Fire Hazards Analysis Report (Fhar), Revision 20, Volume 2, Attachment 3-0 - Appendix R
ML022490159
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 08/27/2002
From: Gallagher M
AmerGen Energy Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
5928-02-20170
Download: ML022490159 (169)


Text

AmerGen Energy, L.L.C.

TMI-1 FIRE HAZARDS ANALYSIS REPORT Volume 2

THREE MILE ISLAND UNIT NO. 1 FIRE HAZARDS ANALYSIS REPORT VOLUME II AmerGen Energy Company, LLC DOCUMENT NO. 990-1745 REVISION 20

1 KU K)

ATTACHMENT 3-0 SHEET la SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE AAAA A A AAAA A AAAAAA A C C CCC C C CCCC C C C CCC BB B B B B B B B B S B B B BB I I B B B8BB B B BBBB B BB BB T T F F F F F F FFFF F FFFFF F F FFF FF FFFF F FF FF AA Z Z Z Z ZZ Z Z Z Z Z Z Z ZF F A A AAA AA AAAA A AA ZZ z z 1 2 1 2 2 2 3 4 5 6 6 7 8 9 1 1 1 2 2 2 2 2 2 2 3 3 3 3 4 4 5 5 SYSTEMS alb c a I 0111 a blc d e f g alb c+ d+ a b4 alb REMARKS a

RC INVENTORY CONTROL MAKEUP PUMP B ABIAC B C C A AC C BC ACBB A5A B iA B A B AIBC BC BC A-MU-P-1A, B-MU-P-1C, C C C=MU-P-1B (NOTE 3)

MU RECIRC VALVES I NM - M Nm M MM M I MU SUPPLY/DISCH VLVS CORRESP. TO MU PUMP M M M I M M M MU PUMP TRIP & RESTART 0 O 0 RECIRC LINE MUST BE OPENED BEFORE RESTARTING PUMP LETDOWN MM M I M MM M M X MM M M MMM MM M MiM M M PREVENT UNCONTROLLED LDI iii 1 1 1 1 1 Fll 1 1 11111 i11 i12 2 3 1 2 i 11212 1 11 1 I-MU-V-3,2-MU-V-2A/B,3-MU-V-4/5 BLEEDOFF THRU RC VENTS X 0 X X X X X X RC-V-28 and 44; or RC-V-40A and 41A; or RC-V-40B and 41B; or RC-V-42 and 43 RC PRESSURE CONTROL PRESSURIZER HEATERS - B X X B A B A B A B B B A-RC-G-B, B-RC-G-9 MAKEUP PUMP B AB AC B C C A AC C BC AC B B A AB A BA BBABCBC BBC A-MU-P-lA, B-MU-P-IC, C C C-MU-P-lB LETDOWN N MN MMM MMM XMmMM M MM M M M PORV PROTECTION 1 2 2 1 1 2 1 2 2 2 2 2 1=RC-RV-2, 2-RC-V-2 RAPID DEPRESS. T A A T'B A T A T A B A B IB B A=RC-V-l, B=RC-V-3, T=TRIP RCP PROTECTION (Note 5)

SPRAY LINE - PRESSURE M NM M M M M -N RC-V-4 CONTROL RC PUMP TRIP CAPABILITY X-X X RC P SEAL COOLING SEAL INJECTION x X-OX 0 0O XX -OX x OXOx X X X THERMAL BARRIER COOLING 01 O.-NMRS M X 0 RSRS - M RS M RS MMO O O TRIP RCPUMPS T TT T T TT T NOTE 4 LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN b -AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-IB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES
5. IN CB-FA-1, RCP's CAN BE TRIPPED FROM THE 6900V SWGR IF TRIP CAPABILITY FROM C.R. IS LOST 003/002 T3-0.1/Rev. 18

K>

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2a A A AA A A A A A A A A A A A A CCACAA C CCCCCCCCC C C C B B B B B B BB B B B B B B B I I B B B B BBB B B B B B B B B B TT FF F F F F F F F F F F FFFFF F F F F F F F F F FF F F F F F A ZAZZ ZZZ Z Z ZZ ZZZFZ ZZFFA A A AAA A A A A A A A A Z Z 121 2 222 3 4 5 6 6 7 86911 1 2 2 2 2 2 2 2 3 3 3 3 4 4 5 5 SYSTEMS a b c a 0,1,111 a bIc d e f gab cld a blalb REMARKS a ++ +

DECAY HEAT REMOVAL EMERGENCY FEEDWATER TURBINE II S I s S S S EMERGENCY FEEDWATER MOTOR B B A AB A B A B A B B B HSPS XX x x x x x x x x x x x MAIN FEEDWATERKOVER- T T T T T T T V V V T V V T M M T-TRIP TURBINE FROM C.R.

FEEDING V CLOSE VALVES FROM C.R.

I I I I M=SIMULTANEOUS ACTION (NOTE 2)

HPI COOLING X MAIN STEAM EXHAUST K MNMM NMM MMMIMIMIMM DUMP TO CODE SAFETY VAL. FIRST STEAM DUMP TO CONDENSER 1-MS-V-3A, 3B, 3C, 3D, 3E, 3F 1 1 1 11 1 221212 2 2-MS-V-EA, 6B MAIN STEAM SUPPLY TO EFW X'X X X XX X D.H. REMOVAL COLD SHUT- AVAILABLE AFTER MANUAL ALIGN DOWN BA A A S B A - B A B B AIA B A B A B A BRB B MENT OF VALVES SUPPORT SYSTEM INTERMEDIATE COOLING B A X B RS A A B A B A B A BB B PUMP IC VALVES -- - M MM n RS RS N N MMN[

MM M M N IC-V-lA, 1B, 2, 3, 4 LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN 0 - AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-IB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-0.2/Rev. 18

KU ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3a AA A iAAAA A A AIA AA AA A AC C C C C C CC C C C C CC C B B B B BB B B B B B B B BB BI I B B B B B B B B BB BB B T T F F F F F F F F FFF F FFF F F F F F F FF F F F F FFF F AAZ Z Z Z Z Z Z Z ZZZ ZZZZF F A A A A A A A A A A A AA A ZZ Z Z 12122234 5 6678911 1 2 2 2 2 2 22 3 3 3 34455 SYSTEMS a blc a 0,111 1 a b c dle f g a b c d a bab REMARKS a + + + I ISPH VENTILATION B JA J B A A B A B A B X X X1X NUC SERV CLOSED CYCLE BC BC AB- RS A AC 1JAC B AC BC A B B B A=NS-P-lA, B=NS-P-IC, C-NS-P-lB COOLING I-C B *A OR B IS AVAILABLE NUC SERV RIVER WATER AB AB AC -I - BC AC BC BC C AC BC AC C AC BC AC B S B IA-NR-P-IA,

-B B=NR-P-iC, C=NR-P-1B NR VALVES M M m m M M MNR-V-15A, 15B, 18 DECAY HEAT CLOSED CYCLEBA - A B B A B AA BBA A BA B A B B BA DECAY HEAT RIVER WATER -B - A B A B A AA- JB BA A B S B INSTRUMENT AIR COMPRESSOR X A AXA

_ A B A B B B COPPER AIR LINES/FITTINGS x X IXKX 2 HR. BACKUP AIR o x LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN 0 - AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION DB - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-lB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-0.3/Rev. 18

K_' <,-I ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4a AA A A A A AA A A A A A A A A A A C CCCCCiC CCC C CCC CCC B B BB B B6 B B B B B B B B B B I I B B B B B B B BSiB B B B B B B B TT F F F F F F F F F FF F F F F F F F F F F F F F F F F F F*F A A Z ZZZZ ZZ Z Z ZZ ZZ ZZ FFA A A A A A A A A A A A AA ZZ z z 1 2 1 2 2 2 3 4 5 6 6 7 8 9 1I1 1 2 2 2 2 2 2 2 3 3 3 3 4 4 5 5 SYSTEMS alb c I0 a 1 11 a b c d e f g a b c d alb alb REMARKS a + + +

INSTRUMENTATION

a. REACTIVITY BI B1 Al Al B1 Al B1 Al 1iB1 B 1 Al-NI-i1 Bl-NI-12
b. RC OUTLET B, A, A, A, A, B, B, N, A=TE-958 B-TE-960 TEMPERATURE B N N N B N B N N N B A,B A,B N-RC4A/B-TEI/4 C. RC INLET B, A, A, A, A, B, B, B, A=TE-959 B-TE-961 TEMPERATURE B NiN N B N B N N N N A,B A,B N=RC5A/B-TE2/4
d. RC PRESSURE RS RS A-RC3A-PT3 RS-PT-963(RSD ONLY)

B B A A B A B A B B B B B-PT-949

e. RC LEVEL B=LT-777 W/RC2-TE2 (TEMP. COMPENSATED) 8 , N B N B N B B 8 IN-RCl-LT I ORP3 W/RC2-TE1
f. SG-A LEVEL A-LT-775 B B A A B A B A B IBLT-789
g. SG-B LEVEL A=LT-788 B B A A B A B A B B B B=LT-776
h. SG-A PRESSURE N, A, A, B A-PT-950 B-PT-1180 B B B N B N IN A A N=SP6A-PTl/2 B&N ARE NOT ON RSD
i. SG-B PRESSURE B A A A B-PT-951 A-PT-1l84 B N N N B N B N B B N-SP6B-PTl/2 A&N ARE NOTON RSD
3. DH FLOW B1 Al 8181 Al Al B1 A1 Bl 1BlIB11 Al=DPT-802 Bi-DPT-803
k. DH OUTLET A-DH2-TEl TEMPERATURE B A XX KB AXAKA 8B I B-DH2-TE2 I. DH INLET A=DH6-TEl TEMPERATURE B A X X KxB A X A KXJA1B 88 1 B-DH6-TE2
m. CST LEVEL A-LT-1060/LT-1062 A A B B A 1B L L L B=LT-1061/LT-1063; L-LOCAL
n. BWST LEVEL Al B1 B1 81 - Al B1 Al B1 Al81 B B1 B1 B1 81 A1-LT-808 BI=LT-809
a. EFW FLOW (SG-A) 8-FT-788 NOT ABSOLUTELY REQUIRED B B C C B C B X B C-FT-779
p. EFW FLOW (SO-B) B=FT-782 NOT ABSOLUTELY REQUIRED SBB C C B C B X B C-FT-791 LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN 6 - AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-IB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-0.4/Rev. 18

Kq2 V ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5a AAAAAAAA AAA AAAAAAAC C C C C C C CCCCC CC B BSBB B B B B B B BB B B B I IB B B B B B B B B B B B SBBB T T F F F F F F FF F F F FFFFF F F F F F F F F F F F F FF FF AAZZ Z ZZiZ Z Z Z Z ZZZZZFFA A A A A A A A AA A A AA ZZ ZZ 12122234 5 6 6 7 8 91 1 1 2 2 2 2 2 2 2 33 3 3 4455 SYSTEMS a blc a 0I 111 a b c d e f g a b c d a b a b REMARKS a II + -+

AUXILIARY ELECTRICAL POWER

a. AC SOURCE DIESEL GENERATOR B B A B BABA BA BB B 4160 V SWGR B B A A B A B A BA B B B 480 SWGR @ CONTROL BLDG B B A A B A B A B A B B B 480 V SWGR @ SCREEN HOUSE A BA B B A A BJA B A B A B B B 480 V "ES" MCC B B A A B A B AISBA IS B B B, A, B, B, A, B, B, A, B, C, B, B, B, 480 V "ESV" MCC C C C C C C A CIA C C C AICIC C 480 V MCC @ SCREEN HOUSEAB A B B A A B A B A B AISB IB B, B, A,C B A,C A=VBA, B=VBB, C=VBC, D-VBD 120/240 V DP D D N D N N-ATA AND ATB
b. DC SOURCE B, B, A, A, B, A, B, A, INVERTER D D C,N C,N D C,N 0 C,N N-EH-INV-IE B, B, A, B, A, B, A, BATTERY CHARGER D D C D C IDC A, A, B, A, MAIN PANEL B B B B A C C ES DIST PNL @

CONTROL BLDG BB A B A ES DIST PNL @ DG BLDG B B A B A LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN

- AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-lB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-v-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-0.5/Rev. 18

I ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET lb DLD FFF FFF FiI I II I 11 11 IIRR R RI R R R R T GG HH H HH H BBB B BB B B S S S S BB B BBB B B PrP P P FF F F F F F F F F F F F F F F H H H H F F F F F F F F AA Z ZZZZZ ZZZZ Z ZZZ ZZ ZZZZZZZA 8F F F F i 12 1 2 3 4 5 6 1 2 3 4 5 678 A Z Z Z1 1 1 1 1 2 3 1 COMPONENTS AND CIRCUITS a2b c dle REMARKS 21213 RC INVENTORY CONTROL MAKEUP PUMP B AC B AC AC B AC AC AC C C AC A-MU-P-lA, B=MU-P-IC, C-MU-P-IB MU RECIRC VALVES MU SUPPLY/DISCH VLVS CORRESP. TO MU PUMP MU PUMP TRIP & RESTART RECIRC. LINE MUST BE OPENED BEFORE RESTARTING PUMP LETDOWN N MM MM M M M M M MIM NM- M M MiM M MM PREVENT UNCONTROLLED LD 1 1 F 1 1 11 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1-MU-V-3,2-MU-V-2A/B,3-MU-V-4/5 BLEEDOFF THRU RC VENTS RC-V-28 AND 44; OR RC-V-40A AND 41A; OR RC-V-40B AND 41B; OR x x x KxRC-V-29 AND 43 RC PRESSURE CONTROL PRESSURIZER HEATERS B A I X MAKEUP PUMP B AC B AC AC B AC AC - AC C C AC A=MU-P-lA, B-MU-P-1C, C-MU-P-IB LETDOWN 'mm M IMM M M m m M M M M M MMMm M mMM PORV PROTECTION 1 1 212 I-RC-Rv-2, 2-RC-V-2 RAPID DEPRESS.BA-RC-V-I, B=RC-V-3, T-TRIP RC PROTECTION BA T A A B A A A I IT TT TBA INOTE 5 SPRAY LINE - PRESSURE CONTROL M NMM MM M Mi I RC-V-4 RC PUMP TRIP CAPABILITY x RC P SEAL COOLING SEAL INJECTION x K RD 0 0 D THERMAL BARRIER COOLING20 Mi RS RSOM MM M M NNN RC TRIP TlT T NOTE 4 LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS US RS - REMOTE SHUTDOWN O - AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-IB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES
5. IN CB-FA-1, RCP's CAN BE TRIPPED FROM THE 6900 V SWGR IF TRIP CAPABILITY FROM C.R. IS LOST 003/002 T3-O.6/Rev. 18

<2 K\->

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 2b D D F F F F F F I I1 I I III I I I I I R RRR R RR T G G H HH H HH B B B B B B B S S S SB B B BB BB P P pPP F FF F F F FFF F F F F F FF FF H H H H FFF F F F F A AZ Z Z Z ZZZ Z Z Z Z Z Z ZZ Z Z ZZZ A FFFF 1 2 1 2 3 4 56 1 2 3 4 56 78 AZ ZZ 1 11 11231 COMPONENTS AND CIRCUITS ab c dle REMARKS 2123 DECAY HEAT REMOVAL EMERGENCY FEEDWATER TURBINE S S X M S SMIS EMERGENCY FEEDWATER MOTOR B A X A A A HSPS x x rXX X X X x X X X X X MAIN FEEDWATER OVER- T-TRIP TURBINE FROM C.R.

FEEDING T T T T TT T T T T T T M V-CLOSE VALVES FROM C.R.

M=SIMULTANEOUS ACTION (NOTE 2)

HPI COOLING 0 - 01 MAIN STEAM EXHAUST M M MM M M M M M DUMP TO CODE SAFETY VALVES FIRST STEAM DUMP TO CONDENSER I-MS-V-3A, 3B, 3C 3D, 3E, 3F 1 1 11 11 1 1 2 2-MS-V-8A, 8B MAIN STEAM SUPPLY TO EFWNx X X M X X M x D.H. REMOVAL COLD SHUT- AVAILABLE AFTER MANUAL ALIGNMENT DOWN B A B A rB A A A BAOF VALVES SUPPORT SYSTEM INTERMEDIATE COOLING B A B A B A r - A PUMP IC VALVES RS M TM IC-V-lA, I1, 2, 3, 4 LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN

- AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J -AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-lB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-O.7/Rev. 18

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 3b D D F F F F F F IFI I I III I1 I RRR RRRRT G G H H HH HH B B B B BB BB S S S S B B B B SBBB P PPP FFF F F F FFF F F F F F F FF HH H H F F F F F F F F A AZ Z ZZ Z Z Z Z Z Z ZZ ZZ ZZ Z ZZ Z Z A FFFFF 12 123456 1 2 3 4 56 78 AZ Z Z 1 1 1 1 1231 COMPONENTS AND CIRCUITS aIb c de REMARKS ISPH VENTILATION B A X A A B I AA A A .I XX A NUC SERV CLOSED CYCLE COOLING BC AC B A B AC AC AC AC A-NS-P-1A, B=NS-P-1C, C-NS-P-1B NUC SERV RIVER WATER BC AC B_ AC A BC -I-AC AC AC B A A AINS-P-IA, B=NR-P-IC, CNR-P-B NR VALVES M M M HII-M M M M M NR-V-15A, 15B, 18 DECAY HEAT CLOSED CYCLE B A B A A B A A A BA A DECAY HEAT RIVER WATER BA B A A B AAA RJR A INSTRUMENT AIR COMPRESSOR B A A X A X B X COPPER AIR LINES/FITTINGS X XX XX X XX XXX_

XXXX X X 2 HR. BACKUP AIR X -X X LEGEND 1+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN 0 - AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M AVAILABLE - MANUAL OPERATION DB - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: I. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-lB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-0.8/Rev. 18

K>

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 4b D DEF FFF FF I I I I I I I I I I I I R R R R R R R T Y G GHH H HM H H B B P B B B B B S S S SBB B B B B B BSA PP P P R FFFF F F FFF F F FFFFF F F F H H H F F F F F F F F D AAZ Z ZZ Z Z ZZZZZZZ Z FZ FFZZ Z Z Z Z Z A 2 12 3 4 5 6 1 2 3 4 5 6 7 8 A Z Z Z 1i1 1 1 1 2 3 1 COMPONENTS AND CIRCUITS a1b c d e REMARKS 12123 INSTRUMENTATION

a. REACTIVITY BIIAl Al Al 51 Al-NI-11 l - I B1=NI-12
b. RC OUTLET B B, B, A-TE-958 B=TE-960 TEMPERATURE N NIN B N B N=RC4A/B-TE2/4
c. RC INLET B, B, B, A, B, B, A=TE-959 B=TE-961 TEMPERATURE N N N B N B N N N=RC5A/B-TE2/4
d. RC PRESSURE A=RC3A-PT3 RS-PT-963(RSD ONLY)

A__ _1 BIB B B ILIBBB=PT-949

e. RC LEVEL B-LT-777 W/RC2-TE2 (TEMP. COMPENSATED) N N N N N M N=RCI-LT1 OR 3 W/RC2-TEI OR RC2-TE2
f. SG-A LEVEL A-LT-775 A A A B=LT-789
g. SG-B LEVEL A=LT-788 B B EB=LT-776
h. SG-A PRESSURE A -A A=PT-950 B=PT-1180 NIN A A A N-SP6A-PT1/2 B&N ARE NOT ON RSD
1. SG-B PRESSURE B B B B=PT-951 A-PT-1184 N N N B B N=SP6B-PTl/2 A&N ARE NOT ON RSD
i. DH FLOW AI=DPT-802 BI=DPT-803
k. DH OUTLET A=DH2-TE1 TEMPERATURE xAI xBI IB=DH2-TE2
1. DH INLET A=DH6-TE1 TEMPERATURE X A X B B-DH6-TE2
m. CST LEVEL A=LT-1060/LT-1062 L II LS BL L I B=LT-1o61/LT-1063 L-LOCAL
n. BWST LEVEL BI BI Al-LT-808 B1-LT-809 L=LOCAL
o. EFW FLOW (SG-A) B=FT-788 NOT ABSOLUTELY REQUIRED x XC=FT-779
p. EFW FLOW (SG-B) B=FT-782 NOT ABSOLUTELY REQUIRED B Xi X C=FT-791 LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN O - AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3 IN CB-FA-3d AND CB-FA-4b, MU-P-lB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-0.9/Rev. 18

K>

ATTACHMENT 3-0 SYSTEM AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE SHEET 5b D FF FFFF I I I I I I I I I I I I IRRRR RRRT G G HM HHHH H BBB B BB B BBS S SS B B BB B B BB PPpP p F F FFF FFF FF F F FF F F FHHHH F FFF FFFF AA Z ZZ ZZZZ ZZ ZZZ ZZ ZZ Z ZZZZZZZA F F F F!

1212 34 56 123 4 56 7 8 8 A Z Z Z l11 1 1I2 3 1 COMPONENTS AND CIRCUITS a aIb cldle REMARKS

_______________2123 AUXILIARY ELECTRICAL POWER

a. AC SOURCE DIESEL GENERATOR B A A A A A 4160 V SWGR B A A A A A 480 SWGR @ CONTROL BLDG B A A A A A 480 V SWGR @ SCREEN HOUSE B A BA A B A A A BA A 480 V "ES" MCC BA A A A A 480 V "ESV" MCC BC AC B AC BC AC AC AC AC 480 V MCC @ SCREEN HOUSE B A BA AB A A A BA A N-ATA AND ATB; A-VBA, B-VBB, 120/240 V DP V-VBC, D=VBD
b. DC SOURCE INVERTER N=EH-INV-lE BATTERY CHARGER MAIN PANEL ES DIST PNL @

CONTROL BLDG ES DIST PNL @ DG BLDG B A LEGEND

+ - AREA WHERE REMOTE SHUTDOWN SYSTEM IS USED RS - REMOTE SHUTDOWN 6 AVAILABLE - MUST BE USED A - "A" TRAIN X - NOT AVAILABLE B - "B" TRAIN S - SUPPORT NOT AVAILABLE C - "C" TRAIN M - AVAILABLE - MANUAL OPERATION D0 - "D" TRAIN O - AVAILABLE - OPEN BREAKER OR SWITCHES NOTES: 1. BLANK SPACE - ALL REDUNDANT COMPONENTS AVAILABLE (FOR SYSTEM)

- - ONE OR OTHER IS AVAILABLE COMPONENTS); OR, SYSTEM AVAILABLE (FOR FUNCTION)

J - AVAILABLE - CUT & JUMPER PROCEDURE 2. TRIP FEEDWATER PUMP AND CLOSE FEEDWATER VALVES FROM C.R.

F - SIMULTANEOUS ACTION - ONE WILL BE AVAILABLE 3. IN CB-FA-3d AND CB-FA-4b, MU-P-lB WILL BE AVAILABLE AFTER MANUALLY CLOSING NS-V-32

4. TRIP RC PUMPS, IF THERMAL BARRIER COOLING CANNOT BE REESTABLISHED WITHIN 10 MINUTES 003/002 T3-0.10/Rev. 18

Ku Building Auxiliary Fire Zone AB-FZ-3 TMI UNIT 1 APPENDIX "R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-P-iC Makeup and ME 7 PWR Wrap existing tray 751 with one hour rated fire barrier Purification Pump No. 1AXC-FB04.

MU-V-37 Makeup Pump Recircu- CR 232A CONT Install new cable and conduit wrapped with one hour rated Addition to FHAR Rev. 7. This new lation Isolation fire barrier No. 1AXC-FB09 to Splice Box S14 cable for MU-V-37 is protected to Valve in FH-FZ-i. ensure minimum flow path for the makeup pump MU-p-Ic.

Attachment 3-1, SH. I FHAR Rev. 18 003/002 T3-1.1

K>/

Building Auxiliary Fire Zone AB-FZ-4 TMI UNIT 1 APPENDIX "R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-V-14A Makeup Suction CG 102 PWR Repower MU-V-14A (from IA-ES-MCC). Addition to FHAR Rev. 7. MU-V-14A Isolation Valve is protected to prevent suction Spare existing cable CQ 14. Install new cable and con- loss. IC and NR components are duit. Wrap conduit in AB-FZ-4 with one hour rated fire also protected here for alternate barrier No. IAXC-FBO7.

  • RCP thermal barrier cooling.

CG 801 CONT Spare existing cable CQ 301. Install new cable and con duit. Wrap conduit in AB-FZ-4 with one hour rated fire barrier No. IAXC-FBO8.

  • MU-V-36 Makeup Pump Recirc CQ232 A CONT Sheathed Rockbestos Firezone R cable routed via existing CQ 232 in FEAR Rev. 7.

Isolation Valve trays 148 & 146 to wrapped Splice B NR-V-15A IC Cooler Outlet CR 572A CONT Install new cable and conduit wrapped with one hour rated Addition to FHAR Rev. 7. See Valve A fire barrier No. lAXC-FB06.

  • remarks for MU-V-14A.

NR-V-15B IC Cooler Outlet CR 582A CONT Same as CR 572A.

  • Addition to FEAR Rev. 7. See Valve B remarks for MU-V-14A.

RC-RV-2 Pressurizer Relief ED 523B CONT Sheathed Rockbestos Firezone R cable routed via existing ED 523 in FHAR Rev. 7.

Valve trays 146 & 147 to one hour rated wrapped penetration 317 Rockbestos cable in Penet. 317 is wrapped with fire barrier No. IAXC-FBO5.

IC-V-4 IC Return to RB RV29A CONT Sheathed Rockbestos Firezone R cable in existing tray Addition to FHAR Rev. 7. See Isolation Valve 178 and field run tray T-52-1 to Splice Box S-27 in remarks for MU-V-14A.

FH-FZ-I.

IC-V-3 IC Supply to RB RV 179 CONT Sheathed Rockbestos Firezone R cable routed via existing Addition to FHAR Rev. 7. See Isolation Valve trays T-52-22, 147 and 146 to wrapped Splice Box S-8 remarks for MU-V-14A.

in FH-FZ-l.

  • Portions of these envelopes are fire barriers rated Attachment 3-1, SH. 2 at 39 minutes, See Topical Report #094 for details. FHAR Rev. 20 003/002 T3-1.2

K>

Building Auxiliary Fire Zone AB-FZ-4 TMI UNIT 1 APPENDIX "R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-V-16A Emergency Makeup CQ 312A CONT Sheathed Rockbestos Firezone R cable in existing trays Addition to FHAR Rev. 7.

Valve 148 & 146 to Splice Box S-25 in FH-FZ-1. MU-V-16A, MU-V-16B and MU-V-17


--.....................................................- are protected to prevent over CQ 312B CONT Same as CQ 312A. filling of the RC pressurizer.

MU-v-16B Emergency Makeup CQ 322A CONT Same as CQ 312A. See remarks for MU-V-16A.

Valve .........................................................

CQ 322B CONT Same as CQ 312A.

IC-V-2 IC Fleturn from RB CR 364B CONT Sheathed Rockbestos Firezone R cable in existing trays See remarks for MU-V-14A.

Isolation Valve 154 & 155.

LT-808 RG 1.97 BWST Level RE 383 INST Install new cable in new conduit wrapped with one hour Addition to FHAR Rev. 9.

(Train A) rated fire barrier 1AXC-FB10.

Attachment 3-1, SH. 3 FHAR Rev. 18 003/002 T3-1.3

kJ Building Auxiliary Fire Zone AB-FZ-5 TMI UNIT 1 APPENDIX "R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS IC-P-lA Intermediate Cooling CG 83 PWR Reroute existing cable in new conduit. Wrap new conduit Pump A and existing tray 590 with one hour rated fire barrier No. 1AXC-FB01.

MU-V-37 Makeup Pump Recirc. CR 232A CONT Install new cable and new conduit wrapped with one hour CR 232 in FHAR Rev. 7.

Isolation Valve rated barrier No. IAXC-FBO3.

DH-V-6B Decay Heat Suction CR 262A CONT Same as CR 232A CR 262 in FHAR Rev. 7.

from RB Sump Valve LT-809 RG 1.97 BWST Level RE 384 INST Install new cable and new conduit wrapped with one hour (Train B) rated fire barrier No. 1AXC-FB02.

Attachment 3-1, SH. 4 FHAR Rev. 18 003/002 T3-1.4

K>

I Building Auxiliary Fire Zone AB-FZ-7 TMI UNIT 1 APPENDIX "R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS NS-P-lA Nuclear Service LP 6 PWR Reroute existing cable thru new conduit. Wrap new con- See PL 6A Cooling Pump IA duit, existing tray 590, and field tray T-54-28 with one hour rated fire barrier No. IAXD-FB02.

NS-P-IA Nuclear Service LP 6A PWR In 13R, a portion of circuit LP6 was replaced with new cable Cooling Pump 1A LP 6A to resolve ampacity derating per MD-D542-001. Fire barrier protection Installed as described for LP 6.

SModified In 13R under MD-D542-001.

NS-p-lC Nuclear Service LS 5 PWR Reroute existing cable thru new conduit. Wrap new con- Circuit LS 5 remains protected as Cooling Pump IC duit and field run tray T-54-31 with one hour rated fire described.

barrier No. IAXD-FB01.

Attachment 3-1, SH. 5 FHAR Rev. 20 003/002 T3-1.5

K>i Building Control Fire Zone CB-FA-1 TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT NO. FUNCTION DESCRIPTION OF WORK REMARKS COMPONENT COMPONENT FUNCTION EH-INV-lB Inverter 1B CH I PWR Remove from trays. Reroute existing cable in new fire wrapped conduit & wrap draped cable with fire barrier No. lCCD-FBll.

EH-INV-1D Inverter ID CH 2 PWR Remove existing cable and conduit. Route new cable in fire wrapped conduit & wrap draped cable with fire barrier No. ICCD-FBl4.

EH-BC-IB Battery Charger lB CH 3 PWR Remove from trays. Reroute existing cable in new fire wrapped conduit & wrap draped cable with fire barrier No. 1CCD-FBl2.*

EH-BC-iD Battery Charger 1D CH 4 PWR Remove from trays. Reroute existing cable in new fire wrapped conduit & wrap draped cable with fire barrier No. ICCD-FB13.

  • IC-P-lB Intermediate Cooling CH 61 A PWR Remove existing cable and install new cable through new In 13R, circuit CH 61 replaced with Pump B trays and existing trays. Wrap new trays with fire new cable CH 61A to resolve ampacit, barrier No. 1CCD-FB01* and draped calble with fire derating per MD-D542-001.

barrier No. ICCD-FB16.

CQ 232B CONT Install new cable from duct through wrapped conduit with CQ 232 in FHAR Rev. 7.

MU-V-36 Makeup Pump Recirc Isolation Valve fire barrier No. lCCD-FB03* through wrapped Splice Box S-6 with fire barrier No. 1CCD-FB05 and new wrapped conduit fire barrier No ICCD-FBO3*.

CS 262A CONT Install new cable from duct through wrapped conduit with CS 262 in FHAR Rev. 7.

RC-V-2 Pressurizer Relief Block Valve fire barrier No. 1CCD-FB03*, through wrapped Splice Box S-6 with fire barrier No. ICCD-FB05, and new wrapped conduit with fire barrier No. ICCD-FB04*.

Nuclear and IC Outlet CS 312A CONT Same as CS 262A. CS 312 in FEAR Rev. 7.

NR-V-18 Valve EG-DP-VBB lB 120V 19 Vital EA 2 PWR Wrap existing conduit and draped cable with fire AC Dist. Pnl. VBB barrier No. 1CCD-FB20*.

  • Portions or all of these envelopes are fire barriers rated at 39-50 minutes.

See Topical Report #094 for details.

Attachment 3-v, SM. 6 FEAR Rev. 20 I 003/002 T3-1.6

KJ Building Control Fire Zone CB-FA-l TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS COMPONENT EG-DP-VBD 1B 120V 19 Vital EA 4 PWR Wrap existing conduit and draped cable with fire AC Dist. Pnl. VBD barrier No. ICCD-FB19*.

EH-DP-lB 125/250V DC Main Dist. ED 52A PWR Wrap existing conduit and draped cable with fire Pnl lB barrier No. ICCD-FB21*.

