Text
Lewis Sumner Southern Nuclear Vice President Operating Company, Inc.
Hatch Project Support 40 Inverness Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7279 Fax 205.992.0341 SOUTHERN COMPANY Energy to Serve Your World '
February 8, 2002 Docket Nos. 50-321 50-366 HL-6180 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Edwin I. Hatch Nuclear Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the January 2002 Monthly Operating Reports for Edwin I. Hatch Nuclear Plant Unit 1, Docket No. 50-321, and Unit 2, Docket No. 50-366. These reports are submitted in accordance with Technical Specifications 5.6.4.
Respectfully submitted, H. L. Sumner, Jr.
IFL/eb
Enclosures:
- 1. January Monthly Operating Report for Plant Hatch Unit 1
- 2. January Monthly Operating Report for Plant Hatch Unit 2 cc: Southern Nuclear Operating Company Mr. P. H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)
U. S. Nuclear Regulatory Commission, Washington D. C.
Mr. L. N. Olshan, Project Manager - Hatch U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident Inspector - Hatch Utility Data Institute, Inc.
Ms. Barbara Lewis - McGraw-Hill Companies
Enclosure 1 Plant Hatch Unit 1 Monthly Operating Report January 2002 Table of Contents Page El-i Operating Data Report El-2 Unit Shutdowns and Power Reductions
OPERATING DATA REPORT Docket No.: 50-321 Unit Name: E. I. Hatch Unit 1 Date: February 1, 2002 Completed By: R. M. Beard Telephone: (912) 367-7781 x2878 Operating Status
- 1. Reporting Period: JANUARY 2002
- 2. Design Electrical Rating (Net MWe): 870
- 3. Maximum Dependable Capacity (Net MWe): 856 Design Electrical Rating for 2002 is 870 MWe (Net).
The value was determined by Southern Company Services based upon data obtained during tests performed after completing Extended Power Uprate modifications.
Maximum Dependable Capacity for 2002 is 856 MWe (Net).
The value was determined by Southern Company Services from 2001 operational data.
This Month Year To Date Cumulative
- 4. Number of Hours Reactor Was Critical: 744.0 744.0 183,258.4
- 5. Hours Generator On Line: 744.0 744.0 177,437.6 0.0 0.0 0.0
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated: 647,404 647,404 128,551,541 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Date [ Tag No. IEvent Description No challenges this month.
El-1
UNIT SHUTDOWNS Docket No.: 50-321 Unit Name: E. I. Hatch Unit 1 Date: February 1, 2002 Completed By: R. M. Beard Telephone: (912) 367-7781 x2878 Reporting Period: JANUARY 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments No unit shutdowns occurred this month.
(1) Reason: (2) METHOD A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS:
NARRATIVE REPORT Unit 1 operated at rated thermal power for most of the month of January. The only exception was when Shift reduced load to approximately 880 GMWe (-2705 CMWT) on 1/12/02 to perform turbine stop valve testing. The unit was returned to rated thermal power later the same day.
El -2
Enclosure 2 Plant Hatch Unit 2 Monthly Operating Report January 2002 Table of Contents Page Operating Data Report E2-1 Unit Shutdowns and Power Reductions E2-2
OPERATING DATA REPORT Docket No.: 50-366 Unit Name: E. I. Hatch Unit 2 Date: February 1, 2002 Completed By: R. M. Beard Telephone: (912) 367-7781 x2878 Operating Status
- 1. Reporting Period: JANUARY 2002
- 2. Design Electrical Rating (Net MWe): 894
- 3. Maximum Dependable Capacity (Net MWe): 870 Design Electrical Rating for 2002 is 894 MWe (Net).
The value was determined by Southern Company Services based upon data obtained during tests performed after completing Extended Power Uprate modifications.
Maximum Dependable Capacity for 2002 is 870 MWe (Net).
The value was determined by Southern Company Services from 2001 operational data.
This Month Year To Date Cumulative
- 4. Number of Hours Reactor Was Critical: 548.6 548.6 158,651.2
- 5. Hours Generator On Line: 528.8 528.8 154,303.9
- 6. Unit Reserve Shutdown Hours: 0.0 0.0 0.0
- 7. Net Electrical Energy Generated: 448,598 448,598 113,643,214 CHALLENGES TO MAIN STEAM SAFETY / RELIEF VALVES Date Tag No. I Event Description No challenges this month.
E2-1
UNIT SHUTDOWNS Docket No.: 50-366 Unit Name: E. I. Hatch Unit 2 Date: February 1, 2002 Completed By: R. M. Beard Telephone: (912) 367-7781 x2878 Reporting Period: JANUARY 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No. Date S: Scheduled (Hours) Reason (1) Down (2) Comments01-003 011225 F 215.2 A 4 Activities associated with the December 2001 forced outage continued. The outage resulted from failure of the "B" Outboard Main Steam Isolation Valve (LER 2-01-003) and was extended to repair the "B" 4th Stage Feedwater Heater Bypass Valve.
Repairs were made to both valves and the unit was returned to power operation.
(1) Reason: (2) METHOD A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip/Scram C-Refueling 3-Automatic Trip/Scram D-Regulatory Restriction 4-Continuation E-Operator Training/License Examination 5-Other (Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
CAUSE/CORRECTIVE ACTION/COMMENTS:
NARRATIVE REPORT Unit 2 began the month of January in a forced outage, (see description of event 01-003 above for details).
Shift began withdrawing control rods for unit startup and brought the reactor critical on 1/9/02. Shift tied the main generator to the grid and began power ascension to rated thermal power later on 1/9/02. The unit attained rated thermal power on 1/11/02. Shift reduced load to approximately 715 GMWe (-2170 CMWT) later that day to perform a rod pattern adjustment. The unit was returned to rated thermal power on 1/12/02.
Shift reduced load to approximately 830 GMWe (-2500 CMWT) on 1/28/02 to remove the "B" Condensate Booster Pump from service to repair an oil leak on the pump motor. Shift increased unit load to approximately 895 GMWe (-2680 CMWT) later on 1/28/02 and continued operation at that power level while repairs were being made on the "B" Condensate Booster Pump. Shift returned the "B" Condensate Booster Pump to service on 1/29/02 and ascended to rated thermal power the same day. Shift maintained unit operation at rated thermal power for the remainder of the month.
E2-2