
2. Inform TSC Manager if leaving the facility.
3. Obtain alpha listing report for Administrative Coordinator.
4. Ensure that Security Shift Supervisor is advised periodically on plant emergency.
5. Coordinate with the Radiation Protection Coordinator for dosimetry and protective actions for security personnel. Monitor wind direction in relation to security positions.

EIP-2-018 REV - 25 PAGE 44 OF 59

ATTACHMENT 12 PAGE 2 OF 2 SECURITY COORDINATOR SUBSEQUENT ACTIONS (cont'd)

6. At a Site Area Emergency or higher, perform evacuation and accountability in accordance with EIP-2-026.
7. Keep the TSC Manager informed of any security contingency event and actions in progress.
8. Notify the Security Shift Supervisor of vehicles needing entry into the Protected Area.

RELOCATION ACTIONS

1. Relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Inform the Security Shift Supervisor of the TSC deactivation.
3. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 45 OF 59

ATTACHMENT 13 PAGE 1 OF 3 TSC HABITABILITY TECHNICIAN ACTIVATION Date: Action Completed Initial

1. Perform operational checks on monitoring equipment prior to use.
2. Perform radiation and airborne radioactivity surveys in accordance with RPP-0006, Radiological Monitoring or applicable attachment of '

EIP-2-014, Offsite Radiological Monitoring to ensure that the TSC is habitable. Report survey results to the Radiation Protection Coordinator.

3. Inform the RP Coordinator when prepared to perform functional responsibilities.

SUBSEOUENT ACTIONS

1. When directed by RP Coordinator, distribute pocket dosimeters and TLDs. Document on page 3 of this attachment.
2. Establish a contamination control point outside of door SB123-19, as directed. If needed, coordinate with OSC Habitability Technician the establishment of a clean path between TSC and OSC.
3. If personnel entering the TSC are contaminated, notify the RP Coordinator and arrange for decontamination by the OSC.
4. Perform periodic surveys of the TSC.
5. Keep the RP Coordinator informed of all activities.

RELOCATION ACTIONS If the TSC is relocating:

1. Relocate to the control room when directed by the TSC Manager. Upon arrival resume habitability assessment and provide team coverage if necessary. Utilize supplies located in the Emergency Planning locker located in the control room.

DEACTIVATION

1. When directed by the RP Coordinator, deactivate the TSC.
2. Ensure that all dosimeters and TLDs that were distributed are collected.

EIP-2-018 REV - 25 PAGE 46 OF 59

ATTACHMENT 13 PAGE 2 OF 3 TECHNICIAN TSC HABITABILITY DEACTIVATION (cont'd)

3. Ensure that all monitoring instrumentation is stored and operable. Report problems to the RP Coordinator.
4. Ensure that all documentation is forwarded to the RP Coordinator.

EIP-2-018 REV - 25 PAGE 47 OF 59 EIP-2-O1 8 REV-25_ PAGE47OF59

ATTACHMENT 13 PAGE 3 OF 3 TSC HABITABILITY TECHNICIAN (Typical)

Date:

TLD Name (Last,First,MI) Print SSN Returned (0)

+ + +

+ 4. -1*

+ *1 1 4.

4. 4. .1.

.1. .1. 4.

4. + 4.
4. + 4.
4. +
4. 4. 4.

+ 4. 4.

+ *1* 1*

4.

4. *1* 1

.1. 4. 4.

.1. 4. 4.

4. + 4-
4. + 4-i + i 4 +

.4 4. +

.4 4 4.

4 4 4.

i i a EIP-2-018 REV - 25 PAGE 48 OF 59

ATTACHMENT 14 PAGE 1 OF I DATA FACILITY COORDINATOR ACTIVATION Date: Action Completed Initial

1. Verify availability of TSC drawings. If necessary, obtain drawings from Drawing Control Center.
2. Develop a list of non-functional administrative equipment and present to Administrative Coordinator.
3. Inform the Administrative Coordinator when prepared to perform functional responsibilities.

SUBSEQUENT ACTIONS

1. Obtain reference materials as requested.
2. Assist the Administrative Coordinator, as necessary.
3. Provide document support for the OSC, as necessary.

