Connecticut, Inc.'S Emergency Motion to Compel Answers to Interrogatories and Production of Documents
ML020650590
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/21/2002
From: Repka D
Dominion Nuclear Connecticut, Winston & Strawn
To:
Atomic Safety and Licensing Board Panel
Byrdsong A
References
50-423-LA-3, ASLBP 00-771-01-LA-R, RAS 3995
Download: ML020650590 (7)


Text

?A - 399*,6 February 21, 2002 UNITED STATES OF AME]RICA DOCKETED USNRC NUCLEAR REGULATORY COM[MISSION March 1, 2002 (2:40PM)

[CENSING BOARD BEFORE THE ATOMIC SAFETY AND LI OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF In the Matter of: ))

Docket No. 50-423-LA-3

)

Dominion Nuclear Connecticut, Inc. ) ASLBP No. 00-771-01-LA-R

)

(Millstone Nuclear Power Station, )

Unit No. 3)

DOMINION NUCLEAR CONNECTICUT, INC.'S EMERGENCY MOTION TO COMPEL ANSWERS TO INTERROGATORIES AND PRODUCTION OF DOCUMENTS In accordance with the schedule directed by the Atomic Safety and Licensing its First Set of Board ("Licensing Board"),' Dominion Nuclear Connecticut, Inc. ("DNC") served 2002.2 The Interrogatories and Document Request in the captioned proceeding on January 25, and a single discovery served on Intervenors consisted of nine narrowly crafted interrogatories document request (attached as Exh. 1). Intervenors were directed to answer the interrogatories, in writing and under oath, within 14 days of service.

To date, however, Intervenors have neither answered the interrogatories, objected deadline of to any of the discovery, nor moved for a protective order. In light of the imminent for See "Memorandum and Order (Telephone Conference Call, 10/31/01; Schedules Proceeding)," issued November 5, 2001.

2 Following customary procedures, the discovery requests were delivered by e-mail service as well as deposit in the United States mail.

-Thnp/a7 = cry- 0q,

March 18, 2002 for the parties to submit "a detailed written summary of all the facts, data and arguments which are known to the party at that time and on which the party proposes to rely at the oral argument," 3 DNC respectfully requests an order from the Licensing Board requiring Intervenors to answer the propounded interrogatories no later than March 1, 2002. DNC also 4

requests the Board to order the production of documents requested forthwith.

Clearly, Intervenors have defaulted in their discovery responsibilities in this proceeding. Though DNC has provided over 10,000 pages of requested documents and 5

otherwise fully complied with the Intervenors' discovery requests, the Intervenors have not responded in any fashion to DNC's single, narrowly focused set of discovery requests. These requests were electronically served on January 25, 2002 and, in accordance with 10 C.F.R.

§2.740b, a response should have been served by February 8, 2002. Even allowing five days for mailing pursuant to 10 C.F.R. §2.710, the Intervenors' response should have been received by February 13, 2002. Yet, as of this date, no response has been received by DNC.

The refusal of an intervenor "to answer even one" of the interrogatories propounded, as here, understandably invites "a cool reception." Pennsylvania Power & Light Co. (Susquehanna Steam Electric Station, Units 1 & 2), ALAB-613, 12 NRC 317, 334 (1980).

As one Licensing Board observed in an early proceeding, pre-trial discovery in modem 3 See "Notice of Filing Schedules and Oral Argument," issued February 4, 2002.

4 DNC's one document request simply asks for any document "that Intervenors expect to submit, reference, site, or otherwise rely upon in the written filing in this Subpart K proceeding."

Indeed, the Licensing Board will take note that DNC made only sparing objections to the discovery requested and the Intervenors have filed no motion to compel, implicitly acknowledging the sufficiency of those responses. Any motion to compel at this time would be long out of time.

in administrative and legal practice "is liberally granted to enable the parties to ascertain the facts hearing or complex litigation, refine the issues, and prepare adequately for a more expeditious trial." Pacific Gas & Electric Co. (Stanislaus Nuclear Project, Unit 1), LBP-78-20, 7 NRC 1038, 1040 (1978).

The Commission and its boards have reiterated from time to time that "an the element of important reason for allowing discovery is to eliminate, insofar as possible, actual trial, with its surprise in modem litigation. The underlying concept is to shorten the parties' ability to attendant expense and inconvenience for all concerned, while increasing the 12 NRC at 312 develop a complete record for decisional purposes." Susquehanna, ALAB-613, Island Nuclear

27. Or, as the Board summarized in Metropolitan Edison Co. (Three Mile Station, Unit No. 1), LBP-80-17, 11 NRC 893, 896 (1980): "Learning the position of an It is also an important adversary in litigation is a traditional and important aspect of discovery.

observed that element in developing a full evidentiary record." Similarly, the Board in Seabrook the dual purposes of

"[i]nterrogatories which inquire into the bases of a contention serve Co. of New Hampshire narrowing the issues and preventing surprise at trial." Public Service (Seabrook Station, Units 1 & 2), LBP-83-17, 17 NRC 490, 493-94 (1983).

an NRC These significant discovery obligations fall equally on all parties to discovery) information on proceeding. "The obligation every litigant faces to provide (through evaded." Long Island matters in controversy is a responsibility that can neither be ignored or 28 NRC 311, 364 Lighting Co. (Shoreham Nuclear Power Station, Unit 1), LBP-88-24, on the existence of (1988)(emphasis added). Hence, "to obtain evidence or secure information then a privilege and evidence and to provide opposing parties the same option is interchangeably Consistent with duty of each Applicant and Intervenor in NRC administrative proceedings." Id.

a party's discovery obligations, the Commission long ago admonished:

Fairness to all involved in NRC's adjudicatory procedures requires that every participant fulfill the obligations imposed by and in accordance with applicable law and commission regulations.

