Category:Letter
MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24088A2062024-03-26026 March 2024 Annual Operating Report ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. 2024-09-26
[Table view] Category:Technical Specification
MONTHYEARML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML22334A2722022-11-30030 November 2022 (VCSNS) Unit 1 - Technical Specification Bases Changes Updated Through November 2022 ML22115A0602022-04-22022 April 2022 Application for Technical Specification Change TSTF-491, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process ML21349B3692021-12-15015 December 2021 Technical Specification Bases Changes Updated Through November 2021 ML21102A1272021-04-0909 April 2021 (Vcsns), Unit 1 - Application for Technical Specification Change Regarding Risk Informed Justification for the Relocation of Specific Surveillance Frquency Requirements to Licensee-Controlled Program ML20351A3312020-12-15015 December 2020 (Vcsns), Unit 1 - Technical Specificatio Bases Revisions Updated Through November 2020 ML19331A4682019-11-27027 November 2019 (Vcsns), Unit 1 - Technical Specification Bases Revisions Updated Through October 2019 ML18313A2392018-11-0909 November 2018 (Vcsns), Unit 1 - Technical Specification Bases Revisions Updated Through October 2018 ML17347A5212017-12-12012 December 2017 Technical Bases Revisions Updated Through November 2017 RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-16-0097, Technical Specification Bases Revision Updated Through September 20162017-01-0404 January 2017 Technical Specification Bases Revision Updated Through September 2016 RC-16-0059, License Amendment Request LAR 12-02439, Technical Specification Change Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2016-04-28028 April 2016 License Amendment Request LAR 12-02439, Technical Specification Change Request for TS 3.5.4 Refueling Water Storage Tank (RWST) RC-16-0043, License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System.2016-04-0707 April 2016 License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System. RC-16-0035, (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B2016-03-0101 March 2016 (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B RC-14-0086, Technical Specification Bases Revision Updated Through May 20142014-06-12012 June 2014 Technical Specification Bases Revision Updated Through May 2014 ML14010A1822014-02-28028 February 2014 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-510 RC-13-0084, Technical Specification Bases Revision Updated Through June 20132013-07-17017 July 2013 Technical Specification Bases Revision Updated Through June 2013 RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years2013-04-0303 April 2013 Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years ML13095A1092013-04-0303 April 2013 License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years ML12195A2372012-07-11011 July 2012 Technical Specification Bases Revision Updated Through June 2012 ML11332A0782011-11-15015 November 2011 License Amendment Request - LAR-06-00055 - License Amendment Request to Adopt NFPA 805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition). Part 2 of 2 RC-11-0094, Technical Specification Bases Revision Updated Through June 20112011-08-31031 August 2011 Technical Specification Bases Revision Updated Through June 2011 ML1016500492010-06-0909 June 2010 Technical Specification Bases Revision Updated Through January 2009 RC-09-0068, License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod Cladding2009-06-0909 June 2009 License Amendment Request - LAR 09-00562, for Use of Optimized Zirlo Fuel Rod Cladding RC-09-0012, License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 262009-03-0202 March 2009 License Amendment Request LAR 08-01332, for Adoption of TSTF-511, Rev. 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR 26 RC-09-0004, License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.672009-02-17017 February 2009 License Amendment Request - LAR 04-02911 License Amendment and Related Technical Specification Changes to Implement Full-scope Alternative Source Term in Accordance with 10 CFR 50.67 ML0711003012006-05-10010 May 2006 Offsite Dose Calculation Manual ML0604002202006-02-0606 February 2006 Virgil C. Summer Nuclear Station License Amendment Request - LAR 05-0677 On-Line Monitoring of Instrument Channel Performance RC-05-0181, Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process2005-11-29029 November 2005 Elimination of Requirements to Provide the Monthly Operating Report and the Occupational Radiation Exposure Report Using the