ED 52B PWR Same as ED52A.

ED 55 PWR Wrap existing conduit and draped cable with fire barrier No. 1CCD-FB17*.

ED 56 PWR Wrap existing cable and draped cable with fire barrier No. ICCD-FBI8*.

EH-DPES-IF 125/250V D.C. Engd ED 60C PWR Remove existing cable and install new cable through Sfgds. Dist. Pnl. wrapped conduit with fire barrier No. 1CCD-FBl5.

ED 60D PWR Same as ED 60C.

7 Route new EE-SGES-IS 480V IS Engd. Sfgds. ED 30 A CONT Remove existing cable from existing trays.

Switchgear PWR cable through new fire wrapped trays with fire barrier No. 1CCD-FB01 and new fire wrapped conduit with fire barrier No. 1CCD-FBOB.

ED-SGES-lE 4160V IE Engd Sfgds. ED 309A CONT Remove existing cable from existing trays and conduit.

Switchgear PWR Route new cable through new fire wrapped conduit with fire barrier No. lCCD-FB10*. Wrap draped cable.

EH-DPESDG- ES DG B 125/250V D.C. ED 313 PWR Remove existing cable from existing trays. Reroute 1Q Dist. Pnl. lQ through new fire wrapped conduit with fire barrier No. lCCD-FB09*. Wrap draped cable.

Portions or all of these envelopes are fire barriers rated at 39-50 minutes. I See Topical Report #094 for details.

Attachment 3-1, SH. 7 FHAR Rev. 0 003/002 T3-1.7

K>

Building Control Fire Zone CB-FA-I TMI UNIT I APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS EE-SGESSH- 480V IT Engd. Sfgds. ED 5033 CONT Remove existing cable from existing trays to FH-FZ-2.

IT Screen House PWR Reroute through new fire wrapped trays with fire barrier Switchgear No. ICCD-FBOI* to wrapped Splice Box S-29 with fire barrier No. 1CCD-FB01*.

ED 5034 CONT Same as ED 5033.

PWR ED 5033A CONT New conventional cable from wrapped Splice Box S-29 to PWR new wrapped trays with fire barrier No. lCCD-FBO0 through new wrapped trays and wrapped conduit with fire barrier No. ICCD-FB08*. Wrap draped cable.

ED 5034A CONT Same as ED 5033A.

PWR EG-CCESV-1C 480V IC Engd. Sfgds. LP 5A PWR Wrap existing tray, conduit and draped cable with fire Valve MCC barrier No. 1CCD-FB02*.

LP 5B PWR Same as LP 5A.

DC-p-lB DH Closed Cycle LS 2 PWR Remove existing cable from existing trays to FH-FZ-2.

Pump B Reroute through new trays in FH-FZ-2 and new fire wrapped conduit with fire barrier No. ICCD-FB24*

In CB-FA-l. Wrap draped cable.

ED-CCESV- 480V iC Engd. Sfgds. LS 4A PWR Wrap existing conduit and draped cable with fire IC Valve MCC barrier No. ICCD-FB22*.

LS 4B PWR Same as LS4A.

In 13R, LS 5A replaced LS 5 to NS-P-IC NS Cooling Pump C LS 5A PWR Remove existing cable from existing trays to FH-FZ-2. resolve ampacity derating per Reroute through new trays in FH-FZ-2 and new fire MD-D542-001.

wrapped trays and conduit with fire barrier No. ICCD-FB01*

in CB-FA-I.

  • Portions or all of these envelopes are fire barriers rated at 39-50 minutes.

See Topical Report f094 for details.

I Attachment 3-1, SH. 8 FHAR Rev. 20 1 003/002 T3-1..8

K_>

Building Control IFire barrier wrap provided is rated one hour.

Zone CB-FA-l Fire TMI UNIT 1 APPENDIX 'R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS EG-CCESV- 480V 1B Engd. Sfgds. LS 7 PWR Same as LS5.

1B Valve MCC ED-SGES-lE 4160V IE Engd. Sfgds. ME 1 PWR Wrap existing tray 745 & Pull Box P38 with fire barrier Switchgear No. ICCD-FB09*.

ME 2 PWR Same as ME 1.

ME 28 CONT Wrap existing tray 126 and existing box P38 with fire barrier no. ICCD-FB09*.

EF-P-2B EF Motor Driven ME 4 PWR Same as ME 1.

Pump B EG-SGES-lS 480V IS Engd. Sfgds. ME 5 PWR Same as ME 1.

Switchgear IC-V-4 IC Supply to RB - RV 29 CONT Sheathed Rockbestos Firezone R cable in new fire wrapped Isolation Valve conduit with fire Barrier no. 1CCD-FB06*.

IC-v-3 IC Return from RB- RV 179A CONT Same as CQ 232B. RV 179 in FHAR Rev. 7.

Isolation Valve Portions or all of these envelopes are fire barriers rated at 39-50 minutes I See Topical Report #094 for details.

Attachment 3-1, SH. 9 FRAR Rev. 208 003/002 T3-1.9

K-'

I Building Control SFire Zone CD-FA-1 Fire barrier wrap provided is rated one hour.

TMI UNIT 1 APPENDIX "R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS EG-Y-IB Diesel Generator B RZ 1 CONT Same as ME 28.

RZ C-NT-Same-as.NE. 28...................................

RZ 2 CONT Same as ME 28.

RZ C-NT-Same-as--.. . . . .

28.. . . . . . . . . . . . . . .

RZ 3 CONT Same as ME 28.

RZ 14C-T.am-a-N. 2..........................................

RZ 8 CONT Same as ME 28.

RZ 13 CONT Same as ME 28.

RZ 33 CONT Same as NE 28.

RZ 14 CONT Same as ME 28.

RZ 15 CONT Same as ME 28.

RZ 53--T.am-a-M. 2..........................................

RZ 25 CONT Same as ME 28.

RZA2tcnONS Same as ME 28.

RZ CONT Same as ME 28. R3 RZ 33 CONT Same as ME 28.

RZ 34 CONT Same as ME 28.

RZ 53 CONT Same as ME 28.

RZ 55 CONT Same as ME 28.

Attachment 3-1, SH. 10 FHAR Rev. 18 003/002 T3-1.10

K>

Building Control rated ONE HOUR. Fire Zone CB-FA-2b TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-v-14A MU Pump Suction CG 802 CONT Wrap existing tray 143 with fire barrier No. ICCE-FBO2. Addition to FHAR Rev. 7. Rerouted Isolation Valve from cable needs protection in this BWST fire area.

CG 805 CONT Same as CG 802.

MU-V-16A Emergency Makeup CQ 313 CONT Same as CG 802. Addition to FHAR Rev. 7. MU-V-16A Valve A is protected to prevent over filling of the RC pressurizer.

MU-v-16B Emergency Makeup CQ 323 CONT Same as CG 802.

Valve B RC3A-PT3 RC Pressure Wide EA 105 CONT Same as CG 802.

Range PWR RS-SCC-A Remote Shutdown Signal EA 6822 INST Same as CG 802.

Cond. Cab. A PWR RC-RV-2 Pressurizer Relief ED 523C CONT Route cable in existing tray 143 which is wrapped with Addition to FHAR Rev. 8 Rerouted Valve fire barrier No. 1CCE-FB02. cable needs protection in this area.

DC-P-lA Decay Heat Closed Clg LP 23 CONT Same as CG 802.

Wtr Pp A DR-P-lA Decay Heat Riv Wtr LR 23 CONT Same as CG 802.

Pump A EE-SGES-lP 480V iP Engd. Sfgds. LX 32 CONT Same as CG 802.

Switchgear Attachment 3-1, SH. 11 FEAR Rev. 18 003/002 T3-1.11

K>

Building Control Fire Zone CB-FA-2b TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-P-lA Makeup and Purifica- MD 68 CONT Same as CG 802.

tion Pump A PT-950 Steam Gen. A RE 465 INST Reroute existing cable in new fire wrapped conduit Addition to FHAR Rev. 7. Re Pressure with fire barrier No. 1CCE-FB03 routed cable needs protection in this fire area.

RE 514 INST Same as RE 465 LT-775 Steam Gen. A Level RE 473 INST Same as RE 465. Addition to FHAR Rev. 7. Rerouted cable needs protection in this RE 510 INST Same as RE 465. fire area.

EG-Y-IA Diesel Generator A RY 4 CONT Same as CG 802.

RY 23 CONT Same as CG 802.

RS-TSP-A Remote Shutdown EA 6912 PWR Route new fire wrapped conduit with fire barrier Transfer Switch No. iCCE-FB09 Panel A NI-il RG 1.97 Full Range EA 19 PWR Same as CG 802 Addition to FHAR Rev. 9 Neutron Flux (Train A)

RS-SCC-A Remote Shutdown EA 339 PWR Install new cable in new conduit wrapped with fire Addition to FHAR Rev. 9 Signal Conditioning barrier ICCE-FBD0.

Cabinet A Attachment 3-1, SH. 12 FHAR Rev. 18 003/002 T3-1.12

KU Building Control GPU NUCLEAR Fire Zone CB-FA-2c TMI UNIT I APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

Originally installed as three hour.

CIRCUIT CIRCUIT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS COMONENT Steam Gen. A Pressure RE 465 INST Route existing cable in new fire wrapped conduit with Addition to FHAR Rev. 7. Rerouted PT-950 fire barrier No. 1CCE-FB03. cable needs protection in this


.---- -------------------- -------------------- ---------- ffireaarea RE 514 INST Same as RE 465.

Steam Gen. A Level RE 473 INST Same as RE 465. Addition to FHAR Rev. 7. Rerouted LT-775 cable needs protection in this fire area.

RE 510 INST Same as RE 465.

RS-TSP-A Remote Shutdown EA 6912 PWR Route new fire wrapped conduit with fire barrier Transfer Switch No. 1CCE-FB09.

Panel A Remote Shutdown EA 339 PWR Install new cable in new conduit wrapped with fire Addition to FHAR Rev. 9 RS-SCC-A Signal Conditioning barrier ICCE-FBIO.

Cabinet A Attachment 3-1, SH. 13 FRAR Rev. 18 003/002 T3-1.13

Building Control Fire Zone CB-FA-2d TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

Originally installed as three hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS IC-P-lB Intermediate Cooling CH 602 CONT Reroute existing cable in new fire wrapped conduit with Pump B fire barrier No. ICCE-FB04.

EG-SEC-IC 480V IC ESV MCC RU 283 CONT Replace existing conduit RU 282 with new fire wrapped Transfer Switch conduit with fire barrier No. 1CCE-FB06.

RU 284 CONT Same as RU 283.

RU 289 CONT Replace existing conduit RU 288 with new fire wrapped conduit with fire barrier No. ICCE-FBO5.

Attachment 3-1, SH. 14 FHAR Rev. 18 003/002 T3-1.14

K>

Building Control Fire Zone CB-FA-2e TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

Orlginally installed as three hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS NNI/ICS " NNI/ICS Cabinet EA 6041A CONT Remove existing cable from field run tray T-44-3 and PWR conduit. Route new cable through new fire wrapped conduit with fire barrier No. ICCE-FBO7.

Attachment 3-1, SH. 15 FHAR Rev. 18 003/002 T3-1.15

K-'

Building Control IFire rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

Zone CB-FA-2f TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS DR-V-IB D.H. River Wtr. CBF 361A CONT Wrap splice box S-16 and conduit stub with fire barrier CBF 365 in FHAR Rev. 7. The cable Discharge Valve B No. ICCE-FBQ8. is spliced within this fire area.

CBF 361B CONT Wrap 18" of Tray 137 and conduit stub with fire barrier No. ICCE-FB08.

MU-P-3C Main Oil Pump for CH 201A CONT Same as CBF 361A. CH 203 in FHAR Rev. 7. The cable MU-P-IC is spliced within this fire area.

CB 2018 CONT Same as CBF 361S.

IC-P-lB Intermediate Cooling CH 601 CONT Same as CBF 361B. The cable is spliced within this Pump B fire area.

CH 601A CONT Same as CBF 361A.

CH 603 CONT Same as CBF 361B. The cable is spliced within this fire area.

CH 603A CONT Same as CBF 361A.

MU-V-37 Makeup Pump Recirc. CR 232 CONT Same as CBF 361B. CR 235 in FHAR Rev. 7. The cable Isol. Valve - ------------------ --------------------------------------------------------- is spliced within this fire area.

CR 232E CONT Same as CSF 361A.

Attachment 3-1, SH. 16 FHAR Rev. 18 003/002 T3-I. 16

K-,'

Building Control Fire Zone CB-FA-2f TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-V-14B Makeup Pump B Suction CR 302C CONT Same as CBF 361A. CR 305 in FHAR Rev. 7. The cable Isolation Valve- --------- ------------------------------------------------------------------- is spliced within this fire area.

CR 302D CONT Same as CBF 361B.

MU-V-16C Emergency Makeup CR 312D CONT Same as CBF 361A. CR 314 in FHAR Rev. 7. The cable Valve---------- ------------------------------------------------------------------- is spliced within this fire area.

CR 312E CONT Same as CBF 361B.

MU-v-16D Emergency Makeup CR 322A CONT Same as CBF 361A. Addition to FHAR Rev. 7. MU-V-16D Valve D---------- ------------------------------------------------------------------- is protected to prevent overfilling CR 322B CONT Same as CBF 3618. of the pressurizer.

NR-v-15B IC Cooler Outlet CR 582 CONT Same as CBF 361B. CR 583 in FEAR Rev. 7. CR 583 is Valve---------- ------------------------------------------------------------------- deleted by design change. CR 582 CR 582B CONT Same as CBF 361A. is spliced within this fire area.

EE-SGES-1S 4BOV 1S Engd. Sfgds. LS 1i CONT a Same as CBF 361B. The cable is spliced within this Switchgear IND fire area.

LS 11A CONT & Same as CBF 361A.

IND EG-CCES-IB 480V lB Engd. Sfgds. LS 16 CONT 6 Same as CBF 3618. The cable is spliced within this MCC IND fire area.

LS 16A CONT a Same as CBF 361A.

IND Attachment 3-1, SH. 17 FHAR Rev. 18 003/002 T3-1.17

K>

Building Control Fire Zone CB-FA-2f TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS DC-P-lB Decay Heat Closed LS 21A CONT Same as CBF 361A. LS 24 in FHAR Rev. 7. The cable Cooling Water Pump B is spliced within this fire area.

LS 21B CONT Same as CBF 361B.

NS-P-IC Nuclear Service LS 26A CONT Same as CBF 361A. LS 39 in FHAR Rev. 7. The cable Cooling Pump IC is spliced within this fire area.

LS 268 CONT Same as CBF 361B.

EE-SGESSH- 480V IT ES Screen LT 11B CONT Same as CBF 361A. LT 14 in FHAR Rev. 7. The cable IT House Switchgear- --------- ------------------------------------------------------------------- is spliced within this fire area.

LT 1iC CONT Same as CBF 361B.

DR-p-IB Decay Heat River LT 21A CONT Same as CBF 361A. LT 21 in FHAR Rev. 7. The cable Water Pump B is spliced within this fire area.

LT 21B CONT Same as CBF 361B.

EG-CCESSH- 480V 1B Engd. Sfgd. LT 51B CONT & Same as CBF 361A. LT 53 in FHAR Rev. 7. The cable 1B Valves MCC IND is spliced within this fire area.

LT 51C CONT Same as CBF 361B.

IND Attachment 3-1, SH. 18 FHAR Rev. 18 003/002 T3-1.18

GPU NUCLEAR 1 Building Control Fire Zone CB-FA-2g TMI UNIT I APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS NNI/ICS NNI/ICS Cabinet EA 6041A CONT Remove existing conduit and cable. Reroute new fire PWR wrapped Conduit through CB-FA-2g with fire barrier No. 1CCE-FB07.

Attachment 3-1, SH. 19 FHAR Rev. 18 003/002 T3-1.19

K>

Building Control Fire Zone CB-FA-3a TMI UNIT 1 APPENDIX "R" CABLES I Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS NR-V-15A IC Cooler Outlet CR 572A CONT Route new cable in a new fire wrapped conduit with Addition to FEAR Rev. 7. Rerouted Valve A fire barrier No. 1CCG-FBOl. cable needs protection here.

NR-V-15B IC Cooler Outlet CR 582A CONT Same as CR 572A. Addition to FHAR Rev. 7. Rerouted Valve B cable needs protection here.

IC-V-4 IC Supply to RB RV 28 CONT Install new fire wrapped conduit through CB-FA-3a with Addition to FHAR Rev. 7. New route Isolation Valve fire barrier No. lCCG-FB05. of RV 28 needs protection here.

Attachment 3-1, SH. 20 FHAR Rev. 18 003/002 T3-1.20

<2 Building Control Fire Zone CB-FA-3a TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

COMPONENT COMPONENT FUNCTION DESCRIPTION OF WORK REMARKS EG-Y-1B Diesel Generator B Same as CR 572A. Addition to FHAR Rev. 7. Rerouted cable needs protection here.

Attachment 3-1, SH. 21 FMAR Rev. 18 003/002 T3-1.21

<2/

Building Control Fire Zone CB-FA-3b TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS EE-SGESSH- 480V iR Engd. Sfgds. LX 52 CONT Wrap existing conduit RP 71 with fire barrier No.

iR Screen House ICCG-FB02.

Switchgear EE-SGES-lP 480V lP Engd Sfgds. MD 57 AM Remove existing cable from existing tray and reroute in Switchgear INST new fire wrapped conduit with fire barrier No. 1CCG-FB03.

Attachment 3-1, SH. 22 FHAR Rev. 18 003/002 T3-1.22

K>/

I Building Control I Fire Zone CB-FA-3b TMI UNIT I APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour. Originally installed as 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS EE-SGESSH- 480V iR Engd. Sfgds. MD 87 AM Same as MD 57.

iR Screen House INST Switchgear RC3A-PT3 RC Pressure Wide Range RG 201 INST Wrap existing conduit with fire barrier no. 1CCG-FB04.

MU-V-20 RCP Seal Injection RV 343 CONT Reroute new fire wrapped conduit in CB-FA-3b with Addition to FHAR Rev. 7. New route Isolation Valve fire barrier No. 1CCG-FB05. of RV 343 needs protection here.

EG-Y-lA Diesel Generator A RY 5 CONT Same as LX 52.

RY 6 CONT Same as LX 52.

Attachment 3-1, SH. 23 FHAR Rev. 18 003/002 T3-1.23

K_>

Building Fuel Handling Fire Zone FH-FZ-l TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS NR-V-lC NR-P-lC Discharge CBF 151 CONT Existing cable through wrapped tray 150 with fire barrier Valve No. IFHC-FB03 and trays 165 & 166 with fire barrier No.

lFHC-FB02-.

CBF 154A CONT Same as CBF 151. CBF 154 in FHAR Rev. 7.

DR-V-lB D.H. River Water CBF 361 CONT Same as CBF 151.

Discharge Valve B .........................................................

CBF 364 CONT Same as CBF 151.

MU-p-3C Main Oil Pump for CH IIA PWR Remove existing cable and replace with new Rockbestos MU-P-IC Firezone R cable for entire route through tray 558 and field run tray T-52-14 in FH-FZ-l.

MU-V-36 Make-up Pump Recirc. CQ 232A CONT Sheathed Rockbestos Firezone R cable in existing tray CQ 232 in FHAR Rev. 7. The cable Isolation Valve 146 in FH-FZ-l to wrapped Splice Box S-8 with fire is spliced within this fire zone.

barrier No. lFHC-FB07*.

CQ 232B CONT New conventional cable from wrapped Splice Box S-8 with fire barrier No. lFHC-FB07* to duct bank in new wrapped conduit with fire barrier No. lFHC-FB07*.

MU-V-37 Make-up Pump Recirc. CR 232A CONT New conventional cable'in new wrapped conduit to wrapped CR 232 in FHAR Rev. 7. The cable Isolation Valve conduit to wrapped Splice Box S-14 with fire barrier is spliced within this fire zone.

No. 1FHC-FB12.

CR 232B CONT Unsheathed Rockbestos Firezone R cable in new conduit to tray 150 and sheathed Rockbestos Firezone R cable to wrapped*Splice Box S-24 with fire barrier No. 1FHC-FBl3*.

CR 232C CONT New conventional cable from wrapped Splice Box S-24 with fire barrier No. lFHC-FB3, through wrapped tray 150 with fire barrier No. lFHC-FB03 to duct bank.

MU-V-14B MU Pump Suction CR 302A CONT Sheathed Rockbestos Firezone R cable from wrapped Splice CR 302 in FHAR Rev. 7. The cable Isolation Valve from Box S-24 with fire barrier No. lFHC-FBl3* through existing is spliced within this fire zone.

BWST tray 150 in FH-FZ-I.

CR 302B CONT Same as CR232C.

Poton l f hseeveoe.aetiebrres.aeda r ..-Umiue.

  • PortSons or all of these envelopes are flre barrsers.rated at 39-50 minutes.

See Topical Report 094 for details. I, Attachment 3-1, SH. 24 FHAR Rev. 10 003/002 T3-1.24

K>i Building Fuel Handling Fire Zone FH-FZ-i TMI UNIT I APPENDIX "R" CABLES Fire barrier wrap provided Is rated one hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-v-16C Emergency Makeup CR 311A CONT Sheathed Rockbestos Firezone R cable in existing trays CR 311 in FHAR Rev. 7. The cable Valve C 150 & 164 in FH-FZ-l. is spliced within this fire zone.

CR 311B CONT Same as CR 311A.

CR 312A CONT Same as CR 302A. CR 312 in FHAR Rev. 7. The cable is spliced within this fire zone.

CR 312B CONT Same as CR 302A.

CR 312C CONT Same as CR 232C.

MU-V-16D Emergency Makeup CR 321A CONT Same as CR 311A. Addition to FHAR Rev. 7. MU-V-16D Valve D------------------- --------------------------------------------------------- is protected to prevent over CR 321B CONT Same as CR 311A. filling of the pressurizer. The cables are spliced within this CR 322C CONT Same as CR 302A. fire zone.

CR 322D CONT Same as CR 302A.

CR 322E CONT Same as CR 232C.

IC-V-2 IC Return to RB CR 362A CONT Same as CR 302A CR 362 in FHAR Rev. 7. The cable Isol. Valve---------- ------------------------------------------------------------------- is spliced within this fire zone.

CR 362B CONT Same as CR 232C.

CR 365A CONT Same as CR 302A. CR 365 in FHAR Rev. 7. The cable is spliced within this fire zone.

CR 365B CONT Same as CR 232C.

Attachment 3-1, SH. 25 FHAR Rev. 18 003/002 T3-1.25

I>

Building Fuel Handling Fire Zone FH-FZ-1 TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS 8

EE-SGESSH- 480V ES Screen Hse. ED 30 A CONT Wrap existing field run tray T-52-58, conduit, and box IT Swgr. IT PWR T 847 with fire barrier No. lFHC-FB05*.

ED 308B CONT Same-as ED 308A.

PWR RC-RV-2 Pressurizer Relief ED 523B CONT Same as CQ 232A ED 523 in FHAR Rev. 1. The cable ED 523C CONT New conventional cable from wrapped Splice Box S-8 in wrapped conduit to duct with fire barrier No. 1FHC FB07*.

EE-SGESSH- 480V ES Screen Hse. ED 5033 CONT Wrap existing conduit, draped cable and cable in tray IT Swgr. IT PWR 558 with fire barrier No. IFHC-FB05*.

ED 5034 CONT Same as ED 5033.

PWR EE-SGESSH- 480V IT ES Screen LT 11 CONT C Same as CBF 151.

IT Hse Swgr. IND LT 12 CONT Same as CBF 151.

LX 61 CONT Same as CBF 151.

I

~

  • Prtons *of these See Toical Rport envelopes o forrare 094 fire td ils. barriers rated deta- tIQýnmiit at 39-50 minutes.

See Topical Report #094 details.

I Attachment 3-1, SH. 26 FHAR Rev. 20 1 003/002 T3-1.26

<q_2 Building Fuel Handling Fire Zone FJ--FZ-l Fire barrier wrap provided is rated one hour.

TMI UNIT 1 APPENDIX "R" CABLES CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS NR-p-IC Nuclear Service River LT 16 CONT Same as CBF 151.

Water Pump C .........................................................

LT 19 CONT Same as CBF 151.

LT 33A CONT Same as CBF 151. LT 33 in FHAR Rev. 7.

DR-P-IB Decay Heat River LT 21 CONT & Same as CBF 151.

Water Pump B IND LT 24 CONT Same as CBF 151.

EG-CCESSH- 480V 1B Engd. Sfgds. LT 51 CONT & Same as CBF 151.

IB Screen House MCC IND MU-P-iC Make-up Pump C ME 7 PWR Wrap the entire length of cable in tray No. 751 in FH-FZ-i with fire barrier No. lFHC-FB01.

EE-SGESSH- 480V iT Engd. Sfgds. ME 11 PWR Wrap the entire length of tray 756 in FH-FZ-i with fire IT Screen House Swgr. barrier no. 1FHC-FB04.

SP6A-PT1 Steam Gen. A. Outlet RE 109 INST Cut and reroute existing cable from Embd. ducts to fire The cable is spliced within this Pressure wrapped conduit and Splice Box S-1l with fire barrier fire zone.

No. 1FHC-FB1D.

RE 109B INST Sheathed Rockbestos Firezone R cable from wrapped Splice Box S-li with fire barrier No. IFHC-FBi0 through existing trays 842 & 843 to wrapped penetration 313 with fire barrier No. IFHC-FBI7.

Attachment 3-1, SH. 27 FHAR Rev. 18 003/002 T3-1.27

<2 <-I Building Fuel Handling Fire Zone FH-FZ-I THI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS SP6B-PT1 Steam Gen. B. Outlet RE 110 INST Wrap existing trays 840 & 841 and Pent. 205 with fire Pressure barrier No. 1FHC-FB06 & lFHC-FB15.

SP6A-PT2 Steam Gen. A. Outlet RE 111 INST Same as RE 110.

Pressure 6

SP B-PT2 Steam Gen. B. Outlet RE 112 INST Same as RE 109. The cable is spliced within this Pressure fire zone.

RE 112B INST Same as RE 109D RCl-LT3 Pressurizer Level RE 158 INST Same as RE 110.

"(Temp. Comp.)

RC4A-TEl RC Outlet Temp. Wide RE 170 INST Cut and reroute existing cable through new fire wrapped The cable is spliced within this Range conduit from Splice Box S-9 to Embd. ducts. Wrap box fire zone.

with fire barrier No.IFHC-FB08.

RE 170B INST Sheathed Rockbestos Firezone R cable from wrapped Splice Box S9 with fire barrier 1FHC-FB08 through existing trays 837, 838 & 839 to wrapped penetration 204 with fire barrier No. lFHC-FB16.

RC5A-TE2 RC Inlet Temp. Wide RE 178 INST Same as RE 109. The cable is spliced within this Range---------- ------------------------------------------------------------------- fire zone.

RE 178B INST Same as RE 109B.

Attachment 3-1, SH. 28 FMAR Rev. 18 003/002 T3-1.28

K>1 Building Fuel Handling Fire Zone FH-FZ-l TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS RC5A-TE4 RC Inlet Temp. Wide RE 180 INST Cut and reroute existing cable through new fire wrapped The cable is spliced within this Range conduit from Splice Box S-12 to Embd. ducts. Wrap box fire zone.

with fire barrier No. 1FHC FBl1.

RE 180B INST Sheathed Rockbestos Firezone R cable from wrapped Splice Box S12 with fire barrier No 1FHC-FBl1 through existing trays 844 & 845 to wrapped penetration 314 with fire barrier No. IFHC-FB8.

PT-950 Steam Gen. A. RE 465 INST Same as RE 170. The cable is spliced within this Pressure Train A fire zone.

RE 465B INST Same as RE 170B.

PT-951 Steam Gen. B. RE 467 INST Same as RE 110.

Pressure Train B LT-775 Steam Gen. A. Level RE 473 INST Same as RE 170. The cable is spliced within this (Full Range - Train A) fire zone.

RE 473B INST Same as RE 170B.

LT-776 Steam Gen. B. Level RE 479 INST Same as RE 110.

(Full Range - Train B)

RC2-TE2 Pressurizer Temp. RE 495 INST Same as RE 110.

RC3A-PT1 RC Pressure Narrow RG 18 INST Same as RE 170. The cable is spliced within this Range fire zone.

RG 18B INST Same as RE 170B.

Attachment 3-1, SH. 29 FHAR Rev. 18 003/002 T3-1.29

<2 Building Fuel Handling Fire Zone FH-FZ-1 TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS RC3A-PT3 RC Pressure Wide RG 201 INST Same as RE 170. The cable is spliced within this Range (Loop A) fire zone.

RG 201B INST Same as RE 170S.

MU-P-IC Makeup Pump C RK 953 CONT Same as CR 232C The cable is spliced within this fire zone.

RK 953A CONT Same as CR 302A.

EF-v-30B EF Train B Control RL 56 INST Cut and reroute existing cable through new fire wrapped The cable is spliced within this Valve to Steam Gen. A conduit from Embd. ducts to Splice Box S-10. Wrap box fire zone.

and conduit with fire barrier No. 1FHC-FB09.

RL 56A INST Sheathed Rockbestos Firezone R cable in new conduit and existing trays 1008 & 1009 through FH-FZ-1.

EF-V-30D EF Train B Control RL 57 INST Same as RL 56. The cable is spliced within this Valve to Steam Gen. B fire zone.

L 57A INST Same as RL 56A.

IC-V-4 IC Supply to RB Isol. RV 29 CONT Sheathed Rockbestos Firezone R cable in new conduit from Valve Embd. duct through existing trays 169 & 170 to wrapped Splice Box S27 with fire barrier No. 1FHC-FB19.

RV29A CONT Sheathed Rockbestos Firezone R cable from wrapped Splice Box S27 with fire barrier No. lFHiC-FB19 to existing tray 170 in FH-FZ-l.

IC-V-3 IC supply to RB Isol. RV 179 CONT Same as CQ 232A. The cable is spliced within this Valve- -------------- --------------------------------------------------------- fire zone.

RV 179A CONT Same as CQ 232B.

LT-809 RG 1.97 BWST Level RE 384 INST Install fire barrier (lFHC-FB20) on conduit RE 384. Cable Addition to FHAR Rev. 9 (Train B) is already routed through fire wrapped trays 840 and 841 (lFHC-FB06).

NI-12 RG 1.97 Full Range RG 441 INST Install new cable to existing fire wapped pent. 201 Addition to EHAR Rev. 9 Neutron Flux (IFHC-FB14) and tray 841 (lFHC-FB06) and new conduit (Train B) RG 441 wrapped with fire barrier (lFHC-FB21).

Attachment 3-1, SH. 30 FHAR Rev. 18 003/002 T3-1.30

K>

Building Fuel Handling Fire Zone FH-FZ-2 TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-V-37 Makeup Pump Recirc. CR 232C CONT Install new cable and new fire wrapped conduit with CR 232 in FHAR Rev. 7.

Isolation Valve fire barrier No. ICCD-FB23.

DH-V-6B RB Sump to DH Pump B CR 262A CONT Same as CR232C. Addition to FRAR Rev. 7. DH-V-6B Isol. Valve must be protected because the time to manually operate DH-V-5B will exceed the requirements since the valve is not accessible until the fire in this zone is extinguished.

IC-V-2 IC Return from RB CR 362B CONT Same as CR 232C. CR 362 in FHAR Rev. 7.

Isol. Valve CR 365B CONT Same as CR 232C. CR 365 in FHAR Rev. 7.

Attachment 3-1, SH. 31 FHAR Rev. 18 003/002 T3-1.31

K-'

Building Fuel Handling Fire Zone FH-FZ-5 TMI UNIT 1 APPENDIX "R" CABLES Fire barrier wrap provided is rated three hours.

CIRCUIT CIRCUIT COMPONENT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS MU-V-37 Makeup Pump Recirc. CR 232C CONT Install new cable and new fire wrapped conduit with CR 232 in FHAR Rev. 7 Isolation Valve fire barrier No. iCCE-FB01.