While a board should endeavor to conduct the proceeding in a manner that takes account of the special circumstances faced by any participant, the fact that a party may have personal or other obligations or possesses fewer resources than others to devote to the proceeding does not relieve that party of its hearing obligations. When a participant fails to meet its obligations, a board should consider the imposition of sanctions against the offending party.

13 NRC 452, 454 (1981).

Statement of Policy on Conduct of Licensing Proceedings, CLI-81-8, perhaps more importantly - its Moreover, here, as in many cases, "this Intervenor and -

ALAB-613, 12 NRC at representatives are not strangers to NRC proceedings." Susquahanna, 335.

delay a Not only does the failure to fulfill discovery obligations unnecessarily Edison Co. (Byron proceeding, "it is also manifestly unfair to the other parties." Commonwealth 1417 (1982). This is so Nuclear Power Station, Units 1 & 2), ALAB-678, 15 NRC 1400, because:

The Applicants in particular carry an unrelieved burden of proof in commission proceedings. Unless they can effectively inquire into the positions of the Intervenors, discharging that burden may be keep impossible. To allow a party to make skeletal contentions, the bases for them secret, then require its adversaries to meet any conceivable thrust at hearing would be patently unfair, and inconsistent with a sound record.

5 NRC 1298, 1300-01 Northern States Power Co. (Tyrone Energy Park, Unit 1), LBP-77-37, are basic to an (1977). Where the unanswered interrogatories "concern matters which the failure to answer is understanding of the [Intervenors'] positions on their contentions,"

particularly egregious. Kerr-McGee Chemical Corp. (West Chicago Rare Earths Facility), LBP 86-4, 23 NRC 75, 79 (1986). As a result, unless the Intervenors are ordered to provide the requested discovery immediately, with the oral argument only a few weeks away, DNC "would be "penalized by [the Intervenors'] wrongful conduct." Tyrone, LBP-77-37, 5 NRC at 1420.

This is particularly true in a Subpart K proceeding such as this one with simultaneous filing by the parties of position statements.

In this instance, Intervenors have completely defaulted in their discovery obligations and, in the process, have unfairly prejudiced DNC's ability to participate effectively in this oral Subpart K proceeding. To vindicate its right to prompt and timely discovery answers, DNC therefore respectfully requests that this motion be given emergency consideration and that the relief requested herein be granted forthwith.

Respectfully submitted, David A. Repka Robert M. Rader WINSTON & STRAWN 1400 L Street, NW Washington, D.C. 20005-3502 Lillian M. Cuoco DOMINION NUCLEAR CONNECTICUT, INC.

Millstone Power Station Building 475/5 Rope Ferry Road (Route 156)

Waterford, CT 06385 Counsel for DOMINION NUCLEAR CONNECTICUT, INC.

Dated in Washington, D.C.

this 21st day of February 2002 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: ))

) Docket No. 50-423-LA-3 Dominion Nuclear Connecticut, Inc.

)

) ASLBP No. 00-771-01-LA-R (Millstone Nuclear Power Station, Unit No. 3)

)

CERTIFICATE OF SERVICE I hereby certify that copies of "Dominion Nuclear Connecticut, Inc.'s Emergency Motion to Compel Answers to Interrogatories and Production of Documents" in the captioned proceeding have been served on the following by deposit in the United States mail, first class, this 2l1t day of February 2002. Additional e-mail service has been made this same day as shown below.

Charles Bechhoefer, Chairman Dr. Richard F. Cole Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 (e-mail: cxb2@nrc.gov) (e-mail: rfcl @nrc.gov)

Dr. Charles N. Kelber Office of the Secretary Administrative Judge U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Washington, DC 20555 U.S. Nuclear Regulatory Commission Attn: Rulemakings and Adjudications Staff Washington, DC 20555-0001 (original + two copies)

(e-mail: cnk@nrc.gov) (e-mail: HEARINGDOCKET@nrc.gov)

Office of Commission Appellate Adjudicatory File Adjudication Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555

Ann P. Hodgdon, Esq. Nancy Burton, Esq.

Office of the General Counsel 147 Cross Highway U.S. Nuclear Regulatory Commission Redding Ridge, CT 06876 Washington, DC 20555 (e-mail: nancyburtonesq@hotmail.com)

(e-mail: aph@nrc.gov)

Diane Curran Harmon, Curran, Spielberg & Eisenberg, L.L.P.

1726 M Street, N.W.

Suite 600 Washington, DC 20036 (e-mail: dcurran@harmoncurran.com)

David A. Repka Counsel for DNC, Inc.

248168.1