Consolidated Line Item Improvement Process RC-03-0194, License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases2003-09-19019 September 2003 License Amendment Request - LAR 03-1901 Surveillance Requirement 4.2.4.2 and Associated Bases RC-03-0159, License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated Bases2003-07-29029 July 2003 License Amendment Request - LAR 03-1864, Surveillance Requirement 4.0.5 & Associated Bases RC-03-0007, License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection Frequency2003-01-14014 January 2003 License Amendment Request - LAR 02-2767 Steam Generators - One-Time Exclusion of Inspection Frequency RC-03-0006, License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS Pumps2003-01-14014 January 2003 License Amendment Request - LAR 02-2820, Emergency Core Cooling Systems - Exclusion of Safety Injection Pumps from Requirement to Vent ECCS Pumps ML0234004902002-12-0303 December 2002 Technical Specification Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter Revision to Testing Plan for the Temporary Crane RC-02-0176, Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter2002-10-14014 October 2002 Letter Regards TS Amendment Request - TSP 00-0075 Emergency Feedwater System Isolation Valves Project Delay Letter RC-02-0147, Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance Requirement2002-09-24024 September 2002 Technical Specification Amendment Request TSP 01-0235, Revision to Emergency Diesel Generator Start Time Surveillance Requirement ML0224701902002-08-30030 August 2002 Virgil C Summer Unit 1, Technical Specification Pages for Amendment 160 Spent Fuel Pool Expansion RC-02-0089, Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 20022002-05-0707 May 2002 Tech Spec Amendment Request - TSP 99-0090 Spent Fuel Pool Storage Expansion - Supplemental Letter - Response to RAI Dated April 1, 2002 ML0210603772002-04-11011 April 2002 Technical Specification Pages to Amendment 159 ML0207803122002-03-12012 March 2002 Technical Specification Pages (Paper) ML0207203752002-03-0808 March 2002 Technical Specification Pages for Amendment 157 for Virgil C. Summer, Unit 1 ML0206506882002-03-0505 March 2002 Technical Specification Pages - Summer Unit 1, Amendment No. 156 RC-93-0310, (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument1993-12-17017 December 1993 (VCSNS) - Technical Specification Change - TSP 930011 Accident Monitoring Instrument 2023-12-12
[Table view] Category:Bases Change
MONTHYEARML23347A0492023-12-12012 December 2023 Technical Specification Bases Changes Updated Through November 2023 ML22334A2722022-11-30030 November 2022 (VCSNS) Unit 1 - Technical Specification Bases Changes Updated Through November 2022 ML21349B3692021-12-15015 December 2021 Technical Specification Bases Changes Updated Through November 2021 ML20351A3312020-12-15015 December 2020 (Vcsns), Unit 1 - Technical Specificatio Bases Revisions Updated Through November 2020 ML19331A4682019-11-27027 November 2019 (Vcsns), Unit 1 - Technical Specification Bases Revisions Updated Through October 2019 ML18313A2392018-11-0909 November 2018 (Vcsns), Unit 1 - Technical Specification Bases Revisions Updated Through October 2018 ML17347A5212017-12-12012 December 2017 Technical Bases Revisions Updated Through November 2017 RC-16-0097, Technical Specification Bases Revision Updated Through September 20162017-01-0404 January 2017 Technical Specification Bases Revision Updated Through September 2016 RC-16-0059, License Amendment Request LAR 12-02439, Technical Specification Change Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2016-04-28028 April 2016 License Amendment Request LAR 12-02439, Technical Specification Change Request for TS 3.5.4 Refueling Water Storage Tank (RWST) RC-16-0043, License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System.2016-04-0707 April 2016 License Amendment Request Technical Specification 3/4.7.1.2, Emergency Feedwater System. RC-16-0035, (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B2016-03-0101 March 2016 (VCSNS) Unit 1 - Exigent License Amendment Request - LAR (16-00848) Technical Specification Change Request for the Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B RC-14-0086, Technical Specification Bases Revision Updated Through May 20142014-06-12012 June 2014 Technical Specification Bases Revision Updated Through May 2014 RC-13-0084, Technical Specification Bases Revision Updated Through June 20132013-07-17017 July 2013 Technical Specification Bases Revision Updated Through June 2013 RC-13-0037, Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years2013-04-0303 April 2013 Virgil C. Summer Nuclear Station, Unit 1, License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years ML13095A1092013-04-0303 April 2013 License Amendment Request - LAR (13-00705) Technical Specification Change to Extend Integrated Leak Rate Test Frequency to 15 Years ML12195A2372012-07-11011 July 2012 Technical Specification Bases Revision Updated Through June 2012 RC-11-0094, Technical Specification Bases Revision Updated Through June 20112011-08-31031 August 2011 Technical Specification Bases Revision Updated Through June 2011 ML1016500492010-06-0909 June 2010 Technical Specification Bases Revision Updated Through January 2009 2023-12-12