IC-V-2 IC Return from RB CR 362B CONT Same as 232C. CR 362 in FHAR Rev. 7 Isolation Valve CR 365B CONT Same as 232C. CR 365 in FHAR Rev. 7 Attachment 3-1, Sh. 32 FHAR Rev. 18 003/002 T3-1.32

K>I Building Fuel Handling Fire Zone FH-FZ-6 TMI UNIT 1 APPENDIX R" CABLES Fire barrier wrap provided is rated one hour CIRCUIT CIRCUIT COMPONENT NO. FUNCTION COMPONENT FUNCTION DESCRIPTION OF WORK REMARKS Install new cable in fire wrapped electrical duct 3221 with fire barrier MU-V-36 MU Pumps Recirc. No lCCC-FB01*.

Isol. Valve CQ 232B CONT CQ 232 In FHAR Rev. 7 RC-V-2 Pressurizer Relief CS 262A CONT Same as CQ 232B. CS 262 in FHAR Rev. 7 Block Valve MR-V-16 Nuclear Va&IC Cooler CS 312A CONT Same as CQ 232B. CS 312 in FHAR Rev. 7 Outlet Vave PT-950 Steam Gen A Pressure RE 465 INST Wrap Electrical duct 3301 with fire barrier No. 1CCC-FB03 (Train A)

Steam LT-775 (Wide Gen.

Range ATrain Level A) RE 473 INST Same as RE 465 IC-V-4 IC Supply to RB RV 29 CONT Install new cable in fire wrapped electrical duct 3257 with fire barrier Isolation Valve No. ICCC-FB02*.

IC-V-3 ICo Returnv from RB RV 179A CONT Same as CQ 232B. RV 179 in FHAR Rev. 7 Iso1. Valve EG-CCESV- 480 iC Engd. Sfgds. LP 5A PWR Wrap electrical duct 3253 with fire barrier No. ICCC-FB04*.

lC Valve MCC LP 5b PWR Wrap electrical duct 3254 with tire barrier No. lCCC-FB05*. Addition to FHAR Rev. 7 R-N1.97 Full Range Install new cable in fire wrapped electrical duct 3223 with fire barrier NI-11 Neutron Flux (Train EA 19 PWR Addition to FNAR Rev. 9 A) No. ICCC-FB07*.

NI-i RG 1.97 Flux Neutron DillRag (Train RG 342 INST Install new cable in fire wrapped electrical duct 3306 with fire barrier A)N l nINNo. 1CCC-FB06* Addition to FHAR Rev. 9

  • Portions of these barriers are rated at 50 minutes. See Topical Report #094 for details.

Attachment 3-1, Sh. 33 I

FHAR Rev. 20 003/002 T3-1.33

K_'

building Intake Screen Pumphouse Fire Zone ISPH-FZ-l TMI UNIT 1 APPENDIX "R" CABLES Fire Barrier wrap provided is rated one hour COMPONENT COMPONENT FUNCTION CIRCUIT CIRCUIT DESCRIPTION OF WORK REMARKS NO. FUNCTION NR-V-lC NR-P-IC Discharge CBF 151 CONT & Cut and reroute existing cable thru new wrapped conduit to wrapped CBF 151 in FHAR Rev. 7. This Valve IND Splice Box S-1 with fire barrier No ISHD-FB01*. cable is spliced within this CeNT & Sheathed Rockbestos firezone R cable from Splice Box S-1 with fire fire zone.

CBF 151A IND barrier No. 1SHD-FB01* to new conduit, to existing Trays 511, 114 and 115 and to switchgear.

CBF 154 CeNT Same as CBF 151 (New Remote Shutdown Circuit) CBF 154is inspliced cable FHAR Rev. 7. This within this fire zone.

CEF 154A CONT Same as CBF 151A (New Remote Shutdown Circuit)

EE- 480V IT Engd. ED308A CONT PWR Cut and reroute exist, cable to Spicie Box S-2. Cable and box are ED 308A in FHAR Rev. 7. This SGESSH-IT Sfgds. Screenhouse wrapped with fire barrier No. ISHD-FBO2. cable is spliced within this Switchgear Sheathed Rockbestos Firezone R cable from Spicie Box S-2 with fire fire zone.

ED308C CONT PWR barrier No. ISHD-F02 to new conduit to existing trays 511 and 512 and to switchgear.

ED308B CONT PWR Same as ED308A ED308B in FHAR Rev. 7. This cable is spliced within this ED308D CONT PWR Same as ED308C fire zone.

LT 11 in Rev. within

7. This LT11 CeNT IND & Same as CNF 151 cable is FHAR spliced this LT1A CeNT IND Same as CBF 151A fire zone.

39-50 minutes. See Topical Report f094 for details.

Attachment 3-1, Sh. 34 FMAR Rev. 20 003/002 T3-1.34

K-'

Building Intake Screen Pumphouse Fire Zone ISPH-FZ-1 TMI UNIT I APPENDIX "R" CABLES Fire Barrier wrap provided is rated one hour COMPONENT COMPONENT FUNCTION CIRCUIT CIRCUIT DESCRIPTION OF WORK REMARKS NO FUNCTION EE- 480V IT Engd. CONT Same as CBF 151. LT 12 in FHAR Rev. 7. This SGESSH-lT Sfgds. Screenhouse LT12 cable Is spliced within this (Cont'd) Switchgear CONT Same as CBF 151A. fire zone.

LTI2A CN aea E 5A CONT Same as CBF 151 LX 61 in FHAR Rev. 7. This LX61 cable is spliced withLn this fire zone.

LX61A CONT Same as CBF 151A NE11 PWR Wrap cable in tray 735 736 with fire barrier No. lSHD-FB05*.

NR-P-lC Nuclear Service LT 16 in FHAR Rev. 7. This River Water Pump C LT6 CO. Same as CBF 151 cable is spliced within this fire zone.

LT16A CONT Same as CBF 151A

  • Portions of this envelope are rated at 39 minutes. See Topical Report 1094 for details.

Attachment 3-i, Sh. 35 FHAR Rev. 10 003/002 T3-1.35

KU TMI UNIT 1 APPENDIX "R" CABLES Building Intake Screen Pumphouse Fire Zone ISPH-FZ-i Fire barrier wrap provided is rated one hour.

CIRCUIT CIRCUIT CC4MPONENT COMPONENT FUNCTION NO. FUNCTION I DESCRIPTION OF WORK REMARKS 4 i4 I 4~ I- . I'l1- - 1 I

NR-P-IC Nuclear Service River LR 18 CONT I Unsheathed Rockbestos Firezone R cable routed in conduit.

(Cont'd) Water Pump C I Replace LRI8 & LT17 with a single 7/c-1/2 Rockbestos Firezone R cable See ISPH-FZ-2.

I LT 18 CONT Unsheathed Rockbestos Firezone R cable in conduit.

I I ---------------------

LT 19 CONT Same as CBF 151. LT 19 in FEAR Rev. 7. This cable is spliced within this fire zone.

LT 19A CONT Same as CBF 151A. I I ----------------------------

LT 33 CONT Same as CBF 151 (New remote shutdown circuit). LT 33 in FHAR Rev. 7. This cable Iis spliced within this fire zone.

I LT 33A CONT Same as CBF 151A (New remote shutdown circuit).

I 4 4 480V lB Engd. Sfgds. 4 +

CONT i Same as CBF 151.o LT 51 in FHAR Rev. 7. This cable EG-CCESSH I480V 1B Engd. Sfgds. LT 51 is spliced within this fire zone.

1B I Screen Hous e MCC IND LT 51A CONT Same as CBF 151A.

IND I I1_____________________1_______I__

I I I Attachment 3-1, Sh. 36 FHAR Rev. 17 003/002 T3-1.36

TMI UNIT I APPENDIX "R" CABLES Building Intake Screen Pumphouse Fire Zone ISPH-FZ-2 Fire Barrier wrap provided as rated one hour COMPONENT COMPONENT CIRCUIT CIRCUIT DESCRIPTION OF WORK REMARKS FUNCTION NO FUNCTION NR-V-1A NR-P-IA Discharge Cut and reroute existing cable through new CBE 489 in FHAR Rev. 7. This cable is spliced CBE 489 CONT wrapped conduit to wrapped Splice Box S-3 with within this fire zone.

fire barrier No. I1SHD-FB03

  • Sheathed Rockbestos Firezone R cable from CBE 489A CONT Splice Box S-3 with fire barrier No. ISIID-FBO3
  • to new conduit to existing tray 110, and to switchgear.

EE-SGESSH-I R 480V I R Engd. CONT Cut and reroute exit. cable to Splice Box S-4. ED 108A in FHAR Rev. 7. This cable is spliced Sfgds. Switchgear ED 108A PWR Cable and box are wrapped with fire barrier No. within this fire zone ISHD-FBO4.

CONT Sheathed Rockbestos Firezone R cable from ED 108C PWR Splice Box S-4 with fire barrier No ISHD-FB04 in new conduit, existing tray 515 to switchgear.

ED 108B PWR CN Same as EDI08A. ED 108B in FHAR Rev. 7. This cable is spliced ED 108D CONT Same as EDI08C. within this fire zone.

PWR LR 11 COWIf Same as CBE 489. LRI 11 in FHAR Rev. 7. This cable is spliced LRI 1IA CONT Same as CBE 489A within this fire zone.

LR 12 CONT Same as CBE 489 LR 12 in FHAR Rev. 7. This cable is spliced LR 12A CONT Same as CBE 489A within this fire zone.

LX51 CONT Same as CIIE 489 LX 51 in FHAR Rev. 7. This cable is spliced LX 5IA CONT Same as CBE 489A within this fire zone.

LX 53 in FHR Rev. 7. This cable is spliced LX 53 CONT Same as CBE 489 within this fire zone, and combined with LX 51A.

Portions of tils barrier are rated at 50 minutes.

See Topical Report #094 for Details. Attachment 3-1, SH.37 FHAR Rev. 20 I

K.>

"TMI UNIT 1 APPENDIX "R" CABLES Building Intake Screen Pumphouse Fire Zone ISPII-FZ-2 Fire Barrier wrap provided as rated one hour COMPONENT CIRCUIT CIRCUIT COMPONENT FUNCTION NO. FUNCTION DESCRIPTION OF WORK REMARKS EE-SGESSH-1R 480V IR Engd. MD 11 PWR Wrap cable in tray 733 with fire barrier No.

Sfgds. Screen ISIID-FBO6.*

House Switchgear NR-P-IA Nuclear Service LR 16 CONT & IND Same as CBE 489 LR 16 in FHAR Rev. 7. This cable is spliced River Water Pump LR16A CONT Unsheathed Rockbestos Firezone R cable routed within this fire zone.

A in conduit.

LR 17 CONT Unsheathed Rockbestos Firezone R cable routed in conduit.

Unsheathed Rockbestos Firezone R cable routed in conduit.

Replace LR1 8 and LT1 7 with a single 7/c- 12 LR 18 CONT Rockbestos Firezone R cable A total of (7) conductors are needed for both circuits. (LRI 8 and LT1 7 are presently run in I the same conduit to the same component.)

LR 19 CONT Same asCBE 489. LR 19inFHARRev. 7. This cable is spliced within this fire zone.

LR 19A CONT Same as CBE 489A EG-CC-ESSH- 480V engd LRs47 CONT Same as CBE 489 LR 47 FHAR Rev. 8. This cable is spliced IA Sfgds Screen House LR 47A CONT Same as CBE 489A within this fire zone.

________MCC ________

roruons of tihs Darrier are rated at 39 minutes.

See Topical Report #094 for Details Attachment 3-1, SH.38 FHAR Rev. 20 I

TMI UNIT I APENDIX "R" CABLES Building Reactor Fire Zone RB-FZ-Ia COMPONENT COMPONENT CIRCUIT CIRCUIT DESCRIPTION OF WORK FUNCTION NO REMARKS FUNCTION RC-V-2 Pressurizer Relief Block Remove and spare existing cable Route new unsheathed Rockbestos CS 33A in FHAR Rev. 7 Valve CS 33B PWR Firezone R cable in conduit from penetration 317 to valve Install radiant energy heat shield ICC-REHS-03 on penetration 317.

CS 261B CONT Same as CS 33B CS 261 A in FHAR Rev.?7 CS261C CONT Same as CS 33B EX 261A in FHAR Rev. 7 RC-RV-2 Pressurizer Relief Valve Remove and spare existing cable Route new unsheathed Rockbestos ED 523A in FHAR Rev. 7 ED 523E CONT Firezone R cable in conduit from penetration 317 to valve. Install radiant energy heat shield ICC-REHS-03 on penetration 317 and on cable in penetration T-775 Steam Generator A Level Remove and spare existing cable Route new unsheathed Rockbestos Addition to FHAR Rev 7. The new cable is (Wide Range Train A) Firezone R cable in conduit from penetration 204 to transmitter LT-775 'routed in this zone.

RE 473C INST via Box J831. Install radiant energy heat shield ICC-REHS-06 on penetration and I1CC-REHS-0 I on the transmitter and transmitter splicing box/condulet.

Attachment 3-1, SH 39 FHAR Rev. 18

<2 -I TMI UNIT I APENDIX "R" CABLES Building Reactor Fire Zone RB-FZ-Ib COMPONENT COMPONENT CIRCUIT CIRCUITDREMARKS FUNCTION NO FUNCTION RCI-LT3 Pressurizer Level (Temp. Remove and spare existing cable. Route new unsheathed Rockbestos RE 158A in FHAR Rev. 7.

Cont) RE 158B INST Firezone R cable in conduit from penetration 205 to transmitter Install radiant energy heat shield ICC-REIIS-05 on penetration and ICC REHS-04 on the transmitter and transmitter splicing boxlcondulet LT.775 Steam Generator A Level RE 473C INST Set.RB-FZ-IA RE 473A in FIIAR Rev 7 (Wide Range - Train A) RNR Attachment FIIAR Rev. 3-1, I8 SI 40

TMI UNIT 1 APENDIX "R" CABLES Building Reactor Fire Zone RB-FZ-Ic COMPONENT COMPONENT CIRCUIT CIRCUIT DESCRIPTION OF WORK REMARKS FUNCTION NO. FUNCTION RC-RV-2 Pressurizer Relief Valve ED 523E CONT See RB-FZ-la ED 523A in FHAR Rev. 7 RC-V-2 Pressurizer Relief Block CS33A in FHAR Rev. 7 Valve CS 33B RWP See RB-FZ-IA CS 261B CONT SeeRB-FZ-IA CS 261A in FHAR Rev. 7 CS261C CONT See RB-FZ-Ia CS 261 A in FPIAR Rev. 7 RCI-LT3 Pressurizer Level (Temp.

RE 158A in FHAR Rev. 7.

Comp) RE 155B INST See RB-FZ-IB TE-961 RC Inlet Temp (Loop B) Remove existing cable. Route new unsheathed Rockbestos Firezone R RE 463A INST cable shield inICC-REHS-05 conduit from penetration 205 to RTD. Install radiant energy heat on penetration, and ICC-REHS-08 on the RTD and RTD splicing box/condulet PT-950 Steam Gen A Remove and spare existing cable. Route new unsheathed Rockbestos Pressure (Train A) RE 465A in FHAR Rev. 7 RE 465C INST Firezone R cable in conduit from penetration 204 to transmitter. Install radiant energy heat shield I CC-REtIS-06 on penetration and ICF-REIIS 03 on the transmitter and transmitter splicing box/condulet.

PT-951ISteamiGen B Pressure Remove existing cable Route new unsheathed Rockbestos Firezone R RET467AnINST cable in conduit from penetration 205 to transmitter.

energy heat shield I CC-REHS-05 on penetration Install radiant and I1CF-REIIS-04 on the transmitter and transmitter splicing box/condulet LT-775 Steam Gen. A Level (Wide RE 473A in FHAR Rev. 7 Range-Train A)

RE 473C INST See RB-FZ-Ia Attachment 3-1. SH 41 FIHAR Rev. 18

K>

TMI UNIT I APENDIX "R" CABLES Building Reactor Fie Zone RB-FZ-Ic COMPONENT COMPONENT CIRCUIT CIRCUIT DESCRIPTION OF WORK REMARKS FUNCTION NO FUNCTION LT-776 Steam Gen. B Level (Wide Remove existing cable. Route new unsheathed Rockbestos Firezone R Range - Train B) RE 479A INST cable in conduit form penetration 205 to transmitter. Install radiant energy heat shield ICC-REHS-05 on penetration and ICC-REHS-02 on transmitter splicing box/condulet RC2-TE2 Pressurizer Temperature Remove existing cable. Route new unsheathed Rockbestos Firezone R cable in conduit form penetration 205 to terminal box T670 (splice to RE 495A INST RTD leads) Install radiant energy heat shield ICC-REHS-05 on penetration and ICF-REHS-01 on the terminal box and conduit containing the RTD leads outside of the D ring PT-949 RC Pressure Wide Range Remove existing cable. Route new unsheathed Rockbestos Firezone R (Loop B) RE 499A INST cable in conduit form penetration 205 to transmitter Install radiant energy heat shield ICC-REHS-05 on penetration and ICF-REIIS-05 on the transmitter and the transmitter splicing boxlcondulet.

TE-960 RC Outlet Temp (Loop B) Remove existing cable. Route new unsheathed Rockbestos Firezone R RESOIA INST cable in conduit form penetration 205 to transmitter. Install radiant energy heat shield ICC-REHS-05 on penetration and ICF-REHS-05 on the transmitter and the transmitter splicing box/condulet.

NI-12 RG 1.97 Full Range Addition to FHAR Rev. 9 Neutron Flux (Train B) Install new cable in existing fire wrapped Pent. 201 (1CC.REHS.07) and RG 441A INST new conduit, pull box P850, and gamma metric J-Box wrapped with radiant energy heat shield ICC-REHS-09.

Route new cable from the new gamma metric J-box to the new fission RG 441B INST chamber detector. Install radiant energy heat shield ICC-REIIS-09 from the gamma metric J-Box to the D-Ring Attachment 3-1, S1t. 42 FHAR Rev. 18

K-,,

"TMI UNIT I APENDIX "R" CABLES Building Reactor Fire Zone RB-FZ-id COMPONENT COMPONENT CIRCUIT CIRCUIT FUNCTION NO FUNCTION DESCRIPTION OF WORK REMARKS IC-RV-2 Pressurizer Relief Valve Se RB-FZ-I A ED 523E CONT ED-523A in FHAR Rev. 7 RC-RV-2 Pressurizer Relief Block Valve CS 33B PWR See RB-FZ-IA CS 33A in FttAR Rev. 7 CS 261B CONT See RB-FZ-IA CS 261 A in FHAR Rev. 7 CS 261C CONT See RB-FZ-Ia CS 261A in FIlAR Rev. 7 RC2-TE2 Pressurizer Temperature RTD Lead INST Protection is not required Operator procedure allows manual calculation of temperature compensated pressurizer level.

Attachment 3-1, S11,.43 FHAR Rev. IS

K)

TMI UNIT I APENDIX "R" CABLES Budding Reactor Fire Zone RB-FZ-Ie COMPONENT COMPONENT CIRCUIT CIRCUIT DESCRIPTION OF WORK FUNCTION NO. FUNCTION REMARKS TE-971 RC Inlet Temp Loop B See RB-FZ-Ic.

RE 463A INST TE-960 RC Outlet Temp Loop B RE 501A 1NST See RB-FZ-Ic Attachment 3-1, SN. 44 FlAR Rev. I 8

K)

TMI UNIT I APENDIX "R" CABLES Building Reactor Fire Zone RD-FZ-2 COMPONENT COMPONENT FUNCTION CIRCUIT CIRCUIT NO. FUNCTION DESCRIPTION OF WORK RC-RV-2 Pressurizer Relief Block REMARKS See RB-FZ-Ia ECS 33 in FIIAR Rev. 7 Valve CS 33B PWR CS 261B CONT See RB-FZ-la CS 261A in FHAR Rev. 7 CS 261C CONT See RB-FZ-Ia CS 261A in FHAR Rev. 7 RC-RV.2 Pressurizer Relief Valve ED 523E CONT See RVB-FZ-I!a ED 523A in FHAR Rev. 7 I

f'- A1D

,leam uen A Pressure PT-950 RE 465C I (Train A) INST

£ _________________

See RB-FZ-!c I ____________________________________________________________________________________ I RE 465A in FMAR Rev. 7 Attachment 3-1, SH 45 FHAR Rev. 18

K>

TMI UNIT I APENDIX "R" CABLES Biullding Keactor -fire Z o ne RB-FZ-2 COMPONENT COMPONENT FUCINN CIRCUIT CIRCUIT UCINDESCRIPTION FUNCTION NO FUNCTION OF WORK REMARKS PT-951 Steam Gen. B Pressure See RB-FZ-1c.

Train B RE 467A INST RC2-TE2 Pressurizer Temperature RE 473C INST See RB-FZ-la. RE 473A in FHAR Rev. 7 RE 495A INST See RB-FZ-ic.

PT-949 RC Pressure Loop B Wide RE 499A INST See RB-FZ-Ic.

Range

--j Attachmcnt 3-1, SH 46 FMIAR Rev 18

Ku FHAR Rev. I8 I..

K>

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 1 VALVE POSITION REQUIRED TIME FOR OPERATIONe REDUNDANT' VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE AREA/ZONE)

NORALSHUTDOWN SHUTDOWN 8

2 Hours None IB-FZ-2 This valve must remain closed to prevent AS-V-4 Closed Closed Closed Spurious No manual action required uncontrollable release of main steam when the turbine driven emergency feedwater pump Is used The valve will be manually closed ifit spuriously opens The 120 minute limit corresponds to the time allowed to operate EP-P-1 and EF-V-30 control valves See Note 8.

1 Hr 3 to 72 Hrs t BS-V-2B This valve must remain closed to prevent BS-V-2A Closed Closed Closed See AB-FZ-4 introduction of NaOH into the RCS Any spurious Discussion operation will be corrected manually before starting the corresponding DH pump See 1 Hr. 3 to 72 Hrs BS-V-2A AB-FA-4 Same remark as BS-V-2A BS-V-2B Closed Closed Closed Discussion See 2 Hrs 3 to 72 Hrs BS-V-3B AB-FA-1 This valve, on the RB Sump-BWST suction line, Is BS-V-3A Closed Closed Closed Discussion required to be closed to prevent the reactor coolant from entering the spray system during cold shutdown Itwill be manually closed before starting the corresponding DH pump for cold shutdown 2 Hrs 3 to 72 Hrs 1

BS-V-3A AB-FA-2 Same remark as BS-V-3A BS-V-3B Closed Closed Closed See Discussion No Limit CO-V-13 TB-FA-1 CO-V-12 with CO-V-14A or CO-V-13 with CO-V CO-V-12 Closed Open Open See 14B are required to be opened If'the hot well is Discussion CO-V-14B used as the source of condensate water for the EF system Since the CST's are the primary source of condensate water, these valves will be manually opened when required No Limit CO-V-12 TB-FA-1 Same remark as CO-V-12 CO-V-13 Closed Open Open See Discussion CO-V-14A See No Limit CO-V-13 IB-FZ-4 Same remark as CO-V-12 CO-V-14A Open Open Open CO-V-14B Discussion II II I II.1. I I I I I

________i________I ________J____________-________I__ __________I- ____________Re_____________ M t:

ev 18 003/002 T3-2 I

ATTACHMI_...f VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 2 VALVE POSITION REQUIRED TIME FOR OPERATION6 REDUNDANT7 VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAI HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE L SHUTDOWN SHUTDOWN AREA/ZONE)

CO-V-14B Open Open Open See - No Limit CO-V-12 IB-FZ-4 Same remark as CO-V-12 Discussion CO-V-14A CO-V- Open Open Open - - None EF-V-1A IB-FZ-4 CO-V-11l A with CO-V-111iB and EF-V-lA with EF-V 111A EF-V-1B IB provides two paths for the condensate water from the CSTs to the EF system. Since Appendix R assumes only one hot short to occur for bny fire scenario, at least three valves are always opened for shutdown Therefore, spurious operation of one valve does not present a problem CO-V- Open Open Open - None EF-V-1A IB-FZ-4 Same remark as CO-V-11ilA 111B EF-V-B DC-V-2A Open-Throttled Spurious/ 2 Hrs 31to 72 Hrs DC-V-2B AB-FA-1 This electro-pneumatic valve is required to be throttled Required open to provide cooling water through the DH cooler.

Valve fails open upon loss of power or instrument air.

Spurious closure can be mitigated by disconnecting power or air at the valve solenoid. It can be manually open for cold shutdown 1

DC-V-2B Open Throttled Spurious/ 2 Hrs 3 to 72 Hrs. DC-V-2A AB-FA-2 Same remark as DC-V-2A.

Required DC-V-65A Closed-Throttled Spurious/ 2 Hrs 31to 72 Hrs.' DC-V-65B AB-FA-1 This electro-pneumatic valve is required to be throttled Required closed to provide cooling water through the DH cooler.

Valve fails closed upon loss of power or instrument air.

Spurious opening can be mitigated by disconnecting power or air at the valve solenoid. It can be manually throttled closed for cold shutdown DC-V-65 B Closed Throttled Spurious/ 2 Hrs 30to 72 Hrs.' DC-V-65A AB-FA-2 Same remark as DH-V-65A Required DH-V-1i Closed Closed Open Spurious/ 3 Hrs. 3 to 72 Hrs' None RB-FZ-le DH-V-1, DH-V-2, and DH-V-3 are in series One of the Required high-low pressure boundary valves is required to remain closed during hot shutdown. They must be opened for the decay heat removal dunng cold shutdown Spurious opening of DH-V-1 is of no concern because DH-V-2 is prevented from spurious opening by removing the electric power. DH-V-1 and 2 will be manually opened for cold shutdown Rev. 15 003/002 T3-2.2

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 3 VALVE POSITION REQUIRED TIME FOR OPERATION" REDUNDANT 7 VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN _AREA/ZONE)

DH-V-2 Closed Closed Open Spunous/ 2 Hrs 3 to 72 Hrs 1 None RB-FZ-lc Same remark as DH-V-1.

Required DH-V-3 Closed Closed Open Required 90 Mins 3 to 72 Hrs None AB-FZ-4 This valve must be opened for the decay heat removal It will be operated manually during cold shutdown Protection from spunous operation is provided for DH-V-1 and 2 See discussion above DH-V-4A Closed Closed Open Required 90 Mins 3 to 72 Hrs DH-V-4B AB-FZ-4 The valve on the decay heat loop in service must be opened during the later stage of cooldown. It will be opened manually DH-V-4B Closed Closed Open Required 90 Mins 31to 72 Hrs DH-V-4A AB-FZ-4 Same remark as DH-V-4A DH-V-5A Open Open Closed Required 45 Mins 31to072 Hrs 1 DH-V-5B AB-FZ-5 This suction valve on the decay heat loop In service must be closed dunng the later stage of Open Closed Closed Required 45 Mins. 45 Mins See cooldown It can also be used to mitigate discussion spurious operation of RB sump isolation valve DH-V-6A (6B) during hot shutdown (45 min. time limit). For either case, the valve will be closed manually.

DH-V-58 Open Open Closed Required 45 Mins 31to072 Hrs DH-V-5a AB-fz-5 Same remark as DH-V-5A Open Closed Closed Required 45 Mins 45 Mins t

DH-V-6A Closed Closed Closed Spurious 45 Mins 3 to 72 Hrs DH-V-6B AB-FA-1 This RB sump isolation valve must remain closed to prevent the contents of the SWST from draining Closed Closed Closed Spunous 45 Mins 45 Mins DH-V-5A to the reactor sump during hot shutdown Itis also required to remain closed when the corresponding DH loop is used during the later stage of cooldown Spurious operation of the valve will be corrected manually (45 min time limit) DH-V-5A (5B) can also be closed to mitigate spunous operation of DH-V-6A (65) during hot shutdown.

Rev 15 003/002 T3-2 3

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 4 7

VALVE POSITION REQUIRED TIME FOR OPERATIONe REDUNDANT VALVE NUMBER OR ACTIONQ ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOU ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

DH-V-6A The 45 minute limit for mitigating spurious (Cont'd) opening of DH-V-6A or B is based on a calculation of the allowable reduction in volume in the BWST which will still allow sufficient borated water for safe shutdown by feed-and-bleed (HPI) cooling The calculation (GPUN no T1-5360-212 007) assumed a single open DH-V-6A or B valve.

an initial BWST volume of 337.000 gallons. and a re-volume of 17,000 gallons for feed-and-bleed cooling. Makeup and seal injection requirements (for cases where HPI is not used) will be less DH-V-6B Closed Closed Closed Spunous 45 Mins 3 to 72 Hrs DH-V-6A AB-FA-2 Same remark as DH-V-6A Closed Closed Closed Spunous 45 Mins 45 Mins DH-V-5B DH-V-7A Closed Closed Closed Spurious 90 Mins 3 to 72 Hrs DH-V-7B AB-FZ-4 This valve on the DH loop In service must remain closed dunng cold shutdown to prevent DH water from diverting to the makeup system Itwilt be manually corrected if It spuriously operates.

DH-V-7B Closed Closed Closed Spunous 90 Mins 3 to 72 Hrs DH-V-7A AB-FZ.4 Same remarks as DH-V-7A DH-V-12A Closed Closed Open Required 90 Mins 31to72 Hrs DH-V-12B AB-FZ-4 This mechanical valve must be manually opened when the corresponding loop of the DH system is used dunng the later stage of cooldown DH-V-12B Open Open Open Required 90Min 3 to172 Hrs DH-V-12A AB-FZ-4 Same remark as DH-V-12A This valve is open if the reactor is critical.

DH-V-64 Closed Closed Open Required 90 Mins 31to 72 Hrs None AB-FZ-4 This mechanical valve is required to be opened during cold shutdown to provide DH water to the RCS pressurizer spray line. The valve vail be manually opened.

Rev 15 003/002 T3-2.4

I>

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 5 VALVE POSITION REQUIRED TIME FOR OPERATION' REDUNDANT7 VALVE NUMBER NORMAL 1SHUTDOWN HOT COLD SHUTDOWN OR SPURIOUS ACTION ACHIEVABLE ACTION REQUIRED VALVES LOCATION (FIRE DISCUSSION AREA/ZONE)

DH-V-75A Closed Closed Open, then See 90 Mins 31to071 Hrs DH-V-77A AB-FA-1 The DH vent valves DH-V-75A (75B) and DH-V Closed Discussion DH-V-78A 76A (768) are required to open before starting the corresponding DH pump and are required to close when the pump is operating If these valves cannot be controlled electrically, mechanical valves DH-V-77A (771) and DH-V-78A (78B) can be used instead NOTE- Procedural requirements for venting fumes require DH-V-77178 A/B valves for venting 1

DH-V-758 Closed Closed Open, then See 90 Mins 3 to 72 Hrs DH-V-77B AB-FA-2 Same remark as DH-V-75A Closed Discussion DH-V-78B DH-V-76A Closed Closed Open, then See 90 Mins 3 to 72 Hrs' DH-V-77A AB-FA-1 Same remark as DH-V-75A Closed Discussion DH-V-78A DH-V-76B Closed Closed Open, then See 90 Mins 31to072 Hrs DH-V-77B AB-FA-2 Same remark as DH-V-75A Closed Discussion DH-V-78B DH-V-77A Closed Closed Open, then See 90 Mins 3 to 72 Hrs 1 None AB-FA-1 Same remark as DH-V-75A Closed Discussion DH-V-77B Closed Closed Open, then See 90 Mins. 3 to 72 Hrs 1 None AB-FA-2 Same remark as DH-V-75A Closed Discussion DH-V-78A Closed Closed Open, then See 90 Mins 31to 72 Hrs . None AB-FA-1 Same remark as DH-V-75A.

Closed Discussion DH-V-78B Closed Closed Open, then See 90 Mins 30to 72 Hrs.' None AB-FA-2 Same remark as DH-V-75A.

Closed Discussion DR-V-lA Closed Open Open Required 3 to 72 Hrs DR-V-1B ISPH-FZ-1 The valve is required to be opened before starting the DR pump to provide cooling river water to the decay heat service cooler 1

DR-V-1B Closed Open Open Required 3 to 72 Hrs DR-V-1A ISPH-FZ-2 Same remark as DR-V-1A.