RELOCATION ACTIONS If the TSC is relocating:

1. Relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. If necessary, ensure that all drawings are returned to the Drawing Control Center.
3. Ensure that all reference materials are returned to the appropriate storage location.
4. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 49 OF 59

ATTACHMENT 15 PAGE 1 OF I STATUS COMMUNICATOR ACTIVATION Date: Action Completed Initial

1. Ensure that the headset is operable.
2. Update status boards with current information from ERIS data sheets, Notification Message Forms, and headset circuit.
2. Have Administrative Coordinator call out another Status Communicator, if needed.

SUBSEQUENT ACTIONS

1. Continually update all status boards with current information from ERIS, Notification Message Forms, and information obtained over the headset or from the Operations Support Coordinator or Maintenance Support Coordinator.
2. Ensure that the Operations Support Coordinator and TSC Manager periodically verify the accuracy of status board information.

RELOCATION ACTIONS If the TSC is relocating:

1. Relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 50 OF 59

ATTACHMENT 15 PAGE 1 OF I STATUS COMMUNICATOR ACTIVATION " Date: Action Completed Initial

1. Ensure that the headset is operable.
2. Update status boards with current information from ERIS data sheets, Notification Message Forms, and headset circuit.
2. Have Administrative Coordinator call out another Status Communicator, if needed.

SUBSEQUENT ACTIONS

1. Continually update all status boards with current information from ERIS, Notification Message Forms, and information obtained over the headset or from the Operations Support Coordinator or Maintenance Support Coordinator.
2. Ensure that the Operations Support Coordinator and TSC Manager periodically verify the accuracy of status board information.

RELOCATION ACTIONS If the TSC is relocating:

1. Relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 50 OF 59

ATTACHMENT 16 PAGE 1 OF I ENS COMMUNICATOR ACTIVATION Date: Action Completed Initial

1. Proceed to the Control Room and relieve the TSC/Control Room Communicator or Control Room Communicator of the NRC notification duties.
2. Inform the TSC Manager that you are in the Control Room.
3. When the TSC becomes operational, inform the NRC that you are relocating duties to the TSC. Report to the TSC.

SUBSEQUENT ACTIONS

1. Communicate plant status as requested. Keep the NRC informed of the following:
a. Degradation in the level of safety in the plant or worsening plant conditions.
b. Results of ensuing evaluations or assessments of plant conditions.
c. Effectiveness of response or protective measures taken.
d. Information related to plant behavior that is not understood.
e. Changes in classifications or Protective Action Recommendations (PARs).
2. When the NRC requests, have the HPN Communicator establish contact with the NRC.
3. If in doubt about information, check with Operations Support Coordinator and TSC Manager on accuracy of your information prior to passing it on to the NRC.
4. Upon termination of the emergency, notify the NRC.

RELOCATION ACTIONS If TSC is relocating:

1. Report to the Communicator's desk in the control room to resume ENS duties.

DEACTIVATION

1. When directed by the TSC Manager, deactivate the TSC.
2. Inform the NRC and obtain concurrence to deactivate ENS duties.
3. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 51 OF 59

ATTACHMENT 17 PAGE I OF 1 ADMINISTRATIVE SUPPORT ACTIVATION Date: Action Completed Initial

1. Test the operability of administrative equipment which includes but is not limited to:

"* copier

"* fax

"* ERIS laser printer

"* Electronic document printer

2. Obtain all previous Notification Message Forms. Copy and distribute to TSC staff.
3. Assist the TSC staff in facility activation.
4. Inform the Administrative Coordinator when prepared to perform functional responsibilities.

SUBSEQUENT ACTIONS

1. Continuously retrieve, copy and distribute ERIS data (as necessary), and Notification Message Forms.
2. Bring or fax information to the OSC as necessary.
3. Retrieve drawings, procedures, and documents.
4. Provide clerical support as directed by the Administrative Coordinator.