[Table view] |
Text
V.C. Summer Nuclear Station ~ Dominion Bradham Blvd & Hwy 215, Jenkinsville, SC 29065 Mailing Address: ~ Energy P.O. Bo x 88, Jen kinsville, SC 29065 Dominion En ergy.com December 15, 2021
Attn: Document Control Desk Serial No.21-392 U. S. Nuclear Regulatory Commission VCS-LIC/BAB RO Washington, DC 20555-0001 Docket No. 50-395 License No. NPF-12
DOMINION ENERGY SOUTH CAROLINA (DESC)
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 TECHNICAL SPECIFICATION BASES CHANGES UPDATED THROUGH NOVEMBER 2021
In accordance with Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Technical Specifications (TS) 6.8.4.i.4, Dominion Energy South Carolina (DESC), acting for itself and as agent for South Carolina Public Service Authority, submits changes to the TS Bases.
This update includes changes to the TS Bases since the previous submittal in December, 2020.
The enclosed changes were revised by License Amendment 218. Changes are annotated by vertical revision bars and the amendment number at the bottom of the affected TS Bases page.
Should you have any questions, please call Michael S. Moore at (803) 345 -4752.
Robin R. Haselden Director, Nuclear Station Safety and Licensing V.C. Summer Nuclear Station
Commitments contained in this letter: None
- Summary of TS Bases Changes Through November 2021 : Technical Specification Bases Changes Updated Through November 2021
cc: G. J. Lindamood - Santee Cooper L. Dudes - NRC Region II G.E. Miller - NRC Project Manager NRC Resident Inspector Serial No.21-392 Docket No. 50-395
Enclosure 1
Summary of TS Bases Changes Through November 2021
Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Dominion Energy South Carolina, Inc. (DESC)
Serial No.21-392 Docket No. 50-395 Enclosure 1 - Summary of TS Bases Changes: Page 1 of 1
SUMMARY
OF BASES CHANGES
License Amendment No. 218
Description of Change:
The term "barrier" as used in the TS 3.6.4 Action statements is described in the revised TS 3.6.4 Bases to be synonymous with either an isolation valve, blind flange, or a closed system that is associated with containment penetrations that conform to GDC 57 applications for closed system isolation valves. In addition to reflecting the proposed changes to the TS, the TS 3.6.4 Bases were revised for clarity and consistency.
Reason and Basis for Change:
The Technical Specification Bases for TS 3/4.6.4 Bases were revised with the issuance of License Amendment 218. License Amendment 218 revised the licensing basis action statements associated with TS Limiting Condition for Operation (LCO) 3.6.4, "Containment Isolation Valves". Specifically, the amendment replaced the term "valve" with the term "barrier" in the LCO Action statement and modified 3.6.4.b and c to specify the penetration "flow path" rather than "penetration." This would encompass all components providing the containment isolation function and to specify that the actions to address an inoperable containment isolation valve apply to the affected penetration flow path only rather than all flow paths associated with the penetration.
Serial No.21-392 Docket No. 50-395
Enclosure 2
Technical Specification Bases Changes Updated Through November 2021
Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Dominion Energy South Carolina, Inc. (DESC)
Serial No.21-392 Docket No. 50-395 Enclosure 2 - Technical Specification Bases Changes: Page 1 of 3
TECHNICAL SPECIFICATION BASES CHANGES UPDATED THROUGH NOVEMBER 2021
Amendment# Pages Affected 218 B3/4 6-5 CONTAINMENT SYSTEMS
BASES
opening of valves XVB-3107A(B)-SW, the air in the piping will act as a cushion to minimize any water hammer affects that could occur downstream of XVB-3107A(B)-SW.
The opening logic of valves XVB-3107 A(B)-SW has a delayed opening after valve 3106A(B)-SW begins to open. The delay allows fluid flow momentum to build to assure that additional void formation in the RBCU piping inside containment will not occur during swap over to the SW system.