EF-V-1A Open Open Open See None CO-V-1i1A IB-FZ-3 Same remark as CO-V-111A Discussion CO-V-111B Rev 20 003/002 T3-2 5

K> K->

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 6 7

VALVE POSITION REQUIRED TIME FOR OPERATION6 REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

EF-V-1B Open Open Open See - None CO-V-111A IB-FZ-3 Same remark as CO-V-111A Discussion CO-V-111 B EF-V-2A Open Open Open Spunous (2 Hrs) No Limit or2 None IB-FZ-3 One of EF-V-2A and EF-V-2B are required to Hrs remain open to allow feedwater into one steam generator when the turbine driven emergency feedwater pump is used. Spunous closure of one valve is acceptable. Manual correction of the spunously closed valve is planned 2

EF-V-25 Open Open Open Spunous (2 His) No Limft or 2 None IB-FZ-3 Same remark as EF-V-2A Hrs EF-V-4 Closed Closed Closed Spurious None EF-V-5 IB-FZ-4 EF-V-4 is in series with EF-V-5 At least one valve should remain closed to prevent river water from being fed to the emergency feedwater pump suction Spurious opening of one valve by a hot short does not present a problem EF-V-5 Closed Closed Closed Spunous None EF-V-4 15-FZ-4 Same remarks as EF-V-4 EF-V-8A Open Open Open Spunous None EF-V-8B IB-FZ-3 EF-V-8A. 8B. or 8C are required to remain open EF-V-8C when their corresponding EF pumps are used for shutdown Since these valves are locked to their safe shutdown position (open), they are always available EF-V-88 Open Open Open Spunous None EF-V-8A IB-FZ-2 Same remark as EF-V-SA EF-V-8C EF-V-8C Open Open Open Spunous None EF-V-8A IB-FZ-3 Same remark as EF-V-8A.

EF-V-8B Rev 15 003/002 T3-2 6

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 7 VALVE POSITION REQUIRED TIME FOR OPERATIONs REDUNDANT' VALVE NUMBER A OLOR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

EF-V-30A Closed I Throttled Closed Required/

Spunous 20 Mins or 2 Hrs 8 20 Mins or 2 6

Hrs. See EF-V-30D IB-FZ-3 EF-V-30A, 30B, 30C, and 30D control the flow of feedwater into the steam generators One valve Discussion for at least one steam generator is required to be operable, while the valves not being used are required to stay dosed to prevent over-filling of the steam generators Since the valves are equipped with only a 2-hour backup air supply, they will be manually controlled after the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> if IA Is not available then.

HPI Cooring requires operation within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for the IB-FZ-3 and IB-FZ-8 fires.

See note 8 for the 20-minute limit for these valves in FH-FZ-5. CB-FA-2g, IB-FZ-2, and DG-FA-2 20 Mins or 2 Hrsee 20Mins or2 EF-V-30C IB-FZ-3 Same remark as EF-V-30A EF-V-30B Closed Throttled Closed Required/

Spunous Hrse 6 I5-FZ-3 Same remark as EF-V-30A EF-V-30C Closed Throttled Closed Required/ 20 Mins or2 Hrs 20Mins or2 EF-V-30B Spunous Hrs8 Closed Throttled Closed Required/ 20 Mins or 2 Hrs' 20 Mins or 2 EF-V-30A IB-FZ-3 Same remark as EF-V-30A EF-V-30D Spunous Hrs a Open Open None IB-FZ-3 EF-V-52A, 52B, 52C, and 52D are located EF-V-52A Open downstream of the EF control valves They are mechanical valves None IB-FZ-3 Same remark as EF-V-52A EF-V-52B Open Open Open None IB-FZ-3 Same remark as EF-V-52A.

EF-V-52C Open Open Open Open Open Open None IB-FZ-3 Same remark as EF-V-52A.

EF-V-52D

_____ I _____ .1.______ 1______ ______ ________ _______ L Rev. 15 003/002 T3-2.7

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 8

7 VALVE POSITION REQUIRED TIME FOR OPERATIONe REDUNDANT' VALVE NUMBER MHTORAACTCD S O ACI CTIN VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN _AREA/ZONE) 3 FW-V-5A Open Closed Closed Required - No Limit FW-V-5B TB-FA-1 Control valves FW-V-17A, 17B, 16A, and 16B close to prevent overfilling of the steam generators. The main feedwater pumps are tripped or the block valves 5A, 5B, 92A, or 92B are dosed if the control valves spunously open 3

FW-V-5B Open Closed Closed Required - No Limet FW-V-5A IB-FZ-6 Same remark as FW-V-5A.

FW-V-16A Throttled Closed Closed Spunous - No Limit FW-V-16B TB-FA-1 Same remark as FW-V-5A.

FW-V-16B Throttled Closed Closed Spunous - No Limit FW-V-16A IB-FZ-6 Same remark as FW-V-5A 3

F'W-V-17A Throttled Closed Closed Spurious - No Limit FW-V-17B TB-FA-1 Same remark as FW-V-SA.

3 FW-V-17B Throttled Closed Closed Spunous - No Limit FW-V-17A IB-FZ-6 Same remark as FW-V-5A.

3 FW-V-92A Open Closed Closed Required - No Limet FW-V-92B TB-FA-1 Same remark as FW-V-SA 3

FW-V-92B Open Closed Closed Required No LimOt FW-V-92A IB-FZ-6 Same remark as FW-V-5A.

IC-V-lA Open Open Open Spunous 2 Hrs 4 Hrs' IC-V-1iB RB-FZ-lc The valve corresponding to the letdown cooler to be used for shutdown is required to remain open The valve will be manually corrected ifit spuriously operates.

Letdown can be delayed for up to four hours 4

IC-V-1B Open Open Open Spurious 2 Hrs 4 Hrs IC-V-lA RB-FZ-lc Same remark as IC-V-IA Rev 17 003/002 T3-2.8

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 9 VALVE POSITION REQUIRED TIME FOR OPERATION' REDUNDANT 7 VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

IC-V-2 Open Open Open Spurious 30Mins Or 2Hrs 30Mins Or 4 None RB-FZ-lc IC-V-2, 3, and 4 are in series and are required to Hrs remain open to allow coohing water through the letdown coolers and RC pump coolers Electrical cables for the valves are normally protected from fire damage to provide thermal barrier cooling, where required Manual correction of spunous operation would be necessary within 30 minutes in some fire areas/zones to support thermal barrier cooling Ifseal injection is available, the next time limit is that required for establishing letdown (4 hr. time)

Spurious operation of IC-V-3 and 4 can also be corrected by opening switches 15 of EH-DPES-IE at CB-FA-2d and 5 of EH-DP-1M at CB-FA-2c.

respectively.

In most of the areas requinng manual operations, four hours are available for establishing letdown flow In cases where thermal barrier cooling was required, modifications were normally made to IC valves to assure that no spunous closure would occur. However, in some areas degradation of the ESAS system can cause spurious Initiation of reactor building (containment) isolation, and closure of these valves. The ESAS output signal can be promptly isolated at the remote shutdown transfer switch panel, and the valves can be manually operated at the remote shutdown panels after this ESAS isolation IC-V-3 Open Open Open Spunous 30 Mins Or 2 Mins 30 Mins Or 4 None AB-FZ-4 Same remark as IC-V-2.

Hrs 9 IC-V-4 Open Open Open Spurious 30 Mins Or 2 Mns 30 Mins Or 4 None AB-FZ-7 Same remark as IC-Vo2 Hrs 9See Discussion Rev. 17 0031002 T3-2 9

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 10 7

VALVE POSITION REQUIRED TIME FOR OPERATIONs REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

IC-V-79A Open Open Open Spunous None None RB-FZ-2 IC-V-79A, 7gB. 79C, and 79D are required to remain open for RCP thermal bamer cooling when seal injection is not available. Spurious operation of the valves Is prevented by removing its electrical power.

IC-V-79B Open Open Open Spurious None None RB-FZ-2 Same remark as IC-V-79A IC-V-79C Open Open Open Spunous None None RB-FZ-2 Same remark as IC-V-79A.

IC-V-79D Open Open Open Spunous None None RB-FZ-2 Same remark as IC-V-79A.

MS-V-2A Open Open Open Spunous 2 Hrs 3 Hrs (2Hrs.) MS-V-2B IB-FZ-2 The valve must remain open for the atmosphenc steam dump The steam will be allowed to dump to the code safety valves if it spuriously doses The valve will be manually opened if necessary for operation of turbine-driven EF-P-1 (2 Hrs ) or MS-V-4A/48 The 180 minute times shown reflect an assumption of maintaining hot shutdown for up to three hours before it is necessary to begin cooldown and, therefore, to use MS-V-4A or B MS-V-2B Open Open Open Spurious 2 Hrs 3 Hrs MS-V-2A IB-FZ-2 Same remark as MS-V-2A MS-V-3A Closed Closed Closed (Prevention No manual action No Umdit MS-V-8B TB-FA-1 MS-V-3A, 3B, 3C. 3D. 3E, and 3F should be of Spurious required closed to prevent uncontrollable dumping of Desirable) steam to the condenser. Spunous operation of these valves can be corrected by closing MS-V 8A and MS-V-8B from the Control Room 0031002 T3-2 10

ATTACHM`ET(<2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 11 VALVE POSITION REQUIRED TIME FOR OPERATION6 REDUNDANT 7 VALVE NUMBER OR VALVES LOCATION DISCUSSION SPURIOUS (FIRE AREA/ZONE)

Cooldown from a single spurious MS-V-3 opening is within the limits calculated for Main Steam breaks Prevention of single valve spurious operation is not therefore required, but is desirable to prevent blowing condenser rupture disks Calculation C-1i101-911-Eel0-001' Appendix R 72 Hour Cold Shutdown Analysis" addressed cool down capability for fires that require evacuation of the control room MS-V-3A may be used to support this cool down but use is not necessary since the valve Is of a different design than the other Turbine Bypass Valves Cold shutdown conditions can be achieved in less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> by using any three Turbine Bypass Valves (MS-V.

BICIDIEIF) and two Atmospheric Dump Valves (MS-V-4A/B) This cool down method would only be used ifthere was an urgent need to proceed to cold shutdown to prevent core damage (damage f__IIIto the condenser)

Rev 19 003/002 T3-2 11

ATTACHM -2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 12 VALVE POSITION REQUIRED TIME FOR OPERATION 8 REDUNDANT 7 VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE I SHUTDOWN SHUTDOWN AREA/ZONE)

MS-V-3B Closed Closed Closed (Prevention No Manual Action No Llmit 10 MS-V-8B TB-FA-1 Same remark as MS-V-3A of Spurious Required Desirable)

MS-V-3C Closed Closed Closed (Prevention No Manual Action No Limit"0 MS-V-SB TB-FA-1 Same remark as MS-V-3A of Spurious Required Desirable)

MS-V-3D Closed Closed Closed (Prevention No Manual Action No Limit"0 MS-V-BA TB-FA-1 Same remark as MS-V-3A of Spurious Required Desirable)

MS-V-3E Closed Closed Closed (Prevention No Manual Action No Limit" MS-V-SA TB-FA-1 Same remark as MS-V-3A of Spurious Required Desirable)

MS-V-3F Closed Closed Closed (Prevention No Manual Action No LimitMP MS-V-8A TB-FA-1 Same remark as MS-V-3A of Spurious Required Action Desirable)

MS-V-4A Closed Throttled Closed Required/ 2 Hrs 3 Hrs MS-V-4B IB-FZ-2 The valve must be under control for the Spurious atmospheric steam dump. If valve cannot be remotely operated, the steam will be allowed to dump to the code safety valves until the valve can be manually controlled Spurious opening of the valve will be corrected by closing MS-V 2A/2B See remark under MS-V-2A MS-V-4B Closed Throttled Closed Required/ 2 Hrs 3 Hrs MS-V-4A IB-FZ-2 Same remark as MS-V-4A.

Spurious See remark under MS-V-2A RKev18 003/002 T3-2 12

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 13 7

VALVE POSITION REQUIRED TIME FOR OPERATION6 REDUNDANT VALVE NUMBER[I OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWNSHUTDOWN AREA/ZONE)

MS-V-6 Open Open Open Required No Limd None IB-FZ-2 The valve is required to control the steam pressure to the EF turbine when the EFturbine driven pump is used for shutdown It isa pneumatic valve controlled by a pressure controller. B fails open on loss of instrument air (MA) 1 MS-V-8A Open Open Closed Required No Manual Action No Limdtl MS-V-8B IB-FZ-2 Same remark as MS-V-3A.

Required MS-V-SB Open Open Closed Required No Manual Action No Llmd& MS-V-8A IB-FZ-2 Same remark as MS-V-3A.

Required MS-V-10A Closed Open Open Required 2 Hrse 2 Hrs' MS-V-10B IB-FZ-2 MS-V-10A or 10B or MS-V-13A or 138 supply steam to the EF turbine. One is required to be opened when the turbine-driven EF pump is used for shutdown (2 Hrs ) The MS-V-13A and 13B bypass pressurization valves will be used if available.

MS-V-i0B Closed Open Open Required 2 Hrs 0 2 Hrse9 MS-V-1OA IB-FZ-2 Same remark as MS-V-1OA MS-V-56A Open Closed Closed Required No Limd MS-V-56B TB-FA-1 MS-V-56A and 56B automatically close when the main feedwater turbine trips They are closed if main feedwaler is not used.

MS-V-56B Open Closed Closed Required No Limd MS-V-56A TB-FA-1 Same remark as MS-V-56A MS-V-13A Closed Open Open Required 2Hrs0 2 Hrse MS-V-13B IB-FZ-2 Same remark as MS-V-10A.

MS-V-13B Closed Open Open Required 2 Hrs' 2 Hrs 0 MS-V-13A IB-FZ-2 Same remark as MS-V-IOA 4

MU-V-lA Open Open Open Spunous 2 Hrs 4 Hrs MU-V-lB RB-FZ-lc One of the inlet valves corresponding to the cooler in use must remain open if letdown is used The valve will be manually corrected if it spunously closes Letdown can be delayed for up to four hours MU-V-lB Open Open Open Spurious 2 Hrs 4 Hrs 4 MU-V-1A RB-FZ-l c Same remark as MU-V-1A Re,ev 17

__I I___ I_____J

_ _I___ _I I_____I

_ _ _ _ _ _ _ _ _ _ _ _ _ _L_ _ _ _ _ _ _ _ _ _ _ _I P 003/002 T3-2 13

K> K>

A'TACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 14 6 7 VALVE POSITION REQUIRED TIME FOR OPERATION REDUNDANT VALVE NUMBER OR ACTION IN VES LOCATION DISCUSSION NORMAL HOT LD SHUTDOWNISHUTDOWN SPURIOUS ACHIEVABLE REQUIRED (FIRE AREA/ZONE)

MU-V-2A Open Open Open Spurious 2 Hrs 4 Hrs 4 MU-V-2B RB-FZ-lc One of the outlet valves corresponding to the cooler in use must remain open If letdown is used The valve will be manually corrected If it spuriously closes Uncontrolled letdown can be mitigated by closing MU-V-2N2B orMU-V-3 orMU-V-4 and MU-V-5 4

MU-V-2B Open Open Open Spunous 2 Hrs 4 Hrs MU-V-2A RB-FZ-lc Same remark as MU-V-2A 4

MU-V-3 Open Open Open Spurious 2 Hrs 4 Hrs None AB-FZ-4 The valve must remain open if letdown Is used The position of the valve will be manually corrected if it spunously operates See remark under MU-V-2A for uncontrolled letdown.

Spunous closure of MU-V-3 can be corrected by opening switch 15 of EH-DPES-1E in CB-FA-2d (for fires in areas other than CB-FA-2d)

MU-V-4 Open Open or Open or Required/ 2 Hrs 4 Hrs' MU-V-5 AB-FZ-3 MU-V-4 with mechanical valve MU-V-99. MU-V-5 Closed Closed Spunous MU-V-98 with mechanical valves, MU-V-97A and 97B. and mechanical valves MU-V-98 with MU-V-109A and 109B are three parallel paths for letdown flow One path must be opened for letdown If leldown is required for RC pressure control, the preferred means of flow control is through MU-V-5 or MU-V

98. MU-V-4 must be closed The position of the valve will be manually corrected if required.

See remark under MU-V-2A for uncontrolled letdown MU-V-5 Throttled Throttled Throttled Required/ 2 Hrs 4 Hrs' MU-V-98 AB-FZ-3 Same remark as MU-V4 Spunous Rev 17 003/002 T3-2.14

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 15 VALVE POSITION REQUIRED TIME FOR OPERATION6 REDUNDANT? VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE) 4 MU-V-6A Open Open Open Spurious 2 Hrs 4 Hrs. MU-V-6B AB-FZ-6 The valve corresponding to the demineralizer in MU-V-70A use prior to the fire must remain open if letdown is used for shutdown. The valves will be manually corrected, If the pneumatic valve spunously closes Mechanical valve MU-V-70A can also be manually opened to bypass the demineralizer if required Only one letdown flowpath is utirized while the other is kept closed.

4 MU-V-6B Open Open Open Spunous 2 Hrs 4 Hrs MU-V-6A AB-FZ-6 Same remarks as MU-V-6A:

MU-V-70A MU-V-8 Open Open to MU Open to Required/ 2 Hrs Desirable in None AB-FZ-6 This valve Is normally positioned such that 3 Way to MU Tank or Bleed Tanks Spunous 4 Hrs 4 letdown flow Is through the makeup tank. This Valve Tank Bleed Tanks valve should be available to transfer letdown flow to the bleed tanks to prevent MU tank overflow This will be accomplished by manual operation, If necessary. Overflow to WDL-T-2 will occur about 5 minutes after makeup tank suction isolation, with normal 140 gpm letdown flow This overflow is acceptable.

MU-V-11A Open Open Open Spunous 2 Hrs 4Hrs MU-V-11B AB-FZ-5 The valve corresponding to the filter In use prior to MU-V-110 the fire must remain open if letdown is used for shutdown The valve will be manually repositioned if the pneumatic valve spunously closes Mechanical valve MU-V-110 can be manually opened to bypass the filter. Only one letdown flowpath is utilized while the other is kept closed MU-V-11B Open Open Open Spunous 2 Hrs 4Hrs' MU-V-olA AB-FZ-5 Same remarks as MU-V-11A MU-V-1i10 MU-V-110 Closed Open Open Required 2 Hrs 4 Hrs'4 None AB-FZ-5 Same remarks as MU-V-1IA.

MU-V-12 Open Open Closed Spunous No Limd None AB-FZ-3 MU-P-1A and 1B can take suction from the MU lank via MU-V-12 and from the BWST via MU-V 14A. Since the makeup tank is not relied upon for safe shutdown, the position of MU-V-12 has no effect on safe shutdown. NOTE- The makeup pump shall be tnpped Immediately if MU-V-12 spunously closes to prevent pump damage and then restarted once a flow path is established from the BWST. See discussion for MU-V-14A/B foradditfonal details on seal injection Rev 20 003/002 T3-2.15

K..>

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 16 VALVE POSITION REQUIRED TIME FOR OPERATION 5 REDUNDANT 7 VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWNISHUTDOWN IAREA/ZONE)

MU-V-14A CLosed Open Open Required 2 Hrs 2 Hrs 5 MU-V-14B AB-FZ-4 This valve Is required to be opened to allow MU P-1A or MU-P-1B to take suction from the BWST.

If seal injection were required the valve should be opened from the control room within 8 minutes alter spurious or intended isolation of letdown recirculation to the makeup tank. (Otherwise the makeup tank would empty and the pump would cavitate) For those areas where thermal barrier cooing is available, operation of makeup system for seal injection is not required Normal makeup can be delayed approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The valve can be manually opened before starting the makeup pump The valve could be damaged by an AB-FZ-4 fire close to the valve, but cable protection has been specified In AB-FZ-4 and the separation Is sufficient (in this spnnklered area) to assure that both thermal barner cooling and seal injection will not be lost MU-V-14B Closed Open Open Required No Manual Action 2 Hrs MU-V-14A AB-FZ-4 MU-V-14B is required to be opened to allow MU Required P-1C to take suction from the BWST for normal RCS inventory control The valve should be opened before starting the makeup pump Normal makeup can be delayed approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> MU-V-16A Closed Open/ Open/ Required/ 2 Hrs or 1 Hr 2 Hrs or 1 Hr. MU-V-16B AB-FZ-4 MU-V-16A. 16B, 16C. and 16D may be used for Throttled Throttled Spunous RC inventory control and are used for HPI cooling. One valve corresponding to the MU pump used during shutdown must be opened, if required for RCS inventory control or HPI. These valves can be jog control Manual control is acceptable for RCS inventory control The preferred path for RC Inventory control (not HPD) isMU-V-17. Spurious operation of other valves not in use would allow uncontrolled Rev 17 003/002 T3-2.16

K>

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 17 7

VALVE POSITION REQUIRED TIME FOR OPERATIONO REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

MU-Vo16A Makeup flow, pressurizer overfill, and PORV (Con'd) cycling RCS primary side enters Into 'feed and bleed' condition Spurious operation can be mitigated by tripping the operating MU pump, provided seal Injection Is not required, and manually correcting the position of the valve corresponding to the makeup pump to be used for reactor coolant Inventory control See also discussion under MU-V-17 MU-V-16B Closed Open/ Open/ Required/ 2 Hrs or 1 Hr 2 Hrs MU-V-18A AB-FZ-4 Same remark as MU-V-16A Throttled Throttled Spurious or 1 Hr MU-V-16C Closed Open/ Open/ Required/ 2 Hrs or 1 Hr 2 Hrs 5 MU-V-16D AB-FZ-6 Same remark as MU-V-16A Throttled Throttled Spurious or 1 Hr MU-V-16D Closed Open/ Open/ Required/ 2 Hrs or 1 Hr 2 Hrs 6 MU-V-16C AB-FZ-6 Same remark as MU-V-16A Throttled Throttled Spurious or 1 Hr.

MU-V-17 Modulat- Modulating Modulating Required/ 2 Hrs or 1 Hr 2 Hrs 5 MU-V-92 AB-FZ-3 The makeup flow line through MU-V-17 and 18 Is Ing Spurious or 1 Hr used for normal make-up flow and for RC pressure control when the pressurizer heaters are not available Mechanical valve MU-V-92 can be used to control makeup flow if MU-V-17 Is unavailable MU-V-217 can be Isolated by mechanical valves MU-V-91A and MU-V-918 MU-V-217 Is a bypass around MU-V-1i7, and If this valve spuriously opens, MU-V-18 must be closed or the pump tripped, or MU-V-222 (manual in the reactor building) closed to stop uncontrollable makeup flow. If MU-V-18 spuriously closes, It can be manually opened This makeup path Is preferred for normal RC Inventory control MU-V-1B Open Open Open Required/ 2 Hrs or 1 Hr 2 Hrs 5 or I Hr. None AB-FZ-4 Same remark as MU-V-17.

Spurious MU-V-18 Is air-to-open. spring-to-close, energize solenoid-to-close, fail-closed on loss of air Rev 18 0031002 T3-2.17

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 18 7

VALVE POSITION REQUIRED TIME FOR OPERATIONs REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

MU-V-20 Open Open Open Spunous 1 Hr. 2 Hrs None FH-FZ-2 MU-V-20 and 32 are required to remain open for RCP seal injection when thermal barrer cooling is not available These valves are made available where seal irjection is required For other areas, manual correction is planned Immediate correction of spurious operation of one of these valves is not required Manual action should however be taken within about two hours to restore seal injection for these areas. Spurious operation of MU-V-20 can also be corrected by opening switch 5 of EH-DP-1M at CB-FA-2c.

Flow through the seal injection path Is sufficient to provide the minimum flow required by one makeup pump See the discussion on MU-V-36 MU-V-20 is air-to-open, spring-to-close, energize solenoid-to-close It fails closed on loss of air, but it also provided with a local air accumulator MU-V-32 Open Open Open Required? 1 Hr 2 Hrs None AB-FZ-3 Same remark as MU-V-20. MU-V-32 Is controlled Spunous by an EFP converter (MU-32-E/P) which gets signals from a manual controller (MU-42-FIC) or from flow transmitter MU-42-DPT. It fails to mid position on loss of signal or on zero signal.

MU-V-36 Open Open Open Spunous 1 Hr. 2 Hrs None AB-FZ-3 MU-V-36 and 37 must stay open to assure minimum acceptable Mlow through the MU pumps to prevent pump damage Reopening within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is acceptable if seal injection is available.

Seal injection flow of 32 gpm is sufficient to satisfy the mimmum flow requirement.

The two-hour value is a very conservative assumption, based on a letter from the pump manufacturer, who states that the pumps can operate at flows as low as the design seal injection flow for days or weeks without senous effects (Gordom Parks of Bingham-Willamette to D H Stevens of Gilbert/Commonwealth, August 25, 1986)

Rev. 17 003/002 T3-2 18

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 19 7

VALVE POSITION REQUIRED TIME FOR OPERATION' REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

MU-V-37 Open Open Open Spurious 1 Hr 2 Hrs None AB-FZ-3 Same remark as MU-V-36 MU-V-38 Closed Closed Closed Spurious None None None RB-FZ-2 This valve must remain closed to prevent excessive leakage (and) temperature through the RCP #1 seal The valve Is kept closed by removing electrical power (unitgA breaker open at the IB radwaste 480 V CC)

AS-FZ-3 MU-V-70A Closed Closed Closed Required 2 Hrs 4 Hrs 4 None AS-FZ-6 See remark in MU-Vo6A MU-V-76A Closed Open (See Open None AB-FZ-3 Mechanical valves MU-V-76A and 76B may be Disc) used Ifdesired to allow MU-P-ic to be used for RC pressure control with the normal makeup path and control valves MU-V-76B Closed Open (See Open - -- None AB-FZ-3 Same remark as MU-V-76A.

Disc )

MU-V-91A Open Open Open Required 2 Hrs 2 Hrs MU-V-918 AB-FZ-3 Same remark as MU-V-17 MU-V-91B Open Open Open Required 2 Hrs 2 Hrs MU-V-D1A AB-FZ-3 Same remark as MU-V-17 MU-V-92 Closed Closed Closed Required 2 Hrs 2 Hrs MU-V-17 AB-FZ-3 Same remark as MU-V-17.

MU-V-97A Open Open Open Required 2 Hrs 4 Hrs 4 MU-V-97B AB-FZ-3 Same remark as MU-V-4 MU-V-97B Open Open Open Required 2 Hrs 4 Hrse4 MU-V-97A AB-FZ-3 Same remark as MU-V-4 MU-V-98 Closed Closed Closed Required 2 Hrs 4 Hrs 4 MU-V-5 AB-FZ-3 Same remark as MU-V-4 MU-V-99 Open Open Open Required 2 Hrs 4 Hrs 4 MU-V-4 AB-FZ-3 Same remark as MU-V-4 MU-V- Closed Closed Closed Required 2 Hrs 4 Hrs 4 MU-V-5 AB-FZ-3 Same remark as MU-V-4 109A MU-V- Closed Closed Closed Required 2 Hrs 4 Hrs 4 MU-V-5 AB-FZ-3 Same remark as MU-V-4 1098 MU-V-217 Closed Closed Closed Spurious 2 Hrs or 1 Hr 2 Hrs 5 or 1 Hr. MU-V-18 AB-FZ-4 See notes under MU-V-1i7.

NR-V-IA Open Open Open Spurious No Manual Action 30 Mins NR-V-1B ISPH-FZ-1 The valve corresponding to the NR pump in use Required NR-V-1C must remain open for NS and ICcooling NR-V-1B Open Open Open Spurious No Manual Action 30 Mins NR-V-1A ISPH-FZ-2 Same remark as NR-V-1A Required NR-V-lC Rev 18 0031002 T3-2.19

1,1ý ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 20 VALVE POSITION REQUIRED TIME FOR OPERATIONs REDUNDANT 7 VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

NR-V-IC Open Open Open Spurious No Manual Acticn 30 Mins NR-VolA ISPH-FZ-2 Same remark as NR-V-IA Required NR-V-1B NR-V-2 Closed Closed Closed Spurious None NR-V-7 ISPH.FZ-2 NR-V-2 is in senes with NR-V-7 At least one valve must stay closed to prevent NR water from diverting to the secondary service Spurious opening of one valve by a hot short does not present a problem NR-V-3 Open Open Open Spurious None None ISPH-FZ-2 This valve must remain opened to allow flow of cooling river water to NS heat exchangers and IC coolers This valve will be kept open by removing the electric power NR-V-4A Closed Closed Closed Spurious No Limit NR-V-4B AB-FZ-1 Deicing makeup is normally provided by the secondary service river water system NR-V-4A is In series with NR-V-4B Both are normally closed At least one valve must stay closed Spurious opening of one valve by a hot short does not present a problem The valves are opened during deicing makeup (infrequent operation) Administrative controls have been developed to protect against spurious wide opening of the valve during that time NR-V-4B Closed Closed Closed Spurious No Limit NR-V-4A AB-FZ-1 Same remark as NR-V-4A NR-V-5 Open Open Open Spurious None None AB-FZ-1 This valve must remain open to allow flow of cooling river water to NS heat exchangers and IC coolers This valve will be kept opened by removing electric power NR-V-6 Closed Closed Closed Spurious None None AB-FZ-1 This valve must remain closed to prevent diversion of NR water This valve is kept closed by removing the electric power NR-V-7 Closed Closed Closed Spurious None NR-V.2 ISPH-FZ-2 Same remark as NR-V-2 Rev 19 003/002 T3-2.20

<2 ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 21 6 7 VALVE POSITION REQUIRED TIME FOR OPERATION REDUNDANT VALVE NUMBER OR ACTIONE ACTION VAVES LOCATION DISCUSSION NORMAL HOT COLD SHUTDOWN SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN AREA/ZONE)

NR-V-8A Open Open Open Spunous None NR-V-8B AB-FZ-1 Three inlet valves are normally opened for NS NR-V-8C heat exchangers Two valves must stay opened NR-V-8D for shutdown. Spunous closing of one valve by a hot short does not present a problem.

NR-V-8B Open Open Open Spunous None NR-V-8A AB-FZ-1 Same remark as NR-V-8A.

NR-V-8C NR-V-8D NR-V-8C Open Open Open Spunous None NR-V-8A AB-FZ-1 Same remark as NR-V-8A NR-V-8B NR-V-8D NR-V-8D Open Open Open Spunous None NR-V-8A AB-FZ-1 Same remark as NR-V-8A NR-V-8B NR-V-8C NR-V-10A Open Open Open Spunous None NR-V-10B AB-FZ-1 At least on inlet valve is normally opened for IC coolers One valve may be closed. These valves must remain in their prefire positions for shutdown They are kept that way by removing the electric power.

NR-V-10B Open Open Open Spurious None NR-V-1OA AB-FZ-1 Same remark as NR-V-10A.

4 NR-V-15A Throttled Throttled Throttled Spurious 2 Hrs 4 HrS NR-V-15B AB-FZ-1 At least one outlet valve is normally throttled open for ICcoolers One valve may be closed. These valves must remain in their prefire positions for shutdown For locations where thermal barrier cooling is used, this valve must be available For a fire in other locations, manual correction will be required for the letdown cooling function. No manual action is required to support thermal barer cooling 4

NR-V-1SB Throttled Throttled Throttled Spurious 2 Hrs. 4 Hrs. NR-V-15A AB-FZ-1 Same remark as NR-V-1SA.

.1

,
ý.