RELOCATION ACTIONS If TSC is relocating:

1. Relocate as directed by the TSC Manager.

DEACTIVATION

1. When directed by the Administrative Coordinator, deactivate the TSC.
2. Ensure that all procedures, drawings, reference materials and equipment are stored in the appropriate location and condition.
3. Ensure that all documentation is forwarded to the TSC Manager.

EIP-2-018 REV - 25 PAGE 52 OF 59

1 -1 0

H Tj C-)

H 00 C-)

H 0

t.J 0

TI e

H 0

Cl)

PROO035M CDR H

H T1

0) H 00

ATTACHMENT 18 PAGE 2 OF 3 PROTECTIVE ACTION RECOMMENDATIONS (PARS)

BLOCK 1 PROTECTIVE ACTION FLOWCHART EVACUATE 2 MILE RADIUS AND EVACUATE 5 MILES DOWNWIND AND SHELTER THE 10 MILE RADIUS AND EVACUATE SCHOOLS, INSTITUTIONS, RECREATION AREAS 5 MILE RADIUS.

Locate the wind direction to find the appropriate scenario number to use.

DEGREES SCENARIO CENTERLINE SIDE FROM NUMBER SECTOR SECTOR 168.76-191.25 1 A R&B OR 191.26-213.75 B A&C 213.76-236.25 2 C B &D 236.26-258.75 3 D C&E 258.76-281.25 4 E D&F OR 281.26-303.75 F E&G 303.76-326.25 5 G F &H OR 326.26-348.75 H G&J 348.76-11.25 6 J H&K 11.26-33.75 7 K J&L 33.76-56.25 8 L K &M OR 56.26-78.75 M L&N 78.76-101.25 9 N M&P 101.26-123.75 10 P N&Q OR 123.76-146.25 Q P&R 146.26-168.75 11 R Q&A BLOCK3 PROTECTIVE ACTION FLOWCHART EVACUATE 5 MILE RADIUS AND SHELTER THE 10 MILE RADIUS.

EIP-2-018 REV - 25 PAGE 54 OF 59

ATTACHMENT 18 PAGE 3 OF 3 PROTECTIVE ACTION RECOMMENDATIONS (PARS)

BLOCK 2 OR 4 PROTECTIVE ACTION FLOWCHART EVACUATE 5 MILE RADIUS AND EVACUATE 10 MILES DOWNWIND AND SHELTER THE 10 MILE RADIUS AND EVACUATE SCHOOLS, INSTITUTIONS, RECREATION AREAS 10 MILE RADIUS.

Locate the wind direction to find the appropriate scenario number to use.

DEGREES SCENARIO CENTERLINE SIDE FROM NUMBER SECTOR SECTOR 168.76-191.25 13 A R&B 191.26-213.75 14 B A&C 213.76-236.25 15 C B&D OR 236.26-258.75 D C&E 258.76-281.25 16 E D&F 281.26-303.75 17 F E&G 303.76-326.25 18 G F &H 326.26-348.75 19 H G &J 348.76-11.25 20 J H&K 11.26-33.75 21 K J&L 33.76-56.25 22 L K&M 56.26-78.75 23 M L &N 78.76-101.25 24 N M&P 101.26-123.75 25 P N&Q OR 123.76-148.25 _P&R Q 148.26-168.75 26 R Q&A BLOCK 5 PROTECTIVE ACTION FLOWCHART EVACUATE 10 MILE RADIUS DEGREES SCENARIO CENTERLINE SIDE FROM NUMBER SECTOR SECTOR ANY 27 ALL ALL EIP-2-018 REV - 25 PAGE 55 OF 59 EIP-2-01 8 REV -25 PAGE 55 OF 59

ATTACHMENT 19 PAGE I OF I LOG FORM (Typical)

Name: Date:

Position: Page of Name:

Position:

TIME TIME ACTIVITY EIP-2-018 REV - 25 PAGE 56 OF OF 59 59 EIP-2-O1 8 REV- 25 PAGE 56

ATTACHMENT 20 PAGE 1 OF I TECHNICAL SUPPORT CENTER ORGANIZATION CHART I

0 DIRECT REPORT

-- ------------- SECONDARY REPORT "J IN TSC

  • a OTHER LOCATION EIP-2-018 REV - 25 PAGE 57 OF 59

ATTACHMENT 21 PAGE 1 OF I TECHNICAL SUPPORT CENTER FLOOR PLAN NRC Conference Area DOOR CORRIDOR SB121-12 WOMEN'S I

ROOM I--,

I l m l tri

.1 i in___

~SBI23-19 13 I

DOOR SB123-03 I

I. EMERGENCY DIRECTOR xx xxx xx xxxx '~xxxxx

17. RAD PROTWI'SC tABIITABILITY TECII
2. TSC MANAGER 18. ENS COMMUNICATOR 3 REACTOR ENGINEER 19 NRC REACTOR SAFETY OPERATIONS COORD 4 ENGINEERING COORDINATOR 20. NRC COMMUNICATOR
5. MECHANICAL ENGINEER 21. NRC RADIATION SAFETY COORD 6 ELECTRICAL ENGINEER 22. NRC HP SPECIALIST I I 7 OPERATIONS SUPPORT COORD 23. NRC REACTOR SAFETY SPECIALIST 8 MAINTENANCE SUPPORT COORD 24 NRC SR. RESIDENT INSPECTOR DOOR 9 RADIATION PROTECTION COORD 25. ADMIN. SUPPORT SB123-04 10. CHEM/CORE DAMAGE ASS COORD 26 ADMIN. SUPPORT
11. SECURITY COORD.

ERDS 12 COMMUNICATOR "TERMINAL 13. STATUS COMMUNICATOR 14 DATA FACILITY COORD.

& PHONE 15 ADMIN. SUPPORT

16. ADMINISTRnIlVE COORD COMPUTER ROOM PROOD02M CDR EIP-2-018 REV - 25 PAGE 58 OF 59 EIP-2-O1 8 REV -25 PAGE 58 OF 59

ATTACHMENT 22 PAGE 1 OF 1 TSC STAFF TO EOF RELOCATION GUIDELINES NOTE Unforeseenfactors may arise which make predeterminedactions ineffective or impracticalin certain circumstances.In these instances,the Emergency Directormay use his discretion in taking alternatecourses of action based on availableinformation.

Situations may arise where personnel responding to an emergency will not be able to access the emergency response facilities in the protected area (e.g. terrorist event). In these situations, TSC personnel should man the Emergency Operations Facility located in the Training Center, while Operations Support Center personnel should be staged in the Training Center classrooms. EOF personnel will report to the Alternate EOF in Baton Rouge to assume their duties as per EIP-2-022 and Joint Information Center personnel should be directed to the Alternate JIC in Baton Rouge.

Arriving TSC personnel should be directed to man the chairs normally occupied by their EOF counterparts as per the EOF floor plan contained in EIP-2-020. Personnel should be directed to carry out the applicable steps of EIP-2-018 with the following exceptions:

1. Reactor Engineer - locates to the dose assessment room. Monitors ERIS and DRMS and assists in core damage assessment as appropriate.
2. Security Coordinator- if a security incident, locates to the chair of the Technical Advisor and coordinates law enforcement response with plant security. Establishes controls for access to EOF. Maintains EOF accountability. Coordinates with Security Shift Supervisor responses of teams to the site.
3. Maintenance Coordinator - locates to Events Information.Team chair and coordinates activities with OSC personnel and Security Coordinator.

The Maintenan.ce Coordinator should refer to the Attachment 11 of EIP 2-020 for guidance on placing the EOF ventilation in the emergency mode.

4. Operations Support Coordinator and Radiation Protection Coordinator should refer to Attachments 6 and 10 of EIP-2-020 for breaker locations for ERIS and DRMS should they not be operable.

As soon as possible, communications should be established with the Recovery Manager/Emergency Director (OSM) and a transfer made of offsite notifications and dose assessment. These responsibilities should then be transferred to the Alternate EOF upon that facility becoming operational.

Any offsite agencies whose assistance is needed should be incorporated into the site response as per established plans.

EIP-2-018 REV - 25 PAGE 59 OF 59