To minimize the effects of the second water hammer scenario XVB-3107A(B)-SW, fast closing air operated butterfly valves, close in seven seconds upon de-energizing of the SWBPs. During times that the RBCUs are aligned with the SW system, if a LOOP were to occur, the fast valve closure will trap water in the high points above the valve and prevent void formation due to gravity drain down of the water to the SW pond. Interface logic is provided to equipment controls that tie the start of the respective SWBP to the closed position of the respective valve XVB-3107A(B)-SW. The controls prevent a SWBP start if the respective valve XVB-3107 A(B )-SW failed to fully close allowing drain down of the water to the SW Pond.
The accident analysis requires the service water booster pump to be passing 2,000 gpm to each selected RBCU within 86.5 seconds. This time encompasses the driving of all necessary service water valves to the correct positions, i.e., fully opened or fully closed. Reference Technical Specification Bases B 3/4.3.1 and B 3/4.3.2 for additional details.
3/4.6.3 PARTICULATE IODINE CLEANUP SYSTEM
The OPERABILITY of the containment filter trains ensures that sufficient iodine removal capability will be available in the event of a LOCA. The reduction in containment iodine inventory reduces the resulting site boundary radiation doses associated with containment leakage. The operation of this system and resultant iodine removal capacity are consistent with the assumptions used in the LOCA analyses.
3/4.6.4 CONTAINMENT ISOLATION VALVES
The containment isolation valves form part of the containment pressure boundary and provide a means for fluid penetration flow paths not serving accident consequence limiting systems to be provided with two isolation barriers that are closed on a containment isolation signal. These isolation barriers are either passive or active (automatic). Manual valves, de-activated automatic valves secured in their closed position, blind flanges, and closed systems are considered passive isolation barriers.
Automatic valves designed to close without operator action following an accident are considered active isolation barriers. Two barriers in series are provided for each penetration flow path so that no single credible failure or malfunction of an active component can result in a loss of isolation or leakage that exceeds limits assumed in the safety analyses. One of these barriers may be a closed system. An inoperable valve may be used to isolate the affected penetration flow path per TS 3.6.4.b/c if the valve is in the closed position (i.e. failed closed or stuck closed) and has power removed, if so equipped.
SUMMER - UNIT 1 B 3/4 6-5 Amendment No. 44Q, BRN 08 001, BRN 10 001 218 CONTAINMENT SYSTEMS
BASES
The OPERABILITY of the containment isolation valves ensures that the reactor building atmosphere will be isolated from the outside environment in the event of a release of radioactive material to the reactor building atmosphere or pressurization of the reactor building and is consistent with the requirements of GDC 54 through 57 of Appendix A to 10 CFR Part 50. Containment isolation within the time limits required by the safety analysis for those isolation valves designed to close automatically ensures that the release of radioactive material to the environment will be consistent with the assumptions used in the analyses for a LOCA.
The opening of locked or sealed closed containment isolation valves on an intermittent basis under administrative control includes the following considerations:
(1) stationing an operator, who is in constant communication with control room, at the valve controls, (2) instructing this operator to close these valves in an accident situation, and (3) assuring that environmental conditions will not preclude access to close the valves.
3/4.6.5 COMBUSTIBLE GAS CONTROL
The OPERABILITY of the equipment and systems required for the detection and control of hydrogen gas ensures that this equipment will be available to maintain the hydrogen concentration within the reactor building below its flammable limit during post LOCA conditions. Either recombiner unit (or the purge system) is capable of controlling the expected hydrogen generation associated with 1} zirconium-water reactions, 2} radiolytic decomposition of water, and 3} corrosion of metals within containment.
These hydrogen control systems are consistent with the recommendations of Regulatory Guide 1.7, "Control of Combustible Gas Concentrations in Containment Following a LOCA," March 1971.
The hydrogen mixing systems are provided to ensure adequate mixing of the containment atmosphere following a LOCA. This mixing action will prevent localized accumulations of hydrogen from exceeding the flammable limit.
SUMMER - UNIT 1 B 3/4 6-6 Amendment No. 44-0, BRN-08-001