Rev. 17 003/002 T3-2 21

K>

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 22 6 7 VALVE POSITION REQUIRED TIME FOR OPERATION REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE ISHUTDOWN jISHUTDOWN _IAREA/ZONE)

NR-V-16A Open Open Open Spunous None NR-V-16B AB-FZ-1 Three outlet valves are normally opened for NS NR-V-16C heat exchangers Two valves must stay open for NR-V-16D shutdown Spurious closing of one valve by a hot short does not present a problem NR-V-16B Open Open Open Spurious None NR-V-16A AB-FZ-1 Same remark as NR-V-16A NR-V-16C NR-V-16D NR-V-16C Open Open Open Spurious None NR-V-16A AB-FZ-1 Same remark as NR-V-16A NR-V-16B NR-V-16D NR-V-16D Open Open Open Spunous None NR-V-16A AB-FZ-1 Same remark as NR-V-16A NR-V-16B NR-V-16C NR-V-18 Throttled Throttled Throttled Required/ 30 Mins. or 2 Hrs 30 Mins or 4 NR-V-19 AB-FZ-1 This outlet valve must remain open to allow NR Spunous Hrs e water flow to NS heat exchangers and IC coolers For fires in other locations where RCP thermal barner cooling is required, this valve must be available Fora fire in other locations where RCP thermal barrier cooling is NOT required, manual correction will be required NR-V-18 is required to control system pressure Manual operation is acceptable for this purpose NR-V-19 Closed Closed Closed Spurous 30 Mins 30 Mins or 4 NR-V-18 AB-FZ-1 NR-V-19 is only open in a throttled condition Hrs 9 during deicing conditions (approx 2 months of the year) If valve spunously closes flow wilt continue through NR-V-18 which is open in parallel with NR-V-19 Spurious opening would cause loss of pressure control, and will be manually corrected Rev 17 003/002 T3-2 22

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 23 VALVE POSITION REQUIRED TIME FOR OPERATION 6 REDUNDANT 7 VALVE NUMBER- OR ACTION I ACTION VALVES LOCATION DISCUSSION NORMAL HOT SHUTDOWN COLD ISHUTDOWN SPURIOUS ACHIEVABLE REQUIRED (FIRE AREA/ZONE)

NS-V-32 Open Closed Closed Required No Manual Action 2 Hrs 5 None AB-FZ-5 This valve should be closed to Isolate non Required essential cooling loads for events which disable two NS pumps and/or two NR pumps and which at the same time require MU-P-1B:

RC-V-1 Closedt Closed Closed Spurious See Discussion 45 Mins RC-V-3 RB-FZ-ld RC-V-1 is in senes with RC-V-3 RC-V-1 opens Open on RC pressure above 2205 psig. RC-V-1 must remain closed to prevent rapid depressurization of the RCS Otherwise, RC-V-3 must be dosed to mitigate depressunzation. This spurious opening of RC-V-1 will be corrected by closing RC-V-3 or tripping the reactor coolant pumps. These actions can be accomplished from the control room or at the 6900Vswitch gear RC-RV-2 Closed Closed Closed/ Spunous See Discussion Immediate RC-V-2 RB-FZ-ld RC-RV-2 is in series with RC-V-2. RC-RV-2 (Cycling)S Required opens on high RCS pressure RC-RV-2 must remain closed to prevent rapid depressurization of the RCS. Otherwise. RC-V-2 must be closed to mitigate depressunzation Opening of both is required for HPI cooling

- RC-V-2 Open Closed8 Closed Required See Discussion Immediate RC-RV-2 RB-FZ-ld Same remarks as RC-RV-2 (Open)

RC-V-3 Open Closed Closed Required See Discussion 30to 72 Hrs RC-V-1 RB-FZ-ld Same remark as RC-V-1. RC-V-3 should be closed for cold shutdown to allow flow of DH water to the pressurizer spray line. The valve will be manually dosed (if necessary) for cold shutdown Rev. 17 003/002 T3-2.23

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 24 7

VALVE POSITION REQUIRED TIME FOR OPERATION" REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

RC-V-4 Closed Closed Open Required 90 Mins 3 to 72 Hrs None RB-FZ-3 This valve Is required to be open during cold shutdown to allow flow of DH water to the pressurizer flow of DH water to the pressurizer spray line. The valve will be manually opened (if necessary) for cold shutdown RC-V-28 Closed Closed Closed Required None RC-V-44 RB-FZ-3 RC-V-28 is in senes with RC-V-44 A control scheme modification is made to RC-V-44 to prevent spunous opening due to any one hot short *See note below RC-V-44 Closed Closed Closed Required None RC-V-28 RB-FZ-3 Same remark as RC-V-28 RC-V-40A Closed Closed Closed Required None RC-V-41A RB-FZ-ld RC-V-40A Is in series with RC-V-41A A control scheme modification is made to RC-V-41A to prevent spurious opening of RC-V-41A due to any one hot short. *See note below RC-V-41A Closed Closed Closed Required None RC-V-40A RB-FZ-ld Same remark as RC-V-40A RC-V-40B Closed Closed Closed Required None RC-V-41B RB-FZ-le RC-V-40B IsIn series with RC-V-41B. A control scheme modification is made to RC-V-41B to prevent spurious opening of RC-V-41B due to any one hot short *See note below.

RC-V-41B Closed Closed Closed Required None RC-V-40B RB-FZ-le Same remark as RC-V-40B

  • NOTE. In the unlikely event that both valves would be spuriously opened dunng a fire by a combination of cable failures (i e. open circuits and multiple hot shorts), it has been demonstrated that the plant capability to achieve and maintain cold shutdown conditions is not jeopardized Rev 17 003/002 T3-2 24

K>

ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 25 6 7 VALVE POSITION REQUIRED TIME FOR OPERATION REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

RC-V-42 Closed Closed Closed Required None RC-V-43 RB-FZ-3 RC-V-42 is In series with RC-V-43 A control scheme modification is made to CR-V-43 to prevent spurious opening of RC-V-43 due to any one hot short. See note below RC-V-43 Closed Closed Closed Required None RC-V-42 RB-FZ-3 Same remark as RC-V-42.

NOTE:

These RC vent valves (ie . RC-V-28, 44, 40A, 41A, 40S, 41B, 42, AND 43) may be required to be opened in some fire areas where leldown is not available to vent excess reactor coolant.

Manual operation is not required because one set of valves is available for operation from the control room.

WDL-V-1 Open Open Open Required! 2 Hrs 4 Hrs 4 None AB-FZ-6 This pneumatic valve should be open during cold Spurious shutdown to divert letdown flow to the bleed tanks if makeup tank overfilling is imminent. Overflow to WDL-T-2 will occur about 5 minutes after makeup tank suction Isolation, with normal 140 gpm letdown flow This overflow is acceptable. The valve can be manually opened by connecting an external air or nitrogen supply if normal operation is not possible.

4 WDL-V-2 Open Closed Closed Required/ 2 Hrs 4 Hrs WDL-V10 AB-FZ-6 This pneumatic valve must be dosed during cold Spunous shutdown when VtDL-V1 Is open The valve can be closed by disconnecting the air supply if normal operation is not possible "NOTE. In the unlikely event that both valves would be spuriously opened dunng a fire by a combination of cable failures (i e. open circuits and multiple hot shorts), it has been demonstrated that the plant capability to achieve and maintain cold shutdown conditions is not jeopardized Rev 17 003/002 T3-2.25

KU <-I ATTACHMENT 3-2 VALVES FOR OR ASSOCIATED WITH SAFE SHUTDOWN Sheet 26 6 7 VALVE POSITION REQUIRED TIME FOR OPERATION REDUNDANT VALVE NUMBER OR ACTION ACTION VALVES LOCATION DISCUSSION NORMAL HOT COLD SPURIOUS ACHIEVABLE REQUIRED (FIRE SHUTDOWN SHUTDOWN AREA/ZONE)

WDL-V-3 Open Open Open Required/ 2 Hrs 4 Hrs 4 WDL-V4 AB-FZ-5 This valve or one of the redundant valves should Spunous WDL-V5 be open during cold shutdown to divert letdown flow to a bleed lank with sufficient capability if makeup tank overilhng is imminent Overflowto WDL-T-2 will occur about 5 minutes after makeup tank suction isolation, with normal 140gpm letdown flow This overflow is acceptable. The valve can be opened by connecting an external air or nitrogen supply if normal operation is not possible WDL-V-4 Open Open Open Required/ 2 Hrs 4 Hrs 4 WDL-V3 AB-FZ-5 Same remark as WDL-V-3 Spunous WDL-V5 WDL-V-5 Open Open Open Required/ 2 Hrs 4 Hrs'4 WDL-V3 AB-FZ-5 Same remark as WDL-V-3 Spunous WDL-V4 Rev. 17 003/002 T3-2.26

ATTACHME!-h-- (Cont'd)

Sheet 27 FOOTNOTES The initiation of the decay heat cooling system (DH) can occur anytime between 3 to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> after an Appendix R fire For fires that require equipment repair before the DH system can be used, the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> time limit applies. DH can be Initiated any time the reactor coolant system temperature and pressure are suitable, which can occur any time after approximately 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> The 3 to 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> manual actions required for DH system operation are not required for hot shutdown

2. Study results show that only one motor-driven EF pump and one OTSG are required for cooling No corrective action is therefore required ifthe valve Is not open. Therefore, "No Limit" entries are used In the table See GPUN Memo 5520-85-0520, 10-01-85 released via DRF 038078, and the attached study by R W Moore, Babcock and Wilcox, 'Evaluation of Effects of Reduced or Delayed EFW Flow for Appendix R Requirements - TMI' 3 Main feedwater flow to the OTSGs must be stopped to prevent overcooling or overfeeding the OTSGs Ifeither the flow control valves or their stop valves cannot be closed quickly, the main feedwater pumps or the condensate pumps must be tripped to stop MF flow Therefore, "No Limit" entnes have been used In the Action Required table, since valve action cannot be taken 4 The letdown function will be used to ease reactor coolant system inventory and pressure control The letdown function is only absolutely necessary when the pressurizer heaters are not available and feed and bleed Is used for solid plant pressure control and when required, to reestablish pressurizer pressure control at the termination of HPI cooling All "Action Required" table entries relative to the letdown function show "4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />" for the time required to establish and maintain a letdown flow path While components are listed for various letdown flow paths and supporting equipment, only one path will be established, depending on available components.

5 The "2 Hr." values for MU-V-14 and MU-V-t6's are based on events for which emergency feedwater Is available, seal injection Is not required, and pressure control Is available, so that normal makeup Is not Immediately required Makeup can be delayed with the reactor In hot shutdown, for two hours Correction of spurious operation of MU-V-16A, B,C, or D, or 17. or 217 Is,however, required within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> during which the RCS enters Into "feed and bleed" condition An alternative means of correcting spurious opening of these valves Is to trip the makeup pump This Is acceptable so long as thermal barrier cooling Is available, so that RCP seal Injection Is not required

6. The Action Achievable column should be regarded as a conservative estimate, for all manual actions Implemented In the fire emergency procedures The Action Required column Is also a conservative estimate In most cases, an adequate margin can be shown without detailed analysis of the system and component operating sequences and times Action required times are supported by analysis as required
7. The Redundant Valves column refers, in most cases, to those valves which serve an equivalent function In a redundant train, and does not, In all cases, Identify valves which provide the required shutdown function for all Appendix R fire events 8 The "2 Hrs"'limit applies for the IB-FZ-3 and IB-FZ-8 fires for which HPI cooling is used, and Is a minimum figure based on the desirability of re-establishing EFW as soon as reasonably achievable, taking into account the time required to extlinguish the fire and gain manual control HPI can safely be used for a considerably longer period, and the reactor can, in fact, be cooled down on HPI and DHR-LPI alone See the following TMI-1 Abnormal Transient Procedures (ATPes)

ATP-1210-4 Rev 7 (06-13-86) "Lack of Primary to Secondary Heat Transfer" ATP-1210-6 Rev 6 (06-13-86) "Small Break LOCA Cooldown" ATP-1210-Rev 8 (06-13-86) "HPI Cooling - Recovery from Solid Operations" At least one of the EF-V-30 valves Is required immediately (I e , within 20 minutes) for EFW cooling (all zones except IB-FZ-3 and IB-FZ-8). The "20 Min "Action Required values are based on small-break LOCA analyses which show acceptable primary system response with neither high pressure Injection nor emergency feedwater available for 20 minutes after reactor trip. This situation occurs In two fire areas, FH-FZ-5 and CB-FA-2g, where the valve circuits can be promptly Isolated at the Remote Shutdown Transfer Switch Panel, and manually controlled using handwheels under direction of control room operators Also, loss of backup air supply due to a fire in IB-FZ-2 and DG-FA-2 leads to a similar situation (Ie, 20 Min Action Required) for the EF-V-30 valves In these fire areas they will be normally controlled using handwheels under direction of control room operators For the small-break LOCA analyses, see the reference under note 2, and GPUN-SDD-TI-211A, Rev 3, System Design Description, Div I, "High Pressure Injection System Cross Connect and High Capacity Makeup Valve, TMI Restart Task RM-14, B/A 412072" 9 The IC and NR valves are required to support thermal barrier cooling and letdown cooling Westinghouse has stated that reactor coolant pump seals will survive for 30 minutes with acceptable leakage, without thermal barrier cooling or seal injection (with the reactor coolant pumps tripped) For a running RC pump, this time limit is lowered to 10 minutes The 30 minutes manual operating time is based on events which requires thermal bamer cooling, the reactor coolant pumps are assumed to be tripped The next limit for operation of these valves would be 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, for establishing letdown cooling Seal Injection is available In these cases

10. "No Limir applies to spurious opening of MS-V-3A, 3B, 3C, 3D, 3E, and 3F since it can always be corrected by closing MS-V-8A and MS-V-8B from the Control Room.
11. A combination of two Atmospheric Dump Valves (MS-V-4A/B) and three Turbine Bypass Valves (any three of MS-V-3B/CID/EIF) may be used to achieve cold shutdown conditions within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for fires that require the evacuation of the Control Room. These combinations are identified In Calculation C-1i101-91 1-E6120-001, 'Appendix R 72 Hour Cold Shutdown Analysis'. Implementation Is addressed under guidance provided to the Technical Support Center (TSC) In "TSC Engineering Calculation Guide 15 0" This guidance will be used for Implementation ifthe plant requires an accelerated cool down to protect the reactor core from damage (cool down path reliability Issue) and with the understanding that condenser damage Is expected and acceptable Implementation also effects the habitability of the Turbine Building Valves MS-V-3A (Turbine Bypass Valve) may also be used but Is not relied on for achieving cold shutdown conditions based due to a different design than the other MS-V-3 valves Main Steam Safety Valves MS-V-17A/B/C/D, MS-V 18A/B/CID MS-V-19A/BICID MS-V-20A/BIC/D and MS-V-21AB (MS-V-2IA/B are a smaller size and would not make any significant contribution to cool down) are addressed in the calculation but are not used for this function since they are not designed for manual operation Rev 19 0031002 T3-2 27

K>

ATTACHMENT 3-3A SAFE SHUTDOWN EQUIPMENT CONDENSATE Page 1 of 1 Required or: Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down IOus?

NOTE* The Condensate system provides water to the Emergency Feedwater system Components of this system needed for safe shutdown are therefore Included in the Emergency Feedwater system and the balance of this table has been deleted 003/002 Rev. 17 T3-3.1

K>

ATTACHMENT 3-3B SAFE SHUTDOWN EQUIPMENT CONTROL BUILDING AND OTHER VENTILATION Page 1 of 1 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

NOTE* Analysis shows that Control Building, DC and NS Room, Diesel Generator and EF Pump Room ventilation systems are not required for safe shutdown The components associated with these systems have therefore been deleted.

INTAKE PUMP AND SCREEN HOUSE AH-E-27A IPSH Fan A X X R One of the fans is required for IPSH ventilation "AH-E-27B IPSH Fan B X X R AH-D-6A Discharge Damper X X R The damper corresponding to the fan In use must open and the AH-D-6B Discharge Damper X X R other damper must close 003/002 Rev. 17 T3-3.2

K>

ATTACHMENT 3-3C SAFE SHUTDOWN EQUIPMENT CORE FLOODING Page 1 of 1 Required or. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

NOTE Under Appendix R, isolation of this system is desirable before reactor pressure drops below 700 psi, but Isolation is not required for safe shutdown, nor is operation of this system required for safe shutdown for Appendix R events. The balance of this table has therefore been deleted 003/002 Rev. 17 T3-3.3

K>

ATTACHMENT 3-3D SAFE SHUTDOWN EQUIPMENT DECAY HEAT CLOSED CYCLE Page 1 of 1 COOLING WATER Required for: Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down Ious?

DC-P-1A DH Closed Cycle Pump A X X R These pumps provide cooling water to the decay heat removal DC-P-1B DH Closed Cycle Pump B X X R coolers, makeup pumps MU-P-1A and MU-P-1C and the decay heat removal pumps Only one is required to operate during shutdown It must match the operating DH river water pump, decay heat pump, and makeup pump. DC-P-1B can be operated from the "B"Aux. RSP.

DC-V-2A DH Cooler A Inlet Valve X R These electro-pneumatic valves are required to be opened during DC-V-2B DH Cooler B Inlet Valve X R cooldown Energization of valve solenoid allows remote throttling from the Control Room. They are equipped with spring-opposed piston operators for throttling service and for closing with 80 psi air. They have hand jacks for manual operation, and time is available for manual operation for cold shutdown The valves fail open upon loss of power or instrument air. Loss of Control Room control, or spurious closure can be mitigated by disconnecting power or air at the solenoid and manually operating the valves Only one is required during shutdown It must match the operating DHCCC system train.

DC-V-65A X R These electro-pneumatic valves are required to be closed during DC-V-65B X R cooldown Energization of valve solenoid allows remote throttling from the Control Room The valve opens on increasing signal and closed upon loss of power or instrument air. A handwheel is available and time is available for manual operation for cold shutdown Loss of Control Room control, or spurious closure can be mitigated by disconnecting power or air at the solenoid and manually operating the valves. Only one is required during shutdown It must match the operating DHCCC system train Manual operation of DC-V-2A or B and DC-V-65A or B may result in high radiation exposure.

0031002 Rev. 17 T3-3.4

K-I ATTACHMENT 3-3E SAFE SHUTDOWN EQUIPMENT DECAY HEAT REMOVAL Page 1 of 3 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

DH-P-1A Decay Heat Pump 1A X R One decay heat pump is required to operate during the later DH-P-1B Decay Heat Pump 1B X R stages of cooldown. It must match the operating decay heat nver water pump and decay heat closed cycle pump. DH-P-1 B can be operated from I E-4160 volt switchgear.

DH-V-1 Decay Heat Suction Valve X R These motor-operated valves are normally closed and are Inside Containment considered High Low pressure Interface valves They must not DH-V-2 Decay Heat Suction Valve X R be allowed to be spuriously opened during hot shutdown, Inside Containment however they are required to be opened during the later stages of DH-V-3 Decay Heat Suction Valve X R cooldown. They can be operated manually if required They Outside Containment must remain open to maintain a suction water supply to the DH pumps when they are operating DH-V-1 is inside the secondary shield wall and radiation level must be considered before operating the valve manually. The Integrity of the High Low pressure interface is maintained by keeping DH-V-2 closed (power removed)

DH-V-4A Decay Heat Discharge Valve to X R These motor-operated valves are normally closed and the one on RC Loop A the decay heat loop in service Is required to be opened during the DH-V-4B Decay Heat Discharge Valve to X R later stages of cooldown They can be operated manually if RC Loop B required DH-V-5A Decay Heat Suction Valve from X X R These motor-operated valves are normally open and are required BWST to close during the later stages of cooldown These valves can DH-V-5B Decay Heat Suction Valve from X X R mitigate BWST drainage due to spurious opening of DHOV BWST 6A/6B They can be operated manually if required 003/002 Rev 17 T3-3 5

<-'I KU ATTACHMENT 3-3E SAFE SHUTDOWN EQUIPMENT DECAY HEAT REMOVAL Page 2of 3 Required for. Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

DH-V-6A Decay Heat Suction from RB X X S These motor-operated valves from the reactor building sump are DH-V-6B sump isolation valve X X S normally closed and must remain closed when decay heat pumps are running to prevent loss of suction to the pumps These valves can have their breakers opened to prevent spurious operation when decay heat pumps are running For hot shutdown, see entries in Attachment 3-3L, Makeup. They can be operated manually if required DH-V-7A Decay Heat Discharge Valve to X S These motor-operated valves are normally closed and should DH-V-7B make up pumps suction X S remain closed not to divert DH water to the makeup system These valves can have their breakers opened to prevent spurious operation when decay heat pumps are running. They can be operated manually If required DH-V-12A Decay Heat Suction Valve- X R One of these manual valves are required to be opened during the Reactor to DH-P-1A later stages of cooldown, corresponding to the decay heat loop in DH-V-12B Decay Heat Suction Valve- X R service Reactor to DH-P-1B DH-V-64 Decay Heat Spray Line Isolation X R Valve DH-V-75A DH-P-1A Vent Valve X R This manually-operated, normally closed valve is located outside DH-V-75B DH-P-1A Vent Valve X R the reactor building. It must be opened to permit use of pressurizer spray through RC-V-4 during cold shutdown These solenoid operated valves are required to open to vent DH P-1A before it is operated They must be closed when the DH pump is operating Ifthey cannot be opened, manual valves on DH-V-77A and DH-V-78A can be used Instead 003/002 Rev. 17 T3-3 6

K> K>1-ATTACHMENT 3-3E SAFE SHUTDOWN EQUIPMENT DECAY HEAT REMOVAL Page 3 of 3 Required for. Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

DH-V-75B DH-P-1B Vent Valve X R These solenoid operated valves are required to open to vent DH DH-V-76B DH-P-1B Vent Valve X R P-1B before it is operated. They must be closed when the DH pump is operating If they cannot be opened, manual valves DH V-77B and DH-V-78B can be used instead DH-V-77A DH-P-1A Vent Valve X R These manual valves can be used to vent DH-P-lA before it Is DH-V-78A DH-P-1A Vent Valve X R operated for cold shutdown If DH-V-75A and DH-V-76A are not available DH-V-77B DH-P-1lB Vent Valve X R These manual valves can be used to vent DH-P-1B before it is DH-V-78B DH-P-1 B Vent Valve X R operated for cold shutdown if DH-V-75B and DH-V-76B are not available I BS-V-2A Sodium Hydroxide Storage X S These motor operated valves must remain closed to prevent BS-V-2B Tank intertie valves to Decay X S introduction of NAOH into the reactor coolant system. Their Heat Suction Header position must be verified, and may be manually corrected, before operation of the decay heat removal system BS-V-3A Reactor Building Spray suction X R These motor operated valves on the reactor building sump/BWST BS-V-3B valves from the RB sump X R suction line are normally open and must be closed when decay heat pumps are running to prevent reactor coolant from entering the spray system These valves can be shut manually if they cannot be closed electrically. Spurious operation is not a concern, since the decay heat system will operate only after the fire is extinguished 003/002 Rev. 17 T3-3 7

K>

ATTACHMENT 3-3F SAFE SHUTDOWN EQUIPMENT DECAY HEAT RIVER WATER Page 1 of 1 Required for Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

DR-P-1A D H River Water Pump A X X R These pumps provide cooling water from the Susquehanna River DR-P-1S D H River Water Pump B X X R to the decay heat service coolers. Only one Is required to operate during shutdown, it must match the operating train of the decay heat closed cycle cooling water. DR-P-IS can be operated from the *B*Aux. Remote Shutdown Panel (RSP)

DR-V-1A DR-P-1A Discharge Valve X X R These motor operated valves are normally closed The valve DR-V-1B DR-P-1B Discharge Valve X X R corresponding to the pump to be used dunng the fire is required to be opened during shutdown. DR-V-1B can be controlled from the"B"Aux RSP.

DR-S-1A DR-P-1A Disch Strainer These strainers and backwash valves are not required. Sufficient DR-S-1iB DR-P-lB Disch Strainer time exists to operate them manually DR-V-24A DR-S-1A Backwash Valve DR-V-24B DR-S-1B Backwash Valve 003/002 Rev. 18 T3-3 8

K>

ATTACHMENT 3-3G SAFE SHUTDOWN EQUIPMENT EMERGENCY FEEDWATER Page 1 of 3 Required for. Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

EF-P-1 EF Turbine Driver Pump X R These pumps deliver water from the condensate system to the EF-P-2A EF Motor Driven Pump A X R steam generators. One motor-driven or one turbine-driven pump EF-P-2B EF Motor Driven Pump B X R is required to operate for safe shutdown. EF-P-2B can be controlled from the IE 4160V ES Switchgear for remote shutdown EF-V-2A,B EF Pump Discharge Header X S These motor operated valves are normally opened They are Valves required to remain open only to allow feed water into both steam generators from a single pump. Spurious closure of the valves may be manually corrected Since analysis shows that only one steam generator is required, spurious closure is not a concern EF-V-4 EF Suction Isolation Valve - These motor operated valves are normally closed. To prevent EV-V-5 EF Suction Isolation Valve river water contamination of the EFW system, at least one valve should remain closed.

Since Appendix R assumes only one spurious operation to occur per fire scenario, at least one valve will remain closed during the fire Cables to these valves do not therefore require evaluation EF-V-30A EF Train A Ctl. Vlv X R These air-operated, solenoid-controlled, control v'alves are to Stm Gen A normally closed They fail closed upon loss of instrument air. At EF-V-30B EF Train B Ctl. VIv. X R least one valve for each steam generator in service is required to to Stm Gen B be operable or manually operated for safe shutdown. The EF-V-30C EF Train A Ctl. VIv X R remaining control valve in each loop Is required to remain closed to Stm Gen A to prevent overfilling of the steam generators EF-V-30D EF Train B CU. Vlv X R to Gen B 003/002 Rev. 17 T3-3 9

lll-ý ATTACHMENT 3-3G SAFE SHUTDOWN EQUIPMENT EMERGENCY FEEDWATER Page 2 of 3 Required for: Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

Normally, these valves are controlled by the HSPS system.

However, during remote shutdown, the train B solenoid valve control are transferred to the RSP "B" while the train A solenoid valves are closed from the RSP WA".

Since the valves are equipped with only a two hour backup air supply, they must be manually controlled after the first two hours if Instrument air is not available.

EF-V-52A EF Train A Flow Iso. Power has been removed from these valves They are used as Vlv To Stm. Gen A manual valves, normally open EF-V-52B EF Train B Flow Iso VIv To Stm. Gen B.

EF-V-52C EF Train B Flow Iso Vlv To Stm. Gen A EF-V-52D EF Train A Flow Iso VIv To Stm. Gen. A EF-V-8A EF-P-2A Recirculating These valves are mechanically blocked open with air and Valve electrical service removed form the solenoid valve.

EF-V-8B EF-P-1 Recirculating Vlv The valve corresponding to the EF pump which wilil be us d EF-V-SC EF-P-2B Recirculating during the fire should remain opened Valve Since these valves are locked to the safe shutdown position (open), cables to these valves do not need to be evaluated.

0031002 Rev 20 I T3-3 10

lllý ATTACHMENT 3-3G SAFE SHUTDOWN EQUIPMENT EMERGENCY FEEDWATER Page 3 of 3 Required for. Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down Ious?

CO-V-111A and B CST. Cross-connect These motor operated valves provide two ways for the EF-V-1A and B Valves EFW Pump Suction - emergency feedwater pumps to take suction from both Header Valves condensate storage tanks. One Is through the cross-over header of the two condensate storage tanks with CO-V-lI1A and B open, and the other is through the common suction header of the emergency feedwater pumps with EF-V-1A and B open. During normal operation, all four valves are opened; however, only(one set of valves are required to remain opened during the fire Since Appendix R assumes only one spurious operation to occur per fire scenario, at least three valves will remain open during shutdown. The cables for these valves do not therefore %1iI not be evaluated.

CO-P-3A Powdex backwash pumps - The Powdex backwash pumps may need to be shut off or CO-P-3B - Isolated from the condensate system if the emergency feedwater system Is used. This can be done manually.

CO-V-10A Condensate storage - These motor operated valves are normally open. They mt st CO-V-1OB Tank drain to EFW and - open to provide emergency feedwater. The valves are Ioc ed Hotwell open, by keeping the circuit breaker locked open CO-V-14A and Condenser Hotwill to X R One pair of these motor-operated valves must open or ren ain CO-V-12, or Condensate storage X R open if condensate Is required from the condenser hotwell for CO-V-14B and Tank cross tie valves X R emergency feedwater operation, or If condensate is requir d from CO-V-1t3 X R the condensate storage tanks for main feedwater operatioi Manual operation is acceptable.

AS-P-1A Auxiliary Boiler feed The auxiliary boiler feed pumps should be secured, If operating, AS-P-1 B pumps to prevent draindown of the condensate storage tanks.

003/002 Rev 20 1 T3-3 11

K>

ATTACHMENT 3-3H SAFE SHUTDOWN EQUIPMENT INTERMEDIATE COOLING Page 1 of 2 Required for: Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down IOUs?

IC-P-IA Intermediate Cooling X X R These pumps provide cooling water to the letdown coolers to Pump A support letdown flow In the make-up and punfication system and IC-P-1 B Intermediate Cooling X X R to the reactor coolant pump seal thermal barner coolers When Pump B R.C. pump seal injection is not available, one pump must be available within 30 minutes for tripped RCP's (10 minutes for running RCPs Only one pump Is required for shutdown IC-P-1B can be operated from the "B" Aux Remote Shutdown Panel (RSP).

IC-V-1A IC Supply to Letdown X X S Prior to the fire, either of these motor operated valves Is normally Iso Valve open This depends upon which letdown cooler is aligned for IC-V-1iB IC Supply to Letdown X X S plant operation Iso Valve For safe shutdown, these valves should remain In their pre-fire position IC-V-1B can be operated from "B"Aux. RSP.

Since sufficient time is available to initiate letdown flow, the valve's position can be manually corrected Ifit spuriously operated IC-V-2 IC Return from RB Iso X X S This motor operated valve is normally opened and is required to Valve be opened for shutdown. The valve position can be manually corrected if it spuriously operates except when reactor coolant pump seal injection Is not available and thermal barrier cooling is required immediately. The valve can be controlled from the 'B" Aux RSP.

003/002 Rev 17 T3-3 12

lllý KU /

ATTACHMENT 3-3H SAFE SHUTDOWN EQUIPMENT INTERMEDIATE COOLING Page 2 of 2 Required for. Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

IC-V-3 IC Return from RB Iso X X S These pneumatic operated valves are riormally opened They Valve are required to remain opened to ensure cooling water through IC-V-4 IC Supply to RB Iso Vlv. X X S the letdown and RCP thermal barrier coolers These valves are equipped with a 2 hr. backup air bottle to keep them open upon loss of instrument air. Their position can be manually corrected if they spuriously operate except when seal injection is not available and thermal barrier cooling Is required Immediately.

IC-V-3 and IC-V-4 are also equipped with a transfer switch at the RSTSP *A" and "B" respectively, which will isolate cables to the control room and transfer control to the RSP *A" for IC-V-3 and "B" Aux. RSP for IC-V-4 IC-V-79A RCP A Cooler Isolation - -- These motor operated valves are normally open They are Valve required to remain open for seal thermal barrier cooling when IC-V-79B RCP B Cooler Isolation - . seal injection is not available The valves have power removed Valve IC-V-79C RCP C Cooler Isolation -

Valve IC-V-79D RCP D Cooler Isolation -

Valve 003/002 Rev 17 T3-3 13

<-I

<2 ATTACHMENT 3-31 SAFE SHUTDOWN EQUIPMENT LETDOWN Page 1 of 3 Required for Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

MU-V-1A Letdown Cooler A inlet X X S Dunng normal operation, both pairs of motor operated Inlet and valve outlet valves can be opened which place both letdown coolers in MU-V-2A Letdown Cooler A outlet X X R/S service.

valve MU-V-lB Letdown Cooler B Inlet X X S MU-V-2A and 2B can be controlled from remote shutdown panel valve (RSP) "B". The required pair can be manually operated for MU-V-2B Letdown Cooler B inlet X X R/S letdown The uncontrolled letdown may be mitigated by closing valve MU-V-2A and 2B.

MU-V-3 Letdown Block Valve X X R/S This pneumatic solenoid operated valve Is normally opened and de-energized If letdown is required and the valve spuriously closes, it can be manually opened MU-V-3 can be operated from remote shutdown panel (RSP) WA. The uncontrolled letdown may be mitigated by closing MU-V-3 MU-V-4 Orifice Block Valve X X RIS This pneumatic solenoid operated valve is normally opened and de-energfzed. If letdown is required for RCS pressure control, the valve should be closed If it cannot be closed due to spurious operation, manual valve MU-V-99 must be closed to prevent uncontrolled letdown flow. (See Remarks under MU-V-2A/B and 3)

MU-V-99 Orifice Block Valve X X R This manual valve must be closed if MU-V-4 cannot be closed and letdown is required for RCS pressure control MU-V-5 Letdown Flow Control X X RIS This pneumatic control valve Is used to control letdown flow down Valve to 10 GPM If letdown is required for RCS pressure control, this valve Is the preferred means of flow control. If it cannot be controlled or spuriously opens, manual valves MU-V-97A or 97B can be closed to prevent uncontrolled letdown flow (See Remarks under MU-V-2A/B and 3.)

003/002 Rev. 18 T3-3 14

L._j ATTACHMENT 3-31 SAFE SHUTDOWN EQUIPMENT LETDOWN Page 2 of 3 Required for Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

MU-V-97A MU-V-5 Manual Isolation X X R One of these manual valves must be closed if MU-V-5 cannot be MU-V-97B Valves X X R controlled MU-V-98 Manual Bypass Valves X X R These three manual valves can be used to control letdown flow if MU-V-109A for MU-V-5 and the X X R letdown is required for RCS pressure control and MU-V-5 is not MU-V-109B letdown orifice X X R available Ifthis flow path is needed, all three valves should be In the throttle position so that the entire letdown pressure decrease is not taken across one valve only MU-V-6A Demineralizer MU-K-1A X X S One of these pneumatic solenoid operated valves is normally Inlet Valve open depending on which demmeralizer Is in service. If it should MU-V-6B Demineralizer MU-K-1iB X X S spuriously close, manual bypass valve MU-V-70A must be Inlet Valve opened to provide a letdown flow path.

MU-V-70A Demineralizer Bypass X X R This manual valve must be opened to provide a letdown flow path Valve if MU-V-6A or 6B spuriously closes MU-V-8 Letdown to MU/Bleed X X R/S This motor operated valve is normally positioned to send letdown Tank Control Valve flow to the make-up tank This valve may need to transfer letdown flow to the bleed tanks to prevent the MU tank from overfilling. This can be accomplished by manual operation, because the MU tank overfill will be drained to WDL-T-2 MU-V-11A Make-up Filter MU-F-1A X X S One of these pneumatic solenoid operated valves Is normally Inlet Valve open depending on which filter is in service If it spuriously MU-V-11B Make-up Filter MU-F-1iB X X S closes, manual bypass valve MU-V-1i10 must be opened to Inlet Valve provide a letdown flow path to the make-up tank 003/002 Rev. 17 T3-3.15

K> KUj ATTACHMENT 3-31 SAFE SHUTDOWN EQUIPMENT LETDOWN Page 3 of 3 Required for. Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ous?

MU-V-1 10 Make-up Filter Bypass X X R This manual valve must be opened to provide a letdown flow path Valve to the make-up tank if MU-V-1lA/1 1B spuriously closes WDL-V-1 Letdown to Bleed Tanks X X R/S This pneumatic valve must be open to divert letdown to the bleed Isolation Valve tanks. The valve must be opened by connecting an external air or nitrogen supply if normal operation is not possible WDL-V-2 Letdown to Deborating X X R/S This pneumatic valve must be closed to divert letdown to the Demineralizer Isolation Valve bleed tanks The valve must be closed by disconnecting sir supply if normal operation Is not possible.

WDL-V-3 Letdown Valve to Bleed Tank X X RIS One of these pneumatic valves must be open to a bleed tank with WDL-T-1A sufficient capacity to accept letdown flow. The valve must be WDL-V-4 Letdown Valve to Bleed Tank X X RIS opened by connecting an external air or nitrogen supply if normal WDL-T-1B operation is not possible.

WDL-V-5 Letdown Valve to Bleed Tank X X R/S WDL-T-1C 003/002 Rev 17 T3-3.16

K)

ATTACHMENT 3-3J SAFE SHUTDOWN EQUIPMENT MAIN FEEDWATER Page 1 of 2 Required for: Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

NOTE: Appendix R requires an assumption of loss of off-site power for fire events The main feedwater system Is not available after a loss of off-site power. The main feedwater system Is not required for safe shutdown under Appendix R. Emergency feedwater Is used for shutdown. Shutdown of the system Is required to prevent OTSG overfill and primary loop overcooling. In that event, the following components are required.

FW-U-1A or B Main feedwater pump turbines x R Trip of the turbines may be required to mitigate spurious opening of the control valves, to prevent steam generator overfill. This is FW-P-1A or B Main feedwater pumps the only operation required for safe shutdown under Appendix R.

FW-V-1A or B Main feedwater pumps x R These motor operated angle stop check valves are normally discharge Isolation open They may be required to close to mitigate OTSG overfill during safe shutdown under Appendix R.

FW-V-5A and B Main control block valves x R These motor-operated valves are normally open. These valves may be required to close to mitigate spurious opening of the respective FW-V-17A and B main control valves FW-V-16A and B Low-load control valves x R These pneumatic valves are required to operate to control steam generator level If main feedwater is used for shutdown. Flow Is controlled on steam generator level. Spurious opening would flood a steam generator, and spurious closure would lower steam generator level and Initiate emergency feedwater. They may be required to close to mitigate OTSG overfill.

Spurious opening can be mitigated by closing the corresponding block valve FW-V-92A or B, or tripping pumps, and Initiating emergency feedwater.

I I I I 003/002 Rev 19 T3-3.17

K>

ATTACHMENT 3-3J SAFE SHUTDOWN EQUIPMENT MAIN FEEDWATER Page 2 of 2 Required for Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

FW-V-17A and B Main control valves X S These pneumatic control valves are normally modulating during operation. They may be required to close to permit control of steam generator level by the FW-V-1 6A and B low-load control valves if main feedwater is used. Spunous opening would flood a steam generator.

Spurious opening can be mitigated by closing the corresponding block valve FW-V-5A or B, or tripping pumps, and Initiating emergency feedwater.

FW-V-92A and B Low-load control block valves X R These motor-operated valves are normally open These valves may be required to close to mitigate spunous opening of the respective FW-V-16A and B low-load control valves CO-P-1A, 1B &IC Condensate pumps - These condensate pumps are not required for shutdown.

Tripping of the condensate pumps will starve feedwater pump suctions and prevent OTSG overfill CO-P-2A, 2B & 2C Condensate booster pump - These condensate booster pumps are not required for shutdown Tripping of the condensate booster pumps will also starve feedwater pump suctions and prevent OTSG overfill 003/002 Rev. 17 T3-3 18

KJ ATTACHMENT 3-3K SAFE SHUTDOWN EQUIPMENT MAIN STEAM Page 1 of 3 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

SV-1,2,3,4 Turbine Stop Valves X R These electro-hydraulic valves are required to close during safe shutdown.

They will automatically close when the main turbine is tripped Ifthey fail to close the Turbine Control valves are available to close.

These valves are required to close for safe shutdown if the Turbine Stop CV-1,2,3.4 Turbine Control Valves x R Valves fail to close due to a hot short These valves will not fail to close in the event of a fire Reliance on these valves to isolate main steam is not a concern These air-operated valves are normally closed and are required to remain MS-V-3A-F Main Steam Dump to x S closed for cooldown by atmospheric dump valves MS-V-4A and B They Condenser Valves are controlled by an E/P converter which gets signal from the NNI/ICS.

Their pneumatic line is equipped with solenoid valves which when deenergized will block control from the E/P converter, drain the air to the valves and close It. Spurious opening of more than one MS-V-3 without closure of MS-V-8A/SB is a pressurized thermal shock concern.

X See Attachment 3-2 Note 11.

These motor-operated valves are normally opened. They are required to mitigate spurious operation of MS-V-3A,B,C,D,EF. Bothvalvescanbe MS-V-8A, B Main Steam Dump to x R controlled from the RSP 'B" for remote shutdown.

Condenser Valves These air-operated valves are normally closed Cooldown can be achieved with one valve under control, provided it serves a steam generator whose level is under control. The other valve must be under MS-V-4A,B Atmospheric Dump Valves x R control or closed These valves can be manually controlled An open MS V-4 is less severe than a main steam break or a stuck-open relief valve incident, for which analyses are available to show acceptable plant response The relief valves are available if both dump valves stay closed For remote shutdown, MS-V-4A can be closed when it spuriously opens X from the RSP "A while MS-V-4B can be controlled from RSP "B".

See Attachment 3-2 Note 11 0031002 Rev. 19 T3-3 19

KU ATTACHMENT 3-3K SAFE SHUTDOWN EQUIPMENT MAIN STEAM Page 2 of 3 Required for: Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

MS-V-2A,8 Steam Dump Header Isolation X S These motor operated valves are normally opened The valve Valve corresponding to the steam generator, atmospheric dump valve and emergency feedwater (EFW) turbine-driven pump steam valve to be used dunng the fire should remain open, if less than two OTSG's, atmospheric dump valves (MS-V-4A and B), or EFW steam valves (MS-V-1iA and B) are used MS-V-1OA,B EF-P-1 Steam Valves X R Two valves are preferred for steam to the EF turbine driven pump. One is sufficient Spurious operation can be manually corrected These motor-operated valves are normally closed. Only one is required to be opened when the emergency feedwater (EF) turbine dnven pump is used. These valves are normally used at low main steam pressures, but can be used at normal (high) pressures MS-V-6 EF Turbine Isolation X R This air-operated valve Is normally opened It Is required to control the steam pressure to the emergency feedwater turbine when the emergency feedwater turbine-driven pump Is used for shutdown It is equipped with a pressure controller (MS_-PC-5) which closes the valve on increasing signal The valve will fail open on loss of instrument air.

AS-V-4 Aux Steam Isolation Valve X S This motor operated valve Is normally closed It should remain closed if the turbine driven EFW pump (EF-P-1) is used, to avoid uncontrolled loss of main steam to the auxiliary steam system.

Manual closure Is acceptable.

003/002 Rev. 17 T3-3 20

K> K>

ATTACHMENT 3-3K SAFE SHUTDOWN EQUIPMENT MAIN STEAM Page 3 of 3 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

MS-V-56A and B Main Feedwater Turbine X These valves open automatically on main turbine trip and Main Steam Stop Valves automatically close when the feedwater turbine trips. When the main feedwater system is used instead of the emergency feedwater system, the valve corresponding to the pump in service must remain open When main feedwater is not used, they should close. Since the main feedwater turbine control valves MS-V-57A and B are in series with these valves, closure of these valves is not required MS-V-5A and B Main Feedwater Turbine These motor-operated valves are normally open When the main Main Steam Isolation feedwater system is used instead of the emergency feedwater system, the valve corresponding to the pump in service must remain open They are not required for safe shutdown under Appendix R Extraction Steam. Stop Protection is not required Check valves are provided upstream.

Valves MS-V-13A MS-V-10A Bypass X R These air-operated valves are used for EFW turbine steam MS-V-13B MS-V-1OB Bypass X R supply at normal (high) main steam pressures They are not required for emergency operation if MS-V-1iOA or B is available.

003/002 Rev. 17 T3-3 21

KU ATTACHMENT 3-3L SAFE SHUTDOWN EQUIPMENT MAKEUP Page 1 of 4 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

MU-P-1A Makeup Pump A X X R These pumps provided makeup water to the reactor coolant (RC)

MU-P-1B Makeup Pump B X X R system for pressure, Inventory, and reactivity control, for reactor MU-P-iC Makeup Pump C X R coolant pump (RCP) seal injection, and for high pressure injection cooling Only one pump Is required to operate for safe shutdown with primary to secondary cooling available for decay heat removal Pumps MU-P-1B and MU-P-1C can be controlled from remote shutdown panel (RSP) WB. If MU-P-1C Is used, the intermediate cooling system must be available to provide RCP thermal barrier cooling since RCP seal injection flow is not normally lined up to MU-P-1C. NOTE Makeup pumps and associated components are required for cold shutdown if reactor coolant temperature is 190 OF. or greater as seal injection is required Makeup could also be required if reactor coolant temperature exceeds 1350 F and reactor coolant pressure control must be re-established due to a steam space in the pressurizer.

Two pumps are required for high pressure Injection (HPI) cooling In the IB-FZ-3 and IB-FZ-8 fire cases MU-P-2A Aux Oil Pump for MU-P-1A X X R These pumps are normally operated in conjunction with and as MU-P-2B Aux Oil Pump for MU-P-1iB X X R backup to the main oil pumps to insure sufficient lubrication for MU-P-2C Aux Oil Pump for MU-P-iC X X R the makeup pumps' motor and bearings Either the aux Oil pump or the main oil pump corresponding to the makeup pump in use Is required for shutdown MU-P-3A Main Oil Pump for MU-P-1A X X R These pumps operate continuously during makeup pump MU-P-3B Main Oil Pump for MU-P-1B .X X R operation to supply the pump motor and bearing with sufficient MU-3-3C Main Oil Pump for MU-P-1C X X R lubricating oil. See remarks above for MU-P-2A, 2B & 2C. MU P-3B and 3C can be operated from remote shutdown panel (RSP) W".

MU-P-4A Lubrication Pump for MU-P-1A - - Lubrication pumps MU-P-4A, B or C for the reduction gears are MU-P-4B Lubrication Pump for MU-P-1B - - - not needed since it is assumed that the shaft driven pump is MU-P-4C Lubrication Pump for MU-P-iC - - - sufficient. If a shaft driven oil pump is not operable, the affected make-up pump is declared inoperable 003/002 RevyIS T3-3A 2

KJ <9 ATTACHMENT 3-3L SAFE SHUTDOWN EQUIPMENT MAKEUP Page 2 of 4 Required for Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

MU-V-12 Makeup Tank Isolation Valve - This motor operated valve is normally open Since the makeup tank is not relied on for safe shutdown, the position of this valve has no effect on safe shutdown. It may also stay open because no gas binding is expected MU-V-14A MU Pump Suction Isolation X X R This motor operated valve is normally closed. It is required to be Valve from BWST opened to allow MU-P-1A or MU-P-1B to take suction from the BWST. It can be manually operated before starting the makeup pump. The valve can be controlled from RSP "A"provided off site power Is available.

MU-V-14B MU Pump Suction Isolation X X R This motor operated valve is normally closed. It is required to be Valve from BWST opened to allow MU-P-IC to take suction from the BWST. The valve can be controlled from RSP "B"and must be opened rapidly If MU-P-iC is the only make-up available for operation Otherwise, MU-P-1C starting must be delayed.

MU-V-16A Emergency Makeup Valve X X R/S These motor operated valves are normally closed. One Is MU-V-16B Emergency Makeup Valve X X RIS required to open to Inject makeup water into the RC system when MU-P-1A or MU-P-1B is used and the normal makeup path is not available or if HPI cooling Is required. Jog control is required for RCS inventory control. Spurious opening of these valves can be mitigated by tripping the operating MU pump and manually closing the valves.

MU-V-16C Emergency Makeup Valve X X R/S These motor operated valves are normally closed One is MU-V-16D Emergency Makeup Valve X X RIS required to open to Inject makeup water into the RC system when MU-P-1C is used. Both valves can be controlled from the RSP "B'. The valve In use must be jog controllable. Spurious opening of these valves can be mitigated by tripping the operating MU pump and manually closing the valves 003/002 Rev. 18 T3-3A 3

Ku ATTACHMENT 3-3L SAFE SHUTDOWN EQUIPMENT MAKEUP Page 3 of 4 Required for: Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down bous?

MU-V-17 Pressurizer Level Control Valve X X R/S These pneumatic operated valves provide the normal make-up MU-V-18 Normal Makeup Valve X X RIS path. MU-V-17 is controlled by an E/P converter (MU25-E/P) which gets signals from a manual controller (RC1-LIC) or from instruments RC1-LTl/2/3 and RC1-TE1/2. MU-V-18 Is a solenoid operated valve which is normally deenergized (open).

The valve will close when the ES logic spuriously actuates or upon loss of Instrument air. IfMU-V-17 spuriously opens, MU-V.

18 must be closed to stop uncontrolled make-up flow. If MU-V-18 spunously closes, an alternative make-up flow path through MU V-16A or B can be used. MU-V-18 can be operated from remote shutdown panel RSP 8B" MU-V-217 Bypass Valve for MU-V-17 x x S This normally closed motor operated valve Is a bypass around MU-V-17. If MU-V-17 spuriously opens, MU-V-18 must be closed to stop uncontrolled make-up flow or make-up pump tripped.

MU-V-92 MU-V-17 Manual Bypass Valve x x R This normally closed manual valve can be used to control make up flow if MU-V-17 Is not available.

MU-V-91A MU-V-17 Isolation X X R These normally open manual valves can be used to isolate MU MU-V-91B Valves X X R V-17 if it is uncontrollable MU-V-20 RC Pump Seal Water Isolation X X S These pneumatic valves provide a path for RCP seal injection.

Valve MU-V-20 Is a solenoid operated valve which is normally MU-V-32 RC Pump Seal Injection Valve X X R/S deenergized (open). It has a backup air bottle that would keep the valve open upon loss of Instrument air. MU-V-20 can be operated from remote shutdown panel (RSP) 'B'. MU-V-32 is controlled by an E/P converter (MU32-EIP) which gets signal from a manual controller (MU42-FIC) or from Instrument MU42 dPT. This path is only used with MU-P-1A or MU-P-1B. MUP-IC Is not normally aligned for seal injection. Either the RCP seal Injection or the RCP thermal bamers are required to protect RCP pump seals 003/002 Rev. 18 T3-A 4

KJ ATTACHMENT 3-3L SAFE SHUTDOWN EQUIPMENT MAKFUP Page 4 of 4 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down bous?

MU-V-36 MU Pumps Recirc Iso X X S These motor operated valves are normally open. They are MU-V-37 Valves X X S required to stay open to assure minimum acceptable flow through the MU pumps to prevent pump damage. Both valves must be protected from spurious closure whenever one of the make-up pumps is running and the seal injection path is not available The pump manufacturer (Bingham-Willamette) states that flow marginally below the minimum stated requirement (e.g., 32 gpm seal injection instead of 40 gpm required) is permissible for some time, without serious effects. An alternative to protection of these valves is to ensure that makeup plus seal injection flow is above 40 gpm at all times (assuming one pump is operating). MU-V-36 can be controlled from RSP "A"provided off-site power Is available. MU-V-37 can be controlled from RSP "B". The spuriously closed valve can be manually aligned.

MU-V-38 RCP #1 Seal Bypass S Control Power Breaker for this motor operated valve is open to prevent spurious opening of the valve which can result in extensive leakage and elevated temperature of the No I RCP seals MU-V-76A MU Pump C Make-up X X R These manual valves must be opened if MU-P-iC Is needed for MU-V-76B Header Isolation Valves X X R reactor coolant pressure control In order to permit the pump to use the normal makeup path DH-V-6A RX Bldg Sump to DH Pump A X X S These motor operated valves are normally closed and are DH-V-6B RX Bldg Sump to DH Pump B X X S required to stay closed for hot and cold shutdown. Ifthey should open spuriously, water from the BWST will drain to the Reactor Building sump. Ifthis occurs, ample time (45 minutes) Is available to manually close these valves or to manually close DH V-5A15B before the BWST level gets too low to provide water to the make-up pumps. DH-V-6A and B have remote shutdown features at the 480V engineered safeguard valve MCC 1A and 1B respectively. For cold shutdown, see entries In Attachment 3 3E, Decay Heat Removal.

0031002 Rev. 18 T3-3A.5

ATTACHMENT 3-3M SAFE SHUTDOWN EQUIPMENT NUCLEAR SERVICES CLOSED CYCLE COOLING WATER Page 1 of 1 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

NS-P-1A NS Cooling Pump A X X R These pumps provide cooling water to makeup pump 1B Only NS-P-1 B NS Cooling Pump B X X R one pump is required for safe shutdown NS-P-1C can be NS-P-1C NS Cooling Pump B X X R controlled from the "B*Aux. Remote shutdown panel (RSP)

NS-V-4 Reactor Coolant Pump - - Reactor coolant pumps, and hence, reactor coolant pump NS-V-1 5 Cooling Containment - - cooling, are not required for safe shutdown NS-V-35 Isolation Valves -

NS-V-32 Nonessential Services X X R This motor-operated valve should be closed to Isolate Isolation Valve nonessential cooling loads when two NS pumps and/or two nuclear service river water (NR) pumps are disabled and MU-P 1B is used for shutdown Manual operation Is acceptable NS-V-52A Reactor Building Fan Since analysis shows that no fan cooler Is required for reactor NS-V-52B Cooler Inlet Valves building cooling, these valves are not required.

NS-V-52C NS-V-53A Reactor Building Fan See remarks for NS-V-52A, 52B, 53C NS-V-53B Cooler Outlet Valves NS-V-53C NS-V-108A Control Bldg Air Condt These pneumatically operated valves are normally open Since NS-V-11088 Outlet Control Valves analysis shows that no chillers are required for control building ventilation, these valves are not required 003/002 Rev. 17 T3-3A 6

K>

ATTACHMENT 3-3N SAFE SHUTDOWN EQUIPMENT NUCLEAR SERVICE RIVER WATER Page 1 of 3 Required for- Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious'?

NR-P-1A Nuclear Service River Water X X R These pumps provide water from the Susquehanna River to the Pump A nuclear service heat exchange of the NS system and to the NR-P-1B Nuclear Service River Water X X R intermediate service coolers of the ICsystem. One pump is Pump A required for shutdown. These pumps can operate without NR-P-1C Nuclear Service River Pump C X X R pressurized lubncating water.

NR-P-1C can be controlled from Auxiliary Remote Shutdown Panel (Aux. RSP) "B" NR-V-1A NR-P-1A Discharge Valve The discharge valves for each pump are motor operated and are NR-V-1B NR-P-1B Discharge Valve open on the normally operating pumps The valve corresponding NR-V-1C NR-P-1 C Discharge Valve to the pump intended to be used at the time of fire should remain opened NR-V-1C can be controlled from the "B"Aux RSP.

NR-V-2 NR-SR System Tie Valve To ensure cooling water to the NS and the IC heat exchangers, NR-V-7 NR-SR System Tie Valve at least one of these valves should stay closed They are motor operated and are normally closed Since Appendix R assumes only one spurious operation to occur per fire scenario, at least one valve will remain closed during the fire. These valves do not therefore require evaluation NR-V-3 N R Line Isolation Valve These motor operated valves are normally opened and required NR-V-5 N R Line Isolation Valve to remain opened for safe shutdown. Spurious operation of either valve will block the flow of cooling water to the nuclear service heat exchangers and the intermediate service coolers Spurious closure of these valves Is prevented by removing the 480 volt ac power to the valves 003/002 Rev. 19 T3-3A 7

K>

ATTACHMENT 3-3N SAFE SHUTDOWN EQUIPMENT NUCLEAR SERVICE RIVER WATER Page 2 of 3 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

NR-V-4A De-Ice Makeup Valve X X S Prior to the fire, the position of these valves could either be NR-V-4B De-Ice Makeup Valve X X S throttled, open or closed. For safe shutdown, one of the valves must be closed or must remain in the prefire posibon to ensure enough water to the nuclear service heat exchangers and to the intermediate service coolers The valves are opened during deicing makeup.

Deicing makeup Is required only when the deicing letdown from circulating water exceeds the makeup capacity of the secondary services river water system Administrative controls will be developed to protect against spurious wide opening of these valves during these short, Infrequent period of operation NR-V-6 NR-SR System Intertie Valve This motor operated valve is normally closed To ensure enough cooling water to the NS and IC heat exchangers, the valve should stay closed The valve is kept closed by removing 480 volt ac power.

NR-V-BA,B,C,D NS Cooler Inlet Valves Three out of four pairs of motor operated valves are normally NR-V-16A,B,C,D NS Cooler Outlet Valves opened. At least two sets of valves (4 valves) should remain opened for safe shutdown because two NS heat exchangers are required to be operable Since Appendix R only assumes one spurious operation to occur during any fire scenario, at least five valves will remain open during the fire. Cables to these valves therefore do not need to be evaluated NR-V-1 8 NS and IC Cooler Outlet X X R One of these motor operated valves is normally opened and is NR-V-1 9 Valve X X S required to remain opened for safe shutdown to allow cooling water to flow through the nuclear service heat exchangers and the Intermediate service coolers Control of valve NR-V-18 Is required for nuclear service river water system pressure control It can be controlled from the "B" Aux RSP and the Control Room.

- - - -- - - 0- 4 003/002 Rev. 17t T3-3A 8

K)

ATTACHMENT 3-3N SAFE SHUTDOWN EQUIPMENT NUCLEAR SERVICE RIVER WATER Page 3 of 3 Required for Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

Spurious opening of NR-V-19 would cause loss of the system pressure control with NR-V-18 It can be manually corrected NR-V-10A, B IC Cooler Inlet Valve - During normal operation, both valves are opened For safe shutdown these motor operated valves should remain opened.

Spurious closure of the valve is prevented by removing 480 volt power supply.

NR-V-15A, B IC Cooler Outlet Valve X X S One of these motor operated valves is normally opened while the other one is closed For safe shutdown, they should remain in their prefire position Manual correction of the valve position is allowed only when the intermediate cooling system is not used for reactor coolant pump thermal bamer cooling or letdown cooling. Control of the valves is required for intermediate cooling system temperature control NR-V-15B can be controlled from the "B" Aux RSP.

NR-S-1A NR-P-1A Disch Strainer Evaluation of these strainers and backwash valves is not NR-S-1 B NR-P-1 B Disc Strainer required Sufficient time exists to operate them manually.

NR-S-1C NR-P-1C Disch Strainer NR-V-53A NR-S-1A Backwash Valve NR-V-53B NR-S-1A Backwash Valve NR-V-53C NR-S-1A Backwash Valve 003/002 Rev. 17 T3-3A 9

K>

ATTACHMENT 3-30 SAFE SHUTDOWN EQUIPMENT REACTOR BUILDING EMERGENCY Page 1 of 1 COOLING RIVER WATER Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

NOTE. Under Appendix R, this system is required to operate only if a reactor building fan cooler is required. Since analysis Shows that no fan cooler is required for Appendix R events, the balance of this table has been deleted.

003/002 Rev. 17 T3-3A 10

KU ATTACHMENT 3-3P SAFE SHUTDOWN EQUIPMENT REACTOR BUILDING VENTILATION Page 1 oflI Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

NOTE, Under Appendix R, this system Is required to operate only if a reactor building cooling is required Since analysis Shows that no reactor building cooling is required for Appendix R events, the balance of this table has been deleted 003/002 Rev. 17 T3-3A 11

K>

ATTACHMENT 3-3Q SAFE SHUTDOWN EQUIPMENT REACTOR COOLANT Page 1 of 4 Required for Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

RC-P-1A Reactor Coolant Pumps X S No reactor coolant pump (RCP), is required for safe shutdown RC-P-1 B X S because natural circulation is used.

RC-P-1C X S RC-P-1 D X S Tripping of the RC pumps is required to prevent RCP seal damage when RCP seal injection and RCP thermal barrier cooling are not available and cannot be restored within 10 minutes RC-P-1A Trip Reactor Coolant Pump Normal X R Normal tnpping of RC pumps can be accomplished from the RC-P-1B Trip Trip X R Control Room RC-P-1C Trip X R RC-P-1D Trip X R RC-P-1A Alt Trip Reactor Coolant Pump Alternate X R Alternate tripping of RC pumps can be accomplished at 6 9kV RC-P-1B Alt Trip Trip X R switchgear located in the Turbine Building RC-P-1C Alt Trip X R RC-P-1D Alt Trip X R RC-G-8 Pressurizer Htr. Group 8 X X R At least one group of pressurizer heaters are required for RCS RC-G-9 Pressurizer Htr. Group 9 X X R Pressure control If pressurizer heaters are not available, makeup and letdown may be used for reactor coolant pressure control. During normal operation, both groups of pressurizer heaters are aligned to MCC PHCC 1B On loss of off-site power, the heaters are realigned to the diesel generators.

RC-V-1 Pressurizer Spray Valve X S This motor-operated valve is normally closed and opens on reactor coolant pressure above 2205 psig Main turbine trip will result in a pressure rise and automatic opening of this valve Spurious operation with reactor coolant pumps operating would result in rapid depressurization Spurious opening can be mitigated by closing RC-V-3 or by tripping the reactor coolant pumps from the control room or at the 6900V switchgear.

Emergency feedwater must be operating and steam generator level must be above 50% before tripping reactor coolant pumps 003/002 Rev. 20 T3-3A 12

<2 ATTACHMENT 3-3Q SAFE SHUTDOWN EQUIPMENT REACTOR COOLANT Page 2 of 4 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

RC-RV-2 Pressurizer Relief Valve (Power X X S This solenoid-operated valve is normally closed and deenergized Operated Relief Valve-PORV) The valve can be automatically controlled by instruments RC3A PTI, RC3A-PT3, RC5A-TE2 and RCSA-TE4. It also has a push button which bypasses the automatic logic and opens the valve.

Spurious opening will cause depressurization of the RC system RC-V-2 is available to mitigate the opening.

RC-V-2 Pressurizer Relief Block Valve X X R This motor-operated valve is normally open It is used only to mitigate spurious opening of RC-RV-2. The valve can be controlled from the RSP "B*.

RC-V-3 Pressurizer Spray Valve X X R This motor operated valve is normally open. It may be required to be closed to mitigate spurious opening of RC-V-1.

RC-V-4 Pressurizer Quench Valve x R For remote shutdown, the valve can be controlled from the RSP B".

RC-V-28 Pressurizer Vent Valve X X R This motor operated valve Is normally closed. It can be manually RC-V-44 Pressurizer Vent Valve X X R operated It is required to be opened during cold shutdown to allow water from the decay heat removal system into the pressurizer spray line.

These high-low pressure valves are normally closed. RC-V-28 is a motor operated valve while RC-V-44 is pneumatic operated Spurious opening due to any one hot short Is prevented by placing a short across the operating coil of RC-V-44. However, opening of both valves due to a combination of cable failures during a fire does not jeopardize plant capability to achieve and maintain cold shutdown conditions 0031002 Rev 19 T3-3A 13

KU ATTACHMENT 3-3Q SAFE SHUTDOWN EQUIPMENT REACTOR COOLANT Page 3 of4 Required for. Req'd Hot Cold or Component Function Shut. Shut- Spur- Remarks Down Down ious?

RC-V-28 The vent function must be available to vent excess reactor RC-V-44 coolant, when letdown flow path is not available. Other reactor (Cont) coolant high point vents can be used for this purpose. The PORV (RC-RV-2) can also be used RC-V-40A Reactor Coolant Loop A X X R These solenoid operated valves are normally closed and RC-V-41A High Point Vent to RC X X R deenergized Spurious opening due to any one hot short Is Drain Tank prevented by placing a short across the operating coil of RC-V 41A and 41B.

RC-V-40B Reactor Coolant Loop B X X R RC-V-41 B High Point Vent to RC X X R Drain Tank See the discussion above under RC-V-28 and 44 for opening of both valves and venting excess reactor coolant RC-V-42 Reactor Vessel Vent X X R These solenoid operated valves are normally closed and RC-V-43 Reactor Vessel Vent X X R deenergized Spurious opening due to any one hot short is prevented by placing a short across the operating coil of RC-V 43.

See the discussion above under RC-V-28 and 44 for opening of both valves and venting excess reactor coolant 003/002 Rev. 17 T3-3A. 14

Ku KU ATTACHMENT 3-3Q SAFE SHUTDOWN EQUIPMENT REACTOR COOLANT Page 4 of 4 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

CA-V-1 Pressurizer Steam Sample - - - CA-V-2 is air-operated The other three sample valves are CIV - - - motor-operated Uncontrolled reactor coolant loss due to CA-V-3 Pressurizer Water Sample - - - spurious opening of these valves is prevented by normally-closed CIV - - manual valves in the sampling system CA-V-13 R.C. Letdown Sample CIV CA-V-2 Reactor Sample CIV -

003/002 Rev 17 T3-3A 15

KU ATTACHMENT 3-3R SAFE SHUTDOWN EQUIPMENT ELECTRICAL Page 1 of 6 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

ED-SGES-1 D 4160V 10 Engd Sfgds X X Reqd This 4160V switchgear supplies power to the 480 V switchgear Switchgear EE-SGES-1 P and EE-SGESSH-1 Rand pumps EF-P-2A, MU-P IA, MU-P-1B, and DH-P-1A.

ED-SGES-1E 4160V I1E Engd Sfgds x X Reqd This 4160V switchgear supplies power to the 480 switchgear EE Switchgear SGES-1S and EE-SGESSH-1T and pumps EF-P-2B, MU-P-1B, MU-P-IC and DH-P-1B.

EG-Y-1 A Diesel Generator A X X Reqd This diesel generator is the source of train "A"AC power when off-site power is lost EG-Y-1 B Diesel Generator B x X Reqd This diesel generator is the source of train "B AC power Is lost EE-SGES-1P 480V I P Engd Sfgds X X Reqd This 480V switchgear supplies power to MCCs EG-CCES-1A, Switchgear EG-CCESV-1A and EG-CCESV-1lC, pumps NS-P-1A, NS-P-1B and DC-P-lA, and group 8 Pressurizer Heaters.

EE-SGES-1S 480V 1S Engd Sfgds X X Reqd This 480V switchgear supplies power to MCCs EG-CCES-1B, Switchgear EG-CCESV1 B, and EG-CCESV-1 C, pumps NS-P-1 B, NS-P-1C and DC-P-1B, and group 9 Pressurizer Heaters.

EE-SGESSH-1R 480V 1R Engd Sfgds X X Reqd This 480V switchgear supplies power to MCCs EG-CCESSH-1A, Screen House Switchgear pumps and NR-P-°A, NR-P-1B and DR-P-1A.

EE-SGESSH-1T 480V 1T Engd Sfgds X X Reqd This 480V switchgear supplies power to MCCs EG-SSESSH-1B, Screen House Switchgear pumps and NR-P-1 B, NR-P-1 C and DR-P-I B.

EG-CCES-1A 480V 1A Engd Sfgds MCC X X This MCC supplies power to the 1A, 1C and IE inverters, 1A, IC and IE battery chargers, distribution panel EG-DP-CT5, Ltg Panel EG-DPO-CT2 (upper), pumps IC-P-IA and MU-P-3A, and some train A valves for the EF System 003/002 Rev 17 T3-3A 16

K>

ATTACHMENT 3-3R SAFE SHUTDOWN EQUIPMENT ELECTRICAL Page 2 of 6 Required for Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

EG-CCES-1B 480V 1B Engd Sfgds MCC X X Reqd This MCC supplies power to the IB and ID Inverters, 1B, 1D and 1F battery chargers, distribution panel EG-DP-CTE, Ltg Panel EG-DP-CT2 (lower); EG-CCES-1 B-XT-RSP-B pumps IC-P-1iB and MU-P-3C and some train B valves for the EF system EG-CCES-1 B-XT-RSP-B 480/120 VAC Control Transformer X X Reqd Supplies power to remote shutdown transfer switch panel t'B'.

I EG-CCESV-1A 480V IA Engd. Sfgds X X Reqd This MCC supplies power to pumps MU-P-2A and MU-P-2B and Valve MCC some train A valves of the NR, DH. BS, IC and MU systems EG-CCESV-1B 480 1B Engd Sfgds X X Reqd This MCC supplies power to pumps MU-P-2C and MU-P-3B and Valve MCC some train B valves of the NR, DH, BS, IC and MU Systems.

EG-SEC-1 C 1C ES Valves MCC X X Reqd This transfer switch aligns the 1C ES valves MCC to EE-SGES Transfer Switch 1P (train A switchgear) or EE-SGES-1S (train B switchgear).

EG-CCESV-1C 480V IC Engd Sfgds X X Reqd This MCC supplies power to distribution panel EG-DP-ABE, and Valve MCC some valves of the MS, DH, RC, MU and NR systems.

EG-CCESSH-1A 480V 1A Engd Sfgds X X Reqd This MCC supplies power to AH-E-27A and some train A valves Screen House MCC of the DR and NR systems EG-CCESSH-11B 480V 1 B Engd Sfgds X X Reqd This MCC supplies power to the AH-E-27B and some train B Screen House MCC valves of the DR and NR systems EG-DP-ATA 120 VAC 10 Computer x X Reqd This distribution panel supplies hand nex and ney power to the Dist Pni ATA non-safety Instruments and components responsible for monitoring and controlling the safe shutdown process It also supplies power to the Main Steam Valves MS-V-3A,B,CD,E,F and Remote Shutdown Transfer Switch Panel "AW.Panel ATA Is a back-up supply of auto power to NNI/ICS cabinets.

003/002 Rev. 20 I T3-3A 17

K)t ATTACHMENT 3-3R SAFE SHUTDOWN EQUIPMENT ELECTRICAL Page 3 of 6 Required for: Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down jous?

EG-DP-ATB 120 VAC 10 Computer X X Reqd This distribution panel supplies power to the Remote Shutdown Dist. Pnl ATB Transfer Switch Panel B It also supplies auto power to the non safety instruments and components responsible for monitoring and controlling the safe shutdown process Panel ATB is a back-up supply of hand power to the NNI/ICS cabinets EG-DP-VBA 1A 120V 10 Vital AC X X Reqd This distribution panel supplies power to the HSPS Cabinet A, Dist. Pnl VBA Remote Shutdown Transfer Switch Panel A, Remote Shutdown Panel A, Signal Conditioning Cabinet A, and EG-DP-ATA EG-DP-VBB 1A 120V 10 Vital AC X X Reqd This distribution panel supplies power to the HSPS Cabinet B, Dist Pnl. VBB Signal Conditioning Cabinet B and Remote Shutdown Panel B and MS-V-4A and 4B manual loader.

EG-DP-VBC 1A 120V 10 Vital AC X X Reqd This distribution panel supplies power to the HSPS Cabinet C, Dist Pnl. VBC Remote Shutdown Transfer Switch Panels B and C, and instruments FT-779 and FT-791.

EG-DP-VBD IA 120V 10 Vital AC X X Reqd This distribution panel supplies power to the HSPS Cabinet D.

Dist Pnl VBD EG-DP-ABE 120/208V AC Dist. Panel Reqd These distribution panels are required to control the control EG-DP-CTE 1201208V AC Dist. Panel building air dampers. Since analysis shows that control building EG-DP-CT5 120/208V AC Dist. Panel ventilation is not required, they are not needed for safe shutdown EG-DP-CT2 2771480 V Ltg Panel X Reqd Supplies power to the Ac Control Room lights.

EH-INV-1A Inverter 1A X X Reqd Inverter 1A supplies power to panel EG-DP-VBA EH-INV-1B Inverter 1B X X Reqd. Inverter 1 B supplies power to panel EG-DP-VBB EH-INV-1C Inverter 1C X X Reqd Inverter 1C supplies power to panel EG-DP-VBC EH-INV-1D Inverter 1D X X Reqd. Inverter 1 D supplies power to panel ED-DP-VBD.

D- 4.i7 003/002 R~ev. 17I T3-3A 18

Ku -'

ATTACHMENT 3-3R SAFE SHUTDOWN EQUIPMENT ELECTRICAL Page 4 of 6 Required for: Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

EH-INV-1E Inverter 1E X X Reqd Inverter 1E is an alternate source of power to panels EG-DP VBA, EG-DP-VBB, EG-DP-VBC, and EG-DP-VBD It also supplies power to panel EG-DP-ATB EH-BA-1A A Battery X X Reqd These 125V/250V battenes supply dc power to EH-DP-lA.

EH-BA-1 C C Battery X X Reqd "A"train distribution panel EH-BA-1 B B Battery X X Reqd These 125/250V batteries supply dc power to EH-DP-1 B EH-BA-1 D D Battery X X Reqd 'B" train distribution panel EH-BC-1A Battery Charger 1A X X Reqd This battery charger recharges EH-BA-1A.

EH-BC-1B Battery Charger 1B X X Reqd This battery charger recharges EH-BA-1iB EH-BC-1C Battery Charger 1C X X Reqd. This battery charger recharges EH-BA-1 C.

EH-BC-1 D Battery Charger ID X X Reqd This battery charger recharges EH-BA-1 D.

EH-BC-1E Battery Charger 1E X X Reqd This battery charger recharges both EH-BA-1A and EH-BA-1C.

EH-BC-1 F Battery Charger 1F X X Reqd This battery charger recharges both EH-BA-1 B and EH-BA-1 D.

EH-DP-1A 1251250V D C Main X X Reqd This distribution panel supplies power to EH-DPES-1 E, Dist. PnH. EH-DP-1C, EH-DP-1M, EH-INV-1A, EH-INV-1C, and EH-INV-1 E EH-DP-1B 125/250V D C Main X x Reqd This distribution panel supplies power to EH-DPES-l F, Dist. Pnl EH-DP-1 D, EH-DP-1 M, EH-INV-1 B and EH-INV-I1D.

EH-DP-1C 125/250V D C Dist Pnil X X Reqd This distnbution panel supplies power to valve MS-V-IOA.

EH-DP-10D 125/250V D C. Dist. Pnl X X Reqd This distribution panel supplies power to valve MS-V-1iOB

.,. 147 003/002 KeV° !i T3-3A 19

Ku ATTACHMENT 3-3R SAFE SHUTDOWN EQUIPMENT ELECTRICAL Page 5 of 6 Required for: Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down Ious?

EH-DP-1M ESI125/250V D C Dist Pnl X X Reqd This distribution panel supplies power to some of the safe shutdown valves of the NS, IC, and MU System, Remote Shutdown Transfer Switch Panel "B" (for IC-V-4, MU-V-18 and MU-V-20) and DC Control Room lighting EH-SEC-1M IM DC Panel Transfer Switch X X Reqd This transfer switch aligns the IM DC panel to EH-DP-1A when EH-DP-IB is unavailable or vice versa.

EH-DPES-1E 125/250V D C Engd X X Reqd This distribution panel supplies DC power to the 4160V Sfgds Dist Panel Switchgear ED-SGES-1ID, 480V Switchgear, EE-SGES-IP and 480V Switchgear EE-SGESSH-1R breakers' control circuit, panel EH-DPESDG-1 P, Relay Panel XCC, and Remote Shutdown Transfer Switch Panel WA (for IC-V-3 and MU-V-3)

EH-DPES-1F 125/250V D C Engd X X Reqd This distribution panel supplies DC power to the 4160V Sfgds Dist Panel switchgear ED-SGES-1 E. 480V switchgear EE-SGES-1S and 480V switchgear EE-SGESSH-1T breakers' control circuit panel EH-DPESDG-1Q and Relay Panel XCL.

EH-DPESDG-1P ES D G A 125/250V D C X X Reqd This distribution panel supplies DC power to the emergency Dist Panel 1P diesel generator A system EH-DPESDG-1Q ES D.G A 125/250V D C. X X Reqd This distribution panel supplies DC power to the emergency Dist Panel 1Q diesel generator B system.

RP-XCL Relay Panel -XCL - These relay panels supply DC power to NS-V-52A/B/C & NS-V RC-XCR Relay Panel-XCR - 53AIBIC. Since analysis shows that reactor building cooling is RP-XCC Relay Panel-XCC - not required, the valves and the relay panels are not required They also supply DC power to DC-V-2A/B and DC-V-65A/B Since these valves can be manually operated for cold shutdown, the relay panels are not required NNISlICS NNI/ICS Cabinet X X Reqd This cabinet supplies power to the train "X" instruments EQ-SEC-NNI/ICS NNI/ICS Power Supply X X Reqd This transfer switch aligns the NNS/ICS auto power to panel Knife Switch Enclosure ATB. Its backup supply is from panel ATA. This transfer switch also aligns the NNI ICS hand power to panel ATA Its back-up supply is from ATB v 1 47 003/002 Rev it T3-3A 20

K>

ATTACHMENT 3-3R SAFE SHUTDOWN EQUIPMENT ELECTRICAL Page 6 of 6 Required for Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

RS-SCC-A Remote Shutdown Signal X X Reqd. This cabinet supplies power to the train "A"remote shutdown Conditioning Cabinet A instruments.

RS-SCC-B Remote Shutdown Signal X X Reqd. This cabinet supplies power to the train "B" remote shutdown Conditioning Cabinet B instruments RS-PA Remote Shutdown Panel A X X Reqd This panel provides control facilities for the train "A"remote shutdown components. This panel is required only for remote shutdown.

RS-PB Remote Shutdown Panel B X X Reqd These panels provide control facilities for the train "B" remote RS-PBX Aux Remote Shutdown shutdown components These panels are required only for Panel B remote shutdown.

RS-TSP-A Remote Shutdown Transfer X X Reqd These panels provide transfer switches to Isolate control circuits Switch Panel A of components included in the Remote Shutdown System They RS-TSP-B Remote Shutdown Transfer X X Reqd are required only for remote shutdown Switch Panel B RS-TSP-C Remote Shutdown Transfer X X Reqd Switch Panel C ESAS Bistable ESAS X S These cabinets contain the electronics for the Engineered Cabinets Safeguards Actuation System The system monitors parameters to detect loss of Integrity in the Reactor Coolant ESAS Relay ESAS X S pressure boundary and Initiates operation of the high and low Cabinets "A" pressure injection systems (HPI, LPI), Reactor Building (Containment) Isolation (RBI), Reactor Building Cooling, and ESAS Relay ESAS X S Reactor Building Spray Systems. Loss of two vital power Cabinets B" supplies to an ES Instrument string can lead to spurious operation of HPI and RBI. Loss of two vital power supplies to the "A"train ES logic system can cause spurious actuation of "A"train ESAS Loss of two vital power supplies to the "B"train ES logic system can cause spurious actuation of "B"train ESAS 003/002 Rev. 17 T3-3A 21

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 1 of 13 Required for Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

A. Reactivity Monitoring NI-11 RG 1 97 Full Range Flux X X Reqd These instruments provide Information about the reactor (Train A) neutron flux level. This allows the operation to monitor the NI-12 RG 1 97 Full Range Flux X X Reqd reactivity level of the core. They are utilized to verify reactor (Train B) scram and to indicate if core reactivity Is Increasing or decreasing as a result of boron concentration, void formation or steam formation Only one Instrument is required for safe shutdown In addition to control room indication, NI-12 provide reactor neutron flux level indication on the RSP "B*.

B. Reactor Coolant System Temp Monitoring B.A RC Outlet (Hot Leg) Temperature RC4A-TEt RC Outlet Temp Narrow X X Reqd These Instruments provide indication of the reactor coolant Inlet Range (Loop A) and outlet temperature. Monitonng of these parameters is RC4A-TE4 RC Outlet Temp Narrow X X Reqd required to verify that natural circulation has been achieved and Range (Loop A) to maintain primary system subcooling margin and cooling rate RC4B-TE1 RC Outlet Temp Narrow X X Reqd Only one set of inletloutlet RTDs is required for shutdown Range (Loop B)

RC4B-TE4 RC Outlet Temp Narrow X X Reqd In addition to control room indication, TE-958and TE-960 Range (Loop B) provide outlet temperature indication on the RSP "A"and 'B",

TE-958 RC Outlet Wide X X Reqd respectively. Similarly, TE-959 and TE-961 provide RC inlet Range (Loop A) temperature indication on the RSP "A"and "B", respectively TE-960 RC Outlet Temp Wide X X Reqd Range (Loop B) 003/002 Rev 17 T3-3A 22

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUIMFNTATION Page 2 of 13 Required for: Req'd Hot Cold Or Component Function Shut- Shut- Spur- Remarks Down Down ious?

B2 RC Inlet (Cold Leg) Temperature RS5A-TE2 RC Inlet Temp. Wide Range X X Reqd (See remarks for 2a 'RC Outlet (Hot Leg) Temperature')

(Loop A)

RC5A-TE4 RC Inlet Temp Wide Range X X Reqd (Loop A)

RC5B-TE2 RC Inlet Temp Wide Range X X Reqd (Loop B)

RC5B-TE4 RC Inlet Temp Wide Range X X Reqd (Loop B)

TE-959 RC Inlet Temp. Wide Range X X Reqd (Loop A)

TE-961 RC Inlet Temp. Wide Range X X Reqd (Loop B)

B3 RC (In-Core) Temperature 04E-TCO7B-TC; Backup In-core Thermocouple X X Reqd. In-core thermocouples of the backup Incore thermocouple 09E-TC;13C-TC (Train A) display system are required for HPI cooling. Two out of four 05G-TCO8F-TC; Backup In-core Thermocouple X X Reqd. thermocouples in each quadrant (a total of eight out of sixteen) 09G-TC,12F-TC (Train B) must be in service.

02L-TC,06L-TC; Backup In-core Thermocouple X X Reqd 07M-TC;13M-TC (Train C) 050-TC;10M-TC, Backup In-core Thermocouple X X Reqd 120-TC;14M-TC (Train D)

C. Reactor Coolant System Pressure Monitoring (Wide Range)

RC3A-PT3 RC Pressure Wide Range X X Reqd. These Instruments provide Indication of the reactor coolant (Loop A) pressure. Monitoring of this parameter is required to maintain PT-963 RC Pressure Wide Range X X Reqd primary system subcooling margin and cooling rate. Only one (Loop A) pressure transmitter must be available for shutdown.

PT-949 RC Pressure Wide Range X X Reqd In addition to control room indication, PT-949 provides RC (Loop B) pressure Indication on the RSP 'B". PT-963 provides Indication on RSP "A".

P- 1I17 003/002 Retv.

T3-3A.23

K>

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 3 of 13 Required for: Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

D. Pressurizer Level Monitoring D.1 Level Transmitter RC1-LT1 Pressurizer Level (Temp X X Reqd These Instruments monitor the water level of the pressurizer.

Comp) Only one level transmitter and RTD are required for shutdown RC1-LT3 Pressurizer Level (Temp X X Reqd. In addition to control room Indication, LT-777 and RC2-TE2 Comp) provide temperature compensated pressurizer level indication on RSP "B" LT-777 Pressurizer Level (Temp X X Reqd Comp)

D2 Temperature RTD RC2-TE1 Pressurizer Temperature X X Reqd Required for temperature compensation for 3 level transmitters, RC2-TE2 Pressurizer Temperature X X Reqd above Manual calculation of temperature compensation is allowed if adequate indication of RC pressure is available (See Emergency Procedure EP-1202-29) Such manual calculation will be used fora fire in RB-FZ-ld E Steam Generator Level Monitoring E1 SG-A Level Transmitters LT-775 SG-A Level (Full Range- X X Reqd These instruments provide indication of the steam generator A Train A) water level This is required to assure SG level is being LT-789 SG-A Level (Full Range- X X Reqd maintained by the main steam and emergency systems, or for manual level control. At least one level transmitter must be available for shutdown In addition to control room indication, LT-775 and LT-789 provide steam generator A water level indication on RSP "A" and RSP "B", respectively 003/002 Rey. 17 T3-3A 24

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 4 of 13 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down bous?

E.2. SG-B Level Transmitters LT-788 SG-A Level (Full Range- X X Reqd These Instruments provide Indication of the steam generator B (Train A) water level This is required to assure SG level is being LT-776 SG-A Level (Full Range- X X Reqd maintained by the main steam and the emergency feedwater Train B systems, or for manual level control. At least one level transmitter must be available for shutdown In addition to control room Indication, LT-788 and LT-776 provide steam generator B water level indication on RSP "A" and RSP "B", respectively.

F. Steam Generator Pressure Monitoring F.A SG-A Pressure Transmitters SP6A-PT1 SG-A Pressure X X Reqd These Instruments provide indication of the steam generator A SG6A-PT2 SG-A Pressure X x Reqd pressure which is the basis for the atmospheric dump valve MS PT-950 SG-A Pressure X x Reqd V-4A operation. Only one pressure transmitter is required for PT-1180 SG-A Pressure X X Reqd shutdown In addition to control room indication, PT-950 provides steam generator A pressure indication on RSP "A".

F 2. SG-B Pressure Transmitters SP6B-PT1 SG-B Pressure X X Reqd These instruments provide indication of the steam generator B SG6B-PT2 SG-B Pressure X X Reqd pressure which is the basis for the atmospheric dump valve MS PT-951 SG-B Pressure X X Reqd V-4B operation Only one pressure transmitter is required for PT-1i184 SG-B Pressure X X Reqd shutdown In addition to control room indication, PT-951 provides steam generator B pressure Indication on RSP "B".

D - 471 0031002 Rev. 17I T3-3A.25

K)

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 5 of 13 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

G. Decay Heat Removal Flow Monitoring DPT-802 RG 1.97 DH Flow (Loop A) X - These instruments provide indication of the decay heat removal DPT-803 RG 1 97 DH Flow (Loop B) X - system flow. This verifies the primary system flow through the core once the DH system is in service. Only one instrument is required for shutdown The instrument need not be available, local indication can be used In addition to control room indication, DPT-802 and DPT-803 provide DH flow indication on RSP "A"and RSP 'B", respectively.

H Decay Heat Removal Temperature Monitoring H.1 Outlet Temperature Instruments DH-2-TE1 DH Cooler 1A Outlet X - These instruments provide indication of the decay heat removal Temperature system temperature. They are required to monitor the coolant DH2-TE2 DH Cooler 1B Outlet X - temperature when the DH System Is in service. Only one set of inlet/outlet temperature indications is needed for safe shutdown.

H2 Inlet Temperature Instruments DH6-TE1 DH Pump 1A Inlet Hdr X - In addition to control room Indication, DH2-TE1 and DH6-TE1 Temperature provide DH temperature indication on RSP "A"., Similarly, DH2 DH6-TE2 DH Pump 1B Inlet Hdr X - TE2 and DH6-TE2 provide DH temperature indication on RSP Temperature "B".

These instruments need not be available for safe shutdown.

Local indication on the DC system can be relied upon to indicate DH system heat removal. RC hot leg temperature is also available to indicate DH inlet temperature.

--- RAV_ 18 Kev. -i t5 T3-3A 26

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 6 of 13 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

I. Tank Level Monitoring II Condensate Storage Tank LT-1060 CST A Level (Train A) X X These instruments provide indication of condensate storage LT-1061 CST A Level (Train B) X X tank level. One indication for each tank is desirable These LT-1062 CST B Level (Train A) X X instruments are backed up by local indicators LI-1004 and LI LT-1063 CST B Level (Train B) X X 1005 12 MakeupTanks MU14-LT Makeup Tank Level These instruments monitor the water of the makeup tank. This LT-778 Makeup Tank Level is required when the makeup system is taking suction from this tank and before suction is aligned to the BWST. This is also required to inform the operator when the letdown system should be switched over the Bleed Tanks In addition to Control Room Indication, LT-778 provides level indication on RSP WB". Since the makeup tank is not relied upon for safe shutdown, the instrument need not be available.

13 Borated Water Storage Tank LT-808 BWST Level (Train A) X X Reqd These instruments provide Indication of the BWST water level.

LT-809 BWST Level (Train B) X X Reqd This is required to ensure availability of the primary source of makeup water for RC inventory and reactivity control It is also required to warn the operator that the content of the tank is draining to the RB sump due to the spurious operation of DH-V 6A or B. Only one is required for shutdown In addition to control room indication, LT-809 provides BWST level indication on RSP "B".

003/002 Rev. 18 T3-3A 27

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 7 of 13 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

I4 Local Instruments LI-1 004 CST A Tank Level X X Reqd This instrument gives local indication of the condensate storage tank A water level LI-1 005 CST B Tank Level X X Reqd This instrument gives local indication of the condensate storage tank B water level LI-1 52 Diesel Fuel Tank Level X X Reqd This instrument gives local Indication of the diesel fuel tank fuel level.

J Emergency Feedwater Flow Monitoring FT-788 EF Flow SG-A Train B - - - These instruments monitor the flow of feedwater to the steam FT-779 EF Flow SG-A Train C generators Only one instrument is required for each steam FT-782 EF Flow SG-B Train B generator. OTSG level Indication is an acceptable alternative FT-791 EF Flow SG-B Train C Emergency feedwater flow monitoring will be used when available Protection Is not required.

In addition to Control Room indication, FT-788 and FT-782 provide flow indication on RSP 'B" and FT-779 and FT-791 provide flow indication on RSP 'A".

003/002 Rev 17 T3-3A 28

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 8of13 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

K Heat Sink Protection System LT-1 044 SG-A Level-Operate Range - - - These instruments constitute the HSPS system They are Train A required to automatically control emergency feedwater control LT-1 040 SG-A Level-Operate Range - - - valves EF-V-30A,B,C and D.

Train B Except for the condensate storage tank A and B level LT-1 045 SG-A Level-Operate Range - - - transmitters, two out of four Instruments for each parameter Train C must be available to operate one train of emergency feedwater LT-l1041 SG-A Level-Operate Range - - - valves.

Train D LT-1i046 SG-A Level-Startup Range -- LT-1040, LT-I1042, LT-I1048, LT-1 050 provide control room Train A indication of OTSG level LT-1042 SG-A Level-Startup Range -- LT-1040, LT-1044, LT-1046, LT-1048, LT-1052, LT-1054 Train B provide control room OTSG level indication via level recorders LT-I1047 SG-A Level-Startup Range - - PT-1Il80 and PT-1184 provide control room indication of OTSG Train C pressure LT-I1043 SG-A Level-Startup Range Train D LT-1i052 SG-A Level-Operate Range Train A LT-1048 SG-A Level-Operate Range Train B LT-1i053 SG-A Level-Operate Range Train C LT-I1049 SG-A Level-Operate Range -

Train D LT-1i054 SG-B Level-Startup Range -

Train A LT-I1050 SG-B Level-Startup Range -

Train B (Continued next page) 003/002 Rev 17 T3-3A 29

K>

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 9 of 13 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

K. Heat Sink Protection System (Cont'd)

LT-1 055 SG-B-Level-Startup Range - -

Train C LT-1 051 SG-B Level-Startup Range - -

Train D LT-1 060 CST A Level Train A -

LT-1 061 CST A Level Train B - -

PT-1i186 Containment Pressure - -

Train A PT-1i187 Containment Pressure - -

Train B PT-1i188 Containment Pressure - -

Train C PT-1i189 Containment Pressure - -

Train D PT-950 SG-A Pressure Train A - -

PT-1180 SG-A Pressure Train B - -

PT-1182 SG-A Pressure Train C -

PT-1181 SG-A Pressure Train D -

PT-1184 SG-B Pressure Train A -

PT-951 SG-B Pressure Train B -

PT-1185 SG-B Pressure Train C -

PT-1i183 SG-B Pressure Train D -

LT-1 062 CST B Level Train A - .

LT-1 063 CST B Level Train B TE-I1046 SG-A Temperature Train A TE-1 044 SG-A Temperature Train B TE-1 047 SG-A Temperature Train C (Continued next page) 003/002 Rev 17 T3-3A 30

KU ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 10 of 13 Required for Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

K. Heat Sink Protection System (Contd)

TE-1 045 SG-A Temperature Train D -

TE-1 050 SG-B Temperature Train A -

TE-1 048 SG-B Temperature Train B -

TE-1 051 SG-B Temperature Train C TE-1 049 SG-B Temperature Train D L. Spurious Operation of Instrumentation NOTE The following instrumentation Is protected only if the components served required protection for a particular fire event IC5-DPT ICCC Return Flow - This instrument is part of the IC pump control logic. It automatically starts the stand by pump when the suction header flow is low Since spurious operation of the instrument will not prevent the pump from starting, cables pertaining to this instrument do not require evaluation.

IC9-TE CRD Cooling Outlet Temp X X Spur. This Instrument Is part of the letdown valve MU-V-1A/B control logic MU-V-1A/B will be manually controlled Instrument circuits need no protection.

MU5-TE Letdown Cooler Outlet Temp X X Spur. This Instrument Is part of the letdown valve MU-V-3 close logic MU-V-3 will be manually controlled Instrument circuits need no protection MU14-LT Makeup Tank Level X X Spur. This instrument Is part of the bleed and feed controls. The letdown valves will be manually controlled. Instrument circuits need no protection 003/002 Rev. 17 T3-3A 31

K>

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 11 of 13 Required for: Req'd Hot I Cold or Function Shut- Shut- Spur- Remarks Down Down ious?

L. Spunous Operation of Instrumentation (Cont'd)c

- - - *,- -- - F - "- -,- -, - - ---- -- ---- ---

MU42-DPT RC Pump Seal Injection x x Spur. This Instrument Is part of the makeup valve MU-V-32 logic Flow Control Manual control will override auto control Instrument circuits x x Spur. need no protection RC3A-PT1 RC Pressure Narrow Range x x Spur. These Instruments are part of the RC valve RC-RV-2 control RC3A-PT3 RC Pressure Wide Range x x Spur. logic.

RC5A-TE2 RC Inlet Temp Wide Range x x Spur.

RC5A-TE4 RC Inlet Temp Wide Range x x Spur RM-Ll Letdown Flow Rad. Monitor x x Spur This instrument Is part of the letdown valve MU-V-2A/B control logic. MU-V-2A/B will be manually controlled or controlled from RSD. Instrument circuits need no protection SP6A-PT1/2 Steam Gen. A Pressure x x Spur. These instruments are part of the main steam valves MS-V-4A SGIOA-PT1/2 Turbine Throttle Pressure x x Spur and MU-V-3D,E,F, control logic.

SG6B-PTI/2 Steam Gen B Pressure x x Spur. These Instruments are part of the main steam valves MS-V-4B SPIOB-PTI/2 Turbine Throttle Pressure x x Spur. and MS-V-3A,B,C control logic.

TC-734 CB Intake Temperature These Instruments control, control building and EFP room HVAC components Since analysis shows that these HVAC systems are not required, these instruments are not required for safe shutdown TS-766B EFP Room Firestat TS-727 CB Vent Supply Fan A Discharge CB Vent Supply Fan B TS-728 Discharge TC-857 EF Room Thermostat I [Pav 17 003/002 Rev it?

T3-3A 32

K)

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 12 of 13 Required for Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

L. Spurious Operation of Instrumentation (Cont'd)

LS-244A DG Day Tank Level Control X X Spur This instrument controls the diesel generator A day tank pump operation LS-244B DG Day Tank Level Control x X Spur. This Instrument controls the diesel generator B day tank pump operation M Engineered Safeguard Actuation System RC3A-PT3 X x These instruments measure the Reactor Coolant pressure RC3A-PT4 Degradation of at least two instruments could lead to 'A" and "B" RC3B-PT3 X X train HPI actuation PT-282 X X These instruments measure Reactor Building pressure.

PT-285 Degradation of at least two instruments could lead to "A"and "B" PT-288 X X train HPI actuation PS-932 X X These instruments measure high-high Reactor Building PS-933 pressure Degradation of at least two instruments could cause PS-934 X X actuation of the Reactor Building Isolation for "A"train components (Included IC-V-3 and IC-V4 )

PS-935 These instruments measure high-high Reactor Building PS-936 pressure Degradation of at least two instruments could cause PS-937 actuation of the Reactor Building Isolation for "B" train components (Included IC-V-2 and IC-V-4)

LI-802 This Instrument measures the ICCW tank level Degradation of this instrument coincidental with an HPI actuation could cause actuation of the RB isolation of "A"train components (Included IC-V-3 and IC-V-4) 003/002 Rev. 17 T3-3A 33

K>

ATTACHMENT 3-3S SAFE SHUTDOWN EQUIPMENT INSTRUMENTATION Page 13 of 13 Required for. Req'd Hot Cold or Component Function Shut- Shut- Spur- Remarks Down Down ious?

LI-803 ICCW Surge Tank Level X S This Instrument measures the ICCS tank level Degradation of this instrument coincidental with an HPI actuation could cause actuation of the RB) isolation of "B'train components (Included IC-V-2 and IC-V-4 PS-283 RB Pressure X S These instruments measure high-high Reactor Building PS-286 RB Pressure X S pressure Degradation of at least two instruments coincidental PS-289 RB Pressure X S with an HPI actuation will start BS-P-1A.

PS-284 RB Pressure X S These Instruments measure high-high Reactor Building PS-287 RB Pressure X S pressure Degradation of at least two Instruments coincidental PS-290 RB Pressure X S with an HPI actuation will start BS-P-1 B N Makeup Flow Monitoring FT-1i126 Makeup Flow (MU-V-16A) X Reqd The makeup flow indication in each Injection path In use is FT-1127 Makeup Flow (MU-V-16B) X Reqd required for HPI cooling FT-1128 Makeup Flow (MU-V-16C) X Reqd FT-1129 Makeup Flow (MU-V-I6D) X Reqd 003/002 Rev. 17 T3-3A 34

0

'I 4'

I 0

5

  • mA*Am*mi ..........................

T.AIIMIENT ]3' ODECAY HEAT CLOSED CYCLE COOUNG WATER" Sheet 2 Oll12 I P'IIVKIoJ Sealnjection Molr andTan beadng Coding

........... "ii

- DCV6A  !" hraring Coding

  • :-** *,DC- - -ISOP1 Nwa IaDe1 Decay/leal Cosrr S)moit emor r MURP-XCL Rev 3.2

K-)

11 ATTACHMENT 3.4 DECAY HEAT REMOVAL Sheet 3 of I12 Makeup System A Velss Via Cott flood 'A, Spray

.A Vtset Vi Corte Flood 9r M*keup Syultm it

(

ATTACHMENT 3-',--IY HEAT RIVER WATERI " Of 12 Decay Heat River

Closed Cycle Cooling Water River River L----]

Decay Heat - j Closed Cycle Cooling Water I.

I,

K-)

ATTACHMENT 3-4 EMERGENCY FEEDWATER Sheet 5 of 12 I~

ATTACHMENT 'K,--RMEDIATE COOLING

.j '4ýfl Letdown Inlermediate, COors int. Cooling Pumps Coolers Nuclear ReactorCoolant Pump Sertice Thermal BarrierCooling River Water CIAl .

SCooler ,

! a

'ai-,IIC-V-798L.

a-Cooer iCSV. 18 L--.. " D "i-Dl IC-V-79D -'

Cooler.i


[E-CESV-18

Ku K-'

AflACHME NT 3-4 LETDOWN Sheet?7 of 11

£ifclwn cadans Letdown Odifae Mat sup Fllens tlIdownConlroI Make-up and VA ve Purificatlion leminei'aliemn 3way RIMswCoroalant Weted Tanks Stakeups And Purification "Fiters

'-I I

I&JTACHMINT 3-9 MAIN STEAM Oheat Ial 12 Safet VlvsAl. Main Steam Tutihne Stop Isolat~on valves YOMve REzV. In t

iC . 9 j

ATTACHMENT 3-4 MAKEUP Sheet 9 of 12 "LC. Locked closed 1Rev 12

K>

ATTACHMENT 3-4 NUCLEAR SERVICES CLOSED CYCLE COOLING Sheet 10 of12 11

KU I

ATTACHMENT 3-4 NUCLEAR SERVICE RIVER WATER SheetIIof 12 River Walet Pump ilouauDell'ng

KU

1 ATTACHMENT 34 REACTOR COOANT Sheet 12 of 12 PIORV Reclcat CoolinI Levaill rank Reactor Co~imn fVrain Tank WDI - Seatl~ealcoff mum Dmikuj and Pwriicalion (Seal injectianj WDI Ri~cii Wl = fiIgh Preslurehijeuuion (From akeup)

KIC nteimedii.e Cowaling (Pump SealFi hrimil OaruirCodling)

NS Ruckdar Services Closed Cycle Cooling (Molrw and I ube Ofl cooliung) lt.down

K)

APPENDIX R EVALUATION REPORT-THREE MILE ISLAND UNIT I COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5A SHEET la MAKEUP AND PURIFICATION I I

A A A A A A A A A A A A A A A A A AC C C C C C C C C C CC C COCO B B B B B B B B B B B B B B B B I I B B B B B B B 8 B B B B B B B B T T F F F IFIFFFFFF FFFFFFFF F FFF F FF IFIF F B F F FIF A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z F F A A A A A A A A A A A A A A Z Z Z z 1 2 1 2 2 2 3 4 56 6 7 8 9 11 1 1 2 2 2 2 2 2 2 333 3 44 55 a b c a 0 1 1 a a b cdeIf g a b c d a b a5b1 COMPONENTS REMARKS MU-P-IA X X S S - S _ X P X S XX X X TranA MU-P-1B S X X S _X XX X S S X X RSD RSD _RSD _ TrainC MU-P-iC X P S XSSS S is X X S SI X1RSD RSD RSD TrainB MU-P-2A X XX X _XX S S X X X TrainA MU-P-3A X X XX X S S - X X TrainA MU-P-2B XX XX X XX S S XIS X -X TrainA MU-P-3B X X X -S- - - - X X X S X S S RSD RSD RSD TrainB MU-P-2C X S- X S S X S X S S X X TrarinB MU-P-3C X X X S X P X S RSD RSD RSD TrainB MU-V-12 XX X XI X X X X TrainX MU-V-14Ax X P/M X X P X S S X X X Train A The suction path from MM BWST is available via cross connect Mm line MU-V-14B X X1SIX-X X X P X S RSD RSD RSD TrainB

.. 1 11. ....... ... ... . A M r.in..RAIvI-I-...A IA 1 i Ao .. e ar .i.

(NoIe 1) PIM M x AX Si1 MU-V-16A

--.- - k.- . I i i i i i i i i vIVI i i - i i i i i i i i i ý X.

i ý 1 1 1 - 1 1 - 1 " 1 i

1 ... 1 M

1 1 -i 1 IrainAP MU-V- 1oA,B are only protected to prevent its

.1- -1 - I - 4- - - - 4-4 + 4-- + 4 4-4-4-4 - -t1-1-1I - - spurious opening MU-V-16B (Note 1) PIM XXP X S X M M M TrainA MU-V-16C (Note1) _X XX X X M P X X RSD RSD -RSD -- TrainB MU-V-16D(Note 1)-XXX XX M P X X RSD RSD RSD TrainB MU-V-17 S S X S S S- S -S S S S S X X X TrainXMidpos onIossof Pwr; Close on close of air MU-V-18 S S x S S SS S-x-xx S S XSXXRSD RSD RSD Train C Open on loss of pwr; Close on loss oftair MU-V-217 D Dx X Train X LEGEND Note 1: Spurious opening of MU-V-16A and 16B during firein CB-FA-1, -2a.,-2d, -2f and MU-V-16C and X - Component Not Available D - Design Modification 16D during a fire In CB-FA-2b, -2c, -2e, -2g due to spunous ESAS initiation can be mitigated by S - Support Not Available RSD - Remote Shut Down tripping the makeup pump(s) at 1D or 1E 4160V switchgear or by tripping the switchgear In CB P - Available-Cable Protected O - Open Switch or Breaker FA-3a or -3b, respectively M - Available-Manual Operation R - Repair A- Manual Op Due To Loss of Inst Air J - Cut & Jumper I

Rev. 20 I 003/002 T3-5 1

K)

APPENDIX R EVALUATION REPORT-THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREAIZONE ATTACHMENT 3-5A SHEET2a MAKEUP AND PURIFICATION AAAAAAAA A A AA A AAAAAAAAAA A A C C C C C C C C C C C CCC CC B B B B B B B B BBBBBBBBI I B B B B B B B B B B B B B B B B T T F F F F F F F F FFFFFFFF F F F F F F F F F F F B F F FF A A Z Z Z Z Z Z Z Z Z Z Z Z Z ZF F A A A A A A A A A A A A A A ZZ z z 1 2 1 2 2 2 3 4 5 6 6 7 8 9 11 1 1 2 2 2 2 2 2 213133 3 414 5 5 a b c a 0O11a a b c d e f g a b c d a b a b COMPONENTS REMARKS MU-V-20 A A S A AAA X O S S XP RSD RSD RSD OpenSw5atEH-DP-1M, Train X, Closes on Loss of Air MU-V-32 X S S S X X Train X MU-V-36 DP M P M M M M RSD TrainA MU-V-37 M P D P M M M M P M M RSD RAD RSD TrainA X Train X LEGEND X- Component Not Available D - Design Modification S - Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0- Open Switch or Breaker M- Available-Manual Operation R - Repair A - Manual Op Due To Loss of Inst Air J - Cut &Jumper 003/002 Rev 20 T3-5 2

APPENDIX R EVALUATION REPORT-THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5A SHEFFT lb DODFFFFIF F I IIII I'I'I RRRRRRRT B B G G H H H H H HB B B B B B B BSS S S B B B B B B PP P P F F F F F IF F F F F F F F F F F H H H H IF F IF F F IF F F A A Z Z Z Z Z Z 2 Z Z Z Z Z Z Z Z Z Z Z Z Z Z A FFF 1 2 1 2 3 4 5 611 1 213 4165718 A Z Z Z 1 1a1bc 1 2 3 1 COMPONENTS ab cd e 2 1 213 REMARKS MU-P-1A S X X IS S ITraiA MU-P-1B S X -I XI --- TrainC MU-P-1C S P X -XI I ISs S SSI S S S TrainB MU-P-2A S X X Train A MU-P-3A S X X -Tra-inA MU-P-2B S X -XTrain A MU-P-3B- S X X X -S S S S TrainB MU-P-2C S x x S-S1-S--S -TrainB MU-P-3C S P x S S----TrainB Train X MU-V-12 X x l XIII A MU-V-14A___XXiIIII- Train MU-V-14B S P X X- --- S- I - - S-- - - -- TrainB MU-V-16A S X TrainA MU-V-16A.B are only protected to prevent its spunous opening MU-V-16B SIX x Train A MU-V-16C S PXX - - ITrainB

- - - - - - - - - - - - S--

MU-V-16D S P X X I S S1--S-- S-TrainmB MU-V-17I xxSSx S S S S S S STran X Mid pos on loss of I----Pwm Close on close of air S X S S S X S S S Train C Open on loss ofpwr; MU-V-18 Close on loss of air MU-V-217 TrainX LEGEND X- Component Not Available D - Design Modification S-Support Not Available RSD - Remote Shut Down P -Available-Cable Protected 0- Open Switch or Breaker M- Available-Manual Operation R - Repair A- Manual Op Due To Loss of Inst Air J - Cut & Jumper Rev 18 003/002 T3-5 3

K)

APPENDIX R EVALUATION REPORT -THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5A SHEET2b I IB TFF IB6I BI B I BI B I R RIRRR IS S I S I S I B R R R T G D D G H'HHF F H F H FH B B B B B B B B PP P P F F: F F F F F F F F F F F F F F H H H H' F F F F F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z.Z Z ZZ ZZA F F F F 1 2 1 2 3 4 5 6 1 2 3 415161718BAIZ Z Z 1 1 1 1 1 213,1 COMPONENTS 2 1 2 3 abIcIdle REMARKS MU-V-20 A X XIAlA XIAlAl A AAAA A A A A AlAlAIIIAl I- I-I-I-I-I I I-I- Open Sw 5 at EH-DP-1M, I - I- I MU-V-32 XIX--- TrainX.Closes on Loss of Air MU-V-36 P P TrainX MU-V-37P p p p TrainA Train A LEGEND X - Component Not Available D - Design Modification S -Support Not Available RSD - Remote Shut Down P -Available-Cable Protected 0 - Open Switch or Breaker

  • - Available-Manual operation R -Repair
  • A-ManualOp Due To Loss of Inst Air J - Cut & Jumper Rev. 18 0031002 T3-5 4

K-)

APPENDIX R EVALUATION REPORT - THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5B SHEET la LETDOWN A A A A A A A A A A A A A A A A A A CCCCCCCCCCC C C C CCC B B B B B B B B B B B B B B B B I I B B B B B B B B B B B B B B BB T T F F F F F F F F FFFFFFFF F F F F F F F F F F F B F F FF A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z F F A A A A A A A A A A A A A A ZZ z z 1 2 1 21 2 2 3 4 5 6 6 7 8 961811 112,2 2 2 2 2 2 3 3 3 3 4 4 515 a b c a 0 1 1 a a b c d e f g a b c d a b a b COMPONENTS REMARKS MU-V-1A M M M S M M M M M M TrainX MU-V-1BM M M S M M M M M M M TrainX MU-V-2A M M- - - -- M M M M M ,MM M M RSD RSD RSD TrainB MU-V-2B M M-- M M M M MIMMM M RSD RSD RSD TrainB MU-V-3 A AMM M A S A A M OO M0 M 0 0 RSD RSD TrainA; Open SW15 at EH-DPES

_ _ _ _A AE; Close on loss of air MU-V-4 A A M A A A S A A M M A A M M M TrainX, Closeonlossofair MU-V-8 M MIM M M M M RSD M M TrainX MU-V-6A A A A A A M S A A A M M M M M TrainX, Close on Loss ofAir MU-V-6B A A A A A M S A A M M M M M M TrainX, CloseonLossofAir MU-V-11A AA A AA M A S A A M MM MIM MM M TrainX CloseonLossofAir MU-V-11B A A A A M A S A A A M M M M M TrainX; Close on Loss ofAir WDL-V-2 M M M M TrainX WDL-V-1 A A A A M M S, MAA A A AM M M TrainX; Valve closes on I----Loss of off-site power and air WDL-V-3 A A A A M A S M A A A A M MrTraiX, Valve closes on Loss of off-sitepower and air WDL-V-4 A A A A M A S M A A A A M M MTrainX, Valvecloses on I----Loss of off-site power andair WDL-V-5 A A A]A M A S M A A A A M M M TrainX,0Valvecoses on I-Loss of off-site power and air MU-V-5 S S XX XS S S S M X X -X X X TrainX.,Valvecloses on

--- H- H- Loss ofair LEGEND X- Component Not Available D0- Design Modification S - Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0 - Open Switch or Breaker M- Available-Manual Operation R - Repair A - Manual Op Due To Loss of Inst Air J - Cut & Jumper 003/002 Rev. 20 T3-5 5

<2 APPENDIX R EVALUATION REPORT- THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5B SHEET 1b LETDOWN D D F F F F F F I I I I I I I I I I R R R RRR R T G G H H H H H H B B B B B B B B S S S SB B B 6B B B B P P P P F F F F F F F F F F F F F F F F H H H H F F F, F F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z A F F F F 1 2 1 2 3 4 5 6 1 2 3 415 6 7 8 A ZIZIZ 1 1 1 1 1 213,1 COMPONENTS a b c d e 2 1 2 3 REMARKS MU-V-1A MIM M M M M M M TrainX MU-V-1B M1M MM M M IM M TrainX MU-V-2A M M---aM TrainB MU-V-2B M; M M M Train B MU-V-3 A M M A A M 0 A A A A A A A lAlA AlTrainA, OpenSW15at EH-DPES

-AE, Close on loss of air MU-V-4 A M A A A M A A A A A A A A Al A S TrainX; Close on lossof air MU-V-8 M M M- - - - - ---- TrainX MU-V-6A AM M A A M AI A A A A A A A A A A TrainX; Close on Loss ofAir MU-V-61A M M A A M-- A A A A A A A Al-AA-TrainXCloseonLossofAir MU-V-11A A, MM AlA M A A A A A A A A A A A Train X; Close on Loss ofAir MUoV-11B A M M A A M A A A A A A A A A A A TrainX; Close on Loss ofAir WDL-V-2 M M M Train X WDL-V-1 A M M A A M A A A A A A A AAA A TrainX;Valvecloseson Loss of off-site power and air WDL-V-3 A M M A A M A A A A A A A A A A A Train X; Valve closes on Loss of off-site power and air WDL-V-4 A M M A A M A A A A A A A AlA A A Train X; Vatve closesoon Loss of off-site power and air WDL-V-5 A M M A A M A A A A A A IA A A A A TrainX;Valvecloseson I--Loss of off-site power andair MU-V-5 S X X SSM S S S SSS S S S S A TrainX, Valvecloses on Loss of air LEGEND X- Component Not Available D - Design Modification S - Support Not Available RSD - Remote Shut Down P -Available-Cable Protected 0- Open Switch or Breaker M- Available-Manual Operation R - Repair A - Manual Op Due To Loss of Inst. Air J - Cut & Jumper Rev- l8io 0031002 mev.

T3-5 6

K-,

APPENDIX R EVALUATION REPORT-THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5C SHEET Ia REACTOROCOOLANT A A A AAAAA AAAAAAAAAAOOC CCCCCCCCC C C C CC BBBBBBB B8 BBBBBBBBI BBBBBBBBBBB B B B BB T T F F F F F F F F FFFFFFFF FFF F F F FF F F F F F F F FF I A A Z Z Z Z Z Z Z Z Z Z Z Z Z ZIF F A A A A A A A A A A A A A A Z Z z z 1 2 1 2 2 2 3 4 5 6 6 7 8191 1 1 1 2 2 2 212 2 2 31 3 3 3 44 55 abc a 0 1 a a b c d e f g a b c d a b a b COMPONENTS REMARKS RC-G-8I XXX X S S S X S S TrainA RC-G-9-I X X1X S S X RSD RSD RSD Train B RC-V-2 X-P XIX X RSD RSD RSD TrainX RC-RV-2 P-X X P X S S X X X TrainX RC-V-1 T T X T T S S X -X Train X RC-V-3 X X X X X XXX X - S RSD RSD RSD TrainX RC-V--- M M M M M M M M TrainX RC-V-28 I x x X x I x x xI -Train RC-V-44(Note1) D DI D D D D TrainB RC-V-40A X x x -- TraiA RC-V-41A(Note 1) D DOD D DD DD TrainA RC-V-40B X X XX X X Train B RC-V-41B (Note 1) D D D D D D TrainB RC-V-42 X X X X X X Train B RC-V-43(Note 1) D D D D D D TrainB RC-P-1A Trip I XIS x x RC-P-1BTripxz S X -X RC-P-1C Trip x x S x x RC-P-1 D Tnp X X S X X RC-P-1A.1 CAlLtTnp -X X SX X x RC-P-1 B.1D AnL Trip X X S X -X LEGEND X- Component Not Available D- Design Modification Note I Design modificabon is made to one of the two RC vent valves in senes (ie RC-V-28 and -44, RC-V S - Support Not Available RSD - Remote Shut Down 40A and -41A. Rc-V-40B and -41 B, Rc-V-42 and -43) to prevent spurious opening due to any one P - Available-Cable Protected 0 - Open Switch or Breaker hot short. However, opening of both valves in any one path does not prevent the plant from safely M -Available-Manual Operation R - Repair shutting down and therefore is acceptable A - Manual Op Due To Loss of Inst Air J - Cut & Jumper T-Tnp RC Pumps 003/002 Rev. 20 T3-5 7

KU APPENDIX R EVALUATION REPORT -THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREAIZONE ATTACHMENT 3-5C SHEET lb REACTOR COOLANT ID D F F F F F F I I I I I I I I I I I I R R R R R R R T G G H H H H H H B B B B B B B B S S S S B B B B B B B B P P P P F F F F F F FI F F F F F F F F F H H H H F F F F F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z A F F F F 1 2 1 2 3414 5 6112 3 415 617 8 AlZ Z Z 1 1 111 1 2131 COMPONENTS a b c d e 2 1 2 3 REMARKS RC-G-8 S--X-I-- -- -- - -X XX X1Train A RC-G-9 S X S S S X X X TrainmB RC-V-2 xIX PPp p p p Train X RC-RV-2 P X P P P P S Train X RC-V-1 S T--X--T T T T X TrainX RC-V-3 S X X X S;SSX X X X S TrainX RC-V-4 M MIM IM M M M Train X RC-V-28 XXX X-- X X X X Train-X RC-V-44(Note 1) D D D D D D Train B RC-V-40A X X X x X Train A RC-V-41A (Note1) D D-DDD TrainA RC-V-40B X X X X X X X TrainB RC-V-41B (Note1) D D D D D D D Train B RC-V-42 -

X-X--XI-X--XX -- TrainB RC-V-43 (Note 1) D D I D D D D TrainB RC-P-1A Trip---X RC-P-1 B Trip X RC-P-1 C Trip X-I RC-P-1 D Trip X RC-P-1A, 1C Alt Trip-X RC-P-1B, ID Alt Trip X LEGEND X- Component Not Available D0- Design Modification S - Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0- Open Switch or Breaker M - Available-Manual Operation R - Repair A - Manual Op Due To Loss of Inst Air J - Cut &Jumper 003/002 Rev. 20 T3-5 8

KU APPENDIX R EVALUATION REPORT -THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5D SHEET la/b CORE FL OODING I A A A A A A A A A A A A A AAAC IAAA C CC C C C C C C Cc C CcC B B B B B B BB B B B BIB B9BIB I I BBBBB B B BBBB B B B B BB T T F F F F F F F'F F F F F F F FFF F F F F F F F F F F B F F FF A A Z Z Z Z Z Z Z Z Z ZIZ Z ZIZlF F A A A A A A A A A A A A A A Z Z Z I 1 2 1 2 3 4 5 6 6 78911 1 1 2 2 2 2 333 3 44 5 a b c a 0 a ab c d efgabc d a b a b COMPONENTS REMARKS Note: Under Appendix R, isolation of this system is desirable before reactor pressure drops below 700 psi, but Isolation is not required for safe shutdown, nor is operation of this system required for safe shutdown for Appendix R events The balance of this table has therefore been deleted S- i l

LEGEND X- Component Not Available D - Design Modification S - Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0 - Open Switch or Breaker M- Available-Manual Operation R - Repair A- Manual Op Due To Loss of Inst Air J - Cut &Jumper 003/002 Rev 17 T3-5 9

K>

APPENDIX R EVALUATION REPORT- THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5E SHEET la EMERGENCY FEEDWATER A A A A A A A A A A A A A A A A AACCCCCCCCCCC C C C CCC B B B B B B B B B B B B B B B B I I BBBBBBBBBBB B B B BBB T T F F F F F F F F F F F F F F F F F F F F F F F F F F F B F F FF A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z F F A A A A A A A A A A A A A A Z Z Z Z 1 2 1 2 2 2 3 4 5 6 6 7 8 911 11 1 2 2 2,2 2 2 2 3,3 3 3 4 4 5 5 a b c a 0Q11a a b c d e f g a b c d a b a b COMPONENTS REMARKS EF-P-1 I SS SIS S S S EF-P-2A XIX S S X1 S X XTrarinA EF-P-2B P X S S S X RSD RSD RSD TrainB EF-V-2A M M M M M TrainA EF-V-2B M M MM M M TrainB EF-V-30A "A A A A A A A A A S X X1 X M X X X RSD RSD TrainA, Valve closes on loss Of air EF-V-30B A A A X XA A A A A X X AXAM RSD RSD RSD TrainB, Valvecloseson loss Of air EF-V-30C A A A A AA A A A SX XlX1M XIXX RSD RSDr TraiC. Valve closes on loss Of air EF-V-30D A A X X A A AA A X1X A X A M RSD RSD RSD TrainD, Valvescdoses onloss Of air LEGEND X - Component Not Available D- Design Modiflcation S -Support Not Available RSD - Remote Shut Down P -Available-Cable Protected 0 - Open Switch or Breaker M - Available-Manual Operation R - Repair A - Manual Op Due To Loss of Inst Air J - Cut &Jumper 003/002 Rev 17 T3-5 10

KU APPENDIX R EVALUATION REPORT -THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5E SHEET lb EMERGENCY FEEDWATER D D F F F F F F I I I I I I I I I I I I R R R R R R R T G G H H H H H H B B B B B B B B S S S S B B B B B B B B P P P P F F F F F F F F F F F F F F F F H H H H F F F F F F F F A A Z ZZZZZZZZZZZZZ Z Z Z Z Z Z Z A F F F F 1 2 1 2,3,4 51611 2 3141516 7 8 AlZIZIZ 1 1 1 1 1 2131 COMPONENTS a b c d e 2 1 2 3 REMARKS EF-P-1 S S X M SS ISI-S-- -

EF-P-2A S X Train A EF-P-2B S X S S S TrainB EF-V-2A M Train A EF-V-2B M Train B EF-V-30A A X A A A M X A A M A AlA M A A A A TrainA:Valveclosesonlossofair EF-V-30B A P/A A A A M A A M X A A M A A Al -- A TrainB.Valveclosesonlossofair EF-V-30C A X A A A M X A A M A A A M AIA A--A TrainC;Valveclosesonlossofair EF-V-30D A P/A A A A M A A M X A A M A A A--A TrainDValvectosesonlossofair LEGEND X- Component Not Available D - Design Modification S - Support Not Available RSD - Remote Shut Down P -Available-Cable Protected 0- Open Switch or Breaker M -Available-Manual Operation R - Repair A - Manual Op Due To Loss of Inst Air J - Cut &Jumper

.D. 40 003/002 Kev it5 T3-5.11

KJ APPENDIX R EVALUATION REPORT- THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5F SHEET la H S P S / EMERGENCY FEEDWATER A A A A A A A A A A A A A A A A A A C C C C C C C C C C C C C C C C B B B B B B B 8 B B B B B B B B8I I B B B B B B B B B B B B B B B B T T FFFF F F F F F F F F F F F F F F F F F F F F F F B F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z F F A A A A A A A A A A A A A A Z Z Z Z a b c a 0 1 1 a a b c d e fg a b c d a b a b COMPONENTS REMARKS EF-HSPS-A S S S1S X X S S S XXTrain A EF-HSPS-B S S SS S 55 X S _ S X X TrainB EF-HSPS-C $ S -S XX S S TrainC EF-HSPS-D-S S X S Train D LEGEND X- Component Not Available D- Design Modification S - Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0 - Open Swdch or Breaker M- Available-Manual Operation R - Repair A - Manual Op. Due To Loss of Inst Air J - Cut &Jumper 003/002 Rev 17 T3-5 12

K>

APPENDIX R EVALUATION REPORT - THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5F SHEET lb HS P S 1 EMERGENCY FEEDWATER D D F F F F F FII I II II II I I I I R R R R R R R T G G H H H H H H B B B B B 8 B B S S S S B B B B B B B B P P P P F F F F F F F F F F F F F F F F H H H H F F F F F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z A F F F F 1 2 1 2 3 4 5 6 1 2 3 41 5161 7 81 A Z IZ IZ 1 11 1 1 1 1 1 213 111 C O MP O NE NT SI I II I 1 12 1 2 3 a b c d eR E A K EF-HSPS-A S X S S1 I S I IS S1 S S1 S SI TrainA EF-HSPS-B SS S S S S S Train EF-HSPS-C S Xi S S S S S S1 S S1 TrainC EF-HSPS-D S X S S S S S S1 S S1 S Train D LEGEND X - Component Not Available D - Design Modification S - Support Not Available RSD - Remote Shut Down P - Availabte-Cable Protected 0 - Open Switch or Breaker

  • - Available-Manual operation R - Repair
  • - Manual Op. Due To Loss of Inst Air J - Cut &Jumper 003/002 Rev 18 T3-5.13

K>

APPENDIX R EVALUATION REPORT - THREE MILE ISLAND UNIT I COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREAIZONE ATTACHMENT 3-5G SHEET la FEEDWATER (FOR PREVENTION OF OVERFEEDING STEAM GENERATORS)

A A A A A A A A A A A A A A A AA C C C C C C C C C C C C C C CC B B B B B B B B B B B B B B B B I I B B B B B B B B B B B B B B B T T F F F F F F F F F F F F F F F F F F F F F F F F F F F B F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z F F A A A A A A A A A A A A A A ZZ z z 1212223456678911 1 1 2 2 2 2 2 2 2 333 3 4 4 515 a b c a 0Q1 a a b c d e f ga b c d a b a b COMPONENTS REMARKS FW-P-1A S S S X1X X IX TrainX FW-P-1B S S S X X X X I TrainX FW-V-1A XX XXX _ TrainX FW-V-1B X X X X TrainX FW-V-5A X-XX X Xx X X X S X X X TrainA FW-V-5B X X X S S S S X X X TrainB FW-V-92A - X X XXX ,X X S X X X TrainA FW-V-92B_ X X X S IS S S S X X ___XTrainB FW-V-17A X Train B FW-V-17B x X X X T--raA FW-V-16A X Train B FW-V-16B x x x TrainA LEGEND X - Component Not Available D - Design Modification S -Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0- Open Swich or Breaker M - Available-Manual Operation R - Repair A - Manual Op Due To Loss of Inst Air J - Cut &Jumper 003/002 Rev 17 T3-5 14

Ku APPENDIX R EVALUATION REPORT-THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5G SHEET lb FEEDWATER D D F F F F F F I I I I I I I I I I I I R , R R R R R T G G H H H H H H B B B B B B B B S S S S B BB B B B B B P P P P F F F F F F F F F F F F F F F F H H H H F F F F F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z A F F F F!

1 2 1 2 3 4 5 6 1 2 3 4 5 6 7 8 AZZZ 111 1 1 1 2131 COMPONENTS a b c d e 2 1 2 3 REMARKS FW-P-1A X Train X FW-P-1 B X Train X FW-V-1A X TrainX FW-V-1B X Train X FW-V-5A S X X X-X -X TrainA FW-V-5B S X X X1 X XX X X - -X--X-I-S1---TrainSB FW-V-92A S X XX X X TrinA FW-V-92B S X XX XXXX X X S Train B FW-V-17A-X X X TrainB FW-V-17B X XX-- X X Train A FW-V-16A X X TrainB FW-V-16B X X X X X Train A LEGEND X- Component Not Available D- Design Modification S - Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0- Open Switch or Breaker M- Available-Manual Operation R - Repair A- Manual Op Due To Loss of Inst Air J - Cut &Jumper UUJ3/UU Re~v. Lu T3-5 15

APPENDIX R EVALUATION REPORT - THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5H SHEET la MAIN STEAM A A A A A A A A AAA A A A A A A CCCCCCCCCCC C C C C C B B B BB B B B B B B B B B B B I I BBBBBBBBBBB B B B BBB T T FFFFFF FF F F F FFFFFFFF FF F F F F F F F F F F F B F F FF A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z F F A A A A A A A A A A A A A A ZZ Z Z 1 2 1 2 2 2 3 4 5 6 6 7 8 9 11 1 11 2 2 2 2 2 22333 3 44 55 abc a 0 1 a a b c d e f g a b c d a b a b COMPONENTS REMARKS MS-V-3A.3B,3C.3D,3E,&3F_ X X X X x MS-V--A-X X X RSD RSD RSD MS-V--B-X X XS S RSD RSD RSD MS-V4A A A A A A A A A A M M M M M M RSD RSD Valve doses on lossofair MS-V-4B A A A A A A A- A M M M M M M RSD RSD RSD Valvecdosesonlossofair MS-V-2A M M M M M MS-V-2B M M M M -MM M M MS-V-10A XX X IS_ x x MS-V-l0B x X X X S x x AS-V-A X X X X X MS-V-13A x xIxFailOpen _x MS-V-13B-- x x x x- XFaillOpen LEGEND X -Component Not Available D- Design Modification S - Support Not Available RSD - Remote Shut Down P -Available-Cable Protected 0- Open Switch or Breaker M - Available-Manual Operation R - Repair A -Manual Op Due To Loss of Inst. Air J - Cut &Jumper 0031002 Rev. 17 T3-5.16

APPENDIX R EVALUATION REPORT -THREE MILE ISLAND UNIT 1 COMPONENT AVAILABILITY FOR A FIRE IN FIRE AREA/ZONE ATTACHMENT 3-5H SHEET lb LETDOWN OD DFF GG H H F H F H F HF H B II B IIIIII B B B B IB B S ISSSBI I R B R B RB R RRB B R B T B

P P P P F F! F F F F F F F F F F F F F F H HI H H F F F F F F F F A A Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z Z A F F F F 1 2 1 2 3 4 5 6 1 2 3 4 5 6 7 8 A Z ZIZI 1 1 1 11 2131 COMPONENTS a b c d e 2 1 2 3 REMARKS MS-V-3A,3B,3C,3D,3E.&3F ,1_1_1_X MS-V-SA XX X X XI-X_ X - _IIXIII MS-V-8B XX IXX X I I I XI I I -

MS-V-A A A A A Al A M AIAlAIM A A AA M-Valveclosesonlossofair A A A A A M A M M A A M A A A A M Valveclosesonlossofair

_MS-V-4B MS-V-2A M M M M MS-V-2B M M M M M M M M MS-V-10A X M X X MS-V-10B X M AS-V-4 X X X X X X-- x - - x Fail Open MS-V-13A Fail Open MS-V-13B X _ XX LEGEND X - Component Not Available D - Design Modification S - Support Not Available RSD - Remote Shut Down P - Available-Cable Protected 0 - Open Switch or Breaker M- Available-Manual Operation R - Repair A- Manual Op Due To Loss of Inst Air J - Cut &Jumper Rv1 003/002 T3-5.17